WO2019142652A1 - 融着接続装置の管理システム、及び、融着接続装置の管理方法 - Google Patents

融着接続装置の管理システム、及び、融着接続装置の管理方法 Download PDF

Info

Publication number
WO2019142652A1
WO2019142652A1 PCT/JP2018/048566 JP2018048566W WO2019142652A1 WO 2019142652 A1 WO2019142652 A1 WO 2019142652A1 JP 2018048566 W JP2018048566 W JP 2018048566W WO 2019142652 A1 WO2019142652 A1 WO 2019142652A1
Authority
WO
WIPO (PCT)
Prior art keywords
fusion
connection
work
data
unit
Prior art date
Application number
PCT/JP2018/048566
Other languages
English (en)
French (fr)
Inventor
一芳 大木
遊佐 英明
Original Assignee
Seiオプティフロンティア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiオプティフロンティア株式会社 filed Critical Seiオプティフロンティア株式会社
Priority to CN201880086790.6A priority Critical patent/CN111819586A/zh
Priority to EP18900962.4A priority patent/EP3742368A4/en
Priority to US16/961,520 priority patent/US20200341196A1/en
Priority to JP2019566401A priority patent/JP7367975B2/ja
Publication of WO2019142652A1 publication Critical patent/WO2019142652A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/255Splicing of light guides, e.g. by fusion or bonding
    • G02B6/2553Splicing machines, e.g. optical fibre fusion splicer
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/255Splicing of light guides, e.g. by fusion or bonding
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0426Programming the control sequence

Definitions

  • the present disclosure relates to a management system of a fusion splicer and a method of managing a fusion splicer.
  • This application claims the priority based on Japanese Patent Application No. 2018-005734 filed on Jan. 17, 2018, and incorporates all the contents described in the Japanese application.
  • Patent Document 1 discloses a fusion splice apparatus for fusion splicing optical fibers.
  • the present disclosure provides a system for managing the progress of fusion splice operations performed by each splice engineer using a fusion splicer.
  • the management system includes an acquisition unit, a determination unit, and a notification unit.
  • the acquisition unit acquires fusion splice data on fusion splice operations by connection engineers using the fusion splice devices, each time the fusion splice operations are performed.
  • the determination unit compares the fusion spliced data with the work plan data indicating the work plan to determine the progress status of each fusion spliced work.
  • the notification unit notifies of the progress of each fusion connection operation determined by the determination unit.
  • the present disclosure provides a management method for managing the progress of fusion connection work performed by each connection engineer using a fusion connection apparatus.
  • This management method includes the steps of acquiring fusion connection data regarding fusion connection work by each connection engineer using the fusion connection apparatus each time each fusion connection operation is performed, and the fusion connection data
  • a step of determining the progress status of each fusion splicing work in comparison with work plan data indicating a plan, and a step of notifying the progress status of each fusion splicing work determined in the determining step are provided.
  • FIG. 1 is a perspective view showing an example of a fusion bonding apparatus.
  • FIG. 2 is a perspective view showing an internal structure of the fusion splice apparatus shown in FIG.
  • FIG. 3 is a diagram showing an outline of an example of a management system of a fusion splice apparatus.
  • FIG. 4 is a block diagram showing an example of a management system of the fusion splice apparatus.
  • FIG. 5 is a block diagram showing a hardware configuration of the fusion splice apparatus shown in FIG.
  • FIG. 6 is a block diagram showing a hardware configuration of the wireless information terminal shown in FIG.
  • FIG. 7 is a block diagram showing a hardware configuration of the management server and the management apparatus shown in FIG. FIG.
  • FIG. 8 is a diagram showing an example of a display screen of the project status of the fusion connection work in the management system.
  • FIG. 9 is a sequence diagram showing a process of managing the progress of the fusion connection work performed by each connection engineer using the fusion connection apparatus by the management system shown in FIG. 4.
  • FIG. 10 is a sequence diagram showing a process of managing the progress of the fusion connection work performed by each connection engineer using the fusion connection apparatus by the management system shown in FIG.
  • FIG. 11 is a sequence diagram showing a process of managing the progress of the fusion connection work performed by each connection engineer using the fusion connection apparatus by the management system shown in FIG.
  • FIG. 12 is a flowchart showing a processing flow of construction project registration in the sequence diagram of FIG.
  • FIG. 13 is a flow chart showing a process flow of automatic assignment of the team in charge in the construction project registration process shown in FIG.
  • the progress status of the fusion bonding operation can be known at an early stage.
  • the management system includes an acquisition unit for acquiring fusion connection data regarding fusion connection work by each connection engineer using the fusion connection apparatus each time each fusion connection operation is performed, and fusion connection data.
  • a determination unit that determines a progress status of each fusion connection work in comparison with work plan data indicating a work plan, and a notification unit that notifies the progress status of each fusion connection work determined by the determination unit .
  • Another aspect of the present disclosure relates to a management method of managing the progress of fusion bonding work performed by each connection engineer using a fusion bonding apparatus.
  • This management method includes the steps of acquiring fusion connection data regarding fusion connection work by each connection engineer using the fusion connection apparatus each time each fusion connection operation is performed, and the fusion connection data
  • a step of determining the progress status of each fusion splicing work in comparison with the plan data, and a step of notifying the progress status of each fusion splicing work determined in the determining step are provided.
  • fusion splice data regarding the fusion splice operation is acquired each time each fusion splice operation is performed. Then, the acquired fusion connection data is compared with the work plan data to determine the progress status of each fusion connection work, and a predetermined notification destination is notified. For this reason, the manager can know the progress status (for example, work delay or connection quality etc.) of each fusion connection work at an early stage, and when delay in the progress of fusion connection work or other problems occur, management Can quickly identify the progress of work delays and take corrective action.
  • the determination unit may compare the fusion spliced data with the work plan data to determine whether each fusion splice work is delayed from the work plan. According to this embodiment, it can be known early whether or not the fusion work is delayed, and the correction can be made early.
  • the notification unit indicates the progress status as to whether or not each fusion connection work is delayed from the work plan, at a predetermined cycle with respect to the management apparatus for managing the work plan, or every time the delay is determined. May be notified.
  • the fusion connection data includes identification information of a fusion connection apparatus used, identification information of a connection engineer who has performed fusion connection work, date and time of fusion connection, and fusion connection.
  • Location splice loss of fusion spliced optical fiber, end face angle of fusion spliced optical fiber, eccentricity of optical fiber, connection condition selected at fusion splice (discharge heating time or discharge power, etc.), light
  • connection condition selected at fusion splice discharge heating time or discharge power, etc.
  • the manager can more specifically recognize the progress information of the fusion work, and it becomes possible to correct the delay more suitably.
  • a separate wireless information terminal may be assigned to each of the fusion spliced devices, and each fusion spliced device may have a configuration capable of wireless connection with the corresponding wireless information terminal.
  • the work plan data may be stored in a management server that can communicate with the wireless information terminal via a predetermined communication line, and an acquisition unit may be provided in the fusion connection apparatus. Then, the wireless information terminal may transmit the fusion connection data acquired by the acquisition unit to the management server, and the determination unit provided in the management server may determine the progress status of each fusion connection work.
  • the selection unit or selection step is further provided, wherein the selection unit or selection step selects a candidate team of a connection engineer suitable for each work plan, and the selection part or selection step comprises the construction period in the work plan data, the number of optical fiber connection scheduled times, Alternatively, a candidate team suitable for the work plan may be selected based on information on at least one of optical fiber connection standards. According to this embodiment, the manager can easily select a work team suitable for each work plan.
  • the candidate team selected may be one working team or a plurality of working teams.
  • the work team may be composed of a plurality of connection engineers or may be composed of one connection engineer.
  • the selection unit may further include a team database including connection engineer data for selecting a candidate team suitable for the work plan.
  • the management system or the management method adds the fusion connection data in the fusion connection work performed by the work plan to the team database after the fusion connection work according to the work plan is completed, and the team It may further comprise an update unit / update step of updating the database. This makes it possible to select a work team that is more suitable for each work plan.
  • FIGS. 1 and 2 are perspective views showing the appearance of the fusion splicer.
  • FIG. 1 shows the appearance of the fusion splicer with the windshield cover closed
  • FIG. 2 shows the windshield cover being opened.
  • the fusion splicing apparatus 10 is an apparatus for fusion splicing optical fibers, and as shown in FIGS. 1 and 2, includes a box-shaped housing 2.
  • a fusion bonding mechanism 3 for fusion bonding optical fibers to each other and a fiber reinforcing sleeve placed on a fusion spliced portion of the optical fiber fused by the fusion bonding mechanism 3 are heated and shrunk
  • a heater 4 and an activation button 5 are provided.
  • the fusion splice apparatus 10 includes a monitor 6 that displays the fusion splice status of optical fibers captured by a microscope camera (not shown) disposed inside the housing 2.
  • the end face of the optical fiber (end face angle), the amount of eccentricity of the optical fiber, the result of automatic discrimination of the fiber type, and the connected light from the end face of the optical fiber before connection and the fusion connection situation after connection It is possible to obtain fusion splice data such as estimated losses (dB) of the fiber. Furthermore, the fusion splice apparatus 10 is provided with a windshield cover 7 for preventing wind from entering the fusion mechanism 3.
  • the fusion bonding mechanism 3 has a pair of fiber positioning portions 3a, a pair of discharge electrodes 3b, and a holder placement portion on which the pair of optical fiber holders 3c can be placed.
  • Each of the optical fibers to be fused is cut by the connecting engineer so that the end face is within a predetermined angle (end face angle) range, and then held and fixed to the optical fiber holder 3c, and the optical fiber holder 3c is It mounts and fixes to a holder mounting part, respectively.
  • the fiber positioning unit 3a is disposed between the optical fiber holders 3c, and positions the tip of the optical fiber held by each of the optical fiber holders 3c.
  • the discharge electrode 3b is disposed between the fiber positioning portions 3a, and is an electrode for fusing the tips of the optical fibers by arc discharge.
  • the fusion splicing of the optical fiber is performed by the above-described configuration, but the accuracy of the end surface treatment of the optical fiber and the processing of the optical fiber for each connection engineer using the fusion splicing apparatus 10
  • the working speed, the accuracy of the fusion splicing process of optical fibers, the working speed, etc. are different, and the connection quality and the connecting work speed may differ, and it may not be possible to perform the fusion bonding in accordance with the work plan. .
  • FIG. 3 is a diagram showing an outline of an example of a management system of a fusion splice apparatus.
  • FIG. 4 is a block diagram showing an example of a management system of the fusion splice apparatus.
  • the management system 1 manages a plurality of fusion spliced devices 10, a wireless information terminal 20 individually assigned to each of the fusion spliced devices 10, a management server 30, and management. And a device 40.
  • the fusion splice apparatus 10 is configured to be able to perform wireless communication in the 2.4 GHz band compliant with, for example, IEEE 802.11 with an external device, and can be wirelessly connected to the corresponding wireless information terminal 20.
  • the wireless information terminal 20 is, for example, a smartphone, and is connected to the management server 30 via a telecommunication line (including wireless) such as the Internet.
  • a management device 40 configured of a personal computer (PC) or the like is also connected to the management server 30 via a telecommunication line such as the Internet.
  • the fusion splicing apparatus 10 As described above, in the management system 1, the fusion splicing apparatus 10, the wireless information terminal 20, the management server 30, and the management apparatus 40 are connected in a wirelessly or wiredly communicable state, and fusion connection data to be described later, etc. Are configured to be able to mutually transmit and receive various types of information.
  • the fusion connection apparatus 10 performs fusion connection performed with the wireless communication unit 11 for wirelessly communicating with an external apparatus such as the wireless information terminal 20 and the fusion connection apparatus 10 as its control / communication unit.
  • the information acquisition unit 12 acquires fusion connection data associated with an operation for each operation, and a lock unit 13 that locks the operation of the fusion connection apparatus 10.
  • a plurality of (for example, three in the present embodiment) fusion splice apparatus 10 constitute one work team, and each work team (work team A, work team B, and work) Conduct one work project by team C). As shown in FIG.
  • each of the fusion spliced devices 10 controls the CPU 10a, the RAM 10b, the ROM 10c, the input device 10d, the wireless communication module 10e, the auxiliary storage device 10f, and the output device 10g as shown in FIG. , And a computer including hardware for communication.
  • the functions of the control / communication unit of the fusion splice apparatus 10 are exhibited by these components operating according to a program or the like.
  • the fusion splice apparatus 10 may be provided with a position information acquisition apparatus such as a GPS 10 h, or may be configured to be able to acquire position information of the fusion splice apparatus 10 such as longitude and latitude by the GPS 10 h.
  • the fusion splice apparatus 10 includes various fusion splice mechanisms 10i (such as a discharge electrode 3b) as well as the control function and the communication function.
  • the wireless communication unit 11 performs wireless communication with the wireless information terminal 20 (communication unit 21).
  • the wireless communication unit 11 includes, for example, a wireless LAN card, and performs wireless communication in the 2.4 GHz band compliant with IEEE 802.11 with the wireless information terminal 20.
  • the wireless communication unit 11 wirelessly transmits the SSID (identifier) of the wireless access point (wireless AP) unique to each fusion spliced device 10.
  • the wireless information terminal 20 receives and recognizes this SSID, whereby the wireless connection between the fusion splicer 10 and the wireless information terminal 20 is established.
  • the wireless communication by the wireless communication unit 11 is not limited to the above communication standard, and may be another communication standard.
  • the information acquisition unit 12 acquires fusion connection data regarding each fusion connection operation by the fusion connection apparatus 10.
  • the information acquisition unit 12 is a date and time of fusion connection, a fusion-connected location, fusion connection when the connection engineer performs an operation of fusing an optical fiber using the fusion connection apparatus 10
  • Connection loss of the optical fiber e.g., a date and time of fusion connection, a fusion-connected location, fusion connection when the connection engineer performs an operation of fusing an optical fiber using the fusion connection apparatus 10
  • Connection loss of the optical fiber e.g., end face angle of the optical fiber to be fusion spliced, eccentricity of the optical fiber, connection conditions selected at the time of fusion splicing (discharge heating time, discharge power, etc.) and type of optical fiber were determined.
  • information such as an optical fiber observation image before and after connection, the number of connections, the reinforcement condition, the time taken for reinforcement, or the number of reinforcements is acquired as fusion connection data.
  • the information acquisition unit 12 fuses the identification information (SSID or similar identification information described above) of the fusion splicing apparatus 10 used for the fusion splicing operation and the identification information of the connection engineer who has performed the fusion splicing operation. It may be acquired as arrival connection data.
  • the fusion connection information such as the identification information of the fusion connection apparatus 10 and the identification information of the connection engineer may be acquired by the wireless information terminal 20 described later.
  • the information acquisition unit 12 acquires the fusion connection data for each fusion connection operation by the fusion connection apparatus 10, and transmits the acquired fusion connection data to the wireless information terminal 20 through the wireless communication unit 11. .
  • the fusion connection data transmission to the wireless information terminal 20 by the information acquisition unit 12 may be performed for each fusion connection operation, or may be performed at a predetermined cycle (for example, every predetermined time).
  • the lock unit 13 temporarily locks the operation of the fusion mechanism of the fusion splice apparatus 10 or releases the lock.
  • the fusion splice apparatus 10 operates the fusion mechanism of the fusion splice apparatus 10 until the release instruction from the wireless information terminal 20 is received after activating the fusion splice apparatus 10 for the purpose of theft prevention etc. It may have a locking function.
  • the lock unit 13 implements the lock function.
  • the lock unit 13 receives the lock release signal from the wireless information terminal 20 (the release instructing unit 23) after the fusion splice device 10 is activated, the lock unit 13 authenticates the lock release signal, and the received lock release signal In the case of a proper signal, the operation locking of the fuser mechanism of the fusion splicer 10 is released.
  • the wireless information terminal 20 for receiving the fusion connection data from the fusion connection apparatus 10 is constituted of, for example, a portable wireless communication terminal such as a smartphone or an information terminal such as a personal computer (PC) having a wireless communication function.
  • the wireless information terminal 20 includes a communication unit 21, a work management unit 22, and a release instruction unit 23.
  • the release instruction unit 23 generates an instruction signal for releasing the operation lock of the fusion bonding mechanism of the fusion splicing apparatus 10 as described above.
  • the release instruction unit 23 transmits a release signal for the corresponding fusion splice apparatus 10 to the fusion splice apparatus 10 via the communication unit 21 to release the operation lock.
  • the release signal may include identification information specific to each wireless information terminal 20 or each connection engineer, so that only a specific fusion connection device 10 can be released from the lock.
  • the wireless information terminal 20 includes a computer including hardware such as a CPU 20a, a RAM 20b, a ROM 20c, an input device 20d, a wireless communication module 20e, an auxiliary storage device 20f, an output device 20g, and a GPS 20h. Configured The functions of the wireless information terminal 20 described later are exhibited by the operation of these components by a program or the like. Further, as shown in FIG. 7, the management server 30 and the management device 40 may be configured by the same hardware configuration.
  • each of the management server 30 and the management device 40 includes a computer including hardware such as a CPU 30a, a RAM 30b, a ROM 30c, an input device 30d, a wireless communication module 30e, an auxiliary storage device 30f, and an output device 30g. Configured as
  • the communication unit 21 includes, for example, a wireless communication module 20 e, and transmits and receives various wireless signals to and from the wireless communication unit 11 of the fusion splice device 10 by wireless communication.
  • the communication unit 21 includes, for example, a wireless LAN module incorporated in the terminal, and performs communication in the 2.4 GHz band compliant with, for example, IEEE 802.11 so as to correspond to the wireless standard of the wireless communication unit 11.
  • the communication unit 21 receives the SSID (identifier) individually assigned to each of the fusion spliced devices from the above-described fusion spliced device 10 as a wireless signal, and performs authentication with respect to the SSID, thereby communicating with the wireless communication unit 11. Establish wireless communication.
  • the communication unit 21 acquires fusion connection data acquired by the information acquisition unit 12 of the fusion splice apparatus 10 via the wireless communication unit 11.
  • the communication unit 21 is also connected to the management server 30 via a predetermined telecommunications line (including radio and the Internet) such as 4G (LTE), and transmits and receives various data / signals with the management server 30. I do.
  • the work management unit 22 cooperates with the work monitoring unit 32 of the management server 30 to manage, with the wireless information terminal 20, the progress of the work project of the fusion connection work assigned to each work team.
  • the work management unit 22 instructs, for each work team assigned from the management server 30, an instruction to start various work before fusion connection and notification of an estimated completion time (alarm notification etc.) for fusion work, and fusion connection. Transmission of each fusion connection data transmitted from the apparatus 10 to the management server 30, an instruction to start fusion connection work, and notification of an estimated completion time (alarm notification) are performed.
  • the management server 30, which receives fusion connection data related to fusion connection work by a connection engineer from the wireless information terminal 20, includes a work monitoring unit 32 including a communication unit 31, a determination unit 33 and a notification unit 34, a construction project DB 35, and a selection unit. 36, a work team DB 37, and an update unit 38.
  • the communication unit 31 corresponds to the communication unit 21 and transmits / receives information to / from the communication unit 21 of the wireless information terminal 20 through a telecommunication line (including a wireless (including 4G and the like) and an Internet line).
  • the communication unit 31 also corresponds to the communication unit 41 of the management device 40, and transmits and receives information to and from the communication unit 41 of the management device 40 through a telecommunication line or the like.
  • the work monitoring unit 32 is configured to include the determination unit 33 and the notification unit 34, and each work team including the one or more fusion spliced devices 10 fuses according to the work plan of the construction project assigned in advance. Monitor whether the connection work is progressing.
  • the determination unit 33 of the operation monitoring unit 32 acquires fusion connection data regarding each fusion connection operation in the fusion connection apparatus 10 via the wireless information terminal 20, the fusion connection included in the fusion connection data The time, location, fusion connection quality (connection loss), etc. are compared with the work plan data of a predetermined construction project stored in the construction project DB.
  • the determination unit 33 determines whether the progress of the fusion splicing work is delayed with respect to the work plan, and that the connection quality (the estimated loss of connection and the end face angle) of the fusion spliced optical fiber is desired It is determined whether or not The determination unit 33 may determine only one of the delay of the fusion bonding operation and the connection quality.
  • the notification unit 34 delays the connection via the communication unit 31.
  • the management apparatus 40 is notified of the information indicating that the quality is not satisfied (abnormality).
  • the notification unit 34 determines that the fusion connection work of a certain work team is being performed along the work plan or satisfies the desired quality
  • the work unit can be performed along the work plan via the communication unit 31.
  • the management device 40 is notified of information indicating that the desired quality is satisfied (normal).
  • the determination of the work status by the determination unit 33 may be performed each time the fusion spliced data is acquired from each fusion splice apparatus 10, or may be performed at a predetermined cycle (for example, every hour). .
  • the manager using the management apparatus 40 can know in advance or in real time the delay of the fusion connection work by each work team and the deterioration of the connection quality.
  • FIG. 8 shows an example of a list screen showing the connection time and connection quality for each project together in the management apparatus 40. In FIG. 8, coloring is performed (displayed in red or yellow, for example) for the connection where the estimated loss does not satisfy the desired value, and the administrator who saw this screen in the management apparatus 40 has an abnormal situation. It can be easily known.
  • the selection unit 36 selects a work group (group of connected engineers) to be assigned to the construction project from past work results.
  • the selection unit 36 receives a request for selecting a work team for a certain construction project from the selection instruction unit 44 of the management apparatus 40, the current fusion connection work schedule for each work team, the number of times of fusion connection (performance), Access to work team DB 37 where information such as construction period of fusion connection (performance) and connection quality of fusion connection are collected for each work team, and match the connection conditions (delivery date, quality, etc.) of the relevant construction project Select a work team as a candidate.
  • the selection unit 36 may select one work team at the time of this selection, or may select a plurality of work teams.
  • the selection unit 36 notifies the management apparatus 40 of the candidate of the selected work team and notifies the administrator.
  • the update unit 38 adds the fusion spliced data performed by the work plan to the work team DB 37, and updates the information in the work team DB 37.
  • the updating unit 38 adds each fused connection data to the existing information as information indicating the skill and experience of each connecting engineer, in association with the identification number indicating the connecting engineer who has performed each fusion connecting operation. . Thereby, selection of a suitable work team using the work team DB 37 becomes more preferable.
  • the management device 40 is configured of, for example, a general device such as a personal computer, and includes a communication unit 41, a registration unit 42, a status display unit 43, and a selection instruction unit 44.
  • the communication unit 41 has a function of performing general Internet communication, and establishes communication between the management server 30 and the management apparatus 40.
  • the registration unit 42 registers the construction project in the construction project DB 35 of the management server 30.
  • the registration unit 42 is linked to the identification information of the manager who manages the management apparatus 40, and the construction project name, the construction period of this construction project, the number of times of connection of optical fiber and the connection standard (desired connection quality) A team etc. are registered into construction project DB35.
  • the status display unit 43 causes the monitor of the management device 40 to display the progress status of the construction project registered by the registration unit 42.
  • the display of the progress status by the status display unit 43 enables the manager to know early when a work delay or the like occurs in the construction project. Thereby, the manager can correct the delay of the fusion connection work by reorganizing the team such as increasing the number of connection engineers as needed.
  • FIG. 8 shows a display example by the situation display unit 43. As shown in FIG.
  • the selection instructing unit 44 instructs the management server 30 to select a work team to be in charge.
  • the management server 30 selects a work team suitable for a construction project by the selection unit 36 and the work team DB 37 as described above, and the selection result Is notified to the management device 40.
  • FIGS. 9 to 11 are sequence diagrams showing a process of managing the progress of the fusion connection work performed by each connection engineer using the fusion connection apparatus 10 by the management system 1.
  • FIG. 12 is a flowchart showing a processing flow of construction project registration in the sequence diagram of FIG.
  • FIG. 13 is a flow chart showing a process flow of automatic assignment of the team in charge in the construction project registration process shown in FIG.
  • the manager operates the management apparatus 40, and the manager first performs user registration of a worker (connection engineer).
  • a worker connection engineer
  • the user's information As the user's information, the user's ID, password, years of work experience, and the type of fusing apparatus that can be handled are registered. This step is performed when a new worker is registered (step S1).
  • the manager performs a team registration process of the work team to be managed. As team information, enter a team name, select a team leader and team members from among the users (connected engineers) who registered as users, and register them. This step is performed when newly creating a team or when changing a team name, a leader or a member (step S2).
  • a construction project registration process (step S3) is performed on the management server 30.
  • step S1 user registration by a manager who manages a plurality of construction projects in a centralized manner is performed on the management server 30.
  • step S2 information on each work team managed by the administrator (information on the affiliated connection engineer and the fusion connection apparatus to be used) is linked to the user information (identification information) of the administrator. , And registered in the work team DB 37 of the management server 30.
  • the manager registers a construction project (an AA project, a BB project, a CC project, etc. illustrated in FIG. 8) which the operator wants to monitor.
  • step S4 registration processing of the construction project to the construction project DB 35 is performed.
  • the registration process of this construction project first performs the input process of the construction project name (step S50), and then the input process of the construction period of the construction project (step S51), the construction Input processing (step S52) of the planned connection number of optical fibers in the project and input processing (step S53) of the connection standard (connection quality), and selection / automatic assignment processing of a work team in charge of the construction project (step S54) Perform S55).
  • step S51 information such as a construction period, construction start date, and construction end date required for a certain fusion connection work is linked to each construction project name and registered in construction project DB 35 .
  • step S52 information on the total number of times of planned fusion bonding (for example, 100 times, 200 times, 500 times, etc.) in a certain fusion bonding work is tied to each construction project name. It is attached and registered in construction project DB35.
  • the allowable loss range (0.02 dB or less, 0.03 dB or less, etc.) or fusion of the fusion spliced optical fiber in a fusion splice operation, or fusion Information related to connection quality such as the allowable range of the end face angle of the optical fiber to be connected (for example, 0.5 degree or less or 3.5 degree or less) is registered in the construction project DB 35 by being linked to each construction project name .
  • the selecting unit 36 of the management server 30 selects a work team suitable for a certain construction project by the selection process shown in FIG. Specifically, first, as shown in step S60, the team search process is started, one work team is selected, and it is determined whether or not another work is included in that work team in the construction period in which the fusion connection work is performed. (Step S61). If another team has already entered another construction, the process returns to step S60, another team is selected, and the same process is repeated.
  • step S62 the process proceeds to step S62, and the performance data of the construction team (the number of times of fusion connection in the past, construction period of fusion connection, and fusion)
  • the connection quality (estimated loss, end face angle, etc.) of the connection connection is acquired from the work team DB 37.
  • step S63 When the process of acquiring the performance of the work team from the work team DB 37 is completed, the process proceeds to step S63, and it is determined whether the performance of the work team has been acquired. If the result can be acquired, the process proceeds to step S64, and the number of fusion splices in the present construction project is compared with the number of fusion splices of the result. If it is determined in step S64 that the actual number of fusion splices is larger, the process proceeds to step S65. On the other hand, when it is determined No in steps S63 and S64, the process returns to step S60, and the comparison with another team is continued.
  • step S64 If it is determined in step S64 that the actual number of fusion splices is larger, the work period of the present construction project is compared with the actual work period.
  • the term "construction period" as used herein refers to the number of days taken for optical fiber laying work.
  • step S66 if the actual work period is shorter than the current work period, the process proceeds to step S66.
  • step S66 the connection quality of the current construction project and the connection quality of the actual result are compared.
  • step S67 when the connection quality of the actual result is higher than the connection quality of this time, the process proceeds to step S67, and the team is selected as a candidate team.
  • connection loss and the end face angle are compared as connection quality, and when these figures in the quality of the actual results are lower than the values required in the current construction project, Is determined to be higher than the current connection quality.
  • the process returns to step S60, and comparison with another team is performed.
  • a work team suitable for a certain construction project is selected, and is linked to the construction project name and registered in the construction project DB 35 of the management server 30 as a work team in charge of the project.
  • step S5 an application for managing the work plan of the fusion connection work installed in the wireless information terminal 20 is activated by the connection engineer who performs the fusion connection work (step S5).
  • a process of accepting user input from the connection engineer is performed (step S6).
  • the information on the work team that has already been registered includes identification information indicating each connected engineer who belongs to the work team, and this identification information is used for authenticating the connection engineer.
  • the connecting engineer inputs an identification number (a password if necessary) assigned to each connecting engineer to the wireless information terminal 20, the information is transmitted to the management server 30, and the user authentication process is requested. (Step S7).
  • the management server 30 determines based on the identification information whether or not it is a connection engineer who belongs to the work team registered in the construction project DB 35, and if the authentication is successful, the authentication completion notification is sent to the wireless information terminal 20 is performed (step S8).
  • FIG. 9 describes only an example of authentication of one wireless information terminal 20 (one connection engineer), the same applies to wireless information terminals 20 assigned to each connection engineer belonging to a working team. Perform user authentication processing.
  • Step S9 the work monitoring unit 32 of the management server 30 starts the monitoring process of the fusion connection work management in the registered construction project.
  • the work monitoring unit 32 first transmits information including the work plan in the construction project to each wireless information terminal 20 belonging to the work team, and the work management unit 22 acquires these pieces of information.
  • the work management unit 22 that has acquired the information including the work plan starts management processing of the work plan in each wireless information terminal 20 (step S11), and notifies the work monitoring unit 32 of the management server 30 that the work has been started. It notifies (step S12).
  • the work monitoring unit 32 recognizes that the fusion connection work in the construction project has been started.
  • the wireless information terminal 20 performs voice announcement or screen display for instructing the connecting engineer to start the work 1 including the end face processing of the optical fiber to be fusion spliced and the other pre-processing work (step S13) And the fact that work 1 has been started is notified to the work monitoring unit 32 of the management server 30 (step S14).
  • the work monitoring unit 32 may transmit information to that effect to the management device 40.
  • step S15 an alarm notification etc. is performed and the connection engineer who holds the wireless information terminal 20 at the operation site It is informed that the scheduled completion time of the work 1 has come (step S15). Further, an alarm indicating that the scheduled completion time of the work 1 has come is notified to the work monitoring unit 32 of the management server 30 (step S16). Thereafter, when an input indicating that work 1 has been completed is made by the connecting engineer to wireless information terminal 20, the input is accepted (step S17), and completion notification of work 1 is given to work monitoring unit 32. (Step S18). The work monitoring unit 32 determines from the completion notification that the work 1 has been reliably completed.
  • the connection engineer may be able to input an effect to that effect. In that case, the alarm notification process accompanying the elapse of the scheduled completion time of the work 1 may be omitted.
  • step S20 the work management unit 22 of the wireless information terminal 20 performs a voice announcement or screen display to instruct the connection engineer to start the fusion connection work.
  • the connection engineer activates the fusion splicer 10 (step S21) and causes the release instruction unit 23 of the wireless information terminal 20 to release the operation lock of the fusion splicer 10 of the fusion splicer 10.
  • a signal is transmitted to fusion splicer 10 (step S22).
  • the connection engineer carries out the fusion connection work (first time) of the optical fiber (step S23).
  • the wireless information terminal 20 confirms the situation with respect to the fusion splicer 10 (step S24), and the information acquisition unit 12 causes the fusion splicer 10 to
  • the fusion connection data is acquired and transmitted to the work management unit 22 of the wireless information terminal 20 (step S25).
  • the fusion spliced data acquired by the fusion splicer 10 includes, for example, date and time of fusion splice, fusion spliced location, splice loss of fusion spliced optical fiber, and fusion spliced Information such as the end face angle of the optical fiber.
  • fusion connection data that can be added to the information by the wireless information terminal 20
  • information such as identification information of the fusion connection apparatus 10 that performs fusion connection and identification information of a connection engineer.
  • Information on the date, time, and location of the fusion connection may be added in the wireless information terminal 20.
  • the work management unit 22 of the wireless information terminal 20 having acquired such fusion connection data links the acquired information to the construction project name and notifies the work monitoring unit 32 of the management server 30 (step S26). .
  • the work monitoring unit 32 of the management server 30 determines whether the operation status in the fusion connection is normal or not by the determination unit 33 It is determined whether or not (step S27). In the determination by the determination unit 33, for example, when the connection work is delayed compared to the work plan in the registered project or when the required connection quality is not satisfied, it is determined as abnormal. On the other hand, for example, if the connection work is being performed in accordance with the work plan in the registered project, or if the required connection quality is satisfied, etc., it is determined as normal.
  • the notification unit 34 of the work monitoring unit 32 of the management server 30 notifies the management apparatus 40 of the determination result (normal / abnormal) by the determination unit 33, and the status display unit 43 notifies the administrator (step S28). ).
  • FIG. 8 is an example of a screen on which such notification has been collected.
  • step S29 an alarm notification etc. is performed, and the completion time to the connection engineer Informing that it has become. Further, an alarm to the effect that the scheduled completion time of the fusion connection work (first time) has come is notified to the work monitoring unit 32 of the management server 30 (step S30).
  • the scheduled completion alarm (pre-notification notification alarm) notification or the like may be issued at a preset time before the scheduled completion time.
  • fusion bonding work (n-th) and notification of fusion bonding data and the like are similarly performed (steps S31 to S34), and the work information determination and management apparatus 40 in the management server 30 is performed.
  • a notification is made (steps S35 to S36).
  • the connection engineer may be able to input an effect to that effect. In that case, the alarm notification accompanying the elapse of the scheduled completion time may be saved.
  • the wireless information terminal 20 receives acceptance of the completion by the connection engineer, and notifies the work monitoring unit 32 of the management server 30 that the fusion connection work is completed (step S38).
  • the work monitoring unit 32 of the management server 30 notified of the completion of the fusion connection work reports to the management apparatus 40 that the fusion connection work associated with the work 1 is completed (Step S39).
  • the subsequent operations included in the registered work project are performed in the same manner as the operation 1 described above (steps S40 to 43).
  • the wireless information terminal 20 receives an input by the connecting engineer that the tasks N are completed (step S44).
  • the wireless information terminal 20 that has received the input indicating that all the work has been completed reports to the work monitoring unit 32 of the management server 30 that all the work has been completed (step S45).
  • the progress management of the work project by the work management unit 22 of the wireless information terminal 20 and the progress management (work monitoring) of the work project by the work monitoring unit 32 of the management server 30 are completed (step S46).
  • the management server 30 may notify the management device 40 of information indicating that all the fusion connection work has been completed.
  • the management server 30 links each fusion connection data in the current work project to the work team by the update unit 38 in order to select the next work team, and performs work It adds to team DB37 and updates the content of work team DB37. This makes it possible to select a more suitable work team when selecting a work team next time.
  • the management system 1 acquires fusion connection data related to the fusion connection operation by the fusion connection apparatus 10 and the corresponding wireless information terminal 20 each time each fusion connection operation is performed. . Then, the management system 1 compares the acquired fusion connection data with the work plan data in the management server 30, determines the progress status of each fusion connection work, and notifies the management device 40 of the determination result as needed. For this reason, when the manager can know the progress status of each fusion connection work (for example, delay of work, deterioration of connection quality, etc.) at an early stage and the progress of fusion connection work or the like occurs, the manager Can quickly find out the progress status such as work delay and take corrective action (for example, increase of connection workers etc.).
  • the management system 1 acquires fusion connection data related to the fusion connection operation by the fusion connection apparatus 10 and the corresponding wireless information terminal 20 each time each fusion connection operation is performed. . Then, the management system 1 compares the acquired fusion connection data with the work plan data in the management server 30, determines the progress status
  • the determination unit 33 compares the fusion spliced data with the work plan data, and determines whether each fusion splice work is delayed from the work plan. Therefore, it can be known at an early stage whether or not the fusion work is delayed, and the correction can be made at an early stage.
  • the notification unit 34 notifies the management apparatus 40 for managing the work plan of the progress status as to whether or not each fusion splicing work is delayed from the work plan in a predetermined cycle or in a delayed manner. Notification may be made for each determination.
  • the fusion splice data includes identification information of the fusion splicer 10 used, identification information of the connection engineer who has performed the fusion splice operation, date and time of the fusion splice, and fusion splice
  • the information includes at least one of the location of the connection, the connection loss of the fusion spliced optical fiber, and the end face angle of the fusion spliced optical fiber. Since the fusion connection data includes such specific information, the manager can more specifically recognize the progress information of the fusion work, and it is possible to correct the delay more suitably. It becomes.
  • each fusion spliced device 10 has a configuration capable of wireless connection with the corresponding wireless information terminals 20.
  • the work plan data is stored in the management server 30 that can communicate with the wireless information terminal 20 via a predetermined communication line, and the information acquisition unit 12 is provided in the fusion splice apparatus 10.
  • the wireless information terminal 20 acquires the fusion connection data acquired by the information acquisition unit 12 from the fusion connection apparatus 10 (a part of the fusion connection data is additionally acquired by the wireless information terminal 20), and the management server Send to 30
  • the determination unit 33 provided in the management server 30 determines the progress of each fusion connection work based on the transmitted fusion connection data.
  • the management system 1 can easily acquire fusion connection data from the fusion connection apparatus 10 by using the wireless information terminal 20 which can be disposed close to the fusion connection apparatus 10, and the operation It is also possible to manage the planning data collectively by the management server 30.
  • the management system 1 further includes a selection unit 36 for selecting a candidate team of connection engineers suitable for each work plan, and the selection unit 36 determines the construction period in the work plan data, the number of connection times of optical fibers, and the optical fiber
  • the candidate team suitable for the said work plan is selected based on the information of at least one in the connection standard of.
  • the manager can easily select a work team suitable for each work plan.
  • the candidate team selected may be one working team or multiple working teams.
  • the work team may be composed of a plurality of connection engineers or may be composed of one connection engineer.
  • the management system 1 includes, in the management server 30, a work team DB 37 including connection engineer data for the selection unit 36 to select a candidate team suitable for a work plan.
  • the management system 1 further adds fusion connection data in the fusion connection work performed by the work plan to the work team DB 37 after the fusion connection work according to the work plan is completed, and the work team DB 37 It further comprises an updating unit 38 for updating. This makes it possible to select a work team that is more suitable for each work plan.
  • the management system and the management method for managing the progress of the fusion splicing operation by the fusion splicing apparatus have been described above, but the management system and management method according to the present invention are limited to the above embodiment Instead, various modifications can be applied.
  • the fusion spliced device 10 transmits fusion spliced data to the management server 30 via the wireless information terminal 20, but the above-described function of the wireless information terminal 20 is fused to the fusion connection device
  • the fusion splice data may be transmitted directly from the fusion splice apparatus 10 to the management server 30.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Plasma & Fusion (AREA)
  • Optics & Photonics (AREA)
  • Data Mining & Analysis (AREA)
  • Automation & Control Theory (AREA)
  • General Factory Administration (AREA)
  • Mechanical Coupling Of Light Guides (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理するための、融着接続装置の管理システムが開示される。この管理システムは、取得部と、判定部と、通知部と、を備える。取得部は、融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを、各融着接続作業が実施される毎に取得する。判定部は、融着接続データを、作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する。通知部は、判定部で判定した各融着接続作業の進捗状況を通知する。

Description

融着接続装置の管理システム、及び、融着接続装置の管理方法
 本開示は、融着接続装置(fusion splicer)の管理システム、及び、融着接続装置の管理方法に関する。
 本出願は、2018年1月17日出願の日本出願第2018-005734号に基づく優先権を主張し、前記日本出願に記載された全ての記載内容を援用する。
 特許文献1は、光ファイバ同士を融着接続するための融着接続装置を開示する。この融着接続装置には、光ファイバを載置するためのV溝、光ファイバ同士を融着するためのアーク放電用電極及び電極台、光ファイバ同士の融着接続状況をモニタする顕微鏡やモニタ、及び、融着された光ファイバの接続部に被せられる補強スリーブを加熱収縮させるための加熱器などが設けられている。
特開2012-141357号公報
 本開示は、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理するシステムを提供する。この管理システムは、取得部と、判定部と、通知部と、を備える。取得部は、融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを、各融着接続作業が実施される毎に取得する。判定部は、融着接続データを、作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する。通知部は、判定部で判定した各融着接続作業の進捗状況を通知する。
 本開示は、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理する管理方法を提供する。この管理方法は、融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを各融着接続作業が実施される毎に取得する工程と、融着接続データを作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する工程と、判定する工程で判定した各融着接続作業の進捗状況を通知する工程と、を備えている。
図1は、融着接続装置の一例を示す斜視図である。 図2は、図1に示す融着接続装置における内部構造を示す斜視図である。 図3は、融着接続装置の管理システムの一例の概要を示す図である。 図4は、融着接続装置の管理システムの一例を示すブロック図である。 図5は、図4に示す融着接続装置のハードウェア構成を示すブロック図である。 図6は、図4に示す無線情報端末のハードウェア構成を示すブロック図である。 図7は、図4に示す管理サーバ及び管理装置のハードウェア構成を示すブロック図である。 図8は、管理システムにおける、融着接続作業のプロジェクト状況の表示画面の一例を示す図である。 図9は、図4に示す管理システムにより、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理する処理を示すシーケンス図である。 図10は、図4に示す管理システムにより、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理する処理を示すシーケンス図である。 図11は、図4に示す管理システムにより、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理する処理を示すシーケンス図である。 図12は、図9のシーケンス図における工事プロジェクト登録の処理フローを示すフローチャートである。 図13は、図12に示す工事プロジェクト登録処理における担当チームの自動アサインの処理フローを示すフローチャートである。
[本開示が解決しようとする課題]
 融着接続装置を使用して接続技術者が光ファイバの融着接続作業を行う作業現場では、日々の作業完了後に各作業現場の進捗状況(例えば作業の遅れ)を管理者が把握することが多い。このため、ある作業現場での融着接続作業が当初の作業計画から遅れた場合、その遅れを管理者が早期に知ることができず、作業の遅れを早期に是正することが難しくなることがある。そこで、融着接続装置を用いた融着接続作業の進捗に遅れ等があった場合でも、管理者がその進捗状況を早期に知ることができることが望まれている。
[本開示の効果]
 本開示によれば、融着接続作業の進捗状況を早期に知ることができる。
[本開示の実施形態の説明]
 最初に本開示の実施形態の内容を列記して説明する。本開示の一態様は、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理するシステムに関する。この管理システムは、融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを各融着接続作業が実施される毎に取得する取得部と、融着接続データを作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する判定部と、判定部で判定した各融着接続作業の進捗状況を通知する通知部と、を備えている。
 本開示の別の一態様は、融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理する管理方法に関する。この管理方法は、融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを各融着接続作業が実施される毎に取得する工程と、融着接続データを作業計画データと対比して各融着接続作業の進捗状況を判定する工程と、判定する工程で判定した各融着接続作業の進捗状況を通知する工程と、を備えている。
 この融着接続装置の管理システム及び管理方法では、融着接続作業に関する融着接続データを各融着接続作業が実施される毎に取得する。そして、取得した融着接続データを作業計画データと対比して各融着接続作業の進捗状況を判定し、所定の通知先に通知する。このため、各融着接続作業の進捗状況(例えば作業の遅れ又は接続品質等)を管理者が早期に知ることができ、融着接続作業の進捗の遅れやその他の問題が発生した場合、管理者は早期に作業の遅れ等の進捗状況を発見して、その是正を図ることができる。
 一実施形態として、判定部は、融着接続データを作業計画データと対比し、各融着接続作業が作業計画から遅延しているか否かについて判定してもよい。この実施形態によれば、融着作業が遅延しているか否かを早期に知ることができ、早期にその是正を図ることができる。この場合において、通知部は、各融着接続作業が作業計画から遅延しているか否かについての進捗状況を、作業計画を管理するための管理装置に対して所定の周期で又は遅延の判定毎に通知するようにしてもよい。
 一実施形態として、融着接続データは、使用された融着接続装置の識別情報、融着接続作業を実施した接続技術者の識別情報、融着接続の日付及び時刻、融着接続が行われた場所、融着接続された光ファイバの接続ロス、融着接続される光ファイバの端面角度、光ファイバの偏心量、融着接続時に選択した接続条件(放電加熱時間又は放電パワー等)、光ファイバの種別を判別した結果、接続前後の光ファイバ観察画像、接続回数、融着接続部の補強条件、補強にかかった時間、及び、補強回数、の内の少なくとも1つの情報を含んでいてもよい。この実施形態によれば、融着作業の進捗情報を管理者がより具体的に認識することができ、より好適な遅延の是正を図ることが可能となる。
 一実施形態として、融着接続装置それぞれに対して個別の無線情報端末が割り当てられてもよく、各融着接続装置は、対応する無線情報端末と無線接続可能な構成を有していてもよい。作業計画データは、無線情報端末と所定の通信回線を介して通信可能な管理サーバに格納され、且つ、取得部が融着接続装置に設けられていてもよい。そして、無線情報端末は、取得部で取得した融着接続データを管理サーバに送信し、管理サーバ内に設けられた判定部により各融着接続作業の進捗状況が判定されてもよい。この実施形態によれば、融着接続装置に近接して配置できる無線情報端末を利用して融着接続データを融着接続装置から容易に取得することができ、また、作業計画データを管理サーバでまとめて管理することも可能となる。
 一実施形態として、各作業計画に適した接続技術者の候補チームを選定する選定部又は選定工程を更に備え、選定部又は選定工程は、作業計画データにおける工事期間、光ファイバの接続予定回数、又は、光ファイバの接続規格の内の少なくとも1つの情報に基づいて、当該作業計画に適した候補チームを選定してもよい。この実施形態によれば、管理者は、それぞれの作業計画に適した作業チームを容易に選定することができる。選定される候補チームは、1つの作業チームでもよいし、複数の作業チームでもよい。また、作業チームは、複数の接続技術者から構成されていてもよいし、一人の接続技術者から構成されてもよい。
 一実施形態として、選定部が作業計画に適した候補チームを選定するための接続技術者データを含むチームデータベースを更に備えてもよい。この場合において、管理システム又は管理方法は、作業計画に沿った融着接続作業が完了した後に、当該作業計画によって行われた融着接続作業における融着接続データをチームデータベースに追加して、チームデータベースを更新する更新部/更新工程を更に備えてもよい。これにより、それぞれの作業計画により適した作業チームを選定することが可能となる。
 なお、上述した何れの実施形態も、必要に応じて、他の実施形態と組み合わせることが可能である。
[本開示の実施形態の詳細]
 次に、本開示の一実施形態に係る融着接続装置の管理システム及びその管理方法の具体例について図面を参照して説明する。本発明はこれらの例示に限定されるものではなく、請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。以下の説明では、図面の説明において同一の要素には同一の符号を付し、重複する説明を省略する。
 まず、本実施形態に係る管理システムによって管理される、融着接続作業を行うための融着接続装置10について、図1及び図2を参照して、説明する。図1及び図2は、融着接続装置の外観を示す斜視図であり、図1は、風防カバーが閉じている状態の融着接続装置の外観を示し、図2は、風防カバーが開けられて融着接続装置の内部構造が見える状態の外観を示す。融着接続装置10は、光ファイバ同士を融着接続するための装置であり、図1及び図2に示すように、箱状の筐体2を備えている。筐体2の上部には、光ファイバ同士を融着接続するための融着機構3と、融着機構3で融着された光ファイバの融着接続部に被せられるファイバ補強スリーブを加熱収縮させる加熱器4と、起動ボタン5とが設けられている。融着接続装置10は、筐体2の内部に配置された顕微鏡カメラ(図示せず)によって撮像された光ファイバ同士の融着接続状況を表示するモニタ6を備えている。顕微鏡によって撮像される接続前の光ファイバ端面及び接続後の融着接続状況から、光ファイバのカット端面(端面角度)、光ファイバの偏心量、ファイバ種類の自動判別結果、及び、接続された光ファイバの推定ロス(dB)といった融着接続データを取得することができる。さらに、融着接続装置10は、融着機構3への風の進入を防止するための風防カバー7を備えている。
 融着機構3は、一対のファイバ位置決め部3aと、一対の放電電極3bと、一対の光ファイバホルダ3cを載置可能なホルダ載置部とを有している。融着対象の光ファイバそれぞれは、接続技術者によって、その端面が所定の角度(端面角度)範囲内になるように切断された後、光ファイバホルダ3cに保持固定され、当該光ファイバホルダ3cはそれぞれホルダ載置部に載置固定される。ファイバ位置決め部3aは、光ファイバホルダ3c同士の間に配置され、光ファイバホルダ3cのそれぞれに保持された光ファイバの先端を位置決めする。放電電極3bは、ファイバ位置決め部3a同士の間に配置され、アーク放電によって光ファイバの先端同士を融着するための電極である。融着接続装置10では、上述した構成により、光ファイバの融着接続を行うようになっているが、融着接続装置10を使用する接続技術者毎に、光ファイバの端面処理の正確性や作業速度、及び、光ファイバの融着接続処理の正確性や作業速度などが異なり、接続品質及び接続作業スピードに違いが出てしまい、作業計画に沿った融着接続を行えない場合もあり得る。
 次に、融着接続装置10を使用し作業計画に沿って接続技術者が光ファイバの融着接続作業を行う際に融着接続作業の進捗管理を行うことができる、管理システム1の構成について、図3及び図4を参照して説明する。図3は、融着接続装置の管理システムの一例の概要を示す図である。図4は、融着接続装置の管理システムの一例を示すブロック図である。図3及び図4に示すように、管理システム1は、複数の融着接続装置10と、各融着接続装置10それぞれに対して個別に割り当てられる無線情報端末20と、管理サーバ30と、管理装置40と、を備えて構成されている。融着接続装置10は、外部装置との間で例えばIEEE802.11に準拠した2.4GHz帯での無線通信を行えるように構成され、対応する無線情報端末20と無線接続可能になっている。無線情報端末20は、例えばスマートフォンであり、インターネットなどの電気通信回線(無線含む)を介して管理サーバ30に接続されている。また、パーソナルコンピュータ(PC)等から構成される管理装置40もインターネットなどの電気通信回線を介して管理サーバ30に接続されている。管理システム1ではこのように、融着接続装置10、無線情報端末20、管理サーバ30及び管理装置40が無線又は有線により相互に通信可能な状態で接続されており、後述する融着接続データなどの各種の情報を相互に送受信できるように構成されている。
 融着接続装置10は、その制御/通信部として、機能的には、無線情報端末20等の外部装置と無線通信するための無線通信部11と、融着接続装置10で行った融着接続作業に伴う融着接続データを作業毎に取得する情報取得部12と、融着接続装置10の装置の作動をロックするロック部13と、を備えている。管理システム1では、複数の(本実施形態では例えば3個の)融着接続装置10(接続技術者)から1つの作業チームが構成され、各作業チーム(作業チームA、作業チームB、及び作業チームC)によって1つの作業プロジェクトを実施する。融着接続装置10のそれぞれは、その制御/通信部として、図5に示すように、CPU10a、RAM10b、ROM10c、入力装置10d、無線通信モジュール10e、補助記憶装置10f、及び出力装置10g等の制御、通信用のハードウェアを備えるコンピュータを含むものとして構成される。これらの構成要素がプログラム等により動作することにより、融着接続装置10の制御/通信部の各機能が発揮される。また、融着接続装置10は、GPS10hなどの位置情報取得装置を備えていてもよく、GPS10hにより経度や緯度といった融着接続装置10の位置情報を取得することができる構成であってもよい。融着接続装置10は、制御機能や通信機能以外としては、各種の融着接続機構10i(放電電極3b等)を含む。
 無線通信部11は、無線情報端末20(通信部21)との間で無線通信を行う。無線通信部11は、例えば無線LANカードを含んで構成され、IEEE802.11に準拠した2.4GHz帯での無線通信を無線情報端末20との間で行う。無線通信部11は、各融着接続装置10に固有の無線アクセスポイント(無線AP)のSSID(識別子)を無線送信する。無線情報端末20(通信部21)がこのSSIDを受信して認識することにより、融着接続装置10と無線情報端末20との間の無線接続が確立される。SSIDの例としては、例えば、「T71C_420000001」等があり、他の無線通信可能な融着接続装置10とは異なるSSIDが付与されており、融着接続装置10毎に識別可能となっている。無線通信部11による無線通信は上述した通信規格に限られず、他の通信規格であってもよい。
 情報取得部12は、融着接続装置10による各融着接続作業に関する融着接続データを取得する。情報取得部12は、接続技術者が融着接続装置10を使用して光ファイバを融着する作業を行った場合における、融着接続の日付及び時刻、融着接続された場所、融着接続された光ファイバの接続ロス、融着接続される光ファイバの端面角度、光ファイバの偏心量、融着接続時に選択した接続条件(放電加熱時間及び放電パワー等)、光ファイバの種別を判別した結果、接続前後の光ファイバ観察画像、接続回数、補強条件、補強にかかった時間、又は、補強回数などといった情報を融着接続データとして取得する。情報取得部12は、融着接続作業に使用された融着接続装置10の識別情報(上述したSSID又は同様の識別情報)や、融着接続作業を実施した接続技術者の識別情報を、融着接続データとして取得してもよい。融着接続装置10の識別情報及び接続技術者の識別情報といった融着接続情報は、後述する無線情報端末20で取得してもよい。情報取得部12は、融着接続装置10による融着接続作業毎にこれらの融着接続データを取得し、取得した融着接続データを、無線通信部11を介して無線情報端末20に送信する。情報取得部12による無線情報端末20への融着接続データの送信は、融着接続作業毎に行ってもよいし、所定の周期(例えば、所定時間毎)で行ってもよい。
 ロック部13は、融着接続装置10の融着機構の動作を一時的にロックしたり、そのロックを解除したりする。融着接続装置10は、盗難防止等の目的のため、融着接続装置10を起動した後、無線情報端末20からの解除指示を受け取るまでは、融着接続装置10の融着機構の動作をロックする機能を有してもよい。ロック部13は、当該ロック機能を実現する。ロック部13は、融着接続装置10が起動された後、無線情報端末20(解除指示部23)からのロック解除信号を受信すると、当該ロック解除信号の認証を行い、受信したロック解除信号が適正な信号の場合、融着接続装置10の融着機構の動作ロックを解除する。
 融着接続装置10から融着接続データを受信する無線情報端末20は、例えばスマートフォンなどの携帯型無線通信端末又は無線通信機能を備えたパーソナルコンピュータ(PC)などの情報端末から構成される。無線情報端末20は、通信部21、作業管理部22、及び解除指示部23を備えている。解除指示部23は、上述したように融着接続装置10の融着機構の動作ロックを解除するための指示信号を生成する。解除指示部23は、対応する融着接続装置10用の解除信号を通信部21を介して融着接続装置10に送信して、動作ロックを解除させる。解除信号は、各無線情報端末20又は各接続技術者に固有の識別情報を含んでもよく、これにより、特定の融着接続装置10のみをロックから解除することができる。無線情報端末20は、図6に示すように、CPU20a、RAM20b、ROM20c、入力装置20d、無線通信モジュール20e、補助記憶装置20f、出力装置20g、及びGPS20h等のハードウェアを備えるコンピュータを含むものとして構成される。これらの構成要素がプログラム等により動作することにより、後述する無線情報端末20の各機能が発揮される。また、管理サーバ30及び管理装置40は、図7に示すように、同様のハードウェア構成により構成されていてもよい。具体的には、管理サーバ30及び管理装置40それぞれは、CPU30a、RAM30b、ROM30c、入力装置30d、無線通信モジュール30e、補助記憶装置30f、及び、出力装置30g等のハードウェアを備えるコンピュータを含むものとして構成される。
 通信部21は、例えば無線通信モジュール20eから構成され、融着接続装置10の無線通信部11との間で無線通信により各種の無線信号の送受信を行う。通信部21は、例えば、端末に内蔵される無線LANモジュールなどから構成され、無線通信部11の無線規格に対応するように、例えばIEEE802.11に準拠した2.4GHz帯での通信を行う。通信部21は、上述した融着接続装置10から各融着接続装置に個別に割り当てられたSSID(識別子)を無線信号により受信し、当該SSIDに対する認証を行うことで無線通信部11との間の無線通信を確立する。通信部21は、無線通信部11を介して、融着接続装置10の情報取得部12で取得した融着接続データを取得する。また、通信部21は、4G(LTE)などの所定の電気通信回線(無線やインターネットを含む)を介して、管理サーバ30とも接続され、管理サーバ30との間で各種のデータ/信号の送受信を行う。
 作業管理部22は、管理サーバ30の作業監視部32と協働して、各作業チームに割り当てられた融着接続作業の作業プロジェクトの進捗を無線情報端末20で管理する。作業管理部22は、管理サーバ30から割り当てられた各作業チーム毎に作業プロジェクトに沿って、融着接続前の各種作業の開始指示及びその完了予定時刻の報知(アラーム報知等)、融着接続装置10から送信された各融着接続データの管理サーバ30への送信、融着接続作業の開始指示及びその完了予定時刻の報知(アラーム報知)などを行う。
 無線情報端末20から接続技術者による融着接続作業に関する融着接続データを受信する管理サーバ30は、通信部31、判定部33及び通知部34を含む作業監視部32、工事プロジェクトDB35、選定部36、作業チームDB37、及び、更新部38を備えている。通信部31は、通信部21に対応しており、無線情報端末20の通信部21との間で電気通信回線(無線(4G等を含む)やインターネット回線を含む)を通じて情報の送受信を行う。また、通信部31は、管理装置40の通信部41にも対応しており、管理装置40の通信部41との間で電気通信回線等を通じて情報の送受信を行う。
 作業監視部32は、判定部33及び通知部34を含んで構成され、1又は複数の融着接続装置10から構成される各作業チームが、予め割り当てられた工事プロジェクトの作業計画通りに融着接続作業を進捗させているか否かを監視する。作業監視部32の判定部33は、融着接続装置10での各融着接続作業に関する融着接続データを、無線情報端末20を介して取得すると、その融着接続データに含まれる融着接続の時刻、場所、融着接続の品質(接続ロス)などを、工事プロジェクトDBに格納されている所定の工事プロジェクトの作業計画データに対比させる。そして、判定部33は、融着接続作業の進捗が作業計画に対して遅れているか否か、及び、融着接続される光ファイバの接続品質(接続の推定ロスや端面角度)が所望の要求を満たすか否か、について判定する。判定部33は、融着接続作業の遅れ又は接続品質の一方のみを判定してもよい。
 通知部34は、ある作業チームの融着接続作業が作業計画に対して遅延している又は所望の品質を満たさないと判定部33によって判定された場合には、通信部31を介して、遅延している又は品質を満たさない旨(異常)の情報を管理装置40に通知する。一方、通知部34は、ある作業チームの融着接続作業が作業計画に沿って行われている又は所望の品質を満たすと判定した場合には、通信部31を介して、作業計画に沿っている又は所望の品質を満たす旨(正常)の情報を管理装置40に通知する。判定部33による作業状況の判定は、融着接続データを各融着接続装置10から取得する度に行うようにしてもよいし、所定の周期(例えば1時間毎)で行うようにしてもよい。これにより、管理装置40を用いた管理者は、各作業チームによる融着接続作業の遅延及び接続品質の低下等を早期に又はリアルタイムに知ることが可能となる。図8には、このようなプロジェクト毎の接続時間及び接続品質を管理装置40でまとめて示す一覧画面の例を示す。図8では、推定ロスが所望の値を満たさない接続について色塗り(例えば赤又は黄色で表示)をしており、管理装置40でこの画面を見た管理者が異常な状況があった接続を容易に知ることができる。
 ここで図4に戻り、説明を続ける。選定部36は、ある工事プロジェクトがある場合に、その工事プロジェクトに割り当てる作業グループ(接続技術者のグループ)を、過去の作業結果から選定する。選定部36は、管理装置40の選定指示部44から、ある工事プロジェクトに対する作業チームの選定依頼を受け付けると、各作業チームにおける現在の融着接続作業の予定、融着接続の回数(実績)、融着接続の工期(実績)、及び、融着接続の接続品質などの情報が作業チーム毎に纏められた作業チームDB37にアクセスし、当該工事プロジェクトの接続条件(納期、品質等)に合致する作業チームを候補として選定する。選定部36は、この選定の際、1の作業チームを選定してもよいし、複数の作業チームを選定してもよい。選定部36は、選定した作業チームの候補を管理装置40に通知し、管理者に知らせる。
 更新部38は、作業計画に沿った融着接続作業が完了した後に、その作業計画によって行われた融着接続データを作業チームDB37に追加して、作業チームDB37の情報を更新する。更新部38は、各融着接続作業を行った接続技術者を示す識別番号に紐付けて、各融着接続データを各接続技術者のスキル及び経験を示す情報として、既存の情報に追加する。これにより、作業チームDB37を用いた好適な作業チームの選定がより好適になる。
 管理装置40は、例えば、パーソナルコンピュータなどの一般的な装置から構成され、通信部41、登録部42、状況表示部43、及び選定指示部44を備えている。通信部41は、一般的なインターネット通信を行う機能を有し、管理サーバ30と管理装置40との間での通信を確立する。
 登録部42は、工事プロジェクトを管理サーバ30の工事プロジェクトDB35に登録させる。登録部42は、管理装置40を管理する管理者の識別情報に紐付けて、工事プロジェクト名、この工事プロジェクトの工事期間、光ファイバの接続予定回数及び接続規格(希望接続品質)、及び、担当チーム等を工事プロジェクトDB35に登録させる。
 状況表示部43は、登録部42で登録した工事プロジェクトの進捗状況を管理装置40のモニタなどに表示させる。管理者は、状況表示部43による進捗状況の表示により、工事プロジェクトにおいて作業遅延などが発生した場合には早期に知ることができる。これにより、管理者は、必要に応じて、接続技術者の増員などのチームの再編などを行わせて、融着接続作業の遅延を是正することができる。図8に、状況表示部43による表示例を示す。
 選定指示部44は、工事プロジェクトを管理サーバ30に登録する際、担当する作業チームの選定処理を管理サーバ30に指示する。選定指示部44によって作業チームの選定処理の依頼がされると、管理サーバ30では、上述したように選定部36及び作業チームDB37により、ある工事プロジェクトに適した作業チームが選定され、その選定結果が管理装置40に通知される。
 次に、上述した構成を備えた管理システム1を用いて各作業チーム(例えば作業チームA)による融着接続作業の進捗を管理する方法について、図9~図13を参照して説明する。図9~図11は、管理システム1により、融着接続装置10を使用して各接続技術者が行う融着接続作業の進捗を管理する処理を示すシーケンス図である。図12は、図9のシーケンス図における工事プロジェクト登録の処理フローを示すフローチャートである。図13は、図12に示す工事プロジェクト登録処理における担当チームの自動アサインの処理フローを示すフローチャートである。
 まず、図9に示すように、管理者によって管理装置40が操作され、管理者は、まず初めに作業者(接続技術者)のユーザ登録を行う。ユーザの情報として、ユーザのID、パスワード、作業経験年数、及び、取り扱い可能な融着装置の種類を登録する。このステップは、新規に作業者を登録するときに実施する(ステップS1)。次に管理者は、管理する作業チームのチーム登録処理を行う。チームの情報として、チーム名を入力し、ユーザ登録したユーザ(接続技術者)の中からチームリーダー及びチームメンバーを選び、登録する。このステップは、新規にチームを作成する場合、又は、チーム名、リーダー又はメンバーの変更を行う場合に実施する(ステップS2)。次に、工事プロジェクトの登録処理(ステップS3)が管理サーバ30に対して行われる。ステップS1の管理者のユーザ登録処理では、複数の工事プロジェクトを統括的に管理する管理者によるユーザ登録が管理サーバ30に対して行われる。ステップS2のチーム登録処理では、管理者が管理する作業チームそれぞれの情報(所属する接続技術者や使用する融着接続装置等の情報)を、管理者のユーザ情報(識別情報)に紐付けて、管理サーバ30の作業チームDB37に登録させる。ステップS3の工事プロジェクト処理では、管理者が作業監視をしたい工事プロジェクト(図8に例示するAAプロジェクト、BBプロジェクト又はCCプロジェクト等)を登録させる。
 ステップS3による工事プロジェクトの登録依頼を受けた管理サーバ30では、ステップS4に進み、工事プロジェクトDB35への工事プロジェクトの登録処理を行う。この工事プロジェクトの登録処理は、例えば、図12に示すように、まず、工事プロジェクト名の入力処理を行い(ステップS50)、その後、その工事プロジェクトの工事期間の入力処理(ステップS51)、その工事プロジェクトにおける光ファイバの接続予定回数の入力処理(ステップS52)及びその接続規格(接続品質)の入力処理(ステップS53)、及び、その工事プロジェクトを担当する作業チームの選定・自動アサイン処理(ステップS54~S55)を行う。
 ステップS51の工事期間の入力処理では、例えば、ある融着接続作業にかかる工事期間、工事開始日及び工事終了日などの情報が、各工事プロジェクト名に紐付けられて工事プロジェクトDB35に登録される。ステップS52の光ファイバ接続予定回数の入力処理では、例えば、ある融着接続作業におけるトータルの融着接続予定回数(例えば100回、200回又は500回等)の情報が、各工事プロジェクト名に紐付けられて工事プロジェクトDB35に登録される。ステップS53の接続規格の入力処理では、例えば、ある融着接続作業における融着接続された光ファイバの推定ロスの許容範囲(0.02dB以下、0.03dB以下又は0.05dB以下等)や融着接続される光ファイバの端面角度の許容範囲(例えば0.5度以下又は3.5度以下等)といった接続品質に関する情報が、各工事プロジェクト名に紐付けられて工事プロジェクトDB35に登録される。
 また、ステップS54の担当チームの自動アサイン処理については、例えば図13に示す選定処理により、ある工事プロジェクトに適した作業チームを管理サーバ30の選定部36が選定する。具体的にはまずステップS60に示すようにチーム探索の処理を開始し、1の作業チームを選び、その融着接続作業を行う工期にその作業チームに別の工事が入っているか否かを判定する(ステップS61)。そのチームには既に別の工事が入っていれば、ステップS60に戻り、別のチームを選び、同じ処理を繰り返す。一方、その作業チームには別の工事が入っていないと判定されると、ステップS62に進み、その作業チームの実績データ(過去の融着接続回数、融着接続を行った工期、及び、融着接続の接続品質(推定ロスや端面角度等))を作業チームDB37から取得する。
 作業チームの実績を作業チームDB37から取得する処理が完了すると、ステップS63に進み、作業チームの実績を取得できたか否かを判定する。その実績を取得できた場合にはステップS64に進み、今回の工事プロジェクトにおける融着接続回数と実績の融着接続回数とを対比する。ステップS64の対比において、実績の融着接続回数の方が多い場合には、ステップS65に進む。一方、ステップS63及びステップS64において、Noと判定された場合には、ステップS60に戻り、別のチームでの対比を続ける。
 ステップS64で実績の融着接続回数の方が多いと判定された場合、今回の工事プロジェクトの工期と実績の工期とを対比する。ここでいう工期とは、光ファイバ敷設工事にかかる日数を指す。ステップS65の対比において、実績の工期の方が今回の工期よりも短い場合には、ステップS66に進む。続いて、ステップS66では、今回の工事プロジェクトの接続品質と実績の接続品質とを対比する。ステップS66の対比において、実績の接続品質のほうが今回の接続品質よりも高い場合には、ステップS67に進み、当該チームを候補チームとして選定する。ステップS66の品質比較では、接続品質として、接続ロス及び端面角度の対比を行い、実績の品質におけるこれらの数値が、今回の工事プロジェクトで要求される数値よりも低い場合に、実績の接続品質の方が今回の接続品質よりも高いと判定される。一方、ステップS65及びステップS66において、Noと判定された場合には、ステップS60に戻り、別のチームでの対比を行う。以上により、ある工事プロジェクトに適した作業チームが選定され、そのプロジェクトを担当する作業チームとして、管理サーバ30の工事プロジェクトDB35に工事プロジェクト名に紐付けられて登録される。
 ここで、図9に戻り、説明を続ける。ステップS4の工事プロジェクトの登録処理が終了すると、融着接続作業を行う接続技術者により、無線情報端末20にインストールされた融着接続作業の作業計画を管理するアプリが起動し(ステップS5)、接続技術者のユーザ入力の受付処理を行う(ステップS6)。既に登録されている作業チームの情報には、作業チームに所属する各接続技術者を示す識別情報が含まれており、この識別情報が接続技術者の認証に使用される。そして、接続技術者が無線情報端末20に各接続技術者に割り当てられた識別番号(必要に応じてパスワード)を入力すると、当該情報が管理サーバ30に送信され、ユーザ認証の処理が依頼される(ステップS7)。管理サーバ30では、工事プロジェクトDB35に登録された作業チームに所属する接続技術者であるか否かをその識別情報に基づいて判定し、認証ができた場合には、認証完了通知を無線情報端末20に対して行う(ステップS8)。図9では、1つの無線情報端末20(1人の接続技術者)の認証の例のみを記載しているが、作業チームに所属する各接続技術者に割り当てられた無線情報端末20で同様のユーザ認証処理を行う。
 作業チームに所属する接続技術者すべて(例えば3名)のユーザ認証処理が完了すると、管理サーバ30の作業監視部32により、登録された工事プロジェクトにおける融着接続の作業管理の監視処理が開始される(ステップS9)。作業監視部32は、監視作業が開始されると、まず工事プロジェクトにおける作業計画を含む情報を作業チームに属する各無線情報端末20に送信し、作業管理部22がこれらの情報を取得する。作業計画を含む情報を取得した作業管理部22は、各無線情報端末20において作業計画の管理処理を開始し(ステップS11)、作業開始をした旨の通知を管理サーバ30の作業監視部32に通知する(ステップS12)。これにより、作業監視部32において、その工事プロジェクトにおける融着接続作業が開始されたことを認識する。
 続いて、無線情報端末20は、融着接続する光ファイバの端面処理及びそれ以外の前処理作業を含む作業1の開始を接続技術者に指示するための音声アナウンス又は画面表示を行い(ステップS13)、作業1を開始した旨を管理サーバ30の作業監視部32に通知する(ステップS14)。作業監視部32では、作業1の開始情報を通知された場合には、管理装置40にその旨の情報を送信してもよい。
 続いて、作業1の開始指示がされてから所定の時間が経過して作業1の完了予定時間となると、アラーム報知等を行い、無線情報端末20を作業現場で保持している接続技術者に作業1の完了予定時間となったことを報知する(ステップS15)。また、作業1の完了予定時間となった旨のアラームを管理サーバ30の作業監視部32に通知する(ステップS16)。その後、接続技術者により作業1が完了した旨の入力が無線情報端末20に対して為されると、当該入力を受け付け(ステップS17)、作業1の完了通知を作業監視部32に対して行う(ステップS18)。作業監視部32では、この完了通知により、作業1が確実に終了したと判断する。無線情報端末20では、作業1の完了予定時間よりも早くに作業1が完了した場合には、接続技術者がその旨の入力をできるようにしてもよい。その場合、作業1の完了予定時間の経過に伴うアラーム報知処理を省略してもよい。
 続いて、作業1が完了すると、図10に示すステップS20に進み、融着接続作業の開始を接続技術者に指示するための音声アナウンス又は画面表示を無線情報端末20の作業管理部22が行う。この指示を受け、接続技術者は、融着接続装置10を起動させ(ステップS21)、無線情報端末20の解除指示部23により、融着接続装置10の融着接続機構の動作ロックを解除させる信号を融着接続装置10に対して送信する(ステップS22)。そして、解除信号を受け取ったロック部13により動作ロックを解除した融着接続装置10を用いて、接続技術者は、光ファイバの融着接続作業(第1回)を実施する(ステップS23)。
 融着接続装置10で融着接続作業が行われると、無線情報端末20から融着接続装置10に対して状況確認を行い(ステップS24)、情報取得部12によって、融着接続装置10での融着接続データを取得し、無線情報端末20の作業管理部22に送信する(ステップS25)。融着接続装置10で取得される融着接続データとしては、例えば、融着接続の日付及び時刻、融着接続された場所、融着接続された光ファイバの接続ロス、及び、融着接続される光ファイバの端面角度といった情報がある。また、これらの情報に無線情報端末20で追加できる融着接続データとしては、融着接続を行った融着接続装置10の識別情報及び接続技術者の識別情報といった情報がある。融着接続の日付、時刻及び場所についての情報は、無線情報端末20で追加するようにしてもよい。このような融着接続データを取得した無線情報端末20の作業管理部22は、取得した情報を、工事プロジェクト名に紐付けて管理サーバ30の作業監視部32に対して通知する(ステップS26)。
 無線情報端末20から個別の融着接続作業のデータである融着接続データを取得した管理サーバ30の作業監視部32は、判定部33によって、その融着接続における作業状況が正常であるか異常であるかを判定する(ステップS27)。判定部33での判定では、例えば、登録されたプロジェクトにおける作業計画よりも接続作業が遅延している又は要求されている接続品質を満たさない等の場合には異常と判定される。一方、例えば、登録されたプロジェクトにおける作業計画に沿って接続作業が行われている又は要求されている接続品質を満たしている等の場合には正常と判定される。管理サーバ30の作業監視部32の通知部34は、このような判定部33による判定結果(正常/異常)を管理装置40に通知し、状況表示部43により管理者に報知される(ステップS28)。図8は、このような報知を纏めた画面の一例である。
 続いて、融着接続作業の開始指示がされてから所定の時間が経過して融着接続作業(第1回)の完了予定時間となると、アラーム報知等を行い、接続技術者に完了予定時間となったことを報知する(ステップS29)。また、融着接続作業(第1回)の完了予定時間となった旨のアラームを管理サーバ30の作業監視部32に通知する(ステップS30)。完了予定時間よりも前の予め設定した時間に完了予定アラーム(事前通知アラーム)報知等を出してもよい。その後、必要に応じて、融着接続作業(第n回)及び融着接続データの通知等を同様に行い(ステップS31~ステップS34)、管理サーバ30での作業情報判定及び管理装置40への通知を行う(ステップS35~S36)。無線情報端末20では、融着接続作業の完了予定時間よりも早くに接続作業が完了した場合には、接続技術者がその旨の入力をできるようにしてもよい。その場合、完了予定時間の経過に伴うアラーム報知は省力されてもよい。
 続いて、融着接続作業が完了すると、接続技術者による完了の受け付けを無線情報端末20が受け付け、融着接続作業の完了を管理サーバ30の作業監視部32に通知する(ステップS38)。融着接続作業の完了を通知された管理サーバ30の作業監視部32は、作業1に伴う融着接続作業が完了した旨の報告を管理装置40に対して行う(ステップS39)。
 続いて、図11に記載のように、登録された作業プロジェクトに含まれる後続の作業(作業N(Nは2以上の整数))を、上述した作業1と同様に行い(ステップS40~ステップ43)、必要となる作業Nがすべて終了すると、無線情報端末20は、作業Nが完了した旨の接続技術者による入力を受け付ける(ステップS44)。すべての作業が完了した旨の入力を受け付けた無線情報端末20は、管理サーバ30の作業監視部32にすべての作業が完了した旨の報告を行う(ステップS45)。これらの報告がされた後、無線情報端末20の作業管理部22による作業プロジェクトの進捗管理、及び、管理サーバ30の作業監視部32による作業プロジェクトの進捗管理(作業監視)が終了する(ステップS46及びステップS47)。管理サーバ30は、すべての融着接続作業が終了した旨の情報を、管理装置40に通知してもよい。
 すべての融着接続作業が完了した後、管理サーバ30は、次回の作業チームを選定するために、更新部38により、今回の作業プロジェクトにおける各融着接続データを作業チームに紐付けて、作業チームDB37に追加し、作業チームDB37の内容を更新する。これにより、次回に作業チームを選定する際に、より好適な作業チームを選定することが可能となる。
 以上、本実施形態に係る管理システム1は、融着接続装置10及びそれに対応する無線情報端末20により、融着接続作業に関する融着接続データを各融着接続作業が実施される毎に取得する。そして、管理システム1は、取得した融着接続データを管理サーバ30で作業計画データと対比して各融着接続作業の進捗状況を判定し、その判定結果を管理装置40へ随時通知する。このため、各融着接続作業の進捗状況(例えば作業の遅れや接続品質の低下等)を管理者が早期に知ることができ、融着接続作業の進捗に遅れ等が発生した場合、管理者は早期に作業の遅れ等の進捗状況を発見して、その是正(例えば接続作業員の増員等)を図ることができる。
 管理システム1では、判定部33は、融着接続データを作業計画データと対比し、各融着接続作業が作業計画から遅延しているか否かについて判定する。このため、融着作業が遅延しているか否かを早期に知ることができ、早期にその是正を図ることができる。この場合において、通知部34は、各融着接続作業が作業計画から遅延しているか否かについての進捗状況を、作業計画を管理するための管理装置40に対して所定の周期で又は遅延の判定毎に通知してもよい。
 管理システム1では、融着接続データは、使用された融着接続装置10の識別情報、融着接続作業を実施した接続技術者の識別情報、融着接続の日付及び時刻、融着接続が行われた場所、融着接続された光ファイバの接続ロス、又は、融着接続される光ファイバの端面角度の内の少なくとも1つの情報を含んでいる。融着接続データがこのような具体的な情報を含んでいることから、融着作業の進捗情報を管理者がより具体的に認識することができ、より好適な遅延の是正を図ることが可能となる。
 管理システム1では、融着接続装置10それぞれに対して個別の無線情報端末20が割り当てられており、各融着接続装置10は、対応する無線情報端末20と無線接続可能な構成を有している。作業計画データは、無線情報端末20と所定の通信回線を介して通信可能な管理サーバ30に格納され、且つ、情報取得部12が融着接続装置10に設けられている。そして、無線情報端末20は、情報取得部12で取得した融着接続データを融着接続装置10から取得して(一部の融着接続データは無線情報端末20で追加取得して)管理サーバ30に送信する。管理サーバ30内に設けられた判定部33は、送信されてきた融着接続データに基づいて、各融着接続作業の進捗状況を判定する。このように、管理システム1は、融着接続装置10に近接して配置できる無線情報端末20を利用して融着接続データを融着接続装置10から容易に取得することができ、また、作業計画データを管理サーバ30でまとめて管理することも可能となる。
 管理システム1では、各作業計画に適した接続技術者の候補チームを選定する選定部36を更に備え、選定部36は、作業計画データにおける工事期間、光ファイバの接続予定回数、及び、光ファイバの接続規格の内の少なくとも1つの情報に基づいて、当該作業計画に適した候補チームを選定する。このため、管理者は、それぞれの作業計画に適した作業チームを容易に選定することができる。選定される候補チームは1つの作業チームでもよいし、複数の作業チームでもよい。また、作業チームは、複数の接続技術者から構成されていてもよいし、一人の接続技術者から構成されてもよい。
 管理システム1は、選定部36が作業計画に適した候補チームを選定するための接続技術者データを含む作業チームDB37を管理サーバ30に備えている。管理システム1は、更に、作業計画に沿った融着接続作業が完了した後に、当該作業計画によって行われた融着接続作業における融着接続データを作業チームDB37に追加して、作業チームDB37を更新する更新部38を更に備えている。これにより、それぞれの作業計画により適した作業チームを選定することが可能となる。
 以上、本実施形態に係る、融着接続装置による融着接続作業の進捗を管理する管理システム及びその管理方法について説明してきたが、本発明に係る管理システム及び管理方法は上記実施形態に限定されるものではなく、種々の変形を適用することができる。例えば、上記実施形態では、融着接続装置10は、無線情報端末20を介して、融着接続データを管理サーバ30に送信していたが、無線情報端末20の上述した機能を融着接続装置10内に取り込む構成として、融着接続装置10から管理サーバ30に直接、融着接続データを送信するようにしてもよい。
 1…管理システム、10…融着接続装置、11…無線通信部、12…情報取得部、13…ロック部、20…無線情報端末、21…通信部、22…作業管理部、23…解除指示部、30…管理サーバ、31…通信部、32…作業監視部、33…判定部、34…通知部、35…工事プロジェクトDB、36…選定部、37…作業チームDB、38…更新部、40…管理装置、41…通信部、42…登録部、43…状況表示部、44…選定指示部。
 

Claims (9)

  1.  融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理するためのシステムであって、
     前記融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを、各融着接続作業が実施される毎に取得する取得部と、
     前記融着接続データを、作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する判定部と、
     前記判定部で判定した各融着接続作業の進捗状況を通知する通知部と、
    を備える、融着接続装置の管理システム。
  2.  前記判定部は、前記融着接続データを前記作業計画データと対比し、各融着接続作業が前記作業計画から遅延しているか否かについて判定する、
    請求項1に記載の融着接続装置の管理システム。
  3.  前記通知部は、各融着接続作業が前記作業計画から遅延しているか否かについての進捗状況を、前記作業計画を管理するための管理装置に対して所定の周期で又は遅延の判定毎に通知する、
    請求項2に記載の融着接続装置の管理システム。
  4.  前記融着接続データは、使用された融着接続装置の識別情報、融着接続作業を実施した接続技術者の識別情報、融着接続の日付及び時刻、融着接続が行われた場所、融着接続された光ファイバの接続ロス、融着接続される光ファイバの端面角度、光ファイバの偏心量、融着接続時に選択した接続条件、光ファイバの種別を判別した結果、接続前後の光ファイバ観察画像、接続回数、補強条件、補強にかかった時間、及び、補強回数、の内の少なくとも1つの情報を含む、
    請求項1~請求項3の何れか一項に記載の融着接続装置の管理システム。
  5.  前記融着接続装置それぞれに対して個別の無線情報端末が割り当てられており、各融着接続装置は、対応する前記無線情報端末と無線接続可能な構成を有しており、
     前記作業計画データは、前記無線情報端末と所定の通信回線を介して通信可能な管理サーバに格納されており、且つ、前記取得部が前記融着接続装置に設けられており、
     前記無線情報端末は、前記取得部で取得した前記融着接続データを前記管理サーバに送信し、前記管理サーバ内に設けられた前記判定部により各融着接続作業の進捗状況が判定される、
    請求項1~請求項4の何れか一項に記載の融着接続装置の管理システム。
  6.  各作業計画に適した接続技術者の候補チームを選定する選定部を更に備え、
     前記選定部は、前記作業計画データにおける工事期間、光ファイバの接続予定回数、及び、光ファイバの接続規格の内の少なくとも1つの情報に基づいて当該作業計画に適した前記候補チームを選定する、
    請求項1~請求項5の何れか一項に記載の融着接続装置の管理システム。
  7.  前記選定部が前記作業計画に適した前記候補チームを選定するための接続技術者データを含むチームデータベースを更に備える、
    請求項6に記載の融着接続装置の管理システム。
  8.  前記作業計画に沿った融着接続作業が完了した後に、当該作業計画によって行われた融着接続作業における融着接続データを前記チームデータベースに追加して、前記チームデータベースを更新する更新部を更に備える、
    請求項7に記載の融着接続装置の管理システム。
  9.  融着接続装置を使用して各接続技術者が行う融着接続作業の進捗を管理するための管理方法であって、
     前記融着接続装置それぞれを使用する各接続技術者による融着接続作業に関する融着接続データを、各融着接続作業が実施される毎に取得する工程と、
     前記融着接続データを、作業計画を示す作業計画データと対比して各融着接続作業の進捗状況を判定する工程と、
     前記判定する工程で判定した各融着接続作業の進捗状況を通知する工程と、
    を備える、融着接続装置の管理方法。
PCT/JP2018/048566 2018-01-17 2018-12-28 融着接続装置の管理システム、及び、融着接続装置の管理方法 WO2019142652A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201880086790.6A CN111819586A (zh) 2018-01-17 2018-12-28 熔接连接装置的管理***及熔接连接装置的管理方法
EP18900962.4A EP3742368A4 (en) 2018-01-17 2018-12-28 FUSION SPLICE DEVICE MANAGEMENT SYSTEM AND FUSION SPLICE DEVICE MANAGEMENT METHOD
US16/961,520 US20200341196A1 (en) 2018-01-17 2018-12-28 Fusion splicing device management system and fusion splicing device management method
JP2019566401A JP7367975B2 (ja) 2018-01-17 2018-12-28 融着接続装置の管理システム、及び、融着接続装置の管理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018005734 2018-01-17
JP2018-005734 2018-01-17

Publications (1)

Publication Number Publication Date
WO2019142652A1 true WO2019142652A1 (ja) 2019-07-25

Family

ID=67301425

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/048566 WO2019142652A1 (ja) 2018-01-17 2018-12-28 融着接続装置の管理システム、及び、融着接続装置の管理方法

Country Status (5)

Country Link
US (1) US20200341196A1 (ja)
EP (1) EP3742368A4 (ja)
JP (1) JP7367975B2 (ja)
CN (1) CN111819586A (ja)
WO (1) WO2019142652A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022215175A1 (ja) * 2021-04-06 2022-10-13 住友電工オプティフロンティア株式会社 融着接続システム、融着接続機の動作制御方法、及び、サーバ

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11454761B2 (en) 2017-12-22 2022-09-27 Sei Optifrontier Co., Ltd. Fusion connection device, wireless information terminal, fusion connection system, and fusion connection method
US20220326442A1 (en) * 2019-06-05 2022-10-13 Sumitomo Electric Optifrontier Co., Ltd. Fusion splicing system, server, fusion splicer, information terminal, and project management method
CN112666660A (zh) * 2020-12-30 2021-04-16 中电科仪器仪表(安徽)有限公司 一种光纤熔接机用远程无线控制装置及控制方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004112853A (ja) * 2002-09-13 2004-04-08 Mitsubishi Heavy Ind Ltd ケーブル敷設工事管理システム
US6742705B1 (en) * 1999-10-29 2004-06-01 Corning Cable Systems Llc Data collection system
JP2006058474A (ja) * 2004-08-18 2006-03-02 Furukawa Electric Co Ltd:The 光ファイバ切断装置、光ファイバ融着接続機、光ファイバ切断接続システム、光ファイバ加工管理方法、光ファイバ把持具及び光ファイバ補強装置
JP2008158648A (ja) * 2006-12-21 2008-07-10 Nippon Field Eng Kk ケーブルネットワークの管理システムとその管理方法
JP2012141357A (ja) 2010-12-28 2012-07-26 Sei Optifrontier Co Ltd 光ファイバ融着接続装置
JP2017224076A (ja) * 2016-06-14 2017-12-21 Seiオプティフロンティア株式会社 融着接続装置の盗難検知システム及び融着接続装置
JP2018005734A (ja) 2016-07-06 2018-01-11 株式会社日立システムズ 決済装置および決済方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4287547B2 (ja) * 1999-08-18 2009-07-01 ミヤチテクノス株式会社 ヒュージング加工方法及び装置
US8364513B2 (en) * 2009-06-09 2013-01-29 Accenture Global Services Limited Technician control system
CN101767452B (zh) * 2009-12-29 2012-06-06 浙江大学 通过无线网络实现焊接质量监控的电熔焊机及实现方法
JP5893732B2 (ja) * 2012-06-13 2016-03-23 西部電機株式会社 ワイヤ放電加工時における加工部材溶着方法
CN103926652B (zh) * 2014-05-08 2016-04-27 罗春晖 手机控制光纤熔接机的方法以及实现该方法的光纤熔接机

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6742705B1 (en) * 1999-10-29 2004-06-01 Corning Cable Systems Llc Data collection system
JP2004112853A (ja) * 2002-09-13 2004-04-08 Mitsubishi Heavy Ind Ltd ケーブル敷設工事管理システム
JP2006058474A (ja) * 2004-08-18 2006-03-02 Furukawa Electric Co Ltd:The 光ファイバ切断装置、光ファイバ融着接続機、光ファイバ切断接続システム、光ファイバ加工管理方法、光ファイバ把持具及び光ファイバ補強装置
JP2008158648A (ja) * 2006-12-21 2008-07-10 Nippon Field Eng Kk ケーブルネットワークの管理システムとその管理方法
JP2012141357A (ja) 2010-12-28 2012-07-26 Sei Optifrontier Co Ltd 光ファイバ融着接続装置
JP2017224076A (ja) * 2016-06-14 2017-12-21 Seiオプティフロンティア株式会社 融着接続装置の盗難検知システム及び融着接続装置
JP2018005734A (ja) 2016-07-06 2018-01-11 株式会社日立システムズ 決済装置および決済方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022215175A1 (ja) * 2021-04-06 2022-10-13 住友電工オプティフロンティア株式会社 融着接続システム、融着接続機の動作制御方法、及び、サーバ

Also Published As

Publication number Publication date
JPWO2019142652A1 (ja) 2021-02-25
JP7367975B2 (ja) 2023-10-24
US20200341196A1 (en) 2020-10-29
EP3742368A1 (en) 2020-11-25
EP3742368A4 (en) 2021-10-13
CN111819586A (zh) 2020-10-23

Similar Documents

Publication Publication Date Title
WO2019142652A1 (ja) 融着接続装置の管理システム、及び、融着接続装置の管理方法
JP7485265B2 (ja) 融着接続装置、無線情報端末、融着接続システム、及び融着接続方法
US11257335B2 (en) Theft sensing system for fusion splicer device and fusion splicer device
US20120084108A1 (en) Systems and methods for a work flow management application suite for mobile communications devices
JP7452805B2 (ja) 融着接続装置の管理システム、及び、融着接続装置の管理方法
CN113227860A (zh) 熔接连接装置的锁止解除***
KR101534174B1 (ko) 중계 통신 시스템
US20200371492A1 (en) Fusion splicing apparatus management system and fusion splicing apparatus management method
US8838084B2 (en) System and method for provisioning mobile communication device upgrades
EP4321911A1 (en) Fusion splicing system, operation control method for fusion splicer, and server
JP7058671B2 (ja) 制御プログラムの実行方法
KR20220016894A (ko) 융착 접속 시스템, 서버, 융착 접속기, 정보 단말, 및 프로젝트 관리 방법
JP4863958B2 (ja) 回線開通試験システム
EP2224687A1 (en) System and method for provisioning mobile communication device upgrades

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18900962

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019566401

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018900962

Country of ref document: EP

Effective date: 20200817