AU2006233182A1 - Luffing jib crane erection process and system - Google Patents

Luffing jib crane erection process and system Download PDF

Info

Publication number
AU2006233182A1
AU2006233182A1 AU2006233182A AU2006233182A AU2006233182A1 AU 2006233182 A1 AU2006233182 A1 AU 2006233182A1 AU 2006233182 A AU2006233182 A AU 2006233182A AU 2006233182 A AU2006233182 A AU 2006233182A AU 2006233182 A1 AU2006233182 A1 AU 2006233182A1
Authority
AU
Australia
Prior art keywords
jib
cable
auxiliary
hoist
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2006233182A
Other versions
AU2006233182B2 (en
Inventor
Michel Lissandre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manitowoc Crane Group France SAS
Original Assignee
Potain SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potain SA filed Critical Potain SA
Publication of AU2006233182A1 publication Critical patent/AU2006233182A1/en
Assigned to MANITOWOC CRANE GROUP FRANCE reassignment MANITOWOC CRANE GROUP FRANCE Alteration of Name(s) of Applicant(s) under S113 Assignors: POTAIN
Application granted granted Critical
Publication of AU2006233182B2 publication Critical patent/AU2006233182B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Description

P001 Section 29 Regulation 3.2(2)
AUSTRALIA
Patents Act 1990 COMPLETE SPECIFICATION STANDARD PATENT Application Number: Lodged: Invention Title: Luffing jib crane erection process and system The following statement is a full description of this invention, including the best method of performing it known to us:
IO
The present invention concerns, in general, luffing jib cranes of the type comprising a fixed or 0 mobile supporting structure, in particular a vertical tower, surmounted by a rotating part, which can be swivelled around a vertical axis made up of a rotating pivot, a luffing jib directed forwards and articulated 00 at its rear end around a horizontal shaft on the C rotating pivot, a jib gantry extending obliquely C- 10 upwards and rearwards from the rotating pivot and an I essentially horozontal counter-jib directed rearwards Sand connected via its front end to the rotating pivot, the counter-jib carrying mechanisms of the crane and, a jib lifting system being provided, the latter comprising a jib lifting hoist belonging to the said mechanisms, a jib lifting cable passing over the top end of the jib gantry and through a jib lifting block connected by at least one lifting tie bar to the front part of the jib, the aforementioned mechanisms also comprising a load lifting hoist with a load lifting cable.
More specifically, this invention concerns erection of the rotating part of such a luffing jib crane and, even more especially, mounting of the components of the jib lifting system and, consequently, the mechanisms which equip the counter-jib, and thus the final erection operations, which make the crane operational.
A luffing jib crane of the type concerned here is described, for example, in the French patent application FR 2641773 A in the name of the Applicant or in the corresponding European patent EP 0379448 A.
To undertake erection of such a luffing jib crane at a place of usage and, in particular, on a construction site, the procedure first involves assembling the main structure of the crane, comprising the base frame, the tower, the counter-jib and the jib cantrv, these operations being performed using an au:xiliarv lifting machine, whi.ch is usually a lorry- 2 mounted hydraulic crane. The jib is then erected, Swhilst being temporarily retained by at least one temporary sling connecting it to the top of the jib 0 gantry. Erection is then completed by the following operations: fitting of a temporary jib-retaining sling or c, temporary jib-retaining slings, 00 installation of the jib lifting cable in the jib Clifting block, C- 10 mounting of the final line of tie bars to be Sconnected to the jib lifting block and to the jib Slifting cable, removal of the temporary sling or temporary slings, passing of the load lifting cable over the corresponding pulleys.
Furthermore, servicing and maintenance of the mechanisms equipping the counter-jib should be ensured on the platform intended for receiving them.
These manual operations are usually performed using the load lifting hoist of the crane, already in place, and which can lift very high loads. This hoist is therefore fitted with a large-diameter load lifting cable, typically a cable with a diameter of the order of 18 millimetres, which is therefore a heavy cable and is difficult to handle. The final operations for erecting a luffing jib crane therefore remain, for the operator, long and arduous operations, which entail accident risks.
The present invention is intended to avoid the previously described disadvantages and its aim is therefore to simplify the mounting of additional elements of the rotating part of a luffing jib crane of the type concerned, in particular mounting of the jib lifting block and of the jib lifting cable, of the temporary jib retaining sling or slings and of the line of tie bars, such that the erection time is reduced and che work of the operator is facilitated, whilsc limiting the risks of an accident.
3 IND For this purpose, the subject of the invention is O essentially a process for erecting a luffing jib crane c_ of the type described in the introduction, a process o O according to which an auxiliary hoist, in particular a hoist carried by the rotating part of the crane, is used, this hoist being fitted with an auxiliary cable with a diameter significantly smaller than that of the 0 load and jib lifting cables, to perform an operation of cabling the jib lifting block with the jib lifting 1 0 cable and/or to undertake fitting of at least one IND temporary sling intended for temporarily retaining the jib and/or to perform an operation of mounting the line of tie bars.
According to the method of implementing the invention process, the operation of cabling the jib lifting block comprises, after having pre-cabled in the workshop the jib lifting block with the auxiliary cable with a diameter significantly smaller than that of the jib lifting cable, connecting one end of the auxiliary cable to the jib lifting cable wound onto the drum of the jib lifting hoist, connecting the other end of the auxiliary cable to the auxiliary hoist and actuating simultaneously the jib lifting hoist and the auxiliary hoist such that the jib lifting cable is unwound and engaged in the jib lifting block, whilst the auxiliary cable is rewound onto the auxiliary hoist.
According to another method of implementing the invention process, the operation of fitting at least one temporary sling for retaining the jib comprises, for each temporary sling, storing a first sling element along the jib gantry and a second sling element, prolonging the first, along the jib, the front end of the second sling element being attached to the front part of the jib, attaching the top end of the first sling element to the cable of the auxiliary hoist, actuating this auxiliary hoist in the winding direction of its cable to tension the temporary sling and attaching the top end of the first sling element to the top of the jib gantry.
4
\O
O In the case in which two temporary slings are CI provided, the elements of these slings are O advantageously stored on both sides of the jib gantry O and of the jib respectively, and fitting of the first 5 temporary sling, then fitting of the second temporary sling is successively undertaken using the auxiliary C-i hoist and its cable.
00 According to yet another method of implementing the invention process, the operation of mounting the CI 10 line of tie bars comprises, after passing the cable of
\O
the auxiliary hoist over a return pulley located CN- towards the front of the jib, anchoring the end of the auxiliary cable on the jib lifting block, the rear end of the line of tie bars being also attached to the jib lifting block, actuating the auxiliary hoist in the winding direction of its cable and actuating the jib lifting hoist in the unwinding direction of its cable to pull the jib lifting block forwards and to connect finally the front end of the line of tie bars to the front part of the jib.
The auxiliary hoist can also be used, in combination with a bracket carried by the mechanism platform, itself carried by the counter-jib, for servicing or maintaining the mechanisms carried by this counter-jib, the cable of the auxiliary hoist then being directed towards the bracket and guided along this bracket.
The subject of the invention is also an erection system for a luffing jib crane intended for implementing the process defined hereinabove, this system comprising essentially an auxiliary hoist carried by the rotating part of the crane, this auxiliary hoist being fitted with an auxiliary cable with a diameter significantly smaller than that of the load and the jib lifting cables. In particular, the auxiliary hoist can be mounted at the base of the jib gantry of the crane.
The system comprises advantageously again, on thne rotating par- of the crane, means of guiding the 5 IND auxiliary cable, in particular pulleys, suitable for O the operations performed using the auxiliary hoist and c_ detailed hereinabove.
o Finally, the subject of the invention is also a luffing jib crane, which is equipped with an erection system with an auxiliary hoist such as the one previously defined.
C
Overall, the invention thereby facilitates crane erection operations through using an auxiliary hoist, m 10 whose cable is thinner and therefore easier to handle \C than the load and jib lifting cables, the same Sauxiliary hoist being used during several erection operations performed successively.
The invention will be better understood by means of the following description, referring to the appended schematic drawing illustrating, as an example, a method of implementing this erection process for a luffing jib crane.
Figure 1 is a general side view of a luffing jib tower crane likely to be erected by the process according to the invention.
Figure 2 is a diagram illustrating the operation of cabling the jib lifting block of such a crane.
Figure 3 is a diagram illustrating, in its successive phases, the operation of fitting temporary slings for retaining the jib.
Figure 4 is a diagram illustrating the operation of mounting the line of tie bars.
Figure 5 is a last diagram illustrating the operation of servicing the mechanisms equipping the counter-j ib.
The luffing jib crane represented in Figure 1 is here a tower crane, which comprises in a known way a base frame 2, fixed or moving on the ground, above which rises a vertical tower 3. Mounted at the top of the tower 3 through a swivelling system is a rotating part 4 comprising mainly a rotating pivot 5, a jib gantrv 6, a counter-jib 7, a mechanism platform 8 and a luffing jib 9.
6
\O
The rotating pivot 5 can be swivelled around the Cq vertical axis A of the tower 3. It supports an operating cab 10 of the crane.
O The jib gantry 6, also called a "stay" is solidly fixed to the rotating pivot 5 and extends from the latter upwards and obliquely with a rearward inclination.
00 The counter-jib 7 extends essentially horizontally C(f to the rear from the rotating pivot 5. It carries the C- 10 mechanism platform 8 and counterweights 11. This Scounter-jib 7 is suspended from the rear part of the Sjib gantry 6 by means of connecting tie bars 12.
On the mechanism platform 8, also visible in Figure 5, are mounted various equipment units, which include in particular a lifting hoist 13 for the jib 9 and a lifting hoist 14 for loads.
The luffing jib 9, composed of a lattice structure, for example of triangular cross section, has a rear end articulated around a horizontal shaft 15 on the rotating pivot The jib lifting hoist 13 has a drum around which is wound a jib lifting cable 16, which passes over pulleys 17 mounted at the top of the jib gantry 6 and which also passes over the pulleys in a jib lifting block 18, located in front of the jib gantry 6. The jib lifting block 18 is connected to the front part or "tip" of the luffing jib 9 by a line of tie bars 19.
The load lifting hoist 14 has a drum, onto which is wound a load lifting cable 20, which passes over pulleys mounted on the jib gantry 6, is then directed towards the tip of the luffing jib 9 and extends as far as a lifting hook 21, with or without a lifting block, the loads to be lifted being suspended from the hook 21, when the crane is used.
The luffing jib crane having therefore been described in its fully erected configuration, additional equipment units allowing erection of this crane are now described.
\O
I These equipment units comprise in particular an Sauxiliary hoist 22 mounted at the base and on one of tthe sides of the jib gantry 6. The auxiliary hoist 22 O has a drum, onto which can be wound an auxiliary cable 23 with a diameter significantly smaller than the diameter of the jib lifting cable 16 and the diameter of the load lifting cable 20. For example, if the 00 normal diameter of the jib lifting cable 16 and the Sload lifting cable 20 is of the order of 18 C, 10 millimetres, the diameter of the auxiliary cable 23 can
I
N
D be of the order of 9 millimetres.
The equipment units in question comprise additionally two temporary slings 24, which are visible in Figure 3, for retaining the jib 9. Each of these two temporary slings 24 comprises a first sling element which can be stored along the jib gantry 6, and a second sling element 26, which can be stored along the jib 9 (see basic position I shown in Figure The two sling elements 25 and 26 are mutually articulated at one point 27 and the second sling element 26 is articulated at a point 28 on the front part of the jib 9. One of the temporary slings 24 formed thereby is stored on the right side of the jib gantry 6 and of the jib 9, whilst the other temporary sling 24 is symmetrically stored on the left side of the jib gantry 6 and of the jib 9.
Finally, the erection equipment units comprise, as shown in particular in Figure 5, a bracket 29 carried by the mechanism platform 8, which can be used with one of the hoists as detailed hereunder.
The operating procedure using the previously described erection equipment units is as follows.
Firstly, the jib lifting block 18 has been precabled in the workshop with a small-diameter, for example of the order of 9 millimetres, temporary cable, which is the auxiliary cable 23 initially separated from the auxiliary hoist 22. The procedure continues, as illustrated in Figure 2, with final cabling of che jib lifting block IS. For zhis purpose, the jib lifting 8
\O
N block 18 being retained at the top of the jib gantry 6, Sone end of the auxiliary cable 23 is connected to the larger jib lifting cable 16 with, for example, a o O diameter of the order of 18 millimetres, which is wound onto the drum of the jib lifting hoist 13. The other end of the auxiliary cable 23 is attached to the drum of the auxiliary hoist 22. The simultaneous electrical 00 control of the two hoists 13 and 22 is then actuated Ssuch that the auxiliary cable 23 winds onto the drum of the auxiliary hoist 22, whilst the jib lifting cable 16 IND unwinds from the drum of the jib lifting hoist 13. The auxiliary cable 23 therefore pulls the jib lifting cable 16 drawing it through the jib lifting block 18 and onto the pulleys of this lifting block 18, where it takes the place of the temporarily installed auxiliary cable 23. Finally, the auxiliary cable 23 is separated from the jib lifting cable 16, which makes this auxiliary cable 23 available for the following operations.
The procedure then continues with the fitting of two temporary slings 24 for retaining the jib, as illustrated in Figure 3, starting from the basic position I, in which the sling elements 25 and 26 are stored on each side of and along the jib gantry 6 and the jib 9 respectively.
On a first side, the cable 23 of the auxiliary hoist 22 is first attached by pinning to the top end 31 of the first sling element 25, whilst the front end of the second sling element 26 had already been attached by pinning at 28 to the front part of the jib 9. Only the auxiliary hoist 22 is then actuated in the winding direction of its cable 23, which passes over a pulley 32 at the top of the jib gantry 6, to tension gradually the sling 24 by passing through intermediate positions such as the one shown in II. The sling 24 is therefore tensioned, being pulled upwards, until the too end 31 of its first element 25 can be attached by pinning to the top of the jib gantry 6 (position III) 9-
NO
After the first sling element 25 has thereby been attached to the top of the jib gantry 6, it is separated from the auxiliary cable 23 and the same 0 operation is repeated on the other side of the crane to fit the second temporary sling 24. The two temporary slings 24, thereby fitted, ensure that the jib 9 is temporarily retained whilst awaiting the next 00 operation, which comprises installation of the line of Ctie bars 19.
1 0 Mounting of the tie bars 19 is illustrated by
N
O Figure 4. During this phase, the cable 23 of the 0auxiliary hoist 22 passes over a return pulley 33 located towards the front of the jib 9 and the end 34 of this auxiliary cable 23 is anchored to the jib lifting block 18, which is initially close to the top of the jib gantry 6. The rear end 35 of the line of tie bars 19 is attached to the jib lifting block 18, whilst its front end is still free. The procedure then continues with actuating of the control of the auxiliary hoist 22 in the winding direction of its cable 23, whilst the jib lifting hoist 13 is actuated in the unwinding direction of its cable 16. The jib lifting block 18 is thereby pulled forwards by the auxiliary cable 23, which moves it away from the jib gantry 6 and allows finally the front end of the line of tie bars 19 to be connected to the front part of the jib 9, as suggested at 30 on Figure 4. The front part of the jib 9 will therefore find itself connected to the jib lifting block 18 through the line of tie bars 19.
It then becomes possible to remove the two temporary slings 24, which till now have been retaining temporarily the jib 9.
Finally, the procedure may continue, as illustrated in Figure 5, with servicing of the mechanisms carried by the counter-jib 7 using the bracket 29 carried by the platform 8. For this puroose, the bracket 29 is used in combination w.;ith the auxiiarv hoist 22 and with its relatively small 10 ND diameter cable 23. More specifically, the auxiliary O cable 23, unwinding from the drum of the hoist 22, is first directed rearwards to the foot of the bracket 29
O
O and it then extends along the column and arm of this bracket 29 with suitable guidance and returning ensured by pulleys 36, 37 and 38. The auxiliary cable 23 can therefore be used for example, as illustrated in Figure 00 5, for dismantling a hoist such as the load lifting hoist 14.
The scope of the invention, as defined in the IND appended patent claims, would not be moved away from by altering the position of the auxiliary hoist on the rotating part of the crane or by using cables with diameters other than those indicated or by using a single temporary sling instead of two or, again, by changing the order of certain crane erection operations.

Claims (8)

  1. 2. Process according to Claim 1, characterized in thac the operation of cabling the jib lifting block (1S) comprises, after having pre-cabled in the vwokshoo 12 the jib lifting block (18) with the auxiliary cable -i (23) with a diameter significantly smaller than that of the jib lifting cable connecting one end of the 0 auxiliary cable (23) to the jib lifting cable (16) wound onto the drum of the jib lifting hoist (13), connecting the other end of the auxiliary cable (23) to the auxiliary hoist (22) and actuating simultaneously 00 the jib lifting hoist (13) and the auxiliary hoist (22) Csuch that the jib lifting cable (16) is unwound and C-i 10 engaged in the jib lifting block whilst the IN auxiliary cable (23) is rewound onto the auxiliary hoist (22).
  2. 3. Process according to Claim 1 or 2, characterized in that the operation of fitting at least one temporary sling (24) for retaining the jib comprises, for each temporary sling storing a first sling element (25) along the jib gantry and a second sling element prolonging the first, along the jib the front end of the second sling element being attached (28) to the front part of the jib attaching the top end (31) of the first sling element to the cable (23) of the auxiliary hoist (22), actuating this auxiliary hoist (22) in the winding direction of its cable (23) to tension the temporary sling (24) and attaching the top end (31) of the first sling element (25) to the top of the jib gantry
  3. 4. Process according to Claim 3, characterized in that, in the case of two temporary slings the elements (25, 26) of these slings are stored on both sides of the jib gantry and of the jib (9) respectively, and in that fitting of the first temporary sling then fitting of the second temporary sling (24) is successively undertaken using the auxiliary hoist (22) and its cable (23). Process according to one of Claims i to i, characterized in that the ooeration of mounting :he 13 IN line of tie bars (19) comprises, after passing the O cable (23) of the auxiliary hoist (22) over a return c_ pulley (33) located towards the front of the jib O anchoring the end (34) of the auxiliary cable (23) on the jib lifting block the rear end (35) of the line of tie bars (19) being also attached to the jib lifting block actuating the auxiliary hoist (22) 00 in the winding direction of its cable (23) and actuating the jib lifting hoist (13) in the unwinding direction of its cable (16) to pull the jib lifting IND block (18) forwards and to connect finally the front end (35) of the line of tie bars (19) to the front part of the jib
  4. 6. Process according to one of Claims 1 to characterized in that the auxiliary hoist (22) is also used, in combination with a bracket (29) carried by the mechanism platform itself carried by the counter- jib for servicing or maintaining the mechanisms carried by this counter-jib the cable (23) of the auxiliary hoist (22) then being directed towards the bracket (29) and guided (36, 37, 38) along this bracket (29).
  5. 7. Erection system for a luffing jib crane, for implementing the process according to one of Claims 1 to 6, characterized in that it comprises an auxiliary hoist (22) carried by the rotating part of the crane, this auxiliary hoist (22) being fitted with an auxiliary cable (23) with a diameter significantly smaller than that of the load (20) and jib (16) lifting cables.
  6. 8. System according to Claim 7, characterized in that the auxiliary hoist (22) is mounted at the base of the jib gantry of the crane.
  7. 9. System according to Claim 7 or 8, characterized in that it comprises, on che rotatinrg part 1) Of the 14 IN crane, means of guiding the auxiliary cable in particular pulleys (32, 33), suitable for the c- operations performed using the auxiliary hoist (23). 0
  8. 10. Luffing jib crane, characterized in that it is equipped with an erection system with the auxiliary hoist (22) according to one of Claims 7 to 9. 00 N CsD 0q
AU2006233182A 2005-10-26 2006-10-24 Luffing jib crane erection process and system Ceased AU2006233182B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0510954A FR2892405B1 (en) 2005-10-26 2005-10-26 METHOD AND DEVICE FOR MOUNTING A CRANE WITH AN ADJUSTABLE ARROW
FR05.10954 2005-10-26

Publications (2)

Publication Number Publication Date
AU2006233182A1 true AU2006233182A1 (en) 2007-05-10
AU2006233182B2 AU2006233182B2 (en) 2011-08-04

Family

ID=36628343

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2006233182A Ceased AU2006233182B2 (en) 2005-10-26 2006-10-24 Luffing jib crane erection process and system

Country Status (8)

Country Link
EP (1) EP1780165B1 (en)
KR (1) KR101330716B1 (en)
CN (1) CN1955102B (en)
AU (1) AU2006233182B2 (en)
DE (1) DE602006013385D1 (en)
ES (1) ES2342969T3 (en)
FR (1) FR2892405B1 (en)
MY (1) MY141399A (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007019747B4 (en) 2007-04-20 2009-02-05 Wilbert Turmkrane Gmbh Luffing crane with transport bracket for roller blocks
DE102009020338B4 (en) * 2009-05-07 2011-07-21 Manitowoc Crane Group France Sas Telescopic crane with self-assembling guying fixture and mounting method for a guying fixture
CN101792091B (en) * 2010-03-12 2012-07-11 广州文冲船厂有限责任公司 Moment hoisting method for three connecting rods of gantry crane
ES2371710B1 (en) * 2010-03-29 2012-09-18 Linden Comansa, S.L. PERFECTION IN FOLDING CRANES.
DE102010020016B4 (en) * 2010-05-10 2021-04-29 Liebherr-Werk Ehingen Gmbh Crane and method of erecting the crane
DE102012019248A1 (en) * 2012-09-28 2014-04-03 Liebherr-Werk Biberach Gmbh Tower Crane
CN102992213A (en) * 2012-12-20 2013-03-27 中联重科股份有限公司 Steel wire rope winding device and tower crane
CN103663189B (en) * 2014-01-02 2015-06-17 中联重科股份有限公司 Moving arm tower crane installation method
CN104340907A (en) * 2014-10-31 2015-02-11 徐州重型机械有限公司 Hoisting and winching control device capable of preventing rope from messing and control method
FR3071489A1 (en) 2017-09-28 2019-03-29 Manitowoc Crane Group France METHOD FOR SECURING A CRANE ARROW CRANE AND ASSOCIATED CRANE
BE1026086B1 (en) * 2018-07-27 2019-10-04 DEME Offshore Holding N.V. Lifting block for a crane

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8709267U1 (en) * 1987-07-04 1987-08-20 Man Ghh Logistics Gmbh, 74076 Heilbronn Tower tip of a rotating construction crane designed as a transport and assembly unit
CN2032611U (en) * 1987-10-15 1989-02-15 中国建筑科学研究院建筑机械化研究所 Folding type fast erecting tower crane
FR2641773B1 (en) 1989-01-18 1991-03-15 Potain Sa LIFT BOOM CRANE WITH BOOM RETURN DEVICE
JPH0912272A (en) * 1995-06-26 1997-01-14 Kyushu Koatsu Concrete Kogyo Kk Tower crane assembling method and towing device to be used for it

Also Published As

Publication number Publication date
AU2006233182B2 (en) 2011-08-04
FR2892405B1 (en) 2007-12-07
EP1780165A1 (en) 2007-05-02
EP1780165B1 (en) 2010-04-07
MY141399A (en) 2010-04-30
FR2892405A1 (en) 2007-04-27
ES2342969T3 (en) 2010-07-20
CN1955102A (en) 2007-05-02
KR101330716B1 (en) 2013-11-26
CN1955102B (en) 2010-07-21
DE602006013385D1 (en) 2010-05-20
KR20070045098A (en) 2007-05-02

Similar Documents

Publication Publication Date Title
AU2006233182B2 (en) Luffing jib crane erection process and system
RU2542828C2 (en) Method for assembling, dismantling and transportation of mobile crane
RU2514561C2 (en) Self-propelled hoisting crane and method of its disassembly, transportation and adjustment
JP6002248B2 (en) Weight lifting device and method
US20190276277A1 (en) Elevator system and method for constructing such an elevator system
CN101687618B (en) Auxiliary device for installing the lower and upper jib support of an adjustable auxiliary boom on a mobile crane
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN115744676B (en) Lifting equipment and lifting arm method
WO2014163490A1 (en) Crane with connector for erecting a structure
CN110777667A (en) Hoisting method for preventing deformation of steel pipe arch
US20100176078A1 (en) Auxiliary Device for Installing the Lower and Upper Jib Support of an Adjustable Auxiliary Boom on a Mobile Crane
JP2855014B2 (en) Disassembled jib crane
CN105883645B (en) The method for dismounting of tower crane attachment device
CN205998901U (en) Tower crane and its gin-pole truck being used
JPH0761773A (en) Jib crane
CN106081913B (en) Gin-pole truck control method
JPH0352791Y2 (en)
CA2919767C (en) Luffing cross member
CN220745114U (en) Hoisting device for concrete pipe pile
CN217126736U (en) A gin pole hoist device for roofing
KR102680607B1 (en) luffing tower crane hydraulic type
JP4848094B2 (en) Roughing jib equipment for self-propelled crane
JP2004067347A (en) Mobile working machine and its method for attaching and detaching counterweight
JP3012132B2 (en) Method and apparatus for assembling ground drill
JPH05139693A (en) Crane

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired