WO2019138518A1 - 無線通信システム、基地局、端末、および通信方法 - Google Patents

無線通信システム、基地局、端末、および通信方法 Download PDF

Info

Publication number
WO2019138518A1
WO2019138518A1 PCT/JP2018/000540 JP2018000540W WO2019138518A1 WO 2019138518 A1 WO2019138518 A1 WO 2019138518A1 JP 2018000540 W JP2018000540 W JP 2018000540W WO 2019138518 A1 WO2019138518 A1 WO 2019138518A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
type
transmitted
transmission
control information
Prior art date
Application number
PCT/JP2018/000540
Other languages
English (en)
French (fr)
Inventor
剛史 下村
Original Assignee
富士通株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士通株式会社 filed Critical 富士通株式会社
Priority to CN201880085873.3A priority Critical patent/CN111656814B/zh
Priority to JP2019564222A priority patent/JP6984666B2/ja
Priority to PCT/JP2018/000540 priority patent/WO2019138518A1/ja
Publication of WO2019138518A1 publication Critical patent/WO2019138518A1/ja
Priority to US16/923,830 priority patent/US11811696B2/en
Priority to US18/377,369 priority patent/US20240048331A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/06Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/27Transitions between radio resource control [RRC] states
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network

Definitions

  • the present invention relates to a wireless communication system, a base station, a terminal, and a communication method.
  • terminals In current networks, traffic of mobile terminals (e.g., smartphones) occupies most of network resources. Also, traffic used by mobile terminals (hereinafter referred to as “terminals”) tends to expand in the future.
  • next-generation (for example, 5G (5th generation mobile communication)) communication standard in addition to the standard technology (for example, non-patent documents 1 to 11) of 4G (4th generation mobile communication), There is a need for technology to realize data rate, capacity increase, and delay reduction.
  • next-generation communication standards technical studies are in progress at a working group (for example, TSG-RAN WG1, TSG-RAN WG2, etc.) of 3 GPP (3rd Generation Partnership Project) (for example, non-patent documents 12 to 38). ).
  • a working group for example, TSG-RAN WG1, TSG-RAN WG2, etc.
  • 3 GPP 3rd Generation Partnership Project
  • 5G supports a wide variety of services. For example, 5G assumes support for many use cases classified as Enhanced Mobile Broadband (eMBB), Machine Type Communications (MTC), and Ultra-Reliable and Low Latency Communication (URLLC).
  • eMBB Enhanced Mobile Broadband
  • MTC Machine Type Communications
  • URLLC Ultra-Reliable and Low Latency Communication
  • URLLC aims to set the delay of the user plane in uplink and downlink to 0.5 ms also for low delay. This is a high demand of less than 1/10 of LTE (Long Term Evolution) which is a 4G wireless communication system.
  • LTE Long Term Evolution
  • URLLC is required to simultaneously satisfy the ultra-reliability and low delay as described above.
  • a terminal transmits data to a base station on a Physical Uplink Shared Channel (PUSCH).
  • PUSCH Physical Uplink Shared Channel
  • uplink data data transmitted in uplink
  • the terminal transmits control information to the base station on a Physical Uplink Control Channel (PUCCH).
  • PUCCH Physical Uplink Control Channel
  • control information transmitted in uplink will be referred to as UCI (Uplink Control Information).
  • uplink data and UCI may be transmitted by PUSCH.
  • UCI includes ACK (Acknowledgement) / NACK (Negative-Acknowledgement) which is acknowledgment information for data transmitted in downlink.
  • data transmitted in downlink will be referred to as downlink data.
  • UCI includes a scheduling request (SR: Scheduling Request) requesting allocation of transmission resources, periodic or non-periodic CSI (Channel State Information), and the like.
  • SR Scheduling Request
  • the CSI includes a channel quality indicator (CQI), a precoding matrix indicator (PMI), and the like.
  • CQI channel quality indicator
  • PMI precoding matrix indicator
  • periodical CSI is a case where periodical transmission resource is allocated beforehand by RRC (Radio Resource Control) (periodic reporting).
  • Non-periodic CSI is a case where transmission is performed based on an instruction of Physical Downlink Control Channel (PDCCH) (aperiodic reporting).
  • PDCH Physical Downlink Control Channel
  • the base station transmits data (downlink data) to the terminal through a physical downlink shared channel (PDSCH). Also, the base station transmits control information to the terminal via PDCCH.
  • control information transmitted in downlink will be referred to as DCI (Downlink Control Information).
  • DCI includes, for example, UL grant information (PUSCH assignment information) and DL assignment (PDSCH assignment information), and is indicated in the technical standard as DCI Format (Non-Patent Documents 2 and 17). .
  • the terminal Piggybacks the UCI onto the PUSCH and transmits it (the UCI is placed on the PUSCH and transmitted). Therefore, also in the 5G communication standard, when the UCI transmission timing and data transmission timing overlap, the discussion is advanced in the direction of adopting that the terminal carries out Piggyback of UCI to PUSCH and transmits.
  • the disclosed technology has been made in view of the above, and aims to secure resources allocated to data requiring high reliability and to meet a required error rate.
  • the wireless communication system uses the channel assigned for data transmission to simultaneously transmit control information to the base station.
  • Send to The wireless communication system includes a terminal having a first transmission unit and a base station having a second transmission unit.
  • the first transmission unit transmits a first signal including information on the type of data to be transmitted.
  • the second transmitting unit transmits, to the terminal, a second signal including information indicating whether the control information can be transmitted on the channel assigned to the transmission of data, according to the type of data notified from the terminal.
  • the first transmission unit transmits control information to the base station according to the information included in the second signal when the timing of transmitting data and the timing of transmitting control information overlap.
  • resources assigned to data requiring high reliability can be secured, and the required error rate can be satisfied.
  • FIG. 1 is a schematic diagram illustrating an example of a configuration of a wireless communication system according to a first embodiment.
  • FIG. 2 is an explanatory view showing an outline of the radio communication system according to the first embodiment.
  • FIG. 3 is a sequence diagram showing an operation of the wireless communication system according to the first embodiment.
  • FIG. 4 is an explanatory diagram showing an example of a method using a dedicated field (in the case of 1 bit) in the PDCCH in the wireless communication system according to the first embodiment.
  • FIG. 5 is an explanatory diagram showing an example of a method using a dedicated field (in the case of 2 bits) in the PDCCH in the wireless communication system according to the first embodiment.
  • FIG. 1 is a schematic diagram illustrating an example of a configuration of a wireless communication system according to a first embodiment.
  • FIG. 2 is an explanatory view showing an outline of the radio communication system according to the first embodiment.
  • FIG. 3 is a sequence diagram showing an operation of the wireless communication system according to the first embodiment.
  • FIG. 6 is an explanatory diagram showing an example of a method of using a shared field in PDCCH in the wireless communication system according to the first embodiment.
  • FIG. 7 is an explanatory diagram showing an example of a method of using the shared field in the PDCCH in the wireless communication system according to the first embodiment.
  • FIG. 8 is an explanatory diagram of an overview of a wireless communication system according to a second embodiment.
  • FIG. 9 is an explanatory diagram of an overview of a wireless communication system according to a third embodiment.
  • FIG. 10 is a sequence diagram illustrating the operation of the wireless communication system according to the third embodiment.
  • FIG. 11 is a sequence diagram illustrating the operation of the wireless communication system according to the fourth embodiment.
  • FIG. 12 is a sequence diagram illustrating another operation of the wireless communication system according to the fourth embodiment.
  • FIG. 13 is a sequence diagram illustrating still another operation of the wireless communication system according to the fourth embodiment.
  • FIG. 14 is a diagram illustrating an example of a hardware configuration of a base station.
  • FIG. 15 is a diagram illustrating an example of a hardware configuration of a terminal.
  • FIG. 16 is a schematic diagram of 5G NR.
  • FIG. 17 is an explanatory view showing a subject of 5G NR.
  • FIG. 1 is a schematic diagram illustrating an example of a configuration of a wireless communication system according to a first embodiment.
  • the wireless communication system illustrated in FIG. 1 includes a base station 10 and a terminal 20.
  • the terminal 20 is, for example, a UE (User Equipment) in LTE.
  • the base station 10 is, for example, an eNB (evolved Node B) in LTE.
  • 5G is under consideration in 3GPP.
  • adoption of New RAT is being considered as a new communication technology.
  • the base station 10 is called 5GNB (5G base station) or gNB.
  • 5G base station 5G base station
  • gNB 10 the terminal 20
  • the base station 10 is described as “gNB 10”.
  • the New RAT is described as "NR" or "5G NR".
  • the gNB 10 has a communication unit 13 and a control unit 14.
  • the control unit 14 centrally controls the operation of the communication unit 13.
  • the communication unit 13 includes a transmission unit 11 and a reception unit 12 and performs wireless communication with the UE 20.
  • the transmission unit 11 transmits data (downlink data) to the UE 20 by PDSCH, and transmits DCI to the UE 20 by PDCCH.
  • the receiving unit 12 receives data (uplink data) transmitted by the PUSCH from the UE 20, and receives UCI transmitted by the PUCCH from the UE 20.
  • the UE 20 has a communication unit 23 and a control unit 24.
  • the control unit 24 centrally controls the operation of the communication unit 23.
  • the communication unit 23 includes a transmission unit 21 and a reception unit 22 and performs wireless communication with the gNB 10.
  • the transmission unit 21 transmits uplink data to the gNB 10 on the PUSCH, and transmits UCI to the gNB 10 on the PUCCH.
  • the reception unit 12 receives downlink data transmitted from the gNB 10 on the PDSCH, and receives DCI transmitted from the gNB 10 on the PDCCH.
  • FIG. 16 is a schematic diagram of 5G NR.
  • the horizontal axis represents time, and the vertical axis represents frequency.
  • a slot is defined as a transmission unit in the time direction.
  • Slot-based transmission (long interval) and Non-slot based transmission (short interval) are defined.
  • a long section is defined as 1 slot and a short section is defined as 0.5 slot.
  • URLLC is assumed to use short intervals to achieve low delay
  • eMBB is assumed to use both long intervals and short intervals.
  • the UE 20 transmits data (“Data” in FIG. 16) and a demodulation reference signal (DMRS) to the gNB 10 on the PUSCH.
  • Data data
  • DMRS demodulation reference signal
  • UE20 transmits UCI containing Ack / Nack etc. to gNB10 by PUCCH.
  • UCI UCI containing Ack / Nack etc.
  • PUCCH PUCCH
  • FIG. 17 is an explanatory view showing a subject of 5G NR.
  • the horizontal axis represents time
  • the vertical axis represents frequency.
  • the gNB 10 instructs the UE 20 on which resource to transmit UCI when the timing of transmitting data on the PUSCH and the timing of transmitting UCI on the PUCCH overlap. This will be described using a specific example.
  • FIG. 2 is an explanatory view showing an outline of the radio communication system according to the first embodiment.
  • the horizontal axis represents time
  • the vertical axis represents frequency.
  • FIG. 3 is a sequence diagram showing an operation of the wireless communication system according to the first embodiment.
  • data to be transmitted is generated in a logical channel (hereinafter sometimes referred to as "LCH").
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted to the gNB 10 by Buffer status report or scheduling request (SR) (step S100 in FIG. 3). That is, the UE 20 notifies the gNB 10 of the type of data to be transmitted.
  • the receiver 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits DCI and data to the UE 20 on the PDCCH and the corresponding PDSCH, respectively (step S110 in FIG. 3). That is, the gNB 10 transmits downlink data to the UE 20 on the PDSCH, and transmits DCI to the UE 20 on the PDCCH.
  • the DCI includes, for example, UL grant information (PUSCH assignment information) and DL assignment (PDSCH assignment information).
  • the transmission unit 11 of the gNB 10 transmits, as a UL signal, a second signal including information indicating whether UCI can be transmitted on a channel assigned to data transmission, It transmits by PDCCH regarding grant (step S120 of FIG. 3).
  • the receiver 22 of the UE 20 receives the second signal.
  • a 2nd signal transmits UCI by the resource of the channel (PUSCH) allocated to transmission of the 1st type of data, when the type of the data notified from UE20 is a 1st type (for example, eMBB) Contains information to indicate that.
  • the second signal transmits UCI using a resource different from the channel allocated for transmission of the second type of data. Contains information that indicates what to do.
  • the type of data is the first type (e.g. eMBB).
  • the transmission unit 21 of the UE 20 transmits the first type of data (“UL data” in FIG. 3) on the PUSCH (step S130 in FIG. 3).
  • the transmission part 21 of UE20 transmits UCI to gNB10 according to the information contained in a 2nd signal.
  • the UE 20 carries UCI on the PUSCH assigned to the transmission of the first type of data and transmits it to the gNB 10. That is, UE20 carries out Piggyback of UCI to PUSCH, and transmits it, and step S140 is not performed.
  • the type of data is the second type (for example, URL LC).
  • the transmission unit 21 of the UE 20 transmits the second type of data (“UL data” in FIG. 3) on the PUSCH (step S130 in FIG. 3).
  • the transmission unit 21 of the UE 20 transmits the UCI to the gNB 10 according to the information included in the second signal without piggybacking the UCI to the PUSCH in step S130 (step S140 in FIG. 3).
  • step S140 the UE 20 transmits the UCI to the gNB 10 using a resource different from that of the PUSCH.
  • the UE 20 transmits UCI to the gNB 10 on the PUSCH after the PUSCH assigned to the transmission of the second type of data (see “I” in FIG. 2).
  • the UE 20 transmits UCI to the gNB 10 on the PUCCH after the PUSCH assigned to the transmission of the second type of data (see “II” in FIG. 2).
  • step S120 the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information on a resource for transmitting UCI according to a specific field in the PDCCH. That is, it instructs the UE 20 whether or not to Piggyback UCI to the PUSCH.
  • a method using a set dedicated field as a specific field in the PDCCH and a method using an existing field as a shared field can be mentioned.
  • FIG. 4 is an explanatory diagram showing an example of a method using a dedicated field (in the case of 1 bit) in the PDCCH in the wireless communication system according to the first embodiment.
  • the dedicated field in the PDCCH is set to 1 bit, and the value of the dedicated field in the PDCCH is indicated by “0” and “1” by the gNB 10.
  • the gNB 10 maps the values “0” and “1” of the dedicated fields in the PDCCH in advance to the LCH, and associates the LCH with the PDCCH.
  • the gNB 10 pre-sets a resource for transmitting UCI used when the value of the dedicated field in the PDCCH is “0” or “1” by RRC, and notifies the UE 20 of the resource.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "0" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data and UCI on the PUSCH. That is, UE20 carries out Piggyback of UCI to PUSCH, and transmits it, and step S140 is not performed.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "1" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • step S130 the UE 20 does not piggyback UCI on PUSCH.
  • step S140 the UE 20 transmits the UCI to the gNB 10 on a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • the gNB 10 can recognize which data is transmitted from the UE 20 by the notification from the UE 20, and can recognize which channel UCI is transmitted from the UE 20 by the instruction to the UE 20.
  • FIG. 5 is an explanatory diagram showing an example of a method using a dedicated field (in the case of 2 bits) in the PDCCH in the wireless communication system according to the first embodiment.
  • the dedicated field in the PDCCH is set to 2 bits, and the value of the dedicated field in the PDCCH is indicated by "00", “01”, “10”, “11” by gNB 10 .
  • the gNB 10 maps the values “00”, “01”, “10”, and “11” of the dedicated fields in the PDCCH in advance to the LCH, and associates the LCH with the PDCCH.
  • the gNB 10 sets in advance the resource for transmitting UCI used when the values of the dedicated fields in the PDCCH are “00”, “01”, “10”, “11” by RRC, and the UE 20 I will notify you.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "00" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data ("UL data" for "00" in FIG. 5) and UCI on the PUSCH. That is, UE20 carries out Piggyback of UCI to PUSCH, and transmits it, and step S140 is not performed.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "01" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • step S130 the UE 20 does not Piggyback UCI to PUSCH and does not execute step S140. This process is used, for example, with the option of not sending UCI this time depending on the situation.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "10" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • UE20 does not Piggyback UCI to PUSCH in step S130 in this case.
  • step S140 for example, the UE 20 performs UCI with the PUSCH (see “I” in FIG. 2) after the PUSCH assigned to the transmission of data (“UL data for“ 10 ”in FIG. 5). Send to gNB10.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the dedicated field in the PDCCH is indicated by "11" by gNB10.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • UE20 does not Piggyback UCI to PUSCH in step S130 in this case.
  • step S140 for example, the UE 20 performs UCI with PUCCH (see “II” in FIG. 2) after PUSCH assigned to transmit data (“UL data” for “11” in FIG. 5). Send to gNB10.
  • the gNB 10 can recognize which data is transmitted from the UE 20 by the notification from the UE 20, and can recognize which channel UCI is transmitted from the UE 20 by the instruction to the UE 20.
  • "10” designates a PUSCH resource
  • "11” designates a PUCCH resource.
  • PUCCH resources (or different PUSCH resources) different for "10" and "11” are given. You may specify
  • the case of 1 bit and the case of 2 bits have been described as an example, but it is not limited thereto.
  • the bits may be used to set the resources to send UCI.
  • the resource for transmitting UCI may be set in consideration of specific contents (time, frequency, etc.) by the next n bits according to the method described above for the first 1 bit or 2 bits.
  • ⁇ offset HARQ-ACK is used as a parameter for determining the size of resources for mapping ACK / NACK.
  • ⁇ offset CSI is used as a parameter for determining the size of a resource to which CSI is mapped.
  • ⁇ offset HARQ-ACK will be described as an example.
  • ⁇ offset HARQ-ACK is a parameter that determines how many REs (Resource Elements) are used when transmitting ACK / NACK on PUSCH.
  • the Re number is calculated by the following equation (1).
  • Q ′ is the number of REs and represents the number when mapping ACKs / NACKs included in UCI.
  • O represents the number of bits of ACK / NACK
  • L represents the number of bits of cyclic redundancy check (CRC) code added to ACK / NACK.
  • CRC cyclic redundancy check
  • M sc PUSCH represents the number of subcarriers scheduled to be transmitted by PUSCH
  • N symb PUSCH represents the number of symbols scheduled to be transmitted by PUSCH.
  • C and Kr represent parameters obtained from PDCCH for scheduling PUSCH transmission. However, if Q ′ is larger than a predetermined number of REs, ACK / NACK mapping is performed only for the predetermined number of REs.
  • 6 and 7 are explanatory diagrams showing an example of a method using the ⁇ offset field in the PDCCH in the wireless communication system according to the first embodiment. 6 and 7 are described in “Table 9.3-1” and “Table 9.3-3” of Section 9.3 of 3GPP TS 38.213 V 2.0.0 (Non-Patent Document 17), respectively. ing.
  • Table 9.3-1 shown in FIG. 6 shows the value and number of ⁇ offset in the case of ACK / NACK, and 32 numbers “0” to “31” and ⁇ offset HARQ-ACK Match. A value of “1.000” or more is set in the ⁇ offset HARQ-ACK corresponding to the numbers “0” to “15”. “Reserved” is set in the ⁇ offset HARQ-ACK corresponding to the numbers “16” to “31”.
  • Table 9.3-3 shown in FIG. 7 has four values “00”, “01”, “10”, “11” as UCI offset indicators and “Table 9.3-1 shown in FIG. And the selected four numbers among the 32 numbers "0" to "31".
  • the values "00", “01”, “10” and “11” of the UCI offset indicator shown in FIG. 7 respectively have the values "00" of the dedicated field shown in FIG. “01”, “10”, and “11” are set to the same contents.
  • the values “00", “10” and “11” shown in FIG. 7 are associated with three selected numbers among the numbers “0” to “15” shown in FIG. .
  • the value “01” shown in FIG. 7 is associated with one of the numbers “16” to “31” shown in FIG.
  • the numerator of the formula (1) becomes “0”. That is, the number of REs is "0", and UCI including ACK / NACK is not transmitted.
  • the value of the common field in the PDCCH is “00”, “01”, “10”, “11” (four numbers selected in FIG. 6 according to gNB 10 Indicated by).
  • the gNB 10 maps the values “00”, “01”, “10”, and “11” of the shared field in the PDCCH in advance to the LCH, and associates the LCH with the PDCCH.
  • the gNB 10 sets in advance, by RRC, a resource for transmitting UCI used when the value of the common field in the PDCCH is “00”, “01”, “10”, “11”, I will notify you.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the shared field in the PDCCH is indicated by the gNB 10 to the value “00” (one of the numbers “0” to “15” shown in FIG. 6) shown in FIG.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data and UCI on the PUSCH. That is, UE20 carries out Piggyback of UCI to PUSCH, and transmits it, and step S140 is not performed.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the shared field in the PDCCH is indicated by the gNB 10 to the value “01” shown in FIG. 7 (one of the numbers “16” to “31” shown in FIG. 6).
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • step S130 the UE 20 does not Piggyback UCI to PUSCH and does not execute step S140. This process is used, for example, with the option of not sending UCI this time depending on the situation.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the shared field in the PDCCH is indicated by the gNB 10 to the value “10” shown in FIG. 7 (the other one of the numbers “0” to “15” shown in FIG. 6).
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • UE20 does not Piggyback UCI to PUSCH in step S130 in this case.
  • step S140 for example, the UE 20 transmits the UCI to the gNB 10 on the PUSCH (see “I” in FIG. 2) after the PUSCH assigned to the transmission of data.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the value of the shared field in the PDCCH is indicated by gNB 10 to the value “11” shown in FIG. 7 (another one of the numbers “0” to “15” shown in FIG. 6).
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • UE20 does not Piggyback UCI to PUSCH in step S130 in this case.
  • step S140 for example, the UE 20 transmits the UCI to the gNB 10 on the PUCCH (see “II” in FIG. 2) after the PUSCH assigned for data transmission.
  • the gNB 10 can recognize which data is transmitted from the UE 20 by the notification from the UE 20, and can recognize which channel UCI is transmitted from the UE 20 by the instruction to the UE 20.
  • "10" designates a PUSCH resource
  • "11” designates a PUCCH resource.
  • PUCCH resources (or different PUSCH resources) different for "10" and "11” are given.
  • the wireless communication system includes the terminal (UE 20) and the base station (gNB 10).
  • UE 20 transmits UCI simultaneously with data to gNB 10 using a channel assigned for data transmission.
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted, and the reception unit 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information indicating whether or not UCI can be transmitted on the channel assigned to data transmission, according to the type of data notified from the UE 20.
  • the second signal includes information indicating that UCI is to be transmitted on the resource of the channel (PUSCH) allocated for data transmission when the type of data is the first type (eMBB).
  • the second signal is to transmit UCI using a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • PUSCH or PUCCH resource
  • PUSCH or PUCCH resource allocated for data transmission.
  • the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information on a resource for transmitting UCI according to a specific field (a dedicated field or a shared field) in the downlink channel (PDCCH).
  • the receiver 22 of the UE 20 receives the second signal.
  • the transmission unit 21 of the UE 20 transmits the UCI to the gNB 10 according to the information included in the second signal, when the timing of transmitting data and the timing of transmitting UCI overlap.
  • the gNB 10 instructs the UE 20 to delay UCI transmission timing when data of the second type (URLLC) and UCI transmission timing overlap. For example, PUSCH after the channel (PUSCH) (see “I” in FIG. 2) or a resource different from the channel (PUSCH) allocated to transmission of the second type (URLLC) of data by the gNB 10 or PUCCH (see “II” in FIG. 2) is indicated. As a result, the ratio of uplink data to PUSCH is secured. That is, the redundancy of PUSCH does not run short. Therefore, in the wireless communication system according to the first embodiment, when data for URLLC for which high reliability is required is transmitted, a resource allocated to the data for URLLC is secured and the required error rate is satisfied. be able to.
  • the gNB 10 transmits, to the UE 20, a second signal including information on a resource for transmitting UCI according to a specific field (a dedicated field or a shared field) in the PDCCH. It is not limited to.
  • the gNB 10 transmits, to the UE 20, a second signal including information specifying the region of time versus frequency to which the PDCCH associated with the resource transmitting UCI is allocated.
  • the same parts as those in the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
  • FIG. 8 is an explanatory diagram of an overview of a wireless communication system according to a second embodiment.
  • Information identifying the time-frequency region to which the PDCCH is assigned includes the size, Radio Network Temporary Identity (RNTI), header, location of CORESET (Control resource set), Search space, and the like.
  • RNTI Radio Network Temporary Identity
  • the gNB 10 maps, in advance, information identifying the time-frequency region to which the PDCCH is allocated to the LCH, and associates the LCH with the PDCCH.
  • the gNB 10 uses RRC to set in advance a resource for transmitting UCI used according to the information, and notifies the UE 20 of the resource.
  • PDCCHs are distinguished by the location of CORESET and search space.
  • the location of CORESET may be distinguished as CORESET “CORESET # 1" for URLLC data or CORESET "CORESET # 2" for eMBB data.
  • “Search space #A” is included as a Search space.
  • PDCCH “PDCCH # n” indicating a resource (PUSCH or PUCCH after PUSCH allocated for transmission of data of URLLC) in “Search space # A” different from the channel allocated for transmission of data of URLLC Is set.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the location of CORESET is indicated by “CORESET # 2” by the gNB 10 as information specifying the time-frequency region to which the PDCCH is assigned.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data and UCI on the PUSCH. That is, UE20 carries out Piggyback of UCI to PUSCH, and transmits it, and step S140 is not performed.
  • step S120 the gNB 10 instructs on PDCCH according to the type of data notified from the UE 20.
  • the location of CORESET is indicated by “CORESET # 1” by the gNB 10 as information specifying the time-frequency domain to which the PDCCH is assigned.
  • the transmission timing of UCI and the transmission timing of data overlap.
  • step S130 the UE 20 transmits data on the PUSCH.
  • step S130 the UE 20 does not piggyback UCI on PUSCH.
  • step S140 the UE 20 transmits the UCI to the gNB 10 on a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • the gNB 10 can recognize which data is transmitted from the UE 20 by the notification from the UE 20, and can recognize which channel UCI is transmitted from the UE 20 by the instruction to the UE 20.
  • the wireless communication system includes the terminal (UE 20) and the base station (gNB 10).
  • UE 20 transmits UCI simultaneously with data to gNB 10 using a channel assigned for data transmission.
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted, and the reception unit 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information indicating whether or not UCI can be transmitted on the channel assigned to data transmission, according to the type of data notified from the UE 20.
  • the second signal includes information indicating that UCI is to be transmitted on the resource of the channel (PUSCH) allocated for data transmission when the type of data is the first type (eMBB).
  • the second signal is to transmit UCI using a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • the transmission unit 11 of the gNB 10 includes information (size, RNTI, header, location of CORESET, Search space) for specifying a region to which a downlink channel (PDCCH) related to a resource to which the UE 20 transmits UCI is allocated.
  • the second signal is transmitted to the UE 20.
  • the receiver 22 of the UE 20 receives the second signal.
  • the transmission unit 21 of the UE 20 transmits the UCI to the gNB 10 according to the information included in the second signal, when the timing of transmitting data and the timing of transmitting UCI overlap.
  • the gNB 10 instructs the UE 20 to delay the UCI transmission timing when the second type (URLLC) data and the UCI transmission timing overlap. For example, PUSCH after the channel (PUSCH) (see “I” in FIG. 2) or a resource different from the channel (PUSCH) allocated to transmission of the second type (URLLC) of data by the gNB 10 or PUCCH (see “II” in FIG. 2) is indicated. As a result, the ratio of uplink data to PUSCH is secured. That is, the redundancy of PUSCH does not run short. For this reason, in the wireless communication system according to the second embodiment, when data for URLLC for which high reliability is required is transmitted, the resources allocated to the data for URLLC are secured, and the required error rate is satisfied. be able to.
  • the gNB 10 when the type of data is the second type (URLLC), the gNB 10 has a different resource (PUSCH or PUSCH or PUSCH assigned to data transmission).
  • a second signal including information indicating that UCI is to be transmitted on PUCCH is transmitted to UE 20.
  • the gNB 10 uses a PDCCH that indicates the PUSCH assigned to the transmission of the second type of data.
  • the gNB 10 uses a resource different from the PDCCH instructing the PUSCH assigned to the transmission of the second type of data.
  • the same parts as those in the first and second embodiments are denoted by the same reference numerals, and the description thereof is omitted.
  • FIG. 9 is an explanatory diagram of an overview of a wireless communication system according to a third embodiment.
  • the horizontal axis represents time, and the vertical axis represents frequency.
  • the type of data notified from the UE 20 is a second type (for example, URLLC).
  • the gNB 10 uses a resource different from the PDCCH instructing the PUSCH assigned to the second type of data transmission, and uses a resource (PUSCH or PUCCH) different from the PUSCH assigned to the data transmission. It instructs UE20.
  • the gNB 10 uses a PDCCH different from the PDCCH that indicates the PUSCH assigned to the transmission of the second type of data.
  • the UE 20 transmits the UCI to the gNB 10 on the PUSCH after the PUSCH assigned to the transmission of the second type of data (see “III” in FIG. 9).
  • FIG. 10 is a sequence diagram illustrating the operation of the wireless communication system according to the third embodiment.
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted to the gNB 10 by Buffer status report or SR (Step S200 in FIG. 10). That is, the UE 20 notifies the gNB 10 of the type of data to be transmitted.
  • the receiver 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits DCI and data to the UE 20 on the PDCCH and the corresponding PDSCH, respectively (step S210 in FIG. 10). That is, the gNB 10 transmits downlink data to the UE 20 on the PDSCH, and transmits DCI to the UE 20 on the PDCCH.
  • the DCI includes, for example, UL grant information (PUSCH assignment information) and DL assignment (PDSCH assignment information).
  • the transmission unit 11 of the gNB 10 transmits, as a UL signal, a second signal including information indicating whether UCI can be transmitted on a channel assigned to data transmission, It transmits by PDCCH regarding grant (step S220 of FIG. 10).
  • the receiver 22 of the UE 20 receives the second signal.
  • the transmission unit 11 of the gNB 10 instructs the PDCCH not to Piggyback UCI to the PUSCH.
  • the following first and second methods may be mentioned as a method for instructing PDCCH not to Piggyback UCI to PUSCH.
  • the first method is a method using a specific field (a dedicated field or a shared field) in the PDCCH in the first embodiment.
  • the second method is a method using information (size, RNTI, header, location of CORESET, Search space) for specifying a time-frequency region to which PDCCH is allocated in the second embodiment.
  • the transmission unit 11 of the gNB 10 indicates a new transmission timing (resource) of UCI with another PDCCH (step S225 in FIG. 10).
  • gNB 10 is different from the channel (PUSCH) assigned to the transmission of the second type of data, using a PDCCH different from the PDCCH indicating the PUSCH assigned to the transmission of the second type of data
  • a third signal is sent to UE 20 including information on resources.
  • the receiver 22 of the UE 20 receives the third signal.
  • the transmission unit 21 of the UE 20 transmits the second type of data (“UL data” in FIG. 10) on the PUSCH (step S230 in FIG. 10).
  • the transmission unit 21 of the UE 20 transmits the UCI to the gNB 10 according to the information included in the second and third signals without piggybacking the UCI to the PUSCH (step S240 in FIG. 10).
  • the UE 20 transmits the UCI to the gNB 10 using a resource different from the PUSCH allocated to the transmission of the second type of data.
  • the UE 20 transmits the UCI to the gNB 10 on the PUSCH after the PUSCH assigned to the transmission of the second type of data (see “III” in FIG. 9).
  • the UE 20 transmits the UCI to the gNB 10 on the PUCCH after the PUSCH assigned to the transmission of the second type of data.
  • the order of the processing may go back and forth or the processing timing may be the same between step S220 and step S225.
  • the gNB 10 can recognize which data is transmitted from the UE 20 by the notification from the UE 20, and can recognize which channel UCI is transmitted from the UE 20 by the instruction to the UE 20.
  • the wireless communication system includes the terminal (UE 20) and the base station (gNB 10).
  • UE 20 transmits UCI simultaneously with data to gNB 10 using a channel assigned for data transmission.
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted, and the reception unit 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information indicating whether or not UCI can be transmitted on the channel assigned to data transmission, according to the type of data notified from the UE 20.
  • the second signal includes information indicating that UCI is to be transmitted on the resource of the channel (PUSCH) allocated for data transmission when the type of data is the first type (eMBB).
  • the second signal is to transmit UCI using a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • PUSCH or PUCCH resource
  • the transmitting unit 11 of the gNB 10 uses the resource (PDCCH) different from the downlink channel (PDCCH) instructing the PUSCH to transmit UCI.
  • a third signal including information on (PUSCH or PUCCH) is transmitted to the UE 20.
  • the receiver 22 of the UE 20 receives the second and third signals.
  • the transmission unit 21 of the UE 20 transmits the UCI to the gNB 10 according to the information included in the second and third signals when the timing of transmitting data and the timing of transmitting UCI overlap.
  • the gNB 10 instructs the UE 20 to delay the UCI transmission timing when the second type (URLLC) data and the UCI transmission timing overlap. For example, PUSCH after the channel (PUSCH) as a resource different from the channel (PUSCH) allocated to transmission of the second type (URLLC) of data by the gNB 10 (see “III” in FIG. 9) or PUCCH is indicated. As a result, the ratio of uplink data to PUSCH is secured. That is, the redundancy of PUSCH does not run short. Therefore, in the wireless communication system according to the third embodiment, when data for URLLC for which high reliability is required is transmitted, a resource allocated to the data for URLLC is secured and the required error rate is satisfied. be able to.
  • the UE 20 In the wireless communication system according to the fourth embodiment, it is assumed that the UE 20 generates the second type of data after notifying the first type as the type of data, and the UCI transmission timing overlaps with the data transmission timing. Do. In this case, in the radio communication system according to the fourth embodiment, the UE 20 transmits the UCI to the gNB 10 using a PUSCH different from the PUSCH allocated to the transmission of the second type of data.
  • the same parts as those in the first to third embodiments are denoted by the same reference numerals, and the description thereof will be omitted.
  • FIG. 11 is a sequence diagram illustrating the operation of the wireless communication system according to the fourth embodiment.
  • eMBB data data of a first type
  • the transmission unit 11 of the UE 20 transmits a first signal including information on a first type (eMBB) as a type of data scheduled to be transmitted to the gNB 10 by Buffer status report or SR (step in FIG. 11). S300). That is, the UE 20 notifies the gNB 10 of the type of data to be transmitted.
  • step S300 a second type of data (“URL LC data" in FIG. 11) is generated in LCH #y (step S305 in FIG. 11).
  • the transmission unit 11 of the gNB 10 transmits DCI and data to the UE 20 on the PDCCH and the corresponding PDSCH, respectively (step S310 in FIG. 11). That is, the gNB 10 transmits downlink data to the UE 20 on the PDSCH, and transmits DCI to the UE 20 on the PDCCH.
  • the DCI includes, for example, UL grant information (PUSCH assignment information) and DL assignment (PDSCH assignment information).
  • the transmission unit 11 of the gNB 10 transmits a second signal including information indicating whether UCI can be transmitted on a channel assigned for data transmission, to UL It transmits by PDCCH regarding grant (step S320 of FIG. 11).
  • the second signal is a resource of the PUSCH channel (PUSCH) allocated to the transmission of the first type of data. Contains information that indicates that the The receiver 22 of the UE 20 receives the second signal.
  • the transmission timing of UCI and the transmission timing of data of the second type (URLLC) overlap.
  • the transmission unit 21 of the UE 20 generates a first PUSCH assigned for transmission of data of the second type (URLLC), and generates a second type (“UL data” in FIG. 11) in the first PUSCH. Is transmitted to the gNB 10 (step S330 in FIG. 11).
  • the transmission part 21 of UE20 produces
  • FIG. 12 is a sequence diagram illustrating another operation of the wireless communication system according to the fourth embodiment.
  • the timing at which data of the second type (URLLC) is generated in LCH #y is different from the example shown in FIG.
  • the second type of data (“URL LC data" in FIG. 12) is generated in LCH #y (step S315 in FIG. 12).
  • the other processes are the same as in the case of FIG.
  • FIG. 13 is a sequence diagram illustrating still another operation of the wireless communication system according to the fourth embodiment.
  • the timing at which data of the second type (URLLC) is generated in LCH # y is different from the example shown in FIGS. 11 and 12.
  • second type data ("URL LC data" in FIG. 13) is generated in LCH #y (step S325 in FIG. 13).
  • the other processes are the same as in the case of FIG.
  • the DMRS sequence or arrangement pattern is to make the gNB 10 capable of recognizing the second type (URLLC) data transmitted from the UE 20 in step S330 and the UCI transmitted from the UE 20 in step S340.
  • the sequence or arrangement pattern of DMRS represents whether or not UCI is loaded on PUSCH by an orthogonal code.
  • the DMRS sequence or arrangement pattern of the first PUSCH is determined in advance. For example, when the orthogonal code is ⁇ +1, +1, +1, +1 ⁇ , the DMRS sequence or arrangement pattern of the first PUSCH indicates that UCI is not carried on the first PUSCH.
  • the DMRS sequence or arrangement pattern of the second PUSCH is generated by the UE 20 changing the orthogonal code. For example, by changing the orthogonal code to ⁇ +1, ⁇ 1, +1, ⁇ 1 ⁇ , the DMRS sequence or arrangement pattern of the second PUSCH indicates that UCI is placed on the second PUSCH.
  • the gNB 10 may recognize the second type (URLLC) data transmitted from the UE 20 in step S330 and the UCI transmitted from the UE 20 in step S340 by the DMRS sequence or arrangement pattern. it can.
  • URLLC second type
  • the following two methods are used to allow the gNB 10 to recognize whether the data transmitted from the UE 20 in step S330 is data of the second type (URLLC).
  • the first method is a method using MCS (Modulation and Coding Scheme) specified by PDCCH.
  • MCS Modulation and Coding Scheme
  • the size of the data of the URLLC that the UE 20 has autonomously replaced is smaller than the size of the data originally intended to be transmitted on the PUSCH assigned for eMBB.
  • the UE 20 fills in the shortage with zero, matches the data size, and generates the first PUSCH based on the MCS designated by the PDCCH.
  • the UE 20 fills the shortage with eMBB data, matches the size, and generates a first PUSCH based on the MCS designated by the PDCCH.
  • the gNB 10 can be recognized by the UE 20 adding a header to the data of the eMBB.
  • the second method is a method of using another MCS different from the MCS specified in the PDCCH.
  • the gNB 10 designates in advance, by RRC, an MCS when the DMRS sequence or arrangement pattern indicates that UCI is not loaded on the PUSCH, as another MCS. Then, in step S330, the UE 20 generates a first PUSCH based on another MCS.
  • the gNB 10 designates in advance the size when transmitting the data of the URLLC by RRC with another MCS.
  • UE20 adjusts a coding rate according to the allocated resource based on other MCS in step S330, and produces
  • the wireless communication system includes the terminal (UE 20) and the base station (gNB 10).
  • UE 20 transmits UCI simultaneously with data to gNB 10 using a channel assigned for data transmission.
  • the transmission unit 21 of the UE 20 transmits a first signal including information on the type of data to be transmitted, and the reception unit 12 of the gNB 10 receives the first signal.
  • the transmission unit 11 of the gNB 10 transmits, to the UE 20, a second signal including information indicating whether or not UCI can be transmitted on the channel assigned to data transmission, according to the type of data notified from the UE 20.
  • the second signal includes information indicating that UCI is to be transmitted on the resource of the channel (PUSCH) allocated for data transmission when the type of data is the first type (eMBB).
  • the second signal is to transmit UCI using a resource (PUSCH or PUCCH) different from the channel (PUSCH) allocated for data transmission.
  • PUSCH or PUCCH resource
  • PUSCH or PUCCH resource
  • PUSCH or PUCCH resource
  • the transmission unit 11 of the UE 20 transmits the UCI to the gNB 10 using a resource (PUSCH) different from the channel (PUSCH) assigned to the transmission of the second type of data.
  • the UE 20 when the UCI transmission timing and the data transmission timing overlap, the UE 20 transmits the UCI when the type of data is the second type (URLLC). Delay UTI and send UCI to gNB10. At this time, the UE 20 uses a resource (PUSCH) different from the channel (PUSCH) assigned to the transmission of the second type of data. As a result, the ratio of uplink data to PUSCH is secured. That is, the redundancy of PUSCH does not run short. For this reason, in the wireless communication system according to the fourth embodiment, when data for URLLC for which high reliability is required is transmitted, the resources allocated to the data for URLLC are secured, and the required error rate is satisfied. be able to.
  • PUSCH resource
  • each component in the embodiments does not necessarily have to be physically configured as illustrated. That is, the specific form of the dispersion and integration of each part is not limited to the illustrated one, and all or a part thereof is functionally or physically dispersed or integrated in any unit according to various loads, usage conditions, etc. Can be configured.
  • each device is executed in whole or any part on a central processing unit (CPU) (or a microcomputer such as a micro processing unit (MPU) or a micro controller unit (MCU)). You may do it.
  • CPU central processing unit
  • MPU micro processing unit
  • MCU micro controller unit
  • all or any part of the various processes may be executed on a program analyzed and executed by a CPU (or a microcomputer such as an MPU or an MCU), or on hardware by wired logic.
  • the base station 10 and the terminal 20 of the embodiment can be realized, for example, by the following hardware configuration.
  • FIG. 14 is a diagram showing an example of a hardware configuration of the base station 10.
  • the base station 10 includes a processor 101, a memory 102, an RF (Radio Frequency) unit 103, and a network interface (IF) 104.
  • the processor 101 include a CPU, a digital signal processor (DSP), and a field programmable gate array (FPGA).
  • the memory 102 a random access memory (RAM) such as a synchronous dynamic random access memory (SDRAM), a read only memory (ROM), a flash memory, and the like can be given.
  • SDRAM synchronous dynamic random access memory
  • ROM read only memory
  • flash memory and the like.
  • the various processes performed by the base station 10 of the embodiment may be realized by the processor 101 executing programs stored in various memories such as a non-volatile storage medium. That is, a program corresponding to each process executed by each configuration may be recorded in the memory 102, and each program may be executed by the processor 101.
  • each configuration corresponds to the function of the control unit 13.
  • the transmitter 11 and the receiver 12 are realized by the RF unit 103.
  • FIG. 15 is a diagram showing an example of the hardware configuration of the terminal 20.
  • the terminal 20 includes a processor 201, a memory 202, and an RF unit 203.
  • the processor 201 include a CPU, a DSP, an FPGA, and the like.
  • the memory 202 a RAM such as an SDRAM, a ROM, a flash memory, etc. may be mentioned.
  • various processes performed by the terminal 20 of the embodiment may be realized by the processor 201 executing programs stored in various memories such as a non-volatile storage medium. That is, a program corresponding to each process executed by each configuration may be recorded in the memory 202, and each program may be executed by the processor 201.
  • each configuration corresponds to the function of the control unit 23.
  • the transmitter 21 and the receiver 22 are realized by the RF unit 203.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

UE(20)は、送信予定のデータの種類に関する情報を含む第1の信号を送信する。gNB(10)は、UE(20)から通知されるデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号をUE(20)に送信する。UE(20)は、データを送信するタイミングとUCIを送信するタイミングとが重なるときに、第2の信号に含まれる情報に応じて、UCIをgNB(10)に送信する。これにより、高信頼度が要求されるデータに割り当てられるリソースを確保し、要求される誤り率を満たすことができる。

Description

無線通信システム、基地局、端末、および通信方法
 本発明は、無線通信システム、基地局、端末、および通信方法に関する。
 現在のネットワークは、モバイル端末(例えば、スマートフォン)のトラフィックがネットワークのリソースの大半を占めている。また、モバイル端末(以下、「端末」と記載する)が使うトラフィックは、今後も拡大していく傾向にある。
 一方で、IoT(Internet of a Things)サービス(例えば、交通システム、スマートメータ、装置等の監視システム)の展開にあわせて、多様な要求条件を持つサービスに対応することが求められている。そのため、次世代(例えば、5G(第5世代移動体通信))の通信規格では、4G(第4世代移動体通信)の標準技術(例えば、非特許文献1~11)に加えて、さらなる高データレート化、大容量化、低遅延化を実現する技術が求められている。なお、次世代通信規格については、3GPP(3rd Generation Partnership Project)の作業部会(例えば、TSG-RAN WG1、TSG-RAN WG2等)で技術検討が進められている(例えば、非特許文献12~38)。
 5Gは多種多様なサービスに対応する。例えば、5Gでは、eMBB(Enhanced Mobile Broadband)、Massive MTC(Machine Type Communications)、およびURLLC(Ultra-Reliable and Low Latency Communication)に分類される多くのユースケースのサポートを想定している。
 上記1つのユースケースであるURLLCでは、誤り率が10-5という超高信頼性の要求がある。超高信頼性を実現する1つの方法として、使用リソース量を増やしてデータに冗長性を持たせる方法がある。しかし、無線リソースは限りがあるので、無制限に使用リソースを増やすことはできない。
 また、URLLCでは、低遅延に関しても、上りリンクおよび下りリンクにおけるユーザプレーンの遅延を0.5ミリ秒とすることが目標とされている。これは4Gの無線通信システムであるLTE(Long Term Evolution)の1/10未満という高い要求である。
 このように、URLLCでは、上述のような超高信頼性と低遅延とを同時に満たすことが要求される。
 例えば、4Gの無線通信ステムでは、端末は、物理上りリンク共有チャネル(PUSCH:Physical Uplink Shared Channel)でデータを基地局に送信する。以下、上りリンクで送信されるデータを上りデータと記載する。また、端末は、物理上りリンク制御チャネル(PUCCH:Physical Uplink Control Channel)で制御情報を基地局に送信する。以下、上りリンクで送信される制御情報をUCI(Uplink Control Information)と記載する。なお、上りデータとUCIとを同時に送信する場合には、上りデータとUCIとをPUSCHで送信することもある。
 ここで、UCIには、下りリンクで送信されたデータに対する送達確認情報であるACK(Acknowledgement)/NACK(Negative-Acknowledgement)が含まれる。以下、下りリンクで送信されるデータを下りデータと記載する。また、UCIには、送信リソースの割り当てを要求するスケジューリングリクエスト(SR:Scheduling Request)、周期的または非周期的なCSI(Channel State Information)等が含まれる。
 CSIには、CQI(Channel Quality Indicator)、PMI(Precoding Matrix Indicator)等が含まれる。また、周期的なCSIとは、RRC(Radio Resource Control)により予め周期的な送信リソースが割り当てられる場合(periodic reporting)である。非周期的なCSIとは、物理下りリンク制御チャネル(PDCCH:Physical Downlink Control Channel)の命令に基づいて送信が行われる場合(aperiodic reporting)である。
 また、4Gの無線通信ステムでは、例えば、基地局は、物理下りリンク共有チャネル(PDSCH:Physical Downlink Shared Channel)でデータ(下りデータ)を端末に送信する。また、基地局は、PDCCHで制御情報を端末に送信する。以下、下りリンクで送信される制御情報をDCI(Downlink Control Information)と記載する。
 ここで、DCIには、例えば、UL grantの情報(PUSCHの割当て情報)やDL assignment(PDSCHの割当て情報)が含まれ、DCI Formatとして技術標準に示されている(非特許文献2、17)。
 また、4Gの無線通信ステムでは、端末は、UCIの送信タイミングとデータの送信タイミングとが重なる場合、UCIをPUSCHにPiggybackして送信する(UCIをPUSCHに載せて送信する)。そこで、5Gの通信規格においても、UCIの送信タイミングとデータの送信タイミングとが重なる場合、端末がUCIをPUSCHにPiggybackして送信することを採用する方向で議論が進んでいる。
3GPP TS36.211 V14.4.0、2017年9月 3GPP TS36.212 V14.4.0、2017年9月 3GPP TS36.213 V14.4.0、2017年9月 3GPP TS36.300 V14.4.0、2017年9月 3GPP TS36.321 V14.4.0、2017年9月 3GPP TS36.322 V14.1.0、2017年9月 3GPP TS36.323 V14.4.0、2017年9月 3GPP TS36.331 V14.4.0、2017年9月 3GPP TS36.413 V14.4.0、2017年9月 3GPP TS36.423 V14.4.0、2017年9月 3GPP TS36.425 V14.0.0、2017年3月 3GPP TS37.340 V2.0.0、2017年12月 3GPP TS38.201 V2.0.0、2017年12月 3GPP TS38.202 V2.0.0、2017年12月 3GPP TS38.211 V2.0.0、2017年12月 3GPP TS38.212 V1.2.1、2017年12月 3GPP TS38.213 V2.0.0、2017年12月 3GPP TS38.214 V2.0.0、2017年12月 3GPP TS38.215 V2.0.0、2017年12月 3GPP TS38.300 V2.0.0、2017年12月 3GPP TS38.321 V2.0.0、2017年12月 3GPP TS38.322 V2.0.0、2017年12月 3GPP TS38.323 V2.0.0、2017年12月 3GPP TS38.331 V0.4.0、2017年12月 3GPP TS38.401 V1.0.0、2017年12月 3GPP TS38.410 V0.6.0、2017年12月 3GPP TS38.413 V0.5.0、2017年12月 3GPP TS38.420 V0.5.0、2017年12月 3GPP TS38.423 V0.5.0、2017年12月 3GPP TS38.470 V1.0.0、2017年12月 3GPP TS38.473 V1.0.0、2017年12月 3GPP TR38.801 V14.0.0、2017年4月 3GPP TR38.802 V14.2.0、2017年9月 3GPP TR38.803 V14.2.0、2017年9月 3GPP TR38.804 V14.0.0、2017年4月 3GPP TR38.900 V14.3.1、2017年7月 3GPP TR38.912 V14.1.0、2017年6月 3GPP TR38.913 V14.3.0、2017年6月
 ところで、制御情報(UCI)の送信タイミングとデータの送信タイミングとが重なるときに端末がUCIをPUSCHにPiggybackして送信する場合、PUSCHに占める上りデータの割合が少なくなる。このため、PUSCHの冗長度が不足して誤り率が悪くなる。例えば、5Gの無線通信ステムにおいて、高信頼度が要求されるようなURLLC用のデータを送信する場合に、URLLC用のデータに割り当てられるリソースが確保されず、要求される誤り率を満たせなくなる可能性がある。
 開示の技術は、上記に鑑みてなされたものであって、高信頼度が要求されるデータに割り当てられるリソースを確保し、要求される誤り率を満たすことを目的とする。
 1つの態様では、無線通信システムは、端末がデータを送信するタイミングと制御情報を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、制御情報をデータと同時に基地局に送信する。この無線通信システムは、第1送信部を有する端末と、第2送信部を有する基地局とを具備する。第1送信部は、送信予定のデータの種類に関する情報を含む第1の信号を送信する。第2送信部は、端末から通知されるデータの種類に応じて、制御情報をデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を端末に送信する。第1送信部は、データを送信するタイミングと制御情報を送信するタイミングとが重なるときに、第2の信号に含まれる情報に応じて、制御情報を基地局に送信する。
 1つの側面では、高信頼度が要求されるデータに割り当てられるリソースを確保し、要求される誤り率を満たすことができる。
図1は、実施例1に係る無線通信システムの構成の一例を示す概略図である。 図2は、実施例1に係る無線通信システムの概要を示す説明図である。 図3は、実施例1に係る無線通信システムの動作を示すシーケンス図である。 図4は、実施例1に係る無線通信システムにおいて、PDCCHの中の専用フィールド(1ビットの場合)を用いる方法の一例を示す説明図である。 図5は、実施例1に係る無線通信システムにおいて、PDCCHの中の専用フィールド(2ビットの場合)を用いる方法の一例を示す説明図である。 図6は、実施例1に係る無線通信システムにおいて、PDCCHの中の共用フィールドを用いる方法の一例を示す説明図である。 図7は、実施例1に係る無線通信システムにおいて、PDCCHの中の共用フィールドを用いる方法の一例を示す説明図である。 図8は、実施例2に係る無線通信システムの概要を示す説明図である。 図9は、実施例3に係る無線通信システムの概要を示す説明図である。 図10は、実施例3に係る無線通信システムの動作を示すシーケンス図である。 図11は、実施例4に係る無線通信システムの動作を示すシーケンス図である。 図12は、実施例4に係る無線通信システムの他の動作を示すシーケンス図である。 図13は、実施例4に係る無線通信システムの更に他の動作を示すシーケンス図である。 図14は、基地局のハードウェア構成の一例を示す図である。 図15は、端末のハードウェア構成の一例を示す図である。 図16は、5G NRの概略図である。 図17は、5G NRの課題を示す説明図である。
 以下、本実施の形態について図面を参照して詳細に説明する。本明細書における課題及び実施例は一例であり、本願の権利範囲を限定するものではない。特に、記載の表現が異なっていたとしても技術的に同等であれば、異なる表現であっても本願の技術を適用可能であり、権利範囲を限定するものではない。そして、各実施の形態は、処理内容を矛盾させない範囲で適宜組み合わせることが可能である。
 また、本明細書で使用している用語や記載した技術的内容は、3GPPなど通信に関する規格として仕様書や寄書に記載された用語や技術的内容が適宜用いられてもよい。このような仕様書としては、例えば、上述した非特許文献1~38が挙げられる。
 以下に、本願の開示する無線通信システム、基地局、端末、および通信方法の実施例を、図面に基づいて詳細に説明する。なお、以下の実施例は開示の技術を限定するものではない。
 [無線通信システムの構成]
 図1は、実施例1に係る無線通信システムの構成の一例を示す概略図である。図1に示す無線通信システムは、基地局10と、端末20とを有する。
 端末20は、例えばLTEにおけるUE(User Equipment)である。基地局10は、例えばLTEにおけるeNB(evolved Node B)である。なお、3GPPでは、5Gが検討されている。5Gでは、新しい通信技術として、New RAT(Radio Access Technology)を採用することが検討されている。New RATでは、基地局10は、5GNB(5Gの基地局)またはgNBと呼ばれている。以下、端末20を「UE20」と記載し、基地局10を「gNB10」と記載する。また、New RATを「NR」または「5G NR」と記載する。
 gNB10は、通信部13および制御部14を有する。制御部14は、通信部13の動作を統括制御する。
 通信部13は、送信部11および受信部12を有し、UE20との間で無線通信を行なう。例えば、送信部11は、PDSCHでデータ(下りデータ)をUE20に送信し、PDCCHでDCIをUE20に送信する。例えば、受信部12は、UE20からPUSCHで送信されたデータ(上りデータ)を受信し、UE20からPUCCHで送信されたUCIを受信する。
 UE20は、通信部23および制御部24を有する。制御部24は、通信部23の動作を統括制御する。
 通信部23は、送信部21および受信部22を有し、gNB10との間で無線通信を行なう。例えば、送信部21は、PUSCHで上りデータをgNB10に送信し、PUCCHでUCIをgNB10に送信する。例えば、受信部12は、gNB10からPDSCHで送信された下りデータを受信し、gNB10からPDCCHで送信されたDCIを受信する。
 [課題]
 ここで、5G NRにおいて、UE20がgNB10に上りデータおよびUCIを送信する場合の課題を説明する。
 図16は、5G NRの概略図である。図16において、横軸は時間を表し、縦軸は周波数を表している。5G NRでは、時間方向の送信単位としてスロット(slot)が規定されている。具体的には、Slot-based transmission(長区間)とNon-slot based transmission(短区間)が規定されている。例えば、長区間が1slotに規定され、短区間が0.5slotに規定されている。例えば、URLLCは低遅延を実現するために短区間の使用が想定され、eMBBは長区間および短区間の両方の使用が想定されている。ここで、UE20は、PUSCHでデータ(図16中の「Data」)と復調参照信号(DMRS:Demodulation Reference Signal)とをgNB10に送信する。また、UE20は、PUCCHで、Ack/Nackなどを含むUCIをgNB10に送信する。以下、UCIを図示する場合、「UCI」、「Ack/Nack」、「UCI(Ack/Nackなど)」と表記する場合もある。
 図17は、5G NRの課題を示す説明図である。図17において、横軸は時間を表し、縦軸は周波数を表している。例えば、5Gの通信規格では、UCIの送信タイミングとデータの送信タイミングとが重なる場合、UE20がUCIをPUSCHにPiggybackして送信することを採用する方向で議論が進んでいる。しかし、4Gの無線通信ステムと同様に、UCIの送信タイミングとデータの送信タイミングとが重なるときにUE20がUCIをPUSCHにPiggybackして送信する場合、図17に示すように、PUSCHに占める上りデータの割合が少なくなる。このため、PUSCHの冗長度が不足して誤り率が悪くなる。例えば、5Gの無線通信ステムにおいて、高信頼度が要求されるようなURLLC用のデータを送信する場合に、要求される誤り率を満たせなくなる可能性がある。
 [解決策]
 そこで、実施例1に係る無線通信システムでは、gNB10は、PUSCHでデータを送信するタイミングとPUCCHでUCIを送信するタイミングとが重なる場合にUCIをどのリソースで送信するのかを、UE20に指示する。これについて具体例を挙げて説明する。
 図2は、実施例1に係る無線通信システムの概要を示す説明図である。図2において、横軸は時間を表し、縦軸は周波数を表している。図3は、実施例1に係る無線通信システムの動作を示すシーケンス図である。
 例えば、論理チャネル(以下、「LCH」と記載することもある)において、送信予定のデータが発生する。この場合、UE20の送信部21は、Buffer status report、または、スケジューリングリクエスト(SR)により、送信予定のデータの種類に関する情報を含む第1の信号をgNB10に送信する(図3のステップS100)。すなわち、UE20は、送信したいデータの種類をgNB10に通知する。gNB10の受信部12は、第1の信号を受信する。
 次に、gNB10の送信部11は、PDCCHおよび対応するPDSCHでそれぞれDCIおよびデータをUE20に送信する(図3のステップS110)。すなわち、gNB10は、PDSCHで下りデータをUE20に送信し、PDCCHでDCIをUE20に送信する。DCIには、例えば、UL grantの情報(PUSCHの割当て情報)やDL assignment(PDSCHの割当て情報)が含まれる。
 次に、gNB10の送信部11は、UE20から通知されたデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を、UL grantに関するPDCCHで送信する(図3のステップS120)。UE20の受信部22は、第2の信号を受信する。第2の信号は、UE20から通知されるデータの種類が第1の種類(例えばeMBB)である場合、第1の種類のデータの送信に割り当てられたチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。また、第2の信号は、UE20から通知されるデータの種類が第2の種類(例えばURLLC)である場合、第2の種類のデータの送信に割り当てられたチャネルとは異なるリソースでUCIを送信することを示す情報を含む。
 次に、UE20において、UCIの送信タイミングとデータの送信タイミングとが重なる。ここで、データの種類が第1の種類(例えばeMBB)である。この場合、UE20の送信部21は、PUSCHで第1の種類のデータ(図3の「UL data」)を送信する(図3のステップS130)。また、UE20の送信部21は、第2の信号に含まれる情報に応じて、UCIをgNB10に送信する。具体的には、UE20は、第1の種類のデータの送信に割り当てられたPUSCHにUCIを載せてgNB10に送信する。すなわち、UE20は、UCIをPUSCHにPiggybackして送信し、ステップS140を実行しない。
 一方、UE20において、UCIの送信タイミングとデータの送信タイミングとが重なるときに、データの種類が第2の種類(例えばURLLC)である。この場合、UE20の送信部21は、PUSCHで第2の種類のデータ(図3の「UL data」)を送信する(図3のステップS130)。また、UE20の送信部21は、ステップS130において、UCIをPUSCHにPiggybackしないで、第2の信号に含まれる情報に応じて、UCIをgNB10に送信する(図3のステップS140)。具体的には、ステップS140において、UE20は、PUSCHとは異なるリソースでUCIをgNB10に送信する。例えば、UE20は、第2の種類のデータの送信に割り当てられたPUSCHの後のPUSCHでUCIをgNB10に送信する(図2の「I」を参照)。または、UE20は、第2の種類のデータの送信に割り当てられたPUSCHの後のPUCCHでUCIをgNB10に送信する(図2の「II」を参照)。
 ここで、ステップS120において、gNB10の送信部11は、PDCCHの中の特定のフィールドにより、UCIを送信するリソースに関する情報を含む第2の信号をUE20に送信する。すなわち、UE20に対して、UCIをPUSCHにPiggybackするか否かを指示する。この指示方法としては、PDCCHの中の特定のフィールドとして、設定された専用フィールドを用いる方法と、既存のフィールドを共用フィールドとして用いる方法とが挙げられる。
 まず、PDCCHの中の特定のフィールドとして、設定された専用フィールドを用いる方法について説明する。
 図4は、実施例1に係る無線通信システムにおいて、PDCCHの中の専用フィールド(1ビットの場合)を用いる方法の一例を示す説明図である。
 図4に示すように、PDCCHの中の専用フィールドが1ビットに設定され、gNB10によりPDCCHの中の専用フィールドの値が“0”、“1”で指示される。ここで、gNB10は、予めPDCCHの中の専用フィールドの値“0”、“1”をLCHにマッピングして、LCHとPDCCHとを関連付けておく。gNB10は、RRCにより、PDCCHの中の専用フィールドの値が“0”、“1”である場合に使用されるUCIを送信するリソースを予め設定しておき、UE20に通知しておく。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“0”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばeMBBのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータとUCIとを送信する。すなわち、UE20は、UCIをPUSCHにPiggybackして送信し、ステップS140を実行しない。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“1”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、UE20は、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIをgNB10に送信する。
 このように、gNB10は、UE20からの通知により、どのデータがUE20から送信されるのかを認識し、UE20への指示により、どのチャネルでUCIがUE20から送信されるのかを認識することができる。
 図5は、実施例1に係る無線通信システムにおいて、PDCCHの中の専用フィールド(2ビットの場合)を用いる方法の一例を示す説明図である。
 図5に示すように、PDCCHの中の専用フィールドが2ビットに設定され、gNB10によりPDCCHの中の専用フィールドの値が“00”、“01”、“10”、“11”で指示される。ここで、gNB10は、予めPDCCHの中の専用フィールドの値“00”、“01”、“10”、“11”をLCHにマッピングして、LCHとPDCCHとを関連付けておく。gNB10は、RRCにより、PDCCHの中の専用フィールドの値が“00”、“01”、“10”、“11”である場合に使用されるUCIを送信するリソースを予め設定しておき、UE20に通知しておく。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“00”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばeMBBのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータ(図5の“00”に対する「UL data」)とUCIとを送信する。すなわち、UE20は、UCIをPUSCHにPiggybackして送信し、ステップS140を実行しない。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“01”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない上に、ステップS140を実行しない。この処理は、例えば、状況に応じて今回はUCIを送信しない、というオプションで使用される。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“10”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、例えば、UE20は、データ(図5の“10”に対する「UL data」)の送信に割り当てられたPUSCHの後のPUSCH(図2の「I」を参照)でUCIをgNB10に送信する。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の専用フィールドの値が“11”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、例えば、UE20は、データ(図5の“11”に対する「UL data」)の送信に割り当てられたPUSCHの後のPUCCH(図2の「II」を参照)でUCIをgNB10に送信する。
 このように、gNB10は、UE20からの通知により、どのデータがUE20から送信されるのかを認識し、UE20への指示により、どのチャネルでUCIがUE20から送信されるのかを認識することができる。なお、図5において“10”はPUSCHリソースを指定し、“11”はPUCCHリソースを指定する例を挙げているが、“10”と“11”とでそれぞれ異なるPUCCHリソース(または異なるPUSCHリソース)を指定しても良い。
 また、実施例1に係る無線通信システムでは、PDCCHの中の専用フィールドを用いる方法として、1ビットの場合と2ビットの場合とを例に挙げて説明したが、これに限定されず、複数のビットを用いて、UCIを送信するリソースを設定してもよい。例えば、先頭の1ビットまたは2ビットは上述の方法に従い、次のnビットにより具体的な内容(時間、周波数など)を考慮して、UCIを送信するリソースを設定してもよい。
 次に、PDCCHの中の特定のフィールドとして、他のパラメータの値を規定する既存のフィールドを共用フィールドとして用いる方法について説明する。
 この場合、UCIをマッピングするリソースの大きさに関するフィールド(またはマッピングするUCIビット数に関するフィールド)にて、マッピングするリソースの大きさが「0」(またはマッピングするUCIビット数が「0」)という指示を行なう。ここで、ACK/NACKをマッピングするリソースの大きさを決めるパラメータとしてβoffset HARQ-ACKが使われる。CSIをマッピングするリソースの大きさを決めるパラメータとしてβoffset CSIが使われる。以下ではβoffset HARQ-ACKを例に説明する。βoffset HARQ-ACKは、ACK/NACKをPUSCHに載せるときに、どのくらいのRE(Resource Element)数を使って送信するかを決めるパラメータである。ここで、Re数は、以下の式(1)により算出される。
Figure JPOXMLDOC01-appb-M000001
 式(1)において、Q’は、RE数であり、UCIに含まれるACK/NACKをマッピングするときの数を表す。また、式(1)の分子において、Oは、ACK/NACKのビット数を表し、Lは、ACK/NACKに付加される巡回冗長検査(CRC)符号のビット数を表す。また、式(1)の分子において、Msc PUSCHは、PUSCHで送信予定のサブキャリア数を表し、Nsymb PUSCHは、PUSCHで送信予定のシンボル数を表す。また、式(1)の分母において、CおよびKrは、PUSCH伝送をスケジューリングするPDCCHから得られるパラメータを表す。但し、Q’が予め決められた所定のRE数より大きい場合、ACK/NACKのマッピングは所定のRE数のみ行う。
 図6、図7は、実施例1に係る無線通信システムにおいて、PDCCHの中のβオフセット・フィールドを用いる方法の一例を示す説明図である。図6、図7は、それぞれ、3GPP TS38.213 V2.0.0(非特許文献17)のセクション9.3の「Table 9.3-1」、「Table 9.3-3」に記載されている。
 図6に示す「Table 9.3-1」は、ACK/NACKの場合のβオフセットの値と番号とを示し、32個の番号“0”~“31”と、βoffset HARQ-ACKとを対応付ける。番号“0”~“15”に対応するβoffset HARQ-ACKには、「1.000」以上の値が設定されている。番号“16”~“31”に対応するβoffset HARQ-ACKには、「Reserved」が設定されている。
 図7に示す「Table 9.3-3」は、UCIオフセットインジケータとして4個の値“00”、“01”、“10”、“11”と、図6に示す「Table 9.3-1」の32個の番号“0”~“31”のうち、選択された4個の番号とを対応付ける。
 例えば、既存のフィールドを用いる方法についても、図7に示すUCIオフセットインジケータの値“00”、“01”、“10”、“11”は、それぞれ、図5に示した専用フィールドの値“00”、“01”、“10”、“11”と同じ内容に設定される。この場合、gNB10において、図7に示す値“00”、“10”、“11”と、図6に示す番号“0”~“15”のうち、選択された3つの番号とが対応付けられる。また、gNB10において、図7に示す値“01”と、図6に示す番号“16”~“31”のうちの1つの番号とが対応付けられる。ここで、図6に示す番号“16”~“31”に対応するβoffset HARQ-ACKに「0」が設定されることにより、式(1)の分子が「0」となる。すなわち、RE数は「0」となり、ACK/NACKを含むUCIが送信されない。
 具体的には、図7に示すように、gNB10によりPDCCHの中の共用フィールドの値が“00”、“01”、“10”、“11”(図6において、選択された4個の番号)で指示される。ここで、gNB10は、予めPDCCHの中の共用フィールドの値“00”、“01”、“10”、“11”をLCHにマッピングして、LCHとPDCCHとを関連付けておく。gNB10は、RRCにより、PDCCHの中の共用フィールドの値が“00”、“01”、“10”、“11”である場合に使用されるUCIを送信するリソースを予め設定しておき、UE20に通知しておく。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の共用フィールドの値が、図7に示す値“00”(図6に示す番号“0”~“15”のうちの1つの番号)に指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばeMBBのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータとUCIとを送信する。すなわち、UE20は、UCIをPUSCHにPiggybackして送信し、ステップS140を実行しない。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の共用フィールドの値が、図7に示す値“01”(図6に示す番号“16”~“31”のうちの1つの番号)に指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない上に、ステップS140を実行しない。この処理は、例えば、状況に応じて今回はUCIを送信しない、というオプションで使用される。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の共用フィールドの値が、図7に示す値“10”(図6に示す番号“0”~“15”のうちの他の1つの番号)に指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、例えば、UE20は、データの送信に割り当てられたPUSCHの後のPUSCH(図2の「I」を参照)でUCIをgNB10に送信する。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10によりPDCCHの中の共用フィールドの値が、図7に示す値“11”(図6に示す番号“0”~“15”のうちの更に他の1つの番号)に指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、この場合、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、例えば、UE20は、データの送信に割り当てられたPUSCHの後のPUCCH(図2の「II」を参照)でUCIをgNB10に送信する。
 このように、gNB10は、UE20からの通知により、どのデータがUE20から送信されるのかを認識し、UE20への指示により、どのチャネルでUCIがUE20から送信されるのかを認識することができる。なお、図7において“10”はPUSCHリソースを指定し、“11”はPUCCHリソースを指定する例を挙げているが、“10”と“11”とでそれぞれ異なるPUCCHリソース(または異なるPUSCHリソース)を指定しても良い。また、PDCCHの中の共用フィールドを用いる例として、βオフセット・フィールドを挙げたが、これに限定されない。例えば、マッピングするACK/NACKビット数(すなわち、式(1)における「O」)を示すフィールドを用い、ACK/NACKビット数が「0」と指示できるようにしても良い。この場合、付加するCRCビット数も「0」である。
 以上の説明により、実施例1に係る無線通信システムは、端末(UE20)と基地局(gNB10)とを具備する。ここで、UE20は、データを送信するタイミングと制御情報(UCI)を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、UCIをデータと同時にgNB10に送信する。この無線通信システムでは、UE20の送信部21は、送信予定のデータの種類に関する情報を含む第1の信号を送信し、gNB10の受信部12は、第1の信号を受信する。gNB10の送信部11は、UE20から通知されるデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号をUE20に送信する。第2の信号は、データの種類が第1の種類(eMBB)である場合、データの送信に割り当てられたチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。また、第2の信号は、データの種類が第2の種類(URLLC)である場合、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIを送信することを示す情報を含む。ここで、gNB10の送信部11は、下りチャネル(PDCCH)の中の特定のフィールド(専用フィールドまたは共用フィールド)により、UCIを送信するリソースに関する情報を含む第2の信号をUE20に送信する。UE20の受信部22は、第2の信号を受信する。UE20の送信部21は、データを送信するタイミングとUCIを送信するタイミングとが重なる場合、第2の信号に含まれる情報に応じて、UCIをgNB10に送信する。
 上述のように、実施例1に係る無線通信システムでは、gNB10は、第2の種類(URLLC)のデータとUCIの送信タイミングとが重なる場合にUCIの送信タイミングを遅らせる指示をUE20に行なう。例えば、gNB10により、第2の種類(URLLC)のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソースとして、そのチャネル(PUSCH)の後のPUSCH(図2の「I」を参照)またはPUCCH(図2の「II」を参照)が指示される。その結果、PUSCHに占める上りデータの割合が確保される。すなわち、PUSCHの冗長度が不足しない。このため、実施例1に係る無線通信システムでは、高信頼度が要求されるようなURLLC用のデータを送信する場合、URLLC用のデータに割り当てられるリソースが確保され、要求される誤り率を満たすことができる。
 実施例1に係る無線通信システムでは、gNB10は、PDCCHの中の特定のフィールド(専用フィールドまたは共用フィールド)により、UCIを送信するリソースに関する情報を含む第2の信号をUE20に送信するが、これに限定されない。例えば、実施例2に係る無線通信システムでは、gNB10は、UCIを送信するリソースに関連するPDCCHが割り当てられた時間対周波数の領域を特定する情報を含む第2の信号をUE20に送信する。実施例2では、実施例1と同じ部分には同じ符号を付し、その説明を省略する。
 図8は、実施例2に係る無線通信システムの概要を示す説明図である。
 PDCCHが割り当てられた時間対周波数の領域を特定する情報としては、サイズ、RNTI(Radio Network Temporary Identity)、ヘッダ、CORESET(Control resource set)の場所、Search spaceなどが挙げられる。ここで、gNB10は、予め、PDCCHが割り当てられた時間対周波数の領域を特定する情報をLCHにマッピングして、LCHとPDCCHとを関連付けておく。gNB10は、RRCにより、その情報により使用されるUCIを送信するリソースを予め設定しておき、UE20に通知しておく。
 例えば、図8に示すように、PDCCHは、CORESETの場所や、Search spaceにより区別される。例えば、CORESETの場所は、URLLCのデータ向けのCORESET“CORESET#1”、または、eMBBのデータ向けのCORESET“CORESET#2”として区別される。“CORESET#1”内には、Search spaceとして“Search space#A”が含まれる。“Search space#A”には、URLLCのデータの送信に割り当てられたチャネルとは異なるリソース(URLLCのデータの送信に割り当てられたPUSCHの後のPUSCHまたはPUCCH)を指示するPDCCH“PDCCH#n”が設定されている。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10により、PDCCHが割り当てられた時間対周波数の領域を特定する情報として、CORESETの場所が“CORESET#2”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばeMBBのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータとUCIとを送信する。すなわち、UE20は、UCIをPUSCHにPiggybackして送信し、ステップS140を実行しない。
 例えば、ステップS120において、gNB10は、UE20から通知されたデータの種類に応じてPDCCHで指示する。このとき、gNB10により、PDCCHが割り当てられた時間対周波数の領域を特定する情報として、CORESETの場所が“CORESET#1”で指示される。ここで、UE20において、UCIの送信タイミングとデータ(例えばURLLCのデータ)の送信タイミングとが重なる。このとき、ステップS130において、UE20は、PUSCHでデータを送信する。また、ステップS130において、UE20は、UCIをPUSCHにPiggybackしない。この場合、ステップS140において、UE20は、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIをgNB10に送信する。
 このように、gNB10は、UE20からの通知により、どのデータがUE20から送信されるのかを認識し、UE20への指示により、どのチャネルでUCIがUE20から送信されるのかを認識することができる。
 以上の説明により、実施例2に係る無線通信システムでは、端末(UE20)と基地局(gNB10)とを具備する。ここで、UE20は、データを送信するタイミングと制御情報(UCI)を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、UCIをデータと同時にgNB10に送信する。この無線通信システムでは、UE20の送信部21は、送信予定のデータの種類に関する情報を含む第1の信号を送信し、gNB10の受信部12は、第1の信号を受信する。gNB10の送信部11は、UE20から通知されるデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号をUE20に送信する。第2の信号は、データの種類が第1の種類(eMBB)である場合、データの送信に割り当てられたチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。また、第2の信号は、データの種類が第2の種類(URLLC)である場合、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIを送信することを示す情報を含む。ここで、gNB10の送信部11は、UE20がUCIを送信するリソースに関連する下りチャネル(PDCCH)が割り当てられた領域を特定する情報(サイズ、RNTI、ヘッダ、CORESETの場所、Search space)を含む第2の信号をUE20に送信する。UE20の受信部22は、第2の信号を受信する。UE20の送信部21は、データを送信するタイミングとUCIを送信するタイミングとが重なる場合、第2の信号に含まれる情報に応じて、UCIをgNB10に送信する。
 このように、実施例2に係る無線通信システムでは、gNB10は、第2の種類(URLLC)のデータとUCIの送信タイミングとが重なる場合にUCIの送信タイミングを遅らせる指示をUE20に行なう。例えば、gNB10により、第2の種類(URLLC)のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソースとして、そのチャネル(PUSCH)の後のPUSCH(図2の「I」を参照)またはPUCCH(図2の「II」を参照)が指示される。その結果、PUSCHに占める上りデータの割合が確保される。すなわち、PUSCHの冗長度が不足しない。このため、実施例2に係る無線通信システムでは、高信頼度が要求されるようなURLLC用のデータを送信する場合、URLLC用のデータに割り当てられるリソースが確保され、要求される誤り率を満たすことができる。
 実施例1、2に係る無線通信システムでは、上述のように、gNB10は、データの種類が第2の種類(URLLC)である場合、データの送信に割り当てられたPUSCHとは異なるリソース(PUSCHまたはPUCCH)でUCIを送信することを示す情報を含む第2の信号をUE20に送信する。この場合、gNB10は、第2の種類のデータの送信に割り当てられたPUSCHを指示するPDCCHを用いる。しかし、これに限定されない。例えば、実施例3に係る無線通信システムでは、gNB10は、第2の種類のデータの送信に割り当てられたPUSCHを指示するPDCCHとは異なるリソースを用いる。実施例3では、実施例1、2と同じ部分には同じ符号を付し、その説明を省略する。
 図9は、実施例3に係る無線通信システムの概要を示す説明図である。図9において、横軸は時間を表し、縦軸は周波数を表している。例えば、UE20から通知されるデータの種類が第2の種類(例えばURLLC)である。この場合、gNB10は、第2の種類のデータの送信に割り当てられたPUSCHを指示するPDCCHとは異なるリソースを用いて、そのデータの送信に割り当てられたPUSCHとは異なるリソース(PUSCHまたはPUCCH)をUE20に指示する。例えば、gNB10は、第2の種類のデータの送信に割り当てられたPUSCHを指示するPDCCHとは別のPDCCHを用いる。この場合、UE20は、第2の種類のデータの送信に割り当てられたPUSCHの後のPUSCHでUCIをgNB10に送信する(図9の「III」を参照)。
 図10は、実施例3に係る無線通信システムの動作を示すシーケンス図である。
 例えば、LCHにおいて、送信予定のデータが発生する。この場合、UE20の送信部21は、Buffer status reportまたはSRにより、送信予定のデータの種類に関する情報を含む第1の信号をgNB10に送信する(図10のステップS200)。すなわち、UE20は、送信したいデータの種類をgNB10に通知する。gNB10の受信部12は、第1の信号を受信する。
 次に、gNB10の送信部11は、PDCCHおよび対応するPDSCHでそれぞれDCIおよびデータをUE20に送信する(図10のステップS210)。すなわち、gNB10は、PDSCHで下りデータをUE20に送信し、PDCCHでDCIをUE20に送信する。DCIには、例えば、UL grantの情報(PUSCHの割当て情報)やDL assignment(PDSCHの割当て情報)が含まれる。
 次に、gNB10の送信部11は、UE20から通知されたデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を、UL grantに関するPDCCHで送信する(図10のステップS220)。UE20の受信部22は、第2の信号を受信する。gNB10の送信部11は、UE20から通知されるデータの種類が第2の種類(例えばURLLC)である場合、UCIをPUSCHにPiggybackしないことをPDCCHで指示する。ここで、UCIをPUSCHにPiggybackしないことをPDCCHで指示する方法としては、以下の第1、第2の方法が挙げられる。第1の方法とは、実施例1におけるPDCCHの中の特定のフィールド(専用フィールドまたは共用フィールド)を用いる方法である。第2の方法とは、実施例2におけるPDCCHが割り当てられた時間対周波数の領域を特定する情報(サイズ、RNTI、ヘッダ、CORESETの場所、Search space)を用いる方法である。
 また、gNB10の送信部11は、UCIの新しい送信タイミング(リソース)を別のPDCCHで指示する(図10のステップS225)。例えば、gNB10は、第2の種類のデータの送信に割り当てられたPUSCHを指示するPDCCHとは別のPDCCHを用いて、第2の種類のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソースに関する情報を含む第3の信号をUE20に送信する。UE20の受信部22は、第3の信号を受信する。
 UE20において、UCIの送信タイミングとデータの送信タイミングとが重なるときに、データの種類が第2の種類(例えばURLLC)である。この場合、UE20の送信部21は、PUSCHで第2の種類のデータ(図10の「UL data」)を送信する(図10のステップS230)。また、UE20の送信部21は、ステップS230において、UCIをPUSCHにPiggybackしないで、第2、第3の信号に含まれる情報に応じて、UCIをgNB10に送信する(図10のステップS240)。具体的には、ステップS240において、UE20は、第2の種類のデータの送信に割り当てられたPUSCHとは異なるリソースでUCIをgNB10に送信する。例えば、UE20は、第2の種類のデータの送信に割り当てられたPUSCHの後のPUSCHでUCIをgNB10に送信する(図9の「III」を参照)。または、UE20は、第2の種類のデータの送信に割り当てられたPUSCHの後のPUCCHでUCIをgNB10に送信する。
 ここで、ステップS220とステップS225とは、処理の順番が前後したり、処理のタイミングが同じになったりしてもよい。
 このように、gNB10は、UE20からの通知により、どのデータがUE20から送信されるのかを認識し、UE20への指示により、どのチャネルでUCIがUE20から送信されるのかを認識することができる。
 以上の説明により、実施例3に係る無線通信システムでは、端末(UE20)と基地局(gNB10)とを具備する。ここで、UE20は、データを送信するタイミングと制御情報(UCI)を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、UCIをデータと同時にgNB10に送信する。この無線通信システムでは、UE20の送信部21は、送信予定のデータの種類に関する情報を含む第1の信号を送信し、gNB10の受信部12は、第1の信号を受信する。gNB10の送信部11は、UE20から通知されるデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号をUE20に送信する。第2の信号は、データの種類が第1の種類(eMBB)である場合、データの送信に割り当てられたチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。また、第2の信号は、データの種類が第2の種類(URLLC)である場合、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIを送信することを示す情報を含む。ここで、データの種類が第2の種類(URLLC)である場合、gNB10の送信部11は、PUSCHを指示する下りチャネル(PDCCH)とは異なるリソース(PDCCH)を用いて、UCIを送信するリソース(PUSCHまたはPUCCH)に関する情報を含む第3の信号をUE20に送信する。UE20の受信部22は、第2、第3の信号を受信する。UE20の送信部21は、データを送信するタイミングとUCIを送信するタイミングとが重なる場合、第2、第3の信号に含まれる情報に応じて、UCIをgNB10に送信する。
 このように、実施例3に係る無線通信システムでは、gNB10は、第2の種類(URLLC)のデータとUCIの送信タイミングとが重なる場合にUCIの送信タイミングを遅らせる指示をUE20に行なう。例えば、gNB10により、第2の種類(URLLC)のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソースとして、そのチャネル(PUSCH)の後のPUSCH(図9の「III」を参照)またはPUCCHが指示される。その結果、PUSCHに占める上りデータの割合が確保される。すなわち、PUSCHの冗長度が不足しない。このため、実施例3に係る無線通信システムでは、高信頼度が要求されるようなURLLC用のデータを送信する場合、URLLC用のデータに割り当てられるリソースが確保され、要求される誤り率を満たすことができる。
 実施例4に係る無線通信システムでは、UE20は、データの種類として第1の種類を通知した後に第2の種類のデータが発生し、UCIの送信タイミングとデータの送信タイミングとが重なる場合について想定する。この場合、実施例4に係る無線通信システムでは、UE20は、第2の種類のデータの送信に割り当てられたPUSCHとは異なるPUSCHでUCIをgNB10に送信する。実施例4では、実施例1~3と同じ部分には同じ符号を付し、その説明を省略する。
 図11は、実施例4に係る無線通信システムの動作を示すシーケンス図である。
 例えば、LCH#xにおいて、送信予定のデータとして、第1の種類のデータ(図11の「eMBB data」)が発生する。この場合、UE20の送信部11は、Buffer status reportまたはSRにより、送信予定のデータの種類として、第1の種類(eMBB)に関する情報を含む第1の信号をgNB10に送信する(図11のステップS300)。すなわち、UE20は、送信したいデータの種類をgNB10に通知する。
 しかし、ステップS300の処理後に、LCH#yにおいて、第2の種類のデータ(図11の「URLLC data」)が発生する(図11のステップS305)。
 次に、gNB10の送信部11は、PDCCHおよび対応するPDSCHでそれぞれDCIおよびデータをUE20に送信する(図11のステップS310)。すなわち、gNB10は、PDSCHで下りデータをUE20に送信し、PDCCHでDCIをUE20に送信する。DCIには、例えば、UL grantの情報(PUSCHの割当て情報)やDL assignment(PDSCHの割当て情報)が含まれる。
 ここで、gNB10の送信部11は、UE20から通知されたデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を、UL grantに関するPDCCHで送信する(図11のステップS320)。ここで、UE20から通知されるデータの種類が第1の種類(eMBB)であるため、第2の信号は、第1の種類のデータの送信に割り当てられたPUSCHチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。UE20の受信部22は、第2の信号を受信する。
 次に、UE20において、UCIの送信タイミングと第2の種類(URLLC)のデータの送信タイミングとが重なる。この場合、UE20の送信部21は、第2の種類(URLLC)のデータの送信に割り当てられた第1のPUSCHを生成し、第1のPUSCHで第2の種類(図11の「UL data」)のデータをgNB10に送信する(図11のステップS330)。また、UE20の送信部21は、第2の種類(URLLC)のデータの送信に割り当てられた第1のPUSCHとは異なる第2のPUSCHを生成し、第2のPUSCHでUCIをgNB10に送信する(図11のステップS340)。すなわち、UE20は、ステップS230において、UCIを第1のPUSCHにPiggybackしないで、ステップS240において、UCIを第2のPUSCHにPiggybackして送信する。
 図12は、実施例4に係る無線通信システムの他の動作を示すシーケンス図である。図12に示す例では、LCH#yにおいて、第2の種類(URLLC)のデータが発生するタイミングが、図11に示す例とは異なる。例えば、ステップS310の処理後に、LCH#yにおいて、第2の種類のデータ(図12の「URLLC data」)が発生する(図12のステップS315)。それ以外の処理については、図11の場合と同じである。
 図13は、実施例4に係る無線通信システムの更に他の動作を示すシーケンス図である。図13に示す例では、LCH#yにおいて、第2の種類(URLLC)のデータが発生するタイミングが、図11、図12に示す例とは異なる。例えば、ステップS320の処理後に、LCH#yにおいて、第2の種類のデータ(図13の「URLLC data」)が発生する(図13のステップS325)。それ以外の処理については、図11の場合と同じである。
 ここで、ステップS330においてUE20から送信された第2の種類(URLLC)のデータと、ステップS340においてUE20から送信されたUCIと、をgNB10により認識可能にするために、DMRSの系列または配置パターンが用いられる。例えば、DMRSの系列または配置パターンは、直交コードにより、PUSCHにUCIを載せているか否かを表す。
 ステップS330においてUE20から第2の種類(URLLC)のデータが送信されるとき、第1のPUSCHのDMRSの系列または配置パターンは、予め決められている。例えば、直交コードが{+1、+1、+1、+1}であることにより、第1のPUSCHのDMRSの系列または配置パターンは、第1のPUSCHにUCIを載せていない旨を表す。
 一方、ステップS340においてUE20からUCIが送信されるとき、第2のPUSCHのDMRSの系列または配置パターンは、UE20が直交コードを変更することにより生成される。例えば、直交コードが{+1、-1、+1、-1}に変更されることにより、第2のPUSCHのDMRSの系列または配置パターンは、第2のPUSCHにUCIを載せている旨を表す。
 このように、gNB10は、DMRSの系列または配置パターンにより、ステップS330においてUE20から送信された第2の種類(URLLC)のデータと、ステップS340においてUE20から送信されたUCIと、を認識することができる。
 また、ステップS330においてUE20から送信されたデータが第2の種類(URLLC)のデータであるのか否かをgNB10により認識可能にするために、以下の2つの方法が用いられる。
 第1の方法では、PDCCHで指定されたMCS(Modulation and Coding Scheme)を用いる方法である。例えば、元々eMBB向けに割り当てられたPUSCHで送信予定だったデータのサイズに比べて、UE20が自律的に差し替えたURLLCのデータのサイズが小さい。この場合、UE20は、ステップS330において、不足分をゼロで埋めてデータサイズを合わせておき、PDCCHで指定されたMCSに基づいて第1のPUSCHを生成する。または、UE20は、ステップS330において、不足分をeMBBのデータで埋めてサイズを合わせておき、PDCCHで指定されたMCSに基づいて第1のPUSCHを生成する。この場合、UE20がeMBBのデータにヘッダを付すことにより、gNB10が認識可能である。
 第2の方法では、PDCCHで指定されたMCSとは異なる他のMCSを用いる方法である。例えば、gNB10は、予めRRCにより、DMRSの系列または配置パターンがPUSCHにUCIを載せていない旨を表すときのMCSを、他のMCSとして指定しておく。そして、UE20は、ステップS330において、他のMCSに基づいて第1のPUSCHを生成する。または、gNB10は、予めRRCによりURLLCのデータを送信するときのサイズを他のMCSで指定しておく。そして、UE20は、ステップS330において、他のMCSに基づいて、割り当てられたリソースに合わせて符号化レートを調整し、第1のPUCCHを生成する。これにより、gNB10がURLLCのデータを識別可能となる。
 以上の説明により、実施例4に係る無線通信システムでは、端末(UE20)と基地局(gNB10)とを具備する。ここで、UE20は、データを送信するタイミングと制御情報(UCI)を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、UCIをデータと同時にgNB10に送信する。この無線通信システムでは、UE20の送信部21は、送信予定のデータの種類に関する情報を含む第1の信号を送信し、gNB10の受信部12は、第1の信号を受信する。gNB10の送信部11は、UE20から通知されるデータの種類に応じて、UCIをデータの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号をUE20に送信する。第2の信号は、データの種類が第1の種類(eMBB)である場合、データの送信に割り当てられたチャネル(PUSCH)のリソースでUCIを送信することを示す情報を含む。また、第2の信号は、データの種類が第2の種類(URLLC)である場合、データの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCHまたはPUCCH)でUCIを送信することを示す情報を含む。ここで、UE20において、データの種類に関する情報として第1の種類を示す情報を含む第1の信号を送信した後に第2の種類のデータが発生し、更に、データを送信するタイミングとUCIを送信するタイミングとが重なる場合がある。この場合、UE20の送信部11は、第2の種類のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCH)を用いて、UCIをgNB10に送信する。
 このように、実施例4に係る無線通信システムでは、UCIの送信タイミングとデータの送信タイミングとが重なるときに、データの種類が第2の種類(URLLC)である場合、UE20は、UCIの送信タイミングを遅らせて、UCIをgNB10に送信する。このとき、UE20は、第2の種類のデータの送信に割り当てられたチャネル(PUSCH)とは異なるリソース(PUSCH)を用いる。その結果、PUSCHに占める上りデータの割合が確保される。すなわち、PUSCHの冗長度が不足しない。このため、実施例4に係る無線通信システムでは、高信頼度が要求されるようなURLLC用のデータを送信する場合、URLLC用のデータに割り当てられるリソースが確保され、要求される誤り率を満たすことができる。
 [他の実施例]
 実施例における各構成要素は、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各部の分散・統合の具体的形態は図示のものに限られず、その全部又は一部を、各種の負荷や使用状況等に応じて、任意の単位で機能的又は物理的に分散・統合して構成することができる。
 さらに、各装置で行われる各種処理は、CPU(Central Processing Unit)(又はMPU(Micro Processing Unit)、MCU(Micro Controller Unit)等のマイクロ・コンピュータ)上で、その全部又は任意の一部を実行するようにしてもよい。また、各種処理は、CPU(又はMPU、MCU等のマイクロ・コンピュータ)で解析実行するプログラム上、又はワイヤードロジックによるハードウェア上で、その全部又は任意の一部を実行するようにしてもよい。
 実施例の基地局10および端末20は、例えば、次のようなハードウェア構成により実現することができる。
 図14は、基地局10のハードウェア構成の一例を示す図である。基地局10は、プロセッサ101と、メモリ102と、RF(Radio Frequency)部103と、ネットワークインターフェース(IF)104とを有している。プロセッサ101の一例としては、CPU、DSP(Digital Signal Processor)、FPGA(Field Programmable Gate Array)等が挙げられる。また、メモリ102の一例としては、SDRAM(Synchronous Dynamic Random Access Memory)等のRAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ等が挙げられる。
 そして、実施例の基地局10で行われる各種処理は、不揮発性記憶媒体などの各種メモリに格納されたプログラムをプロセッサ101で実行することによって実現されてもよい。すなわち、各構成によって実行される各処理に対応するプログラムがメモリ102に記録され、各プログラムがプロセッサ101で実行されてもよい。ここで、各構成とは、制御部13の機能に相当する。また、送信部11、受信部12は、RF部103によって実現される。
 なお、ここでは、実施例の基地局10で行われる各種処理が1つのプロセッサ101によって実行されるものとしたが、これに限定されるものではなく、複数のプロセッサによって実行されてもよい。
 図15は、端末20のハードウェア構成の一例を示す図である。端末20は、プロセッサ201と、メモリ202と、RF部203とを有している。プロセッサ201の一例としては、CPU、DSP、FPGA等が挙げられる。また、メモリ202の一例としては、SDRAM等のRAM、ROM、フラッシュメモリ等が挙げられる。
 そして、実施例の端末20で行われる各種処理は、不揮発性記憶媒体などの各種メモリに格納されたプログラムをプロセッサ201で実行することによって実現されてもよい。すなわち、各構成によって実行される各処理に対応するプログラムがメモリ202に記録され、各プログラムがプロセッサ201で実行されてもよい。ここで、各構成とは、制御部23の機能に相当する。また、送信部21、受信部22は、RF部203によって実現される。
 なお、ここでは、実施例の端末20で行われる各種処理が1つのプロセッサ201によって実行されるものとしたが、これに限定されるものではなく、複数のプロセッサによって実行されてもよい。
 10 基地局
 11 送信部
 12 受信部
 13 通信部
 14 制御部
 20 端末
 21 送信部
 22 受信部
 23 通信部
 24 制御部
101 プロセッサ
102 メモリ
103 RF部
104 ネットワークIF
201 プロセッサ
202 メモリ
203 RF部

Claims (11)

  1.  端末がデータを送信するタイミングと制御情報を送信するタイミングとが重なるときに、前記データの送信に割り当てられたチャネルを用いて、前記制御情報を前記データと同時に基地局に送信する無線通信システムであって、
     送信予定のデータの種類に関する情報を含む第1の信号を送信する第1送信部を有する端末と、
     前記端末から通知される前記データの種類に応じて、前記制御情報を前記データの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を前記端末に送信する第2送信部を有する基地局と、
     を具備し、
     前記第1送信部は、前記データを送信するタイミングと前記制御情報を送信するタイミングとが重なるときに、前記第2の信号に含まれる情報に応じて、前記制御情報を前記基地局に送信することを特徴とする無線通信システム。
  2.  前記第2送信部は、前記データの種類が第1の種類である場合、前記データの送信に割り当てられたチャネルのリソースで前記制御情報を送信することを示し、前記データの種類が第2の種類である場合、前記データの送信に割り当てられたチャネルとは異なるリソースで前記制御情報を送信することを示す情報を含む前記第2の信号を送信することを特徴とする請求項1に記載の無線通信システム。
  3.  前記第2送信部は、下りチャネルの中の特定のフィールドにより、前記制御情報を送信するリソースに関する情報を含む前記第2の信号を前記端末に送信することを特徴とする請求項1または2に記載の無線通信システム。
  4.  前記第2送信部は、前記制御情報を送信するリソースに関連する下りチャネルが割り当てられた領域を特定する情報を含む前記第2の信号を前記端末に送信することを特徴とする請求項1または2に記載の無線通信システム。
  5.  前記第2送信部は、前記データの種類が前記第2の種類である場合、前記データの送信に割り当てられたチャネルを指示する下りチャネルとは異なるリソースを用いて、前記制御情報を送信するリソースに関する情報を含む第3の信号を前記端末に送信し、
     前記第1送信部は、前記データを送信するタイミングと前記制御情報を送信するタイミングとが重なるときに、前記第2、第3の信号に含まれる情報に応じて、前記制御情報を前記基地局に送信することを特徴とする請求項2に記載の無線通信システム。
  6.  前記第1送信部は、前記データの種類に関する情報として前記第1の種類を示す情報を含む前記第1の信号を送信した後に前記第2の種類のデータが発生し、前記第2の種類のデータを送信するタイミングと前記制御情報を送信するタイミングとが重なる場合、前記第2の種類のデータの送信に割り当てられたチャネルとは異なるリソースを用いて、前記制御情報を前記基地局に送信することを特徴とする請求項2に記載の無線通信システム。
  7.  データを送信するタイミングと制御情報を送信するタイミングとが重なるときに、データの送信に割り当てられたチャネルを用いて、前記制御情報を前記データと同時に送信することが可能な端末と無線通信を行なう基地局であって、
     前記端末からデータの種類に関する情報を含む第1の信号を受信する受信部と、
     前記端末から通知された前記データの種類に応じて、前記制御情報を前記データの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を前記端末に送信する送信部と、
     を有することを特徴とする基地局。
  8.  前記送信部は、前記データの種類が第1の種類である場合、前記データの送信に割り当てられたチャネルのリソースで前記制御情報を送信することを示し、前記データの種類が第2の種類である場合、前記データの送信に割り当てられたチャネルとは異なるリソースで前記制御情報を送信することを示す情報を含む前記第2の信号を送信することを特徴とする請求項7に記載の基地局。
  9.  データを送信するタイミングと制御情報を送信するタイミングとが重なるときに、前記データの送信に割り当てられたチャネルを用いて、前記制御情報を前記データと同時に基地局に送信することが可能な端末であって、
     送信予定のデータの種類に関する情報を含む第1の信号を前記基地局に送信する送信部と、
     前記データの種類に応じて、前記制御情報を前記データの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を受信する受信部と、
     を有し、
     前記送信部は、前記第2の信号に含まれる情報に応じて、前記制御情報を前記基地局に送信することを特徴とする端末。
  10.  前記第2の信号は、前記データの種類が第1の種類である場合、前記データの送信に割り当てられたチャネルのリソースで前記制御情報を送信することを示し、前記データの種類が第2の種類である場合、前記データの送信に割り当てられたチャネルとは異なるリソースで前記制御情報を送信することを示す情報を含むことを特徴とする請求項9に記載の端末。
  11.  端末がデータを送信するタイミングと制御情報を送信するタイミングとが重なるときに、前記データの送信に割り当てられたチャネルを用いて、前記制御情報を前記データと同時に基地局に送信する通信方法であって、
     前記端末が、送信予定のデータの種類に関する情報を含む第1の信号を前記基地局に送信し、
     前記基地局が、前記端末から通知される前記データの種類に応じて、前記制御情報を前記データの送信に割り当てられたチャネルで送信可能か否かを示す情報を含む第2の信号を前記端末に送信し、
     前記端末が、前記データを送信するタイミングと前記制御情報を送信するタイミングとが重なるときに、前記第2の信号に含まれる情報に応じて、前記制御情報を前記基地局に送信する、
     処理を実行することを特徴とする通信方法。
PCT/JP2018/000540 2018-01-11 2018-01-11 無線通信システム、基地局、端末、および通信方法 WO2019138518A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201880085873.3A CN111656814B (zh) 2018-01-11 2018-01-11 无线通信***、基站、终端和通信方法
JP2019564222A JP6984666B2 (ja) 2018-01-11 2018-01-11 無線通信システム、基地局、端末、および通信方法
PCT/JP2018/000540 WO2019138518A1 (ja) 2018-01-11 2018-01-11 無線通信システム、基地局、端末、および通信方法
US16/923,830 US11811696B2 (en) 2018-01-11 2020-07-08 Wireless communication system, base station, terminal, and method of communication
US18/377,369 US20240048331A1 (en) 2018-01-11 2023-10-06 Wireless communication system, base station, terminal, and method of communication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/000540 WO2019138518A1 (ja) 2018-01-11 2018-01-11 無線通信システム、基地局、端末、および通信方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/923,830 Continuation US11811696B2 (en) 2018-01-11 2020-07-08 Wireless communication system, base station, terminal, and method of communication

Publications (1)

Publication Number Publication Date
WO2019138518A1 true WO2019138518A1 (ja) 2019-07-18

Family

ID=67218944

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/000540 WO2019138518A1 (ja) 2018-01-11 2018-01-11 無線通信システム、基地局、端末、および通信方法

Country Status (4)

Country Link
US (2) US11811696B2 (ja)
JP (1) JP6984666B2 (ja)
CN (1) CN111656814B (ja)
WO (1) WO2019138518A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11576181B2 (en) 2020-08-10 2023-02-07 International Business Machines Corporation Logical channel management in a communication system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021532652A (ja) * 2018-07-25 2021-11-25 ソニーグループ株式会社 基地局、ユーザ機器、回線、移動通信システム及び方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017539182A (ja) * 2015-01-20 2017-12-28 エルジー エレクトロニクス インコーポレイティド 上りリンク制御情報を送信するための方法及びそのための装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8422429B2 (en) 2010-05-04 2013-04-16 Samsung Electronics Co., Ltd. Method and system for indicating the transmission mode for uplink control information
US10750533B2 (en) * 2016-04-01 2020-08-18 Lg Electronics Inc. Method for transmitting or receiving uplink control information in wireless communication system, and device therefor
WO2017209555A1 (ko) * 2016-06-03 2017-12-07 엘지전자(주) 무선 통신 시스템에서 상향링크 제어 채널을 전송하는 방법 및 이를 위한 장치
WO2018030858A1 (ko) * 2016-08-11 2018-02-15 엘지전자 주식회사 무선 통신 시스템에서 단말에 의해 수행되는 상향링크 제어 정보 전송 방법 및 상기 방법을 이용하는 단말
CN112511284B (zh) * 2016-11-30 2023-04-07 Oppo广东移动通信有限公司 传输信息的方法、终端设备和网络设备
CN115102671B (zh) * 2017-01-03 2024-06-21 北京三星通信技术研究有限公司 数据传输的方法及设备
JP6848440B2 (ja) * 2017-01-06 2021-03-24 ソニー株式会社 端末装置、基地局装置、方法及び記録媒体
US10813118B2 (en) * 2017-07-10 2020-10-20 Lg Electronics Inc. Method for transmitting and receiving uplink control information and devices supporting the same
WO2019021486A1 (ja) * 2017-07-28 2019-01-31 株式会社Nttドコモ ユーザ端末、無線基地局及び無線通信方法
CN111149398B (zh) * 2017-08-01 2023-10-31 株式会社Ntt都科摩 终端、***以及无线通信方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017539182A (ja) * 2015-01-20 2017-12-28 エルジー エレクトロニクス インコーポレイティド 上りリンク制御情報を送信するための方法及びそのための装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
HUAWEI ET AL.: "On UCI multiplexing", 3GPP TSG-RAN WG1#91 RL-1719397, 18 November 2017 (2017-11-18), XP051369306, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsgran/WGlRLl/TSGR191/Docs/Rl-1719397.zip> [retrieved on 20180315] *
LG ELECTRONICS: "UCI transmission on PUSCH for Rel-13 CA", 3GPP TSG-RAN WG1#83 RL-156853, 7 November 2015 (2015-11-07), XP051022537, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_83/Docs/R1-156853.zip> *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11576181B2 (en) 2020-08-10 2023-02-07 International Business Machines Corporation Logical channel management in a communication system

Also Published As

Publication number Publication date
CN111656814A (zh) 2020-09-11
JP6984666B2 (ja) 2021-12-22
US20240048331A1 (en) 2024-02-08
US11811696B2 (en) 2023-11-07
CN111656814B (zh) 2023-09-08
US20200344025A1 (en) 2020-10-29
JPWO2019138518A1 (ja) 2020-12-24

Similar Documents

Publication Publication Date Title
AU2021212111B2 (en) Uplink transmission method and corresponding equipment
EP3308490B1 (en) Transmission of uplink control information in unlicensed spectrum
US11743868B2 (en) Short physical uplink shared channel arrangement
JP7210596B2 (ja) 通信デバイス、基地局及び方法
JP6159672B2 (ja) 基地局、送信方法、移動局及び再送制御方法
US10856285B2 (en) Method and apparatus for allocating control channel candidates
WO2020166334A1 (en) Communication system
JP2018531551A6 (ja) 短縮物理アップリンク共有チャネル・アレンジメント
JP6989581B2 (ja) 伝送パラメータを決定するための方法、装置、およびコンピュータプログラムプロダクト
US10136413B2 (en) ARO values in PUCCH resource allocation for EPDCCH in TDD
US20210100024A1 (en) Method and device for transmitting/receiving uplink control information in wireless communication system
WO2017194022A1 (zh) 下行控制信息的传输方法、装置及***
US20240048331A1 (en) Wireless communication system, base station, terminal, and method of communication
US20210160011A1 (en) Method and device for transmitting/receiving uplink control information in wireless communication system
WO2013099269A1 (en) Method and device for physical uplink control channel (pucch) resource mapping
JP2023058691A (ja) 情報伝送方法、装置及び記憶媒体
AU2018417494B2 (en) Method for transmitting uplink control information, and related product
WO2019159303A1 (ja) 無線通信システム、端末および基地局
JP7277492B2 (ja) 物理的上りリンク制御チャネルの衝突を扱うための装置および方法
GB2490430A (en) Configuring an uplink data channel for multi-cell periodic feedback of channel state information
EP4348897A1 (en) On hybrid automatic repeat request (harq) process handling at extremely large subcarrier spacing (scs)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18899709

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019564222

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18899709

Country of ref document: EP

Kind code of ref document: A1