AT245767B - Process for the production of temporarily used supports for the hollow stones in the construction of reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process - Google Patents

Process for the production of temporarily used supports for the hollow stones in the construction of reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process

Info

Publication number
AT245767B
AT245767B AT109560A AT109560A AT245767B AT 245767 B AT245767 B AT 245767B AT 109560 A AT109560 A AT 109560A AT 109560 A AT109560 A AT 109560A AT 245767 B AT245767 B AT 245767B
Authority
AT
Austria
Prior art keywords
support beam
metallic support
hollow
supports
ribs
Prior art date
Application number
AT109560A
Other languages
German (de)
Inventor
Louis Alziari
Original Assignee
Louis Alziari
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Louis Alziari filed Critical Louis Alziari
Application granted granted Critical
Publication of AT245767B publication Critical patent/AT245767B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • E04G11/54Girders, beams, or the like as supporting members for forms of extensible type, with or without adjustable supporting shoes, fishplates, or the like
    • E04G11/56Girders, beams, or the like as supporting members for forms of extensible type, with or without adjustable supporting shoes, fishplates, or the like of telescopic type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • E04G11/46Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings of hat-like or trough-like shape encasing a rib or the section between two ribs or encasing one rib and its adjacent flat floor or ceiling section

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



   Verfahren zur Herstellung von vorübergehend verwendeten
Unterstützungen für die Deckenhohlsteine bei der Errichtung von armierten Betondecken mit Rippen und bei diesem Verfahren verwendbare ein- oder mehrteilige metallische Stützträger 
Werden für die Herstellung von Decken aus Eisenbeton vollständig aus Holz bestehende Schalungen benutzt, erfordert die richtige Anbringung der Schalung und ihrer zahlreichen Versteifungen viele lang- wierige und schwierige Anpassungsarbeiten, wenn alle Teile der Oberfläche der Decke genau in der glei- chen waagrechten Ebene liegen sollen.

   Zur Vermeidung dieser Schwierigkeiten werden gegenwärtig Me- tallbalken benutzt, welche aus einem einzigen Teil oder aus einem Hauptteil mit einer oder zwei in die- sem gleitend verschieblichen Verlängerungen bestehen, wobei deren obere geradlinige Gurten, welche an die an den Mauern liegenden Randbretter oder eine andere Abstützung angehängt sind, die Halter für die
Schalung oder die vorgefertigten Deckenhohlsteine bilden, so dass die Steifigkeit des Balkens die Eben- heit des Fussbodens bestimmt. 



   Diese Systeme besitzen jedoch einen grossen Nachteil. Die Balken, welche ohne merkliche Durch- biegung die durch das Gewicht der Decke gebildete Belastung aufnehmen sollen und nur an ihren Enden aufliegen, sind notwendigerweise schwer und teuer. Während jedoch der Beton in einigen Tagen abbindet und dann ausgeschalt werden könnte, wenn die Decke, welche noch nicht die erforderliche Starrheit hat, zwischen ihren Auflagestellen unterstützt würde, können die die Decke haltenden Balken nicht vor der vollständigen Erstarrung des Betons und damit der vollständigen Verfestigung des Fussbodens entfernt werden, was lange dauert. 



   Die lange Festlegung der Balken bei jeder herzustellenden Decke zwingt daher den Unternehmer, welcher gleichzeitig auf mehreren Baustellen arbeitet, eine grosse Zahl dieser Balken vorrätig zu haben, was eine bedeutende Bindung von Kapital darstellt, so dass die Verwendung derartiger Balken trotz ihrer Vorteile häufig von den Unternehmern als zu teuer und somit als wenig interessant angesehen wird. 



   Gegenstand der Erfindung ist daher ein Verfahren zur Herstellung von vorübergehend verwendeten Unterstützungen für die Deckenhohlsteine bei der Errichtung von armierten Betondecken mit Rippen, wobei die Deckenhohlsteine auf einfachen oder zusammengesetzten metallischen Stützträgern verlegt werden. 



  Die obigen Nachteile werden hiebei vermieden, wenn gemäss der Erfindung Stützträger verwendet werden, deren die Deckenhohlsteine tragender Obergurt wenigstens über einen Abschnitt von beliebiger Länge eine Einsenkung beliebiger Tiefe aufweist, in diese Ausnehmungen Querbohlen eingelegt werden, deren Oberseite mit der Oberseite der Stützträger fluchten und diese Querbohlen beidseits jedes Stützträgers mittels Stützen abgestützt werden. 



   Bei dem erfindungsgemässen Verfahren ist die Entfernung der Stützträger und ihre Wiederverwendung sofort nach dem Abbinden des Betons möglich, da die Decke auch nach dem Entfernen der   Stützträger an   einer oder mehreren Stellen ihrer Länge von den Querbohlen gehalten wird, welche erst nach vollständiger Verfestigung der Decke entfernt werden. 



   Zur Ausübung des erfindungsgemässen Verfahrens wird vorteilhaft ein ein- oder mehrteiliger me- 

 <Desc/Clms Page number 2> 

 tallischer   Stützträger verwendet,   der dadurch gekennzeichnet ist, dass erfindungsgemäss sein durchlaufender, und das gesamte Deckengewicht ohne Überschreitung der zulässigen Durchbiegung tragender Obergurt innerhalb wenigstens einer Zone beliebiger Länge eine Einsenkung beliebiger Tiefe aufweist, die zum Einlegen einer quer zu ihm liegenden Bohle bestimmt ist, deren Oberseite mit der Oberseite des Obergurtes fluchtet. 



   Wenn der Stützträger aus mehreren Teilen besteht, z. B. aus einem Hauptteil und einer Verlängerung, kann die Einsenkung des die Deckenhohlsteine tragenden Obergurtes entweder in dem Hauptteil oder in der Verlängerung vorgesehen werden. Bei grossen Spannweiten kann die Benutzung von zwei Hauptteilen erforderlich werden, welche miteinander durch einen Zwischenteil verbunden sind. Der Zwischenteil hat dann zweckmässig eine geringere Höhe als der Stützträger, so dass dann in den ober der Oberseite des Zwischenteils liegenden Zwischenraum zwischen den   beiden Hauptteilen die Querbohle   eingebracht werden kann. 



   Die Erfindung ist nachstehend unter Bezugnahme auf die Zeichnungen beispielshalber   erläutert.   



   Die Fig.   l - 3   zeigen einen   erfindungsgemässen   zusammengesetzten Träger mit einem Hauptteil und einer in diesem gleitenden Verlängerung geringerer Höhe, u. zw. ist Fig. l eine Seitenansicht, Fig. 2 ein 
 EMI2.1 
 
1Fig. 3 die Stützträger und die auf diesen ruhende Decke aus Hohlsteinen zeigt. 



   Fig. 4 veranschaulicht in Seitenansicht eine Anordnung, bei welcher der   Stützträger   aus zwei durch einen Zwischenteil geringerer Höhe verbundenen Hauptteilen besteht. 



   In Fig.   1 - 3   ist der Stützträger P wenigstens an einem Ende so ausgebildet, dass er eine   Gleitfüh-   rung für   eine Verlängerung   R geringerer Höhe bildet, wobei der eine oder der andere dieser Teile oder alle beide mit Bolzen oder andern Vorrichtungen zur festen Verbindung dieser beiden Teile versehen sind. 



  Hiefür weist z. B. der Stützträger P zwischen seinem U-förmigen Untergurt   1,   seinem Obergurt 5 und zweier seitlicher Diagonalverbände 2a, 2b einen Hohlraum auf, welcher eine in der Längsrichtung des   Stützträgers   P liegende Gleitbahn für   die Verlängerung   R bildet, welche aus zwei   T-förmi-     gen Gurten 3, 3'und   diese verbindende Diagonalstäbe 4 besteht. Der Obergurt 5 des Stützträgers P wird von einem Kastenprofil mit ebener Oberseite zum Halten der Schalung oder der Deckenhohlsteine gebildet. Über die Länge des Stützträgers P verteilt sind an mehreren Stellen Bolzen 6 ange- 
 EMI2.2 
 
 EMI2.3 
 längerung mit dem Stützträger P in eine Flucht zu bringen und die beiden Teile fest gegeneinander zu verriegeln. 



   Erfindungsgemäss ist der Obergurt des Stützträgers P etwa in der Mitte seiner Länge (oder, wenn der Gurt sehr lang ist, an voneinander entfernten Stellen) unterbrochen, so dass ein leerer Raum über einem Abschnitt p geringerer Höhe des Stützträgers entsteht. In diesen Raum kann eine Querbohle'M eingeführt werden, welche auf dem niedrigeren Abschnitt p ruht und mit den Oberseiten der Gurte 5 fluchtet, wie dies deutlich in   Fig. l   sichtbar ist. Die Bohle M wird später, wie bei E dargestellt ist, seitlich von dem Stützträger P vor der Entfernung desselben abgestützt und verbleibt bis zur vollständi- 
 EMI2.4 
 Verlängerungsglied R, das mittels eines gekröpften Eisens T an einem Randbrett aufgehängt ist, kann ebenfalls durch Bohlen ausgeglichen werden. 



   Fig. 3 zeigt Deckenhohlsteine, welche durch eine Reihe von   Stützträgern   P und eine abgestützte Querbohle M getragen werden. 



   Bei der in Fig. 4 dargestellten Ausführungsform der Erfindung besteht-z. B. bei grossen   Sparnwei-   ten-der Stützträger aus mehreren Teilen, nämlich zwei Hauptteilen   Pl   und P, welche miteinander durch einenZwischenteil L verbunden und in der Länge einstellbar sind. Die beiden Hauptteile   P, P   sind über ihre ganze Länge oder nur an ihren Enden so ausgebildet, dass sie eine Gleitbahn für den Zwischenteil L bilden, welcher ähnlich wie die bereits beschriebene Verlängerung R ausgebildet ist. 



  DieHöhedesZwischenteilesListjedochgeringeralsdiederHauptteileP1, P2,sodassnachderEinführung des Zwischenteils L in die Gleitbahnen der Hauptteile P, P ein leerer Raum über dem Zwischenteil L für die Einbringung einer Querbohle M entsteht. 
 EMI2.5 




   <Desc / Clms Page number 1>
 



   Method of making temporarily used
Supports for the hollow ceilings when erecting reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process
If formwork made entirely of wood is used for the production of reinforced concrete ceilings, the correct installation of the formwork and its numerous stiffeners requires a lot of lengthy and difficult adjustment work if all parts of the surface of the ceiling are to lie exactly in the same horizontal plane .

   To avoid these difficulties, metal beams are currently used, which consist of a single part or of a main part with one or two extensions slidable in this, the upper straight straps of which are attached to the edge boards lying on the walls or another Support are attached to the holder for the
Form formwork or the prefabricated hollow slabs so that the rigidity of the beam determines the evenness of the floor.



   However, these systems have a major disadvantage. The beams, which are supposed to absorb the load created by the weight of the ceiling without any noticeable deflection and which only rest at their ends, are necessarily heavy and expensive. However, while the concrete sets in a few days and could then be stripped if the ceiling, which does not yet have the required rigidity, were supported between its support points, the beams holding the ceiling cannot before the concrete has completely solidified and thus fully solidified removed from the floor, which takes a long time.



   The length of time the beams are fixed in every ceiling to be produced therefore forces the entrepreneur, who works on several construction sites at the same time, to have a large number of these beams in stock, which represents a significant tie-up of capital, so that the use of such beams, despite their advantages, often depends on the Entrepreneurs are seen as too expensive and therefore not very interesting.



   The subject of the invention is therefore a method for the production of temporarily used supports for the hollow ceiling bricks when erecting reinforced concrete ceilings with ribs, the hollow ceiling bricks being laid on simple or composite metallic support beams.



  The above disadvantages are avoided if, according to the invention, support girders are used whose upper chord carrying the hollow slabs has a depression of any depth at least over a section of any length, and transverse planks are inserted into these recesses, the top of which is flush with the top of the support girders and these Cross planks are supported on both sides of each support beam by means of supports.



   In the method according to the invention, the support beams can be removed and reused immediately after the concrete has set, since the ceiling is held by the cross planks at one or more points along its length even after the support beams have been removed, which is only removed after the ceiling has completely solidified will.



   To carry out the method according to the invention, a one-part or multi-part

 <Desc / Clms Page number 2>

 tallischer support girder is used, which is characterized in that according to the invention its continuous top chord, which carries the entire ceiling weight without exceeding the permissible deflection, has a depression of any depth within at least one zone of any length, which is intended for inserting a plank lying transversely to it The top is flush with the top of the top chord.



   If the support beam consists of several parts, e.g. B. from a main part and an extension, the lowering of the upper chord carrying the ceiling hollow blocks can be provided either in the main part or in the extension. In the case of large spans, it may be necessary to use two main parts, which are connected to one another by an intermediate part. The intermediate part then expediently has a lower height than the support beam, so that the transverse plank can then be introduced into the space between the two main parts located above the upper side of the intermediate part.



   The invention is explained below by way of example with reference to the drawings.



   FIGS. 1-3 show a composite carrier according to the invention with a main part and an extension of lesser height sliding in this, and the like. Between. Fig. 1 is a side view, Fig. 2 is a
 EMI2.1
 
1Fig. 3 shows the support beams and the hollow stone ceiling resting on them.



   Fig. 4 illustrates in side view an arrangement in which the support beam consists of two main parts connected by an intermediate part of lower height.



   In FIGS. 1-3, the support beam P is designed at least at one end so that it forms a sliding guide for an extension R of lower height, one or the other of these parts or both with bolts or other devices for a fixed connection these two parts are provided.



  For this purpose z. B. the support beam P between its U-shaped lower chord 1, its upper chord 5 and two lateral diagonal braces 2a, 2b has a cavity which forms a sliding path in the longitudinal direction of the support beam P for the extension R, which consists of two T-shaped gen straps 3, 3 'and diagonal bars 4 connecting them. The upper chord 5 of the support beam P is formed by a box profile with a flat top for holding the formwork or the hollow ceiling bricks. Bolts 6 are distributed over the length of the support beam P at several points.
 EMI2.2
 
 EMI2.3
 to bring extension with the support beam P in alignment and to lock the two parts firmly against each other.



   According to the invention, the upper belt of the support beam P is interrupted approximately in the middle of its length (or, if the belt is very long, at points distant from one another), so that an empty space is created over a section p of lower height of the support beam. A transverse beam'M can be introduced into this space, which rests on the lower section p and is flush with the upper sides of the belts 5, as can be clearly seen in FIG. The screed M is later, as shown at E, supported laterally by the support beam P before it is removed and remains until it is completely
 EMI2.4
 Extension link R, which is suspended from an edge board by means of a cranked iron T, can also be compensated for by planks.



   Fig. 3 shows hollow slabs which are supported by a series of support beams P and a supported cross beam M.



   In the embodiment of the invention shown in FIG. B. in the case of large savings, the support beam consists of several parts, namely two main parts Pl and P, which are connected to one another by an intermediate part L and are adjustable in length. The two main parts P, P are designed over their entire length or only at their ends in such a way that they form a sliding path for the intermediate part L, which is designed similarly to the extension R already described.



  The height of the intermediate part, however, is lower than that of the main parts P1, P2, so that an empty space is created above the intermediate part L for the insertion of a transverse screed M after the intermediate part L has been inserted into the slideways of the main parts P, P.
 EMI2.5


 

Claims (1)

P. grösser als die Breite einer Bohle ist,PATENTANSPRÜCHE : 1. Verfahren zur Herstellung von vorübergehend verwendeten Unterstützungen für die Deckenhohlsteine bei der Errichtung von armierten Betondecken mit Rippen, wobei die Deckenhohlsteine auf einfachen oder zusammengesetzten metallischen Stützträgern verlegt werden, dadurch gekenn- zeichnet, dass Stützträger (P) verwendet werden, deren die Deckenhohlsteine tragender Obergurt we- nigstens über einen Abschnitt von beliebiger Länge eine Einsenkung beliebiger Tiefe aufweist, in diese Ausnehmungen Querbohlen eingelegt werden, deren Oberseite mit der Oberseite der Stützträger fluchten und diese Querbohlen beidseits jedes Stützträgers mittels Stützen (E) abgestützt werden. P. is larger than the width of a plank, PATENT CLAIMS: 1. Process for the production of temporarily used supports for the hollow ceilings when erecting reinforced concrete ceilings with ribs, the hollow ceilings being laid on simple or composite metallic support girders, characterized in that supporting girders (P) are used whose hollow stones are more load-bearing Upper chord has a depression of any depth at least over a section of any length, into these recesses cross planks are inserted, the top of which are aligned with the top of the support beam and these cross planks are supported on both sides of each support beam by means of supports (E). 2. Ein- oder mehrteiliger metallischer Stützträger zur Verwendung bei einem Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass sein durchlaufender, und das gesamte Deckengewicht ohne Überschreitung der zulässigen Durchbiegung tragende Obergurt innerhalb wenigstens einer Zone beliebiger Länge eine Einsenkung beliebiger Tiefe aufweist, die zum Einlegen einer quer zu ihm liegenden Bohle bestimmt ist, deren Oberseite mit der Oberseite des Obergurtes fluchtet. 2. One-piece or multi-part metallic support beam for use in a method according to claim 1, characterized in that its continuous, and the entire ceiling weight bearing without exceeding the permissible deflection upper chord has a depression of any depth within at least one zone of any length, which can be inserted a plank lying transversely to it is determined, the top of which is flush with the top of the top flange. 3. Metallischer Stützträger zur Verwendung bei einem Verfahren nach Anspruch l, der zwecks Ermöglichung einer beliebigen Bemessung seiner Gesamtlänge aus wenigstens zwei Haupt- und einem Zwi- schenteilbesteht, dieteleskopartigineinanderverschiebbarsind, dadurch gekennzeichnet, dass die Oberseite des Zwischenteiles wesentlich tiefer liegt als die durchlaufende Oberseite der Hauptteile und die Aufnahme einer mit ihrer Oberseite mit der Oberseite der Hauptteile fluchtendenQuerbohle zulässt. 3. Metallic support beam for use in a method according to claim 1, which in order to enable any dimensioning of its total length consists of at least two main and one intermediate part which can be telescoped into one another, characterized in that the upper side of the intermediate part is substantially lower than the continuous upper side of the Allows main parts and the inclusion of a cross-beam aligned with its top with the top of the main parts.
AT109560A 1959-02-13 1960-02-12 Process for the production of temporarily used supports for the hollow stones in the construction of reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process AT245767B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR6394A FR1216705A (en) 1959-02-13 1959-02-13 Improvements to metal joists serving as formwork in the construction of reinforced concrete floors, and methods for their use

Publications (1)

Publication Number Publication Date
AT245767B true AT245767B (en) 1966-03-10

Family

ID=8571473

Family Applications (1)

Application Number Title Priority Date Filing Date
AT109560A AT245767B (en) 1959-02-13 1960-02-12 Process for the production of temporarily used supports for the hollow stones in the construction of reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process

Country Status (7)

Country Link
AT (1) AT245767B (en)
BE (1) BE587599A (en)
CH (1) CH359270A (en)
ES (1) ES255727A1 (en)
FR (2) FR1216705A (en)
GB (1) GB941801A (en)
MC (1) MC196A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342930B (en) * 2020-12-11 2022-03-11 山西建筑工程集团有限公司 PC component superimposed sheet bailey frame braced system device

Also Published As

Publication number Publication date
GB941801A (en) 1963-11-13
BE587599A (en) 1960-05-30
CH359270A (en) 1961-12-31
ES255727A1 (en) 1960-10-01
MC196A1 (en) 1960-09-08
FR1216705A (en) 1960-04-27
FR75612E (en) 1961-11-27

Similar Documents

Publication Publication Date Title
DE2101084A1 (en) Procedure for erecting a structure
EP0092694B1 (en) Shuttering system for ceilings
EP0350525B1 (en) Method for producing building-walls and a shuttering system
AT245767B (en) Process for the production of temporarily used supports for the hollow stones in the construction of reinforced concrete ceilings with ribs and one-part or multi-part metallic support girders that can be used in this process
DE2147870A1 (en) formwork
DE2248472A1 (en) PROCESS FOR THE MANUFACTURING OF COMPONENTS FROM STRENGTHEN CONCRETE
DE3535558A1 (en) FLANGE DEVICE
DE1659218C3 (en) Composite trusses and methods of assembling them
DE807015C (en) Reinforced concrete ceiling
DE841722C (en) Mold for the production of building panels
DE1909457B2 (en) CONCRETE FORMWORK
DE3312582A1 (en) FORMWORK FOR PRODUCING SIDES ON CONCRETE CEILINGS
DE19548504A1 (en) Method and device for producing a concrete floor
DE202017007193U1 (en) Prefabricated wall element
DE102017114619A1 (en) Prefabricated wall element
DE811686C (en) Apparatus and method for producing reinforced concrete beams
DE2548298C2 (en) Method and cavity formwork wall for building a cavity wall
DE219503C (en)
DE19720637C1 (en) Process for producing a component from reinforced concrete and formwork for carrying out the process
DE3017840C2 (en) Permanent formwork for a concrete ceiling and anchors for this
DE1220990B (en) Method for creating wall fractures
DE661762C (en) Formwork with transverse webs resting on the support flanges to accommodate the formwork
AT213036B (en) Formwork for solid ceilings, beams, columns, etc. similar Components
DE1049076B (en) Adjustable shuttering frame for concrete beams
DE923698C (en) Reinforced concrete beams