WO2016098483A1 - 熱源システム管理装置、熱源システム管理方法、及びプログラム - Google Patents

熱源システム管理装置、熱源システム管理方法、及びプログラム Download PDF

Info

Publication number
WO2016098483A1
WO2016098483A1 PCT/JP2015/081246 JP2015081246W WO2016098483A1 WO 2016098483 A1 WO2016098483 A1 WO 2016098483A1 JP 2015081246 W JP2015081246 W JP 2015081246W WO 2016098483 A1 WO2016098483 A1 WO 2016098483A1
Authority
WO
WIPO (PCT)
Prior art keywords
heat
heat source
operation plan
source system
amount
Prior art date
Application number
PCT/JP2015/081246
Other languages
English (en)
French (fr)
Inventor
勉 河村
薫 川端
亮介 中村
菊池 宏成
進 池田
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to US15/533,675 priority Critical patent/US10808947B2/en
Priority to MYPI2017701701A priority patent/MY189921A/en
Publication of WO2016098483A1 publication Critical patent/WO2016098483A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D11/00Central heating systems using heat accumulated in storage masses
    • F24D11/002Central heating systems using heat accumulated in storage masses water heating system
    • F24D11/004Central heating systems using heat accumulated in storage masses water heating system with conventional supplementary heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • F24F11/47Responding to energy costs
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D19/00Regenerative heat-exchange apparatus in which the intermediate heat-transfer medium or body is moved successively into contact with each heat-exchange medium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D20/00Heat storage plants or apparatus in general; Regenerative heat-exchange apparatus not covered by groups F28D17/00 or F28D19/00
    • F28D20/0034Heat storage plants or apparatus in general; Regenerative heat-exchange apparatus not covered by groups F28D17/00 or F28D19/00 using liquid heat storage material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2130/00Control inputs relating to environmental factors not covered by group F24F2110/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2130/00Control inputs relating to environmental factors not covered by group F24F2110/00
    • F24F2130/10Weather information or forecasts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/60Energy consumption
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/14Thermal energy storage

Definitions

  • the present invention relates to a heat source system management device that manages a heat source system.
  • Patent Document 1 when operating a heat source device that supplies heat via a heat storage tank, while the predicted heat storage amount after a predetermined time is not expected to exceed a predetermined limit range, It describes about the operation method of the heat source equipment which continues.
  • Patent Document 1 describes a technique for creating an operation plan so as to reduce the number of times of starting / stopping the heat source device, but about a technique for using the cold energy stored in the heat storage tank within the day. Not specifically described.
  • an object of the present invention is to provide a heat source system management device or the like that increases the energy efficiency of the heat source system.
  • a heat source system management apparatus includes heat for a heat source system including one or a plurality of heat source units, and a heat storage tank that stores cold heat or heat generated by the heat source units.
  • a heat demand prediction upper limit value calculation unit that calculates a heat demand prediction upper limit value by adding a predetermined prediction error to the demand prediction value, and heat of the heat demand prediction upper limit value is supplied to the load side of the heat source system.
  • the operation plan creation unit for creating the operation plan of the heat source system is consumed on the load side from the heat demand prediction upper limit value.
  • a surplus heat storage amount calculation unit that repeats the process of calculating the surplus heat storage amount by subtracting the generated heat amount, and the future operating rate of the heat source unit is reduced so as to cancel the surplus heat storage amount. Characterized in that and a driving plan change unit for changing the operation plan sequentially.
  • A) is explanatory drawing regarding the operation plan of a heat source system
  • (b) is explanatory drawing which shows the electric power unit price of each time slot
  • (c) is explanatory drawing which shows the predicted value of heat storage residual amount.
  • (A) is explanatory drawing which shows transition of the amount of cold consumed at the demand facility during heat radiation operation
  • (b) is explanatory drawing which shows the electric power unit price of each time slot
  • (c) is heat storage residual amount. It is explanatory drawing which shows the actual value of a predicted value and a heat storage residual amount.
  • FIG. 1 is a configuration diagram including a heat source system management apparatus 100 according to the present embodiment.
  • the solid line arrow shown in FIG. 1 represents the direction of the cold water which flows through each piping, and the broken line arrow represents the signal line.
  • the heat source system management apparatus 100 will be described in detail.
  • the heat source system 200 is a system that applies cold heat to water, which is a “heat medium”, using the refrigerator 211a and the like, and supplies this cold heat to the demand facility F (building, factory, etc.) via the heat storage tank 213.
  • the heat source system 200 includes a primary system 210 that generates cold energy and stores it in the heat storage tank 213, and a secondary system 220 that consumes the cold energy stored in the heat storage tank 213.
  • the primary system 210 includes four primary units A, B, C, and D, and a heat storage tank 213.
  • the primary side unit A includes a refrigerator 211a (heat source machine) and a primary side cold water pump 212a.
  • the refrigerating machine 211a is, for example, a turbo refrigerating machine, and is a cold heat source that gives cold heat to cold water flowing in via the pipe h1.
  • the primary side cold water pump 212a is a pump that pumps cold water from the heat storage tank 213 toward the refrigerator 211a, and is installed on the upstream side of the refrigerator 211a.
  • the other primary units B, C, and D also have the same configuration as the primary unit A described above.
  • the refrigerators 211a to 211d may have different characteristics (for example, power consumption characteristics described later: see FIG. 3), or may have the same characteristics.
  • the four primary units A to D are connected in parallel.
  • the upstream side of the primary side units A to D is connected to the upper part of the heat storage tank 213 via a pipe h2.
  • the downstream side of the primary side units A to D is connected to the lower part of the heat storage tank 213 via the pipe h3.
  • the cold water pumped from the upper part of the thermal storage tank 213 via the pipe h2 is cooled by the refrigerator 211a etc., and the cooled cold water flows into the lower part of the thermal storage tank 213 via the pipe h3.
  • the primary units A to D can be operated individually. For example, only the primary side unit A may be operated based on an operation plan to be described later, or all of the primary side units A to D may be operated.
  • the heat storage tank 213 is, for example, a temperature stratification type heat storage tank, and stores cold heat by storing cold water cooled by the refrigerator 211a or the like. By the way, cold water has a higher density and tends to settle as the temperature is lower. Therefore, the cold water stored in the heat storage tank 213 has a temperature gradient in the vertical direction, and becomes colder as it goes downward.
  • FIG. 1 shows a temperature interface S between cold water having a relatively high temperature (for example, 12 ° C.) and cold water having a relatively low temperature (for example, 5 ° C.) settling below the cold water.
  • the secondary system 220 includes a secondary chilled water pump 221 and a heat load device 222 (load).
  • the secondary side cold water pump 221 is a pump that pumps cold water from the heat storage tank 213 toward the heat load device 222, and is installed in the pipe h ⁇ b> 4 on the upstream side of the heat load device 222.
  • the heat load device 222 is, for example, a heat exchanger for cooling the indoor air of the demand facility F, and is installed in the demand facility F. Cold heat supplied from the heat storage tank 213 is consumed by heat exchange between the low-temperature cold water and the room air via the heat transfer tube r of the heat load device 222.
  • the upstream side of the heat transfer tube r is connected to the lower part of the heat storage tank 213 via a pipe h4.
  • the downstream side of the heat transfer pipe r is connected to the upper part of the heat storage tank 213 through the pipe h5. Then, the cold water pumped from the lower part of the heat storage tank 213 through the pipe h4 exchanges heat with room air in the heat transfer pipe r, and the cold water heated by the heat exchange flows into the upper part of the heat storage tank 213 through the pipe h5. It is supposed to be.
  • the refrigerators 211a to 211d, the primary side cold water pumps 212a to 212d, and the secondary side cold water pump 221 operate according to an operation plan created (or changed) by the heat source system management device 100 described later.
  • the temperature detector T1 is a sensor that detects the temperature of the cold water cooled by the refrigerator 211a or the like, and is installed in the pipe h3.
  • the temperature detector T2 is a sensor that detects the temperature of the cold water that has been heated by heat exchange in the heat load device 222, and is installed in the pipe h5.
  • the detection values of the temperature detectors T1 and T2 are input to the heat source system management apparatus 100.
  • the flow rate detector Q1 is a sensor that detects the flow rate of the chilled water cooled by the refrigerator 211a or the like, and is installed in the pipe h3.
  • the flow rate detector Q2 is a sensor that detects the flow rate of cold water that has been heated by heat exchange in the heat load device 222, and is installed in the pipe h5.
  • the detection values of the flow rate detectors Q1 and Q2 are input to the heat source system management apparatus 100.
  • FIG. 2 is a functional block diagram of the heat source system management apparatus 100.
  • the heat source system management apparatus 100 creates an operation plan of the heat source system 200 based on the weather forecast, and sends control commands based on the operation plan to the refrigerators 211a to 211d, the primary side cold water pumps 212a to 212d, and the secondary side cold water pump.
  • 221 is a device that outputs the data.
  • the heat source system management apparatus 100 also has a function of sequentially changing the operation plan based on the detection values of the temperature detectors T1, T2 and the flow rate detectors Q1, Q2.
  • the heat source system management apparatus 100 is configured to include electronic circuits such as a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and various interfaces, and reads a program stored in the ROM to read the RAM.
  • the CPU executes various processes.
  • the heat source system management apparatus 100 includes an input unit 101, a storage unit 102, an arithmetic processing unit 103, an output unit 104, and a display control unit 105.
  • the input unit 101 has a function of outputting the information to the arithmetic processing unit 103 when a weather forecast, detection values of the temperature detectors T1 and T2, detection values of the flow rate detectors Q1 and Q2, and the like are input. Yes.
  • the aforementioned weather forecast includes a predicted temperature value and a predicted humidity value. For example, a weather forecast that predicts the temperature and humidity every hour for 24 hours is delivered to the heat source system management apparatus 100 periodically (for example, every 6 hours).
  • the storage unit 102 stores information including energy consumption characteristic information 1021, power unit price information 1022, operation performance information 1023, and an operation plan 1024.
  • the energy consumption characteristic information 1021 is information on the energy consumption characteristic indicating the relationship between the load factor of the refrigerators 211a to 211d (see FIG. 1) and the power consumption.
  • the “load factor” of the refrigerator 211a is the ratio of the amount of cold generated by the refrigerator 211a to the refrigeration capacity (cooling amount) during rated operation of the refrigerator 211a.
  • FIG. 3 is an explanatory diagram showing energy consumption characteristics of the refrigerators 211a to 211d.
  • the energy consumption characteristics of the refrigerator 211a and the like have a downward convex curve, and the power consumption of the refrigerator 211a and the like increases as the load factor increases.
  • Such energy consumption characteristics are acquired by a prior experiment or simulation, and are stored in advance in the storage unit 102 (see FIG. 2) as a predetermined function, for example.
  • the energy consumption characteristics of the refrigerator 211a and the like vary depending on the temperature of the cooling water supplied to the refrigerator 211a and the like.
  • the energy consumption characteristics of the refrigerator 211a and the like vary depending on the outside air temperature and humidity.
  • the power consumption of the refrigerator 211a is smaller than that of the other refrigerators 211b to 211d for an arbitrary load factor. That is, among the four refrigerators 211a to 211d, the refrigerator 211a has the highest energy efficiency. Moreover, it turns out that efficiency is high in order of refrigerator 211a, 211b, 211c, 211d from the positional relationship of the curve shown in FIG.
  • Electric power unit price information 1022 shown in FIG. 2 is an electric bill when the amount of electric power of 1 kWh is consumed by operating the refrigerator 211a and the like, and is set in advance by a contract with an electric power company. Usually, the electricity charge at night is low, and the electricity charge during the day is high (see FIG. 5B).
  • the operation result information 1023 shown in FIG. 2 is information indicating past operation results related to the refrigerators 211a to 211d. Specifically, the operation result information 1023 includes the past date and time when the refrigerators 211a to 211d are operated, the temperature / humidity of that day (for example, every hour), and the amount of cold consumed at the demand facility F. It is.
  • the operation plan 1024 is an operation plan created by an operation plan creation unit 1033 described later. This operation plan is sequentially changed by the operation plan changing unit 1035 during the operation of the heat source system 200. The creation / change of the operation plan will be described later.
  • the arithmetic processing unit 103 has a function of performing various arithmetic processes.
  • the arithmetic processing unit 103 includes a heat demand prediction unit 1031, a heat demand prediction upper limit value calculation unit 1032, an operation plan creation unit 1033, a surplus heat storage amount calculation unit 1034, and an operation plan change unit 1035.
  • the heat demand prediction unit 1031 predicts the heat load (cooling load) of the demand facility F based on the weather forecast acquired via the input unit 101 and the past operation result information 1023. Such processing is performed every time the weather forecast is distributed. In the present embodiment, as an example, a case where the heat demand for the day is predicted once a day at midnight will be described.
  • the heat demand prediction unit 1031 extracts, for example, a plurality of past heat demands included in the operation result information 1023 in which the temperature / humidity is similar to the temperature / temperature / humidity predicted by the weather forecast. And the heat demand prediction part 1031 estimates the heat demand of the next day by taking the average value of the extracted past heat demand.
  • the method for predicting heat demand is not limited to this.
  • the heat demand is calculated based on past weather forecasts, the set temperature of the indoor unit (heat load device 222), the structure of the housing constituting the demand facility F, and the like. May be.
  • a device (not shown) for predicting the heat demand may be provided, and the heat demand may be captured from the device via the input unit 101.
  • the heat demand prediction upper limit calculation unit 1032 calculates a heat demand prediction upper limit value by adding a predetermined prediction error to the heat demand prediction value calculated by the heat demand prediction unit 1031.
  • the “prediction error” is an error between the heat demand predicted by the heat demand prediction unit 1031 and the amount of cold energy actually consumed at the demand facility F.
  • the value of the prediction error (for example, 10% of the predicted value of heat demand) is set in advance based on the comparison between the past heat demand predicted value included in the operation result information 1023 and the operation result.
  • the prediction error is set so that the actual heat demand does not exceed the heat demand prediction upper limit even when the temperature becomes higher than that predicted by the weather forecast.
  • the predicted value of heat demand becomes a different value at each time of the period to be predicted (see the broken line in FIG. 5A)
  • the heat demand prediction upper limit obtained by adding a predetermined prediction error to this predicted value is also different at each time (see the solid line in FIG. 5B).
  • the operation plan creation unit 1033 shown in FIG. 2 creates an operation plan for the heat source system 200 so that the heat at the heat demand prediction upper limit value described above is supplied to the demand facility F. That is, the operation plan creation unit 1033 creates an operation plan so that cold energy larger than the predicted value of heat demand can be supplied to the demand facility F with a predetermined margin (prediction error).
  • the above-described operation plan includes information for specifying the operation mode (heat storage operation, heat radiation operation) of the heat source system 200, the time zone in which the operation mode is executed, and the primary side units A to D that are operated / stopped. And are included.
  • the “heat storage operation” is an operation mode in which cold water is given to the cold water by the refrigerator 211a or the like and the cold heat is stored in the heat storage tank 213.
  • the “heat radiation operation” is an operation mode in which the cold energy stored in the heat storage tank 213 is radiated to the demand facility F.
  • the surplus heat storage amount calculation unit 1034 shown in FIG. 2 calculates the surplus heat storage amount by subtracting the amount of cold energy consumed at the demand facility F from the above-described heat demand prediction upper limit value during the heat radiation operation performed according to the operation plan. .
  • the amount of cold consumed at the demand facility F during the heat radiation operation is usually smaller than the heat demand prediction upper limit value, so that the amount of cold is left. This extra cold is the surplus heat storage amount.
  • the surplus heat storage amount calculation unit 1034 repeats the process of calculating the surplus heat storage amount at a predetermined cycle (for example, every hour) during the heat radiation operation.
  • the operation plan change unit 1035 sequentially changes the operation plan by reducing the future operation rate of the refrigerator 211a and the like so as to cancel the above-described surplus heat storage amount. The processing executed by the operation plan change unit 1035 will be described later.
  • the output unit 104 outputs a control command based on the operation plan created by the operation plan creation unit 1033 and the operation plan changed by the operation plan change unit 1035 to each device of the heat source system 200.
  • the display control unit 105 causes the display device 300 to display driving performance information, a driving plan, and the like according to an operation via a mouse or a keyboard.
  • FIG. 4 is a flowchart illustrating processing executed by the heat source system management apparatus 100. Note that the time of “START” shown in FIG. 4 is, for example, midnight, and it is assumed that weather forecasts for 24 hours (every hour) on that day have been distributed.
  • the heat source system management apparatus 100 predicts the heat demand of the day by the heat demand prediction unit 1031. For example, the heat source system management apparatus 100 predicts the heat demand every hour of the day for 24 hours.
  • FIG. 5A is an explanatory diagram regarding an operation plan of the heat source system 200.
  • 0:00 (“START” in FIG. 4) shown in FIG. 5A is the current time.
  • the horizontal axis of Fig.5 (a) is each time of the day, and a vertical axis
  • shaft is the amount of cold heat.
  • the lower side of the straight line U shown in FIG. 5A is the amount of cold energy stored in the heat storage tank 213 by the heat storage operation.
  • the upper side of the straight line U is the amount of cold generated by the refrigerator 211a or the like, or the amount of cold released from the heat storage tank 213 to the demand facility F.
  • FIG. 5A is an explanatory diagram regarding an operation plan of the heat source system 200.
  • 0:00 (“START” in FIG. 4) shown in FIG. 5A is the current time.
  • the horizontal axis of Fig.5 (a) is each time of the day, and a vertical axis
  • shaft is the amount of cold heat.
  • a plurality of rectangular areas shown in FIG. 5A represent the amount of cold generated by the refrigerators 211a to 211d in a predetermined time zone.
  • the first stage above the straight line U is the amount of cold generated by the refrigerator 211a
  • the second, third and fourth stages are the amount of cold generated by the refrigerators 211b, 211c and 211d.
  • the area of the rectangular area indicated by the symbol W1 represents the amount of cold generated by the refrigerator 211a from 2 o'clock to 3 o'clock.
  • the heat source system management apparatus 100 calculates the heat demand prediction upper limit at each time (every hour) by the heat demand prediction upper limit calculation unit 1032 (heat demand prediction upper limit calculation step). That is, the heat source system management apparatus 100 adds a predetermined prediction error (for example, 10% of the predicted value of heat demand: see FIG. 5A) to the predicted value of heat demand obtained in step S101. Calculate the prediction upper limit.
  • a predetermined prediction error for example, 10% of the predicted value of heat demand: see FIG. 5A
  • the continuous line shown to Fig.5 (a) has shown transition of the heat demand prediction upper limit in each time.
  • the heat source system management apparatus 100 creates an operation plan for the day of the heat source system 200 by the operation plan creation unit 1033 (operation plan creation step).
  • the heat source system management apparatus 100 divides a period (one day) that is an object of an operation plan into a plurality of time zones (every hour), and generates cold heat generation costs (generation per unit heat amount) in each time zone. Cost) is calculated for each of the refrigerators 211a to 211d.
  • the heat source system management apparatus 100 creates an operation plan so that a refrigerator having a low cold generation cost is preferentially operated.
  • FIG.5 (b) is explanatory drawing which shows the power unit price of each time slot
  • the power unit price at night (from 18:00 to 7:00 the next morning) is lower than in the daytime.
  • An operation plan is created so that heat storage operation is performed using this inexpensive nighttime electric power and heat radiation operation is performed in the daytime.
  • the heat source system management apparatus 100 assumes that the refrigerators 211a to 211d are operated at the rated load at night (until 7 o'clock) when the unit price of electricity is low, and the generation cost of cold heat for each time zone for each of the refrigerators 211a to 211d. Is calculated.
  • the cost of generating cold is calculated by multiplying the amount of power consumed (see the vertical axis in FIG. 3) by the unit price of electric power (see FIG. 5B) when the refrigerator 211a and the like are rated, and dividing by the amount of generated heat. Is required.
  • the refrigerator 211a since the refrigerator 211a has the highest energy efficiency (see FIG. 3), the refrigerator 211a has the lowest cost of generating cold heat in each time zone. Similarly, according to the energy consumption characteristics shown in FIG. 3, the cost of generating cold heat increases in the order of the refrigerators 211a, 211b, 211c, and 211d.
  • the operation plan shown in FIG. 5 (a) only the refrigerators 211a and 211b are placed between 1 o'clock and 7 o'clock so that a predetermined amount of cold energy is stored in the heat storage tank 213 (for example, close to full storage).
  • the area of the shaded portion described below the straight line U represents the amount of cold heat stored in the heat storage tank 213.
  • the heat source system management apparatus 100 does not use the cold energy stored in the heat storage tank 213, and the amount of cold heat generated when the refrigerators 211a to 211d are operated based on the above-described heat demand prediction upper limit value. Is calculated. Then, the heat source system management apparatus 100 creates an operation plan so as to operate preferentially from the refrigerator 211a or the like with a low cold heat generation cost.
  • an operation plan is created so that only the refrigerator 211a with the lowest cold heat generation cost is rated.
  • an operation plan is created so that all the refrigerators 211a to 211d are rated.
  • the amount of cold P1 shown in FIG. 5 (a) is the amount of cold generated per unit time when all the refrigerators 211a to 211d are rated.
  • the heat demand prediction upper limit value exceeds the cold energy amount P1 from around 9:00 to around 17:00.
  • This insufficient amount of cold heat (hereinafter referred to as insufficient amount of cold heat) is obtained by subtracting the amount of cold heat generated by the refrigerator 211a or the like during the heat radiation operation from the value obtained by integrating the heat demand prediction upper limit value with time. Desired.
  • the amount of cold heat (the area surrounded by the straight line of the cold heat amount P1 and the curve of the heat demand prediction upper limit value) is the amount of cold heat (straight line U) stored in the heat storage tank 213. Smaller than the shaded area on the lower side). That is, when the refrigerator 211a and the like are operated as much as possible based on the heat demand prediction upper limit value, the cold energy is left.
  • the operation plan is created so as to cancel out the remaining cold heat by temporarily stopping the refrigerator 211d and the like.
  • the heat source system management apparatus 100 calculates the generation cost of the cold heat when performing the heat radiation operation for the refrigerators 211a to 211d.
  • the heat source system management device 100 sets each time zone scheduled to perform the heat radiation operation (in FIG. 5A, a time zone in which 7:00 to 21:00 are divided every hour) and a refrigeration operating in that time zone. As for the combination with the machine, order from the one with the highest cooling cost.
  • the power unit price from 11:00 to 13:00 is higher than in other time zones. If the refrigerator 211d is operated from 11:00 to 13:00, the power cost is increased. Therefore, it is desirable to stop the refrigerator 211d during this time period.
  • the combination of the time zone from 11:00 to 12:00 and the refrigerator 211d is given rank 1, and the combination of the time zone from 12:00 to 13:00 and the refrigerator 211d.
  • a rule is set such that the higher the time zone, the higher the order.
  • the heat source system management apparatus 100 assigns, for example, ranks 1 to 8 with respect to combinations of time zones and refrigerators (see the numbers in the rectangles in FIG. 5A). As described above, when selecting the refrigerator to be stopped during the heat radiation operation, the heat source system management apparatus 100 creates an operation plan so as to preferentially stop the one having a large cold heat generation cost.
  • the heat storage tank 213 is loaded when there is a heat demand of the heat demand prediction upper limit value. It is predicted that the stored cold energy can be used up within the day.
  • the amount of cold stored in the heat storage tank 213 by the heat storage operation (area of the shaded portion below the straight line U) and the amount of cold supplied to the demand facility F by the heat radiation operation (area of the shaded portion above the straight line U) And are equal.
  • the ranks 5 to 8 shown in FIG. 5A are used when changing the operation plan (S109: see FIG. 4) described later.
  • FIG.5 (c) is explanatory drawing which shows the predicted value of heat storage residual amount. As shown by the broken line in FIG. 5 (c), the remaining amount of heat stored in the heat storage tank 213 increases during 1 to 7 o'clock when the heat storage operation is performed, and after gently decreasing due to the subsequent heat release, at the end of the heat release operation ( 17:00) is expected to be zero.
  • step S104 the heat source system management apparatus 100 executes the heat storage operation based on the operation plan created in step S103. As shown in FIG. 6 (b), the heat source system management apparatus 100 operates the refrigerators 211a and 211b and the primary side cold water pumps 212a and 212b at night (1 to 7 o'clock) when the unit price of electricity is low to store heat. Run the operation.
  • FIG. 6C is an explanatory diagram showing a predicted value of the remaining heat storage amount and an actual measurement value of the remaining heat storage amount. As shown by the solid line in FIG. 6 (c), the measured value of the heat storage remaining amount in the heat storage tank 213 increases as the operation plan.
  • the temperature interface S (see FIG. 1) between cold water having a relatively low temperature (for example, 5 ° C.) and cold water having a relatively high temperature (for example, 12 ° C.) gradually increases.
  • the amount of cold Q 1 per unit time supplied from the refrigerator 211a or the like to the heat storage tank 213 and the amount of cold Q 2 per unit time supplied from the heat storage tank 213 to the demand facility F are shown below (Formula 1) ) And (Expression 2).
  • ⁇ w [kg / m 3 ] is the density of cold water
  • C Pw [J / (kg ⁇ ° C.)] is the specific heat of cold water.
  • T s [° C.] is the water supply temperature of the cold water (detection value of the temperature detector T1)
  • T r [° C.] is the return temperature of the cold water (detection value of the temperature detector T2).
  • W 1 [m 3 / s] is the primary flow rate (the total value of the water flow rate from the refrigerator 211a), and W 2 [m 3 / s] is the secondary flow rate (from the heat storage tank 213 to the demand facility).
  • step S105 of FIG. 4 the heat source system management apparatus 100 determines whether or not the end time of the heat storage operation (for example, 7:00: see FIG. 6A) has been reached. When it is the end time of the heat storage operation (S105: Yes), the processing of the heat source system management apparatus 100 proceeds to step S106. When it is not the end time of the heat storage operation (S105: No), the processing of the heat source system management apparatus 100 returns to step S104.
  • the end time of the heat storage operation for example, 7:00: see FIG. 6A
  • step S106 the heat source system management apparatus 100 performs a heat radiation operation based on the operation plan created in step S103.
  • the heat source system management apparatus 100 operates the refrigerator 211a, the primary side cold water pump 212a, and the secondary side cold water pump 221 from 7:00 to 8:00 (see FIG. 6A).
  • the cold water cooled by the refrigerator 211 a is supplied to the lower part of the heat storage tank 213, and the same amount of cold water is supplied from the heat storage tank 213 to the demand facility F.
  • the cold water heated up by the heat consumption in the demand facility F is returned to the upper part of the heat storage tank 213 through the pipe h5 and is cooled again by the refrigerator 211a or the like.
  • step S107 the heat source system management apparatus 100 determines whether or not a predetermined time ⁇ t1 has elapsed since the start of the heat radiation operation (or the change of the previous operation plan).
  • the predetermined time ⁇ t1 is a cycle for changing the operation plan (S109). In the present embodiment, the predetermined time ⁇ t1 is 1 hour.
  • step S107 When the predetermined time ⁇ t1 has elapsed since the start of the heat radiation operation (S107: Yes), the processing of the heat source system management apparatus 100 proceeds to step S108. When the predetermined time ⁇ t1 has not elapsed since the start of the heat radiation operation (S107: No), the heat source system management apparatus 100 repeats the process of step S107.
  • FIG. 6 (a) is an explanatory diagram showing the transition of the amount of cold energy consumed in the demand facility F during the heat radiation operation.
  • the current time is 10 o'clock, and until 10 o'clock is the “driving record” and after 10 o'clock is the “driving plan”.
  • the thick line shown to Fig.6 (a) represents transition of the amount of cold energy per unit time actually consumed in the demand facility F.
  • the heat source system management apparatus 100 calculates the surplus heat storage amount by the surplus heat storage amount calculation unit 1034 (excess heat storage amount calculation step). As shown in FIG. 6A, when the current time is 10:00, the heat source system management apparatus 100 subtracts the amount of cold energy consumed at the demand facility F from the heat demand prediction upper limit value from 9:00 to 10:00. Thus, the surplus heat storage amount (area of the hatched portion J1) is calculated. Note that the amount of cold energy consumed in the demand facility F is calculated based on the above-described (Equation 3).
  • step S109 the heat source system management apparatus 100 changes the operation plan by the operation plan change unit 1035 (operation plan change step). For example, in the time zone from 9:00 to 10:00 shown in FIG. 6A, the surplus heat storage amount obtained by subtracting the amount of cold consumed at the demand facility F from the upper limit value of the heat demand prediction is left in the heat storage tank 213. (S109: Yes). That is, more cold heat than the remaining amount of cold heat at 10 o'clock predicted in the initial operation plan is stored in the heat storage tank 213 (see FIG. 6C). The heat source system management apparatus 100 reduces the number of operating units in the future such as the refrigerator 211a so as to cancel out this surplus heat storage amount (reduces the operating rate).
  • the heat source system management apparatus 100 changes the operation plan so that a refrigerator having a high cold generation cost is preferentially stopped.
  • the energy consumption characteristic of a refrigerator changes with external temperature and humidity, when changing an operation plan, you may determine again the order
  • the heat source system management apparatus 100 changes the operation plan so that the refrigerator 211c is operated at a partial load from 11:00 to 12:00 based on the order 5. That is, the heat source system management apparatus 100 moves the surplus heat storage amount of the shaded portion J1 shown in FIG. 6A to the shaded portion J2 to reduce the load factor of the refrigerator 211c.
  • the load factor of the refrigerator 211c from 11:00 to 12:00 is set such that cold energy is generated by subtracting the excess heat storage amount from the cold heat amount generated during rated operation.
  • the operation plan is changed so that the refrigerator 211c is operated at a partial load from 11:00 to 12:00 (see FIG. 6).
  • the rating of the refrigerators 211a, 211b, and 211c is changed. You may change into the driving
  • the heat source system management apparatus 100 supplies the demand facility F with the cold energy at the upper limit of the heat demand prediction with a margin, and supplies the remaining cold energy that cannot be consumed at the demand facility F to the future refrigerator 211d and the like.
  • the operation plan is sequentially changed so as to be assigned to the stop (or operation with partial load). Therefore, even if there is a heat demand that exceeds the predicted value of the heat demand, the cold energy in the heat storage tank 213 will not be insufficient. Further, the heat source system management apparatus 100 sequentially changes the operation plan so as to preferentially stop the refrigerator 211d and the like having a low cold heat generation cost based on the above ranks 1 to 8. Therefore, the cost required for the operation of the refrigerator 211d and the like can be minimized.
  • the amount of cold energy actually consumed at the demand facility F becomes the heat demand prediction upper limit value. It is almost equal. In this way, when the surplus heat storage amount is very small, the operation plan may not be changed at 8:00.
  • step S110 of FIG. 4 the heat source system management apparatus 100 executes the changed operation plan.
  • the operation plan from 11:00 to 12:00 is changed when the current time is 10:00. Therefore, only the refrigerator 211d is stopped as originally scheduled from 10:00 to 11:00, and the operation plan changed twice at 10:00 to 11:00 is executed from 11:00 to 12:00 (for example, the refrigerator 211c, 211d is stopped).
  • step S111 of FIG. 4 the heat source system management apparatus 100 determines whether or not the end time of the heat radiation operation (for example, 24:00) has been reached.
  • the end time of the heat radiation operation is reached (S111: Yes)
  • the heat source system management apparatus 100 ends the process (END).
  • the processing of the heat source system management device 100 returns to step S106.
  • steps S106 to S111 is repeatedly executed every hour, for example.
  • the operation plan is changed (S109)
  • the number of operating units of the future refrigerator 211d and the like is changed so as to cancel the surplus heat storage amount.
  • the cold energy stored in the heat storage tank 213 is consumed, and the height of the temperature interface S (see FIG. 1) gradually decreases.
  • the remaining heat storage capacity of the heat storage tank 213 becomes substantially zero. Become. This is because an initial operation plan is made so that the cold in the heat storage tank 213 is used up (see FIG. 6A), and the surplus heat storage amount is allocated to a future stop such as the refrigerator 211d. .
  • an operation plan is created based on the heat demand prediction upper limit value that is larger than the heat demand prediction value. Then, the cold energy more than the predicted value of the heat demand is supplied to the heat storage tank 213, the cold heat actually consumed in the demand facility F is supplied from the heat storage tank 213 to the demand facility F, and the remaining cold heat is stored in the heat storage tank 213. Stored in Therefore, for example, even when the actual heat demand exceeds the predicted value, if the heat demand is lower than the predicted upper limit value, the cold energy will not be insufficient.
  • the surplus heat storage amount that is not consumed in the demand facility F is allocated to a future stop (or reduction in load factor) of the refrigerator 211d and the like. Therefore, the heat storage remaining amount of the heat storage tank 213 can be made substantially zero at the end of the heat radiation operation. That is, since the cold energy stored in the heat storage tank 213 can be used up and down within the same day, the heat radiation loss in the heat storage tank 213 can be suppressed.
  • the heat source system management apparatus 100 preferentially operates the refrigerator 211a and the like having a low cold generation cost and preferentially stops the refrigerator 211d and the like having a high cold generation cost. Thereby, energy saving of the heat source system 200 can be achieved, and the power cost can be minimized.
  • the heat source system management apparatus 100 has been described above by the embodiments. However, the present invention is not limited to these descriptions, and various modifications can be made. For example, when the heat source system management apparatus 100 changes the operation plan by the operation plan change unit 1035 (S109: see FIG. 4), the heat storage remaining amount in the heat storage tank 213 is frozen so as not to fall below the “heat storage remaining amount lower limit value”. The operating number of the machine 211a and the like may be adjusted.
  • the above-mentioned “heat storage remaining amount lower limit value” is a lower limit value of the heat storage remaining amount for enabling the heat of the heat demand prediction upper limit value to be supplied to the demand facility F, and varies with time. Specifically, after the current time (for example, 10 o'clock), the amount of cold corresponding to the area surrounded by the curve of the heat demand prediction upper limit value shown in FIG. “Lower limit value”. As described above, by storing cold heat equal to or higher than the “heat storage remaining amount lower limit value” in the heat storage tank 213, it is possible to reliably prevent the cold heat in the heat storage tank 213 from being insufficient.
  • a “heat dissipation loss calculation unit” that calculates the heat dissipation loss in the heat storage tank 213 may be added.
  • This heat dissipation loss is calculated based on the outside air temperature and the temperature distribution of cold water stored in the heat storage tank 213.
  • the heat dissipation loss Q L [W] per unit time from the heat storage tank 213 to the outside air is expressed by the following (Formula 4).
  • S [ ⁇ ] is a heat storage rate (heat storage amount / maximum heat storage capacity)
  • h [W / (m 2 ⁇ ° C.)] is a heat transfer rate from the heat storage tank 213 to the outside air
  • T O [° C.
  • T C [° C.] is the temperature of the low-temperature cold water stored in the heat storage tank 213
  • T H [° C.] is the temperature of the relatively high-temperature cold water stored in the heat storage tank 213.
  • a c [m 2 ] is a surface area of a portion of the heat storage tank 213 filled with low-temperature cold water
  • a H [m 2 ] is a surface area of a portion of the heat storage tank 213 filled with relatively high-temperature cold water. is there.
  • the operation plan making unit 1033 heat obtained by adding the heat radiation loss Q L to heat demand prediction limit to the operating schedule as generated by a refrigerator 211a, etc. (S103: see FIG. 4).
  • the heat storage remaining amount of the heat storage tank 213 can be calculated accurately, and the cold energy stored in the heat storage tank 213 can be used up within the day without excess or deficiency.
  • the heat source system management apparatus 100 changes the operation plan by reducing the future load factor (operation rate) of the refrigerator so as to cancel the surplus heat storage amount.
  • the present invention is not limited thereto. That is, in order to heat the demand facility F, the heat generated by a heat source device (heat pump, boiler, electric heating device, etc.) may be stored in the heat storage tank 213 and supplied to the demand facility F. In addition, since high temperature water is stored in the upper part of the thermal storage tank 213, it is made to circulate warm water in the direction opposite to the direction demonstrated in embodiment (refer FIG. 1).
  • a heat source device heat pump, boiler, electric heating device, etc.
  • the heat medium is water
  • a heat medium other than water may be used.
  • a cloud computing system in which a plurality of heat source systems 200 installed at each base and the heat source system management apparatus 100 exchange information via a network may be used.
  • the heat source system management apparatus 100 may be applied to an air conditioning control system, and an operation plan may be created and changed based on the heat demand associated with air conditioning in a predetermined area. Further, the heat source system management apparatus 100 may be applied to a heat supply plant control system, and an operation plan may be created / changed based on the heat demand of a plant such as a factory or a power plant.
  • the heat source system management apparatus 100 which is a computer performs a series of processes (refer FIG. 4) with a program
  • the function of each configuration (see FIG. 2) included in the heat source system management apparatus 100 may be realized by hardware by designing with an integrated circuit.
  • information such as programs, tables, and files for realizing each function may be stored in a storage device such as a memory, a hard disk, or an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, or a DVD. Good.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Signal Processing (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

熱源システム管理装置は、熱源システムに対する熱需要の予測値に予測誤差を加算して熱需要予測上限値を算出する熱需要予測上限値算出部と、熱需要予測上限値の熱が需要施設に供給されるように熱源システムの運転計画を作成する運転計画作成部と、熱需要予測上限値から、需要施設で消費された熱量を減算して余剰蓄熱量を算出する処理を繰り返す余剰蓄熱量算出部と、余剰蓄熱量を打ち消すように冷凍機の将来の稼働率を小さくして運転計画を逐次変更する運転計画変更部と、を備える。

Description

熱源システム管理装置、熱源システム管理方法、及びプログラム
 本発明は、熱源システムを管理する熱源システム管理装置等に関する。
 近年、地球温暖化の防止が喫緊の課題となっており、COの排出量の削減や省エネ化が求められている。この点に関して製造業ではオイルショックを契機に、製造プロセスの改変、高効率・省エネ機器の導入、燃料転換等による省エネ化が積極的に進められ、エネルギの消費量は略横ばいで推移している。
 一方、住宅・業務部門では、快適さや利便性を求めるライフスタイルが普及するにつれて、エネルギの消費量が年々増加している。今後、より一層の省エネ化を進めるために、ビルや工場等の需要施設に熱エネルギを供給する熱源システムの高効率化が求められている。例えば、熱源システムの高効率化を図るための技術として、以下に示すものが知られている。
 すなわち、特許文献1には、蓄熱槽を介して熱供給を行う熱源機器を運転する際、所定時間後の予測蓄熱量が所定の制限範囲を超えないと予想される間は、現時点の運転状態を継続する熱源機器の運転方法について記載されている。
特開平6-313605号公報
 特許文献1には、熱源機器の起動/停止回数を少なくするように運転計画を作成する技術については記載されているが、蓄熱槽に蓄えられた冷熱をその日のうちに使い切るための技術については、特に記載されていない。
 例えば、特許文献1に記載の技術において、蓄熱槽に蓄えられた冷熱をその日のうちに使い切るために、熱需要の予測値を過不足なく満たすように運転計画を作成することが考えられる。しかしながら、気象予報の予測値が実際の気温等に完全に一致することは稀である。仮に、気象予報の予測値よりも翌日の気温等が高くなった場合、蓄熱槽に蓄えられた冷熱では、充分な冷熱を負荷側に供給できなくなる可能性がある。
 また、特許文献1に記載の技術において、熱需要の予測値を上回る冷熱を熱源機器で生成し、需要施設に余裕を持って冷熱を供給することも考えられる。しかしながら、実際の気温等が気象予報の予測値以下になった場合、熱源機器で生成した冷熱の一部が無駄になり、システム全体のエネルギ効率が大幅に低下してしまう。
 そこで、本発明は、熱源システムのエネルギ効率を高くする熱源システム管理装置等を提供することを課題とする。
 前記した課題を解決するために、本発明に係る熱源システム管理装置は、一つ又は複数の熱源機と、前記熱源機で生成される冷熱又は温熱を蓄える蓄熱槽と、を備える熱源システムに対する熱需要の予測値に、所定の予測誤差を加算することによって熱需要予測上限値を算出する熱需要予測上限値算出部と、前記熱需要予測上限値の熱が前記熱源システムの負荷側に供給されるように、前記熱源システムの運転計画を作成する運転計画作成部と、前記運転計画に従って前記蓄熱槽から前記負荷側に放熱する放熱運転中、前記熱需要予測上限値から、前記負荷側で消費された熱量を減算することによって余剰蓄熱量を算出する処理を繰り返す余剰蓄熱量算出部と、前記余剰蓄熱量を打ち消すように、前記熱源機の将来の稼働率を小さくして前記運転計画を逐次変更する運転計画変更部と、を備えることを特徴とする。
 本発明によれば、熱源システムのエネルギ効率を高くする熱源システム管理装置等を提供できる。
本発明の一実施形態に係る熱源システム管理装置を含む構成図である。 熱源システム管理装置の機能ブロック図である。 4台の冷凍機のエネルギ消費特性を示す説明図である。 熱源システム管理装置が実行する処理を示すフローチャートである。 (a)は熱源システムの運転計画に関する説明図であり、(b)は各時間帯の電力単価を示す説明図であり、(c)は蓄熱残量の予測値を示す説明図である。 (a)は放熱運転中に需要施設で消費された冷熱量の推移を示す説明図であり、(b)は各時間帯の電力単価を示す説明図であり、(c)は蓄熱残量の予測値及び蓄熱残量の実測値を示す説明図である。
≪実施形態≫
 図1は、本実施形態に係る熱源システム管理装置100を含む構成図である。なお、図1に示す実線矢印は各配管を流れる冷水の向きを表し、破線矢印は信号線を表している。以下では、熱源システム管理装置100の管理対象である熱源システム200について説明した後、熱源システム管理装置100について詳細に説明する。
<熱源システムの構成>
 熱源システム200は、冷凍機211a等によって「熱媒体」である水に冷熱を与え、この冷熱を、蓄熱槽213を介して需要施設F(ビル、工場等)に供給するシステムである。熱源システム200は、冷熱を生成して蓄熱槽213に蓄える一次側システム210と、蓄熱槽213に蓄えられた冷熱を消費する二次側システム220と、を備えている。
(一次側システム)
 一次側システム210は、4つの一次側ユニットA,B,C,Dと、蓄熱槽213と、を備えている。
 一次側ユニットAは、冷凍機211a(熱源機)と、一次側冷水ポンプ212aと、を備えている。冷凍機211aは、例えば、ターボ冷凍機であり、配管h1を介して流入する冷水に冷熱を与える冷熱源である。一次側冷水ポンプ212aは、蓄熱槽213から冷凍機211aに向けて冷水を圧送するポンプであり、冷凍機211aよりも上流側に設置されている。
 他の一次側ユニットB,C,Dも、前記した一次側ユニットAと同様の構成を備えている。なお、冷凍機211a~211dは、それぞれ異なる特性(例えば、後記する消費電力特性:図3参照)を有していてもよいし、同一の特性を有していてもよい。
 図1に示すように、4つの一次側ユニットA~Dは並列に接続されている。一次側ユニットA~Dの上流側は、配管h2を介して蓄熱槽213の上部に接続されている。一次側ユニットA~D下流側は、配管h3を介して蓄熱槽213の下部に接続されている。そして、蓄熱槽213の上部から配管h2を介して圧送された冷水が冷凍機211a等で冷やされ、冷やされた冷水が配管h3を介して蓄熱槽213の下部に流入するようになっている。
 なお、一次側ユニットA~Dは、それぞれ個別に稼働させることが可能である。例えば、後記する運転計画に基づいて一次側ユニットAのみが稼働される場合もあり、また、一次側ユニットA~Dの全てが稼働される場合もある。
 蓄熱槽213は、例えば、温度成層型蓄熱槽であり、冷凍機211a等で冷やされた冷水を貯留することで冷熱を蓄えるものである。ちなみに、冷水は低温であるほど密度が大きく沈降しやすい。したがって、蓄熱槽213に貯留されている冷水は、鉛直方向において温度勾配があり、下方に向かうにつれて低温になっている。図1では、比較的高温(例えば、12℃)の冷水と、この冷水の下側に沈降している比較的低温(例えば、5℃)の冷水と、の温度界面Sを図示している。
(二次側システム)
 二次側システム220は、二次側冷水ポンプ221と、熱負荷装置222(負荷)と、を備えている。
 二次側冷水ポンプ221は、蓄熱槽213から熱負荷装置222に向けて冷水を圧送するポンプであり、熱負荷装置222よりも上流側の配管h4に設置されている。
 熱負荷装置222は、例えば、需要施設Fの室内空気を冷やすための熱交換器であり、需要施設Fに設置されている。熱負荷装置222の伝熱管rを介して低温の冷水と室内空気とが熱交換することで、蓄熱槽213から供給される冷熱が消費される。
 図1に示すように、伝熱管rの上流側は、配管h4を介して蓄熱槽213の下部に接続されている。伝熱管rの下流側は、配管h5を介して蓄熱槽213の上部に接続されている。そして、蓄熱槽213の下部から配管h4を介して圧送された冷水が、伝熱管rにおいて室内空気と熱交換し、熱交換によって昇温した冷水が配管h5を介して蓄熱槽213の上部に流入するようになっている。
 なお、冷凍機211a~211d、一次側冷水ポンプ212a~212d、及び二次側冷水ポンプ221は、後記する熱源システム管理装置100によって作成(又は変更)される運転計画に従って稼働する。
(温度検出器・流量検出器)
 温度検出器T1は、冷凍機211a等で冷やされた冷水の温度を検出するセンサであり、配管h3に設置されている。温度検出器T2は、熱負荷装置222での熱交換によって昇温した冷水の温度を検出するセンサであり、配管h5に設置されている。温度検出器T1,T2の検出値は、熱源システム管理装置100に入力される。
 流量検出器Q1は、冷凍機211a等で冷やされた冷水の流量を検出するセンサであり、配管h3に設置されている。流量検出器Q2は、熱負荷装置222での熱交換によって昇温した冷水の流量を検出するセンサであり、配管h5に設置されている。流量検出器Q1,Q2の検出値は、熱源システム管理装置100に入力される
<熱源システム管理装置の構成>
 図2は、熱源システム管理装置100の機能ブロック図である。
 熱源システム管理装置100は、気象予報に基づいて熱源システム200の運転計画を作成し、この運転計画に基づく制御指令を冷凍機211a~211d、一次側冷水ポンプ212a~212d、及び二次側冷水ポンプ221に出力する装置である。また、熱源システム管理装置100は、温度検出器T1,T2及び流量検出器Q1,Q2の検出値に基づいて運転計画を逐次変更する機能も有している。
 熱源システム管理装置100は、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)、各種インタフェースなどの電子回路を含んで構成され、ROMに記憶されたプログラムを読み出してRAMに展開し、CPUが各種処理を実行するようになっている。
 図2に示すように、熱源システム管理装置100は、入力部101と、記憶部102と、演算処理部103と、出力部104と、表示制御部105と、を備えている。
 入力部101は、気象予報、温度検出器T1,T2の検出値、流量検出器Q1,Q2の検出値等が入力された場合、これらの情報を演算処理部103に出力する機能を有している。前記した気象予報には、気温予測値と、湿度予測値と、が含まれている。例えば、1時間毎の気温・湿度を24時間ぶん予測した気象予報が、定期的に(例えば、6時間毎に)熱源システム管理装置100に配信される。
 記憶部102には、エネルギ消費特性情報1021、電力単価情報1022、運転実績情報1023、及び運転計画1024を含む情報が格納されている。なお、記憶部102として、磁気ディスク装置、光ディスク装置、半導体記憶装置等を用いることができる。
 エネルギ消費特性情報1021は、冷凍機211a~211d(図1参照)の負荷率と、消費電力と、の関係を示すエネルギ消費特性に関する情報である。例えば、冷凍機211aの「負荷率」とは、冷凍機211aの定格運転時の冷凍能力(冷熱量)に対して、冷凍機211aで生成する冷熱量が占める割合である。
 図3は、冷凍機211a~211dのエネルギ消費特性を示す説明図である。図3に示すように、冷凍機211a等のエネルギ消費特性は、下に凸の曲線状を呈しており、負荷率が大きくにつれて冷凍機211a等の消費電力が大きくなっている。このようなエネルギ消費特性は、事前の実験やシミュレーションによって取得され、例えば、所定の関数として予め記憶部102(図2参照)に格納されている。
 なお、冷凍機211a等のエネルギ消費特性は、冷凍機211a等に供給される冷却水の温度によって変化する。また、冷却水の温度は外気温度や湿度に影響されるため、冷凍機211a等のエネルギ消費特性は、外気温度や湿度によって変化する。
 図3に示すように、任意の負荷率に関して、冷凍機211aの消費電力は他の冷凍機211b~211dよりも小さくなっている。つまり、4台の冷凍機211a~211dのうち冷凍機211aが最もエネルギ効率が高い。また、図3に示す曲線の位置関係から、冷凍機211a,211b,211c,211dの順に効率が高いことが分かる。
 また、例えば、冷凍機211aに着目すると、負荷率が大きくなるほど、負荷率の変化に対する消費電力の変化(勾配)が大きくなっている。つまり、負荷率が大きいほど冷凍機211aのエネルギ効率が高くなり、また、定格運転時(負荷率=1)に最もエネルギ効率が高くなることが分かる。なお、他の冷凍機211b~211dについても同様である。したがって、本実施形態では、基本的に冷凍機211a等を定格運転し、部分負荷での運転は必要に応じて適宜行うようにしている。
 図2に示す電力単価情報1022は、冷凍機211a等を稼働することで1kWhの電力量を消費したときの電気料金であり、電力会社との契約によって予め設定されている。通常、夜間の電気料金は安価であり、昼間の電気料金は高くなっている(図5(b)参照)。
 図2に示す運転実績情報1023は、冷凍機211a~211dに関する過去の運転実績を示す情報である。具体的に説明すると、運転実績情報1023には、冷凍機211a~211dを稼働した過去の日時、その日(例えば、1時間毎)の気温・湿度、及び需要施設Fで消費された冷熱量が含まれる。
 運転計画1024は、後記する運転計画作成部1033によって作成された運転計画である。この運転計画は、熱源システム200の運転中に運転計画変更部1035によって逐次変更される。なお、運転計画の作成・変更については、後記する。
 演算処理部103は、各種の演算処理を行う機能を有している。演算処理部103は、熱需要予測部1031と、熱需要予測上限値算出部1032と、運転計画作成部1033と、余剰蓄熱量算出部1034と、運転計画変更部1035と、を備えている。
 熱需要予測部1031は、入力部101を介して取得された気象予報と、過去の運転実績情報1023と、に基づいて、需要施設Fの熱負荷(冷房負荷)を予測する。このような処理は気象予報が配信されるたびに行われるが、本実施形態では一例として、一日に一回、午前0時にその日の熱需要を予測する場合について説明する。
 熱需要予測部1031は、例えば、運転実績情報1023に含まれる過去の熱需要のうち、気温・湿度等が、気象予報で予測された気温・温湿等と似通っているものを複数抽出する。そして、熱需要予測部1031は、抽出した過去の熱需要の平均値をとることで、翌日の熱需要を予測する。
 なお、熱需要の予測方法はこれに限定されず、例えば、過去の気象予報、室内機(熱負荷装置222)の設定温度、需要施設Fを構成する躯体の構造等に基づいて熱需要を算出してもよい。また、熱源システム管理装置100とは別に、熱需要を予測する装置(図示せず)を設けて、この装置から入力部101を介して熱需要を取り込むようにしてもよい。
 熱需要予測上限値算出部1032は、熱需要予測部1031によって算出された熱需要の予測値に、所定の予測誤差を加算することによって熱需要予測上限値を算出する。なお、「予測誤差」とは、熱需要予測部1031によって予測される熱需要と、需要施設Fで実際に消費される冷熱量と、の誤差である。予測誤差の値(例えば、熱需要の予測値の10%)は、運転実績情報1023に含まれる過去の熱需要予測値と運転実績との比較に基づいて予め設定されている。
 なお、予測誤差は、気象予報で予測されていたよりも気温が高くなった場合でも、実際の熱需要が熱需要予測上限値を超えることがないように設定されている。ちなみに、熱需要の予測値は、予測対象となる期間の各時刻で異なる値になるため(図5(a)の破線を参照)、この予測値に所定の予測誤差を加算した熱需要予測上限値も、各時刻で異なる値になる(図5(b)の実線を参照)。
 図2に示す運転計画作成部1033は、前記した熱需要予測上限値の熱が需要施設Fに供給されるように、熱源システム200の運転計画を作成する。つまり、運転計画作成部1033は、所定の余裕(予測誤差)をもって、熱需要の予測値よりも大きな冷熱を需要施設Fに供給できるように運転計画を作成する。
 前記した運転計画には、熱源システム200の運転モード(蓄熱運転、放熱運転)と、その運転モードを実行する時間帯と、一次側ユニットA~Dのうち稼働/停止されるものを特定する情報と、が含まれる。
 なお、「蓄熱運転」とは、冷凍機211a等によって冷水に冷熱を与え、この冷熱を蓄熱槽213に蓄える運転モードである。
 また、「放熱運転」とは、蓄熱槽213に蓄えられた冷熱を需要施設Fに放熱する運転モードである。この「放熱運転」には、冷凍機211a等を稼働しつつ需要施設Fに冷熱を供給する場合(いわゆる追掛運転)と、全ての冷凍機211a~211dを停止した状態で需要施設Fに冷熱を供給する場合と、が含まれる。
 図2に示す余剰蓄熱量算出部1034は、運転計画に従って行われる放熱運転中、前記した熱需要予測上限値から、需要施設Fで消費された冷熱量を減算することによって余剰蓄熱量を算出する。放熱運転時に需要施設Fで消費される冷熱量は、通常、熱需要予測上限値よりも小さいため、その分だけ冷熱が余る。この余った分の冷熱が、余剰蓄熱量である。余剰蓄熱量算出部1034は、放熱運転中、余剰蓄熱量を算出する処理を所定周期で(例えば、1時間毎に)繰り返す。
 運転計画変更部1035は、前記した余剰蓄熱量を打ち消すように、冷凍機211a等の将来の稼働率を小さくして運転計画を逐次変更する。なお、運転計画変更部1035が実行する処理については後記する。
 出力部104は、運転計画作成部1033によって作成された運転計画や、その後に運転計画変更部1035によって変更された運転計画に基づく制御指令を、熱源システム200の各機器に出力する。
 表示制御部105は、マウスやキーボードを介した操作に応じて、運転実績情報や運転計画等を表示装置300に表示させる。
<熱源システム管理装置の動作>
 図4は、熱源システム管理装置100が実行する処理を示すフローチャートである。なお、図4に示す「START」の時刻は、例えば、午前0時であり、その日の24時間分(1時間毎)の気象予報が配信されたものとする。
 ステップS101において熱源システム管理装置100は、熱需要予測部1031によって、その日の熱需要を予測する。例えば、熱源システム管理装置100は、その日の1時間毎の熱需要を24時間ぶん予測する。
 図5(a)は、熱源システム200の運転計画に関する説明図である。図5(a)に示す0時(図4の「START」時)が現在の時刻である。図5(a)の横軸はその日の各時刻であり、縦軸は冷熱量である。なお、図5(a)に示す直線Uの下側は蓄熱運転によって蓄熱槽213に蓄えられる冷熱量である。直線Uの上側は冷凍機211a等で生成される冷熱量、又は蓄熱槽213から需要施設Fに放熱される冷熱量である。
 図5(a)に示す例では、破線(熱需要の予測値)で示すように、熱需要が7時から8時半頃まで急上昇し、8時半頃から15時過ぎまで緩やかに上昇し、15時過ぎから低下すると予測されている。
 なお、図5(a)に示す複数の矩形領域は、所定の時間帯に冷凍機211a~211dで生成される冷熱量を表している。直線Uの上側の1段目は冷凍機211aで生成される冷熱量であり、2,3,4段目は、冷凍機211b,211c,211dで生成される冷熱量である。例えば、符号W1で示す矩形領域の面積は、2時~3時に冷凍機211aで生成される冷熱量を表している。
 図4のステップS102において熱源システム管理装置100は、熱需要予測上限値算出部1032によって、各時刻(1時間毎)における熱需要予測上限値を算出する(熱需要予測上限値算出ステップ)。すなわち、熱源システム管理装置100は、ステップS101で求めた熱需要の予測値に所定の予測誤差(例えば、熱需要の予測値の10%:図5(a)参照)を加算することで熱需要予測上限値を算出する。なお、図5(a)に示す実線は、各時刻における熱需要予測上限値の推移を示している。
 図4のステップS103において熱源システム管理装置100は、運転計画作成部1033によって、熱源システム200のその日の運転計画を作成する(運転計画作成ステップ)。まず、熱源システム管理装置100は、運転計画の対象となる期間(一日分)を複数の時間帯(1時間毎)に分割し、各時間帯での冷熱の生成コスト(単位熱量当たりの生成コスト)を、冷凍機211a~211dのそれぞれについて算出する。そして、熱源システム管理装置100は、冷熱の生成コストの小さい冷凍機を優先的に稼働させるように運転計画を作成する。
 図5(b)は、各時間帯の電力単価を示す説明図である。図5(b)に示す例では、夜間(18時~翌朝の7時)の電力単価は、昼間よりも安くなっている。この安価な夜間電力を用いて蓄熱運転を行い、昼間に放熱運転を行うように運転計画が作成される。
 まず、蓄熱運転の運転計画について説明する。熱源システム管理装置100は、電力単価の安い夜間(7時まで)に冷凍機211a~211dを定格負荷で稼働したと仮定し、冷凍機211a~211dのそれぞれに関して、各時間帯の冷熱の生成コストを算出する。冷熱の生成コストは、冷凍機211a等を定格運転したとき消費電力量(図3の縦軸を参照)に、電力単価(図5(b)参照)を掛け、生成した冷熱量で除算することで求められる。
 前記したように、冷凍機211aのエネルギ効率が最も高いため(図3参照)、各時間帯での冷熱の生成コストは冷凍機211aが最も低くなる。同様に、図3に示すエネルギ消費特性によれば、冷凍機211a,211b,211c,211dの順に冷熱の生成コストが高くなる。
 図5(a)に示す運転計画では、蓄熱槽213に所定量の冷熱が蓄えられるように(例えば、満蓄に近い状態になるように)、1時~7時に冷凍機211a,211bのみが定格運転される。ちなみに、直線Uの下側に記載した網掛部分の面積は、蓄熱槽213に蓄えられる冷熱量を表している。
 次に、放熱運転の運転計画について説明する。まず、熱源システム管理装置100は、蓄熱槽213に蓄えられた冷熱を利用しない場合を仮定し、前記した熱需要予測上限値に基づいて冷凍機211a~211dを稼働したときに生成される冷熱量を算出する。そして、熱源システム管理装置100は、冷熱の生成コストの小さい冷凍機211a等から優先的に稼働するように運転計画を作成する。
 例えば、図5(a)に示す7時~8時では、冷熱の生成コストの最も小さい冷凍機211aのみを定格運転するように運転計画が作成される。また、熱需要が急上昇する8時~9時では、冷凍機211a~211dを全て定格運転するように運転計画が作成される。なお、図5(a)に示す冷熱量P1は、冷凍機211a~211dを全て定格運転した場合において単位時間当たりに生成される冷熱量である。
 図5(a)に示す例では、9時頃~17時頃において、熱需要予測上限値が冷熱量P1を上回っている。この足りない分の冷熱量(以下、不足分の冷熱量という)は、熱需要予測上限値を時間で積分した値から、放熱運転中に冷凍機211a等で生成する冷熱量を減算することで求められる。
 図5(a)に示すように、不足分の冷熱量(冷熱量P1の直線と、熱需要予測上限値の曲線と、によって囲まれる面積)は、蓄熱槽213に蓄えられる冷熱量(直線Uの下側の網掛部分の面積)よりも小さい。つまり、熱需要予測上限値に基づいて冷凍機211a等を可能な限り稼働した場合には、冷熱が余る。この余った分の冷熱を、冷凍機211d等を一時的に停止することで打ち消すように運転計画が作成される。
 次に、放熱運転中に一時的に停止させる冷凍機の優先順位について説明する。
 熱源システム管理装置100は、放熱運転を行う際の冷熱の生成コストを冷凍機211a~211dに関して算出する。そして、熱源システム管理装置100は、放熱運転を行う予定の各時間帯(図5(a)では、7時~21時を1時間毎に分割した時間帯)と、その時間帯に稼働する冷凍機と、の組合せに関して、冷熱コストの高いものから順位付けする。
 例えば、図3に示すように、定格運転(負荷率=1)を行う場合、冷凍機211dは最も効率が低くなっている。また、図5(b)に示すように、11時~13時の電力単価は、他の時間帯と比べて高くなっている。仮に11時~13時に冷凍機211dを稼働すると電力コストの増加を招くため、この時間帯には冷凍機211dを停止させておくことが望ましい。
 したがって、図5(a)に示す例では、11時~12時の時間帯と冷凍機211dとの組合せには順位1が付けられ、12時~13時の時間帯と冷凍機211dとの組合せには順位2が付けられている。ちなみに、各組合せに関して冷熱コストが等しいものが存在する場合、例えば、時間帯が早いものほど高順位にする等の規則が設定されている。
 同様にして、熱源システム管理装置100は、時間帯と冷凍機との組み合わせに関して、例えば、順位1~8を付ける(図5(a)の矩形内の数字を参照)。このように熱源システム管理装置100は、放熱運転中に停止させる冷凍機を選択する際、冷熱の生成コストの大きいものを優先的に停止させるように運転計画を作成する。
 図5(a)に示す例では、順位1~4に対応して冷凍機211dを10時~14時まで停止すれば、熱需要予測上限値の熱需要があった場合において、蓄熱槽213に蓄えられた冷熱をその日のうちに使い切ることができると予測されている。
 なお、蓄熱運転によって蓄熱槽213に蓄えられる冷熱量(直線Uの下側の網掛部分の面積)と、放熱運転によって需要施設Fに供給される冷熱量(直線Uの上側の網掛部分の面積)と、は等しくなっている。また、図5(a)に示す順位5~8は、後記する運転計画の変更(S109:図4参照)を行う際に用いられる。
 図5(c)は、蓄熱残量の予測値を示す説明図である。図5(c)の破線で示すように、蓄熱槽213の蓄熱残量は、蓄熱運転を行う1時~7時において増加し、その後の放熱によってなだらかに減少した後、放熱運転の終了時(17時)にはゼロになると予測されている。
 再び、図4に戻って説明を続ける。
 ステップS104において熱源システム管理装置100は、ステップS103で作成した運転計画に基づいて、蓄熱運転を実行する。図6(b)に示すように、熱源システム管理装置100は、電力単価が安価な夜間(1時~7時)に、冷凍機211a,211b及び一次側冷水ポンプ212a,212bを稼働させて蓄熱運転を実行する。
 図6(c)は、蓄熱残量の予測値及び蓄熱残量の実測値を示す説明図である。図6(c)の実線で示すように、蓄熱槽213の蓄熱残量の実測値は、運転計画どおりに上昇している。蓄熱運転中、比較的低温(例えば、5℃)の冷水と、比較的高温(例えば、12℃)の冷水と、の温度界面S(図1参照)は徐々に上昇する。
 ちなみに、冷凍機211a等から蓄熱槽213に供給される単位時間当たりの冷熱量Q1、蓄熱槽213から需要施設Fに供給される単位時間当たりの冷熱量Q2は、以下に示す(数式1)、(数式2)で表される。ここで、ρw[kg/m3]は冷水の密度であり、CPw[J/(kg・℃)]は冷水の比熱である。また、Ts[℃]は冷水の送水温度(温度検出器T1の検出値)であり、Tr[℃]は冷水の戻り温度(温度検出器T2の検出値)である。また、W1[m3/s]は一次側流量(冷凍機211a等からの送水流量の合計値)であり、W2[m3/s]は二次側流量(蓄熱槽213から需要施設Fへの送水流量)である。
 Q1=ρw・CPw・W1・(T-Ts) ・・・(数式1)
 Q2=ρw・CPw・W2・(T-Ts) ・・・(数式2)
 また、単位時間当たりの蓄熱槽213への蓄熱量QT(冷熱の増加分)と、単位時間当たりの蓄熱槽213からの放熱量(冷熱の減少分)と、は以下に示す(数式3)で表される。
 QT=-QH=Q1-Q2 ・・・(数式3)
 図4のステップS105において熱源システム管理装置100は、蓄熱運転の終了時刻(例えば、7時:図6(a)参照)になったか否かを判定する。蓄熱運転の終了時刻になった場合(S105:Yes)、熱源システム管理装置100の処理はステップS106に進む。蓄熱運転の終了時刻になっていない場合(S105:No)、熱源システム管理装置100の処理はステップS104に戻る。
 ステップS106において熱源システム管理装置100は、ステップS103で作成した運転計画に基づいて放熱運転を実行する。例えば、熱源システム管理装置100は、7時~8時には(図6(a)参照)、冷凍機211a、一次側冷水ポンプ212a、及び二次側冷水ポンプ221を稼働する。そうすると、冷凍機211aで冷やされた冷水が蓄熱槽213の下部に供給され、同量の冷熱量の冷水が蓄熱槽213から需要施設Fに供給される。なお、需要施設Fでの熱消費によって昇温した冷水は、配管h5を介して蓄熱槽213の上部に戻され、冷凍機211a等によって再度冷却される。
 図4のステップS107において熱源システム管理装置100は、放熱運転の開始(又は、前回の運転計画の変更)から所定時間Δt1が経過したか否かを判定する。所定時間Δt1は、運転計画の変更(S109)を行う周期である。本実施形態では、所定時間Δt1を1時間としている。
 放熱運転の開始から所定時間Δt1が経過した場合(S107:Yes)、熱源システム管理装置100の処理はステップS108に進む。放熱運転の開始から所定時間Δt1が経過していない場合(S107:No)、熱源システム管理装置100はステップS107の処理を繰り返す。
 図6(a)は、放熱運転中に需要施設Fで消費された冷熱量の推移を示す説明図である。なお、図6(a)では現在時刻が10時であり、10時までが「運転実績」、10時以後が「運転計画」になっている。また、図6(a)に示す太線は、需要施設Fで実際に消費された単位時間当たりの冷熱量の推移を表している。
 図4のステップS108において熱源システム管理装置100は、余剰蓄熱量算出部1034によって、余剰蓄熱量を算出する(余剰蓄熱量算出ステップ)。図6(a)に示すように現在時刻が10時である場合、熱源システム管理装置100は、9時~10時における熱需要予測上限値から、需要施設Fで消費された冷熱量を減算することによって余剰蓄熱量(斜線部分J1の面積)を算出する。なお、需要施設Fで消費された冷熱量は、前記した(数式3)に基づいて算出される。
 ステップS109において熱源システム管理装置100は、運転計画変更部1035によって、運転計画を変更する(運転計画変更ステップ)。
 例えば、図6(a)に示す9時~10時の時間帯では、熱需要予測上限値から、需要施設Fで消費された冷熱量を減算した分の余剰蓄熱量が蓄熱槽213内に余っている(S109:Yes)。つまり、当初の運転計画で予測されていた10時の時点での冷熱残量よりも多くの冷熱が蓄熱槽213に蓄えられている(図6(c)参照)。熱源システム管理装置100は、この余剰蓄熱量を打ち消すように、冷凍機211a等の将来の稼働台数を減らす(稼働率を小さくする)。
 ちなみに、運転計画を変更する際、どの冷凍機をどの時間帯に停止させるかは、ステップS103の運転計画で作成した順位1~8に基づいて決定される。すなわち、熱源システム管理装置100は、冷熱の生成コストの大きい冷凍機を優先的に停止するように運転計画を変更する。なお、冷凍機のエネルギ消費特性は外気温度や湿度によって変化するため、運転計画を変更する際、停止させる冷凍機の順位を再度決定してもよい。
 図6(a)に示すように、順位1~4については既に割り当てられ、10時~14時に冷凍機211dを停止することが確定している。したがって、熱源システム管理装置100は、順位5に基づいて、11時~12時において冷凍機211cを部分負荷で運転するように運転計画を変更する。つまり、熱源システム管理装置100は、図6(a)に示す斜線部分J1の余剰蓄熱量を、斜線部分J2に移して冷凍機211cの負荷率を小さくする。ちなみに、11時~12時における冷凍機211cの負荷率は、定格運転時に生成される冷熱量から、余剰蓄熱量を差し引いた分の冷熱が生成されるように設定される。
 なお、本実施形態では、11時~12時において冷凍機211cを部分負荷で運転するように運転計画を変更したが(図6参照)、他の方法として、冷凍機211a,211b,211cの定格運転時に生成される冷熱量から、余剰蓄熱量を差し引いた分の冷熱を、冷凍機211a,211b,211cを等負荷率(均等な部分負荷)にして供給する運転計画に変更してもよい。
 このように熱源システム管理装置100は、余裕をもって熱需要予測上限値の冷熱を需要施設Fに供給し、需要施設Fで消費し切れずに余った分の冷熱を、将来の冷凍機211d等の停止(又は部分負荷での運転)に割り当てるように運転計画を逐次変更する。したがって、熱需要の予測値を上回る熱需要があったとしても、蓄熱槽213内の冷熱が不足することはない。
 また、熱源システム管理装置100は、前記した順位1~8に基づいて、冷熱の生成コストの低い冷凍機211d等を優先的に停止するように運転計画を逐次変更する。したがって、冷凍機211d等の稼働に要するコストを最小限に抑えることができる。
 なお、図4のフローチャートでは省略したが、例えば、図6(a)に示す7時~8時の時間帯には、需要施設Fで実際に消費された冷熱量が、熱需要予測上限値に略等しくなっている。このように余剰蓄熱量が非常に小さい場合、8時において運転計画の変更を行わないようにしてもよい。
 図4のステップS110において熱源システム管理装置100は、変更した運転計画を実行する。図6(a)に示す例では、現在時刻が10時のときに11時~12時の運転計画が変更されている。したがって、10時~11時には当初の予定どおりに冷凍機211dのみが停止され、11時~12時には、10時と11時において2回変更された運転計画が実行される(例えば、冷凍機211c,211dが停止される)。
 図4のステップS111において熱源システム管理装置100は、放熱運転の終了時刻(例えば、24時)になったか否かを判定する。放熱運転の終了時刻になった場合(S111:Yes)、熱源システム管理装置100は処理を終了する(END)。放熱運転の終了時刻になっていない場合(S111:No)、熱源システム管理装置100の処理はステップS106に戻る。
 なお、ステップS106~S111の処理は、例えば、1時間毎に繰り返し実行される。そして、運転計画の変更(S109)が行われる度に、前記した余剰蓄熱量を打ち消すように将来の冷凍機211d等の稼働台数が変更される。
 放熱運転中、蓄熱槽213で蓄えられていた冷熱は消費されて温度界面S(図1参照)の高さが徐々に低くなり、放熱運転の終了時には蓄熱槽213の蓄熱残量が略ゼロになる。これは、蓄熱槽213内の冷熱を使い切るように当初の運転計画を立て(図6(a)参照)、さらに、余剰蓄熱量を冷凍機211d等の将来の停止に割り当てるようにしたからである。
<効果>
 本実施形態によれば、熱需要の予測値よりも大きい熱需要予測上限値に基づいて、運転計画が作成される。そして、熱需要の予測値よりも多い冷熱が蓄熱槽213に供給され、需要施設Fで実際に消費される冷熱が蓄熱槽213から需要施設Fに供給され、余った分の冷熱が蓄熱槽213に蓄えられる。したがって、例えば、実際の熱需要が予測値を上回った場合でも、熱需要予測上限値よりも小さければ、冷熱が不足することはない。
 また、需要施設Fで消費されずに余った分の余剰蓄熱量は、冷凍機211d等の将来の停止(又は負荷率の減少)に割り当てられる。したがって、放熱運転の終了時には蓄熱槽213の蓄熱残量を略ゼロにすることができる。つまり、蓄熱槽213に蓄えられた冷熱をその日のうちに過不足なく使い切ることができるため、蓄熱槽213での放熱損失を抑制できる。
 また、熱源システム管理装置100は、冷熱の生成コストの低い冷凍機211a等を優先的に稼働させ、冷熱の生成コストの高い冷凍機211d等を優先的に停止させる。これによって、熱源システム200の省エネ化を図ることができるとともに、電力コストを最小限に抑えることができる。
≪変形例≫
 以上、本発明に係る熱源システム管理装置100について実施形態により説明したが、本発明はこれらの記載に限定されるものではなく、種々の変更を行うことができる。
 例えば、熱源システム管理装置100が、運転計画変更部1035によって運転計画を変更する際(S109:図4参照)、蓄熱槽213の蓄熱残量が「蓄熱残量下限値」を下回らないように冷凍機211a等の稼働台数を調整するようにしてもよい。
 前記した「蓄熱残量下限値」は、熱需要予測上限値の熱を需要施設Fに供給可能にするための蓄熱残量の下限値であり、時間の経過とともに変動する。具体的に説明すると、現在時刻(例えば、10時)以後において、図6(a)に示す熱需要予測上限値の曲線と、冷熱量P1と、によって囲まれる面積に相当する冷熱量が「蓄熱残量下限値」である。前記したように、「蓄熱残量下限値」以上の冷熱を蓄熱槽213に蓄えておくことで、蓄熱槽213内の冷熱が不足することを確実に防止できる。
 また、熱源システム管理装置100の構成として、蓄熱槽213における放熱損失を算出する「放熱損失算出部」を追加してもよい。この放熱損失は、外気温度と、蓄熱槽213に貯留されている冷水の温度分布と、に基づいて算出される。
 なお、蓄熱槽213から外気への単位時間当たりの放熱損失QL[W]は、以下の(数式4)で表される。ここで、S[-]は蓄熱率(蓄熱量/最大蓄熱容量)であり、h[W/(m2・℃)]は蓄熱槽213から外気への熱伝達率であり、TO[℃]は外気温度である。また、TC[℃]は蓄熱槽213に貯留されている低温の冷水の温度であり、TH[℃]は蓄熱槽213に貯留されている比較的高温の冷水の温度である。Ac[m2]は蓄熱槽213において低温の冷水が満たされている部分の表面積であり、AH[m2]は蓄熱槽213において比較的高温の冷水が満たされている部分の表面積である。
 QL=S・h・Ac・(TO-TC)+(1-S)・h・AH ・(TO-TH) ・・・(数式4)
 そして、運転計画作成部1033は、熱需要予測上限値に放熱損失QLを加算した熱が冷凍機211a等で生成されるように運転計画を作成する(S103:図4参照)。これによって、蓄熱槽213の蓄熱残量を正確に算出することができ、蓄熱槽213に蓄えられた冷熱を過不足なくその日のうちに使い切ることができる。
 また、実施形態では、需要予測上限値が冷熱量P1(図6(a)参照)を上回る時間帯(9時頃~17時頃:図6(a)参照)が存在する場合について説明したが、これに限らない。例えば、比較的涼しい季節では、需要予測上限値が冷熱量P1を上回る時間帯が存在しないこともあるが、この場合でも実施形態と同様の方法で運転計画を作成・変更すればよい。
 また、実施形態では、熱源システム200が4台の冷凍機211a~211dを備える場合について説明したが、これに限らない。すなわち、冷凍機の台数は、3台以下であってもよいし、5台以上であってもよい。なお、冷凍機が1台である場合には、熱源システム管理装置100は、余剰蓄熱量を打ち消すように当該冷凍機の将来の負荷率(稼働率)を小さくすることで運転計画を変更する。
 また、実施形態では、需要施設Fの冷房を行うために、蓄熱槽213から低温の冷水を需要施設Fに供給する場合について説明したが、これに限らない。すなわち、需要施設Fの暖房を行うために、熱源機(ヒートポンプ、ボイラ、電熱機器等)で生成した温熱を蓄熱槽213に蓄え、この温熱を需要施設Fに供給するようにしてもよい。なお、高温水は蓄熱槽213の上部に蓄えられるため、実施形態(図1参照)で説明した向きとは逆向きに温水を循環させるようにする。
 また、実施形態では、熱媒体が水である場合について説明したが、水以外の熱媒体を用いてもよい。
 また、各拠点に設置された複数の熱源システム200と、熱源システム管理装置100と、がネットワークを介して情報をやり取りするクラウド・コンピューティングのシステムであってもよい。
 また、実施形態では、熱源システム管理装置100をエネルギ・ネットワーク制御システムに適用する場合について説明したが、これに限らない。すなわち、熱源システム管理装置100を冷暖房制御システムに適用し、所定地域内での冷暖房に伴う熱需要に基づいて、運転計画を作成・変更するようにしてもよい。また、熱源システム管理装置100を熱供給プラント制御システムに適用し、工場や発電所等のプラントの熱需要に基づいて、運転計画を作成・変更するようにしてもよい。
 また、実施形態は、本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
 また、実施形態では、プログラムによって、コンピュータである熱源システム管理装置100に一連の処理(図4参照)を実行させる場合について説明したが、これに限らない。すなわち、熱源システム管理装置100が備える各構成(図2参照)の機能を、集積回路で設計する等によってハードウェアで実現してもよい。また、各機能を実現するプログラム、テーブル、ファイル等の情報を、メモリ、ハードディスク、SSD(Solid State Drive)等の記憶装置、又は、ICカード、SDカード、DVD等の記録媒体に格納してもよい。
 100 熱源システム管理装置
 103 演算処理部
 1031 熱需要予測部
 1032 熱需要予測上限値算出部
 1033 運転計画作成部
 1034 余剰蓄熱量算出部
 1035 運転計画変更部
 200 熱源システム
 211a,211b,211c,211d 冷凍機(熱源機)
 213 蓄熱槽
 222 熱負荷装置(負荷)
 F 需要施設(負荷)

Claims (7)

  1.  一つ又は複数の熱源機と、前記熱源機で生成される冷熱又は温熱を蓄える蓄熱槽と、を備える熱源システムに対する熱需要の予測値に、所定の予測誤差を加算することによって熱需要予測上限値を算出する熱需要予測上限値算出部と、
     前記熱需要予測上限値の熱が前記熱源システムの負荷側に供給されるように、前記熱源システムの運転計画を作成する運転計画作成部と、
     前記運転計画に従って前記蓄熱槽から前記負荷側に放熱する放熱運転中、前記熱需要予測上限値から、前記負荷側で消費された熱量を減算することによって余剰蓄熱量を算出する処理を繰り返す余剰蓄熱量算出部と、
     前記余剰蓄熱量を打ち消すように、前記熱源機の将来の稼働率を小さくして前記運転計画を逐次変更する運転計画変更部と、を備えること
     を特徴とする熱源システム管理装置。
  2.  前記熱源システムは、複数台の前記熱源機を備え、
     前記運転計画作成部は、前記運転計画の対象となる期間を複数の時間帯に分割し、各時間帯での単位熱量当たりの生成コストを前記熱源機それぞれについて算出し、前記生成コストの大きい熱源機を優先的に停止させるように前記運転計画を作成すること
     を特徴とする請求項1に記載の熱源システム管理装置。
  3.  前記運転計画変更部は、複数台の前記熱源機のうち、前記余剰蓄熱量を打ち消すために停止させる熱源機を選択する際、各時間帯での単位熱量当たりの生成コストの大きい熱源機を優先的に停止させるように前記運転計画を逐次変更すること
     を特徴とする請求項1に記載の熱源システム管理装置。
  4.  前記運転計画変更部は、前記負荷側で消費された熱量に基づいて、前記蓄熱槽に蓄えられている熱の残量である蓄熱残量を算出し、当該蓄熱残量が、前記熱需要予測上限値の熱を前記負荷側に供給可能にするための蓄熱残量下限値を下回らないように、前記運転計画を逐次変更すること
     を特徴とする請求項1に記載の熱源システム管理装置。
  5.  外気温度と、前記蓄熱槽に貯留されている熱媒体の温度分布と、に基づいて、前記蓄熱槽における放熱損失を算出する放熱損失算出部を備え、
     前記運転計画作成部は、前記熱需要予測上限値に前記放熱損失を加算した熱が前記熱源機で生成されるように、前記運転計画を作成すること
     を特徴とする請求項1に記載の熱源システム管理装置。
  6.  一つ又は複数の熱源機と、前記熱源機で生成される冷熱又は温熱を蓄える蓄熱槽と、を備える熱源システムに対する熱需要の予測値に、所定の予測誤差を加算することによって熱需要予測上限値を算出する熱需要予測上限値算出ステップと、
     前記熱需要予測上限値の熱が前記熱源システムの負荷側に供給されるように、前記熱源システムの運転計画を作成する運転計画作成ステップと、
     前記運転計画に従って前記蓄熱槽から前記負荷側に放熱する放熱運転中、前記熱需要予測上限値から、前記負荷側で消費された熱量を減算することによって余剰蓄熱量を算出する処理を繰り返す余剰蓄熱量算出ステップと、
     前記余剰蓄熱量を打ち消すように、前記熱源機の将来の稼働率を小さくして前記運転計画を逐次変更する運転計画変更ステップと、を含むこと
     を特徴とする熱源システム管理方法。
  7.  請求項6に記載の熱源システム管理方法をコンピュータに実行させるためのプログラム。
PCT/JP2015/081246 2014-12-18 2015-11-06 熱源システム管理装置、熱源システム管理方法、及びプログラム WO2016098483A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US15/533,675 US10808947B2 (en) 2014-12-18 2015-11-06 Heat source system managing device, heat source system managing method, and program
MYPI2017701701A MY189921A (en) 2014-12-18 2015-11-06 Heat source system managing device, heat source system managing method, and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-255862 2014-12-18
JP2014255862A JP6467216B2 (ja) 2014-12-18 2014-12-18 熱源システム管理装置、熱源システム管理方法、及びプログラム

Publications (1)

Publication Number Publication Date
WO2016098483A1 true WO2016098483A1 (ja) 2016-06-23

Family

ID=56126382

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/081246 WO2016098483A1 (ja) 2014-12-18 2015-11-06 熱源システム管理装置、熱源システム管理方法、及びプログラム

Country Status (4)

Country Link
US (1) US10808947B2 (ja)
JP (1) JP6467216B2 (ja)
MY (1) MY189921A (ja)
WO (1) WO2016098483A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019216522A (ja) * 2018-06-12 2019-12-19 株式会社日立製作所 エネルギー管理システム及びエネルギー管理方法
CN111027007A (zh) * 2019-12-30 2020-04-17 天津天大求实电力新技术股份有限公司 一种基于建筑特性的蓄热供暖***需热量预测方法及***

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6467216B2 (ja) * 2014-12-18 2019-02-06 株式会社日立製作所 熱源システム管理装置、熱源システム管理方法、及びプログラム
US10746429B2 (en) * 2018-10-25 2020-08-18 Consumer 2.0 Inc. System and method for controlling temperature in a building
CN111027885B (zh) * 2019-12-24 2020-12-15 北京华远意通热力科技股份有限公司 一种供热***效能分析管理***
US11371731B2 (en) * 2020-02-10 2022-06-28 Desert Spring Eco-Products Ltd. Humidification apparatus and method
CN111550861B (zh) * 2020-05-19 2021-08-20 山东建筑大学 一种热泵与电蓄热设备自适应优化控制方法、***及装置
KR102669411B1 (ko) * 2022-07-28 2024-05-29 한국에너지기술연구원 열 및 전력 네트워크 운영시스템 및 운영방법
CN116398926B (zh) * 2023-03-16 2024-01-30 广州森茂智慧能源科技有限公司 一种基于热泵智慧能源调配的供热供冷***及其运行方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60251336A (ja) * 1984-05-25 1985-12-12 Hitachi Ltd 蓄熱槽の最適制御方法
JPS63251743A (ja) * 1987-04-06 1988-10-19 Mitsubishi Electric Corp 蓄熱式空調装置の制御装置
JPH0886492A (ja) * 1994-09-14 1996-04-02 Ebara Corp 熱供給設備
JP2008082642A (ja) * 2006-09-28 2008-04-10 Shimizu Corp 蓄熱槽熱源システムの制御装置及び制御方法
JP2013174412A (ja) * 2012-02-27 2013-09-05 Toshiba Corp 蓄電蓄熱最適化装置、最適化方法及び最適化プログラム

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5176345A (ja) * 1974-12-27 1976-07-01 Kureha Chemical Ind Co Ltd Horifutsukabiniridennoshinkinasoseibutsu
ES2097480T3 (es) * 1992-07-01 1997-04-01 Sintra Holding Ag Aparato para preparar bebidas calientes.
JPH06313605A (ja) 1993-04-28 1994-11-08 Hitachi Ltd 熱源機器の運転制御方法および装置
US20010018971A1 (en) * 1996-01-10 2001-09-06 Ellen Marcie Emas Heat storage air conditioning apparatus and heat storage estimating method
US6591255B1 (en) * 1999-04-05 2003-07-08 Netuitive, Inc. Automatic data extraction, error correction and forecasting system
JP3994910B2 (ja) * 2003-05-08 2007-10-24 株式会社日立製作所 電力売買支援システム
JP5248897B2 (ja) * 2008-04-01 2013-07-31 ダイダン株式会社 運転計画決定システム
EP2413059A1 (en) * 2009-03-23 2012-02-01 Panasonic Corporation Energy supply system
JP5444020B2 (ja) * 2010-01-26 2014-03-19 大阪瓦斯株式会社 コージェネレーションシステム
US8538593B2 (en) * 2010-07-02 2013-09-17 Alstom Grid Inc. Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast
US9727931B2 (en) * 2012-02-14 2017-08-08 Toshiba Mitsubishi-Electric Industrial Systems Corporation Electricity demand prediction system
EP3016229B1 (en) * 2013-06-27 2017-08-09 Panasonic Corporation Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
CN105556786A (zh) * 2013-09-27 2016-05-04 日本电气株式会社 蓄电池管理装置、蓄电池、蓄电池管理方法和程序
US9964316B2 (en) * 2014-12-15 2018-05-08 Intellihot, Inc. Weather forecast and prediction based temperature control
JP6467216B2 (ja) * 2014-12-18 2019-02-06 株式会社日立製作所 熱源システム管理装置、熱源システム管理方法、及びプログラム
JP2016142491A (ja) * 2015-02-04 2016-08-08 株式会社日立製作所 熱源システムの運転管理装置、熱源システムの運転管理方法およびコンピュータプログラム
JP6363556B2 (ja) * 2015-05-28 2018-07-25 株式会社日立製作所 エネルギー管理システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60251336A (ja) * 1984-05-25 1985-12-12 Hitachi Ltd 蓄熱槽の最適制御方法
JPS63251743A (ja) * 1987-04-06 1988-10-19 Mitsubishi Electric Corp 蓄熱式空調装置の制御装置
JPH0886492A (ja) * 1994-09-14 1996-04-02 Ebara Corp 熱供給設備
JP2008082642A (ja) * 2006-09-28 2008-04-10 Shimizu Corp 蓄熱槽熱源システムの制御装置及び制御方法
JP2013174412A (ja) * 2012-02-27 2013-09-05 Toshiba Corp 蓄電蓄熱最適化装置、最適化方法及び最適化プログラム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019216522A (ja) * 2018-06-12 2019-12-19 株式会社日立製作所 エネルギー管理システム及びエネルギー管理方法
JP7148057B2 (ja) 2018-06-12 2022-10-05 株式会社日立製作所 エネルギー管理システム及びエネルギー管理方法
CN111027007A (zh) * 2019-12-30 2020-04-17 天津天大求实电力新技术股份有限公司 一种基于建筑特性的蓄热供暖***需热量预测方法及***

Also Published As

Publication number Publication date
US10808947B2 (en) 2020-10-20
MY189921A (en) 2022-03-21
US20170314789A1 (en) 2017-11-02
JP6467216B2 (ja) 2019-02-06
JP2016114340A (ja) 2016-06-23

Similar Documents

Publication Publication Date Title
JP6467216B2 (ja) 熱源システム管理装置、熱源システム管理方法、及びプログラム
Kamal et al. Strategic control and cost optimization of thermal energy storage in buildings using EnergyPlus
CN107077704B (zh) 用于针对微电网的容量确定的***、方法以及装置以及有形计算机可读介质
US11346572B2 (en) Building equipment with predictive control
US10746480B2 (en) Plural heat pump and thermal storage system for facilitating power shaping services on the electrical power grid at consumer premises
Arteconi et al. Domestic demand-side management (DSM): Role of heat pumps and thermal energy storage (TES) systems
Seo et al. Detailed analysis on part load ratio characteristics and cooling energy saving of chiller staging in an office building
JP6282071B2 (ja) 空調制御システム及び空調制御方法
CN102668302A (zh) 运转计划方法、运转计划装置、热泵式热水供给***的运转方法、以及热泵式热水供给供暖***的运转方法
De Ridder et al. An optimal control algorithm for borehole thermal energy storage systems
Wang et al. Reliability and availability analysis of a hybrid cooling system with water-side economizer in data center
CN102687364A (zh) 运转计划方法以及热泵式热水供给供暖***的运转方法
Huang et al. A hierarchical coordinated demand response control for buildings with improved performances at building group
Shaibani et al. Thermo-economic analysis of a cold storage system in full and partial modes with two different scenarios: a case study
US20200218233A1 (en) Systems and methods for prediction model update scheduling for building equipment
Soler et al. Optimizing performance of a bank of chillers with thermal energy storage
Walsh et al. Free-cooling thermal energy storage using phase change materials in an evaporative cooling system
Sebzali et al. Comparison of energy performance and economics of chilled water thermal storage and conventional air-conditioning systems
EP2818801B1 (en) Method and device for controlling heater devices
JP2015117918A (ja) 蓄熱システム及びその制御方法
JP2014010631A (ja) エネルギーネットワークの最適運転制御装置および方法
JP2016061512A (ja) 熱源プラントの運転計画作成装置および運転計画作成方法
JP2012154563A (ja) 運転パターン作成装置及びその方法並びにプログラム
US8107804B2 (en) Energy accummulator system
US12013152B1 (en) Low-emissions heating, cooling and hot water system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15869691

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15533675

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15869691

Country of ref document: EP

Kind code of ref document: A1