Metal weld-on dowel for steel/concrete composite constructions, which has at one end, a weld-on end and at the other end a head for anchoring in the concrete. For improving the load-carrying behaviour in the case of shear loading, at the weld-on end the shank has a portion with an increased cross-section compared with the shank.