WO2017211329A3 - Semi-prefabricated concrete-filled steel tubular column having inner high-strength steel, and fabrication method for same - Google Patents
Semi-prefabricated concrete-filled steel tubular column having inner high-strength steel, and fabrication method for same Download PDFInfo
- Publication number
- WO2017211329A3 WO2017211329A3 PCT/CN2017/096138 CN2017096138W WO2017211329A3 WO 2017211329 A3 WO2017211329 A3 WO 2017211329A3 CN 2017096138 W CN2017096138 W CN 2017096138W WO 2017211329 A3 WO2017211329 A3 WO 2017211329A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- steel
- rebar
- prefabricated concrete
- same
- semi
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Mechanical Engineering (AREA)
Abstract
Disclosed in the present invention are a semi-prefabricated concrete-filled steel tubular column (CFST) having inner high-strength steel and a fabrication method for same, comprising a steel tube and arranged within same a vertical sequence of prefabricated concrete sections separated each from the others; a gap is left between the inner wall of the steel tube and the outer walls of the prefabricated concrete sections; vertically reserved in the center of each prefabricated concrete section is a through-hole for steel rebar, said rebar through-hole being used for inserting steel rebar; a gap is left between the walls of the rebar through-hole and the outer wall of the steel rebar; grout is injected into the inside of the steel tubular column; the grout fills in all the gaps left between the concrete sections, the gaps between the walls of the rebar through-hole and the outer wall of the steel rebar, and the gap left between the inner wall of the steel tube and the outer walls of the prefabricated concrete sections. The semi-prefabricated CFST having inner high-strength steel of the present method presents noticeably reduced sectional dimensions for same bearing requirements, thus increasing the usable floorspace of buildings and achieving excellent economic and social benefits.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610402017.9A CN105926853B (en) | 2016-06-07 | 2016-06-07 | A kind of half Prefabricated concrete-filled steel tube column and preparation method thereof of built-in high-strength shaped steel |
CN201610402017.9 | 2016-06-07 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2017211329A2 WO2017211329A2 (en) | 2017-12-14 |
WO2017211329A3 true WO2017211329A3 (en) | 2018-02-01 |
Family
ID=56832690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2017/096138 WO2017211329A2 (en) | 2016-06-07 | 2017-08-05 | Semi-prefabricated concrete-filled steel tubular column having inner high-strength steel, and fabrication method for same |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105926853B (en) |
WO (1) | WO2017211329A2 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926853B (en) * | 2016-06-07 | 2018-09-14 | 华南理工大学 | A kind of half Prefabricated concrete-filled steel tube column and preparation method thereof of built-in high-strength shaped steel |
CN106760207B (en) * | 2016-12-16 | 2018-12-18 | 中国矿业大学 | A kind of preparation method of TRC template reinforced column |
CN108222949A (en) * | 2018-01-03 | 2018-06-29 | 上海市机械施工集团有限公司 | Passage construction structures and methods |
CN108149846B (en) * | 2018-02-08 | 2023-12-12 | 珠海市建邦昌盛工程有限公司 | Prefabricated combined thin steel pipe-cast-in-situ concrete column structure and manufacturing method thereof |
CN109184079A (en) * | 2018-11-09 | 2019-01-11 | 福建省建筑设计研究院有限公司 | One kind partly combining prefabricated assembled column and preparation method thereof and design method |
CN110130580B (en) * | 2019-05-20 | 2024-04-26 | 福建工程学院 | Steel pipe constraint type precast concrete column connecting structure and construction method |
CN111139975A (en) * | 2020-02-24 | 2020-05-12 | 浙江东南网架股份有限公司 | Light steel pipe concrete structure filled with inflation pressure bar and construction method thereof |
CN111379218A (en) * | 2020-04-17 | 2020-07-07 | 浙江省交通规划设计研究院有限公司 | Prefabricated pier body and prefabricated pier body installation method |
CN111980298B (en) * | 2020-08-18 | 2022-02-18 | 杭州江南建筑设计院有限公司 | Oblique steel reinforced concrete combined column and construction method thereof |
CN113684944B (en) * | 2021-07-16 | 2022-11-11 | 中国二十冶集团有限公司 | Construction method of steel plate-concrete combined structure |
CN113640086B (en) * | 2021-08-27 | 2023-12-29 | 中钢集团郑州金属制品研究院股份有限公司 | Manufacturing method of steel tube concrete void detection test piece |
CN113958347B (en) * | 2021-08-30 | 2023-09-01 | 新疆大学 | Method for constructing roadside support body by FRP constraint sand-based cementing material column |
CN113914486B (en) * | 2021-09-28 | 2022-10-21 | 上海颂扬展示工程有限公司 | Bamboo exhibition hall and construction method thereof |
CN116005888B (en) * | 2022-12-05 | 2023-08-08 | 北京城建集团有限责任公司 | Steel pipe batten plate column connected by cross plate |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02304161A (en) * | 1989-05-18 | 1990-12-17 | Ohbayashi Corp | Steel pipe concrete material |
JPH07292857A (en) * | 1994-04-27 | 1995-11-07 | Ohbayashi Corp | Pc member with irregular-shaped steel pipe for joint, and connecting method thereof |
KR200440537Y1 (en) * | 2007-05-23 | 2008-06-17 | 비엔지 주식회사 | Support assembly type for landscape institution |
CN101487333A (en) * | 2009-02-13 | 2009-07-22 | 江苏南通二建集团有限公司 | Recycled concrete superposed column and its implementing method |
CN105298020A (en) * | 2015-11-26 | 2016-02-03 | 华南理工大学 | Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof |
CN205421718U (en) * | 2015-11-26 | 2016-08-03 | 华南理工大学 | Semi -prefabricated circular steel tube regeneration mixes concrete column |
CN105926853A (en) * | 2016-06-07 | 2016-09-07 | 华南理工大学 | Semi-precast concrete filled steel tubular column with built-in high-strength structural steel and manufacturing method thereof |
CN205712736U (en) * | 2016-06-07 | 2016-11-23 | 华南理工大学 | A kind of half Prefabricated concrete-filled steel tube post of built-in high-strength shaped steel |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0676711B2 (en) * | 1989-01-09 | 1994-09-28 | 株式会社クボタ | Steel pipe column for structure |
CN1896383B (en) * | 2005-07-14 | 2011-12-07 | 胡柏英 | Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction |
KR101616953B1 (en) * | 2015-09-15 | 2016-04-29 | 케이피이엔씨 주식회사 | Manufacturing Method of Precast Concrete Hollow Column with Inner Shear Groove, and Column Structure using such Precast Concrete Hollow Column |
-
2016
- 2016-06-07 CN CN201610402017.9A patent/CN105926853B/en active Active
-
2017
- 2017-08-05 WO PCT/CN2017/096138 patent/WO2017211329A2/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02304161A (en) * | 1989-05-18 | 1990-12-17 | Ohbayashi Corp | Steel pipe concrete material |
JPH07292857A (en) * | 1994-04-27 | 1995-11-07 | Ohbayashi Corp | Pc member with irregular-shaped steel pipe for joint, and connecting method thereof |
KR200440537Y1 (en) * | 2007-05-23 | 2008-06-17 | 비엔지 주식회사 | Support assembly type for landscape institution |
CN101487333A (en) * | 2009-02-13 | 2009-07-22 | 江苏南通二建集团有限公司 | Recycled concrete superposed column and its implementing method |
CN105298020A (en) * | 2015-11-26 | 2016-02-03 | 华南理工大学 | Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof |
CN205421718U (en) * | 2015-11-26 | 2016-08-03 | 华南理工大学 | Semi -prefabricated circular steel tube regeneration mixes concrete column |
CN105926853A (en) * | 2016-06-07 | 2016-09-07 | 华南理工大学 | Semi-precast concrete filled steel tubular column with built-in high-strength structural steel and manufacturing method thereof |
CN205712736U (en) * | 2016-06-07 | 2016-11-23 | 华南理工大学 | A kind of half Prefabricated concrete-filled steel tube post of built-in high-strength shaped steel |
Also Published As
Publication number | Publication date |
---|---|
CN105926853A (en) | 2016-09-07 |
CN105926853B (en) | 2018-09-14 |
WO2017211329A2 (en) | 2017-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017211329A3 (en) | Semi-prefabricated concrete-filled steel tubular column having inner high-strength steel, and fabrication method for same | |
MY194640A (en) | Integrated steel concrete building and construction method thereof | |
SG10201908614WA (en) | Composite structural wall and method of construction thereof | |
AU2015100669A4 (en) | Hollow Wall | |
PL412577A1 (en) | Self-supporting precast building element and method for erecting external walls of building objects made from precast building elements | |
CN105133793A (en) | Space constraint multi-cavity pipe-in-pipe steel bar concrete huge column and construction method | |
EA201791540A1 (en) | REINFORCEMENT TOOL FOR CONSTRUCTION BLOC WITH LOCKING CONNECTION AND MODULAR CONSTRUCTION SYSTEM | |
KR101598692B1 (en) | A light weight brick wall structure with enhansed heat and sound insulation | |
WO2013032349A3 (en) | Monolithic- precast housing construction system | |
CN203795721U (en) | Concrete column with built-in square steel tube | |
Lee et al. | A study on the application of the in-fill construction method to high-rise unit modular buildings | |
WO2016087886A3 (en) | Element collection for composite building structures | |
KR20200059674A (en) | Gang form | |
MD677Y (en) | Earthquakeproof wall structure | |
CN106869157B (en) | Foundation structure exterior wall and interior wall synchronous construction engineering method equipped with pumping equipment | |
JP2019002214A (en) | Method for joining precast concrete members and joining structure | |
UA118723C2 (en) | METHOD OF CONSTRUCTION OF EXTERIOR WALLS OF MULTILATERAL FRAMEWORK BUILDINGS | |
WO2017126996A2 (en) | Method and tools for constructing a structural framework such as a structural wall used to build conventional houses | |
RU2581069C2 (en) | Hollow-core floor slabs with openings | |
EA201501179A1 (en) | BUILDING BLOCK (OPTIONS) | |
Packer | Concrete-Filled Double-Skin Tubes | |
PH12019050072A1 (en) | A system of vertical and horizontal tube-like concrete masonry units | |
PE20230084Z (en) | A CONSTRUCTION SYSTEM MADE UP OF A KIT OF STACKABLE BLOCKS OF COMPRESSED EARTH | |
AU2016100917A4 (en) | Panel | |
KR100743387B1 (en) | Architectural T type brick used to building works method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17809768 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 18/04/2019) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17809768 Country of ref document: EP Kind code of ref document: A2 |