WO2019122149A1 - Demountable floor construction - Google Patents
Demountable floor construction Download PDFInfo
- Publication number
- WO2019122149A1 WO2019122149A1 PCT/EP2018/086231 EP2018086231W WO2019122149A1 WO 2019122149 A1 WO2019122149 A1 WO 2019122149A1 EP 2018086231 W EP2018086231 W EP 2018086231W WO 2019122149 A1 WO2019122149 A1 WO 2019122149A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- planks
- floor
- beams
- concrete
- plates
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/04—Walls having neither cavities between, nor in, the solid elements
- E04B2/06—Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/023—Separate connecting devices for prefabricated floor-slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2103/00—Material constitution of slabs, sheets or the like
- E04B2103/02—Material constitution of slabs, sheets or the like of ceramics, concrete or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
- E04B5/06—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement with beams placed against one another optionally with pointing-mortar
Definitions
- the present invention relates to precast concrete floors suitable for use in concrete buildings, for schools, hotels, office, retail and other premises.
- the invention is also applicable to precast concrete floors that connect to conventional steel framed buildings. It is an alternative to building floors that consist of concrete on metal deck spanning onto steel beams, and it can be integrated with this solution or used as a direct replacement.
- the invention is particularly applicable to floors which are required to be
- a conventional solution would be to either cast an in situ topping or an in situ joint.
- a steel framed building will typically have an array of vertical columns arranged in a grid structure joined at each floor level by horizontal beams.
- Various types of floor system for creating a floor or deck supported by the beams have been proposed.
- diaphragm forces across a floor, as well as making sure that joints do not open up, or suffer excessive cracking when the floor is subject to vertical loads and in-plane loads.
- precast and prefabricated elements that can be assembled easily on site and remain competitive in terms of weight and profile depth with prior art solutions.
- Embodiments of the present invention utilise primary precast floor components made from reinforced concrete or prestressed concrete elements.
- the secondary components are an inverted U-shaped planks with a depending rib running along each longitudinal edge. These secondary components abut (with a narrow grouted gap) other secondary components along the longitudinal edge to create a ribbed floor.
- the secondary planks are connected together at regular centres by intermediate connector plates that transfer tensile forces across the grouted joint so that the floor can act as a complete diaphragm.
- the ends of the secondary components are supported on primary beam elements that typically span between columns.
- the secondary components have a corner connector plate that extends across the grouted joint at the primary beam, to reduce cracking over the primary beam and to provide continuity across that joint, so that the floor can act as a complete diaphragm.
- the primary beams can be an inverted T-shaped profile which enables the secondary components to sit on a support nib.
- primary support beams can also be rectangular beams below the planks, or steel beams.
- the secondary planks are continuous over such support beams.
- the primary beams support the secondary planks and sit on columns.
- a connector plate at the column connects the secondary planks to the primary beam and to the column above.
- the column connector plates transfer diaphragm action across the joints and are designed to reduce cracking in the floors and to create a performance similar to a concrete floor on metal deck on steel beams.
- All the connector plates are designed to transfer tensile forces across joints.
- the plates can be recessed into the floor. Tolerance is achieved by inserting the connector plates into grouted or concreted joints.
- the connector plates are designed to be unbolted and thus the system can be
- planks are precast with sleeves for bolt holes and recesses so that the various elements of the flooring system can be interconnected with metal plates bolted into the concrete elements. These plates work in combination with grouted joints to create a complete diaphragm. Bolted joints are normally not possible because of the need to allow tolerances.
- the system can be disassembled in order to remove or re-configure the floor allowing at least some components to be reused.
- Figure 1 shows a perspective view from below of a floor section within a single bay or grid rectangle
- Figure 2 is a perspective view of a primary beam
- Figure 3 is a perspective view of a plank showing how it would be supported for craning into position together with a transparent view showing its internal
- Figure 4 is a view of a floor bay from above;
- Figure 5 shows a perspective view of two floors
- FIG. 6 is a detail showing a primary beam to column connection
- Figure 7 shows an exploded view of a typical column connection
- Figure 8 shows a slab connector plate for use in connecting the edges of two adjoining planks
- Figure 9 shows an exploded perspective view showing a beam connector plate for use in connecting planks on either side of a beam in position
- Figure 10 shows the beam connector plate figure 9
- Figure 11 shows an exploded view of a beam connector plate showing the elements of the bolts
- Figure 12 shows an exploded view of a typical column, beam, and plank connection.
- the modular flooring system described is intended to be installed in a multi-storey building such as a low rise office, retail premises, hotel or school.
- the building is defined by means of an array of vertical columns made up of individual floor height column sections 2 arranged in a grid structure, for example a 9m x 9m or 7.5m x 7.5m, or 9m xl2m grid as shown in figure 5.
- a single bay of the grid is illustrated in the drawings for simplicity.
- four vertical column sections 4 are interconnected by a pair of parallel horizontal primary beams 6.
- the floor between the beams is created by means of a series of adjoining precast concrete planks 10 which serve as the secondary components of the floor.
- Each concrete plank 10 is an elongate inverted U-shaped precast concrete element having ends 12 and ribs 14 depending on the longitudinal side edges.
- the plank has a substantially flat upper surface that defines the level of the floor.
- the upper surface has recesses as described later for the purpose of interconnecting the planks.
- the underside of the plank is the soffit.
- the concrete planks are precast with internal rebar reinforcement 20 as shown in figure 3.
- the planks have deeper side edges or ribs where the planks adjoin each other side by side creating a ribbed effect in the underside of the floor and providing sufficient depth of concrete to support connecting bolts.
- each rib 14 has a slight projection 16 to control the spacing of the planks as they abut each other to form a grout joint zone that when in filled provides a shear key between adjacent planks.
- the ribs act as beams supporting the flat plank surface.
- a typical inverted U channel plank has a width of 1500 to 3000mm between its side edges and a rib depth of 250 to 550mm at those edges and 120- 150mm in its middle region.
- the planks may span 6 to 12m between primary beams such that three planks can create a grid bay as illustrated in figures 1 and 4.
- the ends 12 of the longitudinal beams may be square or have an undercut rebate 24 which is sized to cooperate with the adjacent beam and allows the plank to be self- supporting on the beams 6 during construction.
- the ends of the planks sit on neoprene pads 64 on the beams.
- the joints between the planks are filled with a grout or concrete mix.
- Connector plates 54 link the planks across the beams 6 and therefore create a moment connection across the beams in the final condition.
- the longitudinal ribs 14 of the planks may be provided with apertures 44 for services to pass through if required.
- Lifting points 26 are provided on the plank so that it can be hoisted into position as shown in figure 3. Alternative lifting methods are possible such as by lifting it through service penetrations 44 in the ribs.
- Recesses 30 for the connector plates surrounding bolt sleeves 32 are pre-cast in the upper surface of the plank along the longitudinal edges. The bolt sleeves extend from the upper surface into the ribs 14. Recesses 40 surrounding bolt sleeves 42 are also formed at each comer of the end of the plank. These recesses 30, 40 are deep enough, for example 20mm, to accommodate the various connector plates 52, 54, 56, and 58 which are used to join the components of the flooring system together. The use of connector plates 52, 54, 56, 58 and bolts 50 rather than welded or in situ joints which require construction work during assembly, allows this flooring system to be demountable.
- the beams 6 are preferably of an inverted T-shaped section as shown in figure 2 with a lower flange 34 and web 36.
- the lower projecting flange 34 provides support for a base of a rib 14 during assembly, and neoprene pads 64 may be provided on this support surface.
- the beam 6 can be provided with penetrations or apertures 38 for the passage of services, as required.
- Connector plates 52, 54, 56, 58 are provided in various configurations as shown in figures 7 to 12.
- the plates are provided with bolts 50 that connect to the plates and are cast into and cooperate with the bolt sleeves 32, 42 precast into the planks.
- each bolt 50 is assembled from a counter sunk head 53 and a threaded stud 55.
- the head 53 is received in a hole in a connector plate and is connected to the stud 55 by means of a threaded sleeve coupler 51.
- the countersunk bolt head 53 can simply be unscrewed to facilitate removal of the connector plates 52, 54, 56, 58. Once the connector plates are removed the panels have no tensile capacity between the precast units, and can be separated by a concrete splitter for later reuse.
- the primary beams 6, are bolted to a column 4 through threaded bars 74 that sleeve through the beam, as shown in figure 12. Where the column is narrower than the width of the beam, these threaded bars will sleeve through the web 36 of the primary beam 6.
- the column connector plate 56 connects the primary beam to adjacent planks through bolts 50 cast into sleeves.
- the column connector plate can be detailed so that it has threaded bars 70 to connect to standard column shoes 72, or can be detailed to connect to steel or concrete columns.
- Connector plates 52 connect adjacent planks.
- Connector plates 54 bridge across a primary supporting beam and connector plates 58 can be used to connect other support beams below the planks.
- the flooring system made up of the components as described can be assembled on site without significant construction steps. There is no need for any propping during construction as the planks are self-supporting on the beams.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA3085626A CA3085626A1 (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
SG11202005469PA SG11202005469PA (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
US16/956,328 US20210095466A1 (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
AU2018387263A AU2018387263A1 (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
CN201880083203.8A CN111566291A (en) | 2017-12-21 | 2018-12-20 | Detachable floor structure |
EP18836242.0A EP3728755A1 (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
KR1020207020620A KR20200100730A (en) | 2017-12-21 | 2018-12-20 | Removable floor structure |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1721561.7A GB2569607B (en) | 2017-12-21 | 2017-12-21 | Demountable floor construction |
GB1721561.7 | 2017-12-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019122149A1 true WO2019122149A1 (en) | 2019-06-27 |
Family
ID=61131481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2018/086231 WO2019122149A1 (en) | 2017-12-21 | 2018-12-20 | Demountable floor construction |
Country Status (9)
Country | Link |
---|---|
US (1) | US20210095466A1 (en) |
EP (1) | EP3728755A1 (en) |
KR (1) | KR20200100730A (en) |
CN (1) | CN111566291A (en) |
AU (1) | AU2018387263A1 (en) |
CA (1) | CA3085626A1 (en) |
GB (1) | GB2569607B (en) |
SG (1) | SG11202005469PA (en) |
WO (1) | WO2019122149A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220268018A1 (en) * | 2019-08-13 | 2022-08-25 | LWC Research Pty Ltd | Prefabricated floor panel, construction and method therefor |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2503776A1 (en) * | 1981-04-14 | 1982-10-15 | Charbonnages Sa Ste Indle Cale | MULTI-LEVEL BUILDING RESISTANT TO TELLURIC SHAKES |
EP0422915A2 (en) * | 1989-10-12 | 1991-04-17 | Yigal Erel | A pre-fabricated modular structure for vehicle parking, elements therefor, and a method for their combination |
FR2697553A1 (en) * | 1992-10-30 | 1994-05-06 | Bouygues Sa | Prefabricated room module, e.g. for constructing hotel - has walls, floor and ceiling of cast concrete, assembled by bolts and equipped with doors, windows and other fittings |
WO1994010389A1 (en) * | 1992-11-05 | 1994-05-11 | Terence Foster Doolan | Building or construction element |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DK128948C (en) * | 1972-08-11 | 1980-04-14 | Bruun & Soerensen | Ice rink substrate |
FR2349004A2 (en) * | 1976-04-21 | 1977-11-18 | Saret | Concrete floor panel structure - has prestressed concrete, beams held in position by end spandrels and has panels holding in insulation |
CN1118826A (en) * | 1994-05-05 | 1996-03-20 | 特兰斯·F·杜兰 | Building or construction element |
ES1057260Y (en) * | 2004-04-20 | 2004-10-16 | Colomer Ines Jackson | DEVICE FOR THE CONSTRUCTION OF BASEMENTS. |
-
2017
- 2017-12-21 GB GB1721561.7A patent/GB2569607B/en active Active
-
2018
- 2018-12-20 SG SG11202005469PA patent/SG11202005469PA/en unknown
- 2018-12-20 KR KR1020207020620A patent/KR20200100730A/en unknown
- 2018-12-20 EP EP18836242.0A patent/EP3728755A1/en not_active Withdrawn
- 2018-12-20 CA CA3085626A patent/CA3085626A1/en active Pending
- 2018-12-20 US US16/956,328 patent/US20210095466A1/en not_active Abandoned
- 2018-12-20 CN CN201880083203.8A patent/CN111566291A/en active Pending
- 2018-12-20 AU AU2018387263A patent/AU2018387263A1/en active Pending
- 2018-12-20 WO PCT/EP2018/086231 patent/WO2019122149A1/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2503776A1 (en) * | 1981-04-14 | 1982-10-15 | Charbonnages Sa Ste Indle Cale | MULTI-LEVEL BUILDING RESISTANT TO TELLURIC SHAKES |
EP0422915A2 (en) * | 1989-10-12 | 1991-04-17 | Yigal Erel | A pre-fabricated modular structure for vehicle parking, elements therefor, and a method for their combination |
FR2697553A1 (en) * | 1992-10-30 | 1994-05-06 | Bouygues Sa | Prefabricated room module, e.g. for constructing hotel - has walls, floor and ceiling of cast concrete, assembled by bolts and equipped with doors, windows and other fittings |
WO1994010389A1 (en) * | 1992-11-05 | 1994-05-11 | Terence Foster Doolan | Building or construction element |
Also Published As
Publication number | Publication date |
---|---|
US20210095466A1 (en) | 2021-04-01 |
EP3728755A1 (en) | 2020-10-28 |
KR20200100730A (en) | 2020-08-26 |
SG11202005469PA (en) | 2020-07-29 |
GB2569607A (en) | 2019-06-26 |
GB201721561D0 (en) | 2018-02-07 |
CN111566291A (en) | 2020-08-21 |
AU2018387263A1 (en) | 2020-06-25 |
CA3085626A1 (en) | 2019-06-27 |
GB2569607B (en) | 2020-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3495371A (en) | Prefabricated concrete structure | |
US9874036B2 (en) | Prefabricated, deconstructable, multistory building construction | |
CA2407359C (en) | Open web dissymmetric beam construction | |
AU2017304226B2 (en) | Precast concrete formwork, floor system and a method of construction | |
WO1995005509A1 (en) | Connection between hollow core concrete slabs and steel framed walls | |
CA3109393C (en) | Precast building construction system | |
EA006995B1 (en) | Method and apparatus for precast and framed block element construction | |
US20220213684A1 (en) | Modular composite action panel and structural systems using same | |
EP0418216B1 (en) | Frame-work for structural walls in multy-storey buildings | |
WO2015087070A1 (en) | Pre-fabricated flooring cassette | |
US20210095466A1 (en) | Demountable floor construction | |
KR101735077B1 (en) | Bridge deck using precast concrete panel | |
GB2495319A (en) | Beam and slab floor construction | |
RU2197578C2 (en) | Structural system of multistory building and process of its erection ( variants ) | |
US20220403641A1 (en) | Method for using aerated autoclaved concrete in residential and commercial construction | |
RU2087633C1 (en) | Sectional-monolithic framework of multistory buildings and method for its erection | |
JPS59138644A (en) | Constructon of synthetic floor consisting of pc beam or ps beam and deck plate floor slab concrete | |
JPH09273317A (en) | Vibration-resistant reinforcing method of existing concrete structure | |
UA92652C2 (en) | Girth-rail-free frame of building, construction | |
JPH04140366A (en) | Preceding erection method of prefabricated column bar and semi-pc girder in pc construction | |
EP0385998A1 (en) | Floor structure for buildings. | |
JPH0358401B2 (en) | ||
AU2006322634A1 (en) | Composite formwork for concrete slabs | |
WO2007065204A1 (en) | Composite formwork for concrete slabs | |
JPH0366463B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18836242 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 3085626 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2018387263 Country of ref document: AU Date of ref document: 20181220 Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 20207020620 Country of ref document: KR Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 2018836242 Country of ref document: EP Effective date: 20200721 |