WO2016088178A1 - 情報処理システム、情報処理方法、及び記憶媒体 - Google Patents

情報処理システム、情報処理方法、及び記憶媒体 Download PDF

Info

Publication number
WO2016088178A1
WO2016088178A1 PCT/JP2014/081764 JP2014081764W WO2016088178A1 WO 2016088178 A1 WO2016088178 A1 WO 2016088178A1 JP 2014081764 W JP2014081764 W JP 2014081764W WO 2016088178 A1 WO2016088178 A1 WO 2016088178A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
information processing
inspected
information indicating
electrical equipment
Prior art date
Application number
PCT/JP2014/081764
Other languages
English (en)
French (fr)
Inventor
仁 古家
健二郎 加瀬
直宏 南出
秀司 上野
文夫 石毛
浩一 小野寺
克美 山田
雅之 市田
慶次郎 渋井
英生 水落
Original Assignee
東京電力ホールディングス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京電力ホールディングス株式会社 filed Critical 東京電力ホールディングス株式会社
Priority to PCT/JP2014/081764 priority Critical patent/WO2016088178A1/ja
Publication of WO2016088178A1 publication Critical patent/WO2016088178A1/ja
Priority to US15/460,624 priority patent/US10628976B2/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/20Drawing from basic elements, e.g. lines or circles
    • G06T11/203Drawing of straight lines or curves
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention relates to an information processing system, an information processing method, and a storage medium.
  • the substation inspection and power outage plan support system formulates a work plan for carrying out inspections, repairs, repairs, and construction for the equipment and equipment of the substations and substations that are equipped with power outages during work. It stores information related to the equipment and devices of the generator / transformer, stores work information related to inspections, repairs, repairs, and construction performed in the past for the equipment / equipment of the generator / transformer.
  • the equipment to be inspected, repaired, repaired and constructed, the model and specifications related to the equipment are entered, and the entered equipment, equipment, the stored equipment, information on the equipment and information on the inspection, etc.
  • Substation inspection Power outage planning support system is described in Patent Document 1.
  • the present invention provides an information processing system, an information processing method, and a storage medium that can improve the efficiency of patrol and inspection of electrical equipment.
  • One aspect of the present invention is the information indicating the positions of the plurality of electrical equipments included in a track diagram including information indicating the positions of the electrical equipments and information indicating the connection paths between the electrical equipments, and information Based on the information indicating the position of the processing terminal, based on the identification unit that identifies the electrical equipment to be inspected, and information indicating the inspection result of the electrical equipment that is the inspection target specified by the identification unit, When the information processing terminal displays information indicating that the electrical equipment has been inspected in the track diagram, and the adjacent electrical equipment connected by the connection path with the electrical equipment has been inspected, And a display control unit that changes a display state of the connection route displayed on the information processing terminal.
  • An embodiment of the present invention provides an information processing system, an information processing method, and a program that can improve the efficiency of patrol and inspection of electrical equipment.
  • FIG. 1 is a diagram illustrating an example of the configuration of the information processing system 1.
  • the information processing system 1 includes an information processing device 2, an equipment information DB (Database) 3, an equipment inspection information DB 4, and an information processing terminal 5.
  • the information processing system 1 provides support for inspection work that patrols and inspects electrical equipment.
  • Information indicating the route is displayed on the display unit of the information processing terminal 5.
  • the inspection of the electrical equipment indicates that a part or all of the inspection items predetermined for each electrical equipment is inspected.
  • the inspection work for inspecting the electrical equipment by inspection is simply referred to as inspection work.
  • the electrical equipment that has been inspected will be referred to as inspected electrical equipment (for example, in the case where the electrical equipment is a utility pole, the inspected utility pole).
  • the user of the information processing system 1 is, for example, an employee who checks electric facilities owned by an electric power company, but may be a person who supports the employee.
  • the electrical facilities are, for example, utility poles, transformers, switches, electric wires, cables, underground devices for underground lines, etc., but may be other facilities.
  • the electrical equipment is a utility pole will be described.
  • the user of the information processing system 1 is simply referred to as a user.
  • the information processing apparatus 2 is a server that generates display screen information for generating a display screen for supporting the inspection work on the information processing terminal 5 based on various information transmitted from the information processing terminal 5.
  • the information processing device 2 transmits the generated display image information to the information processing terminal 5.
  • the information processing apparatus 2 is connected to the facility information DB 3 so that they can communicate with each other by wire or wirelessly. Further, the information processing apparatus 2 is connected to the facility inspection information DB 4 so that they can communicate with each other by wire or wirelessly. Further, the information processing device 2 is connected to the information processing terminal 5 so as to be able to communicate with each other wirelessly.
  • the communication between the information processing device 2 and the information processing terminal 5 is communication using a mobile communication network, a wireless LAN (Local Area Network), or the like.
  • the equipment information DB 3 stores information on the electrical equipment that the user performs the inspection work as equipment information for each type of electrical equipment.
  • Equipment inspection information DB4 memorizes inspection item information which shows an item which a user inspects in inspection work for every kind of electric equipment.
  • the information processing terminal 5 is, for example, a tablet PC (Personal Computer), a multi-function mobile phone terminal (smartphone), a mobile phone terminal, an electronic book reader, a PDA (Personal Digital Assistant), or the like.
  • the information processing terminal 5 is installed with an application program that supports the inspection work performed by the user, and supports the user's inspection work through the GUI (Graphical User Interface) of the application program. More specifically, the information processing terminal 5 displays a display screen that supports the inspection work via the GUI.
  • FIG. 2 is a diagram illustrating an example of a display screen displayed by the GUI of the application program that supports the inspection work performed by the user.
  • GUI the GUI of the application program that supports the inspection work performed by the user
  • the GUI causes the information processing terminal 5 to display the display screen P.
  • the display screen P On the display screen P, at least a map P1, a site photograph P2, an inspection item image P3, an imaging button B1, and an inspection completion button B2 are displayed.
  • the electrical facility map is a map in which information indicating the position of each of a plurality of electrical facilities existing in the area is displayed on a map image of a certain area.
  • the electrical facility map is a map (pole map) image in which power pole position information indicating the positions of a plurality of power poles existing in the area is superimposed on a map image of a certain area.
  • information indicating the position of each of the plurality of utility poles in the electrical facility map is associated with utility pole identification information for identifying the utility pole.
  • information which shows the position of the utility pole in an electric equipment map is information which shows the latitude and the longitude, for example, other information may be sufficient as it.
  • the information indicating the position of the utility pole in the electrical facility map may include other information related to the position of the utility pole, such as information indicating the altitude.
  • the distribution line map is a map image in which power pole position information indicating the position of each of a plurality of power poles existing in a certain area and information indicating a connection path from one power pole to another power pole are displayed in an overlapping manner.
  • the utility pole position information in an electrical equipment map and the utility pole position information in a distribution line map are the same information.
  • the distribution line map is superimposed with power pole position information indicating the position of each of a plurality of power poles existing in a certain area, a map image of the area, and information indicating a connection path from one power pole to another power pole. May be displayed. In this case, only the distribution line map is displayed on the map P1.
  • the distribution line diagram is an example of a track diagram.
  • route shows the power transmission path
  • the electric pole identification information which identifies an electric pole is matched with the information which shows the position of each of the several electric pole in a distribution line map.
  • the information indicating the position of each of the plurality of utility poles in the distribution line diagram is, for example, information indicating latitude and longitude, but may be other information.
  • the information indicating the position of each power pole in the distribution line diagram may include other information related to the position of the power pole, such as information indicating the altitude.
  • a mark indicating the position of the utility pole is displayed on the map P1 shown in FIG.
  • each of the circles T1 to T9 on the map P1 indicates the position of the utility pole.
  • the electric poles at the positions indicated by the circles T1 to T9 will be referred to as electric poles T1 to T9.
  • the utility pole T4 is a utility pole currently being inspected by the user
  • the power pole currently being inspected by the user will be described as a target power pole.
  • a mark N indicating that it is the target power pole is displayed on the power pole T4.
  • the mark N is a rectangular mark surrounding the utility pole T4, but may have other sizes and shapes.
  • the target power pole may be distinguished by a change in color or lighting state (blinking, blinking, etc.) with other power poles.
  • each of the utility pole T2 and the utility pole T3 is an inspected utility pole
  • the inspected telephone pole is displayed with a mark indicating that it has been inspected, such as the mark S1 and the mark S2.
  • the mark S1 is a mark indicating that the utility pole T2 is an inspected utility pole.
  • the mark S2 is a mark indicating that the utility pole T3 is an inspected utility pole.
  • the mark S1 is a star-shaped mark surrounding the utility pole T2, but may have other shapes and sizes.
  • the inspected power pole may be distinguished by a change in color or lighting state (blinking, blinking, etc.) with other power poles. Since the mark S2 is the same as the mark S1, description thereof is omitted.
  • the mark which shows that it is an inspected electric pole may be a mark which can identify the order which the test
  • the display state of the connection path is changed.
  • the connection path between the inspected power pole T2 and the inspected telephone pole T3 is changed to a thick line L unlike other connection paths.
  • the display status of the connection route is changed to a thick line instead of a change in the color of the line indicating the connection route, a change in the lighting state (flashing, blinking, etc.) of the line, For example, the shape of the line segment may be changed.
  • the map P1 may display either an electric facility map or a distribution line map instead of displaying an electric facility map and a distribution line map in an overlapping manner.
  • the connection path between the power poles is displayed only for the connection path between the tested power poles.
  • either one of the electric facility map and the distribution line route map may be displayed in a semi-transparent manner.
  • the on-site photo P2 displays a captured image captured by the imaging unit included in the information processing terminal 5 by performing an imaging operation in which the user presses the shooting button B1.
  • the on-site photo P2 is information based on GPS information acquired from a GPS (Global Positioning System) sensor provided in the information processing terminal 5, and includes other information such as information indicating the direction taken by the user. May be displayed.
  • GPS Global Positioning System
  • inspection item image P3 information indicating inspection items that must be inspected by the user regarding the target power pole is displayed side by side.
  • text information indicating inspection items from “inspection item 1” to “inspection item 4” is displayed side by side. As described above, the user performs an inspection operation for inspecting some or all of these inspection items.
  • a check box (radio box) associated with text information indicating each inspection item is displayed.
  • These check boxes are displayed in the check boxes of the inspection items that have been inspected by performing a selection operation from the user. For example, when a user performs a selection operation on a check box corresponding to an inspection item that has been inspected, a check is displayed for the inspection item that has been inspected.
  • a check indicating that “inspection item 1” has ended inspection is displayed as a black circle in a check box C1 associated with “inspection item 1”.
  • an inspection completion button B2 is displayed on the inspection item image P3.
  • the information processing terminal 5 receives a completion operation of pressing the examination completion button B2 from the user, the information processing terminal 5 shows information indicating each examination item in which a check is displayed in the check box and a captured image displayed in the on-site photograph P2. Information associated with the information is transmitted to the information processing apparatus 2 as inspection result information indicating the inspection result.
  • the information processing system 1 displays information indicating the inspected power pole on the map P1 on the information processing terminal 5, and the adjacent power pole connected to the checked power pole by the connection path is the inspected power pole. Then, the display state of the connection path displayed on the information processing terminal 5 is changed. Thereby, the user can not only easily grasp the power pole that has not been inspected so far, but also can easily grasp the connection path between the checked power poles. As a result, the information processing system 1 can improve the efficiency of patrol / inspection of the utility pole (ie, electrical equipment).
  • the utility pole ie, electrical equipment
  • a display screen before accepting a completion operation by the user is referred to as a first display screen
  • a display screen after accepting the completion operation by the user is referred to as a second display screen.
  • the first display screen and the second display screen are simply referred to as display screens unless it is necessary to distinguish them.
  • the display screen P may display a text box in which the user inputs information indicating remarks related to the inspection.
  • the information processing terminal 5 accepts the completion operation, the information input in the text box is displayed in the field photograph P2 as information indicating each inspection item whose check is displayed in the check box. Inspection result information associated with information indicating a captured image is generated.
  • information on the target power pole (at least a part of information included in the facility information) may be displayed on the display screen P.
  • FIG. 3 is a diagram illustrating an example of a hardware configuration of the information processing apparatus 2.
  • the information processing apparatus 2 includes, for example, a CPU (Central Processing Unit) 21, a storage unit 22, an input reception unit 23, a communication unit 24, and a display unit 25, and communicates with other devices via the communication unit 24. I do. These components are connected to each other via a bus Bus so that they can communicate with each other.
  • the CPU 21 executes various programs stored in the storage unit 22.
  • the storage unit 22 includes, for example, HDD (Hard Disk Drive), SSD (Solid State Drive), EEPROM (Electrically Erasable Programmable Read-Only Memory), ROM (Read-Only Memory), RAM (Random Access Memory), etc.
  • HDD Hard Disk Drive
  • SSD Solid State Drive
  • EEPROM Electrically Erasable Programmable Read-Only Memory
  • ROM Read-Only Memory
  • RAM Random Access Memory
  • the input receiving unit 23 is, for example, a keyboard, mouse, touch pad, or other input device.
  • the input receiving unit 23 may be configured as a touch panel integrated with the display unit 25.
  • the communication unit 24 includes, for example, a digital input / output port such as USB, an Ethernet (registered trademark) port, and the like.
  • the display unit 25 is, for example, a liquid crystal display panel or an organic EL (ElectroLuminescence) display panel.
  • FIG. 4 is a diagram illustrating an example of a functional configuration of the information processing apparatus 2.
  • the information processing apparatus 2 includes a storage unit 22, a communication unit 24, and a control unit 28. Part or all of the functional units included in the control unit 28 is realized, for example, when the CPU 21 executes various programs stored in the storage unit 22. Some or all of these functional units may be hardware functional units such as LSI (Large Scale Integration) and ASIC (Application Specific Integrated Circuit).
  • LSI Large Scale Integration
  • ASIC Application Specific Integrated Circuit
  • the storage unit 22 includes an electrical equipment map information storage unit 221 and a distribution line route map information storage unit 223.
  • the electrical facility map information storage unit 221 stores electrical facility map information indicating the electrical facility map described above.
  • the distribution line diagram information storage unit 223 stores distribution line diagram information indicating the above-described distribution line diagram.
  • the control unit 28 controls the entire information processing apparatus 2.
  • the control unit 28 receives terminal position information from the information processing terminal 5 via the communication unit 24. Further, the control unit 28 receives inspection result information from the information processing terminal 5 via the communication unit 24.
  • the control unit 28 includes a communication control unit 281, an information acquisition unit 283, a specification unit 285, a screen information generation unit 287, a determination unit 288, and an information update unit 289.
  • the communication control unit 281 transmits the display screen information for generating the display screen generated by the screen information generation unit 287 to the information processing terminal 5 via the communication unit 24.
  • the information acquisition unit 283 determines the position indicated by the terminal position information based on the terminal position information indicating the position of the information processing terminal 5 received by the control unit 28 from the information processing terminal 5.
  • the electrical facility map information indicating the electrical facility map of the area including is acquired from the electrical facility map information storage unit 221 (read).
  • the terminal position information is an example of information indicating the position of the information processing terminal.
  • the information acquisition part 283 is based on the terminal position information which the control part 28 received from the information processing terminal 5, and distribution line route information which shows the distribution line route figure of the area containing the position which the said terminal position information shows is a distribution line route. Obtained from the figure information storage unit 223.
  • the information acquisition unit 283 includes a plurality of pieces included in one or both of the electrical facility map information acquired from the electrical facility map information storage unit 221 and the distribution line route map information acquired from the distribution line route map information storage unit 223.
  • the facility information for each utility pole identification information (that is, for each utility pole) is acquired from the facility information DB 3 based on the current pole identification information.
  • the information acquisition unit 283 includes a plurality of pieces included in one or both of the electrical facility map information acquired from the electrical facility map information storage unit 221 and the distribution line route map information acquired from the distribution line route map information storage unit 223.
  • the inspection item information for each utility pole identification information is acquired from the equipment inspection information DB 4 based on the utility pole identification information.
  • the specifying unit 285 includes the terminal position information received from the information processing terminal 5 by the control unit 28, the electrical facility map information acquired from the electrical facility map information storage unit 221, and the distribution line route map acquired from the distribution line route map information storage unit 223.
  • the target power pole is specified (detected) based on the power pole position information indicating the position of each of the plurality of power poles included in one or both of the information.
  • Specifying the target power pole means detecting the power pole identification information associated with the power pole position information of the target power pole.
  • the screen information generation unit 287 includes the power pole position information and power pole identification information of the target power pole specified by the specification unit 285, the facility information of the target power pole acquired by the information acquisition unit 283, the inspection item information of the target power pole, Display screen information including at least equipment map information and distribution line map information is generated.
  • the display screen information is display screen information for generating a first display screen.
  • the display screen information will be referred to as first display screen information.
  • the screen information generation unit 287 generates display screen information for changing the display state of the first display screen based on the generated first display screen information and the examination result information acquired from the information processing terminal 5. To do.
  • the display screen information will be referred to as second display screen information.
  • the determination unit 288 Based on the inspection result information received by the control unit 28, the determination unit 288 reads inspection item information associated with the utility pole identification information of the target utility pole included in the inspection result information from the facility inspection information DB 4. Then, the determination unit 288 determines whether all the inspection items included in the read inspection item information have been inspected based on the inspection result information received by the control unit 28. If the determination unit 288 determines that all of the inspection items have not been inspected, information (hereinafter referred to as error information) indicating that all of the inspection items have not been inspected is processed via the communication unit 24. Transmit to terminal 5. When the information processing terminal 5 receives the error information, the information processing terminal 5 displays the received error information.
  • the inspection result information stored in the equipment inspection information DB 4 and currently being inspected is included in the inspection result information.
  • the inspection result information associated with the identification information is updated by the information updating unit 289 with the inspection result information received by the control unit 28 (in this case, overwritten).
  • the information update unit 289 updates the inspection result information stored in the facility inspection information DB 4 in response to a request from the determination unit 288.
  • the update of the inspection result information performed by the information update unit 289 includes generation, change, deletion, etc. of the inspection result information.
  • FIG. 5 is a diagram illustrating an example of a hardware configuration of the information processing terminal 5.
  • the information processing terminal 5 includes, for example, a CPU 51, a storage unit 52, an input reception unit 53, a communication unit 54, a display unit 55, an imaging unit 56, and a position detection unit 57, via the communication unit 54. Communicate with other devices. These components are connected to each other via a bus Bus so that they can communicate with each other.
  • the CPU 51 executes various programs stored in the storage unit 52.
  • the storage unit 52 includes, for example, an HDD, an SSD, an EEPROM, a ROM, a RAM, and the like, and stores various information, images, programs, and the like that are processed by the information processing apparatus 2.
  • the storage unit 52 may be an external storage device connected by a digital input / output port such as a USB instead of the one built in the information processing terminal 5.
  • the input receiving unit 53 is, for example, a keyboard, mouse, touch pad, or other input device.
  • the input receiving unit 53 may be configured as a touch panel integrated with the display unit 55.
  • the communication unit 54 includes, for example, a digital input / output port such as USB, an Ethernet (registered trademark) port, and the like.
  • the display unit 55 is, for example, a liquid crystal display panel or an organic EL display panel.
  • the imaging unit 56 is, for example, a camera including a CCD (Charge Coupled Device), a CMOS (Complementary Metal Oxide Semiconductor), or the like, which is an imaging element that converts the collected light into an electrical signal.
  • CCD Charge Coupled Device
  • CMOS Complementary Metal Oxide Semiconductor
  • the position detector 57 is, for example, a GPS sensor, and acquires GPS information, for example, time information and satellite orbit data, for calculating information on latitude and longitude where the information processing terminal 5 is located.
  • FIG. 6 is a diagram illustrating an example of a functional configuration of the information processing terminal 5.
  • the information processing terminal 5 includes a storage unit 52, an input reception unit 53, a communication unit 54, a display unit 55, an imaging unit 56, a position detection unit 57, and a control unit 58.
  • Part or all of the functional units included in the control unit 58 is realized by the CPU 51 executing various programs stored in the storage unit 52, for example.
  • Some or all of these functional units may be hardware functional units such as an LSI or an ASIC.
  • the control unit 58 controls the entire information processing terminal 5.
  • the control unit 58 includes a communication control unit 581, a display control unit 582, an imaging control unit 583, a position information generation unit 585, and an inspection result information generation unit 589.
  • the communication control unit 581 transmits the terminal location information generated by the location information generation unit 585 to the information processing device 2 via the communication unit 54. In addition, the communication control unit 581 transmits the inspection result information generated by the inspection result information generation unit 589 to the information processing apparatus 2 via the communication unit 54.
  • the display control unit 582 causes the display unit 55 to display the first display screen based on the first display screen information acquired from the information processing apparatus 2 via the communication unit 54.
  • the display control unit 582 displays a second display screen in which the display state of the first display screen is changed on the display unit 55 based on the second display screen information acquired from the information processing device 2 via the communication unit 54. Display.
  • the display control unit 582 superimposes the captured image on the display screen based on the captured image acquired from the imaging unit 56. For example, the display control unit 582 superimposes the captured image acquired from the imaging unit 56 on the site photograph P2 on the display screen P.
  • the imaging control unit 583 causes the imaging unit 56 to capture an imageable range.
  • the position information generation unit 585 acquires GPS information from the position detection unit 57. Further, the position information generation unit 585 generates terminal position information indicating the position of the information processing terminal 5 based on the acquired GPS information.
  • the terminal position information is information indicating the latitude and longitude of the information processing terminal 5, but in addition to this, information indicating the altitude of the information processing terminal 5 and the lens of the imaging unit 56 of the information processing terminal 5 are suitable. The information which shows the direction which is looking may be included.
  • the inspection result information generation unit 589 generates inspection result information based on the operation received from the user by the input reception unit 53 via the display screen displayed on the display unit 55.
  • FIG. 7 is a flowchart illustrating an example of a flow of processing performed by the information processing terminal 5 from when the user starts the inspection work until the end of the inspection work.
  • FIG. 7 a case where the GUI is already displayed on the display unit 55 of the information processing terminal 5 will be described.
  • control unit 58 receives an inspection start operation for starting an inspection operation from the user by the input reception unit 53 via the GUI displayed on the display unit 55 (step S100).
  • position information generation unit 585 acquires GPS information from the position detection unit 57.
  • the position information generation unit 585 generates terminal position information based on the acquired GPS information (step S110).
  • the communication control unit 581 transmits the terminal location information generated by the location information generation unit 585 in step S110 to the information processing apparatus 2 via the communication unit 54 (step S120).
  • the control unit 58 receives the first display screen information from the information processing apparatus 2 via the communication unit 54 (step S130).
  • the display control unit 582 displays the first display screen on the display unit 55 based on the first display screen information received by the control unit 58 in step S130 (step S140). For example, the display control unit 582 causes the display unit 55 to display the display screen P illustrated in FIG. 2.
  • control unit 58 receives an operation related to the inspection work from the user by the input receiving unit 53 through the GUI displayed on the display unit 55 (step S150).
  • the operation related to the inspection work is, for example, a selection operation for selecting check boxes (checking the check boxes) of the plurality of inspection items shown in FIG.
  • an imaging operation for displaying the captured image as the on-site photograph P2, a completion operation for pressing the inspection completion button B2, and the like are shown.
  • step S150 the user displays a check in the check box of some or all of the inspection items shown in FIG. 2, displays the captured image as the on-site photo P2, and then presses the inspection completion button B2. A case where the operation is performed will be described.
  • the inspection result information generation unit 589 generates inspection result information based on the completion operation received from the user in step S150 (step S160).
  • the inspection result information is, for example, an inspection associated with a check box in which a check is displayed as information indicating that the inspection is completed when a check is displayed in the check boxes of all inspection items illustrated in FIG. This is information in which information indicating items, information indicating captured images displayed as site photographs P2, and power pole identification information of the target power poles included in the display image information received by the control unit 58 in step S130 are associated with each other.
  • the inspection result information may include other information.
  • the communication control unit 581 transmits the inspection result information generated by the inspection result information generation unit 589 in step S160 to the information processing apparatus 2 via the communication unit 54 (step S170).
  • the control unit 58 receives the second display screen information from the information processing device 2 via the communication unit 54 (step S180).
  • step S190 the display control unit 582 displays the second display screen on the display unit 55 based on the second display screen information received by the control unit 58 in step S180 (step S190).
  • the control unit 58 receives an inspection end operation for ending the inspection work from the user by the input receiving unit 53 via the GUI displayed on the display unit 55 (step S200). Thereby, the control part 58 complete
  • FIG. 8 is a flowchart illustrating an example of a flow of processing performed by the control unit 28 of the information processing device 2 while the processing from step S100 to step S200 is performed by the information processing terminal 5.
  • the control unit 28 receives terminal position information from the information processing terminal 5 via the communication unit 24 (step S300).
  • the information acquisition unit 283 obtains the electrical facility map information of the area including the location indicated by the terminal location information, as the electrical facility map. Obtained from the information storage unit 221 (step S310).
  • the information acquisition unit 283 is configured to acquire the electrical facility map information of the whole country instead of the configuration of acquiring the electrical facility map information of the region including the position indicated by the location information from the electrical facility map information storage unit 221. There may be.
  • the information acquisition unit 283 obtains the distribution line map information of the region including the position indicated by the terminal position information. Obtained from the information storage unit 223 (step S320). In addition, the information acquisition part 283 replaces with the structure which acquires the distribution line map information of the area
  • the specifying unit 285 specifies the target power pole based on the information shown in the following A) to B) (step S325).
  • Terminal position information received from the information processing terminal 5 by the control unit 28 in step S300 B) Electrical facility map information acquired from the electrical facility map information storage unit 221 in step S310 and distribution line route map information storage unit 223 in step S320 Pole position information indicating the position of each of the plurality of utility poles included in either or both of the distribution line map information acquired from
  • the identification unit 285 includes a power pole that includes the position indicated by the terminal position information within a predetermined range, and a power pole that indicates a position of each of the plurality of power poles included in one or both of the electrical facility map information and the distribution line map information. Extract based on location information.
  • the predetermined range is a range including the position of a certain utility pole, for example, a circular range having a radius of 10 meters centered on the position of a certain utility pole.
  • the predetermined range may be a range of another shape or a range of another size.
  • the identification unit 285 detects (identifies) the utility pole identification information associated with the extracted utility pole position information of the utility pole as the utility pole identification information of the target utility pole.
  • the information acquisition unit 283 acquires facility information associated with the utility pole identification information from the facility information DB 3 based on the utility pole identification information of the target utility pole specified by the specification unit 285 in step S325 (step S330). .
  • FIG. 9 is a diagram illustrating an example of information included in the facility information stored in the facility information DB 3.
  • the facility information includes, for each type of electrical equipment (described as equipment in step S ⁇ b> 9), a start code for identifying a branch of the electric power company that owns the electrical equipment, Electrical equipment identification information for identifying the electrical equipment (for example, when the electrical equipment is a utility pole, utility pole identification information), information indicating the type of the electrical equipment, information indicating the year of manufacture of the electrical equipment, and the electrical equipment And information indicating the year of installation of the electrical equipment.
  • the information indicating the type of electrical equipment includes information indicating the size, shape, and the like of the electrical equipment.
  • the facility information may include other information related to the electrical facility.
  • the information acquisition unit 283 acquires the inspection item information associated with the utility pole identification information from the facility inspection information DB 4 based on the utility pole identification information of the target utility pole specified by the specification unit 285 in Step S325 (Step S325). S340).
  • FIG. 10 is a diagram illustrating an example of information included in the inspection item information stored in the facility inspection information DB 4.
  • the inspection item information includes, for each electrical facility (in this example, a utility pole), electrical facility identification information (in this example, utility pole identification information) that identifies the electrical facility, and the electrical facility identification. And information indicating one or more inspection items associated with each piece of information.
  • the screen information generation unit 287 includes terminal position information, electrical equipment identification information, distribution line map information, equipment information on the target power pole, and inspection items on the target power pole acquired in the processing from step S310 to step S340.
  • First display screen information including at least information is generated (step S350).
  • the communication control unit 281 transmits the first display screen information generated by the screen information generation unit 287 in step S350 to the information processing terminal 5 via the communication unit 24 (step S360).
  • the control unit 58 waits until examination result information is acquired from the information processing terminal 5 (step S370).
  • the determination unit 288 determines whether all the inspection items related to the utility pole specified by the specifying unit 285 in step S325 have been inspected. Is performed (step S380). The determination unit 288 performs the determination by comparing the inspection item information acquired by the information acquisition unit 283 in step S340 with the inspection result information received from the information processing terminal 5 by the control unit 28 in step S370.
  • step S325 When it is determined in step S325 that all the inspection items related to the target power pole specified by the specifying unit 285 have not been checked (step S380-No), the determining unit 288 sends error information to the information processing terminal 5 via the communication unit 24. (Step S390), the control unit 28 transitions to Step S370 and waits until the test result information is received from the information processing terminal 5 again.
  • the determining unit 288 receives the inspection result received by the control unit 28 in step S370. Based on the information, the inspection result information stored in the facility inspection information DB 4 and the inspection result information regarding the target power pole specified by the specifying unit 285 in step S325 is updated by the information updating unit 289 (step S400).
  • the screen information generation unit 287 changes the display state of the first display screen generated based on the first display screen information generated in step S350 based on the inspection result information received by the control unit 28 in step S370. Second display screen information is generated (step S410).
  • the second display screen in which the display state of the first display screen is changed is the position of the target power pole on the first display screen, and the position of the target power pole specified by the specifying unit 285 in step S325.
  • This is a screen on which a mark (for example, a mark S1 or a mark S2 in FIG. 2) indicating an inspected telephone pole is displayed.
  • the second display screen in which the display state of the first display screen has been changed is that when the adjacent power pole connected by the connection path to the target telephone pole that has been newly inspected has been inspected, This is a screen whose display state has been changed.
  • the communication control unit 281 transmits the second display screen information generated by the screen information generation unit 287 in step S410 to the information processing terminal 5 via the communication unit 24 (step S420).
  • FIG. 11 is a sequence diagram illustrating an example of the flow of processing between the information processing device 2 and the information processing terminal 5 in the information processing system 1.
  • the sequence diagram in FIG. 11 the case where the GUI is already displayed on the display unit 55 of the information processing terminal 5 will be described.
  • the information processing terminal 5 generates terminal position information based on the inspection start operation from the user received by the input receiving unit 53 via the GUI. Then, the information processing terminal 5 transmits the terminal position information to the information processing device 2 (step S500).
  • the information processing apparatus 2 generates first display screen information based on the terminal position information received from the information processing terminal 5 (step S510). Next, the information processing apparatus 2 transmits the first display screen information generated in step S510 to the information processing terminal 5 (step S520).
  • the information processing terminal 5 receives the first display screen information from the information processing apparatus 2. Then, the information processing terminal 5 displays the first display screen based on the received first display screen information (step S530).
  • the information processing terminal 5 receives an operation related to the inspection work from the user by the input receiving unit 53 via the GUI displayed on the display unit 55 of the information processing terminal 5, and then completes the operation. A case where the above is performed will be described.
  • the information processing terminal 5 After the completion operation is performed by the user, the information processing terminal 5 generates inspection result information (step S540). Next, the information processing terminal 5 transmits the inspection result information generated in step S540 to the information processing apparatus 2 (step S550).
  • the information processing apparatus 2 receives the inspection result information from the information processing terminal 5 (step S560). Next, the information processing apparatus 2 determines whether or not all the inspection items related to the target power pole have been inspected based on the inspection result information received in step S560 (step S560). Hereinafter, a case will be described in which the information processing apparatus 2 determines in step S560 that all inspection items related to the target power pole have been inspected.
  • step S570 the information processing apparatus 2 generates second display screen information based on the inspection result information received from the information processing terminal 5 in step S560 (step S570).
  • the information processing apparatus 2 is inspection result information in which the equipment inspection information DB 4 is stored based on the inspection result information received from the information processing terminal 5 in step S560, and the inspection result information on the target power pole. Update.
  • the information processing apparatus 2 transmits the second display screen information generated in step S570 to the information processing terminal 5 (step S580).
  • the information processing terminal 5 receives the second display screen information from the information processing device 2. Then, the information processing terminal 5 displays the second display screen based on the received second display screen information (step S590).
  • the information processing system 1 is a track diagram (for example, a first diagram) including information indicating the positions of a plurality of electrical facilities (for example, utility poles in the first embodiment) and information indicating a connection path between the electrical facilities.
  • Information for example, electrical equipment position information in the first embodiment
  • an information processing terminal for example, the information processing terminal 5 in the first embodiment
  • information for example, terminal position information in the first embodiment
  • information indicating the position of the electrical equipment (for example, the target power pole in the first embodiment) to be inspected, and becomes the specified inspection target
  • information indicating that the electrical equipment has been inspected in the track diagram is processed by the information processing terminal. Is displayed, if the electrical equipment next to be connected by a connection path with the electrical equipment was already inspected, it performs the display change processing for changing the display state of the connection
  • the information processing system 1 stores track diagram information indicating the track diagram (for example, distribution line route map information in the first embodiment), reads the stored track diagram information, and includes a plurality of information included in the read track diagram information. Based on the information indicating the position of the electrical equipment, the electrical equipment to be inspected is specified.
  • track diagram information indicating the track diagram for example, distribution line route map information in the first embodiment
  • the information processing system 1 displays the information processing terminal on the information processing terminal based on the information indicating the positions of the plurality of electric facilities included in the track diagram and the information indicating the positions of the specified electric facilities to be inspected.
  • 1st display image information which shows a display image is generated
  • 2nd display image information which changes the display state of the 1st display image based on information which shows the inspection result of the electric equipment used as inspection object was generated and generated
  • the first display image is displayed on the information processing terminal based on the first display image information, and the display change process is performed on the first display image based on the generated second display image information.
  • the information processing system 1 determines whether or not all inspection items related to the electrical equipment to be inspected have been inspected, and if some or all of the inspection items have been inspected, performs a display change process. When all the inspection items have not been inspected, information indicating an error is displayed on the information processing terminal.
  • the information processing system 1 includes information indicating the positions of a plurality of electrical facilities (in this example, utility poles) (in this example, utility pole position information) and connection paths between the electrical facilities. Based on the information indicating the positions of the plurality of electrical facilities included in the distribution line map including the information to be displayed and the information indicating the position of the information processing terminal 5 (terminal position information in this example). Based on the inspection result information indicating the inspection result of the specified electrical equipment, the information processing terminal 5 displays information indicating that the electrical equipment has been inspected in the distribution line diagram, When the adjacent electrical equipment connected by the connection path has been inspected, the display state of the connection path displayed on the information processing terminal 5 is changed. As a result, the information processing system 1 can improve the efficiency of inspection and inspection of the electrical equipment.
  • the information processing system 1 is based on terminal position information, and utility pole position information indicating the positions of a plurality of utility poles included in one or both of electrical facility map information and distribution line route map information. For example, by accepting an operation of selecting a power pole by a user from a plurality of power poles on the map P1 displayed on the display unit 55 of the information processing terminal 5, the configuration of identifying the power pole identification information of The utility pole identification information may be specified. In this case, for example, the information processing terminal 5 transmits the selected power pole position information indicating the position of the selected power pole on the map P ⁇ b> 1 to the information processing apparatus 2.
  • And information processor 2 is based on the received selection electric pole position information of electric pole position information which shows the position of each of a plurality of electric poles contained in either or both of electric equipment map information and distribution line route map information.
  • the power pole position information closest to the position indicated by the selected power pole position information is extracted, and the power pole identification information associated with the extracted power pole position information is detected (specified) as the power pole identification information of the target power pole.
  • the information processing terminal 5 may be configured to include a part or all of the functional units included in the information processing apparatus 2. For example, in the case of a configuration including all of the functional units included in the information processing device 2, the information processing terminal 5 communicates with the facility information DB 3 and the facility inspection information DB 4 by wireless communication.
  • a computer-readable recording medium (for example, a non-recording medium) can be used to store a program for realizing the functions of arbitrary components in the apparatus described above (for example, the information processing apparatus 2 and the information processing terminal 5 of the information processing system 1).
  • the program may be recorded on a temporary recording medium), and the program may be read into a computer system and executed.
  • the “computer system” includes hardware such as an OS (Operating System) and peripheral devices.
  • the “computer-readable recording medium” means a portable medium such as a flexible disk, a magneto-optical disk, a ROM, a CD (Compact Disk) -ROM, or a storage device such as a hard disk built in the computer system. .
  • “computer-readable recording medium” means a volatile memory (RAM) inside a computer system that becomes a server or client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line.
  • RAM volatile memory
  • those holding programs for a certain period of time are also included.
  • the above program may be transmitted from a computer system storing the program in a storage device or the like to another computer system via a transmission medium or by a transmission wave in the transmission medium.
  • the “transmission medium” for transmitting the program refers to a medium having a function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line.
  • the above program may be for realizing a part of the functions described above.
  • the program may be a so-called difference file (difference program) that can realize the above-described functions in combination with a program already recorded in the computer system.
  • Information processing system 2 Information processing device 3
  • Facility information DB 4 facility inspection information DB 5
  • Communication unit 25 55
  • Control unit 56 Imaging unit 57
  • Position detection unit 221 Electrical facility map information storage unit 223 Distribution line diagram information storage unit 281, 581 Communication Control unit 283

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Instructional Devices (AREA)

Abstract

 情報処理システムは、複数の電気設備の位置を示す情報と、電気設備間の接続経路を示す情報とを含む線路図に含まれる複数の電気設備の位置を示す情報と、情報処理端末の位置を示す情報とに基づいて、検査対象となる電気設備を特定する特定部と、特定部が特定した検査対象となる電気設備の検査結果を示す情報に基づいて、線路図において当該電気設備が検査済みであることを示す情報を情報処理端末に表示させ、当該電気設備と接続経路によって接続される隣の電気設備が検査済みであった場合、情報処理端末に表示された当該接続経路の表示状態を変更する表示制御部と、を含む。

Description

情報処理システム、情報処理方法、及び記憶媒体
 本発明は、情報処理システム、情報処理方法、及び記憶媒体に関する。
 電気設備の点検を支援する装置が研究・開発されている。
 これに関し、作業時に停電を伴う発変電所に備えられた発変電器の設備、機器について点検、補修、修理、工事を実施するための作業計画を策定する発変電器点検・停電計画支援システムであって、発変電器の設備と機器に関する情報を記憶し、発変電器の設備、機器について、過去に実施した点検、補修、修理、工事に関する作業情報を記憶し、発変電器に含まれる電力設備のうち、点検、補修、修理、工事を行う設備、機器に関する機種、仕様が入力され、入力された設備、機器と、記憶されている設備、機器の情報と点検等の情報とに基づいて、点検作業のために停電できる設備、機器候補を決定し、生成される停電できる設備候補の中から、算定される工量に基づいて、その作業に必要な稼働作業員と人数を算定する発変電器点検・停電計画支援システムが特許文献1に記載されている。
特開2010-239731号公報
 ところで、電気設備の巡視・点検には、電気設備の位置を示す地図や、電気設備間の論理的な接続を示す地図、検査項目の検査結果を記入するカード類等を作業員が携行しなければならず、当該作業員がそれらの地図やカード類等を紛失してしまうリスクが伴う。また、電気設備の巡視・点検を終えた作業員は、事業所等に戻り次第、多量の巡視・点検結果をサーバー等に手入力で記憶させなければならず、多大な時間と労力を要していた。そして、従来のシステムでは、これらを解決することができなかった。
 そこで本発明は、電気設備の巡視・点検の効率化を図ることができる情報処理システム、情報処理方法、及び記憶媒体を提供する。
 本発明の一態様は、複数の電気設備の位置を示す情報と、前記電気設備間の接続経路を示す情報とを含む線路図に含まれる前記複数の前記電気設備の位置を示す情報と、情報処理端末の位置を示す情報とに基づいて、検査対象となる前記電気設備を特定する特定部と、前記特定部が特定した前記検査対象となる前記電気設備の検査結果を示す情報に基づいて、前記線路図において当該電気設備が検査済みであることを示す情報を前記情報処理端末に表示させ、当該電気設備と前記接続経路によって接続される隣の前記電気設備が検査済みであった場合、前記情報処理端末に表示された当該接続経路の表示状態を変更する表示制御部と、を含む情報処理システムである。
 本発明の一態様は、電気設備の巡視・点検の効率化を図ることができる情報処理システム、情報処理方法、及びプログラムを提供する。
情報処理システムの構成の一例を示す図である。 ユーザーが行う点検作業を支援するアプリケーションプログラムのGUIが表示する表示画像の一例を示す図である。 情報処理装置のハードウェア構成の一例を示す図である。 情報処理装置の機能構成の一例を示す図である。 情報処理端末のハードウェア構成の一例を示す図である。 情報処理端末の機能構成の一例を示す図である。 ユーザーが点検作業を開始してから点検作業を終了するまでの情報処理端末5が行う処理の流れの一例を示すフローチャートである。 情報処理端末によりステップS100からステップS200までの処理が行われる間に情報処理装置の制御部が行う処理の流れの一例を示すフローチャートである。 設備情報DBに格納される設備情報に含まれる情報の一例を示す図である。 設備検査情報DBに格納される検査項目情報に含まれる情報の一例を示す図である。 情報処理システムにおける情報処理装置と情報処理端末の間の処理の流れの一例を示すシーケンス図である。
 (第1実施形態)
 以下、本発明の第1実施形態について、図面を参照して説明する。図1は、情報処理システム1の構成の一例を示す図である。情報処理システム1は、情報処理装置2と、設備情報DB(Database)3と、設備検査情報DB4と、情報処理端末5を備える。
 まず、第1実施形態に係る情報処理システム1の概要について説明する。情報処理システム1は、電気設備を巡視して点検する点検作業の支援を行う。点検作業の支援とは、情報処理システム1のユーザーが複数の電気設備を巡視して点検する際、当該ユーザーが点検作業を終えた電気設備を示す情報と、点検を終えた電気設備同士の接続経路を示す情報とを情報処理端末5の表示部に表示すること等を示す。電気設備の点検とは、この一例において、電気設備毎に予め決めらえた検査項目の一部又は全部を検査することを示す。以下では、説明の便宜上、電気設備を巡視して点検する点検作業を、単に点検作業と称して説明する。また、以下では、点検を終えた電気設備を、点検済電気設備(例えば、電気設備が電柱の場合、点検済電柱)と称して説明する。
 情報処理システム1のユーザーは、例えば、電力会社が保有する電気設備を点検する従業員であるが、当該従業員をサポートする役目の人等であってもよい。電気設備は、例えば、電柱や変圧器、開閉器、電線、ケーブル、地中線用路上機器等であるが、他の設備であってもよい。なお、以下では、説明の便宜上、電気設備が電柱である場合について説明する。また、以下では、情報処理システム1のユーザーを単にユーザーと称して説明する。
 情報処理装置2は、情報処理端末5から送信される各種情報に基づいて、情報処理端末5に点検作業を支援する表示画面を生成するための表示画面情報を生成するサーバーである。情報処理装置2は、生成した表示画像情報を、情報処理端末5に送信する。情報処理装置2は、設備情報DB3と有線又は無線によって互いに通信可能に接続されている。また、情報処理装置2は、設備検査情報DB4と有線又は無線によって互いに通信可能に接続されている。また、情報処理装置2は、情報処理端末5と無線によって互いに通信可能に接続されている。なお、情報処理装置2と情報処理端末5との間の通信は、移動体通信網や無線LAN(Local Area Network)等を利用した通信である。
 設備情報DB3は、ユーザーが点検作業を行う電気設備に関する情報を、設備情報として電気設備の種類毎に記憶する。
 設備検査情報DB4は、ユーザーが点検作業において検査する項目を示す検査項目情報を電気設備の種類毎に記憶する。
 情報処理端末5は、例えば、タブレットPC(Personal Computer)や多機能携帯電話端末(スマートフォン)、携帯電話端末、電子書籍リーダー、PDA(Personal Digital Assistant)等である。情報処理端末5は、ユーザーが行う点検作業を支援するアプリケーションプログラムがインストールされており、当該アプリケーションプログラムのGUI(Graphical User Interface)を介してユーザーの点検作業を支援する。より具体的には、情報処理端末5は、当該GUIを介して、点検作業を支援する表示画面を表示する。
 ここで、図2を参照して、ユーザーが行う点検作業を支援するアプリケーションプログラムのGUIが表示する表示画面について説明する。図2は、ユーザーが行う点検作業を支援するアプリケーションプログラムのGUIが表示する表示画面の一例を示す図である。以下では、説明の便宜上、ユーザーが行う点検作業を支援するアプリケーションプログラムのGUIを、単にGUIと称して説明する。
 図2に示したように、GUIは、情報処理端末5に表示画面Pを表示させる。表示画面Pには、少なくとも地図P1と、現場写真P2と、検査項目画像P3と、撮影ボタンB1と、検査完了ボタンB2が表示される。
 地図P1には、電気設備地図と、配電線路図とが重ねて表示される。電気設備地図とは、ある地域の地図画像上に、当該地域に存在する複数の電気設備それぞれの位置を示す情報が重ねて表示された地図である。この一例において、電気設備地図は、ある地域の地図画像上に、当該地域に存在する複数の電柱それぞれの位置を示す電柱位置情報が重ねて表示された地図(ポールマップ)画像である。
 なお、電気設備地図における複数の電柱それぞれの位置を示す情報には、電柱を識別する電柱識別情報が対応付けられている。また、電気設備地図における電柱の位置を示す情報は、例えば、緯度及び経度を示す情報であるが、他の情報であってもよい。また、電気設備地図における電柱の位置を示す情報には、高度を示す情報等、電柱の位置に係る他の情報が含まれていてもよい。
 また、配電線路図とは、ある地域に存在する複数の電柱それぞれの位置を示す電柱位置情報と、ある電柱から他の電柱への接続経路を示す情報とが重ねて表示された地図画像である。なお、電気設備地図における電柱位置情報と、配電線路図における電柱位置情報とは、同じ情報である。また、配電線路図には、ある地域に存在する複数の電柱それぞれの位置を示す電柱位置情報と、当該地域の地図画像と、ある電柱から他の電柱への接続経路を示す情報とが重ねて表示されてもよい。この場合、地図P1には、配電線路図のみが表示される。配電線路図は、線路図の一例である。
 なお、接続経路とは、この一例において、電柱と電柱を結ぶ送電を目的とした送電線によって結ばれた送電経路を示すが、通信ケーブル等の他の経路であってもよい。また、配電線路図における複数の電柱それぞれの位置を示す情報には、電柱を識別する電柱識別情報が対応付けられている。また、配電線路図における複数の電柱それぞれの位置を示す情報は、例えば、緯度及び経度を示す情報であるが、他の情報であってもよい。また、配電線路図における電柱それぞれの位置を示す情報には、高度を示す情報等、電柱の位置に係る他の情報が含まれていてもよい。
 図2に示した地図P1上には、電柱の位置を示す印が表示される。例えば、地図P1上における円T1~T9のそれぞれは、電柱の位置を示す。以下では、説明の便宜上、円T1~T9のそれぞれが示す位置の電柱を、電柱T1~T9と称して説明する。
 ここで、電柱T4が、ユーザーにより現在点検作業中の電柱である場合について説明する。以下では、ユーザーにより現在点検作業中の電柱を、対象電柱と称して説明する。地図P1上において、電柱T4には、対象電柱であることを示す印Nが表示される。図2において、印Nは、電柱T4を囲む矩形状の印であるが、他の大きさや他の形状であってもよい。また、地図P1において、対象電柱は、他の電柱との色や点灯状態の変更(点滅や明滅等)等によって区別されてもよい。
 ここで、電柱T2と電柱T3のそれぞれが、点検済電柱である場合について説明する。地図P1上において、点検済電柱には、印S1や印S2のように、検査済みであることを表す印が表示される。印S1は、電柱T2が点検済電柱であることを示す印である。印S2は、電柱T3が点検済電柱であることを示す印である。
 図2において、印S1は、電柱T2を囲む星型の印であるが、他の形状や他の大きさであってもよい。また、地図P1において、点検済電柱は、他の電柱との色や点灯状態の変更(点滅や明滅等)等によって区別されてもよい。なお、印S2は、印S1と同様であるため、説明を省略する。また、点検済電柱であることを示す印は、複数の点検済電柱に関して検査が終了した順を識別可能な印であってもよい。
 また、地図P1上において、ある点検済電柱と接続経路によって接続される隣の電柱が点検済電柱であった場合、当該接続経路の表示状態は、変更される。図2において、点検済電柱T2と、点検済電柱T3との間の接続経路は、他の接続経路と異なり、太線Lに変更されている。なお、接続経路の表示状態の変更は、太線への変更に代えて、例えば、接続経路を示す線分の色の変更や、当該線分の点灯状態(点滅や明滅等)の変更や、当該線分の形状の変更等であってもよい。
 なお、地図P1は、電気設備地図と、配電線路図とが重ねて表示されるのに代えて、電気設備地図と、配電線路図とのうちいずれか一方が表示されてもよい。電気設備地図のみが表示される場合、電柱間の接続経路の表示は、検査済みの電柱間の接続経路のみが表示される。また、地図P1には、電気設備地図と、配電線路図とのうちいずれか一方を半透明にして重ねて表示されてもよい。
 現場写真P2には、ユーザーにより撮影ボタンB1を押下する撮像操作が行われることにより情報処理端末5が備える撮像部によって撮像される撮像画像が表示される。なお、現場写真P2には、情報処理端末5が備えるGPS(Global Positioning System)センサーから取得されるGPS情報に基づいた情報であって、ユーザーが撮影した方角を示す情報等、他の情報が併せて表示されてもよい。
 検査項目画像P3には、対象電柱に関してユーザーが検査しなければならない検査項目を示す情報が並べて表示されている。図2に示した例では、「検査項目1」~「検査項目4」までの検査項目をそれぞれ示すテキスト情報が並べて表示されている。前述したように、ユーザーは、これらの検査項目の一部又は全部を検査する点検作業を行う。
 また、検査項目画像P3には、各検査項目を示すテキスト情報と対応付けられたチェックボックス(ラジオボックス)が表示される。これらのチェックボックスは、ユーザーからの選択操作が行われることにより、検査済みとなった検査項目のチェックボックスにチェックが表示される。例えば、ユーザーが検査を終えた検査項目に対応するチェックボックスに対して選択操作を行うことにより、検査済みとなった検査項目には、チェックが表示される。図2において、「検査項目1」が検査終了になっていることを示すチェックが、「検査項目1」に対応付けられたチェックボックスC1に黒丸として表示されている。
 また、検査項目画像P3には、検査完了ボタンB2が表示されている。情報処理端末5は、ユーザーから検査完了ボタンB2を押下する完了操作を受け付けることにより、チェックボックスにチェックが表示されている各検査項目を示す情報と、現場写真P2に表示された撮像画像を示す情報とを対応付けた情報を、検査結果を示す検査結果情報として情報処理装置2に送信する。
 このように、情報処理システム1は、地図P1において点検済電柱を示す情報を情報処理端末5に表示させ、当該点検済電柱と接続経路によって接続される隣の電柱が点検済電柱であった場合、情報処理端末5に表示された当該接続経路の表示状態を変更する。これにより、ユーザーは、現在までに点検作業が行われていない電柱を容易に把握することができるだけではなく、点検済電柱間の接続経路を容易に把握することができる。その結果、情報処理システム1は、電柱(すなわち、電気設備)の巡視・点検の効率化を図ることができる。
 なお、以下では、説明の便宜上、ユーザーによる完了操作を受け付ける前の表示画面を、第1表示画面と称し、ユーザーによる完了操作を受け付けた後の表示画面を、第2表示画面と称して説明する。また、以下では、第1表示画面と第2表示画面を区別する必要が無い限り、単に表示画面と称して説明する。
 また、表示画面Pには、ユーザーが検査に関する備考等を示す情報を入力するテキストボックスが表示されていてもよい。この場合、情報処理端末5は、完了操作を受け付けることにより、当該テキストボックスに入力された情報を、チェックボックスにチェックが表示されている各検査項目を示す情報と、現場写真P2に表示された撮像画像を示す情報とに対応付けた検査結果情報を生成する。また、図2には図示していないが、表示画面Pには、対象電柱に関する情報(設備情報に含まれる情報の少なくとも一部)が表示されてもよい。
 次に、図3を参照して、情報処理装置2のハードウェア構成について説明する。図3は、情報処理装置2のハードウェア構成の一例を示す図である。情報処理装置2は、例えば、CPU(Central Processing Unit)21と、記憶部22と、入力受付部23と、通信部24と、表示部25を備え、通信部24を介して他の装置と通信を行う。これらの構成要素は、バスBusを介して相互に通信可能に接続されている。CPU21は、記憶部22に格納された各種プログラムを実行する。
 記憶部22は、例えば、HDD(Hard Disk Drive)やSSD(Solid State Drive)、EEPROM(Electrically Erasable Programmable Read-Only Memory)、ROM(Read-Only Memory)、RAM(Random Access Memory)等を含み、情報処理装置2が処理する各種情報や画像、プログラム等を格納する。なお、記憶部22は、情報処理装置2に内蔵されるものに代えて、USB(Universal Serial Bus)等のデジタル入出力ポート等によって接続された外付け型の記憶装置でもよい。
 入力受付部23は、例えば、キーボードやマウス、タッチパッド、その他の入力装置である。なお、入力受付部23は、表示部25と一体のタッチパネルとして構成されてもよい。
 通信部24は、例えば、USB等のデジタル入出力ポートやイーサネット(登録商標)ポート等を含んで構成される。
 表示部25は、例えば、液晶ディスプレイパネル、あるいは、有機EL(ElectroLuminescence)ディスプレイパネルである。
 次に、図4を参照して、情報処理装置2の機能構成について説明する。図4は、情報処理装置2の機能構成の一例を示す図である。情報処理装置2は、記憶部22と、通信部24と、制御部28を備える。制御部28が備える機能部のうち一部又は全部は、例えば、CPU21が、記憶部22に記憶された各種プログラムを実行することで実現される。また、これらの機能部のうち一部または全部は、LSI(Large Scale Integration)やASIC(Application Specific Integrated Circuit)等のハードウェア機能部であってもよい。
 記憶部22は、電気設備地図情報記憶部221と、配電線路図情報記憶部223を備える。
 電気設備地図情報記憶部221は、前述した電気設備地図を示す電気設備地図情報を記憶する。
 配電線路図情報記憶部223は、前述した配電線路図を示す配電線路図情報を記憶する。
 制御部28は、情報処理装置2の全体を制御する。制御部28は、通信部24を介して、情報処理端末5から端末位置情報を受信する。また、制御部28は、通信部24を介して、情報処理端末5から検査結果情報を受信する。制御部28は、通信制御部281と、情報取得部283と、特定部285と、画面情報生成部287と、判定部288と、情報更新部289を備える。
 通信制御部281は、通信部24を介して、画面情報生成部287が生成した表示画面を生成する表示画面情報を情報処理端末5に送信する。
 情報取得部283は、制御部28からの要求に応じて、制御部28が情報処理端末5から受信した情報処理端末5の位置を示す端末位置情報に基づいて、当該端末位置情報が示す位置を含む地域の電気設備地図を示す電気設備地図情報を、電気設備地図情報記憶部221から取得する(読み込む)。端末位置情報は、情報処理端末の位置を示す情報の一例である。また、情報取得部283は、制御部28が情報処理端末5から受信した端末位置情報に基づいて、当該端末位置情報が示す位置を含む地域の配電線路図を示す配電線路図情報を、配電線路図情報記憶部223から取得する。
 また、情報取得部283は、電気設備地図情報記憶部221から取得した電気設備地図情報と、配電線路図情報記憶部223から取得した配電線路図情報とのうちいずれか一方又は両方に含まれる複数の電柱識別情報に基づいて、設備情報DB3から電柱識別情報毎(すなわち、電柱毎)の設備情報を取得する。また、情報取得部283は、電気設備地図情報記憶部221から取得した電気設備地図情報と、配電線路図情報記憶部223から取得した配電線路図情報とのうちいずれか一方又は両方に含まれる複数の電柱識別情報に基づいて、設備検査情報DB4から電柱識別情報毎の検査項目情報を取得する。
 特定部285は、制御部28が情報処理端末5から受信した端末位置情報と、電気設備地図情報記憶部221から取得した電気設備地図情報と、配電線路図情報記憶部223から取得した配電線路図情報とのうちいずれか一方又は両方に含まれる複数の電柱それぞれの位置を示す電柱位置情報とに基づいて対象電柱を特定(検出)する。対象電柱を特定するとは、対象電柱の電柱位置情報に対応付けられた電柱識別情報を検出することを示す。
 画面情報生成部287は、特定部285が特定した対象電柱の電柱位置情報及び電柱識別情報と、情報取得部283が取得した当該対象電柱の設備情報と、当該対象電柱の検査項目情報と、電気設備地図情報と、配電線路図情報とを少なくとも含む表示画面情報を生成する。当該表示画面情報は、第1表示画面を生成する表示画面情報である。以下では、説明の便宜上、当該表示画面情報を、第1表示画面情報と称して説明する。また、画面情報生成部287は、生成した第1表示画面情報と、情報処理端末5から取得される検査結果情報とに基づいて、当該第1表示画面の表示状態を変更する表示画面情報を生成する。以下では、説明の便宜上、当該表示画面情報を、第2表示画面情報と称して説明する。
 判定部288は、制御部28が受信した検査結果情報に基づいて、検査結果情報に含まれる対象電柱の電柱識別情報に対応付けられた検査項目情報を設備検査情報DB4から読み込む。そして、判定部288は、読み込んだ検査項目情報に含まれる検査項目のすべてが検査済みであるか否かを、制御部28が受信した検査結果情報に基づいて判定する。判定部288は、検査項目のすべてが検査済みではないと判定した場合、通信部24を介して、検査項目の全てが検査済みではないことを示す情報(以下、エラー情報と称する)を情報処理端末5に送信する。なお、情報処理端末5は、エラー情報を受信すると、受信したエラー情報を表示する。一方、判定部288は、検査項目の一部又は全部が検査済みであると判定した場合、設備検査情報DB4に記憶された検査結果情報であって、検査結果情報に含まれる現在点検中の電柱識別情報に対応付けられた検査結果情報を、制御部28が受信した検査結果情報によって情報更新部289に更新させる(この場合、上書きさせる)。
 情報更新部289は、判定部288からの要求に応じて、設備検査情報DB4に記憶された検査結果情報を更新する。なお、情報更新部289が行う検査結果情報の更新とは、検査結果情報の生成や変更、削除等を含む。
 次に、図5を参照して、情報処理端末5のハードウェア構成について説明する。図5は、情報処理端末5のハードウェア構成の一例を示す図である。情報処理端末5は、例えば、CPU51と、記憶部52と、入力受付部53と、通信部54と、表示部55と、撮像部56と、位置検出部57を備え、通信部54を介して他の装置と通信を行う。これらの構成要素は、バスBusを介して相互に通信可能に接続されている。CPU51は、記憶部52に格納された各種プログラムを実行する。
 記憶部52は、例えば、HDDやSSD、EEPROM、ROM、RAM等を含み、情報処理装置2が処理する各種情報や画像、プログラム等を格納する。なお、記憶部52は、情報処理端末5に内蔵されるものに代えて、USB等のデジタル入出力ポート等によって接続された外付け型の記憶装置でもよい。
 入力受付部53は、例えば、キーボードやマウス、タッチパッド、その他の入力装置である。なお、入力受付部53は、表示部55と一体のタッチパネルとして構成されてもよい。
 通信部54は、例えば、USB等のデジタル入出力ポートやイーサネット(登録商標)ポート等を含んで構成される。
 表示部55は、例えば、液晶ディスプレイパネル、あるいは、有機ELディスプレイパネルである。
 撮像部56は、例えば、集光された光を電気信号に変換する撮像素子であるCCD(Charge Coupled Device)やCMOS(Complementary Metal Oxide Semiconductor)等を備えたカメラである。
 位置検出部57は、例えば、GPSセンサーであり、情報処理端末5の位置する緯度と経度の情報を算出するための、GPS情報、例えば時刻情報と衛星軌道データ等を取得する。
 次に、図6を参照して、情報処理端末5の機能構成について説明する。図6は、情報処理端末5の機能構成の一例を示す図である。情報処理端末5は、記憶部52と、入力受付部53と、通信部54と、表示部55と、撮像部56と、位置検出部57と、制御部58を備える。制御部58が備える機能部のうち一部又は全部は、例えば、CPU51が、記憶部52に記憶された各種プログラムを実行することで実現される。また、これらの機能部のうち一部または全部は、LSIやASIC等のハードウェア機能部であってもよい。
 制御部58は、情報処理端末5の全体を制御する。制御部58は、通信制御部581と、表示制御部582と、撮像制御部583と、位置情報生成部585と、検査結果情報生成部589を備える。
 通信制御部581は、通信部54を介して、位置情報生成部585が生成した端末位置情報を情報処理装置2に送信する。また、通信制御部581は、通信部54を介して、検査結果情報生成部589が生成した検査結果情報を情報処理装置2に送信する。
 表示制御部582は、情報処理装置2から通信部54を介して取得される第1表示画面情報に基づいて、第1表示画面を表示部55に表示させる。また、表示制御部582は、情報処理装置2から通信部54を介して取得される第2表示画面情報に基づいて、第1表示画面の表示状態を変更した第2表示画面を表示部55に表示させる。また、表示制御部582は、撮像部56から取得される撮像画像に基づいて、表示画面に当該撮像画像を重畳する。例えば、表示制御部582は、表示画面P上の現場写真P2に対して、撮像部56から取得される撮像画像を重畳する。
 撮像制御部583は、撮像部56に撮像可能な範囲を撮像させる。
 位置情報生成部585は、位置検出部57からGPS情報を取得する。また、位置情報生成部585は、取得したGPS情報に基づいて、情報処理端末5の位置を示す端末位置情報を生成する。なお、端末位置情報は、情報処理端末5の緯度及び経度を示す情報であるが、これに加えて、情報処理端末5の高度を示す情報や、情報処理端末5の撮像部56のレンズが向いている方角を示す情報が含まれていてもよい。
 検査結果情報生成部589は、表示部55に表示された表示画面を介して入力受付部53によりユーザーから受け付けられた操作に基づいて、検査結果情報を生成する。
 以下、図7を参照して、ユーザーが点検作業を開始してから点検作業を終了するまでの情報処理端末5が行う処理について説明する。図7は、ユーザーが点検作業を開始してから点検作業を終了するまでの情報処理端末5が行う処理の流れの一例を示すフローチャートである。図7におけるフローチャートでは、情報処理端末5の表示部55に、GUIがすでに表示されている場合について説明する。
 まず、制御部58は、表示部55に表示されているGUIを介して、入力受付部53によりユーザーから点検作業を開始する点検開始操作を受け付ける(ステップS100)。次に、位置情報生成部585は、位置検出部57からGPS情報を取得する。位置情報生成部585は、取得したGPS情報に基づいて端末位置情報を生成する(ステップS110)。
 次に、通信制御部581は、通信部54を介して、ステップS110において位置情報生成部585が生成した端末位置情報を情報処理装置2に送信する(ステップS120)。次に、制御部58は、通信部54を介して、情報処理装置2から第1表示画面情報を受信する(ステップS130)。
 次に、表示制御部582は、ステップS130において制御部58が受信した第1表示画面情報に基づいて、表示部55に第1表示画面を表示させる(ステップS140)。表示制御部582は、例えば、図2に示した表示画面Pを表示部55に表示させる。
 次に、制御部58は、表示部55に表示されたGUIを介して入力受付部53によりユーザーから点検作業に係る操作を受け付ける(ステップS150)。点検作業に係る操作とは、例えば、図2に示した複数の検査項目それぞれのチェックボックスを選択する(チェックボックスにチェックする)選択操作や、ユーザーが点検作業中の電柱を撮像部56により撮像し、撮像した撮像画像を現場写真P2として表示させる撮像操作や、検査完了ボタンB2を押下する完了操作等を示す。
 以下では、ステップS150において、ユーザーが図2に示した一部又は全部の検査項目のチェックボックスにチェックを表示させ、撮像画像を現場写真P2として表示させ、その後、検査完了ボタンB2を押下する完了操作を行った場合について説明する。
 次に、検査結果情報生成部589は、ステップS150においてユーザーから受け付けられた完了操作に基づいて検査結果情報を生成する(ステップS160)。検査結果情報とは、例えば、図2に示したすべての検査項目のチェックボックスにチェックが表示された場合、検査が終了したことを示す情報としてチェックが表示されたチェックボックスに対応付けられた検査項目を示す情報と、現場写真P2として表示された撮像画像を示す情報と、ステップS130において制御部58が受信した表示画像情報に含まれる対象電柱の電柱識別情報とを対応付けた情報である。なお、検査結果情報には、他の情報が含まれてもよい。
 次に、通信制御部581は、通信部54を介して、ステップS160において検査結果情報生成部589が生成した検査結果情報を情報処理装置2に送信する(ステップS170)。次に、制御部58は、通信部54を介して、情報処理装置2から第2表示画面情報を受信する(ステップS180)。
 次に、表示制御部582は、ステップS180において制御部58が受信した第2表示画面情報に基づいて、表示部55に第2表示画面を表示させる(ステップS190)。次に、制御部58は、表示部55に表示されているGUIを介して、入力受付部53によりユーザーから点検作業を終了する点検終了操作を受け付ける(ステップS200)。これにより、制御部58は、ステップS100からステップS200までの処理を終了する。
 以下、図8を参照して、情報処理端末5によりステップS100からステップS200までの処理が行われる間に情報処理装置2の制御部28が行う処理について説明する。図8は、情報処理端末5によりステップS100からステップS200までの処理が行われる間に情報処理装置2の制御部28が行う処理の流れの一例を示すフローチャートである。
 まず、制御部28は、通信部24を介して、情報処理端末5から端末位置情報を受信する(ステップS300)。次に、情報取得部283は、ステップS300において制御部28が情報処理端末5から受信した端末位置情報に基づいて、当該端末位置情報が示す位置を含む地域の電気設備地図情報を、電気設備地図情報記憶部221から取得する(ステップS310)。なお、情報取得部283は、位置情報が示す位置を含む地域の電気設備地図情報を、電気設備地図情報記憶部221から取得する構成に代えて、全国の電気設備地図情報を取得する構成等であってもよい。
 次に、情報取得部283は、ステップS300において制御部28が情報処理端末5から受信した端末位置情報に基づいて、当該端末位置情報が示す位置を含む地域の配電線路図情報を、配電線路図情報記憶部223から取得する(ステップS320)。なお、情報取得部283は、端末位置情報が示す位置を含む地域の配電線路図情報を、配電線路図情報記憶部223から取得する構成に代えて、全国の配電線路図情報を取得する構成等であってもよい。
 次に、特定部285は、以下のA)~B)に示す情報に基づいて対象電柱を特定する(ステップS325)。
A)ステップS300において制御部28が情報処理端末5から受信した端末位置情報
B)ステップS310において電気設備地図情報記憶部221から取得した電気設備地図情報と、ステップS320において配電線路図情報記憶部223から取得した配電線路図情報とのうちいずれか一方又は両方に含まれる複数の電柱それぞれの位置を示す電柱位置情報
 ここで、対象電柱を特定する特定部285の処理について説明する。特定部285は、端末位置情報が示す位置を所定範囲内に含む電柱を、電気設備地図情報と、配電線路図情報とのうちいずれか一方又は両方に含まれる複数の電柱それぞれの位置を示す電柱位置情報に基づいて抽出する。所定範囲とは、ある電柱の位置を含む範囲であり、例えば、ある電柱の位置を中心とした半径10メートル以内の円形状の範囲を示す。なお、所定範囲は、他の形状の範囲であってもよく、他の大きさの範囲であってもよい。特定部285は、抽出した電柱の電柱位置情報に対応付けられた電柱識別情報を、対象電柱の電柱識別情報として検出(特定)する。
 次に、情報取得部283は、ステップS325において特定部285が特定した対象電柱の電柱識別情報に基づいて、設備情報DB3から当該電柱識別情報に対応付けられた設備情報を取得する(ステップS330)。
 ここで、図9を参照して、設備情報について説明する。図9は、設備情報DB3に格納される設備情報に含まれる情報の一例を示す図である。図9に示した通り、設備情報には、電気設備の種類(ステップS9において、機材と記載している)毎に、当該電気設備を保有している電力会社の支店を識別する始点コードと、当該電気設備を識別する電気設備識別情報(例えば、電気設備が電柱の場合、電柱識別情報)と、当該電気設備の種別を示す情報と、当該電気設備の製造年を示す情報と、当該電気設備の製造メーカーを示す情報と、当該電気設備が施設された年を示す情報とが含まれる。また、電気設備の種別を示す情報には、当該電気設備の大きさや形状等を示す情報が含まれる。なお、設備情報には、電気設備に関する他の情報が含まれてもよい。
 次に、情報取得部283は、ステップS325において特定部285が特定した対象電柱の電柱識別情報に基づいて、設備検査情報DB4から当該電柱識別情報に対応付けられた検査項目情報を取得する(ステップS340)。
 ここで、図10を参照して、検査項目情報について説明する。図10は、設備検査情報DB4に格納される検査項目情報に含まれる情報の一例を示す図である。図10に示した通り、検査項目情報には、電気設備(この一例において、電柱)毎に、当該電気設備を識別する電気設備識別情報(この一例において、電柱識別情報)と、当該電気設備識別情報毎に対応付けられた1以上の検査項目を示す情報とが含まれる。
 次に、画面情報生成部287は、ステップS310からステップS340までの処理において取得した端末位置情報と、電気設備識別情報と、配電線路図情報と、対象電柱の設備情報と、対象電柱の検査項目情報とを少なくとも含む第1表示画面情報を生成する(ステップS350)。
 次に、通信制御部281は、通信部24を介して、ステップS350において画面情報生成部287が生成した第1表示画面情報を情報処理端末5に送信する(ステップS360)。次に、制御部58は、情報処理端末5から検査結果情報が取得されるまで待機する(ステップS370)。
 ステップS370において制御部28が情報処理端末5から検査結果情報を取得した場合、判定部288は、ステップS325において特定部285が特定した電柱に関するすべての検査項目が検査済みであるか否かの判定を行う(ステップS380)。判定部288は、ステップS340において情報取得部283が取得した検査項目情報と、ステップS370において制御部28が情報処理端末5から受信した検査結果情報とを比較することによって当該判定を行う。
 ステップS325において特定部285が特定した対象電柱に関するすべての検査項目が検査済みではないと判定した場合(ステップS380-No)、判定部288が通信部24を介して、エラー情報を情報処理端末5に送信し(ステップS390)、制御部28は、ステップS370に遷移して再び検査結果情報を情報処理端末5から受信するまで待機する。一方、ステップS325において特定部285が特定した対象電柱に関するすべての検査項目が検査済みであると判定した場合(ステップS380-Yes)、判定部288は、ステップS370において制御部28が受信した検査結果情報に基づいて、設備検査情報DB4に記憶された検査結果情報であって、ステップS325において特定部285が特定した対象電柱に関する検査結果情報を情報更新部289に更新させる(ステップS400)。
 次に、画面情報生成部287は、ステップS370において制御部28が受信した検査結果情報に基づいて、ステップS350において生成した第1表示画面情報により生成される第1表示画面の表示状態を変更する第2表示画面情報を生成する(ステップS410)。
 第1表示画面の表示状態を変更した第2表示画面とは、より具体的には、第1表示画面における対象電柱の位置であって、ステップS325において特定部285が特定した対象電柱の位置に、点検済電柱を示す印(例えば、図2における印S1や印S2)を表示させた画面である。また、第1表示画面の表示状態を変更した第2表示画面とは、新たに検査済みとなった対象電柱と接続経路によって接続される隣の電柱が検査済みであった場合、当該接続経路の表示状態が変更された画面である。
 次に、通信制御部281は、通信部24を介して、ステップS410において画面情報生成部287が生成した第2表示画面情報を情報処理端末5に送信する(ステップS420)。
 以下、図11を参照して、情報処理システム1における情報処理装置2と情報処理端末5の間の処理について説明する。図11は、情報処理システム1における情報処理装置2と情報処理端末5の間の処理の流れの一例を示すシーケンス図である。なお、図11におけるシーケンス図では、情報処理端末5の表示部55に、GUIがすでに表示されている場合について説明する。
 まず、情報処理端末5は、GUIを介して入力受付部53により受け付けられたユーザーからの点検開始操作に基づいて端末位置情報を生成する。そして、情報処理端末5は、端末位置情報を情報処理装置2に送信する(ステップS500)。
 次に、情報処理装置2は、情報処理端末5から受信した端末位置情報に基づいて、第1表示画面情報を生成する(ステップS510)。次に、情報処理装置2は、ステップS510において生成した第1表示画面情報を情報処理端末5に送信する(ステップS520)。
 次に、情報処理端末5は、情報処理装置2から第1表示画面情報を受信する。そして、情報処理端末5は、受信した第1表示画面情報に基づいて第1表示画面を表示する(ステップS530)。以下、情報処理端末5が、ステップS530の処理の後に、情報処理端末5の表示部55に表示されたGUIを介して入力受付部53によりユーザーから点検作業に係る操作を受け付け、その後、完了操作を行った場合について説明する。
 ユーザーにより完了操作が行われた後、情報処理端末5は、検査結果情報を生成する(ステップS540)。次に、情報処理端末5は、ステップS540において生成した検査結果情報を情報処理装置2に送信する(ステップS550)。
 次に、情報処理装置2は、情報処理端末5から検査結果情報を受信する(ステップS560)。次に、情報処理装置2は、ステップS560において受信した検査結果情報に基づいて、対象電柱に関するすべての検査項目が検査済みであるか否かの判定を行う(ステップS560)。以下、ステップS560において、情報処理装置2が、対象電柱に関するすべての検査項目が検査済みであると判定した場合について説明する。
 次に、情報処理装置2は、ステップS560において情報処理端末5から受信した検査結果情報に基づいて第2表示画面情報を生成する(ステップS570)。また、ステップS570において、情報処理装置2は、ステップS560において情報処理端末5から受信した検査結果情報に基づいて、設備検査情報DB4が記憶された検査結果情報であって、対象電柱に関する検査結果情報を更新する。
 次に、情報処理装置2は、ステップS570において生成した第2表示画面情報を情報処理端末5に送信する(ステップS580)。次に、情報処理端末5は、第2表示画面情報を情報処理装置2から受信する。そして、情報処理端末5は、受信した第2表示画面情報に基づいて第2表示画面を表示する(ステップS590)。
 以上のように、情報処理システム1は、複数の電気設備(例えば、第1実施形態における電柱)の位置を示す情報と、電気設備間の接続経路を示す情報とを含む線路図(例えば、第1実施形態における配電線路図)に含まれる複数の電気設備の位置を示す情報(例えば、第1実施形態における電気設備位置情報)と、情報処理端末(例えば、第1実施形態における情報処理端末5)の位置を示す情報(例えば、第1実施形態における端末位置情報)とに基づいて、検査対象となる電気設備(例えば、第1実施形態における対象電柱)を特定し、特定した検査対象となる電気設備の検査結果を示す情報(例えば、第1実施形態における検査結果情報)に基づいて、線路図において当該電気設備が検査済みであることを示す情報を情報処理端末に表示させ、当該電気設備と接続経路によって接続される隣の電気設備が検査済みであった場合、情報処理端末に表示された当該接続経路の表示状態を変更する表示変更処理を行う。
 また、情報処理システム1は、線路図を示す線路図情報(例えば、第1実施形態における配電線路図情報)を記憶し、記憶した線路図情報を読み込み、読み込んだ線路図情報に含まれる複数の電気設備の位置を示す情報に基づいて、検査対象となる電気設備を特定する。
 また、情報処理システム1は、線路図に含まれる複数の電気設備の位置を示す情報と、特定した検査対象となる電気設備の位置を示す情報とに基づいて、情報処理端末に表示させる第1表示画像を示す第1表示画像情報を生成し、検査対象となる電気設備の検査結果を示す情報に基づいて、第1表示画像の表示状態を変更させる第2表示画像情報を生成し、生成した第1表示画像情報に基づいて第1表示画像を情報処理端末に表示させ、生成した第2表示画像情報に基づいて第1表示画像に対して表示変更処理を行う。
 また、情報処理システム1は、検査対象となる電気設備に関する検査項目がすべて検査済みであるか否かを判定し、検査項目が一部又は全部が検査済みであった場合、表示変更処理を行い、検査項目がすべて検査済みではなかった場合、情報処理端末にエラーを示す情報を表示させる。
 以上説明したように、本実施形態における情報処理システム1は、複数の電気設備(この一例において、電柱)の位置を示す情報(この一例において、電柱位置情報)と、電気設備間の接続経路を示す情報とを含む配電線路図に含まれる複数の電気設備の位置を示す情報と、情報処理端末5の位置を示す情報(この一例において、端末位置情報)とに基づいて、検査対象となる電気設備を特定し、特定した電気設備の検査結果を示す検査結果情報に基づいて、配電線路図において当該電気設備が検査済みであることを示す情報を情報処理端末5に表示させ、当該電気設備と接続経路によって接続される隣の電気設備が検査済みであった場合、情報処理端末5に表示された当該接続経路の表示状態を変更する。これにより情報処理システム1は、電気設備の巡視・点検の効率化を図ることができる。
 なお、情報処理システム1は、端末位置情報と、電気設備地図情報と配電線路図情報とのうちいずれか一方または両方に含まれる複数の電柱それぞれの位置を示す電柱位置情報とに基づいて対象電柱の電柱識別情報を特定する構成に代えて、例えば、情報処理端末5の表示部55に表示された地図P1上の複数の電柱から、ユーザーによる電柱を選択する操作を受け付けることにより、対象電柱の電柱識別情報を特定してもよい。この場合、例えば、情報処理端末5は、地図P1上において選択された電柱の位置を示す選択電柱位置情報を情報処理装置2へ送信する。そして、情報処理装置2は、受信した選択電柱位置情報に基づいて、電気設備地図情報と配電線路図情報とのうちいずれか一方または両方に含まれる複数の電柱それぞれの位置を示す電柱位置情報の中から、選択電柱位置情報が示す位置と最も近い電柱位置情報を抽出し、抽出した電柱位置情報に対応付けられた電柱識別情報を、対象電柱の電柱識別情報として検出(特定)。
 また、情報処理端末5は、情報処理装置2が備える機能部のうちの一部又は全部を備える構成であってもよい。例えば、情報処理装置2が備える機能部のうちの全部を備える構成の場合、情報処理端末5は、無線通信によって設備情報DB3や設備検査情報DB4と通信を行う。
 以上、この発明の実施形態を、図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない限り、変更、置換、削除等されてもよい。
 また、以上に説明した装置(例えば、情報処理システム1の情報処理装置2、情報処理端末5)における任意の構成部の機能を実現するためのプログラムを、コンピューター読み取り可能な記録媒体(例えば、非一時的記録媒体)に記録し、そのプログラムをコンピューターシステムに読み込ませて実行するようにしてもよい。なお、ここでいう「コンピューターシステム」とは、OS(Operating System)や周辺機器等のハードウェアを含むものとする。また、「コンピューター読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD(Compact Disk)-ROM等の可搬媒体、コンピューターシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピューター読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムが送信された場合のサーバーやクライアントとなるコンピューターシステム内部の揮発性メモリー(RAM)のように、一定時間プログラムを保持しているものも含むものとする。
 また、上記のプログラムは、このプログラムを記憶装置等に格納したコンピューターシステムから、伝送媒体を介して、あるいは、伝送媒体中の伝送波により他のコンピューターシステムに伝送されてもよい。ここで、プログラムを伝送する「伝送媒体」は、インターネット等のネットワーク(通信網)や電話回線等の通信回線(通信線)のように情報を伝送する機能を有する媒体のことをいう。
 また、上記のプログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、上記のプログラムは、前述した機能をコンピューターシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。
 1  情報処理システム
 2  情報処理装置
 3  設備情報DB
 4  設備検査情報DB
 5  情報処理端末
 21、51 CPU
 22、52 記憶部
 23、53 入力受付部
 24、54 通信部
 25 55 表示部
 28、58 制御部
 56 撮像部
 57 位置検出部
 221 電気設備地図情報記憶部
 223 配電線路図情報記憶部
 281、581 通信制御部
 283 情報取得部
 285 特定部
 287 画面情報生成部
 288 判定部
 289 情報更新部
 582 表示制御部
 583 撮像制御部
 585 位置情報生成部
 589 検査結果情報生成部

Claims (6)

  1.  複数の電気設備の位置を示す情報と、前記電気設備間の接続経路を示す情報とを含む線路図に含まれる前記複数の前記電気設備の位置を示す情報と、情報処理端末の位置を示す情報とに基づいて、検査対象となる前記電気設備を特定する特定部と、
     前記特定部が特定した前記検査対象となる前記電気設備の検査結果を示す情報に基づいて、前記線路図において当該電気設備が検査済みであることを示す情報を前記情報処理端末に表示させ、当該電気設備と前記接続経路によって接続される隣の前記電気設備が検査済みであった場合、前記情報処理端末に表示された当該接続経路の表示状態を変更する表示変更処理を行う表示制御部と、
     を含む情報処理システム。
  2.  前記線路図を示す線路図情報を記憶する線路図記憶部を備え、
     前記特定部は、前記線路図記憶部から前記線路図情報を読み込み、読み込んだ前記線路図情報に含まれる前記複数の前記電気設備の位置を示す情報に基づいて、前記検査対象となる前記電気設備を特定する、
     請求項1に記載の情報処理システム。
  3.  前記線路図に含まれる前記複数の前記電気設備の位置を示す情報と、前記特定部が特定した前記検査対象となる前記電気設備の位置を示す情報とに基づいて、前記情報処理端末に表示させる第1表示画像を示す第1表示画像情報を生成し、前記検査対象となる前記電気設備の検査結果を示す情報に基づいて、前記第1表示画像の表示状態を前記表示制御部に変更させる第2表示画像情報を生成する画面情報生成部を備え、
     前記表示制御部は、前記第1表示画像情報を取得した場合、前記第1表示画像情報に基づいて前記第1表示画像を前記情報処理端末に表示させ、前記第2表示画像情報を取得した場合、前記第2表示画像情報に基づいて前記第1表示画像に対して前記表示変更処理を行う、
     請求項1又は2に記載の情報処理システム。
  4.  前記検査対象となる前記電気設備に関する検査項目がすべて検査済みであるか否かを判定する判定部を備え、
     前記表示制御部は、前記検査項目が一部又は全部が検査済みであった場合、前記表示変更処理を行い、前記検査項目がすべて検査済みではなかった場合、前記情報処理端末にエラーを示す情報を表示させる、
     請求項1から3のうちいずれか一項に記載の情報処理システム。
  5.  複数の電気設備の位置を示す情報と、前記電気設備間の接続経路を示す情報とを含む線路図に含まれる前記複数の前記電気設備の位置を示す情報と、情報処理端末の位置を示す情報とに基づいて、検査対象となる前記電気設備を特定し、
     特定した前記検査対象となる前記電気設備の検査結果を示す情報に基づいて、前記線路図において当該電気設備が検査済みであることを示す情報を前記情報処理端末に表示させ、当該電気設備と前記接続経路によって接続される隣の前記電気設備が検査済みであった場合、前記情報処理端末に表示された当該接続経路の表示状態を変更する表示変更処理を行う、
     情報処理方法。
  6.  情報処理システムのコンピューターに、
     複数の電気設備の位置を示す情報と、前記電気設備間の接続経路を示す情報とを含む線路図に含まれる前記複数の前記電気設備の位置を示す情報と、情報処理端末の位置を示す情報とに基づいて、検査対象となる前記電気設備を特定させ、
     特定した前記検査対象となる前記電気設備の検査結果を示す情報に基づいて、前記線路図において当該電気設備が検査済みであることを示す情報を前記情報処理端末に表示させ、当該電気設備と前記接続経路によって接続される隣の前記電気設備が検査済みであった場合、前記情報処理端末に表示された当該接続経路の表示状態を変更する表示変更処理を行わせる、
     プログラムを記憶する記憶媒体。
PCT/JP2014/081764 2014-12-01 2014-12-01 情報処理システム、情報処理方法、及び記憶媒体 WO2016088178A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2014/081764 WO2016088178A1 (ja) 2014-12-01 2014-12-01 情報処理システム、情報処理方法、及び記憶媒体
US15/460,624 US10628976B2 (en) 2014-12-01 2017-03-16 Information processing system, information processing method, and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/081764 WO2016088178A1 (ja) 2014-12-01 2014-12-01 情報処理システム、情報処理方法、及び記憶媒体

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/460,624 Continuation-In-Part US10628976B2 (en) 2014-12-01 2017-03-16 Information processing system, information processing method, and storage medium

Publications (1)

Publication Number Publication Date
WO2016088178A1 true WO2016088178A1 (ja) 2016-06-09

Family

ID=56091159

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/081764 WO2016088178A1 (ja) 2014-12-01 2014-12-01 情報処理システム、情報処理方法、及び記憶媒体

Country Status (2)

Country Link
US (1) US10628976B2 (ja)
WO (1) WO2016088178A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018049558A (ja) * 2016-09-23 2018-03-29 東京電力ホールディングス株式会社 情報処理装置
JP2018142371A (ja) * 2018-05-25 2018-09-13 東京電力ホールディングス株式会社 情報処理装置
JP2019028478A (ja) * 2017-07-25 2019-02-21 清水建設株式会社 検査支援システムおよび検査支援装置
JP7328645B1 (ja) 2022-11-16 2023-08-17 北海道瓦斯株式会社 検査情報管理システム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006330975A (ja) * 2005-05-25 2006-12-07 Chugoku Electric Power Co Inc:The 点検表作成装置及び点検表作成システム
US20090037485A1 (en) * 2007-07-31 2009-02-05 Embarq Holdings Company, Llc Method and apparatus for auditing utility poles
JP2014191715A (ja) * 2013-03-28 2014-10-06 Mitsubishi Electric Corp 設備維持管理業務用地図表示方法及び設備維持管理業務用地図表示装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6834285B1 (en) * 2000-03-24 2004-12-21 Numoda Corporation Computer system for portable digital data capture and data distribution
US20020035432A1 (en) * 2000-06-08 2002-03-21 Boguslaw Kubica Method and system for spatially indexing land
JP4564783B2 (ja) 2004-05-24 2010-10-20 パナソニック株式会社 配電業務支援システムおよび配電業務支援方法
WO2006074436A2 (en) * 2005-01-06 2006-07-13 Rockwell Automation Technologies, Inc. Firewall method and apparatus for industrial systems
US7761318B2 (en) * 2006-04-26 2010-07-20 Embarq Holdings Company, Llc System and method for billing a construction activity for a telecommunications company
WO2010053562A2 (en) * 2008-11-06 2010-05-14 Silver Springs Networks, Inc. System and method for identifying power usage issues
JP5171715B2 (ja) 2009-03-31 2013-03-27 中国電力株式会社 発変電機器点検・停電計画支援システム及びその計画支援方法
JP5141705B2 (ja) * 2010-03-19 2013-02-13 アイシン・エィ・ダブリュ株式会社 運転支援装置、方法およびプログラム
DE102011015777A1 (de) * 2011-04-01 2012-10-04 Volkswagen Aktiengesellschaft Verfahren und Vorrichtung zum Durchführen einer Reiseroutenplanung für ein Fahrzeug
DE102011050655A1 (de) * 2011-05-26 2012-11-29 Conductix-Wampfler Gmbh Verfahren zur Erkennung eines elektrisch leitfähigen Fremdkörpers und Vorrichtung zur induktiven Übertragung elektrischer Energie

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006330975A (ja) * 2005-05-25 2006-12-07 Chugoku Electric Power Co Inc:The 点検表作成装置及び点検表作成システム
US20090037485A1 (en) * 2007-07-31 2009-02-05 Embarq Holdings Company, Llc Method and apparatus for auditing utility poles
JP2014191715A (ja) * 2013-03-28 2014-10-06 Mitsubishi Electric Corp 設備維持管理業務用地図表示方法及び設備維持管理業務用地図表示装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018049558A (ja) * 2016-09-23 2018-03-29 東京電力ホールディングス株式会社 情報処理装置
JP2019028478A (ja) * 2017-07-25 2019-02-21 清水建設株式会社 検査支援システムおよび検査支援装置
JP2018142371A (ja) * 2018-05-25 2018-09-13 東京電力ホールディングス株式会社 情報処理装置
JP7328645B1 (ja) 2022-11-16 2023-08-17 北海道瓦斯株式会社 検査情報管理システム
JP2024072467A (ja) * 2022-11-16 2024-05-28 北海道瓦斯株式会社 検査情報管理システム

Also Published As

Publication number Publication date
US10628976B2 (en) 2020-04-21
US20170193678A1 (en) 2017-07-06

Similar Documents

Publication Publication Date Title
US11843904B2 (en) Automated combined display of measurement data
US9443159B2 (en) Target identification system target identification server and target identification terminal
US10378913B2 (en) Navigation apparatus and navigation method
WO2016088178A1 (ja) 情報処理システム、情報処理方法、及び記憶媒体
JP6876271B2 (ja) 配電設備点検システム
JP6316176B2 (ja) 点検履歴管理システム、点検履歴管理方法
TW201314225A (zh) 維護管理系統與方法
JP6058188B2 (ja) 点検支援システム、点検支援方法および点検支援プログラム
JP6384443B2 (ja) 点検作業支援装置、システム、及び方法
CN104779551A (zh) 便携式多功能智能巡线仪和电力巡线***
JP6895598B2 (ja) 設備点検システム、サーバ、設備点検方法、及び制御プログラム
JP2022058907A (ja) 測定周期決定装置、測定周期決定プログラム、及びその方法
JP2018128733A (ja) センサの登録方法、センサの登録システム及び中継装置
KR101393191B1 (ko) 음극방식 관리장치의 cips 측정방법
JP2019180066A (ja) 表示システム、表示方法
CN204885997U (zh) 具有立体摄像功能的便携式多功能智能巡线仪
JP6787481B2 (ja) 探索支援プログラム、探索支援方法および探索支援装置
Fonte et al. A web GIS-based platform to harvest georeferenced data from social networks: examples of data collection regarding disaster events
KR20170036280A (ko) 전주 관리 프로그램 및 그 프로그램을 갖는 휴대단말
JP7368937B2 (ja) 設備管理システム
JP2012234231A (ja) 現場調査支援システムおよびそのプログラム
JP5221580B2 (ja) 画像表示システム、携帯情報端末及び画像表示プログラム
JP2020165729A (ja) 距離測定装置、距離測定方法及び距離測定プログラム
WO2016088177A1 (ja) 情報処理システム、情報処理方法、及びプログラム
JPWO2015189911A1 (ja) 施設情報表示制御装置、施設情報表示制御方法および施設情報表示システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14907269

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: JP

122 Ep: pct application non-entry in european phase

Ref document number: 14907269

Country of ref document: EP

Kind code of ref document: A1