WO2016087704A1 - Sea-going vessel - Google Patents

Sea-going vessel Download PDF

Info

Publication number
WO2016087704A1
WO2016087704A1 PCT/FI2014/050956 FI2014050956W WO2016087704A1 WO 2016087704 A1 WO2016087704 A1 WO 2016087704A1 FI 2014050956 W FI2014050956 W FI 2014050956W WO 2016087704 A1 WO2016087704 A1 WO 2016087704A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
gas handling
room
vessel
fuel
Prior art date
Application number
PCT/FI2014/050956
Other languages
French (fr)
Inventor
Tomaz NABERGOJ
Claudiu Nichita
Lars VESTBØSTAD
Original Assignee
Wärtsilä Finland Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wärtsilä Finland Oy filed Critical Wärtsilä Finland Oy
Priority to PCT/FI2014/050956 priority Critical patent/WO2016087704A1/en
Publication of WO2016087704A1 publication Critical patent/WO2016087704A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/38Apparatus or methods specially adapted for use on marine vessels, for handling power plant or unit liquids, e.g. lubricants, coolants, fuels or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B17/0027Tanks for fuel or the like ; Accessories therefor, e.g. tank filler caps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for

Definitions

  • the present invention relates to a sea-going vessel in accordance with the preamble of claim 1 .
  • Natural gas or in general mixtures of hydrocarbons that are volatile enough to make the mixture appear in gaseous form in room temperature, constitutes an advantageous alternative to fuel oil as the fuel of internal combustion engines.
  • the natural gas In sea-going vessels that use natural gas as fuel, the natural gas is typically stored onboard in liquid form, giving rise to the commonly used acronym LNG (Liquefied Natural Gas).
  • LNG Liquefied Natural Gas
  • Natural gas can be kept in liquid form by maintaining its temperature below a boiling point, which is approximately -1 62 degrees centigrade. Natural gas can be also stored for use as fuel by keeping it com- pressed to a sufficiently high pressure, in which case the acronym CNG (Compressed Natural Gas) is used.
  • CNG Compressed Natural Gas
  • the object of the present invention is to provide an improved sea-going vessel, which is provided with at least one engine that can be operated using fuel that is introduced into the engine in gaseous state or as a supercritical fluid, the vessel comprising gas handling equipment for handling the fuel.
  • the characterizing features of the vessel according to the present invention are given in the characterizing part of claim 1 .
  • the vessel comprises a gas-tight gas handling room for accommodating at least part of the gas handling equipment, the gas handling room being enclosed entirely by the hull of the vessel and separated from the engine room(s) of the vessel by a double bulkhead.
  • gaseous fuel can be effectively prevented from entering other parts of the vessel. Consequently, the equipment can be placed more freely in the vessel.
  • the gas handling room within the hull, i.e. below the main deck, open deck space can be saved for cargo, such as containers, or for other purposes.
  • the arrangement also protects the gas handling equipment from impacts from cargo handling opera- tions.
  • the length of the piping that is needed for transferring the gas can be reduced.
  • the gas handling room is accessible from an upper deck via a vertical shaft.
  • the gas handling room is accessible only via the shaft. This guarantees that the gas handling room remains gas-tight in other directions.
  • An air lock can be arranged between the gas handling room and the shaft to provide safe access into the gas handling room.
  • the gas handling room is located adjacent to an engine room.
  • the length of the piping between the gas handling equipment and the engines can thus be minimized.
  • the gas handling equipment comprises a pump for pressurizing the fuel and the pump is arranged in the gas handling room.
  • the gas handling room is divided at least into a first gas-tight compartment and a second gas-tight compartment.
  • the pump for pressurizing the fuel can be arranged in the first compartment and the drive of the pump in the second compartment.
  • the second compartment of the gas handling room does not contain any gas handling equipment where the fuel is stored or circulated.
  • a pump for pressurizing fuel is a possible leaking component, and by arranging the pump and similar components in the first compartment, the risk level of the second compartment can be lowered.
  • the first gas-tight compartment is accessible only via the second gas-tight compartment.
  • the compartment containing the more hazardous components is thus better separated from the rest of the vessel.
  • the fuel used in the engines can be liquefied natural gas.
  • the gas handling room is located such that no space accessible by the vessel crew is located directly beneath it.
  • the gas handling room can be arranged in the vessel such that at least one deck is located between the gas handling room and the main deck of the vessel. Alternatively, the gas handling room can be delimited by the main deck.
  • Fig. 1 shows schematically a top view of a deck of a sea-going vessel
  • Fig. 2 shows a cross-sectional view of the vessel of Fig. 1 taken along line A- A
  • Fig. 3 shows an enlarged view of part of the deck shown in Fig. 1
  • Fig. 4 shows a gas handling room of a vessel according to one embodiment of the invention. Description of embodiments of the invention
  • FIG 1 a deck of a sea-going vessel according to an embodiment of the invention.
  • the vessel of the figures is a cargo ship that is configured to carry containers.
  • the invention is not limited to container ships or even cargo ships, but the invention can be applied to many kinds of sea-going vessels, such as cruisers, off-shore ships or RoRo ships.
  • the ship is provided with a main engine 4, which produces propulsion for the ship, and with several auxiliary engines 5a, 5b, 5c for producing electricity and/or for driving different equipment of the ship. All the engines 4, 5a, 5b, 5c are piston engines.
  • the main engine 4 is connected to the propeller 16 of the ship via a propeller shaft 17. However, the main engine 4 could also be used for producing electricity for an electric motor driving the propeller 16.
  • the ship could also be provided with more than one main engines 4.
  • the main engine 4 is a two-stroke dual-fuel engine that can be operated using either gaseous or liquid fuel. The operation with gaseous fuel can be combined with liquid pilot fuel injection.
  • auxiliary engines 5a, 5b, 5c can be dual-fuel engines, which operate mainly by gas that is ignited by a pilot fuel injection. At least one of the auxiliary engines 5a, 5b, 5c could also be a gas-engine, which is always operated on gaseous fuel that is spark ignit- ed. It is also possible that the main engine 4 is configured only for operation on liquid fuel. In any case, at least one of the engines 4, 5a, 5b, 5c of the ship is operable on gaseous fuel.
  • the fuel does not necessarily need to be gaseous when it is injected into the engine, but the fuel can also be injected into the engine as a supercritical fluid, which is at a pressure and temperature above its critical point. Such fluid is quickly changed into gas in the cylinders of the engine.
  • the main engine 4 and the auxiliary engines 5a, 5b, 5c are arranged in an engine room 3.
  • the main engine 4 and the auxiliary engines 5a, 5b, 5c could also be arranged in different engine rooms.
  • the ship is provided with a main deck 103 and with several decks 100, 101 , 102 that are arranged below the main deck 103 and with several decks 104, 105, 106, 107 that are arranged above the main deck 103.
  • the term 'main deck' refers here to the uppermost complete deck extending from bow to stern.
  • the decks 104 to 107 above the main deck 103 form the superstructure of the ship.
  • the engine room 3 is arranged inside the hull of the ship below the main deck 103.
  • the engine room 3 extends from a lower deck 100 to an upper deck 101 .
  • the engine room may extend over even more decks.
  • the ship is provided with one or more tanks (not shown) for storing liquefied natural gas (LNG).
  • LNG liquefied natural gas
  • the engines 4, 5a, 5b, 5c could also use compressed natural gas or some other fuel that can be injected into the engine in gaseous state or as a supercritical fluid.
  • the fuel is injected into the cylinders of the main engine 4 at high pressure, for instance at pressure in the range of 200 to 400 bar.
  • the ship is provided with gas handling equipment.
  • the gas handling equipment refers here to equipment that is used for handling the fuel, irrespective of whether the fuel is in liquid, gaseous or supercritical form.
  • the gas handling equipment comprises a pump 6a for pressurizing the fuel, a feed pump 8a, an LNG vaporizer 7, and optionally a boil-off gas (BOG) compressor 9.
  • the BOG compressor 9 forms part of a BOG reliquefaction system that condenses excess gas boiling in the tanks, which can then be returned to the tanks in liquid state or used in the main engine 4 as fuel.
  • the gas handling equipment can also comprise further devices 10.
  • the pump 6a is a high pressure pump.
  • the feed pump 8a supplies the fuel in liquid state to the high-pressure pump 6a, which raises the pressure of the fuel to the required level.
  • the fuel is then vaporized in the LNG vaporizer 7 and heated to suitable injection temperature.
  • the fuel can be taken directly from the LNG tank, or it can be condensate from the BOG reliquefaction system.
  • the fuel could also be injected into the engines at a lower pressure, in which case pump 6a would not be a high-pressure pump, but one or more low-pressure pumps would be used for introducing the fuel into the engines.
  • the gas handling equipment is arranged in a gas handling room 1 .
  • the gas handling room 1 is a gas-tight space that is arranged completely within the hull of the ship.
  • the gas handling room 1 is arranged on the same deck 101 with the engine room 3.
  • the gas handling room 1 is thus below the main deck 103 of the ship.
  • there is one deck 102 between the gas handling room 1 and the main deck 103 but the gas handling room 1 could also be delimited by the main deck 103, or there could be several decks between the gas handling room 1 and the main deck 103.
  • the ship can be provided with tank connection rooms that are arranged in connection with the LNG tanks and part of the gas handling equipment, such as low-pressure pumps, can be arranged in the tank connection rooms.
  • the gas handling room 1 forms a gas-tight room within the hull of the ship.
  • the gas handling room 1 is divided into a first compartment 1 a and a second compartment 1 b.
  • the gas handling room 1 can also be an undivided space, as shown in figure 4.
  • the first compartment 1 a and the second compartment 1 b are gas-tightly separated from each other.
  • the first compartment 1 a is accessible from the second compartment 1 b via a gas-tight door 14.
  • the feed pump 8a, the high-pressure pump 6a, the BOG compressor 9 and other devices 10 that are in contact with the fuel are arranged in the first compartment 1 a of the gas handling room 1 .
  • the gas handling equipment further comprises a drive 6b for operating the high- pressure pump 6a and a drive 8b for operating the feed pump 8a. All the drives 6b, 8b of the gas handling equipment are located in the second compartment 1 b of the gas handling room 1 . All the gas handling equipment that is in contact with the fuel either in gaseous or in liquid state is located in the first compartment 1 a of the gas handling room 1 . The second compartment 1 b is thus free from any devices that are in contact with the fuel. Conversely, the first compartment 1 a is free from the drives 6a, 8a of the gas handling equipment. The risk of leaking fuel entering the second compartment 1 b as well as the risk of ignition of the fuel in the first compartment 1 a is minimized by the arrangement.
  • the drives 6b, 8b of the pumps 6a, 8a are hy- draulic drives.
  • Each hydraulic drive comprises an electric motor for driving a hydraulic pump.
  • the pressurized hydraulic fluid is used for driving the high- pressure pump 6a and the feed pump 8a.
  • the electric motor of the hydraulic drive 6b, 8b is located in a space that is gas-tightly separated from the space where the fuel pumps 6a, 8a are arranged, less expensive electric mo- tors can be used.
  • ATEX certified motors need to be used.
  • the rooms of a ship are divided into different categories on the basis of the risk that an explosive gas atmosphere is present in the room.
  • the gas handling room 1 of figure 3 comprises further gas-tight compartments 1 c, 1 d.
  • a third gas-tight compartment 1 c is arranged within the first compart- ment 1 a of the gas handling room 1 , and the feed pump 8a, the high-pressure pump 6a and the LNG vaporizer 7 are arranged in the third compartment 1 c.
  • a fourth gas-tight compartment 1 d is arranged in the first compartment 1 a and the BOG compressor 9 is arranged in the fourth compartment 1 d.
  • the walls of the third and the fourth gas tight compartments 1 c, 1 d are made of stainless steel to withstand and contain cold LNG in case of leakage. Also some other material with similar properties could be used.
  • These additional compartments 1 c, 1 d further increase the safety of the gas handling room 1 . It is not necessary to have the third and the fourth compartment 1 c, 1 d in the gas handling room 1 . However, by providing the gas handling room 1 with the third and fourth compartments 1 c, 1 c, it is easier to protect the hull of the ship from cold LNG, since the whole first compartment 1 a does not need to withstand extremely low temperatures.
  • Figure 4 shows a gas handling room 1 of a vessel that is provided with engines that can be operated using low-pressure gas.
  • the gas handling room 1 is formed of a single compartment.
  • a fuel supply pump 6a for pressurizing the fuel is arranged in the gas handling room 1 .
  • the pump 6a is configured to raise the pressure of the gaseous fuel to the range of 5 to 15 bar.
  • the gas handling room 1 is also provided with an LNG vaporizer 7 and a drive 6b for the pump 6a.
  • the drive 6b comprises an ATEX certified electric motor, and can thus be arranged in the same space with the pump 6a.
  • the gas handling room 1 can be divided into different compartments.
  • the gas handling room 1 is located adjacent to the engine room 3, i.e. it has at least one wall in common with the engine room 3.
  • the wall 15 between the gas handling room 1 and the engine room 3 is a double bulkhead, i.e. a double- walled structure. If the vessel is provided with several engine rooms, between the gas handling room 1 and each of the engine rooms needs to be a double bulkhead.
  • the double bulkhead effectively protects the engine room 3 from leaking LNG.
  • the double bulkhead also protects the gas handling room 1 from a fire occurring in the engine room 3. By arranging the gas handling room 1 next to the engine room 3, the length of piping can be minimized.
  • the second compartment 1 b of the gas handling room 1 is in connection with a vertical shaft 12 that opens to open air.
  • the single compartment of the gas handling room is in connection with a shaft 12.
  • the shaft 12 can connect the gas handling room 1 for instance with the main deck 103 of the ship or other deck that opens to air outside the vessel's hull.
  • the gas handling room 1 is connected to the shaft 12 via an air lock 1 1 .
  • the shaft 12 is provided with a stairway 13, which provides access into the gas handling room 1 from an upper deck of the ship.
  • the gas handling room 1 is accessible only via the shaft 12, which ensures that the gas handling room 12 remains gas-tight from other directions.
  • the shaft 12 leading from a deck opening to air outside the vessel's hull, to the gas handling room 1 , creates a vertical structure through the decks that is gas-tight towards the other internal structure of the hull.
  • the shaft 12 may pen- etrate through several decks of the vessel.
  • the gas handling room 1 is at the bottom of the shaft 12.
  • the stairway 13 leads from the gas handling room 1 upwards, possibly through several decks, up to the deck that opens to open air outside the vessel hull. Gas-tight doors may be arranged in the stairway 13 between some the decks, or between all the decks, depending on the need con- sidered.
  • the gas handling room 1 is arranged in the ship in such a location that there are no rooms directly beneath the gas handling room 1 that would be accessible by the ship crew. This is preferable to protect the gas handling room 1 from fire.
  • different tanks such as oily bilge water tanks or sludge tanks can be arranged below the gas handling room 1 .

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The sea-going vessel is provided with at least one engine (4) that can be operated using fuel that is introduced into the engine (4) in gaseous state or as a supercritical fluid, and comprises gas handling equipment (6a, 6b, 6c, 7, 8, 9, 10) for handling the fuel. The vessel further comprises a gas-tight gas handling room (1) for accommodating the gas handling equipment (6a, 6b, 6c, 7, 8, 9, 10) and the gas handling room (1) is enclosed entirely by the hull of the vessel and separated from the engine room(s) (3) of the vessel by a double bulkhead (15).

Description

Sea-going vessel
Technical field of the invention
The present invention relates to a sea-going vessel in accordance with the preamble of claim 1 .
Background of the invention
Natural gas, or in general mixtures of hydrocarbons that are volatile enough to make the mixture appear in gaseous form in room temperature, constitutes an advantageous alternative to fuel oil as the fuel of internal combustion engines. In sea-going vessels that use natural gas as fuel, the natural gas is typically stored onboard in liquid form, giving rise to the commonly used acronym LNG (Liquefied Natural Gas). Natural gas can be kept in liquid form by maintaining its temperature below a boiling point, which is approximately -1 62 degrees centigrade. Natural gas can be also stored for use as fuel by keeping it com- pressed to a sufficiently high pressure, in which case the acronym CNG (Compressed Natural Gas) is used.
Since natural gas has a low boiling point and it is highly flammable, strict regulations govern its use in sea-going vessels. To allow good ventilation in case of leaking natural gas, the equipment for handling the gas usually needs to be placed on an open deck of the vessel. A conventional solution has been to provide a so called evaporation skid, which comprises different gas handling equipment and which has been arranged on an open deck of the ship. This solution is often problematic, since the equipment may take space that could otherwise be used for cargo or for other purposes. In addition, long pipes are needed for supplying gas to the engines of the vessel.
Summary of the invention
The object of the present invention is to provide an improved sea-going vessel, which is provided with at least one engine that can be operated using fuel that is introduced into the engine in gaseous state or as a supercritical fluid, the vessel comprising gas handling equipment for handling the fuel. The characterizing features of the vessel according to the present invention are given in the characterizing part of claim 1 .
According to the invention, the vessel comprises a gas-tight gas handling room for accommodating at least part of the gas handling equipment, the gas handling room being enclosed entirely by the hull of the vessel and separated from the engine room(s) of the vessel by a double bulkhead.
Because of the gas-tight gas handling room and the double bulkhead between the gas handling room and the engine room, gaseous fuel can be effectively prevented from entering other parts of the vessel. Consequently, the equipment can be placed more freely in the vessel. By arranging the gas handling room within the hull, i.e. below the main deck, open deck space can be saved for cargo, such as containers, or for other purposes. The arrangement also protects the gas handling equipment from impacts from cargo handling opera- tions. In addition, the length of the piping that is needed for transferring the gas can be reduced.
According to an embodiment of the invention, the gas handling room is accessible from an upper deck via a vertical shaft. Preferably, the gas handling room is accessible only via the shaft. This guarantees that the gas handling room remains gas-tight in other directions. An air lock can be arranged between the gas handling room and the shaft to provide safe access into the gas handling room.
According to an embodiment of the invention, the gas handling room is located adjacent to an engine room. The length of the piping between the gas handling equipment and the engines can thus be minimized.
According to an embodiment of the invention, the gas handling equipment comprises a pump for pressurizing the fuel and the pump is arranged in the gas handling room.
According to an embodiment of the invention, the gas handling room is divided at least into a first gas-tight compartment and a second gas-tight compartment. By dividing the gas handling room into two or more compartments, different parts of the gas handling equipment can be separated from each other to better control possible fuel leakages. For instance, the pump for pressurizing the fuel can be arranged in the first compartment and the drive of the pump in the second compartment. Preferably, the second compartment of the gas handling room does not contain any gas handling equipment where the fuel is stored or circulated. A pump for pressurizing fuel is a possible leaking component, and by arranging the pump and similar components in the first compartment, the risk level of the second compartment can be lowered.
According to an embodiment of the invention, the first gas-tight compartment is accessible only via the second gas-tight compartment. The compartment containing the more hazardous components is thus better separated from the rest of the vessel.
The fuel used in the engines can be liquefied natural gas.
Preferably, the gas handling room is located such that no space accessible by the vessel crew is located directly beneath it.
The gas handling room can be arranged in the vessel such that at least one deck is located between the gas handling room and the main deck of the vessel. Alternatively, the gas handling room can be delimited by the main deck.
Brief description of the drawings
Embodiments of the invention are described below in more detail with refer- ence to the accompanying drawings, in which
Fig. 1 shows schematically a top view of a deck of a sea-going vessel,
Fig. 2 shows a cross-sectional view of the vessel of Fig. 1 taken along line A- A,
Fig. 3 shows an enlarged view of part of the deck shown in Fig. 1 , and Fig. 4 shows a gas handling room of a vessel according to one embodiment of the invention. Description of embodiments of the invention
In figure 1 is shown a deck of a sea-going vessel according to an embodiment of the invention. The vessel of the figures is a cargo ship that is configured to carry containers. However, the invention is not limited to container ships or even cargo ships, but the invention can be applied to many kinds of sea-going vessels, such as cruisers, off-shore ships or RoRo ships.
The ship is provided with a main engine 4, which produces propulsion for the ship, and with several auxiliary engines 5a, 5b, 5c for producing electricity and/or for driving different equipment of the ship. All the engines 4, 5a, 5b, 5c are piston engines. The main engine 4 is connected to the propeller 16 of the ship via a propeller shaft 17. However, the main engine 4 could also be used for producing electricity for an electric motor driving the propeller 16. The ship could also be provided with more than one main engines 4. In the embodiment of the figures, the main engine 4 is a two-stroke dual-fuel engine that can be operated using either gaseous or liquid fuel. The operation with gaseous fuel can be combined with liquid pilot fuel injection. Also the auxiliary engines 5a, 5b, 5c can be dual-fuel engines, which operate mainly by gas that is ignited by a pilot fuel injection. At least one of the auxiliary engines 5a, 5b, 5c could also be a gas-engine, which is always operated on gaseous fuel that is spark ignit- ed. It is also possible that the main engine 4 is configured only for operation on liquid fuel. In any case, at least one of the engines 4, 5a, 5b, 5c of the ship is operable on gaseous fuel. The fuel does not necessarily need to be gaseous when it is injected into the engine, but the fuel can also be injected into the engine as a supercritical fluid, which is at a pressure and temperature above its critical point. Such fluid is quickly changed into gas in the cylinders of the engine.
The main engine 4 and the auxiliary engines 5a, 5b, 5c are arranged in an engine room 3. The main engine 4 and the auxiliary engines 5a, 5b, 5c could also be arranged in different engine rooms. The ship is provided with a main deck 103 and with several decks 100, 101 , 102 that are arranged below the main deck 103 and with several decks 104, 105, 106, 107 that are arranged above the main deck 103. The term 'main deck' refers here to the uppermost complete deck extending from bow to stern. The decks 104 to 107 above the main deck 103 form the superstructure of the ship. The engine room 3 is arranged inside the hull of the ship below the main deck 103. Due to the height of the main engine 4, the engine room 3 extends from a lower deck 100 to an upper deck 101 . The engine room may extend over even more decks. For gas-fuelled operation of the main engine 4 and/ or the auxiliary engines 5a, 5b, 5c, the ship is provided with one or more tanks (not shown) for storing liquefied natural gas (LNG). The engines 4, 5a, 5b, 5c could also use compressed natural gas or some other fuel that can be injected into the engine in gaseous state or as a supercritical fluid. According to an embodiment of the invention, the fuel is injected into the cylinders of the main engine 4 at high pressure, for instance at pressure in the range of 200 to 400 bar. For handling the fuel, the ship is provided with gas handling equipment. The gas handling equipment refers here to equipment that is used for handling the fuel, irrespective of whether the fuel is in liquid, gaseous or supercritical form. In the embodiment of figure 3, the gas handling equipment comprises a pump 6a for pressurizing the fuel, a feed pump 8a, an LNG vaporizer 7, and optionally a boil-off gas (BOG) compressor 9. The BOG compressor 9 forms part of a BOG reliquefaction system that condenses excess gas boiling in the tanks, which can then be returned to the tanks in liquid state or used in the main engine 4 as fuel. The gas handling equipment can also comprise further devices 10. In the embodiment of figure 3, the pump 6a is a high pressure pump. The feed pump 8a supplies the fuel in liquid state to the high-pressure pump 6a, which raises the pressure of the fuel to the required level. The fuel is then vaporized in the LNG vaporizer 7 and heated to suitable injection temperature. The fuel can be taken directly from the LNG tank, or it can be condensate from the BOG reliquefaction system. The fuel could also be injected into the engines at a lower pressure, in which case pump 6a would not be a high-pressure pump, but one or more low-pressure pumps would be used for introducing the fuel into the engines. The gas handling equipment is arranged in a gas handling room 1 . The gas handling room 1 is a gas-tight space that is arranged completely within the hull of the ship. In the embodiment of the figures, the gas handling room 1 is arranged on the same deck 101 with the engine room 3. The gas handling room 1 is thus below the main deck 103 of the ship. In the embodiment of the fig- ures, there is one deck 102 between the gas handling room 1 and the main deck 103, but the gas handling room 1 could also be delimited by the main deck 103, or there could be several decks between the gas handling room 1 and the main deck 103. Not all the gas handling equipment needs to be located in the gas handling room 1 . For example, the ship can be provided with tank connection rooms that are arranged in connection with the LNG tanks and part of the gas handling equipment, such as low-pressure pumps, can be arranged in the tank connection rooms.
The gas handling room 1 forms a gas-tight room within the hull of the ship. In the embodiment of figures 1 and 3, the gas handling room 1 is divided into a first compartment 1 a and a second compartment 1 b. However, the gas handling room 1 can also be an undivided space, as shown in figure 4. The first compartment 1 a and the second compartment 1 b are gas-tightly separated from each other. The first compartment 1 a is accessible from the second compartment 1 b via a gas-tight door 14. In the embodiment of figure 3, the feed pump 8a, the high-pressure pump 6a, the BOG compressor 9 and other devices 10 that are in contact with the fuel are arranged in the first compartment 1 a of the gas handling room 1 . The gas handling equipment further comprises a drive 6b for operating the high- pressure pump 6a and a drive 8b for operating the feed pump 8a. All the drives 6b, 8b of the gas handling equipment are located in the second compartment 1 b of the gas handling room 1 . All the gas handling equipment that is in contact with the fuel either in gaseous or in liquid state is located in the first compartment 1 a of the gas handling room 1 . The second compartment 1 b is thus free from any devices that are in contact with the fuel. Conversely, the first compartment 1 a is free from the drives 6a, 8a of the gas handling equipment. The risk of leaking fuel entering the second compartment 1 b as well as the risk of ignition of the fuel in the first compartment 1 a is minimized by the arrangement.
In the embodiment of figure 3, the drives 6b, 8b of the pumps 6a, 8a are hy- draulic drives. Each hydraulic drive comprises an electric motor for driving a hydraulic pump. The pressurized hydraulic fluid is used for driving the high- pressure pump 6a and the feed pump 8a. When the electric motor of the hydraulic drive 6b, 8b is located in a space that is gas-tightly separated from the space where the fuel pumps 6a, 8a are arranged, less expensive electric mo- tors can be used. When placing electric motors in an environment with an ex- plosive atmosphere, ATEX certified motors need to be used. The rooms of a ship are divided into different categories on the basis of the risk that an explosive gas atmosphere is present in the room. Different classification societies have slightly different ways to categorize different areas of the ship, but the higher the explosion risk is, the stricter requirements are set for the electrical equipment. By dividing the gas handling room 1 into gas-tight compartments and placing the electrical components into a space with a lower explosion risk, less expensive equipment can be used. Instead of using hydraulic drives for driving the pumps 6a, 8a, electric motors could be used for directly driving the pumps 6a, 8a. Also in this case, it would be preferable to locate the motors in a compartment that is gas-tightly separated from the compartment in which the pumps 6a, 8a are arranged.
The gas handling room 1 of figure 3 comprises further gas-tight compartments 1 c, 1 d. A third gas-tight compartment 1 c is arranged within the first compart- ment 1 a of the gas handling room 1 , and the feed pump 8a, the high-pressure pump 6a and the LNG vaporizer 7 are arranged in the third compartment 1 c. Also a fourth gas-tight compartment 1 d is arranged in the first compartment 1 a and the BOG compressor 9 is arranged in the fourth compartment 1 d. The walls of the third and the fourth gas tight compartments 1 c, 1 d are made of stainless steel to withstand and contain cold LNG in case of leakage. Also some other material with similar properties could be used. These additional compartments 1 c, 1 d further increase the safety of the gas handling room 1 . It is not necessary to have the third and the fourth compartment 1 c, 1 d in the gas handling room 1 . However, by providing the gas handling room 1 with the third and fourth compartments 1 c, 1 c, it is easier to protect the hull of the ship from cold LNG, since the whole first compartment 1 a does not need to withstand extremely low temperatures.
Figure 4 shows a gas handling room 1 of a vessel that is provided with engines that can be operated using low-pressure gas. The gas handling room 1 is formed of a single compartment. A fuel supply pump 6a for pressurizing the fuel is arranged in the gas handling room 1 . The pump 6a is configured to raise the pressure of the gaseous fuel to the range of 5 to 15 bar. The gas handling room 1 is also provided with an LNG vaporizer 7 and a drive 6b for the pump 6a. In the embodiment of figure 4, the drive 6b comprises an ATEX certified electric motor, and can thus be arranged in the same space with the pump 6a. Also in a ship having only low-pressure pumps, the gas handling room 1 can be divided into different compartments.
The gas handling room 1 is located adjacent to the engine room 3, i.e. it has at least one wall in common with the engine room 3. The wall 15 between the gas handling room 1 and the engine room 3 is a double bulkhead, i.e. a double- walled structure. If the vessel is provided with several engine rooms, between the gas handling room 1 and each of the engine rooms needs to be a double bulkhead. The double bulkhead effectively protects the engine room 3 from leaking LNG. The double bulkhead also protects the gas handling room 1 from a fire occurring in the engine room 3. By arranging the gas handling room 1 next to the engine room 3, the length of piping can be minimized.
The second compartment 1 b of the gas handling room 1 is in connection with a vertical shaft 12 that opens to open air. In the embodiment of figure 4, the single compartment of the gas handling room is in connection with a shaft 12. The shaft 12 can connect the gas handling room 1 for instance with the main deck 103 of the ship or other deck that opens to air outside the vessel's hull. The gas handling room 1 is connected to the shaft 12 via an air lock 1 1 . The shaft 12 is provided with a stairway 13, which provides access into the gas handling room 1 from an upper deck of the ship. The gas handling room 1 is accessible only via the shaft 12, which ensures that the gas handling room 12 remains gas-tight from other directions.
The shaft 12, leading from a deck opening to air outside the vessel's hull, to the gas handling room 1 , creates a vertical structure through the decks that is gas-tight towards the other internal structure of the hull. The shaft 12 may pen- etrate through several decks of the vessel. The gas handling room 1 is at the bottom of the shaft 12. The stairway 13 leads from the gas handling room 1 upwards, possibly through several decks, up to the deck that opens to open air outside the vessel hull. Gas-tight doors may be arranged in the stairway 13 between some the decks, or between all the decks, depending on the need con- sidered.
The gas handling room 1 is arranged in the ship in such a location that there are no rooms directly beneath the gas handling room 1 that would be accessible by the ship crew. This is preferable to protect the gas handling room 1 from fire. In practice, different tanks, such as oily bilge water tanks or sludge tanks can be arranged below the gas handling room 1 .
It will be appreciated by a person skilled in the art that the invention is not limited to the embodiments described above, but may vary within the scope of the appended claims.

Claims

Claims
1 . A sea-going vessel, which is provided with at least one engine (4) that can be operated using fuel that is introduced into the engine (4) in gaseous state or as a supercritical fluid, the vessel comprising gas handling equipment (6a, 6b, 6c, 7, 8, 9, 10) for handling the fuel, characterized in that the vessel comprises a gas-tight gas handling room (1 ) for accommodating at least part of the gas handling equipment (6a, 6b, 6c, 7, 8, 9, 10), the gas handling room (1 ) being enclosed entirely by the hull of the vessel and separated from the engine room(s) (3) of the vessel by a double bulkhead (15).
2. A vessel according to claim 1 , wherein the gas handling room (1 ) is accessible from an upper deck via a vertical shaft (12).
3. A vessel according to claim 2, wherein the gas handling room (1 ) is accessible only via the shaft (12).
4. A vessel according to claim 2 or 3, wherein an air lock (1 1 ) is arranged between the gas handling room (1 ) and the shaft (12).
5. A vessel according to any of the preceding claims, wherein the gas handling room (1 ) is located adjacent to an engine room (3).
6. A vessel according to any of the preceding claims, wherein the gas handling equipment (6a, 6b, 6c, 7, 8, 9, 10) comprises a pump (6a) for pressuriz- ing the fuel and the pump (6a) is arranged in the gas handling room (1 ).
7. A vessel according to any of the preceding claims, wherein the gas handling room (1 ) is divided at least into a first gas-tight compartment (1 a) and a second gas-tight compartment (1 b).
8. A vessel according to claim 6 and 7, wherein the pump (6a) is arranged in the first compartment (1 a) of the gas handling room (1 ).
9. A vessel according to claim 8, wherein the drive (6b) of the pump (6a) is arranged in the second compartment (1 b) of the gas handling room (1 ).
10. A vessel according to any of claims 7 to 9, wherein the second compartment (1 b) of the gas handling room (1 ) does not contain any gas handling equipment where the fuel is stored or circulated.
1 1 . A vessel according to any of claims 7 to 10, wherein the first gas-tight compartment (1 a) is accessible only via the second gas-tight compartment (1 b).
12. A vessel according to any of the preceding claims, wherein the gas han- dling room (1 ) is located such that no space accessible by the vessel crew is located directly beneath it.
13. A vessel according to any of the preceding claims, wherein the fuel is liquefied natural gas.
14. A vessel according to any of the preceding claims, wherein the gas han- dling room (1 ) is delimited by the main deck (103) of the ship.
15. A vessel according to any of claims 1 to 10, wherein at least one deck (102) is located between the gas handling room (1 ) and the main deck (103) of the vessel.
PCT/FI2014/050956 2014-12-05 2014-12-05 Sea-going vessel WO2016087704A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/FI2014/050956 WO2016087704A1 (en) 2014-12-05 2014-12-05 Sea-going vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/FI2014/050956 WO2016087704A1 (en) 2014-12-05 2014-12-05 Sea-going vessel

Publications (1)

Publication Number Publication Date
WO2016087704A1 true WO2016087704A1 (en) 2016-06-09

Family

ID=52134223

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2014/050956 WO2016087704A1 (en) 2014-12-05 2014-12-05 Sea-going vessel

Country Status (1)

Country Link
WO (1) WO2016087704A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018150904A1 (en) * 2017-02-17 2018-08-23 三井E&S造船株式会社 Traffic route formation structure for liquefied gas fuel ship
JP2021079747A (en) * 2019-11-15 2021-05-27 株式会社新来島どっく Non-energized avoidance structure of ship using low flash point fuel

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
CLASSNK / NIPPON ET AL: "LNG Fuelled Ships - Activities of ClassNK -", LNG-FUELLED VESSEL TECHNOLOGIES SEMINAR ACTIVITIES OF CLASSNK, 25 July 2014 (2014-07-25), XP055206873, Retrieved from the Internet <URL:http://classnk-rd.com/LNG-Fuelled_Vessel_Technologies_Seminar/pdf/6_Activities_of_ClassNK-LNG_Fuelled_Ship-.pdf> [retrieved on 20150807] *
DET NORSKE VERITAS: "RULES FOR CLASSIFICATION OF SHIPS / HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT GAS FUELLED ENGINE INSTALLATIONS", 30 January 2011 (2011-01-30), pages 1 - 33, XP055121501, Retrieved from the Internet <URL:https://exchange.dnv.com/publishing/rulesship/2011-01/ts613.pdf> [retrieved on 20140604] *
GUIDO FRIEDERICH: "Germanischer Lloyd - LNG as Ship Fuel, Innovation Update", 1 December 2013 (2013-12-01), XP055121874, Retrieved from the Internet <URL:http://www.maritim-de-nl.eu/cms_uploads/files/201312_dnv_gl_-_global_overview_of_lng_as_marine_fuel.pdf> [retrieved on 20140605] *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018150904A1 (en) * 2017-02-17 2018-08-23 三井E&S造船株式会社 Traffic route formation structure for liquefied gas fuel ship
CN110121461A (en) * 2017-02-17 2019-08-13 三井易艾斯造船有限公司 The traffic route of liquefied gas as fuel ship forms structure
KR20190113771A (en) * 2017-02-17 2019-10-08 미쯔이 이앤에스 조우센 가부시키가이샤 Traffic route formation structure of liquefied gas fuel vessel
CN110121461B (en) * 2017-02-17 2021-11-30 三井易艾斯造船有限公司 Traffic route forming structure of liquefied gas fuel carrier
KR102484766B1 (en) * 2017-02-17 2023-01-04 미쯔이 이앤에스 조우센 가부시키가이샤 Transportation route formation structure of liquefied gas fueled ships
JP2021079747A (en) * 2019-11-15 2021-05-27 株式会社新来島どっく Non-energized avoidance structure of ship using low flash point fuel

Similar Documents

Publication Publication Date Title
KR102211150B1 (en) Container Carrier capable of mounting LNG Fueled Propulsion System
KR101210916B1 (en) Floating structure with a fuel gas tank
KR100961867B1 (en) Floating structure with a fuel gas tank
CN110099842B (en) Container transport ship propelled by gas fuel
CN104903186B (en) The fuel gas supply system and method for ship
CN110099843B (en) Container transport ship propelled by gas fuel
KR101559407B1 (en) A ship
KR101807986B1 (en) A fuel tank arrangement of a marine vessel and method of operating a tank container of a marine vessel
KR101544810B1 (en) A ship
KR20160005919A (en) Structure for storage tank of marine floating Structure
KR20110041941A (en) Floating structure with a propulsion system using heterogeneous fuel
WO2016087704A1 (en) Sea-going vessel
KR20180036240A (en) Gas Fuelled Container Carrier
KR102177571B1 (en) Vessel
KR102297873B1 (en) Fuel gas supply system of ship with dual fuel engine
KR20190143683A (en) Gas Fuelled Container Carrier
KR20110041940A (en) Floating structure with a propulsion system using heterogeneous fuel
KR102028819B1 (en) Gas Fuelled Container Carrier
KR20110047414A (en) Ship propelled with liquified fuel gas having a fuel injection door
KR102279215B1 (en) Gas Fuelled Container Carrier
KR101654203B1 (en) Apparatus for supplying fuel gas of ship
KR102012493B1 (en) Liquefied gas fuel type vessel
KR20160075483A (en) Ship propelled with liquified fuel gas having a fuel injection door
KR102061930B1 (en) Gas Fuelled Container Carrier
WO2016087705A1 (en) Sea-going vessel with tanks for dual fuel engines

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14815784

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14815784

Country of ref document: EP

Kind code of ref document: A1