WO2020037632A1 PCT/CN2018/102062 CN2018102062W WO2020037632A1 WO 2020037632 A1 WO2020037632 A1 WO 2020037632A1 CN 2018102062 W CN2018102062 W CN 2018102062W WO 2020037632 A1 WO2020037632 A1 WO 2020037632A1
Authority
WO
WIPO (PCT)
Prior art keywords
network
industrial control
simulation
network resource
control equipment
Prior art date
Application number
PCT/CN2018/102062
Other languages
English (en)
French (fr)
Inventor
孙建国
赵国冬
刘铎
Original Assignee
哈尔滨工程大学计算机科学与技术学院
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 哈尔滨工程大学计算机科学与技术学院 filed Critical 哈尔滨工程大学计算机科学与技术学院
Priority to SG11202101752VA priority Critical patent/SG11202101752VA/en
Priority to PCT/CN2018/102062 priority patent/WO2020037632A1/zh
Publication of WO2020037632A1 publication Critical patent/WO2020037632A1/zh

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Definitions

  • the invention relates to, but not limited to, the fields of industrial automation, information technology, and computers, and in particular, to a simulation system, method, computer-readable storage medium, and computer equipment for an industrial control equipment network.
  • Industrial control equipment has a decisive position in industrial informatization. It is widely used in industrial, electric power, energy, transportation, water conservancy, public utilities and production enterprises.
  • the scope of industrial control equipment's control objects includes production processes, mechanical devices, vehicles, vehicles, Experimental equipment, instruments, household living facilities, household appliances, etc. It guarantees the normal operation of industrial facilities by automating the monitoring, commanding, controlling and adjusting of working processes. It is an important part of the country's key infrastructure and information systems.
  • Embodiments of the present invention aim to solve the problems described above.
  • a simulation system for an industrial control equipment network including:
  • Virtualization management module for creating a virtual environment for system simulation of industrial control equipment networks
  • Simulation parameter configuration module used to configure configuration parameters for system simulation
  • the execution module is used to create a simulated network resource in a virtual environment based on configuration parameters, and perform simulation based on the simulated network resource or based on the simulated network resource and the real network resource of the industrial control equipment network.
  • the simulation system of the industrial control equipment network further includes:
  • Real network resource information acquisition module used to obtain real network resource information in real time
  • the execution module is also used for:
  • the information of the real network resources includes at least one of the following:
  • Asset information of network resources is of network resources, performance information of network resources, event information related to network resources, security vulnerability information related to network resources, security threat information related to network resources, traffic information related to network resources, and network topology information.
  • the simulation parameter configuration module includes at least one of the following:
  • a networking parameter configuration module configured to configure a first configuration parameter for describing a topology structure of an industrial control device network
  • the network resource configuration module is configured to configure a second configuration parameter for describing a network resource.
  • the virtualization management module adopts a software-defined infrastructure
  • the software-defined infrastructure includes the open source OpenStack cloud computing management stack and the open source software-defined storage Ceph.
  • the virtual environment includes virtual computing resources, virtual storage resources, and virtual network resources.
  • the network resource includes at least one of the following:
  • PLC PLC, RTU, DCS controller, industrial control equipment, workstation, history station, industrial application software products, security protection products.
  • the simulation network resource is created using a virtual machine in the virtual environment.
  • a simulation method for an industrial control equipment network including:
  • a simulated network resource is created in a virtual environment based on configuration parameters, and simulation is performed based on the simulated network resource or based on the simulated network resource and the real network resource of the industrial control equipment network.
  • the method for simulating an industrial control equipment network according to the present invention further includes:
  • Real-time information on real network resources is obtained through the real network resource information acquisition module
  • the information of the real network resources includes at least one of the following:
  • Asset information of network resources is of network resources, performance information of network resources, event information related to network resources, security vulnerability information related to network resources, security threat information related to network resources, traffic information related to network resources, and network topology information.
  • the method for simulating an industrial control equipment network further includes at least one of the following steps:
  • a second configuration parameter for describing a network resource is configured.
  • the method for simulating an industrial control equipment network according to the present invention further includes:
  • the software-defined infrastructure includes the open source OpenStack cloud computing management stack and the open source software-defined storage Ceph.
  • the virtual environment includes virtual computing resources, virtual storage resources, and virtual network resources.
  • its network resources include at least one of the following:
  • PLC PLC, RTU, DCS controller, industrial control equipment, workstation, history station, industrial application software products, security protection products.
  • the method for simulating an industrial control equipment network according to the present invention further includes:
  • a computer-readable storage medium is provided.
  • a computer program is stored on the storage medium, and when the program is executed by a processor, the steps of the method described above are implemented.
  • a computer device including a memory, a processor, and a computer program stored on the memory and executable on the processor.
  • the processor executes the program, at least one of the following steps is implemented:
  • Via the execution module create simulated network resources in the virtual environment based on the configuration parameters, and perform simulation based on the simulated network resources or based on the simulated network resources and the real network resources of the industrial control equipment network;
  • Real-time information on real network resources is obtained through the real network resource information acquisition module
  • the invention provides a simulation system, method, computer-readable storage medium, and computer equipment for an industrial control equipment network, which solves the problem of simulating an actual industrial control equipment network for simulation.
  • FIG. 1 exemplarily shows a schematic block diagram of a simulation system of an industrial control equipment network according to a first aspect of the present invention
  • FIG. 2 exemplarily illustrates a schematic diagram of a software-defined infrastructure that can be adopted by a simulation system of an industrial control equipment network according to the first aspect of the present invention
  • FIG. 3 exemplarily shows a schematic diagram of a virtual network that can be adopted by a simulation system of an industrial control equipment network according to the first aspect of the present invention
  • FIG. 4 exemplarily shows a schematic flowchart of a method for simulating an industrial control equipment network according to a second aspect of the present invention.
  • FIG. 1 exemplarily shows a schematic block diagram of a simulation system 100 of an industrial control equipment network according to the first aspect of the present invention.
  • the simulation system 100 of the industrial control equipment network includes:
  • a virtualization management module 101 configured to create a virtual environment for system simulation of an industrial control device network
  • a simulation parameter configuration module 103 configured to configure configuration parameters for system simulation
  • the execution module 105 is configured to create a simulated network resource in a virtual environment based on configuration parameters, and perform simulation based on the simulated network resource or based on the simulated network resource and the real network resource of the industrial control equipment network.
  • the simulation system 100 of the industrial control equipment network further includes:
  • Real network resource information acquisition module 107 configured to obtain information of real network resources in real time
  • the execution module 105 is further configured to:
  • the information of the real network resources includes at least one of the following:
  • Asset information of network resources is of network resources, performance information of network resources, event information related to network resources, security vulnerability information related to network resources, security threat information related to network resources, traffic information related to network resources, and network topology information.
  • the simulation parameter configuration module 103 includes at least one of the following:
  • a networking parameter configuration module configured to configure a first configuration parameter for describing a topology structure of an industrial control device network
  • the network resource configuration module is configured to configure a second configuration parameter for describing a network resource.
  • the virtualization management module 101 uses a software-defined infrastructure (SDI),
  • SDI software-defined infrastructure
  • the software-defined infrastructure includes the open source OpenStack cloud computing management stack and the open source software-defined storage Ceph.
  • the virtual environment includes virtual computing resources, virtual storage resources, and virtual network resources.
  • FIG. 2 exemplarily shows a schematic diagram of a software-defined infrastructure that can be adopted by a simulation system of an industrial control equipment network according to the first aspect of the present invention.
  • multiple X86 servers can be used to build a virtual environment that is simulated for a very large-scale industrial network.
  • Compute nodes and storage nodes can be set on the same physical node, and high availability of mirroring can be achieved through storage resource pools, replication, and redundancy. You can do VM HA for certain VMs with specific requirements.
  • the network mode can select VLANs, network nodes and control node services can be placed on the same physical node, and network and control services can be provided at the same time. , Corsync, etc. to achieve heartbeat detection and high availability.
  • the following methods can be used to increase link bandwidth, eliminate network bottlenecks caused by bandwidth in the switching network, achieve high availability of network resources, and improve data transmission efficiency of server network cards:
  • FIG. 3 exemplarily shows a schematic diagram of a virtual network that can be adopted by a simulation system of an industrial control equipment network according to the first aspect of the present invention.
  • a computing (storage) node can be planned. Due to the high availability of the compute storage node, the downtime of any compute storage node will only affect the virtual machines hosted on it, and will not affect other compute storage nodes. If the downtime is predictable, you can first VMs on the server are migrated to other compute storage nodes so that the impact on services can be minimized.
  • the network control node can use the active-standby mode to achieve HA high availability, and adopt the cold standby method, but the database remains synchronized in real time. Because this kind of private cloud architecture has very little dependence on the control node, the control node goes down, and it will hardly affect the normal operation of the virtual machine without restarting the openvswitch-agent of the computing node.
  • the virtual machine network is directly connected to a physical router or switch through a bridge in trunk mode, which has better performance and high stability.
  • the management network is the network where various components of OpenStack communicate, including image distribution, virtual machine migration, and so on.
  • a storage network is a network where virtual machines access shared storage GlusterFS or Ceph (in a hyper-converged architecture, storage networks are generally not used independently).
  • VLAN-based Neutron mode In this network control architecture that supports hyper-converged computing storage, a VLAN-based Neutron mode is used. Because VLAN packets pass directly through the IP network to the outside network, no L3 virtual router is required. In addition, L3-Agent has stability and performance problems, and L3 has complexity problems. Therefore, L3-Agent was eliminated.
  • the virtual machine is first connected to br-int, and br-int is connected to br-em3, and the external network can be reached through the trunk.
  • This architecture solves two problems : First, it can ensure the performance and stability of the network, and second, it can achieve seamless communication with other machines on the internal network.
  • the simulation system 100 of the industrial control equipment network according to the first aspect of the present invention has the following advantages:
  • the SDI platform has a unified resource scheduling function, that is, a multi-center integrated unified management and a multi-resource pool intelligent scheduling function.
  • Multi-center integration and unified management can realize multiple data center features such as unified management of multiple data centers, decentralized operation and maintenance, and unified management of integrated cloud and non-cloud, and joint management of infrastructure and infrastructure; multiple resource pools Intelligent scheduling can formulate scheduling policies based on services and resources, automatically execute operational processes, and achieve the selection and deployment of required resources.
  • Unified resource scheduling can realize unified management, precise quantification, and shared utilization of software and hardware resources, and give full play to resource efficiency; it can achieve unified and intensive management of multi-center integration and reduce operating costs.
  • the SDI platform uses a solution based on strategy and intent-driven infrastructure to enhance the automation of IT resource allocation.
  • the SDI platform can automatically translate policies and intents into commands on the corresponding infrastructure without manual intervention. Administrators only need to formulate corresponding automatic deployment policies and business templates according to the type of business, and the management platform completes the application of resources according to the developed automated policies And business deployment / offloading to achieve rapid resource allocation and recycling.
  • the SDI management platform continuously monitors events and changes in the infrastructure of the industrial control equipment network. When an application or virtual resource reaches the threshold set by the policy, it can automatically respond in real time according to the formulated policy to make server expansion and change , Or live migration.
  • the network resource includes at least one of the following:
  • PLC PLC, RTU, DCS controller, industrial control equipment, workstation, history (data storage) station, industrial application software products, security protection products.
  • the simulated network resource is created using a virtual machine in the virtual environment.
  • FIG. 4 exemplarily shows a schematic flowchart of a method for simulating an industrial control equipment network according to a second aspect of the present invention.
  • the method for simulating an industrial control equipment network according to the second aspect of the present invention includes:
  • Step S402 Create a virtual environment for system simulation of the industrial control equipment network via the virtualization management module;
  • Step S404 configure the configuration parameters for system simulation via the simulation parameter configuration module
  • Step S406 via the execution module, create a simulated network resource in the virtual environment based on the configuration parameters, and perform simulation based on the simulated network resource or based on the simulated network resource and the real network resource of the industrial control equipment network.
  • the method for simulating an industrial control device network according to the second aspect of the present invention further includes:
  • Step S408 Real-time information about real network resources is obtained through the real network resource information acquisition module;
  • Step S410 Update the corresponding information of the simulated network resource based on the information of the real network resource via the execution module,
  • the information of the real network resources includes at least one of the following:
  • Asset information of network resources is of network resources, performance information of network resources, event information related to network resources, security vulnerability information related to network resources, security threat information related to network resources, traffic information related to network resources, and network topology information.
  • the method for simulating an industrial control equipment network according to the second aspect of the present invention further includes at least one of the following steps:
  • Step S412 configure a first configuration parameter for describing the topology of the industrial control device network via the networking parameter configuration module;
  • Step S414 Configure a second configuration parameter for describing the network resource via the network resource configuration module.
  • the method for simulating an industrial control device network according to the second aspect of the present invention further includes:
  • Step S416 using a software-defined infrastructure to implement a virtualization management module
  • the software-defined infrastructure includes the open source OpenStack cloud computing management stack and the open source software-defined storage Ceph.
  • the virtual environment includes virtual computing resources, virtual storage resources, and virtual network resources.
  • its network resources include at least one of the following:
  • PLC PLC, RTU, DCS controller, industrial control equipment, workstation, history station, industrial application software products, security protection products.
  • the method for simulating an industrial control device network according to the second aspect of the present invention further includes:
  • Step S418 Use a virtual machine in a virtual environment to create a simulated network resource.
  • a computer-readable storage medium is provided.
  • a computer program is stored on the storage medium, and the steps of the method described above are implemented when the program is executed by a processor.
  • a computer device including a memory, a processor, and a computer program stored on the memory and executable on the processor.
  • the processor executes the program, at least one of the following steps is implemented:
  • Via the execution module create simulated network resources in the virtual environment based on the configuration parameters, and perform simulation based on the simulated network resources or based on the simulated network resources and the real network resources of the industrial control equipment network;
  • Real-time information on real network resources is obtained through the real network resource information acquisition module
  • the invention provides a simulation system, method, computer-readable storage medium, and computer equipment for an industrial control equipment network, which solves the problem of simulating an actual industrial control equipment network for simulation.
  • the invention provides a simulation system, method, computer-readable storage medium, and computer equipment for an industrial control equipment network, which solves the problem of simulating an actual industrial control equipment network for simulation.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

一种工控设备网络的仿真***(100)、方法、计算机可读存储介质及计算机设备。所提供的工控设备网络的仿真***(100)包括:虚拟化管理模块(101),用于创建进行工控设备网络的***仿真的虚拟环境;仿真参数配置模块(103),用于配置用于进行***仿真的配置参数;执行模块(105),用于基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真。解决了模拟实际工控设备网络进行仿真的问题。

Description

一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备 技术领域
本发明涉及但不限于工业自动化、信息化和计算机领域,尤其涉及一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备。
背景技术
工控设备在工业信息化中有着举足轻重的位置,其广泛应用于工业、电力、能源、交通运输、水利、公用事业和生产企业,工控设备的控制对象的范围包括生产过程、机械装置、交通工具、实验装置、仪器仪表、家庭生活设施、家用电器等。它通过对工作过程进行自动化监测、指挥、控制和调节,保证工业设施的正常运转,是国家关键基础设施和信息***的重要组成部分。
随着工业4.0及工业化和信息化两化融合的趋势的到来,越来越多的工控设备接入到了互联网,致使工控设备的漏洞和脆弱性不断增加,因而需要对工控设备网络进行信息安全防护操作。
然而,为了避免误操作,针对工控设备的信息安全防护操作所进行的研究工作通常不能直接运行于处于生产环境中的实际工控设备网络中。
因此,需要提出用于模拟实际工控设备网络的技术方案。
发明内容
本发明实施例旨在解决上面描述的问题。
根据本发明的第一方面,提供了一种工控设备网络的仿真***,包括:
虚拟化管理模块,用于创建进行工控设备网络的***仿真的虚拟环境;
仿真参数配置模块,用于配置用于进行***仿真的配置参数;
执行模块,用于基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真。
根据本发明的工控设备网络的仿真***,还包括:
真实网络资源信息获取模块,用于实时获取真实网络资源的信息,
其中,执行模块还用于:
基于真实网络资源的信息更新模拟网络资源的对应信息,
其中,真实网络资源的信息包括下列中的至少一项:
网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
根据本发明的工控设备网络的仿真***,其仿真参数配置模块包括下列中的至少一项:
组网参数配置模块,用于配置用于描述工控设备网络的拓扑结构的第一配置参数;
网络资源配置模块,用于配置用于描述网络资源的第二配置参数。
根据本发明的工控设备网络的仿真***,其虚拟化管理模块采用软件定义基础架构,
其中,软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
根据本发明的工控设备网络的仿真***,其网络资源包括下列中的至少一种:
PLC、RTU、DCS控制器、工控设备、工作站、历史站、工业应用软件产品、安全防护产品。
根据本发明的工控设备网络的仿真***,其模拟网络资源是在所述虚拟环境中使用虚拟机创建的。
根据本发明的第二方面,提供了一种工控设备网络的仿真方法,包括:
经由虚拟化管理模块,创建进行工控设备网络的***仿真的虚拟环境;
经由仿真参数配置模块,配置用于进行***仿真的配置参数;
经由执行模块,基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真。
根据本发明的工控设备网络的仿真方法,还包括:
经由真实网络资源信息获取模块,实时获取真实网络资源的信息;
经由执行模块,基于真实网络资源的信息更新模拟网络资源的对应信息,
其中,真实网络资源的信息包括下列中的至少一项:
网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
根据本发明的工控设备网络的仿真方法,还包括下列步骤中的至少一个步骤:
经由组网参数配置模块,配置用于描述工控设备网络的拓扑结构的第一配置参数;
经由网络资源配置模块,配置用于描述网络资源的第二配置参数。
根据本发明的工控设备网络的仿真方法,还包括:
采用软件定义基础架构实现虚拟化管理模块,
其中,软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
根据本发明的工控设备网络的仿真方法,其网络资源包括下列中的至少一种:
PLC、RTU、DCS控制器、工控设备、工作站、历史站、工业应用软件产品、安全防护产品。
根据本发明的工控设备网络的仿真方法,还包括:
在虚拟环境中使用虚拟机来创建模拟网络资源。
根据本发明的第三方面,提供了一种计算机可读存储介质,存储介质上 存储有计算机程序,程序被处理器执行时实现上文所述的方法的步骤。
根据本发明的第四方面,提供了一种计算机设备,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,处理器执行程序时实现下列步骤中的至少一个步骤:
经由虚拟化管理模块,创建进行工控设备网络的***仿真的虚拟环境;
经由仿真参数配置模块,配置用于进行***仿真的配置参数;
经由执行模块,基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真;
经由真实网络资源信息获取模块,实时获取真实网络资源的信息;
经由执行模块,基于真实网络资源的信息更新模拟网络资源的对应信息;
经由组网参数配置模块,配置用于描述工控设备网络的拓扑结构的第一配置参数;
经由网络资源配置模块,配置用于描述网络资源的第二配置参数;
采用软件定义基础架构实现虚拟化管理模块;
在虚拟环境中使用虚拟机来创建模拟网络资源。
本发明提供了一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备,解决了模拟实际工控设备网络进行仿真的问题。
参照附图来阅读对于示例性实施例的以下描述,本发明实施例的其他特性特征和优点将变得清晰。
附图说明
并入到说明书中并且构成说明书的一部分的附图示出了本发明的实施例,并且与描述一起用于解释本发明实施例的原理。在这些附图中,类似的附图标记用于表示类似的要素。下面描述中的附图是本发明的一些实施例,而不是全部实施例。对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,可以根据这些附图获得其他的附图。
图1示例性地示出了根据本发明的第一方面的工控设备网络的仿真***的示意框图;
图2示例性地示出了根据本发明的第一方面的工控设备网络的仿真***可以采用的软件定义基础架构的示意图;
图3示例性地示出了根据本发明的第一方面的工控设备网络的仿真***可以采用的虚拟网络的示意图;
图4示例性地示出了根据本发明的第二方面的工控设备网络的仿真方法的示意流程图。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明实施例保护的范围。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互任意组合。
图1示例性地示出了根据本发明的第一方面的工控设备网络的仿真***100的示意框图。
如图1的实线框所示,根据本发明的第一方面的工控设备网络的仿真***100,包括:
虚拟化管理模块101,用于创建进行工控设备网络的***仿真的虚拟环境;
仿真参数配置模块103,用于配置用于进行***仿真的配置参数;
执行模块105,用于基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真。
可选地,如图1的虚线框所示,工控设备网络的仿真***100还包括:
真实网络资源信息获取模块107,用于实时获取真实网络资源的信息,
其中,执行模块105还用于:
基于真实网络资源的信息更新模拟网络资源的对应信息,
其中,真实网络资源的信息包括下列中的至少一项:
网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
可选地,仿真参数配置模块103包括下列中的至少一项:
组网参数配置模块,用于配置用于描述工控设备网络的拓扑结构的第一配置参数;
网络资源配置模块,用于配置用于描述网络资源的第二配置参数。
可选地,虚拟化管理模块101采用软件定义基础架构(SDI),
其中,软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
图2示例性地示出了根据本发明的第一方面的工控设备网络的仿真***可以采用的软件定义基础架构的示意图。
如图2所示,可以采用开源的OpenStack云计算管理堆栈、开源的软件定义存储Ceph,并将二者结合而成超融合解决方案,以此作为整个软件定义基础架构的底层平台。还可以对Linux以及KVM虚拟化引擎进行工业级改造,使其支持工业网络要求,并利用DPDK硬加速等新技术来保障整个基础架构的性能及实时性要求,使得根据本发明的第一方面的工控设备网络的仿真***100在仿真和模拟工业网络环境时更加贴近工业现场的环境。
为了使本领域技术人员更清楚地了解如何实现上述软件定义基础架构,下面将结合一个具体实施例进行描述。
1、规划用于进行工控设备网络的***仿真的虚拟环境
例如,可以采用多台X86服务器构建针对超大规模工业网络进行仿真的虚拟环境。
1)采用多台(例如,4台)Host实现计算存储超融合:计算节点和存储节点可以设置在同一个物理节点上,可以通过存储资源池,做副本和冗余方式实现镜像的高可用,可以针对某些特定需求的VM,做VM的HA。
2)采用多台(例如,2台)Host实现网络控制超融合:网络模式可以选择VLAN,网络节点和控制节点服务可以放在同一个物理节点上,可以同时提供网络和控制服务,可以通过HAproxy、Corsync等实现心跳检测和高可用等。
另外,还可以采用下列方法来增大链路带宽,消除交换网络中因带宽引起的网络瓶颈,实现网络资源的高可用,以及提高服务器网卡数据传输效率等:
1)服务器网卡做绑定
2)交换机做链路聚合(端口聚合)
3)使用STP(生成树协议)
2、规划用于进行工控设备网络的***仿真的虚拟网络
图3示例性地示出了根据本发明的第一方面的工控设备网络的仿真***可以采用的虚拟网络的示意图。
如图3所示,可以规划计算(存储)节点和(网络)控制节点这两种虚拟网络节点。由于计算存储节点做了HA高可用,所以任何一个计算存储节点宕机,只会影响其上面承载的虚拟机,不会影响其他计算存储节点,如果宕机是可以预知的,则可以先将其上的虚拟机迁移到其他计算存储节点,这样就可以将对服务的影响降到最低。
另外,网络控制节点可以采用主备模式来实现HA高可用,并且采用冷备的方式,但是数据库保持实时同步。因为这种私有云的架构对控制节点的依赖非常小,控制节点宕机,在不重启计算节点的openvswitch-agent的情况下,几乎不会影响虚拟机的正常运行。
在网络的架构上,虚拟机网络通过网桥,采用Trunk模式,直接连接到物理路由器或交换机,具有较好的性能和极高的稳定性。管理网络是OpenStack各个组件通信的网络,包括镜像分发、虚拟机迁移等。存储网络 是虚拟机访问共享存储GlusterFS或Ceph的网络(超融合架构中,存储网络一般不独立使用)。
在这种支持超融合计算存储的网络控制架构中,使用了基于VLAN的Neutron模式,由于VLAN的数据包直接经过IP网络出外网,所以不需要L3的虚拟路由器。另外,L3-Agent存在稳定性和性能问题,L3存在复杂性问题。因此,淘汰了L3-Agent。
在这种支持超融合计算存储的网络控制架构中,虚拟机首先连接到br-int,,br-int连接到br-em3上,通过Trunk就可以达到外部网络,这样的架构解决了两个问题:第一,能够保证网络的性能和稳定性,第二,能实现和内网其他机器无缝互通。
由于虚拟化管理模块101采用了上述软件定义基础架构,根据本发明的第一方面的工控设备网络的仿真***100具有以下优点:
1、能够进行灵活统一的资源管理
SDI平台具有统一资源调度功能,即具有多中心融合统一管理和多资源池智能调度的功能。多中心融合统一管理可实现多个数据中心统一管理、分权分域运维等多数据中心特性,并能实现融合云与非云的统一管理,基础架构和基础设施的联动管理;多资源池智能调度能够根据服务和资源制定调度策略,自动执行操作流程,实现所需资源的选择和部署。
统一资源调度可实现软硬件资源统一管理、精确量化、共享利用,充分发挥资源效率;可实现多中心融合统一集约化管理,降低运营成本。
2、能够进行自动化快速部署
SDI平台采用了基于策略与意图驱动基础设施的解决方案,增强了IT资源调配的自动化能力。SDI平台能自动将策略和意图转化为相应基础设施上的命令而不需要人工干涉,管理员只需要根据业务类型制定相应的自动部署策略和业务模板,管理平台根据制定的自动化策略完成资源的申请和业务部署/卸载,实现资源的快速分配与回收。同时,SDI管理平台持续监视事件和变化的工控设备网络的基础设施,当某个应用或者虚拟资源到达策略所设置的阈值时,能够根据制定的策略实时地自动做出响应,进行服务器的扩容变 更,或者动态迁移。
可选地,网络资源包括下列中的至少一种:
PLC、RTU、DCS控制器、工控设备、工作站、历史(数据存储)站、工业应用软件产品、安全防护产品。
可选地,模拟网络资源是在所述虚拟环境中使用虚拟机创建的。
图4示例性地示出了根据本发明的第二方面的工控设备网络的仿真方法的示意流程图。
如图4的实线框所示,根据本发明的第二方面的工控设备网络的仿真方法,包括:
步骤S402:经由虚拟化管理模块,创建进行工控设备网络的***仿真的虚拟环境;
步骤S404:经由仿真参数配置模块,配置用于进行***仿真的配置参数;
步骤S406:经由执行模块,基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真。
可选地,如图4的虚线框所示,根据本发明的第二方面的工控设备网络的仿真方法,还包括:
步骤S408:经由真实网络资源信息获取模块,实时获取真实网络资源的信息;
步骤S410:经由执行模块,基于真实网络资源的信息更新模拟网络资源的对应信息,
其中,真实网络资源的信息包括下列中的至少一项:
网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
可选地,如图4的虚线框所示,根据本发明的第二方面的工控设备网络的仿真方法,还包括下列步骤中的至少一个步骤:
步骤S412:经由组网参数配置模块,配置用于描述工控设备网络的拓扑结构的第一配置参数;
步骤S414:经由网络资源配置模块,配置用于描述网络资源的第二配置参数。
可选地,如图4的虚线框所示,根据本发明的第二方面的工控设备网络的仿真方法,还包括:
步骤S416:采用软件定义基础架构实现虚拟化管理模块,
其中,软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
根据本发明的工控设备网络的仿真方法,其网络资源包括下列中的至少一种:
PLC、RTU、DCS控制器、工控设备、工作站、历史站、工业应用软件产品、安全防护产品。
可选地,如图4的虚线框所示,根据本发明的第二方面的工控设备网络的仿真方法,还包括:
步骤S418:在虚拟环境中使用虚拟机来创建模拟网络资源。
根据本发明的第三方面,提供了一种计算机可读存储介质,存储介质上存储有计算机程序,程序被处理器执行时实现上文所述的方法的步骤。
根据本发明的第四方面,提供了一种计算机设备,包括存储器、处理器及存储在存储器上并可在处理器上运行的计算机程序,处理器执行程序时实现下列步骤中的至少一个步骤:
经由虚拟化管理模块,创建进行工控设备网络的***仿真的虚拟环境;
经由仿真参数配置模块,配置用于进行***仿真的配置参数;
经由执行模块,基于配置参数在虚拟环境中创建模拟网络资源,基于模拟网络资源或者基于模拟网络资源和工控设备网络的真实网络资源进行仿真;
经由真实网络资源信息获取模块,实时获取真实网络资源的信息;
经由执行模块,基于真实网络资源的信息更新模拟网络资源的对应信息;
经由组网参数配置模块,配置用于描述工控设备网络的拓扑结构的第一配置参数;
经由网络资源配置模块,配置用于描述网络资源的第二配置参数;
采用软件定义基础架构实现虚拟化管理模块;
在虚拟环境中使用虚拟机来创建模拟网络资源。
本发明提供了一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备,解决了模拟实际工控设备网络进行仿真的问题。
上面描述的内容可以单独地或者以各种方式组合起来实施,而这些变型方式都在本发明实施例的保护范围之内。
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制。尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例的技术方案的精神和范围。
工业实用性
本发明提供了一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备,解决了模拟实际工控设备网络进行仿真的问题。

Claims (14)

  1. 一种工控设备网络的仿真***,其特征在于,包括:
    虚拟化管理模块,用于创建进行所述工控设备网络的***仿真的虚拟环境;
    仿真参数配置模块,用于配置用于进行所述***仿真的配置参数;
    执行模块,用于基于所述配置参数在所述虚拟环境中创建模拟网络资源,基于所述模拟网络资源或者基于所述模拟网络资源和所述工控设备网络的真实网络资源进行仿真。
  2. 如权利要求1所述的工控设备网络的仿真***,其特征在于,还包括:
    真实网络资源信息获取模块,用于实时获取所述真实网络资源的信息,
    其中,所述执行模块还用于:
    基于所述真实网络资源的信息更新所述模拟网络资源的对应信息,
    其中,所述真实网络资源的信息包括下列中的至少一项:
    网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
  3. 如权利要求1所述的工控设备网络的仿真***,其特征在于,所述仿真参数配置模块包括下列中的至少一项:
    组网参数配置模块,用于配置用于描述所述工控设备网络的拓扑结构的第一配置参数;
    网络资源配置模块,用于配置用于描述网络资源的第二配置参数。
  4. 如权利要求1所述的工控设备网络的仿真***,其特征在于,所述虚拟化管理模块采用软件定义基础架构,
    其中,所述软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,所述虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
  5. 如权利要求1所述的工控设备网络的仿真***,其特征在于,网络资源包括下列中的至少一种:
    PLC、RTU、DCS控制器、工控设备、工作站、历史站、工业应用软件产品、安全防护产品。
  6. 如权利要求5所述的工控设备网络的仿真***,其特征在于,所述模拟网络资源是在所述虚拟环境中使用虚拟机创建的。
  7. 一种工控设备网络的仿真方法,其特征在于,包括:
    经由虚拟化管理模块,创建进行所述工控设备网络的***仿真的虚拟环境;
    经由仿真参数配置模块,配置用于进行所述***仿真的配置参数;
    经由执行模块,基于所述配置参数在所述虚拟环境中创建模拟网络资源,基于所述模拟网络资源或者基于所述模拟网络资源和所述工控设备网络的真实网络资源进行仿真。
  8. 如权利要求7所述的工控设备网络的仿真方法,其特征在于,还包括:
    经由真实网络资源信息获取模块,实时获取所述真实网络资源的信息;
    经由所述执行模块,基于所述真实网络资源的信息更新所述模拟网络资源的对应信息,
    其中,所述真实网络资源的信息包括下列中的至少一项:
    网络资源的资产信息、网络资源的性能信息、与网络资源相关的事件信息、与网络资源相关的安全漏洞信息、与网络资源相关的安全威胁信息、与网络资源相关的流量信息、网络拓扑信息。
  9. 如权利要求7所述的工控设备网络的仿真方法,其特征在于,还包括下列步骤中的至少一个步骤:
    经由组网参数配置模块,配置用于描述所述工控设备网络的拓扑结构的第一配置参数;
    经由网络资源配置模块,配置用于描述网络资源的第二配置参数。
  10. 如权利要求7所述的工控设备网络的仿真方法,其特征在于,还包括:
    采用软件定义基础架构实现所述虚拟化管理模块,
    其中,所述软件定义基础架构包括开源的OpenStack云计算管理堆栈和开源的软件定义存储Ceph,所述虚拟环境包含虚拟计算资源、虚拟存储资源、虚拟网络资源。
  11. 如权利要求7所述的工控设备网络的仿真方法,其特征在于,网络资源包括下列中的至少一种:
    PLC、RTU、DCS控制器、工控设备、工作站、历史站、工业应用软件产品、安全防护产品。
  12. 如权利要求11所述的工控设备网络的仿真方法,其特征在于,还包括:
    在所述虚拟环境中使用虚拟机来创建所述模拟网络资源。
  13. 一种计算机可读存储介质,所述存储介质上存储有计算机程序,所述程序被处理器执行时实现权利要求7至12中任意一项所述方法的步骤。
  14. 一种计算机设备,包括存储器、处理器及存储在所述存储器上并可在所述处理器上运行的计算机程序,所述处理器执行所述程序时实现下列步骤中的至少一个步骤:
    经由虚拟化管理模块,创建进行所述工控设备网络的***仿真的虚拟环境;
    经由仿真参数配置模块,配置用于进行所述***仿真的配置参数;
    经由执行模块,基于所述配置参数在所述虚拟环境中创建模拟网络资源,基于所述模拟网络资源或者基于所述模拟网络资源和所述工控设备网络的真实网络资源进行仿真;
    经由真实网络资源信息获取模块,实时获取所述真实网络资源的信息;
    经由所述执行模块,基于所述真实网络资源的信息更新所述模拟网络资源的对应信息;
    经由组网参数配置模块,配置用于描述所述工控设备网络的拓扑结构的第一配置参数;
    经由网络资源配置模块,配置用于描述网络资源的第二配置参数;
    采用软件定义基础架构实现所述虚拟化管理模块;
    在所述虚拟环境中使用虚拟机来创建所述模拟网络资源。
PCT/CN2018/102062 2018-08-24 2018-08-24 一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备 WO2020037632A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SG11202101752VA SG11202101752VA (en) 2018-08-24 2018-08-24 Simulation system and method for industrial control device network, computer-readable storage medium, and computer device
PCT/CN2018/102062 WO2020037632A1 (zh) 2018-08-24 2018-08-24 一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/102062 WO2020037632A1 (zh) 2018-08-24 2018-08-24 一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备

Publications (1)

Publication Number Publication Date
WO2020037632A1 true WO2020037632A1 (zh) 2020-02-27

Family

ID=69592162

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/102062 WO2020037632A1 (zh) 2018-08-24 2018-08-24 一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备

Country Status (2)

Country Link
SG (1) SG11202101752VA (zh)
WO (1) WO2020037632A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113219857B (zh) * 2021-05-31 2022-07-19 中国人民解放军国防科技大学 一种无人***集群网络通信仿真方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101645813A (zh) * 2009-09-07 2010-02-10 中国电子科技集团公司第三十研究所 分布式半实物网络仿真***及其半实物接口控制方法
CN103984333A (zh) * 2014-06-04 2014-08-13 北京京能高安屯燃气热电有限责任公司 一种电厂监控管理***
CN104317204A (zh) * 2014-10-17 2015-01-28 哈尔滨工业大学 基于虚拟现实技术的二次平台半物理仿真***及方法
CN105607509A (zh) * 2016-01-21 2016-05-25 浙江大学 一种工业无线控制***半物理安全实验平台
US20160314224A1 (en) * 2015-04-24 2016-10-27 Northrop Grumman Systems Corporation Autonomous vehicle simulation system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101645813A (zh) * 2009-09-07 2010-02-10 中国电子科技集团公司第三十研究所 分布式半实物网络仿真***及其半实物接口控制方法
CN103984333A (zh) * 2014-06-04 2014-08-13 北京京能高安屯燃气热电有限责任公司 一种电厂监控管理***
CN104317204A (zh) * 2014-10-17 2015-01-28 哈尔滨工业大学 基于虚拟现实技术的二次平台半物理仿真***及方法
US20160314224A1 (en) * 2015-04-24 2016-10-27 Northrop Grumman Systems Corporation Autonomous vehicle simulation system
CN105607509A (zh) * 2016-01-21 2016-05-25 浙江大学 一种工业无线控制***半物理安全实验平台

Also Published As

Publication number Publication date
SG11202101752VA (en) 2021-03-30

Similar Documents

Publication Publication Date Title
Huang et al. A survey of deployment solutions and optimization strategies for hybrid SDN networks
US10999163B2 (en) Multi-cloud virtual computing environment provisioning using a high-level topology description
CN107947961B (zh) 基于SDN的Kubernetes网络管理***与方法
US12047232B2 (en) Initializing network device and server configurations in a data center
US20210258281A1 (en) Address translation for external network appliance
Saraswat et al. Challenges and solutions in software defined networking: A survey
US10554483B2 (en) Network policy analysis for networks
US11201782B1 (en) Automation of maintenance mode operations for network devices
US10938660B1 (en) Automation of maintenance mode operations for network devices
Morreale et al. Software defined networking: Design and deployment
CN111064649B (zh) 一种分层端口绑定实现方法、装置、控制设备及存储介质
CN104468212B (zh) 一种云计算数据中心网络智能联动配置方法及***
CN111638957B (zh) 一种集群共享式公有云负载均衡的实现方法
CN103905523A (zh) 一种基于sdn的云计算网络虚拟化实现方法及***
CN112039682A (zh) 软件定义数据中心在运营商网络中的运用及实践的方法
EP3731459B1 (en) Initializing server configurations in a data center
Chen et al. An sdn-based fabric for flexible data-center networks
WO2020037632A1 (zh) 一种工控设备网络的仿真***、方法、计算机可读存储介质及计算机设备
Gedia et al. A Centralized Network Management Application for Academia and Small Business Networks
CN112655185B (zh) 软件定义网络中的服务分配的设备、方法和存储介质
CN114584504B (zh) 一种ai训练平台的网卡通信方法、装置、设备及介质
CN105227499B (zh) 虚拟边缘端口汇聚器控制方法及vepa控制器
Zhao et al. Research on SDN Network Management Architecture in the Field of Electric Power Communication
Risdianto et al. Leveraging onos sdn controllers for of@ tein sd-wan experiments
Zhai et al. Application Discussion of SDN Technology in Multi-data Center

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18931005

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18931005

Country of ref document: EP

Kind code of ref document: A1