WO2020153039A1 - 保管システム - Google Patents

保管システム Download PDF

Info

Publication number
WO2020153039A1
WO2020153039A1 PCT/JP2019/048870 JP2019048870W WO2020153039A1 WO 2020153039 A1 WO2020153039 A1 WO 2020153039A1 JP 2019048870 W JP2019048870 W JP 2019048870W WO 2020153039 A1 WO2020153039 A1 WO 2020153039A1
Authority
WO
WIPO (PCT)
Prior art keywords
ceiling
track
crane
article
elevating
Prior art date
Application number
PCT/JP2019/048870
Other languages
English (en)
French (fr)
Inventor
栄治 和田
功輔 入野
Original Assignee
村田機械株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 村田機械株式会社 filed Critical 村田機械株式会社
Priority to EP19911633.6A priority Critical patent/EP3915903A4/en
Priority to JP2020567419A priority patent/JP7136236B2/ja
Priority to SG11202108087XA priority patent/SG11202108087XA/en
Priority to US17/425,716 priority patent/US11615975B2/en
Priority to CN201980089990.1A priority patent/CN113348140B/zh
Priority to KR1020217023443A priority patent/KR102531954B1/ko
Publication of WO2020153039A1 publication Critical patent/WO2020153039A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/67733Overhead conveying
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67763Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations the wafers being stored in a carrier, involving loading and unloading
    • H01L21/67769Storage means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/0407Storage devices mechanical using stacker cranes
    • B65G1/0428Transfer means for the stacker crane between the alleys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/0457Storage devices mechanical with suspended load carriers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes
    • B66C7/02Runways, tracks or trackways for trolleys or cranes for underhung trolleys or cranes
    • B66C7/04Trackway suspension
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/67706Mechanical details, e.g. roller, belt
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/67724Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations by means of a cart or a vehicule
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/67727Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations using a general scheme of a conveying path within a factory
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/6773Conveying cassettes, containers or carriers
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L21/00Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
    • H01L21/67Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
    • H01L21/677Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
    • H01L21/67703Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations between different workstations
    • H01L21/67736Loading to or unloading from a conveyor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0297Wafer cassette

Definitions

  • the present invention relates to a storage system.
  • articles such as FOUPs (Front-Opening Unified Pods) that store semiconductor wafers or reticle pods that store reticles are transported by a ceiling transport vehicle to a transfer destination such as a load port of a processing device.
  • FOUPs Front-Opening Unified Pods
  • a transfer destination such as a load port of a processing device.
  • an article conveyed by this ceiling transport vehicle is stored in a storage system capable of transferring the article to and from this ceiling transport vehicle (for example, refer to Patent Document 1).
  • a plurality of storage units for mounting the articles are provided in the vertical direction, and the articles can be transferred between the storage units.
  • transfer of articles in a plurality of storage sections can be performed using a crane that travels along a ceiling track and transfers articles between the plurality of storage sections (for example, Patent Document 1). 2).
  • Patent Document 2 The crane described in Patent Document 2 needs to be carried in and out of the ceiling track for maintenance and the like. For example, when various systems, devices, storage units, etc. are provided below the ceiling track on which this crane travels, it is necessary to avoid loading and unloading the various systems and to carry the crane in and out of the ceiling track. ..
  • An object of the present invention is to provide a storage system that can reliably and easily carry out and carry in a crane to/from a ceiling track.
  • a storage system includes a first ceiling track, a shelf including a plurality of storage sections in a vertical direction, and a storage system that travels along the first ceiling track to store articles between the plurality of storage sections.
  • a ceiling stocker having a crane for delivering and receiving, a second ceiling track provided below the lower end of the ceiling stocker, and traveling along the second ceiling track to deliver articles to a predetermined transfer destination.
  • a ceiling transport vehicle system having a ceiling transport vehicle, wherein the first ceiling track is a portion that deviates from the second ceiling track in a plan view and that is capable of descending and descending while supporting a crane that has stopped traveling. Have a trajectory.
  • the hoisting orbit may be provided directly above the worker passage.
  • a suspending member that suspends and holds the elevating trajectory may be provided, and an elevating trajectory drive unit that elevates the elevating trajectory by winding or unwinding the suspending member.
  • a carrying device for carrying articles in the vertical direction is provided between the ceiling stocker and the ceiling carriage system, and a mounting unit to which both the ceiling carriage and the carriage device can deliver the goods just below the hoisting track. May be provided, and the mounting part may be retractable from immediately below the ascending/descending track.
  • the placing section may be arranged so as to be bridged between the pair of other placing sections, and the ceiling transport vehicle may be capable of delivering the article to and from the other placing section.
  • the first ceiling track has a hoisting track capable of descending while supporting the crane that is stopped traveling in a portion deviated from the second ceiling track in plan view. This makes it possible to reliably and easily carry out and carry in the crane to and from the first ceiling track without interfering with the ceiling guided vehicle system.
  • the hoisting track is provided directly above the worker's passage
  • devices and the like are not normally placed in the worker's passage.Therefore, by using this worker's passage, the crane can be carried in and out. Can be done easily.
  • the suspending member and the elevating track drive unit may be used. It is possible to easily raise and lower the hoisting orbit.
  • a carrying device for carrying articles in the vertical direction is provided between the ceiling stocker and the ceiling carriage system, and a mounting unit to which both the ceiling carriage and the carriage device can deliver the goods just below the hoisting track.
  • the crane In the configuration in which the loading section can be retracted from directly under the hoisting track, the crane to be carried out and loaded by retracting the loading section from immediately below the hoisting track when lowering the hoisting track is installed. It is possible to increase the number of places where articles are transferred between the ceiling transfer vehicle and the transfer device while avoiding interference with the storage section.
  • the placing unit is arranged so as to be stretched between a pair of other placing units and the ceiling transport vehicle is capable of delivering articles to and from the other placing unit, Since there is no suspending member from the ceiling or a supporting member from the floor in the mounting portion, this mounting portion can be easily retracted from directly under the hoisting orbit.
  • FIG. 1 It is the figure which looked at an example of the storage system which concerns on 1st Embodiment from the X direction. It is the figure which looked at an example of the storage system shown in FIG. 1 from the Y direction. It is the figure which showed typically the storage system shown in FIG. 1 by planar view.
  • An example of operation of a hoisting orbit is shown, (A) is a figure showing the state of a hoisting orbit before descent, and (B) is a figure showing the state of a hoisting orbit being descended. It is a figure which shows an example of operation
  • FIG. 6 is a diagram illustrating a state in which the placement unit is retracted following FIG. 5. It is a figure which shows the state which descended the raising/lowering track following FIG. It is a figure which shows the state which connects a crane conveyance truck to an up-and-down track following FIG. It is a figure which shows the state which transferred the crane to the crane carrier following FIG. It is a figure which shows the state which raises a raising/lowering track following FIG. It is the figure which looked at an example of the storage system which concerns on 2nd Embodiment from the Y direction. It is the figure which showed typically the storage system shown in FIG. 11 by planar view.
  • the direction indicated by the arrow is appropriately expressed as a + direction (for example, +X direction), and the direction opposite to the direction indicated by the arrow is a ⁇ direction (for example, ⁇ X direction).
  • + direction for example, +X direction
  • ⁇ X direction for example, ⁇ X direction
  • FIG. 1 is a diagram of an example of the storage system SYS according to the first embodiment as viewed from the X direction.
  • FIG. 2 is a view of the storage system SYS as viewed from the Y direction.
  • FIG. 3 is a diagram schematically showing the storage system SYS in a plan view. Note that, in FIG. 3, the article 2 is shown by hatching in order to make it easy to distinguish the figure.
  • the storage system SYS shown in FIGS. 1 to 3 is provided, for example, in a semiconductor device manufacturing factory or the like, and stores an article 2 such as a FOUP containing a semiconductor wafer used for manufacturing a semiconductor device or a reticle pod containing a reticle. store.
  • an article 2 such as a FOUP containing a semiconductor wafer used for manufacturing a semiconductor device or a reticle pod containing a reticle. store.
  • the article 2 may be other than FOUP.
  • the storage system SYS is applicable to equipment other than the semiconductor manufacturing field, and the article 2 may be another article that can be stored in the storage system SYS.
  • the storage system SYS includes a ceiling stocker 100, a ceiling transfer vehicle system 200, and a transfer device 300.
  • the ceiling stocker 100 includes a shelf 10 including a plurality of storage units 11, a first ceiling track 20, and a crane 40.
  • the shelf 10 is arranged along the first ceiling track 20 on which the crane 40 travels in a plan view (see FIG. 3 ).
  • the plurality of storage units 11 provided on the shelf 10 are provided on the frame 13 and are arranged in three stages in the vertical direction (Z direction). The number of stages of the storage unit 11 can be set arbitrarily. Further, the plurality of storage units 11 are arranged side by side along the traveling direction (Y direction) of the crane 40 described below.
  • the plurality of storage units 11 are provided with shelf boards 11a on which the articles 2 are placed. Each shelf 11a is held by the frame 13.
  • placing the article 2 in the storage unit 11 means placing the article 2 in the shelf 11 a of the storage unit 11.
  • the shelf 11a of the storage unit 11 may be provided with a plurality of pins that enter the grooves provided on the bottom surface of the article 2 when the article 2 is placed on the shelf 11a. By inserting the pin into the groove of the article 2, the article 2 is positioned with respect to the storage unit 11 (shelf 11a).
  • the shelf 10 is suspended from the system ceiling SC1 by a frame 13.
  • the system ceiling SC1 is suspended from the ceiling C of the building by the suspension fitting 3.
  • the frame 13 may be directly suspended from the ceiling C instead of being suspended from the system ceiling SC1.
  • the lower end of the shelf 10 is set to be higher than the height of the upper end of the processing device TL from the floor surface F.
  • the processing apparatus TL performs various processes such as a film forming process or an etching process on the semiconductor wafer housed in the FOUP that is the article 2.
  • the height of the lower end of the crane 40 described later is set to be higher than the height of the upper end of the processing device TL. That is, the ceiling stocker 100 is arranged above the upper end of the processing device TL.
  • the lower end of the crane 40 is set to a height at which a worker or the like can pass through the floor surface F without any trouble. As a result, a part of the space below the ceiling stocker 100 can be used as the worker passage PS.
  • the article 2 is placed on the storage unit 11 by the crane 40, and the article 2 is taken out. Further, in a part of the storage unit 11, the article 2 is placed by the upper ceiling transport vehicle 60 described later, and the article 2 is taken out.
  • the storage unit 11 to which the article 2 is delivered by the upper ceiling transport vehicle 60 is the storage unit 11 at the uppermost stage of the shelf 10.
  • the vertical size of the storage unit 11 (the size from the upper surface of the shelf plate 11a to the lower surface of the shelf plate 11a of the storage unit 11 above) is raised by the transfer device 42 of the crane 40, which will be described later, supporting the article 2 from the lower surface side. It is set to the required dimensions.
  • the transfer device 42 of the crane 40 is configured to support and lift the article 2 from the lower surface side, for example, and does not require a large space above the article 2.
  • the vertical dimension of the storage unit 11 can be set to a dimension that adds a few centimeters to the vertical dimension of the article 2.
  • the first ceiling track 20 is suspended from the system ceiling SC1 by the suspension fitting 5.
  • the first ceiling track 20 may be directly suspended from the ceiling C instead of being suspended from the system ceiling SC1.
  • the first ceiling track 20 has a higher height from the floor surface F than the second ceiling track 30 of the ceiling guided vehicle system 200.
  • the first ceiling orbit 20 is a circular orbit having straight portions 21 and 22 and a curved portion 23, as shown in FIG.
  • the crane 40 can travel in one direction (for example, a counterclockwise direction in a plan view) along the straight portions 21 and 22 and the curved portion 23.
  • the linear portion 21 is arranged along the Y direction in FIG.
  • the straight line portion 22 is arranged along the X direction in FIG.
  • the straight line portion 21 and the straight line portion 22 respectively extend in directions orthogonal to each other.
  • the curved portion 23 connects the straight portion 21 and the straight portion 22.
  • the first ceiling track 20 is provided with a branch portion 24 inside the first ceiling track 20 which is a circular track in a plan view.
  • the branch portion 24 connects the two linear portions 22 to each other.
  • the above-mentioned shelf 10 is provided on the +Y side and the -Y side of the linear portion 22. Further, the shelf 10 is provided on the +X side and the ⁇ X side of the branch section 24. These shelves 10 are arranged above the processing device TL. Since the second ceiling track 30 of the ceiling guided vehicle system 200 is not provided above the processing device TL, by arranging the shelves 10 in such a dead space, the space inside the building can be effectively used. ..
  • the first ceiling track 20 has an elevating track 25 at a portion deviated from the second ceiling track 30 in a plan view (a position not overlapping the second ceiling track 30).
  • 4A and 4B show an example of the operation of the ascent/descent trajectory
  • FIG. 4A is a diagram showing a state before the ascent/descent trajectory
  • FIG. 4B is a diagram showing a state when the ascent/descent trajectory is descending.
  • the straight portion 21 of the first ceiling track 20 is notched in a section corresponding to a lifting track 25 described later.
  • the straight portion 21 includes an end portion 21a and an end portion 21b that face each other in the cutout portion.
  • the elevating track 25 includes a housing 26, a suspending member 27, and an elevating track drive unit 28.
  • the housing portion 26 spans between the end portions 21a and 21b of the linear portion 21 and is arranged in a state of covering the end portions 21a and 21b from above.
  • the housing 26 is supported on the ceiling C by a hanging member or the like (see FIG. 1), but may be supported on the system ceiling SC1 or the first ceiling track 20.
  • the casing 26 supports the lifting track 25 via the suspension member 27 and the lifting track drive unit 28.
  • the elevating track 25 is linear and is provided in a part of the linear portion 21 of the first ceiling track 20. That is, the ascending/descending track 25 is provided as a part of the straight line portion 21 that constitutes the first ceiling track 20 that is a circular track.
  • the ascending/descending track 25 is arranged between the end 21a and the end 21b when it is most raised, and is connected to both the end 21a and the end 21b.
  • the elevating track 25 has a linear dimension such that, for example, the entire two traveling units 41 provided in the crane 40 fit within the elevating track 25.
  • the suspending member 27 is, for example, a wire, a belt or the like, and suspends and holds the elevating track 25.
  • a plurality of suspending members 27, for example, two suspending members 27 are arranged side by side in the linear direction of the elevating track 25.
  • the suspending member 27 is wound and held by the elevating orbiting drive unit 28.
  • the suspending member 27 has a length that allows it to descend to a predetermined height close to the floor surface F when the elevating track 25 is descended.
  • the hoisting/lowering track drive unit 28 is held by the housing 26, and the hoisting/lowering track 25 is hoisted by winding and unwinding the suspending member 27.
  • the elevating track drive unit 28 includes, for example, a drive source (not shown) such as a motor device, a rotatable take-up shaft (not shown) that winds the suspension member 27, and a drive source that transmits the drive force of the drive source to the take-up shaft. And the transmission mechanism shown in the figure.
  • the elevating track drive unit 28 rotates the winding shaft by transmitting the driving force of the driving source to the winding shaft, and winds and unwinds the hanging member 27.
  • the operation of the up-and-down trajectory drive unit 28 is controlled by a control device (not shown) or the like.
  • the hoisting and lowering track 25 can descend (it can be hoisted) while supporting the crane 40 that is not traveling. As shown in FIG. 3, since the hoisting track 25 is deviated from the second ceiling track 30 in a plan view, by moving the hoisting track 25 up and down while the crane 40 is stopped on the hoisting track 25, the ceiling transport vehicle is lifted. The crane 40 can be raised and lowered without interfering with the system 200. Further, the ascending/descending track 25 is arranged immediately above the worker passage PS. This worker passage PS is provided so as to deviate from immediately below the second ceiling track 30 in a plan view.
  • the worker passage PS is a region where various devices such as the processing device TL and the load port LP of the processing device TL are not installed in order to allow passage of the worker. Therefore, the crane 40 can be reliably lowered to the vicinity of the floor surface F by temporarily using the worker passage PS at the time of maintenance or the like.
  • the configuration for elevating the elevating track 25 is not limited to the above-described configuration, and any configuration for elevating the elevating track 25 can be applied.
  • the crane 40 holds the article 2 and travels along the first ceiling track 20 to move, as shown in FIGS. 1 and 2.
  • the crane 40 conveys the article 2 between the storage unit 11 and another storage unit 11.
  • the number of cranes 40 arranged on one first ceiling track 20 is not limited to one.
  • two or more cranes 40 may be arranged on one first ceiling track 20.
  • the crane 40 is suspended from the first ceiling track 20 as shown in FIGS. 1 and 2.
  • the crane 40 includes two traveling units 41 and a transfer device 42. Below the traveling portion 41, an upper support portion 47 is attached via a mounting portion 46, and the two traveling portions 41 are connected by the upper support portion 47.
  • Each traveling unit 41 includes a traveling drive unit (not shown) and a plurality of wheels 41 a, and travels along the first ceiling track 20.
  • the traveling drive unit (not shown) included in the traveling unit 41 may be, for example, an electric motor that is provided in the traveling unit 41 and drives the wheels 41a, or a linear motor. Since the crane 40 of the present embodiment is provided with the two traveling parts 41, the transfer device 42 and the article 2 which are heavy objects can be reliably supported.
  • the crane 40 is not limited to the configuration including the two traveling units 41, and may include one or three or more traveling units 41.
  • the transfer device 42 includes a mast 43, a lift base 44, a lift drive unit 45, a telescopic unit 48, and a mounting base 49.
  • the mast 43 extends vertically while being suspended from the upper support portion 47.
  • One mast 43 is provided at each of the front and rear sides of the traveling portion 41 in the traveling direction.
  • the number of masts 43 is not limited to two in total, and may be one.
  • the mast 43 is provided such that the height of the lower end of the mast 43 from the floor surface F is higher than the height of the upper end of the processing device TL.
  • the lower end of the mast 43 is the lower end of the crane 40.
  • Extending/contracting portion 48 is composed of a plurality of arms that are extendable/contractible in a direction orthogonal to the traveling direction of traveling portion 41.
  • the mounting table 49 is provided at the tip of the expandable portion 48.
  • the mounting table 49 is a triangular plate-shaped member on which the article 2 can be mounted.
  • the mounting table 49 holds the article 2 mounted on the mounting table 49 by supporting the article 2 from below.
  • On the upper surface of the mounting table 49 there is provided a pin that is inserted into a groove provided on the bottom surface of the article 2 to position the article 2.
  • the shelf 11a of the storage unit 11 is provided with a notch (not shown) through which the mounting table 49 can pass in the vertical direction.
  • the transfer unit 42 When the transfer device 42 receives the article 2 from the storage unit 11, the transfer unit 42 extends the expansion/contraction section 48 to position the mounting table 49 below the article 2 and raises the elevating table 44, so that the article 2 is transferred to the mounting table 49. Scoop up.
  • the transfer device 42 arranges the mounting table 49 on which the article 2 is mounted by placing the mounting table 49 on which the article 2 is mounted by contracting the expansion/contraction portion 48 while the article 2 is mounted on the mounting table 49. Further, when the transfer device 42 delivers the article 2 to the storage section 11, the reverse operation is performed.
  • the transfer device 42 is not limited to the configuration described above, and may have another configuration such as a configuration for holding and lifting a part of the article 2 (for example, the flange portion 2a provided on the upper portion of the FOUP). Good.
  • the two elevator drive units 45 are, for example, hoists, and move the elevators 44 up and down along the mast 43.
  • Each elevating/lowering drive unit 45 includes a suspension member 45a and a drive unit (not shown).
  • the suspending member 45a is, for example, a belt, a wire, or the like, and the lifting platform 44 is suspended from the upper support portion 47 by the suspending member 45a.
  • a drive unit (not shown) included in the lift drive unit 45 is provided, for example, on the upper support unit 47, and extends and winds the hanging member 45a.
  • the elevating table 44 is guided by the mast 43 and descends when an unillustrated driving unit included in the elevating and lowering driving unit 45 unwinds the suspension member 45a.
  • the lift base 44 is guided by the mast 43 to move up.
  • the lift drive unit 45 is controlled by a control device (not shown) or the like to lower or raise the lift base 44 at a predetermined speed.
  • the lifting drive unit 45 is controlled by a control device (not shown) or the like to hold the lifting platform 44 at a target height.
  • the lift drive unit 45 is provided on the upper support unit 47.
  • the elevating/lowering drive unit 45 may be provided, for example, on the elevating table 44 instead of being provided on the upper support unit 47.
  • a belt or wire hung from the upper support 47 is wound or unwound by a hoist mounted on the lifting/lowering table 44 to lift/lower the lifting/lowering table 44.
  • an electric motor or the like for driving the pinion gear is mounted on the lifting table 44, a rack with which the pinion gear meshes is formed on the mast 43, and the lifting table 44 is lifted by rotating the pinion gear by the electric motor or the like. It may be.
  • the ceiling guided vehicle system 200 includes a second ceiling track 30 and a ceiling guided vehicle 50.
  • the ceiling transport vehicle 50 travels along the second ceiling track 30 and transfers the article 2 to and from the load port LP of the processing apparatus TL, which is a predetermined transfer destination disposed below the second ceiling track 30.
  • the second ceiling track 30 is attached to the lower surface side of the system ceiling SC2, as shown in FIG.
  • the system ceiling SC2 is hung from the ceiling C by the hanging metal fitting 4.
  • the second ceiling track 30 may be suspended from the system ceiling SC1 instead of being suspended from the system ceiling SC2, or may be directly suspended from the ceiling C.
  • the second ceiling track 30 is arranged between the inter-beirut (track between bays) R1 and the inter-beirut R2 in plan view, as shown in FIG.
  • the second ceiling tracks 30 are provided in the bay (intrabay), respectively, and the inter-beirut route R1 and the like are provided to connect the plurality of second ceiling tracks 30.
  • the bay (intra-bay) is, for example, between the load ports LP provided so that the load ports LP in the plurality of processing devices TL are opposed to each other in a plan view. Indicates a range (area) in which the worker passage PS is provided.
  • the second ceiling track 30 is connected from the interbay route R1 via two branch lines S1 for entry or exit, and is connected from the interbay route R2 via two branch lines S2 for entry or exit. ..
  • the second ceiling track 30 has a linear portion 31 and a connecting portion 32.
  • the ceiling guided vehicle 50 travels along the straight portion 31 and the connecting portion 32 in one direction (for example, a clockwise direction in plan view).
  • the straight line portion 31 is arranged in the Y direction along the plurality of load ports LP immediately above the load port LP.
  • the two linear portions 31 are arranged (parallel) in parallel with the linear portion 21 of the first ceiling track 20 in a plan view.
  • the connecting portions 32 are arranged at both ends on the +Y side and the ⁇ Y side including the curved portion, and connect the two straight line portions 31 to each other.
  • the second ceiling track 30 is arranged below the crane 40 (mast 43) and the shelf 10 of the ceiling stocker 100.
  • the ceiling transport vehicle 50 traveling on the second ceiling track 30 travels below the ceiling stocker 100.
  • the ceiling guided vehicle 50 enters the second ceiling track 30 via the branch lines S1 and S2 with respect to the interbay routes R1 and R2, or the interbay route R1 with respect to the second ceiling track 30 via the branch lines S1 and S2. Exit to R2.
  • the ceiling transport vehicle 50 travels along the second ceiling track 30 and transfers the article 2 between the load port LP of the processing device TL and the mounting unit 14 described later in the linear portion 31.
  • the linear portion 31 of the second ceiling track 30 is provided immediately above a plurality of load ports LP that are opposed to each other with a predetermined space (worker passage PS).
  • the load port LP is provided at four places in one processing device TL (see FIG. 3), but the present invention is not limited to this form.
  • one processing device TL may be provided with one to three load ports LP, or may be provided with five or more load ports LP.
  • the number of articles 2 that can be placed on the load port LP is predetermined for each processing device TL.
  • the second ceiling track 30 is provided directly above the load port LP, and the ceiling transport vehicle 50 traveling on the second ceiling track 30 is stopped and the article 2 is moved up and down. Then, the gripping portion 53 is laterally extended (by lateral transfer) to the placing portion 14 (delivery port 12) described later, and the article 2 is delivered.
  • the ceiling guided vehicle 50 has a traveling unit 51 and a main body unit 52.
  • the traveling unit 51 includes a traveling drive unit (not shown) and a plurality of wheels 51 a, and travels along the second ceiling track 30.
  • the traveling drive unit (not shown) included in the traveling unit 51 may be, for example, an electric motor that is provided in the traveling unit 51 and drives the wheels 51a, or may be a linear motor.
  • the main body 52 is attached to the lower portion of the traveling unit 51 via the attaching portion 52a.
  • the main body portion 52 has a grip portion 53 that holds the article 2, an elevating drive portion 54 that suspends and elevates the grip portion 53, and a sideways mechanism 55 that moves the elevating drive portion 54 to the side of the track.
  • the grip portion 53 suspends and holds the article 2 by grasping and gripping the flange portion 2a of the article 2 from above.
  • the grip portion 53 is, for example, a chuck having a plurality of claw portions that can advance and retract in the horizontal direction, and the claw portions are inserted below the flange portion 2a of the article 2 to lift the grip portion 53 to suspend the article 2. Hold down.
  • the grip portion 53 is connected to a suspending member such as a wire or a belt.
  • the grip portion 53 is suspended from the elevating and lowering drive portion 54 and is moved up and down by the elevating and lowering drive portion 54.
  • the elevating/lowering drive unit 54 is, for example, a hoist, and lowers the gripping unit 53 by feeding out the suspending member, and raises the gripping unit 53 by winding the suspending member.
  • the elevating/lowering drive unit 54 is controlled by a control device (not shown) or the like, and lowers or raises the gripping unit 53 at a predetermined speed.
  • the lifting drive unit 54 is controlled by a control device (not shown) or the like, and holds the grip portion 53 at a target height.
  • the side-out mechanism 55 has, for example, movable plates that are arranged one above the other in the vertical direction.
  • the movable plate is movable to the side of the traveling direction of the traveling unit 51 (direction orthogonal to the traveling direction, lateral direction).
  • a lift drive unit 54 is attached to the movable plate.
  • the main body 52 has a guide (not shown) that guides the side-out mechanism 55, a drive unit (not shown) that drives the side-out mechanism 55, and the like.
  • the side-out mechanism 55 moves the lifting drive unit 54 and the gripping unit 53 between the projecting position and the storage position by the driving force from the driving unit such as an electric motor.
  • the projecting position is a position where the grip portion 53 projects laterally from the main body portion 52.
  • the storage position is a position where the grip portion 53 is stored in the main body portion 52.
  • a rotation mechanism for rotating the up-and-down drive part 54 or the grip part 53 around a vertical axis may be provided.
  • the ceiling transfer vehicle 50 raises and lowers the grip portion 53 (article 2) by the elevating drive portion 54 as described above, and transfers the article 2 to and from the load port LP. Further, the ceiling transfer vehicle 50 is moved up and down while the elevation drive unit 54 (grasping unit 53) is moved above any one of the plurality of placement units 14 (including the transfer port 12) by the sideways-out mechanism 55. It is possible to raise and lower the grip portion 53 (article 2) by the portion 54 and transfer the article 2 to and from the placing portion 14.
  • the transfer device 300 transfers the article 2 vertically between the ceiling stocker 100 and the ceiling transfer vehicle system 200.
  • the transfer device 300 is the upper ceiling transfer vehicle 60.
  • the storage system SYS also includes a delivery port 12 for delivering articles between the ceiling transport vehicle system 200 and the transport device 300 (upper ceiling transport vehicle 60).
  • the delivery port 12 is a part of the placing portion 14 on which the article 2 can be placed.
  • a plurality of articles 2 can be placed on the delivery port 12.
  • the delivery port 12 is arranged below the straight portion 21 of the first ceiling track 20 on which the upper ceiling carrier 60 travels. Further, the delivery port 12 is arranged laterally and below the second ceiling track 30. As a result, as described above, the ceiling transfer vehicle 50 can transfer the article 2 by lateral transfer to the transfer port 12.
  • the mounting portion 14 is arranged inside the second ceiling track 30 which is a circular track in a plan view, and is linearly provided along the Y direction.
  • the placement unit 14 can place the articles 2 in a line, for example.
  • the mounting portion 14 has a fixed portion 14a and an attachment/detachment portion 14b that is the delivery port 12.
  • the attachment/detachment portion 14b is provided immediately below the elevation track 25.
  • the fixed portion 14a is a pair of other placement portions 14 with respect to the attachment/detachment portion 14b (delivery port 12) that is a part of the placement portion 14.
  • the fixing portion 14a is, for example, a plate-shaped member or two beam-shaped members, is hung from the system ceiling SC2, and the article 2 is placed on the plate-shaped member or on the two beam-shaped members. It The pair of fixing portions 14 a are arranged at a portion located directly below the elevating track 25 with a gap. The size of the gap, that is, the interval between the pair of fixing portions 14a is set to a size that allows the hoisting track 25 (and the crane 40) to pass in the vertical direction.
  • the fixing portion 14a has a connecting portion 14d for connecting the attachment/detachment portion 14b at the ends facing each other with a gap in between.
  • the fixed portion 14a is a buffer on which the article 2 can be placed and which can be transferred by the ceiling transport vehicle 50.
  • the attachment/detachment unit 14b of the placing unit 14 can transfer the article 2 to both the ceiling transport vehicle 50 of the ceiling transport vehicle system 200 and the upper ceiling transport vehicle 60 that is the transport device 300.
  • the attachment/detachment portion 14b is the delivery port 12 for delivering the article 2 between the ceiling transport vehicle 50 and the upper ceiling transport vehicle 60 (transport device 300).
  • the attachment/detachment portion 14b is a plate-shaped member or two beam-shaped members similarly to the fixed portion 14a.
  • the attachment/detachment portion 14b is arranged just below the elevating track 25 so as to be stretched between the fixing portions 14a.
  • the attaching/detaching portion 14b is held by connecting both ends in the longitudinal direction to the connecting portions 14d on both sides of the fixing portion 14a.
  • the attaching/detaching portion 14b does not require a suspending member from the ceiling C or the system ceiling SC2 or the like, and a supporting member from the floor surface F, and the suspending member or the like travels the ceiling transport vehicle 50 or the upper ceiling transport vehicle 60.
  • a suspending member from the ceiling C or the system ceiling SC2 or the like and a supporting member from the floor surface F, and the suspending member or the like travels the ceiling transport vehicle 50 or the upper ceiling transport vehicle 60.
  • the attachment/detachment portion 14b can be retracted from directly below the ascending/descending track 25 by being detached from the connecting portion 14d of the fixing portion 14a.
  • the upper ceiling transport vehicle 60 transports the article 2 in the vertical direction between the ceiling stocker 100 and the delivery port 12 (the attachment/detachment portion 14b of the placing portion 14).
  • the upper ceiling transport vehicle 60 has a second traveling portion 61 and a second main body portion 62.
  • the second traveling unit 61 has the same configuration as the traveling unit 41 of the crane 40, includes a traveling drive unit (not shown) and a plurality of wheels 61a, and travels along the first ceiling track 20.
  • the second main body portion 62 is attached to the lower portion of the second traveling portion 61 via the attachment portion 62a.
  • the second main body 62 includes a second grip 63 that holds the article 2, a second lift drive 64 that suspends and lifts the second grip 63, and a second lift 64 on the side of the track. It has the 2nd side-out mechanism 65 to move.
  • the second traveling portion 61, the second main body portion 62, the second grip portion 63, the second elevating drive portion 64, and the second horizontal ejection mechanism 65 are the traveling portion 51, the main body portion 52, and the main body portion 52 of the above-described ceiling guided vehicle 50.
  • the same configurations as the grip portion 53, the elevating/lowering drive portion 54, and the side-out mechanism 55 are applied. Therefore, as the upper ceiling carrier 60, the ceiling carrier 50 of the ceiling carrier system 200 can be applied as it is. Further, since the upper ceiling transport vehicle 60 travels on the first ceiling track 20, there is no need to provide a separate track, and the manufacturing cost of the storage system SYS can be reduced.
  • the upper ceiling carrier 60 can move the second gripping portion 63 (article 2) up and down by the second elevating and lowering drive unit 64 to deliver the article 2 to and from the attachment/detachment portion 14b of the placing unit 14 that is the delivery port 12. Is.
  • the upper ceiling transport vehicle 60 moves the second elevating/lowering drive unit 64 to a position above the one storage unit 11 of the plurality of storage units 11 by the second horizontal ejection mechanism 65, and then performs the second elevating/lowering drive.
  • the second gripping portion 63 (article 2) is moved up and down by the portion 64, and the article 2 can be transferred between the second gripping portion 63 (article 2) and the storage portion 11 existing below the second raising/lowering drive portion 64.
  • the upper ceiling transport vehicle 60 can transfer the article 2 to and from the uppermost storage unit 11 of the shelf 10.
  • the storage unit 11 to be delivered to and from the upper ceiling transport vehicle 60 may be a storage unit 11 other than the uppermost stage.
  • the transport device 300 is not limited to the upper ceiling transport vehicle 60, and may be another device capable of transporting the article 2 between the storage unit 11 and the delivery port 12, such as a conveyor device. Good.
  • the shelf 10 can be horizontally extended above the load port LP, and many articles 2 can be stored. Further, since the shelf 10 can be provided regardless of the arrangement of the second ceiling track 30 of the ceiling guided vehicle system 200, the degree of freedom in the arrangement of the shelf 10 is high, and the efficiency of storing the articles 2 is high. The arrangement of 10 can be easily realized.
  • the storage system SYS has a control device (not shown).
  • the control device controls the storage system SYS as a whole.
  • a control device controls the operations of the crane 40, the ceiling transport vehicle 50, and the upper ceiling transport vehicle 60 by wireless or wired communication.
  • the control device may be divided into a control device that controls the crane 40, a control device that controls the ceiling transport vehicle 50, and a control device that controls the upper ceiling transport vehicle 60.
  • a control device controls the upper ceiling transfer vehicle 60 (the transfer device 300) to transfer an object to be transferred from the uppermost storage unit 11.
  • the article 2 is received, and it is instructed to deliver the article 2 to the designated delivery port 12.
  • the crane 40 of the ceiling stocker 100 transfers the article 2 to be transported to the uppermost storage section 11 on the shelf 10.
  • the upper ceiling transport vehicle 60 travels along the first ceiling track 20 and stops at the side of the storage unit 11 on which the article 2 to be transported is placed to project the second side-loading mechanism 65.
  • the second lifting/lowering drive unit 64 lowers the second gripping unit 63, and the second gripping unit 63 grips the article 2.
  • the upper ceiling transport vehicle 60 raises the second grip portion 63 by the second elevating/lowering drive unit 64, and then contracts the second side-feed mechanism 65 to return the second grip unit 63 to the storage position.
  • the article 2 is housed in the second main body 62.
  • the upper ceiling carrier 60 holds the article 2 by the second grip portion 63, travels along the first ceiling track 20, and stops immediately above the designated delivery port 12 (attachment/detachment portion 14b). Subsequently, the upper ceiling transport vehicle 60 drives the second elevating/lowering drive unit 64 to lower the second gripping unit 63 and the article 2, place the article 2 on the delivery port 12, and then use the second gripping unit 63. The article 2 is delivered to the delivery port 12 by releasing the grip.
  • the control device controls the ceiling transport vehicle 50 of the ceiling transport vehicle system 200 to receive the article 2 from the delivery port 12, and gives an instruction to deliver the article 2 to the designated load port LP.
  • the ceiling transport vehicle 50 travels along the second ceiling track 30 and stops at the side of the delivery port 12 on which the article 2 is placed, and causes the side-loading mechanism 55 to project.
  • the portion 53 is lowered, and the gripping portion 53 grips the article 2.
  • the ceiling guided vehicle 50 stores the article 2 in the main body 52 by raising the gripping portion 53 by the elevating/lowering drive portion 54 and then contracting the side-out mechanism 55 to return the gripping portion 53 to the storage position. To do.
  • the ceiling carrier 50 holds the article 2 by the grip portion 53, travels along the second ceiling track 30, and stops immediately above the designated load port LP. Subsequently, the ceiling guided vehicle 50 drives the up-and-down drive unit 54 to lower the gripping unit 53 and the article 2, place the article 2 on the load port LP, and then release the gripping by the gripping unit 53. Pass 2 to load port LP. Through the series of operations described above, the article 2 is transported from the storage unit 11 to the load port LP.
  • the article 2 When the article 2 is conveyed from the load port LP of the processing apparatus TL to the storage unit 11 of the ceiling stocker 100, the article 2 passes through the delivery port 12 by performing the reverse operation of the series of operations described above. And is transferred from the load port LP of the processing device TL to the storage unit 11 of the ceiling stocker 100.
  • the transfer destination of the article 2 is other than the load port LP, and the same applies to the case where the article 2 is received from other than the load port LP.
  • FIG. 5 to 10 are diagrams showing an example of the unloading operation of the crane 40 in the storage system SYS.
  • the crane 40 to be carried out is arranged on the elevating track 25.
  • the crane 40 moves to a position where the two traveling parts 41 are accommodated in the hoisting track 25 and stops.
  • the stop position of the crane 40 is controlled by a control device (not shown).
  • the traveling unit 41 of the crane 40 may lock the wheels 41a by a braking device (not shown) so that the wheels 41a do not roll, or the wheels 41a may be held at a stop position by a traveling drive unit (not shown). May be.
  • the article 2 on the attachment/detachment portion 14b is previously set by the ceiling transport vehicle 50 or the upper ceiling transport vehicle 60. It is conveyed to the (fixed part 14a) or the storage part 11 of the ceiling stocker 100.
  • the attachment/detachment portion 14b is removed from between the fixing portions 14a and retracted from directly below the ascending/descending track 25.
  • an operator may manually release the connection by the connecting part 14d, or when the connecting part 14d is an electric connecting device, the connecting device is driven to connect. May be canceled.
  • the detached attachment/detachment portion 14b is transported to a predetermined storage location and temporarily stored.
  • one of the connecting portions 14d on both sides may be used as a hinge, and the attaching/detaching portion 14b may be suspended from the hinge by releasing the connection by the other connecting portion 14d to retract the attaching/detaching portion 14b.
  • the elevating orbiting drive unit 28 is driven to extend the suspending member 27, so that the elevating and lowering track 25 is lowered while the crane 40 is placed.
  • the hoisting and lowering track 25 descends, the hoisting and lowering track 25 and the crane 40 pass through the gap between the fixed parts 14a facing each other, and when the hoisting and lowering track 25 reaches a predetermined height from the floor surface F, the hoisting and lowering track drive unit 28 is driven.
  • the elevating track drive unit 28 may be driven by a control device (not shown) or may be operated by an operator operating the operation unit.
  • the predetermined height at which the elevating track 25 is stopped is a height at which the lower end of the crane 40 does not contact the floor surface F. Further, the predetermined height at which the elevating track 25 is stopped may be equal to the height of a transfer track 71 (see FIG. 8) of the crane carrier 70 described later.
  • the crane carrier 70 is arranged on one end side of the elevating track 25.
  • the crane carrier 70 has a transfer track 71, a crane housing 72, and wheels 73.
  • the transfer track 71 is, for example, a member whose cross-sectional shape and dimensions are the same or substantially the same as the cross-sectional shape and dimensions of the elevating track 25. Therefore, when the crane 40 is transferred to the transfer track 71, the two traveling parts 41 of the crane 40 can be accommodated in the transfer track 71.
  • the crane accommodating portion 72 is formed to have a size capable of accommodating the transfer device 42 and the mast 43 of the crane 40.
  • the wheels 73 are casters, for example, and move the crane carrier 70 on the floor surface F. Note that at least one of the wheels 73 may be a drive wheel that is driven by a drive source such as an electric motor to roll.
  • the wheels 41a of the traveling section 41 are unlocked, and the crane 40 is transferred from the hoisting track 25 to the transfer track 71 as shown in FIG. Move to the side. Since the elevating track 25 is arranged at the same height as the transfer track 71, the crane 40 can be smoothly moved from the elevating track 25 to the transfer track 71. It should be noted that, in order to prevent the traveling portion 41 accommodated in the transfer track 71 from moving, a rotation stopper may be provided for the wheels 41a, or a connecting tool for holding a part of the traveling portion 41 on the transfer track 71 may be provided. Good. Further, since the crane accommodating portion 72 is formed to have a size capable of accommodating the mast 43, the mast 43 and the transfer device 42 are accommodated in the crane accommodating portion 72 only by moving the crane 40 to the transfer track 71. ..
  • the crane carrier 70 After the crane 40 is housed in the crane carrier 70, as shown in FIG. 10, the crane carrier 70 is pushed by a worker or the like to pass through the worker passage PS and reach a predetermined maintenance area or storage facility. And so on. Further, the elevating track drive unit 28 raises the elevating track 25 by winding the suspending member 27. The elevating track 25 passes through the gap between the facing fixed portions 14 a and is arranged in the cutout portion of the linear portion 21 of the first ceiling track 20. After the ascending/descending track 25 is arranged on the linear portion 21, the worker attaches the attaching/detaching portion 14b between the fixing portions 14a. By this series of operations, the crane 40 on the first ceiling track 20 can be carried out.
  • the operation is reversed from the above operation.
  • the attaching/detaching part 14b is removed from between the fixing parts 14a, and the elevating track 25 is lowered to the above-described height.
  • the crane carrier 70 accommodating the crane 40 is arranged on one end side of the elevating track 25, and the crane 40 is moved from the transfer track 71 to the elevating track 25.
  • the elevating track 25 is raised and the elevating track 25 is arranged on the linear portion 21.
  • the attaching/detaching portion 14b is mounted between the fixing portions 14a.
  • the elevating track 25 on which the crane 40 is placed and which can be moved up and down is provided in a part of the first ceiling track 20, and is separated from the second ceiling track 30 in a plan view. Since the crane 40 is disposed in the upper portion, it is not necessary to provide a dedicated track for unloading or loading the crane 40 to or from the first ceiling track 20, and the crane 40 can be loaded and unloaded without interfering with the ceiling guided vehicle system 200. It can be carried in reliably and easily.
  • the attachment/detachment portion 14b that is the delivery port 12 has a configuration in which the plurality of articles 2 can be placed side by side in a row in the Y direction, but the configuration is not limited to this configuration.
  • 11 and 12 are diagrams showing an example of the storage system SYS2 according to the second embodiment. 11 is a side view and FIG. 12 is a plan view. In the following description, configurations that are the same as or equivalent to those of the first embodiment described above will be assigned the same reference numerals and description thereof will be omitted or simplified.
  • the storage system SYS2 has a placing section 114 on which the article 2 is placed.
  • the mounting portion 114 is arranged inside the orbiting portion of the second ceiling track 30 in a plan view, and is linearly provided along the Y direction.
  • the placement unit 114 can place a plurality of articles 2 arranged in two rows in the X direction.
  • the articles 2 can be delivered to the +X side row of the placement sections 114 by the upper ceiling transport vehicle 60 that travels on the linear portion 31 arranged on the +X side of the placement sections 114.
  • the articles 2 can be delivered by the upper ceiling transport vehicle 60 traveling on the linear portion 31 arranged on the ⁇ X side of the placing sections 114. ..
  • the mounting portion 114 has a fixed portion 114a and an attachment/detachment portion 114b which is the delivery port 12.
  • the fixing portion 114a and the attaching/detaching portion 114b differ from the first embodiment in that the dimension in the X direction is larger than that of the fixing portion 14a and the attaching/detaching portion 14b described in the first embodiment. Is the same as in the first embodiment. Further, two rows are secured for the attachment/detachment portion 114b which is the delivery port 12, and more articles 2 can be placed than the attachment/detachment portion 14b of the first embodiment.
  • the number of articles 2 transferred between the ceiling stocker 100 and the ceiling transfer vehicle system 200 increases, and the ceiling stocker 100 and the ceiling transfer vehicle system 200 are transferred. It is possible to improve the transportation efficiency of the article 2 during the period.
  • the upper ceiling carrier 60 moves the second elevating/lowering drive unit 64 to the +X side or the ⁇ X side by the second laterally moving mechanism 65 with respect to both the +X side row and the ⁇ X side row of the mounting section 114.
  • the article 2 can be delivered to and from the attachment/detachment portion 114b by laying out sideways and arranging the second grip portion 63 directly above the +X side row or the ⁇ X side row. It should be noted that either one of the +X side row and the ⁇ X side row can transfer the article 2 by elevating the second gripping portion 63 without performing the horizontal ejection by the second lateral ejection mechanism 65.
  • the mounting portion 114 may be arranged.
  • the crane 40 In carrying out the crane 40 from the first ceiling track 20 in the storage system SYS2, the crane 40 is arranged on the elevating track 25, and the attaching/detaching part 114b is removed from between the fixing parts 114a, as in the first embodiment.
  • the elevating track 25 is lowered while supporting the crane 40 which is not traveling.
  • the crane 40 is moved from the lowered hoisting track 25 to the transfer track 71 of the crane carrier 70 (see FIG. 5 etc.), and the crane 40 is transferred to another place by the crane carrier 70.
  • the attaching/detaching portion 114b is mounted between the fixing portions 114a.
  • the operation is reversed from the above operation.
  • the attaching/detaching portion 114b is removed from between the fixing portions 114a, and the elevating track 25 is lowered.
  • the crane 40 is moved from the transfer track 71 of the crane carrier 70 to the elevating track 25.
  • the elevating track 25 is raised and the elevating track 25 is arranged on the linear portion 21.
  • the attaching/detaching portion 114b is attached between the fixing portions 114a.
  • the storage system SYS2 similarly to the above-described storage system SYS, it is not necessary to provide a dedicated track for carrying the crane 40 in and out of the first ceiling track 20, and thus the ceiling transport vehicle system. It is possible to reliably and easily carry out and carry in the crane 40 without interfering with the crane 200.
  • the number of articles 2 that can be placed on the delivery port 12 attachment/detachment portion 114b
  • the efficiency of conveyance of the articles 2 between the ceiling stocker 100 and the ceiling guided vehicle system 200 is improved, and the entire system is improved.
  • the transport efficiency of the article 2 can be improved.
  • the present invention is not limited to the above description, and various modifications can be made without departing from the gist of the present invention.
  • the configuration in which the first ceiling track 20 and the second ceiling track 30 are not connected in the storage systems SYS and SYS2 has been described as an example, but the configuration is not limited to this.
  • the first ceiling track 20 and the second ceiling track 30 may be connected via a connection track or the like.
  • the configuration in which the shelf 10, the first ceiling track 20, and the second ceiling track 30 are suspended from the ceiling C or the system ceilings SC1 and SC2 is taken as an example. Although described, it is not limited to this configuration.
  • at least one of the shelf 10, the first ceiling track 20, and the second ceiling track 30 is supported by a pillar or a frame provided on the floor surface F, a gantry, or the like, and the load of the shelf 10 or the like on the floor surface F. It may be configured to receive.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Condensed Matter Physics & Semiconductors (AREA)
  • General Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Container, Conveyance, Adherence, Positioning, Of Wafer (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

【課題】天井軌道に対するクレーンの搬出及び搬入を確実かつ容易に行う。 【解決手段】保管システムSYSは、第1天井軌道20と、上下方向に複数段の保管部11を備えた棚10と、第1天井軌道20に沿って走行し、複数段の保管部11の間で物品2を受け渡しするクレーン40と、を有する天井ストッカ100と、天井ストッカ100の下端よりも下方に設けられた第2天井軌道30と、第2天井軌道30に沿って走行してロードポートLPに対して物品2を受け渡しする天井搬送車50と、を有する天井搬送車システムと、を備え、第1天井軌道20は、平面視において第2天井軌道30から外れた部分に、走行を停止しているクレーン40を支持して下降可能な昇降軌道25を有する。

Description

保管システム
 本発明は、保管システムに関する。
 半導体製造工場等では、半導体ウエハを収容するFOUP(Front‐Opening Unified Pod)又はレチクルを収容するレチクルポッド等の物品を天井搬送車により搬送して、処理装置のロードポート等の移載先に対して物品の受け渡しを行っている。この天井搬送車で搬送される物品は、この天井搬送車との間で物品を受け渡し可能な保管システムに保管されることが知られている(例えば、特許文献1参照)。特許文献1では、物品を載置する保管部が上下方向に複数段設けられており、この保管部の間で物品を移載可能としている。また、複数段の保管部における物品の移載は、天井軌道に沿って走行し、複数の保管部の間で物品を受け渡しするクレーンを適用可能であることが知られている(例えば、特許文献2参照)。
特開2017-030944号公報 国際公開第2018/074130号
 特許文献2に記載のクレーンは、メンテナンス等において天井軌道に対して搬出及び搬入させる必要がある。例えば、このクレーンが走行する天井軌道の下方に各種システム、装置、又は保管部等が設けられる場合、その各種システム等の配置を避けて天井軌道に対するクレーンの搬入及び搬出を行うことが必要となる。
 本発明は、天井軌道に対するクレーンの搬出及び搬入を確実かつ容易に行うことが可能な保管システムを提供することを目的とする。
 本発明の態様に係る保管システムは、第1天井軌道と、上下方向に複数段の保管部を備えた棚と、第1天井軌道に沿って走行し、複数段の保管部の間で物品を受け渡しするクレーンと、を有する天井ストッカと、天井ストッカの下端よりも下方に設けられた第2天井軌道と、第2天井軌道に沿って走行して所定の移載先に対して物品を受け渡しする天井搬送車と、を有する天井搬送車システムと、を備え、第1天井軌道は、平面視において第2天井軌道から外れた部分に、走行を停止しているクレーンを支持して下降可能な昇降軌道を有する。
 また、昇降軌道は、作業者用通路の直上に設けられてもよい。また、昇降軌道を吊り下げて保持する吊り下げ部材と、吊り下げ部材を巻き取り又は繰り出すことにより昇降軌道を昇降させる昇降軌道駆動部と、を備えてもよい。また、天井ストッカと天井搬送車システムとの間で上下方向に物品を搬送する搬送装置を備え、昇降軌道の直下には、天井搬送車及び搬送装置の何れもが物品を受け渡し可能な載置部が設けられ、載置部は、昇降軌道の直下から退避可能であってもよい。また、載置部は、一対の他の載置部の間に掛け渡されて配置され、天井搬送車は、他の載置部との間で物品を受け渡し可能であってもよい。
 上記した保管システムによれば、第1天井軌道が、平面視において第2天井軌道から外れた部分に、走行を停止しているクレーンを支持して下降可能な昇降軌道を有するため、この昇降軌道により、第1天井軌道に対するクレーンの搬出及び搬入を天井搬送車システムと干渉することなく確実かつ容易に行うことができる。
 また、昇降軌道が、作業者用通路の直上に設けられる構成では、通常、作業者用通路には装置等が置かれないので、この作業者用通路を利用することで、クレーンの搬出及び搬入を容易に行うことができる。また、昇降軌道を吊り下げて保持する吊り下げ部材と、吊り下げ部材を巻き取り又は繰り出すことにより昇降軌道を昇降させる昇降軌道駆動部と、を備える構成では、吊り下げ部材及び昇降軌道駆動部により、昇降軌道を容易に昇降させることができる。また、天井ストッカと天井搬送車システムとの間で上下方向に物品を搬送する搬送装置を備え、昇降軌道の直下には、天井搬送車及び搬送装置の何れもが物品を受け渡し可能な載置部が設けられ、載置部が、昇降軌道の直下から退避可能である構成では、昇降軌道を下降させる場合に昇降軌道の直下から載置部を退避させることにより、搬出及び搬入されるクレーンと載置部とが干渉するのを回避しつつ、天井搬送車と搬送装置とが物品を受け渡しする場所を増やすことができる。また、載置部が、一対の他の載置部の間に掛け渡されて配置され、天井搬送車が、他の載置部との間で物品を受け渡し可能である構成では、退避させる載置部において天井からの吊り下げ部材又は床面からの支持部材がないので、この載置部を昇降軌道の直下から容易に退避させることができる。
第1実施形態に係る保管システムの一例をX方向から見た図である。 図1に示す保管システムの一例をY方向から見た図である。 図1に示す保管システムを平面視で模式的に示した図である。 昇降軌道の動作の一例を示し、(A)は昇降軌道の下降前の状態を示す図、(B)は昇降軌道の下降時の状態を示す図である。 クレーンを搬出する動作の一例を示し、クレーンが昇降軌道に配置された状態を示す図である。 図5に続いて、載置部を退避した状態を示す図である。 図6に続いて、昇降軌道を下降させた状態を示す図である。 図7に続いて、クレーン搬送台車を昇降軌道に接続する状態を示す図である。 図8に続いて、クレーンをクレーン搬送台車に移載した状態を示す図である。 図9に続いて、昇降軌道を上昇させる状態を示す図である。 第2実施形態に係る保管システムの一例をY方向から見た図である。 図11に示す保管システムを平面視で模式的に示した図である。
 以下、実施形態について図面を参照しながら説明する。ただし、本発明は以下に説明する実施形態に限定されない。また、図面においては実施形態を説明するため、一部分を大きく又は強調して記載する等、適宜縮尺を変更して表現している。以下の各図においては、XYZ座標系により図中の方向を説明する。このXYZ座標系では、鉛直方向をZ方向とし、水平方向をX方向、Y方向とする。Y方向は、水平方向内における一方向である。X方向は、Y方向と直交する方向である。また、X、Y、Z方向の各方向について、適宜、矢印が指す向きを+方向(例えば、+X方向)と表現し、矢印が指す向きとは反対方向を-方向(例えば、-X方向)と表現する。
[第1実施形態]
 図1は、第1実施形態に係る保管システムSYSの一例をX方向から見た図である。図2は、保管システムSYSをY方向から見た図である。図3は、保管システムSYSを平面視で模式的に示した図である。なお、図3では、図を判別しやすくするため、物品2をハッチングで示している。
 図1から図3に示す保管システムSYSは、例えば、半導体デバイスの製造工場等に設けられ、半導体デバイスの製造に用いられる半導体ウエハを収容したFOUP、又はレチクルを収容したレチクルポッド等の物品2を保管する。本実施形態では、物品2がFOUPである例を説明するが、物品2は、FOUP以外であってもよい。また、保管システムSYSは、半導体製造分野以外の設備に適用可能であり、物品2は、保管システムSYSで保管可能な他の物品でもよい。
 保管システムSYSは、図1から図3に示すように、天井ストッカ100と、天井搬送車システム200と、搬送装置300と、を備える。天井ストッカ100は、複数の保管部11を備える棚10と、第1天井軌道20と、クレーン40とを備える。棚10は、平面視において、クレーン40が走行する第1天井軌道20に沿って配置される(図3参照)。また、棚10に備える複数の保管部11は、図1に示すように、フレーム13に設けられて、上下方向(Z方向)に3段配置されている。なお、保管部11の段数は任意に設定できる。また、複数の保管部11は、後述するクレーン40の走行方向(Y方向)に沿って複数並んで配置される。
 複数の保管部11は、物品2を載置する棚板11aを備えている。各棚板11aは、フレーム13に保持されている。以下の説明において、保管部11に物品2を置くことは、保管部11の棚板11aに物品2を置くことを意味する。なお、保管部11の棚板11aには、それぞれ物品2を載置した際に物品2の底面に設けられた溝部に入り込む複数のピンが設けられてもよい。このピンが物品2の溝部に入り込むことにより、物品2は、保管部11(棚板11a)に対して位置決めされる。
 棚10は、フレーム13によりシステム天井SC1から吊り下げられている。システム天井SC1は、吊り金具3により建屋の天井Cから吊り下げられている。なお、フレーム13は、システム天井SC1から吊り下げられることに代えて、天井Cから直接吊り下げられてもよい。棚10の下端は、床面Fからの処理装置TLの上端の高さよりも高くなるように設定されている。処理装置TLは、例えば、物品2であるFOUPに収容されている半導体ウエハに対して製膜処理又はエッチング処理等の各種処理を行う。また、後述するクレーン40の下端の高さも処理装置TLの上端の高さよりも高くなるように設定されている。すなわち、天井ストッカ100は、処理装置TLの上端よりも上方に配置されている。なお、クレーン40の下端は、作業者等が床面Fを支障なく通行することが可能な高さに設定される。その結果、天井ストッカ100の下方の空間の一部を、作業者用通路PSとして利用可能となる。
 保管部11は、クレーン40により物品2が載置され、また、物品2が取り出される。また、保管部11のうち一部は、後述する上側天井搬送車60により物品2が載置され、また物品2が取り出される。上側天井搬送車60により物品2が受け渡される保管部11は、棚10のうち最上段の保管部11である。保管部11の上下寸法(棚板11aの上面から上方の保管部11の棚板11aの下面までの寸法)は、後述するクレーン40の移載装置42が物品2を下面側から支持して持ち上げるために必要な寸法に設定される。クレーン40の移載装置42は、例えば、物品2を下面側から支持して持ち上げる構成が採用されており、物品2の上方に大きなスペースを必要としない。例えば、保管部11の上下寸法は、物品2の上下寸法に数センチ加える程度の寸法とすることも可能である。
 第1天井軌道20は、図1に示すように、システム天井SC1から吊り金具5により吊り下げられている。なお、第1天井軌道20は、システム天井SC1から吊り下げられることに代えて、天井Cから直接吊り下げられてもよい。第1天井軌道20は、図1に示すように、天井搬送車システム200の第2天井軌道30よりも床面Fからの高さが高い。
 第1天井軌道20は、図3に示すように、直線部21、22と、曲線部23とを有する周回軌道である。クレーン40は、直線部21、22及び曲線部23に沿って一方向(例えば平面視で反時計まわりの方向)に周回走行することが可能である。直線部21は、図3においてY方向に沿って配置される。直線部22は、図3においてX方向に沿って配置される。直線部21と直線部22とは互いに直交する方向にそれぞれ延在する。曲線部23は、直線部21と直線部22とを接続する。第1天井軌道20は、平面視において、周回軌道である第1天井軌道20の内側に分岐部24が設けられる。分岐部24は、2本の直線部22同士を接続する。
 上記した棚10は、直線部22の+Y側及び-Y側に設けられる。また、棚10は、分岐部24の+X側及び-X側に設けられる。これらの棚10は、処理装置TLの上方に配置されている。処理装置TLの上方は、天井搬送車システム200の第2天井軌道30が設けられないので、このようなデッドスペースに棚10を配置することにより、建屋内の空間を有効に利用することができる。
 また、第1天井軌道20は、平面視において第2天井軌道30から外れた部分(第2天井軌道30と重ならない位置)に、昇降軌道25を有する。図4は、昇降軌道の動作の一例を示し、(A)は昇降軌道の下降前の状態を示す図、(B)は昇降軌道の下降時の状態を示す図である。図4に示すように、第1天井軌道20の直線部21は、後述する昇降軌道25に対応する区間が切り欠かれている。直線部21は、切り欠き部分において互いに対向する端部21aと端部21bとを備える。この切り欠き部分(端部21a及び端部21b)は、後述する載置部14の直上である(図3参照)。昇降軌道25は、図4に示すように、筐体部26と、吊り下げ部材27と、昇降軌道駆動部28とを備える。筐体部26は、直線部21の端部21aと端部21bとの間に架け渡され、端部21aと端部21bとの間を上方から覆った状態で配置される。筐体部26は、吊り金具等により天井Cに支持されるが(図1参照)、システム天井SC1又は第1天井軌道20に支持されてもよい。
 筐体部26は、吊り下げ部材27及び昇降軌道駆動部28を介して昇降軌道25を支持する。昇降軌道25は、直線状であり、第1天井軌道20の直線部21の一部に設けられる。すなわち、昇降軌道25は、周回軌道である第1天井軌道20を構成する直線部21の一部として設けられている。昇降軌道25は、最も上昇したときに端部21aと端部21bとの間に配置され、端部21a及び端部21bの双方に接続される。昇降軌道25は、直線方向の寸法が、例えば、クレーン40に備える2台の走行部41の全体がその昇降軌道25内に収まるように設定される。
 吊り下げ部材27は、例えばワイヤ、ベルト等であり、昇降軌道25を吊り下げて保持する。吊り下げ部材27は、昇降軌道25の直線方向に複数、例えば2つ並んで配置される。吊り下げ部材27は、昇降軌道駆動部28によって巻き取られて保持される。吊り下げ部材27は、昇降軌道25を下降させたときに、床面Fに近い所定の高さまで下降させることが可能な長さを有する。
 昇降軌道駆動部28は、筐体部26に保持され、吊り下げ部材27の巻き取り及び繰り出しを行うことで昇降軌道25を昇降させる。昇降軌道駆動部28は、例えばモータ装置等の不図示の駆動源と、吊り下げ部材27を巻き取る回転可能な不図示の巻き取り軸と、駆動源の駆動力を巻き取り軸に伝達する不図示の伝達機構とを有する。昇降軌道駆動部28は、駆動源の駆動力が巻き取り軸に伝達されることにより巻き取り軸を回転させ、吊り下げ部材27の巻き取り及び繰り出しを行う。なお、昇降軌道駆動部28の動作は、不図示の制御装置等により制御される。
 昇降軌道25は、走行を停止しているクレーン40を支持して下降可能(昇降可能)である。図3に示すように、平面視において、昇降軌道25が第2天井軌道30から外れているので、昇降軌道25にクレーン40が停止した状態で、昇降軌道25を昇降させることにより、天井搬送車システム200と干渉することなくクレーン40を昇降させることができる。また、昇降軌道25は、作業者用通路PSの直上に配置される。この作業者用通路PSは、平面視において第2天井軌道30の直下から外れて設けられている。作業者用通路PSは、作業者の通行を可能とするために処理装置TL及び処理装置TLのロードポートLP等の各種装置、機器等が設置されていない領域である。このため、メンテナンス時等にこの作業者用通路PSを一時的に利用することで、クレーン40を床面Fの近傍まで確実に降ろすことが可能となる。なお、昇降軌道25を昇降させる構成は、上記した構成に限定されず、昇降軌道25を昇降させる任意の構成を適用可能である。
 クレーン40は、図1及び図2に示すように、物品2を保持し、第1天井軌道20を走行して移動する。クレーン40は、保管部11と他の保管部11との間で物品2を搬送する。なお、1つの第1天井軌道20に配置されるクレーン40は、1台に限定されない。例えば、1つの第1天井軌道20に2台以上のクレーン40が配置されてもよい。クレーン40は、図1及び図2に示すように、第1天井軌道20から吊り下げられている。
 クレーン40は、2台の走行部41と、移載装置42と、を備える。走行部41の下方には、取付部46を介して上部支持部47が取り付けられ、上部支持部47により2台の走行部41が連結されている。各走行部41は、不図示の走行駆動部及び複数の車輪41aを備え、第1天井軌道20に沿って走行する。走行部41が備える不図示の走行駆動部は、例えば、走行部41に備えられて車輪41aを駆動する電動モータであってもよいし、リニアモータであってもよい。なお、本実施形態のクレーン40では、2台の走行部41を備えていることにより、重量物である移載装置42及び物品2を確実に支持することができる。なお、クレーン40は、2台の走行部41を備える構成に限定されず、1台又は3台以上の走行部41を備えてもよい。
 移載装置42は、マスト43と、昇降台44と、昇降駆動部45と、伸縮部48と、載置台49とを備える。マスト43は、上部支持部47から吊り下げられた状態で上下方向に延在する。マスト43は、走行部41の走行方向の前後にそれぞれ1本ずつ設けられている。なお、マスト43は、合計2本であることに限定されず、1本であってもよい。マスト43は、上記したように、マスト43の下端の床面Fからの高さが処理装置TLの上端の高さよりも高くなるように設けられている。例えば、マスト43の下端がクレーン40の下端である。
 伸縮部48は、走行部41の走行方向と直交する方向に伸縮可能な複数のアームにより構成されている。載置台49は、伸縮部48の先端に設けられている。載置台49は、物品2を載置可能な三角形状の板状部材である。載置台49は、その載置台49に載置された物品2を下側から支持することにより保持する。載置台49の上面には、物品2の底面に備える溝部に挿入して物品2を位置決めするピンが設けられている。なお、上記した保管部11の棚板11aには、載置台49が上下方向に通過可能な不図示の切り欠きが設けられている。
 移載装置42は、保管部11から物品2を受け取る際、伸縮部48を伸ばして載置台49を物品2の下方に位置させて昇降台44を上昇させることにより、載置台49で物品2をすくい上げる。移載装置42は、載置台49に物品2を載置したまま伸縮部48を縮めることにより、物品2を載置した載置台49を昇降台44の上方に配置させる。また、移載装置42により物品2を保管部11に渡す際は、上記の逆の動作により行う。なお、移載装置42は、上記した構成に限定されず、例えば物品2の一部(例えば、FOUPの上部に設けられたフランジ部2a)を保持して持ち上げる構成等、他の構成であってもよい。
 2台の昇降駆動部45は、例えば、ホイストであり、マスト43に沿って昇降台44を昇降させる。各昇降駆動部45は、吊り下げ部材45a及び不図示の駆動部を備える。吊り下げ部材45aは、例えば、ベルト又はワイヤ等であり、昇降台44は、この吊り下げ部材45aによって上部支持部47から吊り下げられている。昇降駆動部45が備える不図示の駆動部は、例えば上部支持部47に設けられ、吊り下げ部材45aの繰り出し、巻き取りを行う。昇降台44は、昇降駆動部45が備える不図示の駆動部が吊り下げ部材45aを繰り出すと、マスト43に案内されて下降する。また、昇降台44は、昇降駆動部45が備える不図示の駆動部が吊り下げ部材45aを巻き取ると、マスト43に案内されて上昇する。昇降駆動部45は、不図示の制御装置等により制御されて、所定の速度で昇降台44を下降又は上昇させる。また、昇降駆動部45は、不図示の制御装置等により制御されて、昇降台44を目標の高さに保持する。
 昇降駆動部45は、上部支持部47に設けられる。なお、昇降駆動部45は、上部支持部47に設けられることに代えて、例えば、昇降台44に設けられてもよい。昇降台44に昇降駆動部45が設けられる構成としては、例えば、上部支持部47から吊り下げたベルト又はワイヤ等を昇降台44に搭載したホイストにより巻き上げ又は繰り出しを行って昇降台44を昇降させる構成であってもよい。また、昇降台44にピニオンギアを駆動する電動モータ等が搭載され、このピニオンギアが噛み合うラックがマスト43に形成され、電動モータ等によりピニオンギアを回転させることにより昇降台44を昇降させる構成であってもよい。
 天井搬送車システム200は、第2天井軌道30と、天井搬送車50とを備える。天井搬送車50は、第2天井軌道30に沿って走行し、第2天井軌道30より下方に配置された所定の移載先である処理装置TLのロードポートLPに対して物品2の受け渡しを行う。第2天井軌道30は、図1に示すように、システム天井SC2の下面側に取り付けられる。システム天井SC2は、天井Cから吊り金具4により吊り下げられている。なお、第2天井軌道30は、システム天井SC2から吊り下げられることに代えて、システム天井SC1から吊り下げられてもよいし、天井Cから直接吊り下げられてもよい。
 第2天井軌道30は、図3に示すように、平面視でインターベイルート(ベイ間軌道)R1とインターベイルートR2との間に配置されている。第2天井軌道30は、ベイ内(イントラベイ内)にそれぞれ設けられており、インターベイルートR1等は、複数の第2天井軌道30を接続するために設けられている。本実施形態において、ベイ(イントラベイ)とは、例えば、平面視において、複数の処理装置TLにおけるロードポートLPが互いに対向するように設けられ、互いに対向するように設けられたロードポートLPの間に作業者用通路PSが設けられている範囲(領域)を指す。第2天井軌道30は、インターベイルートR1から進入用又は退出用の2本の支線S1を介して接続され、インターベイルートR2から進入用又は退出用の2本の支線S2を介して接続されている。
 第2天井軌道30は、直線部31と、接続部32とを有する。天井搬送車50は、直線部31及び接続部32に沿って一方向(例えば平面視で時計まわりの方向)に周回走行する。直線部31は、ロードポートLPの直上において、複数のロードポートLPに沿ってY方向に配置される。2本の直線部31は、平面視で第1天井軌道20の直線部21と並行するように(平行に)配置されている。接続部32は、曲線部を含んで+Y側及び-Y側の両端に配置され、2つの直線部31同士を接続する。第2天井軌道30は、天井ストッカ100のクレーン40(マスト43)及び棚10より下方に配置される。この第2天井軌道30を走行する天井搬送車50は、天井ストッカ100より下方において走行する。
 天井搬送車50は、インターベイルートR1、R2に対して支線S1、S2を介して第2天井軌道30に進入し、又は第2天井軌道30に対して支線S1、S2を介してインターベイルートR1、R2に退出する。天井搬送車50は、第2天井軌道30に沿って走行し、直線部31において処理装置TLのロードポートLPと、後述する載置部14との間で物品2の移載を行う。
 第2天井軌道30の直線部31は、所定の間隔(作業者用通路PS)を隔てて相対向する複数のロードポートLPの直上に沿って設けられている。本実施形態では、ロードポートLPが、1台の処理装置TLにおいて4カ所設けられているが(図3参照)、この形態に限定されない。例えば、1台の処理装置TLにおいて1カ所から3カ所のロードポートLPが設けられてもよいし、5カ所以上のロードポートLPが設けられてもよい。ただし、ロードポートLPに載置可能な物品2の数は処理装置TLごとに予め定められている。第2天井軌道30は、ロードポートLPの直上に設けられており、第2天井軌道30を走行する天井搬送車50が停止して物品2を昇降させるだけでロードポートLPとの間で物品2の受け渡しを行い、後述する載置部14(受け渡しポート12)に対しては把持部53を横出しして(横移載により)物品2の受け渡しを行う。
 天井搬送車50は、図1及び図2に示すように、走行部51と、本体部52とを有する。走行部51は、不図示の走行駆動部及び複数の車輪51aを備え、第2天井軌道30に沿って走行する。走行部51が備える不図示の走行駆動部は、例えば、走行部51に備えられて車輪51aを駆動する電動モータであってもよいし、リニアモータであってもよい。
 本体部52は、取付部52aを介して走行部51の下部に取り付けられている。本体部52は、物品2を保持する把持部53と、把持部53を吊り下げて昇降させる昇降駆動部54と、昇降駆動部54を軌道の側方に移動させる横出し機構55とを有する。把持部53は、物品2のフランジ部2aを上方からつかんで把持することにより、物品2を吊り下げて保持する。把持部53は、例えば、水平方向に進退可能な複数の爪部を有するチャックであり、爪部を物品2のフランジ部2aの下方に進入させ、把持部53を上昇させることにより物品2を吊り下げて保持する。把持部53は、ワイヤ又はベルト等の吊り下げ部材と接続されている。把持部53は、昇降駆動部54から吊り下げられ、その昇降駆動部54により昇降させられる。
 昇降駆動部54は、例えばホイストであり、吊り下げ部材を繰り出すことにより把持部53を下降させ、吊り下げ部材を巻き取ることにより把持部53を上昇させる。昇降駆動部54は、不図示の制御装置等により制御され、所定の速度で把持部53を下降又は上昇させる。また、昇降駆動部54は、不図示の制御装置等により制御され、把持部53を目標の高さに保持する。
 横出し機構55は、例えば上下方向に重ねて配置された可動板を有する。可動板は、走行部51の走行方向の側方(走行方向に直交する方向、横方向)に移動可能である。可動板には、昇降駆動部54が取り付けられている。本体部52は、横出し機構55を案内する不図示のガイド、及び横出し機構55を駆動する不図示の駆動部等を有する。横出し機構55は、電動モータ等の駆動部からの駆動力によって、昇降駆動部54及び把持部53を突出位置と格納位置との間で移動させる。突出位置は、把持部53が本体部52から側方に突出する位置である。格納位置は、本体部52内に把持部53を格納する位置である。なお、昇降駆動部54又は把持部53を上下方向の軸まわりに回転させるための回転機構が設けられてもよい。
 天井搬送車50は、上記のように昇降駆動部54により把持部53(物品2)を昇降させて、ロードポートLPとの間で物品2の受け渡しを行う。また、天井搬送車50は、横出し機構55により昇降駆動部54(把持部53)を複数の載置部14(受け渡しポート12を含む)のいずれかの上方に移動させた状態で、昇降駆動部54により把持部53(物品2)を昇降させて、その載置部14との間で物品2を受け渡すことが可能である。
 搬送装置300は、天井ストッカ100と天井搬送車システム200との間で上下方向に物品2を搬送する。本実施形態では、搬送装置300は、上側天井搬送車60である。また、保管システムSYSは、天井搬送車システム200と搬送装置300(上側天井搬送車60)との間で物品を受け渡すための受け渡しポート12を備える。受け渡しポート12は、物品2を載置可能な載置部14の一部である。受け渡しポート12には、複数の物品2を載置可能である。受け渡しポート12は、上側天井搬送車60が走行する第1天井軌道20の直線部21の下方に配置される。また、受け渡しポート12は、第2天井軌道30に対して横方向かつ下方に配置される。その結果、上記のように、天井搬送車50は受け渡しポート12に対して横移載により物品2の受け渡しが可能である。
 載置部14は、平面視において、周回軌道である第2天井軌道30の内側に配置され、Y方向に沿って直線状に設けられる。載置部14は、物品2を例えば1列に並べて載置可能である。載置部14は、固定部14aと、受け渡しポート12である着脱部14bとを有する。着脱部14bは、昇降軌道25の直下に設けられる。固定部14aは、載置部14の一部である着脱部14b(受け渡しポート12)に対して、一対の他の載置部14である。固定部14aは、例えば板状の部材又は2本の梁状の部材であり、システム天井SC2から吊り下げられ、板状の部材上又は2本の梁状の部材上に物品2が載置される。一対の固定部14aは、昇降軌道25の直下に位置する部分に間隙を隔てて配置される。間隙の寸法、つまり一対の固定部14a同士の間隔は、昇降軌道25(及びクレーン40)が上下方向に通過可能な寸法に設定される。固定部14aは、間隙を挟んで対向する端部に、着脱部14bを連結するための連結部14dを有する。なお、固定部14aは、物品2を載置可能であって、天井搬送車50により物品2を受け渡し可能なバッファである。
 載置部14のうちの着脱部14bは、天井搬送車システム200の天井搬送車50、及び搬送装置300である上側天井搬送車60の何れもが物品2を受け渡し可能である。この着脱部14bは、天井搬送車50と上側天井搬送車60(搬送装置300)との間で物品2を受け渡すための受け渡しポート12である。着脱部14bは、固定部14aと同様に板状の部材又は2本の梁状の部材である。着脱部14bは、昇降軌道25の直下において、固定部14aの間に掛け渡されて配置される。着脱部14bは、長手方向の両側の端部が固定部14aの両側の連結部14dにそれぞれ連結されて保持される。この構成により、着脱部14bは、天井C又はシステム天井SC2等からの吊り下げ部材、床面Fからの支持部材が不要となり、吊り下げ部材等が天井搬送車50又は上側天井搬送車60の走行、又はクレーン40(昇降軌道25)の昇降の支障となること等を回避しつつ、着脱部14bを容易に着脱させることができる。着脱部14bは、固定部14aの連結部14dから取り外されることにより、昇降軌道25の直下から退避可能である。
 上側天井搬送車60は、天井ストッカ100と、受け渡しポート12(載置部14のうちの着脱部14b)との間で上下方向に物品2を搬送する。上側天井搬送車60は、第2走行部61と、第2本体部62とを有する。第2走行部61は、クレーン40の走行部41と同様の構成が適用されており、不図示の走行駆動部及び複数の車輪61aを備え、第1天井軌道20に沿って走行する。第2本体部62は、取付部62aを介して第2走行部61の下部に取り付けられている。第2本体部62は、物品2を保持する第2把持部63と、第2把持部63を吊り下げて昇降させる第2昇降駆動部64と、第2昇降駆動部64を軌道の側方に移動させる第2横出し機構65とを有する。
 これら第2走行部61、第2本体部62、第2把持部63、第2昇降駆動部64、及び第2横出し機構65は、上記した天井搬送車50の走行部51、本体部52、把持部53、昇降駆動部54、及び横出し機構55と同様の構成が適用される。従って、上側天井搬送車60は、天井搬送車システム200の天井搬送車50をそのまま適用可能である。また、上側天井搬送車60は、第1天井軌道20を走行するので別途軌道を設ける必要がなく、保管システムSYSの製造コストを低減できる。
 上側天井搬送車60は、第2昇降駆動部64により第2把持部63(物品2)を昇降させて、受け渡しポート12である載置部14の着脱部14bとの間で物品2を受け渡し可能である。また、上側天井搬送車60は、第2横出し機構65により第2昇降駆動部64を複数段の保管部11のうちの1つの保管部11の上方に移動させた状態で、第2昇降駆動部64により第2把持部63(物品2)を昇降させて、第2昇降駆動部64の下方に存在する保管部11との間で物品2を受け渡し可能である。本実施形態では、上側天井搬送車60は、棚10のうち最上段の保管部11との間で物品2を受け渡し可能である。なお、上側天井搬送車60との受け渡し対象の保管部11が最上段以外の保管部11であってもよい。また、搬送装置300は、上側天井搬送車60であることに限定されず、例えば、コンベヤ装置等、物品2を保管部11と受け渡しポート12との間で搬送可能な他の装置であってもよい。
 図3に示すように、本実施形態では、棚10の一部と、所定の移載先である処理装置TLのロードポートLPとが、平面視において重なっている。従って、棚10をロードポートLPの上方まで水平方向に拡張することができ、多くの物品2を保管することができる。また、棚10は、天井搬送車システム200の第2天井軌道30の配置にかかわらず、棚10を設けることができるので、棚10の配置の自由度が高く、物品2の収納効率がよい棚10の配置を容易に実現できる。
 また、保管システムSYSは、不図示の制御装置を有する。この不図示の制御装置は、保管システムSYSを統括して制御する。不図示の制御装置は、無線又は有線による通信によりクレーン40、天井搬送車50、及び上側天井搬送車60の動作を制御する。なお、不図示の制御装置は、クレーン40を制御する制御装置と、天井搬送車50を制御する制御装置と、上側天井搬送車60を制御する制御装置と、に分割されてもよい。
 保管システムSYSにおいて保管部11からロードポートLPに物品2を搬送する場合、不図示の制御装置は、上側天井搬送車60(搬送装置300)を制御し、最上段の保管部11から搬送対象の物品2を受け取り、指定された受け渡しポート12に物品2を渡すように指示する。搬送対象の物品2が最上段以外の保管部11にある場合、天井ストッカ100のクレーン40は、搬送対象の物品2を棚10における最上段の保管部11に移載する。
 続いて、上側天井搬送車60は、第1天井軌道20に沿って走行し、搬送対象の物品2が載置された保管部11の側方に停止して、第2横出し機構65を突出させた後に第2昇降駆動部64により第2把持部63を下降させ、第2把持部63により物品2を把持する。続いて、上側天井搬送車60は、第2昇降駆動部64により第2把持部63を上昇させた後、第2横出し機構65を収縮させて第2把持部63を格納位置に戻すことにより、物品2を第2本体部62内に収容する。
 続いて、上側天井搬送車60は、第2把持部63により物品2を保持して第1天井軌道20に沿って走行し、指定された受け渡しポート12(着脱部14b)の直上で停止する。続いて、上側天井搬送車60は、第2昇降駆動部64を駆動して第2把持部63及び物品2を下降させ、物品2を受け渡しポート12に載置させた後に第2把持部63による把持を解放することにより物品2を受け渡しポート12に渡す。
 次に、不図示の制御装置は、天井搬送車システム200の天井搬送車50を制御して、受け渡しポート12から物品2を受け取り、指定されたロードポートLPに物品2を渡すように指示する。天井搬送車50は、第2天井軌道30に沿って走行し、物品2が載置された受け渡しポート12の側方に停止して、横出し機構55を突出させた後に昇降駆動部54により把持部53を下降させ、把持部53により物品2を把持する。その後、天井搬送車50は、昇降駆動部54により把持部53を上昇させた後、横出し機構55を収縮させて把持部53を格納位置に戻すことにより、物品2を本体部52内に収容する。
 続いて、天井搬送車50は、把持部53により物品2を保持して第2天井軌道30に沿って走行し、指定されたロードポートLPの直上で停止する。続いて、天井搬送車50は、昇降駆動部54を駆動して把持部53及び物品2を下降させ、物品2をロードポートLPに載置させた後に把持部53による把持を解放することにより物品2をロードポートLPに渡す。以上の一連の動作により、物品2は、保管部11からロードポートLPに搬送される。
 また、処理装置TLのロードポートLPから天井ストッカ100の保管部11に物品2を搬送する場合は、上記した一連の動作の逆の動作を行うことにより、物品2は、受け渡しポート12を経由して処理装置TLのロードポートLPから天井ストッカ100の保管部11に搬送される。なお、物品2の移載先がロードポートLP以外であっても上記と同様であり、ロードポートLP以外から物品2を受ける場合についても上記と同様である。
 図5から図10は、保管システムSYSにおいてクレーン40の搬出動作の一例を示す図である。第1天井軌道20からクレーン40を搬出する場合、まず、図5に示すように、搬出対象となるクレーン40を、昇降軌道25に配置する。この場合、クレーン40は、2つの走行部41が昇降軌道25内に収容される位置まで移動して停止する。クレーン40の停止位置は、不図示の制御装置により制御される。また、クレーン40の走行部41は、車輪41aが転動しないように、不図示のブレーキ装置により車輪41aをロックしてもよいし、不図示の走行駆動部により停止位置で車輪41aを保持させてもよい。また、昇降軌道25の直下の着脱部14b上には物品2が載置されないように、予め、天井搬送車50又は上側天井搬送車60により着脱部14b上の物品2を他の載置部14(固定部14a)又は天井ストッカ100の保管部11に搬送しておく。
 次に、図6に示すように、着脱部14bは、固定部14aの間から取り外されて、昇降軌道25の直下から退避させられる。着脱部14bの取り外し作業は、例えば作業者が手作業により連結部14dによる連結を解除してもよいし、連結部14dが電動の連結装置である場合には、この連結装置を駆動させて連結を解除してもよい。取り外された着脱部14bは、所定の保管場所に搬送されて一時的に保管される。また、両側の連結部14dの一方をヒンジとし、他方の連結部14dによる連結を解除することにより、着脱部14bをヒンジから垂下させて、着脱部14bを退避させる構成であってもよい。
 次に、図7に示すように、昇降軌道駆動部28を駆動させて吊り下げ部材27を繰り出すことにより、クレーン40を載置したまま昇降軌道25を下降させる。昇降軌道25の下降により、昇降軌道25及びクレーン40は、対向する固定部14aの間隙を通過し、昇降軌道25が床面Fから所定の高さに達した段階で昇降軌道駆動部28の駆動を停止させる。なお、昇降軌道駆動部28の駆動は、不図示の制御装置により制御されてもよいし、作業者が操作部を操作することにより行ってもよい。昇降軌道25を停止させる所定の高さは、クレーン40の下端が床面Fに接触しない高さである。また、昇降軌道25を停止させる所定の高さは、後述するクレーン搬送台車70の移載用軌道71(図8参照)の高さと等しい高さであってもよい。
 次に、図8に示すように、昇降軌道25の一方の端部側にクレーン搬送台車70を配置させる。クレーン搬送台車70は、移載用軌道71と、クレーン収容部72と、車輪73とを有する。移載用軌道71は、例えば断面形状及び寸法が昇降軌道25の断面形状及び寸法と同一又はほぼ同一の部材である。従って、移載用軌道71にクレーン40を移載した場合、クレーン40の2台の走行部41を移載用軌道71内に収容することができる。クレーン収容部72は、クレーン40の移載装置42及びマスト43を収容可能な寸法に形成されている。車輪73は、例えばキャスタであり、クレーン搬送台車70を床面F上において移動させる。なお、車輪73の少なくとも1つは、電動モータ等の駆動源による駆動を受けて転動する駆動輪であってもよい。
 クレーン搬送台車70を昇降軌道25の一方の端部側に配置した後、走行部41の車輪41aのロックを解除し、図9に示すように、クレーン40を昇降軌道25から移載用軌道71側へ移動させる。昇降軌道25が移載用軌道71と等しい高さ位置に配置されるため、クレーン40をスムーズに昇降軌道25から移載用軌道71に移動させることができる。なお、移載用軌道71に収容された走行部41が移動しないように、車輪41aに対するまわり止め、又は走行部41の一部を移載用軌道71に保持するための連結具を備えてもよい。また、クレーン収容部72がマスト43を収容可能な寸法に形成されているため、クレーン40を移載用軌道71に移動させるだけでマスト43及び移載装置42がクレーン収容部72に収容される。
 クレーン40がクレーン搬送台車70に収容された後、図10に示すように、クレーン搬送台車70は、作業者等に押されることにより、作業者用通路PSを通って所定のメンテナンスエリア又は保管施設等まで移動する。また、昇降軌道駆動部28は、吊り下げ部材27を巻き取ることにより、昇降軌道25を上昇させる。昇降軌道25は、対向する固定部14aの間隙を通過し、第1天井軌道20の直線部21の切り欠き部分に配置される。昇降軌道25が直線部21に配置された後、作業者等により、着脱部14bを固定部14aの間に装着する。この一連の動作により、第1天井軌道20のクレーン40を搬出することができる。
 また、第1天井軌道20にクレーン40を搬入する場合には、上記した動作の逆の動作により行う。まず、着脱部14bを固定部14aの間から取り外して、昇降軌道25を上記した高さまで下降させる。昇降軌道25の下降後、クレーン40を収容したクレーン搬送台車70を昇降軌道25の一方の端部側に配置させ、クレーン40を移載用軌道71から昇降軌道25へ移動させる。クレーン40を昇降軌道25へ移動させた後、昇降軌道25を上昇させ、昇降軌道25を直線部21に配置させる。昇降軌道25が直線部21に配置された後、着脱部14bを固定部14aの間に装着する。
 このように、保管システムSYSによれば、クレーン40を載置して昇降可能な昇降軌道25が、第1天井軌道20の一部に設けられ、かつ、平面視において第2天井軌道30から外れた部分に配置されるので、クレーン40を第1天井軌道20に対して搬出又は搬入するための専用の軌道を設ける必要がなく、天井搬送車システム200と干渉することなく、クレーン40の搬出及び搬入を確実かつ容易に行うことができる。
[第2実施形態]
 上記した第1実施形態では、受け渡しポート12である着脱部14bが、複数の物品2をY方向に1列に並べて載置可能な構成を示しているが、この構成に限定されない。図11及び図12は、第2実施形態に係る保管システムSYS2の一例を示す図である。図11は側面図、図12は平面図を示している。なお、以下の説明において、上記した第1実施形態と同一又は同等の構成については同一の符号を付けて説明を省略又は簡略化する。
 図11及び図12に示すように、保管システムSYS2は、物品2を載置する載置部114を有する。載置部114は、平面視において第2天井軌道30の周回部分の内側に配置され、Y方向に沿って直線状に設けられる。載置部114は、複数の物品2をX方向に2列に並べて載置可能である。この場合、載置部114のうち+X側の列に対しては、載置部114の+X側に配置される直線部31を走行する上側天井搬送車60によって物品2の受け渡しが可能である。また、載置部114のうち-X側の列に対しては、載置部114の-X側に配置される直線部31を走行する上側天井搬送車60によって物品2の受け渡しが可能である。
 載置部114は、固定部114aと、受け渡しポート12である着脱部114bとを有する。固定部114a及び着脱部114bは、X方向の寸法が第1実施形態に記載の固定部14a及び着脱部14bよりも大きくなっている点で第1実施形態とは異なっており、他の構成については第1実施形態と同様である。また、受け渡しポート12である着脱部114bについても、2列分確保されており、第1実施形態の着脱部14bよりも多くの物品2を載置可能となっている。従って、天井ストッカ100と天井搬送車システム200との間で受け渡しされる物品2の数(受け渡しポート12に載置される物品2の数)が多くなり、天井ストッカ100と天井搬送車システム200との間の物品2の搬送効率を向上させることができる。
 また、上側天井搬送車60は、載置部114のうち+X側及び-X側の列の双方に対して、第2横出し機構65により第2昇降駆動部64を+X側又は-X側に横出しして、第2把持部63を+X側の列又は-X側の列の直上に配置させることで着脱部114bとの間で物品2の受け渡しが可能である。なお、+X側の列及び-X側の列のいずれか一方は、第2横出し機構65による横出しを行わずに第2把持部63を昇降させることで物品2の受け渡しが可能となるように、載置部114が配置されてもよい。
 保管システムSYS2において、第1天井軌道20からクレーン40を搬出する場合には、第1実施形態と同様に、クレーン40を昇降軌道25に配置させ、着脱部114bを固定部114aの間から取り外し、走行を停止しているクレーン40を支持して昇降軌道25を下降させる。下降した昇降軌道25からクレーン搬送台車70(図5等参照)の移載用軌道71へクレーン40を移動させ、クレーン搬送台車70によりクレーン40を他の場所に移送する。昇降軌道25を上昇させて直線部21に配置した後、着脱部114bを固定部114aの間に装着する。この一連の動作により、第1天井軌道20のクレーン40を搬出することができる。
 また、第1天井軌道20にクレーン40を搬入する場合には、上記した動作の逆の動作により行う。まず、着脱部114bを固定部114aの間から取り外して、昇降軌道25を下降させる。昇降軌道25の下降後、クレーン40をクレーン搬送台車70の移載用軌道71から昇降軌道25へ移動させる。クレーン40を昇降軌道25へ移動させた後、昇降軌道25を上昇させ、昇降軌道25を直線部21に配置させる。昇降軌道25が直線部21に配置された後、着脱部114bを固定部114aの間に装着する。
 このように、保管システムSYS2によれば、上記した保管システムSYSと同様に、クレーン40を第1天井軌道20に対して搬出又は搬入するための専用の軌道を設ける必要がなく、天井搬送車システム200と干渉することなく、クレーン40の搬出及び搬入を確実かつ容易に行うことができる。また、受け渡しポート12(着脱部114b)に載置可能な物品2の数が多くなるので、天井ストッカ100と天井搬送車システム200との間の物品2の搬送効率を向上させ、システム全体としての物品2の搬送効率を向上させることができる。
 以上、実施形態について説明したが、本発明は、上述した説明に限定されず、本発明の要旨を逸脱しない範囲において種々の変更が可能である。例えば、上記した実施形態では、保管システムSYS、SYS2において、第1天井軌道20と第2天井軌道30とが接続されない構成を例に挙げて説明したが、この構成に限定されない。例えば、第1天井軌道20と第2天井軌道30とが接続軌道等を介して接続されてもよい。
 また、上記した実施形態では、保管システムSYS、SYS2において、棚10、第1天井軌道20、第2天井軌道30が、天井C又はシステム天井SC1、SC2から吊り下げられた構成を例に挙げて説明したが、この構成に限定されない。例えば、棚10、第1天井軌道20、及び第2天井軌道30の少なくとも1つが、床面F上に設けられた支柱又はフレーム、架台等によって支持され、棚10等の荷重を床面Fで受けるような構成であってもよい。
 なお、上述の実施形態などで説明した要件の1つ以上は、省略されることがある。また、上述の実施形態などで説明した要件は、適宜組み合わせることができる。また、法令で許容される限りにおいて、日本特許出願である特願2019-011280、及び、上述の実施形態などで引用した全ての文献の開示を援用して本文の記載の一部とする。
C・・・天井
F・・・床面
LP・・・ロードポート
TL・・・処理装置
PS・・・作業者用通路
SYS、SYS2・・・保管システム
2・・・物品
10・・・棚
11・・・保管部
12・・・受け渡しポート
14、114・・・載置部
14a、114a・・・固定部
14b、114b・・・着脱部
20・・・第1天井軌道
25・・・昇降軌道
27・・・吊り下げ部材
28・・・昇降軌道駆動部
30・・・第2天井軌道
40・・・クレーン
50・・・天井搬送車
60・・・上側天井搬送車
70・・・クレーン搬送台車
71・・・搬入出用軌道
72・・・クレーン収容部
73・・・移動部
100・・・天井ストッカ
200・・・天井搬送車システム
300・・・搬送装置

Claims (5)

  1.  第1天井軌道と、上下方向に複数段の保管部を備えた棚と、前記第1天井軌道に沿って走行し、前記複数段の保管部の間で物品を受け渡しするクレーンと、を有する天井ストッカと、
     前記天井ストッカの下端よりも下方に設けられた第2天井軌道と、前記第2天井軌道に沿って走行して所定の移載先に対して物品を受け渡しする天井搬送車と、を有する天井搬送車システムと、を備え、
     前記第1天井軌道は、平面視において前記第2天井軌道から外れた部分に、走行を停止している前記クレーンを支持して下降可能な昇降軌道を有する、保管システム。
  2.  前記昇降軌道は、作業者用通路の直上に設けられる、請求項1に記載の保管システム。
  3.  前記昇降軌道を吊り下げて保持する吊り下げ部材と、前記吊り下げ部材を巻き取り又は繰り出すことにより前記昇降軌道を昇降させる昇降軌道駆動部と、を備える、請求項1又は請求項2に記載の保管システム。
  4.  前記天井ストッカと前記天井搬送車システムとの間で上下方向に物品を搬送する搬送装置を備え、
     前記昇降軌道の直下には、前記天井搬送車及び前記搬送装置が何れも物品を受け渡し可能な載置部が設けられ、
     前記載置部は、前記昇降軌道の直下から退避可能である、請求項1から請求項3のいずれか一項に記載の保管システム。
  5.  前記載置部は、一対の他の載置部の間に掛け渡されて配置され、
     前記天井搬送車は、前記他の載置部との間で物品を受け渡し可能である、請求項4に記載の保管システム。
PCT/JP2019/048870 2019-01-25 2019-12-13 保管システム WO2020153039A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP19911633.6A EP3915903A4 (en) 2019-01-25 2019-12-13 STORAGE SYSTEM
JP2020567419A JP7136236B2 (ja) 2019-01-25 2019-12-13 保管システム
SG11202108087XA SG11202108087XA (en) 2019-01-25 2019-12-13 Storage system
US17/425,716 US11615975B2 (en) 2019-01-25 2019-12-13 Storage system
CN201980089990.1A CN113348140B (zh) 2019-01-25 2019-12-13 保管***
KR1020217023443A KR102531954B1 (ko) 2019-01-25 2019-12-13 보관 시스템

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019011280 2019-01-25
JP2019-011280 2019-01-25

Publications (1)

Publication Number Publication Date
WO2020153039A1 true WO2020153039A1 (ja) 2020-07-30

Family

ID=71736727

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/048870 WO2020153039A1 (ja) 2019-01-25 2019-12-13 保管システム

Country Status (8)

Country Link
US (1) US11615975B2 (ja)
EP (1) EP3915903A4 (ja)
JP (1) JP7136236B2 (ja)
KR (1) KR102531954B1 (ja)
CN (1) CN113348140B (ja)
SG (1) SG11202108087XA (ja)
TW (1) TWI828841B (ja)
WO (1) WO2020153039A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024070624A1 (ja) * 2022-09-27 2024-04-04 村田機械株式会社 保管システム
WO2024150505A1 (ja) * 2023-01-11 2024-07-18 村田機械株式会社 有軌道台車システム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114649250B (zh) * 2022-05-20 2022-08-05 弥费实业(上海)有限公司 供存储库与oht交换晶圆盒的运输装置、天车窗口及存储库

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000124284A (ja) * 1998-10-13 2000-04-28 Hitachi Kiden Kogyo Ltd 搬送装置
WO2012060291A1 (ja) * 2010-11-04 2012-05-10 ムラテックオートメーション株式会社 搬送システム及び搬送方法
JP2017030944A (ja) 2015-08-04 2017-02-09 村田機械株式会社 搬送システム
WO2017029871A1 (ja) * 2015-08-14 2017-02-23 村田機械株式会社 搬送システム
US20170140966A1 (en) * 2015-11-13 2017-05-18 Taiwan Semiconductor Manufacturing Co., Ltd. High capacity overhead transport (oht) rail system with multiple levels
WO2018074130A1 (ja) 2016-10-18 2018-04-26 村田機械株式会社 天井搬送車及び搬送システム
WO2019003753A1 (ja) * 2017-06-30 2019-01-03 村田機械株式会社 搬送システム及び搬送方法
JP2019011280A (ja) 2017-06-30 2019-01-24 ポーラ化成工業株式会社 油性化粧料

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5028871B2 (ja) 2006-06-09 2012-09-19 村田機械株式会社 メンテナンスステーション
JP2007331906A (ja) 2006-06-16 2007-12-27 Murata Mach Ltd 天井走行車システム
WO2011065146A1 (ja) * 2009-11-27 2011-06-03 株式会社ダイフク 天井搬送車
JP5168321B2 (ja) * 2010-06-21 2013-03-21 村田機械株式会社 搬送体昇降装置
JP5229363B2 (ja) * 2010-11-04 2013-07-03 村田機械株式会社 搬送システム及び搬送方法
JP5316907B2 (ja) * 2011-03-17 2013-10-16 株式会社ダイフク 物品搬送設備
JP2013001533A (ja) * 2011-06-20 2013-01-07 Murata Machinery Ltd 天井走行車システム
JP5674041B2 (ja) * 2011-08-11 2015-02-18 株式会社ダイフク 物品搬送設備
US9520313B2 (en) 2012-06-08 2016-12-13 Murata Machinery, Ltd. Conveyance system and temporary storage method of articles in conveyance system
US9415934B2 (en) * 2014-05-14 2016-08-16 Murata Machinery, Ltd. Transport system and transport method
CN106463442B (zh) * 2014-06-19 2019-11-05 村田机械株式会社 载具的临时保管装置以及临时保管方法
JP6048686B2 (ja) * 2014-09-25 2016-12-21 村田機械株式会社 一時保管装置と搬送システム及び一時保管方法
JP6256420B2 (ja) * 2015-06-30 2018-01-10 村田機械株式会社 スタッカクレーン
JP2018177376A (ja) * 2015-09-09 2018-11-15 村田機械株式会社 搬送システム及び搬送方法
JP6531626B2 (ja) * 2015-11-10 2019-06-19 村田機械株式会社 自動倉庫システム
JP6760386B2 (ja) * 2016-09-26 2020-09-23 村田機械株式会社 天井搬送システム、及び天井搬送車
KR102283382B1 (ko) 2017-06-26 2021-07-29 세메스 주식회사 비히클 유지 보수용 승강 장치
CN110831873B (zh) * 2017-06-30 2021-07-16 村田机械株式会社 搬运***以及搬运方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000124284A (ja) * 1998-10-13 2000-04-28 Hitachi Kiden Kogyo Ltd 搬送装置
WO2012060291A1 (ja) * 2010-11-04 2012-05-10 ムラテックオートメーション株式会社 搬送システム及び搬送方法
JP2017030944A (ja) 2015-08-04 2017-02-09 村田機械株式会社 搬送システム
WO2017029871A1 (ja) * 2015-08-14 2017-02-23 村田機械株式会社 搬送システム
US20170140966A1 (en) * 2015-11-13 2017-05-18 Taiwan Semiconductor Manufacturing Co., Ltd. High capacity overhead transport (oht) rail system with multiple levels
WO2018074130A1 (ja) 2016-10-18 2018-04-26 村田機械株式会社 天井搬送車及び搬送システム
WO2019003753A1 (ja) * 2017-06-30 2019-01-03 村田機械株式会社 搬送システム及び搬送方法
JP2019011280A (ja) 2017-06-30 2019-01-24 ポーラ化成工業株式会社 油性化粧料

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024070624A1 (ja) * 2022-09-27 2024-04-04 村田機械株式会社 保管システム
WO2024150505A1 (ja) * 2023-01-11 2024-07-18 村田機械株式会社 有軌道台車システム

Also Published As

Publication number Publication date
JPWO2020153039A1 (ja) 2021-11-25
EP3915903A1 (en) 2021-12-01
EP3915903A4 (en) 2022-10-05
US11615975B2 (en) 2023-03-28
TWI828841B (zh) 2024-01-11
KR20210106549A (ko) 2021-08-30
SG11202108087XA (en) 2021-08-30
TW202031572A (zh) 2020-09-01
CN113348140A (zh) 2021-09-03
US20220189807A1 (en) 2022-06-16
KR102531954B1 (ko) 2023-05-12
JP7136236B2 (ja) 2022-09-13
CN113348140B (zh) 2023-08-29

Similar Documents

Publication Publication Date Title
KR102336425B1 (ko) 반송 시스템 및 반송 방법
TWI814792B (zh) 倉儲系統
JP6849065B2 (ja) 搬送システム及び搬送方法
WO2020153039A1 (ja) 保管システム
TWI829848B (zh) 搬送系統
WO2020153040A1 (ja) 保管システム
WO2020137225A1 (ja) 保管システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19911633

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020567419

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20217023443

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019911633

Country of ref document: EP

Effective date: 20210825