WO2013140533A1 - 無線通信装置 - Google Patents

無線通信装置 Download PDF

Info

Publication number
WO2013140533A1
WO2013140533A1 PCT/JP2012/057082 JP2012057082W WO2013140533A1 WO 2013140533 A1 WO2013140533 A1 WO 2013140533A1 JP 2012057082 W JP2012057082 W JP 2012057082W WO 2013140533 A1 WO2013140533 A1 WO 2013140533A1
Authority
WO
WIPO (PCT)
Prior art keywords
band
scell
pcell
radio
base station
Prior art date
Application number
PCT/JP2012/057082
Other languages
English (en)
French (fr)
Inventor
大出高義
Original Assignee
富士通株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士通株式会社 filed Critical 富士通株式会社
Priority to PCT/JP2012/057082 priority Critical patent/WO2013140533A1/ja
Publication of WO2013140533A1 publication Critical patent/WO2013140533A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0079Transmission or use of information for re-establishing the radio link in case of hand-off failure or rejection
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0032Distributed allocation, i.e. involving a plurality of allocating devices, each making partial allocation
    • H04L5/0035Resource allocation in a cooperative multipoint environment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • H04L5/0092Indication of how the channel is divided
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0069Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
    • H04W36/00692Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink using simultaneous multiple data streams, e.g. cooperative multipoint [CoMP], carrier aggregation [CA] or multiple input multiple output [MIMO]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0014Three-dimensional division
    • H04L5/0023Time-frequency-space
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver

Definitions

  • the following embodiment relates to a wireless communication device.
  • LTE Release 10 Long Term Evolution Release 10
  • Rel′8 Release 8
  • LTE-Advanced system which is an extension of the LTE system
  • technologies such as Carrier Aggregation, uplink MIMO (Multi-Input-Multi-Output) transmission, and radio relay device (Relay) are newly added in Rel'10.
  • CoMP Coordinat Multi Point transmission and reception
  • 8x8 MIMO transmission In the future, studies are underway to introduce CoMP (Coordinate Multi Point transmission and reception) and 8x8 MIMO transmission.
  • the LTE-Advanced system is an extension of the LTE system, so it has a configuration that includes the LTE system and accommodates terminals that support only LTE Rel'8 and Rel'9. It must be possible. That is, the LTE-Advanced system specification must be Upper compatible with the LTE system specification.
  • the up / down bandwidth can be set to 1.4MHz, 3MHz, 5MHz, 10MHz, 15MHz, 20MHz (see TS36.101V10.4.0 5.6).
  • the band set in this way is defined as Component ⁇ Carrier (CC).
  • CC Component ⁇ Carrier
  • the reason why multiple bandwidths are set is that the bandwidth allocated to the conventional GSM (Global System for Mobile Communications) system and W-CDMA (Wideband-Code Divisional Multiple Access) system is used as it is. This is because it is assumed.
  • the LTE system must realize high-speed transmission compared with the conventional GSM system and W-CDMA system. Therefore, the bandwidth must be wide compared to these systems.
  • the band and frequency band used in a wireless communication system vary depending on the situation in each country. Furthermore, in Europe, it is connected to other countries on the land, and there is a need to consider interference, and the frequency band used is adjusted between countries. As a result, the available bandwidth is reduced and shredded. On the other hand, as described above, the LTE system must be broadband.
  • FIGS. 1 to 7 are diagrams for explaining Carrier Aggregation.
  • Carrier Aggregation integrates a plurality of bands having the bandwidth set as described above, and the following three patterns are shown in the 3GPP specification. 1) Integrating consecutive bands of the same frequency band See Figure 1 2) Integrate discontinuous bands of the same frequency band See Figure 2 3) Integrate different frequency bands. See Figure 3
  • Fig. 1 there are Component Carriers (CC2, CC3, CC4, CC5) in the same frequency band. Of these, consecutive Aggregation of CC2 and CC3 is performed.
  • FIG. 2 among CC2 to CC5 in the same frequency band, discontinuous CC2 and CC4 are carrier-aggregated.
  • FIG. 3 there is a frequency band consisting of CC1 and a frequency band consisting of CC2 to CC5, and different bands and discontinuous CC1 and CC2 are Carrier-Aggregated.
  • a band having a bandwidth defined in the LTE specification (for example, Rel'8) is regarded as one unit, and in the LTE-Advanced system, the band is called Component ⁇ Carrier. That is, Carrier Aggregation is supposed to aggregate (integrate) a plurality of Component Carriers.
  • Carrier Aggregation can be seen as a technology for data transmission using multiple bands simultaneously.
  • PCell Primary Cell
  • PCell is set at the time of initial connection, reconnection, reconfiguration, or handover according to the definition of TS36.331V10.3.0 3.1.
  • connection initial line setting
  • this is a cell used at the time of initial connection (at the time of initial line setting) or the like.
  • SCell Secondary Cell
  • TS36.331V10.3.0 6.3.4 SCellIndex 1-7 TS36.331V10.3.0 6.3.4 SCellIndex 1-7.
  • Carrier Aggregation is possible using up to 8 Component Carriers together with PCell.
  • the LTE-Advanced system assumes a maximum bandwidth of 100MHz, and in the case of 1CC 20MHz, it is possible to perform carrier aggregation using up to four SCells and up to five Component Carriers together with PCell. .
  • Carrier Aggregation integrates PCell and at least one SCell.
  • CC2 SCell is CarrierCellAggregation for CC1 PCell.
  • the 3GPP Cell definition is “one service area is configured using one frequency”. Therefore, it is defined that one cell is configured for Component Carrier. Therefore, Component Carrier constituting one cell is called Cell.
  • Serving Cell is also defined (see TS21.905V10.3.0-3 and TS36.331V10.3.0-3.1, 6.3.4 ServCellIndex).
  • ServingServCell is a cell where a terminal is camping according to TS21.905 definition. In other words, it is a cell in which the terminal is located.
  • CA Carrier Aggregation
  • PCell is only one serving Cell.
  • CA Carrier Aggregation
  • SCell is Serving ⁇ Cell. That is, both PCell and SCell are Serving Cell.
  • Serving Cell is defined from 0 to 7. Further, 0 is PCell, and 1 to 7 are defined as SCells. From the above, it can be seen that CA of up to 8CC is possible.
  • Each component carrier sets a downlink control channel (PDCCH: Physical Downlink Control CHannel) and uses the control signal transmitted on the downlink control channel (PDCCH) to perform uplink or uplink and downlink data transmission To do.
  • a downlink control channel (PDCCH) is set only for PCell, and uplink or uplink and downlink data transmission is performed in each CC using a control signal transmitted by this control channel. This is called Cross Carrier Scheduling. As shown in FIG.
  • the downlink control channel PDCCH is set in the PCell, and scheduling of the downlink downlink shared data channel PDSCH (Physical Downlink Shared CHannel) of the PCell and downlink downlink shared data channel PDSCH of the SCell is performed.
  • PDSCH Physical Downlink Shared CHannel
  • the difference between the left diagram and the right diagram in FIG. 5 will be described later.
  • the downlink radio shared channel may be simply referred to as a downlink data channel.
  • PCell is set at the time of initial connection, at the time of resetting, or at the time of a handover.
  • a setting at the time of handover will be described.
  • handover it is described as a handover from a handover source base station (hereinafter referred to as Source eNB (E-UTRAN Node B)) to a handover destination base station (hereinafter referred to as Target eNB).
  • Source eNB E-UTRAN Node B
  • Target eNB a handover destination base station
  • 3GPP defines that one base station is set for one cell.
  • a cell is defined as a region served by one frequency.
  • a general base station sets up a plurality of sectors (for example, 3 sectors or 6 sectors) using a plurality of frequencies and performs communication. Therefore, a general base station is made up of a plurality of cells. In other words, it can be said that one base station as viewed from the exterior or the entire apparatus is an aggregate of a plurality of base stations as a function.
  • the handover source cell as Source Cell
  • the handover destination cell as Target Cell
  • a handover command is transmitted from the source cell to the terminal, and the terminal performs the handover in response to this.
  • Target Cell and handover timing are specified. Specifically, it is as follows.
  • HandoverCommand message is included in DL-DCCH (DownLink-Dedicated Control CHannel) -Message including RRC (Radio Resource Control) Connection Reconfiguration message.
  • HandoverCommandMessage is created by Target eNB, transmitted to Source eNB via X2 interface, and sent from Source eNB to UE.
  • Source Cell and Target Cell when Source Cell and Target Cell are selected for the cells configured by the same base station, they may be transmitted without using the X2 interface because they are in the same base station.
  • the appearance is one base station and the function is a plurality of base stations, even if the above-mentioned X2 interface is provided between the base stations as a function and the HandoverCommadMessage is transmitted using the X2 interface, There is no problem.
  • Handover command message is transmitted to the terminal, there is essentially no problem.
  • the X2 interface is a logical interface between base stations. Note that just because the X2 interface is set does not mean that it is physically connected directly.
  • the RRC Connection Reconfiguration message is included in the DL-DCCH-Message.
  • the DL-DCCH-Message is transmitted from the E-UTRAN (base station) to the UE through the downlink logical channel DL DCCH.
  • the RRC Connection Reconfiguration message includes MobilityControlInfo IE. Also, settings such as SCell addition / deletion (or release) are included.
  • the RRC Connection Reconfiguration message is notified from the E-UTRAN (base station) to the UE (terminal).
  • MobilityControlInfo IE includes targetPhysCellId (target Physical Cell ID). In other words, this specifies a handover destination cell. Since this target cell becomes PCell, the base station notifies PCell. That is, the base station notifies the terminal of PCell setting / change. Note that the operation of the terminal when the target cell is specified is also defined.
  • RRC ConnectionReconfiguration includes settings such as SCell addition / deletion (or release). At this time, the SCell to be added / deleted (or released) is designated by a physical cell ID (Physical Cell ID).
  • the base station notifies the terminal of addition / deletion (or release) of SCell.
  • the operation at the time of handover is also specified.
  • movement is prescribed
  • 3GPP introduced scheduling from HSDPA (High-Speed Downlink Packet Access; W-CDMA Rel'5).
  • a wireless channel between base station terminals is not fixedly assigned to the terminal, but a method of sharing a wireless channel (wireless channel) between a plurality of terminals. It has been taken.
  • Scheduling methods include Max CIR method selected from terminals with high CIR (Carrier-to-Interference Ratio), proportional-fairness method that assigns radio resources fairly to each terminal based on radio channel quality (Radio Channel Quality), all terminals
  • the Round Robin method which allocates radio resources evenly, is famous.
  • the radio resource is composed of a spreading code and time.
  • OFDMA Orthogonal Frequency Division Multiple Access
  • it is composed of subcarriers and time.
  • a shared channel is called a shared channel.
  • the method for transmitting data to the selected terminal for example, modulation scheme, coding rate, etc.
  • radio resources used for transmitting data are selected by scheduling (including these). Sometimes called scheduling).
  • control signal indicating the selected modulation scheme, coding rate, and radio resource is notified to the selected terminal prior to data transmission to the selected terminal, and the terminal is transmitted on the shared channel by following these control signals. Data can be received.
  • each terminal measures the pilot signal (or reference signal RS (Reference Signal)) transmitted from the base station, and the downlink radio channel quality (Downlink channel quality) obtained by calculating is the base station Will be notified.
  • the base station performs scheduling based on this, transmits a control signal related to downlink data transmission obtained by the scheduling to the terminal, and subsequently performs downlink data transmission.
  • uplink data transmission scheduling is performed based on uplink radio channel quality (Uplink channel quality) obtained by measuring and calculating a pilot (or reference signal) transmitted from each terminal.
  • Uplink channel quality uplink radio channel quality
  • a control signal related to uplink data transmission obtained by scheduling is transmitted to the terminal, and the terminal performs uplink data transmission based on this control signal.
  • Downlink radio control channel (PDCCH: Physical Downlink Control CHannel) that transmits control signals for data transmission using the downlink downlink shared data channel (PDSCH: Physical Downlink Shared CHannel) of PCell (Scheduling Cell) 2) PCell downlink shared data channel (PDSCH) that transmits downlink data by PCell using the control information transmitted by the downlink radio control channel. 3) A downlink radio control channel (PDCCH) that transmits a control signal for a downlink radio shared data channel (PDSCH: Physical Downlink Shared CHannel) of SCell (Non-scheduling Cell) is transmitted.
  • PDCCH Physical Downlink Control CHannel
  • SCell Non-scheduling Cell
  • the downlink radio control channel (PDCCH) and the downlink radio shared data channel (PDSCH) include control information indicating which CC is a SCell (Scheduling Cell).
  • Radio broadcast channel (PBCH: Physical Broadcast CHannel), radio synchronization signal (Physical Synchronisation Signal), radio control format indicator channel (PCFICH: Physical Control Format Indicator CHannel), radio H-ARQ indicator channel (PHICH: Physical Hybrid-ARQ Indicator CHannel) ) Is also transmitted on the downlink.
  • PCell Switchuling Cell
  • two downlink radio control channels PDCCH are transmitted.
  • a radio broadcast channel (PBCH: Physical Broadcast CHannel), a radio synchronization signal (Physical SynchronisationchronSignal), a radio control format indicator channel (PCFICH: Physical Control Format Indicator CHannel), a radio H-ARQ indicator channel (PHICH: Physical (Hybrid-ARQ (Indicator) CHannel) is also transmitted on the downlink.
  • PBCH Physical Broadcast CHannel
  • a radio synchronization signal Physical SynchronisationchronSignal
  • PCFICH Physical Control Format Indicator CHannel
  • PHICH Physical (Hybrid-ARQ (Indicator) CHannel
  • SCell Non-scheduling Cell
  • PDSCH SCell downlink radio shared channel
  • PBCH Physical roadBroadcast CHannel
  • PBCH Physical roadBroadcast CHannel
  • a radio synchronization signal Physical Synchronisation ⁇ Signal
  • PCFICH Physical Control Format Indicator ⁇ CHannel
  • PHICH Physical ARQ Indicator CHannel
  • PDCCH downlink radio control channel
  • PCFICH radio control format indicator channel
  • PHICH radio H-ARQ indicator channel
  • PDCCH downlink radio control channel
  • Figure 5 shows the Cross-Carrier-Scheduling model.
  • there is one downlink radio control channel but actually, a downlink radio control channel is set for each CC. That is, the right diagram in FIG. Note that in the left diagram of FIG. 5, only the downlink radio control channel for one terminal is shown, but actually there are downlink radio control channels for other terminals.
  • PCell is described as Scheduling Cell and SCell is described as Non-scheduling Cell.
  • CA is implemented at 3CC or more.
  • FIG. 6 is a diagram illustrating a case where there are three CCs.
  • CA is performed in 3CC (that is, when there are a plurality of SCells)
  • Cross Carrier Scheduling may not be applied to all SCells. That is, the SCell may be a scheduling cell.
  • a certain SCell can be a Scheduling Cell for another SCell.
  • the base stations constituting the PCell can perform scheduling of SCell1 with the PCell itself, and the base stations constituting the SCell2 can also have a PDCCH for scheduling SCell2 itself and SCell3. is there.
  • the PCell schedules for the sake of simplicity, it means that the base stations constituting the PCell perform scheduling. The same applies to SCell.
  • Control signals for carrying out Cross Carrier Scheduling are defined in TS36.331V10.3.0.
  • Scheduling Cell is specified by Serving Cell ID.
  • Serving Cell ID 0
  • PCell becomes a Scheduling Cell.
  • restrictions are set in Cross Carrier Scheduling with TS36.300V10.5.0.
  • Scheduling Cell a cell that performs scheduling
  • Non-scheduling Cell a cell that does not perform scheduling
  • CC Non-scheduling Cell
  • CC Non-scheduling Cell
  • a cell ID is included in the downlink control channel PDCCH to indicate which cell (CC) the control channel is for.
  • This is TS36.212 5.3.3.1.1, 5.3.3.1.2, 5.3.3.1.3, 5.3.3.1.3A, 5.3.3.1.4A, 5.3.3.1.5, 5.3.3.1.5A, 5.3. It is specified in 3.1.5B, 5.3.3.1.5C, 5.3.3.1.8.
  • DCI Downlink Control Information
  • Carrier indicator that is, 3-bit information. These 3 bits correspond to 0 to 7 defined by ServCellIndex IE, that is, 3 bits.
  • DCI Format 1 is a control signal for the downlink shared channel PDSCH. DCI is transmitted on PDCCH.
  • the DCI is transmitted to the terminal through the downlink radio control channel PDCCH.
  • the downlink radio control channel PDCCH includes information indicating which CC (Cell) the control signal is for, and is transmitted to the terminal.
  • PCell can be interpreted as the main band (master band, main band) and SCell as the dependent band (slave band or extended band).
  • PCell is sometimes called an anchor component.
  • PCell becomes Scheduling Cell
  • SCell becomes Scheduling Cell or Non-scheduling Cell.
  • CC1 is PCell and scheduling Cell
  • CC2 is SCell and Non-scheduling Cell.
  • CC1 and CC2 are CCs (or cells) formed by the same base station eNB1 (e Node B1).
  • the necessity of changing PCell and SCell is judged based on the radio channel quality of PCell and SCell.
  • the base station may determine the necessity of changing the PCell and SCell according to the radio channel quality sent from the terminal UE.
  • a case of changing (exchange) of PCell and SCell will be described as an example.
  • PCell reception quality is better than SCell reception quality.
  • SCell or cell with better radio channel quality be PCell.
  • PCell and SCell change request it is determined that PCell and SCell need to be changed.
  • PCell and SCell change request the base station to change (exchange) the PCell and SCell.
  • the radio channel quality includes received power, and the determination may be performed based on the received power.
  • CC1 is PCell and CC2 is SCell, but it is required to change CC2 to PCell and CC1 to SCell.
  • the base station eNB that has received the request or the base station eNB that has decided to change it first notifies the terminal UE that the SCell is to be deleted (or released). That is, it notifies that the SCell communication is to be stopped (or interrupted).
  • the terminal UE that has received the notification deletes (or releases) the SCell, and continues communication with the base station eNB1 using only the PCell.
  • the base station eNB deletes (or releases) the SCell, and uses only the PCell for communication with the terminal UE.
  • the base station eNB notifies the terminal UE to perform a different frequency handover (hard handover) to CC2 (that is, the original SCell).
  • the terminal UE that has received the notification with the base station eNB performs a different frequency handover to CC2.
  • line connection is performed by performing random access (see TS36.300V 10.1.5.2 Non-contention based random access).
  • CC2 becomes PCell by handing over to CC2 (Because it is not connected to other CCs, it is necessarily PCell).
  • the base station eNB1 notifies the terminal of the addition of SCell (CC1) using CC2 (PCell).
  • Terminal UE1 which received notification with the base station eNB adds SCell (CC1).
  • FIG. 8 to FIG. 12 are diagrams for explaining the prior art. For the sake of simplicity, it is assumed that CC is implemented by 2CC, with CC1 as PCell and CC2 as SCell.
  • FIG. 8 is a block diagram of the base station
  • FIG. 9 is a block diagram of the terminal.
  • the base station eNB creates a pilot signal in the pilot signal creation unit 10 of the transmission unit 50a, and performs modulation in the encoding / modulation unit 11.
  • the pilot signal modulated in the transmission radio unit 12 of the transmission unit 50a is converted into a radio signal, and the pilot signal is transmitted via the antenna 13 using all CC (Component Carrier) or in all cells, the base station eNB It transmits to the subordinate at least one terminal UE.
  • CC Component Carrier
  • the pilot signal creation unit 10, the handover control signal creation unit 14, the signal creation unit of the band control signal creation unit 15, the encoding / modulation unit 11 and the transmission radio unit 12 are collectively referred to as a transmission unit 50a or a transmission unit.
  • the pilot signal is also called a pilot or a reference signal (RS).
  • the handover control signal creation unit 14 of the control unit 51a generates a control signal to be transmitted to the terminal UE in order to control handover.
  • the band control signal creation unit 15 of the transmission unit 50a generates a signal for controlling a band for communication with the terminal UE.
  • the terminal UE (see FIG. 9) that has received the pilot signal via the antenna 34 converts the radio signal into a baseband signal in the reception radio unit 25 of the reception unit 53a, and demodulates it in the demodulation / decoding unit 26.
  • the radio channel quality measurement and calculation unit 27 of the reception unit 53a extracts a pilot signal, and measures and calculates reception power and reception quality of the pilot signal.
  • the radio channel quality is measured in all CCs (cells). Specifically, it acquires pilot received power (RSRP: Reference Signal Received Power), pilot received quality (RSRQ: Reference Signal Received Quality), CIR (Carrier to Interference Ratio), SIR (Signal to Interference Ratio), etc. .
  • the obtained radio channel quality is determined by the radio channel quality information creation unit 37 based on a calculation formula or the like, and the measurement result is converted to a discrete numerical value, and the radio channel quality (Channel Q Quality) or radio channel quality index (CQI: Channel Q Quality Indicator ) Hereinafter, it is collectively referred to as wireless channel quality.
  • the obtained wireless channel quality is sent to the encoding / modulating unit 32 of the transmitting unit 55a.
  • the bandwidth control unit 35 of the control unit 54a controls the bandwidth used by the terminal UE for communication, and the terminal setting / transmission / reception control unit 36 controls transmission / reception processing of the terminal UE under the control of the bandwidth control unit 35.
  • the reception radio unit 25, demodulation / decoding unit 26, radio channel quality measurement and calculation unit 27, band control information extraction unit 28, and handover control signal extraction unit 29 are collectively referred to as a reception unit 53a or reception means.
  • the handover control signal extraction unit 29 extracts a signal for controlling handover from the base station eNB from the received signal.
  • the handover control unit 30 compares the channel quality of PCell and SCell based on the radio channel quality of all CCs (cells). Here, it is assumed that the radio channel quality of SCell (CC2) is better than the radio channel quality of PCell (CC1). At this time, the handover control unit 30 determines that the PCell and the SCell need to be changed, and determines that the handover is necessary to execute the change. Subsequently, the handover request signal creation unit 31 is notified of the determination result, and the handover request signal creation unit 31 creates a handover request signal.
  • the encoding / modulation unit 32 performs encoding, modulation, conversion to a radio signal by the transmission radio unit 33, and transmission to the base station eNB via the antenna.
  • the base station eNB that has received the handover request signal via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates the signal in the demodulation / decoding unit 17, and decodes the signal as a reception signal. Reproduce.
  • the handover request signal extraction unit 18 extracts a handover request signal from the reproduced reception signal and notifies the handover control unit 19 of the handover request signal.
  • the handover control unit 19 that has received the notification requests the band control unit 20 to delete (or release) the SCell.
  • the band control unit 20 notifies the SCell deletion (or release) to the transmission radio unit 12, the reception radio unit 16, the encoding / modulation unit 11, the demodulation / decoding unit 17, and the band control signal creation unit 15.
  • the band control signal creation unit 15 sends a control signal (SCell deletion notification signal or SCell release notification) related to deletion (or release) of the SCell and deletion (or release) of the downlink radio control channel PDCCH transmitted by the PCell for the SCell. create.
  • the encoding / modulation unit 11 performs encoding, modulation, conversion to a radio signal by the transmission radio unit 12, and transmission to the terminal UE via the antenna 13.
  • the SCell deletion (or release) notification may be the above-described radio channel reconfiguration message (RRCConnectionReconfigurationRemessage).
  • the terminal UE and the base station eNB that have received the notification delete (or release) the SCell and delete (or release) the radio control channel for the SCell transmitted by the PCell.
  • the radio channels such as the downlink radio shared channel PDSCH, the uplink radio shared channel PUSCH, and the uplink radio control channel PUCCH used for communication with the terminal UE are also deleted (or released). To do.
  • a radio channel reconfiguration completion message (RRCConnectionReconfigurationComplete message) may be returned from the terminal UE to the base station eNB.
  • the terminal UE notifies the base station eNB of a handover failure (handover failure).
  • the terminal UE creates a signal, modulates it, converts it to a radio signal, and transmits it to the base station eNB, as described above. Moreover, in the base station eNB, it converts into a baseband signal, demodulates, and extracts a notification signal. In the future, similar processing will be omitted.
  • the handover control unit 19 of the base station eNB that recognizes that the deletion (or release) of the SCell has been completed controls the execution of the PCell different frequency handover (handover from CC1 to the original SCell (CC2)). Specifically, handover control information such as a handover destination and a handover timing is determined, and the handover control signal creation unit 14 is notified of the creation of the handover control control signal based on this. The handover control signal creation unit 14 creates a handover control signal based on the information and notifies the terminal UE.
  • the terminal UE and the base station eNB that have received the notification perform a hard handover of the PCell from CC1 to CC2 based on the handover control signal (handover control information).
  • the handover destination CC is specified by the targerPhysCellId included in MobilityControlInfo IE of TS36.331 6.3.4.
  • the terminal UE notifies the base station eNB of handover completion or failure in the same manner as SCell deletion (or release).
  • the base station eNB that has received the notification requests the bandwidth control unit 20 to add a SCell and set a downlink radio control channel for data transmission in the SCell transmitted in the SCell.
  • the band control signal creation unit 15 creates a control signal (SCell addition control signal) related to the addition of the SCell and the addition of the downlink radio control channel PDCCH transmitted in the SCell, and transmits the control signal to the terminal UE.
  • the terminal UE and the base station eNB that have received the notification add a SCell and add (set) a radio control channel for the SCell transmitted by the PCell.
  • SCell radio channels such as downlink radio shared channel PDSCH, uplink radio shared channel PUSCH, and uplink radio control channel PUCCH used for communication with terminal UE are also added (set).
  • the terminal UE notifies the base station eNB of the completion or failure of SCell deletion (or release) and SCell addition.
  • the terminal UE notifies the base station eNB of handover completion or failure in the same manner as SCell deletion (or release).
  • PCell and SCell are changed (exchanged).
  • the terminal requested required the different frequency handover for change of PCell and SCell in the above, you may judge a base station. The description will be made below except for the portions that overlap with the description when the above-mentioned terminal determines.
  • the terminal UE receives the pilot signal transmitted from the base station eNB, and measures the radio channel quality in the radio channel quality measurement and calculation unit 27.
  • the wireless quality measurement result is notified to the wireless channel quality information creation unit 37.
  • the radio channel quality information creating unit 37 sets the measurement result as a discrete numerical value based on a calculation formula or the like, and obtains radio channel quality (Channel Quality) or a radio channel quality index (CQI: Channel Quality Indicator). Hereinafter, it is collectively referred to as wireless channel quality.
  • the obtained radio channel quality is encoded and encoded by the encoding / modulation unit 32.
  • the transmission radio unit 33 converts the radio signal into a radio signal and transmits the radio signal to the base station eNB via the antenna 34.
  • the radio channel quality measured in all CCs (cells) may be transmitted only by PCell, or the radio channel quality may be transmitted by each measured CC (that is, PCell or SCell here).
  • the base station eNB that has received the radio channel quality via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates it in the demodulation / decoding unit 17, and decodes the signal as a reception signal. Reproduce.
  • the radio channel quality information extraction unit 21 extracts radio channel quality from the reproduced received signal and notifies the band control unit 20 and the handover control unit 19 of the radio channel quality.
  • the handover control unit 19 compares the channel quality of the PCell and other SCells based on the radio channel quality for all CCs (or cells). Here, it is assumed that the radio channel quality of SCell (CC2) is better than the radio channel quality of PCell (CC1). At this time, the handover control unit 19 determines that a change (exchange) between the PCell and the SCell is necessary, and determines that a handover is necessary to execute the change (exchange). In consideration of control such as radio channel control, it is desirable that PCell reception quality is better than SCell reception quality. For this reason, it is judged that it is necessary to change PCell and SCell.
  • the bandwidth control unit 20 is notified of the change (exchange) of the PCell and the SCell.
  • the band control unit 20 notifies the SCell deletion (or release) to the transmission radio unit 12, the reception radio unit 16, the encoding / modulation unit 11, the demodulation / decoding unit 17, and the band control signal creation unit 15.
  • the band control signal creation unit 15 sends a control signal (SCell deletion notification signal or SCell release notification) related to deletion (or release) of the SCell and deletion (or release) of the downlink radio control channel PDCCH transmitted by the PCell for the SCell. create.
  • the encoding / modulation unit 11 performs encoding, modulation, conversion to a radio signal by the transmission radio unit 12, and transmission to the terminal UE via the antenna 13.
  • the SCell deletion (or release) notification may be the above-described radio channel reconfiguration message (RRCConnectionReconfigurationRemessage).
  • the terminal UE that has received the notification via the antenna 34 converts the radio signal into a baseband signal in the reception radio unit 25, demodulates and decodes the signal in the demodulation / decoding unit 26, and reproduces the signal as a reception signal.
  • the bandwidth control information extraction unit 28 extracts the notification and notifies the bandwidth control unit.
  • the bandwidth control unit that has received the notification deletes (or releases) the SCell, and deletes (or releases) the radio control channel for the SCell transmitted by the PCell.
  • the base station also deletes (or releases) the SCell, and deletes (or releases) the radio control channel for the SCell transmitted on the PCell.
  • the radio channels such as the downlink radio shared channel PDSCH, the uplink radio shared channel PUSCH, and the uplink radio control channel PUCCH used for communication with the terminal UE are also deleted (or released). To do.
  • a radio channel reconfiguration completion message (RRCConnectionReconfigurationComplete message) may be returned from the terminal UE to the base station eNB.
  • the terminal UE notifies the base station eNB of a handover failure (handover failure).
  • the terminal UE creates a signal, modulates it, converts it to a radio signal, and transmits it to the base station eNB, as described above. Moreover, in the base station eNB, it converts into a baseband signal, demodulates, and extracts a notification signal.
  • the bandwidth control unit 35 or the handover control unit 30 determines completion and failure, notifies the determination result to a control signal creation unit (not shown) such as completion and failure, and generates a control signal such as completion and failure that has received the notification.
  • the unit generates a control signal such as completion or failure, encodes and modulates the control signal such as completion or failure in the encoding / modulation unit 32, converts the signal to a radio frequency in the transmission radio unit 33, and then converts the signal through the antenna 34. Transmit to the base station.
  • the base station that has received a control signal such as completion or failure via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates and decodes the signal in the demodulation / decoding unit 17, and receives the signal. Play as.
  • a control signal extraction unit such as completion and failure
  • a control signal such as completion and failure is extracted from the generated received signal and notified to the band control unit 20 and the handover control unit 19. Recognizing that the deletion (or release) of the SCell is completed, the handover control unit 19 of the base station eNB controls the execution of the PCell different frequency handover (handover from CC1 to the original SCell (CC2)).
  • handover control information such as a handover destination and a handover timing is determined, and the handover control signal creation unit 14 is notified of the creation of the handover control control signal based on this.
  • the handover control signal creation unit 14 creates a handover control signal based on the information and notifies the terminal UE.
  • the terminal UE and the base station eNB that have received the notification perform a hard handover of the PCell from CC1 to CC2 based on the handover control signal (handover control information).
  • the handover destination CC is specified by the targerPhysCellId included in MobilityControlInfo IE of TS36.331 6.3.4.
  • the terminal UE notifies the base station eNB of handover completion or failure in the same manner as SCell deletion (or release).
  • the base station eNB that has received the notification requests the bandwidth control unit 20 to add a SCell and set a downlink radio control channel for data transmission in the SCell transmitted in the SCell.
  • the band control signal creation unit 15 creates a control signal (SCell addition control signal) related to the addition of the SCell and the addition of the downlink radio control channel PDCCH transmitted in the SCell, and transmits the control signal to the terminal UE.
  • the terminal UE and the base station eNB that have received the notification add a SCell and add (set) a radio control channel for the SCell transmitted by the PCell.
  • SCell radio channels such as downlink radio shared channel PDSCH, uplink radio shared channel PUSCH, and uplink radio control channel PUCCH used for communication with terminal UE are also added (set).
  • the terminal UE notifies the base station eNB of the completion or failure of SCell deletion (or release) and SCell addition.
  • the terminal UE notifies the base station eNB of handover completion or failure in the same manner as SCell deletion (or release).
  • FIG. 10 and FIG. 11 are diagrams showing an operation image of PCell and SCell change in the prior art.
  • CC1 is PCell and CC2 is SCell.
  • the SCell is deleted (or released), and only PCell communication is performed.
  • the PCell CC1 is handed over to CC2 at a different frequency.
  • CC1 is added as a SCell.
  • a pilot signal is transmitted from the base station eNB to the terminal UE.
  • the terminal UE measures the radio channel quality and performs a radio channel quality report to the base station eNB.
  • the base station eNB performs PCell and SCell change determination.
  • a SCell deletion notification (or release notification) is sent to the terminal UE.
  • the SCell is deleted (or released), and a different frequency handover request is made from the base station eNB to the terminal UE.
  • This conventional different frequency handover is a hard handover in which the line is once disconnected and the frequency is changed, and then the line is reconnected. Accordingly, in order to reconnect the line, synchronization detection, random access, and the like are performed again.
  • a different frequency handover is performed from the PCell to the old SCell, and then the SCell to be added is selected by the base station eNB.
  • the base station eNB notifies which SCell is used as the new SCell, and SCell addition is performed.
  • the radio channel quality is measured in step S10, and cell selection of a cell to be PCell is performed in step S11.
  • step S12 a PCell / SCell change request is sent from the base station eNB.
  • step S13 the SCell is deleted (or released), and in step S14, a PCell different frequency handover is performed.
  • step S15 SCell is added and the process ends.
  • a component carrier is added / deleted (released) by carrier aggregation, and the information of addition / deletion (release) is notified to the terminal, or a component carrier based on quality information from the terminal by carrier aggregation. There is something to assign.
  • the conventional method has the following problems. -The different frequency handover is a hard handover, and the line needs to be disconnected and reconnected. ⁇ Those communicating with 2CC should be changed to 1CC. (That is, the state where communication was performed using two bands at the same time was changed to a state where communication was performed using only one band.)
  • a wireless communication apparatus capable of changing the PCell (first band) and SCell (second band) without reducing the transmission rate and without disconnecting the line.
  • a wireless communication apparatus includes first data, a first control signal for transmitting the first data, and a second data for second data transmitted in the second band.
  • a wireless communication apparatus that performs data transmission between wireless communication apparatuses by simultaneously using the first band for transmitting the control signal of 2 and the second band for transmitting the second data, line connection is established.
  • a band control unit that controls the change of the first band and the second band is maintained.
  • a wireless communication apparatus capable of changing the PCell (first band) and SCell (second band) without reducing the transmission speed and without disconnecting the line. can do.
  • FIG. 6 is a diagram (part 1) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 2) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 3) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 4) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 5) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 6) for explaining Carrier-Aggregation.
  • FIG. 7 is a diagram (part 7) for explaining Carrier-Aggregation.
  • FIG. 6 is a diagram (part 1) for explaining a conventional technique.
  • FIG. 2 is a second diagram for explaining a conventional technique.
  • FIG. 4 is a diagram (part 3) for explaining a conventional technique.
  • FIG. 4 is a diagram (part 4) for explaining a conventional technique.
  • FIG. 5 is a diagram (part 5) for explaining a conventional technique;
  • FIG. 11 is a diagram (No. 1) illustrating an image of an operation when changing (exchanging) a Scheduling Cell and a Non-scheduling Cell.
  • FIG. 10 is a diagram (part 2) illustrating an image of an operation when changing (exchange) Scheduling Cell and Non-scheduling Cell. It is a figure explaining the image of PCell and SCell change processing of this embodiment. It is an image figure explaining the case where SCell * 1 (Scheduling * Cell) and SCell * 2 (Non-scheduling * Cell) are changed (exchange).
  • FIG. 3 is a diagram (part 1) illustrating a first configuration example of the present embodiment in more detail.
  • FIG. 5 is a diagram (part 2) illustrating the first configuration example of the embodiment in more detail.
  • FIG. 6 is a third diagram illustrating the first configuration example of the embodiment in more detail.
  • FIG. 4 is a diagram (part 4) illustrating the first configuration example of the embodiment in more detail.
  • FIG. 5 is a fifth diagram illustrating the first configuration example of the embodiment in more detail.
  • FIG. 6 is a sixth diagram illustrating the first configuration example of the embodiment in more detail.
  • FIG. 7 is a diagram (No. 7) for explaining the first configuration example of the embodiment in more detail;
  • FIG. 8 is a diagram (part 8) illustrating the first configuration example of the embodiment in more detail.
  • FIG. 8 is a diagram (part 8) illustrating the first configuration example of the embodiment in more detail.
  • FIG. 9 is a diagram (part 9) illustrating the first configuration example of the present embodiment in more detail
  • FIG. 10 is a diagram (No. 10) for explaining the first configuration example of the embodiment in more detail
  • FIG. 11 is a diagram (part 11) illustrating the first configuration example of the embodiment in more detail
  • FIG. 12 is a diagram (No. 12) for explaining the first configuration example of the embodiment in more detail
  • FIG. 14 is a diagram (No. 13) illustrating the first configuration example of this embodiment in more detail.
  • FIG. 14 is a diagram (No. 14) for explaining the first configuration example of the embodiment in more detail
  • FIG. 15 is a diagram (No. 15) illustrating the first configuration example of this embodiment in more detail
  • FIG. 16 is a diagram (No.
  • FIG. 16 illustrating the first configuration example of this embodiment in more detail
  • FIG. 17 is a diagram (No. 17) explaining the first configuration example of this embodiment in more detail
  • FIG. 18 is a diagram (No. 18) explaining the first configuration example of this embodiment in more detail
  • FIG. 19 is a diagram (19) illustrating the first configuration example of the embodiment in more detail
  • FIG. 5 is a diagram (part 1) illustrating a second configuration example of the embodiment.
  • FIG. 6 is a second diagram illustrating a second configuration example of the embodiment.
  • FIG. 10 is a third diagram illustrating the second configuration example of the embodiment.
  • FIG. 10 is a diagram (No. 4) for explaining the second configuration example of the embodiment.
  • FIG. 10 is a diagram (No. 5) explaining the second configuration example of the embodiment.
  • FIG. 10 is a diagram (No. 5) explaining the second configuration example of the embodiment.
  • FIG. 10 is a diagram (No. 7) explaining the second configuration example of the embodiment.
  • FIG. 10 is a diagram (part 1) illustrating a third configuration example of the embodiment.
  • FIG. 10 is a second diagram illustrating a third configuration example of the embodiment.
  • FIG. 10 is a third diagram illustrating the third configuration example of the embodiment.
  • FIG. 10 is a fourth diagram illustrating the third configuration example according to the embodiment;
  • FIG. 10 is a fifth diagram illustrating the third configuration example according to the present embodiment;
  • FIG. 6 is a sixth diagram illustrating the third configuration example according to the embodiment;
  • FIG. 10 is a diagram (part 1) illustrating a fourth configuration example of the embodiment.
  • FIG. 10 is a second diagram illustrating a fourth configuration example of the embodiment.
  • FIG. 10 is a third diagram illustrating the fourth configuration example of the embodiment.
  • Carrierg Aggregation in LTE-Advanced system will be described as an example.
  • the present invention is applicable to any wireless communication system that uses a plurality of bands simultaneously.
  • the base station eNB determines whether to change the PCell or SCell based on the radio channel quality notified from the terminal, and notifies the previous band (CC, cell) and the change timing thereof. That is, the cell (or cell ID) to be PCell is notified. Furthermore, a cell (or cell ID) to be a SCell is notified along with the change.
  • the terminal UE that has received the notification changes as follows according to the notified timing.
  • (1) -The original SCell (CC2) is changed to the new PCell (CC2), and then the original PCell (CC1) is changed to the new SCell (CC1).
  • (2) -The original PCell (CC1) is changed to the new SCell (CC1), and then the original SCell (CC2) is changed to the new PCell (CC2).
  • (3) -The original SCell (CC2) is changed to the new PCell (CC2), and at the same time, the original SCell (CC2) is changed to the new PCell (CC2). That is, PCell and SCell are changed sequentially or simultaneously. This can be done simply by changing the PCell and SCell settings. It should be changed so that PCell always exists at a certain moment.
  • the PCell, the SCell, and the terminal UE maintain the line. That is, by continuing data transmission, a reduction in transmission speed is prevented.
  • the case of (1) will be described. However, the same processing is possible for the cases of (2) and (3) unless otherwise noted.
  • PCell is a Scheduling Cell
  • SCell is a Non-scheduling Cell.
  • the base station eNB uses the downlink radio control channel PDCCH transmitted in the original PCell (CC1) to notify the terminal UE that the PCell and SCell are changed and the original SCell (CC2) is changed to the new PCell (CC2). .
  • the terminal UE and the base station eNB change the original SCell (CC2) to the new PCell (CC2), and change the downlink radio control channel PDCCH from the original PCell (CC1) to the new PCell (CC2) (replay).
  • the terminal UE is notified to change the original PCell (CC1) to the new SCell (CC1) using the downlink radio control channel PDCCH transmitted in the new PCell (CC2).
  • the terminal UE and the base station eNB that have received the notification change the PCell (CC1) to the new SCell (CC1).
  • the source PCell changes from Scheduling Cell to Non-scheduling Cell
  • the source SCell changes from Non-scheduling Cell to Scheduling Cell
  • the base station eNB transmits the downlink radio control channel PDCCH or downlink radio shared data channel (PDSCH) transmitted by the original PCell (CC1). ) To notify the terminal UE that the original SCell is changed to scheduling ⁇ Cell. The terminal UE and the base station eNB that have received this change (reset) the downlink radio control channel PDCCH for the original SCell that was transmitted by the original PCell (CC1) to be transmitted by the original PCell. ). That is, it changes to Scheduling Cell.
  • PDCCH downlink radio control channel
  • PDSCH downlink radio shared data channel
  • the base station eNB uses the downlink radio control channel PDCCH or downlink radio shared data channel (PDSCH) transmitted in the original PCell (CC1) and / or the original SCell (CC2) to change the PCell and SCell to the terminal UE.
  • PDCCH downlink radio control channel
  • PDSCH downlink radio shared data channel
  • the terminal UE and the base station eNB that have received the notification change the original SCell (CC2) to the new PCell (CC2). Subsequently, the terminal UE is notified of changing the original PCell (CC1) to the new SCell (CC1) using the downlink radio control channel PDCCH or the downlink radio shared data channel (PDSCH) transmitted in the original PCell (CC1).
  • the terminal UE is notified of changing the original PCell (CC1) to the new SCell (CC1) using the downlink radio control channel PDCCH or the downlink radio shared data channel (PDSCH) transmitted in the original PCell (CC1).
  • PDCCH downlink radio control channel
  • PDSCH downlink radio shared data channel
  • PDCCH downlink radio control channel
  • PDSCH downlink radio shared data channel
  • the terminal UE and the base station eNB change so that the radio control channel PDDCH for the new SCell transmitted in the new SCell (CC1) is transmitted in the new PCell.
  • the PCell and SCell and the terminal UE maintain the line. That is, by continuing data transmission, a reduction in transmission speed is prevented.
  • the source SCell is changed from Non-scheduling Cell to Scheduling Cell
  • the PCell and SCell are changed
  • the changed (target) SCell is changed from Scheduling Cell to Non-scheduling Cell .
  • FIG. 13 and FIG. 14 are diagrams showing an image of the operation when changing (exchange) the Scheduling ⁇ Cell and the Non-scheduling Cell.
  • PCell and SCell-1 are Scheduling Cell and SCell-2 is Non-scheduling Cell.
  • Scheduling Cell is changed to PCell and SCell 2.
  • FIG. 15 is a diagram illustrating an image of the PCell / SCell change process according to the present embodiment.
  • CC1 is a PCell and Scheduling Cell
  • CC2 is SCell1 and Scheduling Cell
  • CC3 is SCell2 and Non-scheduling Cell.
  • SCell 2 is changed to Scheduling Cell
  • SCell 1 is changed to Non-scheduling Cell. This can be done by changing the information included in the cell to set which cell is the scheduling cell.
  • PCell Since PCell must exist, PCell exists separately at the time of the above change, and is not subject to change.
  • SCell-1 (Scheduling Cell)
  • SCell-2 Non-scheduling Cell
  • FIG. 16 is an image diagram illustrating a case where SCell-1 (Scheduling-Cell) and SCell-2 (Non-scheduling-Cell) are changed (exchanged).
  • FIG. 16 shows a case where the change is performed in three steps.
  • CC1 is a scheduling cell in PCell
  • CC2 is a scheduling cell in SCell1
  • CC3 is a non-scheduling cell in SCell2.
  • SCell 2 is changed from a non-scheduling cell to a scheduling cell using the control signal of SCell 2 transmitted in SCell 1 ((2) in FIG. 16).
  • SCell 1 is changed to a non-scheduling cell using a control signal transmitted in SCell 2 or a control signal transmitted in SCell 1.
  • SCell 1 (Scheduling cell) and SCell 2 (Non-scheduling) are changed to SCell 1 (Non-scheduling Cell) and SCell 2 (Scheduling Cell) ((3) in FIG. 16).
  • PCell Since PCell must exist, PCell exists separately at the time of the above change, and is not subject to change.
  • the downlink control channel contains a radio layer control signal
  • the downlink radio shared data channel contains a higher layer control signal.
  • PCell and SCell setting information is included in the data channel control signal. Therefore, the change of PCell and SCell can be realized by rewriting the setting of the control signal in the higher layer of the radio layer.
  • the setting of SchedulingulCell and Non-scheduling Cell is indicated by whether or not the control channel is actually placed on a certain Cell.
  • the modulation method of the control channel is determined in advance, and any mobile terminal can demodulate with the determined method, and the information of other mobile terminals can also be demodulated. Only information can be decrypted. Based on the decoded control information, the data channel modulation scheme and timing are acquired to obtain data.
  • the measurement of the radio channel quality may measure only the band (or cell) that is used, or may measure the entire band including the band (or cell) that is not being used.
  • the measurement result is transmitted using an uplink control channel.
  • the radio channel quality may be transmitted using the uplink PCell or SCell uplink control channel corresponding to the downlink PCell or SCell, or aggregated and transmitted to the uplink PCell uplink control channel corresponding to the downlink PCell. May be.
  • 17 to 35 are diagrams for explaining the first configuration example of the present embodiment in more detail.
  • CC1 is PCell
  • CC2 is SCell
  • CA is being performed in 2CC.
  • FIG. 17 is an operation image of the first configuration example
  • FIG. 18 is a diagram showing how PDCCH and PDSCH are transmitted in FIG.
  • CC1 is a PCell and Scheduling Cell
  • CC2 is a SCell and Non-scheduling Cell. Therefore, PCell and SCell are changed (exchanged).
  • CC1 is a SCell and a non-scheduling cell.
  • CC2 is assumed to be PCell and Scheduling Cell.
  • CC1 is a scheduling cell in PCell and has PDCCH and PDSCH
  • CC2 is a non-scheduling cell in SCell and has PDSCH.
  • SCell is changed to PCell
  • PCell is changed to SCell
  • PDCCH is replaced.
  • CC2 is a PCell, becomes a Scheduling Cell, and has PDCCH and PDSCH.
  • the first band is the primary cell and the second band is the secondary cell on the upper side (that is, earlier in time). This is because the first band is the secondary cell and the second band is the primary cell on the lower side (ie, later in time) due to the change in PCell and SCell.
  • the first band is a Primary Cell
  • the second band is a Secondary Cell
  • the third band is also a Secondary Cell
  • the Primary Cell and the second band of the first band Change the setting of the secondary cell of the band.
  • the first and third bands are secondary cells
  • the second band is a primary cell.
  • the bands are written adjacent (or continuous) for simplicity, but may not be adjacent (or continuous).
  • FIG. 21 is a block configuration diagram of the base station of the present embodiment.
  • FIG. 22 is a block configuration diagram of a terminal according to the present embodiment.
  • the base station eNB creates a pilot signal in the pilot signal creation unit 10 and performs modulation in the encoding / modulation unit 11.
  • the pilot signal modulated in the transmission radio unit 12 is converted into a radio signal, and the pilot signal is transmitted via the antenna 13 to at least one terminal UE under the base station eNB via all CCs (Component Carrier).
  • the pilot signal creation unit 10, the signal creation unit of the band control signal creation unit 15, the encoding / modulation unit 11, and the transmission radio unit 12 are collectively referred to as a transmission unit 50 or a transmission unit.
  • the pilot signal is also referred to as a pilot or a reference signal (RS: “Reference” Signal).
  • the terminal UE that has received the pilot signal via the antenna 34 converts the radio signal into a baseband signal in the reception radio unit 25 and demodulates it in the demodulation / decoding unit 26.
  • the radio channel quality measurement and calculation unit 27 extracts a pilot signal, and measures and calculates the reception power and reception quality of the pilot signal. Similarly, the radio channel quality is measured in all CCs. Specifically, information such as pilot received power (RSRP: Reference Signal Received Power), pilot received quality (RSRQ: Reference Signal Received Quality), CIR (Carrier to Interference Ratio), SIR (Signal to Interference Ratio), etc. obtain.
  • the reception radio unit 25, the demodulation / decoding unit 26, the radio channel quality measurement and calculation unit 27, and the band control information extraction unit 28 are collectively referred to as a reception unit 53 or a reception unit.
  • the bandwidth control unit 35 is notified of the measured and calculated wireless channel quality.
  • the bandwidth control unit 35 compares the channel quality of PCell and other SCells based on the radio channel quality for all CCs. Here, it is assumed that the radio channel quality of SCell (CC2) is better than the radio channel quality of PCell (CC1). At this time, the bandwidth control unit 35 determines that it is necessary to change (exchange) the PCell and the SCell. Subsequently, this determination result is notified to the PCell and SCell change request signal creation unit 41.
  • the PCell / SCell change signal creation unit 41 creates a PCell / SCell change request signal, and the encoding / modulation unit 32 encodes and modulates it.
  • the bandwidth control unit 35 notifies the terminal setting / transmission / reception control unit 36 of a bandwidth setting instruction. As a result, the bandwidth used for communication is changed.
  • the band control unit 35 and the terminal setting / transmission / reception control unit 36 are collectively referred to as a control unit 54 or a control unit.
  • the base station eNB that has received the PCell and SCell change request signal via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16 and demodulates it in the demodulation / decoding unit 17.
  • the signal is reproduced as a received signal by decoding.
  • the PCell / SCell change request signal extraction unit 40 extracts the PCell / SCell change request signal from the reproduced received signal, and notifies the bandwidth control unit 20 of the PCell / SCell change request signal extraction unit 40.
  • the reception radio unit 16, the demodulation / decoding unit 17, the radio channel quality information extraction unit 21, and the PCellSCell change request signal extraction unit 40 are collectively referred to as a reception unit 52 or a reception unit.
  • the bandwidth control unit 20 Upon receiving the notification, the bandwidth control unit 20 sends a PCell and SCell change request to the transmission radio unit 12, the reception radio unit 16, the encoding / modulation unit 11, the demodulation / decoding unit 17, and the band control signal creation unit 15. Notice. Note that the change request and the change timing may be notified at the same time. Moreover, you may change PCell and SCell simultaneously.
  • the bandwidth control unit 20 is referred to as a control unit 51 or control means.
  • the band control signal creation unit 15 creates a control signal related to the PCell change and the SCell change.
  • the transmission radio unit 12, the encoding / modulation unit 11, the band control signal creation unit 15, and the pilot signal creation unit 10 are collectively referred to as a transmission unit 50 of the base station eNB.
  • the transmission radio unit 33, the encoding / modulation unit 32, the PCell, the SCell change request signal creation unit 41, and the radio channel quality information creation unit 37 are collectively referred to as a transmission unit 55 of the terminal UE.
  • change a PCell to a SCell change one of the SCells to a PCell, and create a control signal related to the change timing.
  • it may be a control signal such as switching the Cell ID of the PCell and the Cell ID of the SCell, or the Cell ID of the original SCell is specified as the Cell ID of the PCell, and the original PCell is specified as the Cell ID of the SCell.
  • It may be a control signal such as designating the Cell ID of
  • the control signal for PCell and SCell change created as described above is encoded and modulated in the encoding / modulation unit 11. In the transmission radio unit 12, this is converted into a radio signal and transmitted to the terminal UE via the antenna 13.
  • the SCell deletion (or release) notification may be the above-described radio channel reconfiguration message (RRCConnectionReconfiguration message) (that is, the control signal for SCell deletion (or release) is included in the radio channel cross-configuration message. It may be a control signal).
  • the terminal UE and the base station eNB that have received the notification change the PCell and SCell. That is, the terminal UE that has received the notification via the antenna 34 converts the radio signal into a baseband signal in the reception radio unit 25, demodulates it in the demodulation / decoding unit 26, and reproduces the signal as a reception signal by decoding. To do.
  • the bandwidth control information extraction unit 28 extracts the notification and notifies the bandwidth control unit.
  • the bandwidth control unit that has received the notification deletes (or releases) the SCell, and deletes (or releases) the radio control channel for the SCell transmitted by the PCell.
  • the base station also deletes (or releases) the SCell, and deletes (or releases) the radio control channel for the SCell transmitted on the PCell. As the SCell is deleted (or released), the radio channels such as the downlink radio shared channel PDSCH, the uplink radio shared channel PUSCH, and the uplink radio control channel PUCCH used for communication with the terminal UE are also deleted (or released). To do.
  • a radio channel reconfiguration completion message (RRCConnectionReconfigurationComplete message) may be returned from the terminal UE to the base station eNB.
  • the terminal UE may notify the base station eNB of the failure to set up the radio channel.
  • the terminal UE creates a signal, modulates it, converts it to a radio signal, and transmits it to the base station eNB, as described above. Moreover, in the base station eNB, it converts into a baseband signal, demodulates, and extracts a notification signal.
  • the bandwidth control unit 35 determines completion and failure, notifies the determination result to a control signal creation unit (not shown) such as completion and failure, and the control signal creation unit such as completion and failure that has received the notification Create a control signal for failure, etc., encode and modulate the control signal for completion or failure in the encoding / modulation unit 32, convert it to a radio frequency in the transmission radio unit 33, and transmit it to the base station via the antenna 34 .
  • the base station that has received a control signal such as completion or failure via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates and decodes the signal in the demodulation / decoding unit 17, and receives the signal. Play as.
  • a completion / failure control signal extraction unit (not shown) extracts a completion / failure control signal from the received signal and notifies the bandwidth control unit 20 of it. In the future, description of similar processing will be omitted.
  • the PCell and SCell can be changed (exchanged).
  • the base station eNB and the terminal UE have been described above as examples, the base station eNB and the relay (RN: Relay Node or RS: Relay Station) or the relay RN and the terminal UE may be used.
  • the base station eNB may be a small base station called a femto cell (HeNB: Home eNB).
  • FIG. 23 is a schematic flowchart of the present embodiment. This flow shows the entire processing performed between the terminal and the base station (hereinafter the same).
  • step S20 the radio channel quality is measured at the terminal.
  • step S21 a cell to be PCell is selected by the terminal.
  • step S22 the terminal or base station makes a PCell / SCell change request.
  • step S23 the base station performs PCell and SCell change control.
  • step S24 the PCell / SCell change is also completed in the terminal.
  • a pilot signal is transmitted from the base station to the terminal.
  • the radio channel quality is measured.
  • the PCell / SCell change determination is performed from the measured wireless channel quality.
  • the PCell and SCell change determination is performed by the terminal, but the base station may obtain the radio channel quality from the terminal and perform the determination.
  • PCell / SCell change request is issued
  • PCell / SCell change control is performed in the base station.
  • the PCell and SCell change notification is made from the base station to the terminal.
  • both the base station and the terminal change PCell to SCell and SCell to PCell. At this time, since the process is performed while the wireless line is maintained, the line is not disconnected.
  • RS Packet
  • a common pilot transmitted by a base station to a terminal a common pilot (pilot) or a cell-specific pilot for one or more terminals existing in a cell constituting the base station)
  • Cell specific specific pilot or cell specific specific RS dedicated pilot
  • UE specific specific pilot or UE specific specific pilot a pilot or terminal specific pilot (UE specific specific pilot or UE specific specific pilot) that is transmitted only to one terminal existing in a cell configured by the base station
  • pilot signal is mapped to a pilot channel, mapped to a predetermined radio resource as a radio signal, or mapped to a frame format and transmitted.
  • pilot channel In the LTE system, there is no pilot channel, it is defined as a physical signal (Physical signal), and is mapped to a radio frame format and transmitted in the same manner as the control channel and data channel (shared channel).
  • the terminal that has received the pilot signal transmitted from the base station via the antenna measures the radio channel quality according to the flow shown in FIG. 26 or FIG. 27, for example.
  • the radio channel quality includes RSRP, RSRQ, SNR (Signal to Noise Ratio), SIR (Signal to Interference Ratio), CQI, and the like.
  • 26 and 27 show RSRP as an example.
  • the CQI is converted (calculated) into discrete numerical values based on the radio channel quality.
  • RSRQ, SIR, etc. are calculated from the measured received signal power and noise power.
  • radio channel quality measurement for PCell and the radio channel quality measurement for SCell are preferably performed simultaneously, but may not be performed simultaneously.
  • radio channel quality information calculated based on the measured radio channel quality or converted into a discrete value is used as the radio channel quality information.
  • FIG. 28 shows a case where the wireless quality measurement is performed only for PCell and one SCell.
  • FIG. 28 measures the radio channel quality of PCell and SCell.
  • a change determination is made based on at least the PCell and SCell radio channel quality.
  • the radio channel quality (or radio channel quality information) of SCell is compared with the radio channel quality (or radio channel quality information) of PCell, and if the former is good, it is determined that it is necessary to change PCell and SCell.
  • parameters to prevent other factors for example, cell priorities and changes
  • cell priorities and changes from occurring frequently in the PCell radio channel quality (or radio channel quality information) and SCell radio channel quality (or radio channel quality information). Etc.
  • the SCell with the best radio channel quality may be selected and changed. Thereafter, the same processing as in the case of one SCell is performed.
  • the terminal that determines that the PCell and SCell need to be changed creates a PCell and SCell change request signal and notifies the base station.
  • the PCell / SCell change request signal is encoded and mapped to a radio channel (radio control channel or radio shared channel). Then, after modulation, the signal is converted into a radio frequency (converted into a radio signal), and after amplification, transmitted to the terminal via the antenna.
  • a radio channel radio control channel or radio shared channel
  • the signal is converted into a radio frequency (converted into a radio signal), and after amplification, transmitted to the terminal via the antenna.
  • encoding there are two possible cases: encoding after mapping to a radio channel and mapping to a radio channel after encoding.
  • the base station receives a radio channel via an antenna, amplifies it, converts it to a baseband signal, demodulates and decodes it, and uses the obtained signal to make a PCell / SCell change request. Extract the signal.
  • PCell PCell
  • SCell change request signal if the base station decides to change, it will be a PCell
  • SCell change notification signal or a change control signal, even if no change is required
  • the PCell / SCell change control signal created as described above is encoded and mapped to a radio channel (radio control channel or radio shared channel) as shown in FIG. 31, and after modulation, converted to a radio frequency. (Wireless signal) and transmitted to the terminal via the antenna.
  • a radio channel radio control channel or radio shared channel
  • the change control signal for PCell may be transmitted using a radio channel transmitted by PCell, and the change control signal for SCell may be transmitted using a radio channel transmitted by at least one SCell. Further, the change control signal for PCell and SCell may be transmitted using a radio channel transmitted by PCell or SCell. That is, it may be transmitted in a certain cell.
  • the change control signal is received by the terminal as shown in FIG. 32, for example. Subsequently, the PCell and SCell are changed according to the extracted change control signal. Similarly, the base station also changes.
  • the change may be performed simultaneously in the terminal and the base station based on the change timing included in the change control signal.
  • FIG. 25 is a detailed flowchart of pilot signal transmission processing of the base station of FIG.
  • RS Reference Signal; Pilot
  • step S31 the RS is mapped to a radio channel or a predetermined radio resource.
  • step S32 the mapped RS is modulated, and in step S33, radio signal conversion (frequency conversion (up-conversion)) is performed.
  • step S34 the radio signal is amplified, and in step S35, it is transmitted from the antenna.
  • step S40 PCell and SCell, or RS (Pilot) of PCell, SCell, and another Cell are received.
  • step S41 RS is demodulated.
  • step S42 wireless channel quality measurement and calculation are performed. Radio channel quality includes the aforementioned RSRP, RSRQ, SIR, and the like.
  • step S43 PCell and SCell, or RS of PCell, SCell, and another Cell are received by the antenna.
  • RS is amplified
  • step S45 baseband signal conversion (frequency conversion (down-conversion))
  • step S46 RS is demodulated.
  • step S47 wireless channel quality measurement and calculation are performed.
  • FIG. 28 is a flowchart of the PCell / SCell change determination process of FIG.
  • radio channel quality information for example, RSRP
  • step S51 it is determined whether the RSRP of the SCell is larger than the RSRP of the PCell (quality is good). If the determination in step S51 is no, the process proceeds to step S50. If the determination in step S51 is yes, a PCell / SCell change request signal is created in step S52.
  • FIG. 29 is a flowchart of the transmission process of the PCell / SCell change request signal in FIG.
  • a PCell / SCell change request signal is created and encoded in step S54.
  • this is mapped to a radio channel, modulated in step S56, and converted into a radio signal (frequency conversion (up-conversion)) in step S57.
  • the radio signal is amplified and transmitted from the antenna in step S59.
  • FIG. 30 is a flowchart of the reception process of the PCell / SCell change request signal in FIG.
  • step S60 the radio channel is received via the antenna, and in step S61 it is amplified.
  • step S62 this is converted into a baseband signal (frequency conversion (down-conversion)), demodulated in step S63, decoded in step S64, and PCell and SCell change request signals are extracted in step S65.
  • step S60 the radio channel is received via the antenna, and in step S61 it is amplified.
  • step S62 this is converted into a baseband signal (frequency conversion (down-conversion)), demodulated in step S63, decoded in step S64, and PCell and SCell change request signals are extracted in step S65.
  • baseband signal frequency conversion (down-conversion)
  • FIG. 31 is a flowchart of the PCell / SCell change notification transmission process of FIG.
  • step S70 a PCell / SCell change notification signal is created.
  • step S71 encoding is performed, in step S72, this is mapped to a radio channel, modulation is performed in step S73, and radio signal conversion (frequency conversion (up-conversion)) is performed in step S74. This is amplified in step S75, and transmitted from the antenna in step S76.
  • FIG. 32 is a flowchart of the PCell / SCell change notification reception process in FIG.
  • step S77 the PCell / SCell change notification radio channel is received via the antenna, and is amplified in step S78.
  • step S79 this is converted into a baseband signal (frequency conversion (down-conversion)), demodulated in step S80, and decoded in step S81.
  • step S82 a PCell / SCell change notification signal is extracted.
  • FIG. 33 to 35 are process flowcharts of the PCell and SCell change control and notification in FIG.
  • FIG. 33 shows a case in which SCell change notification is notified by SCell.
  • FIG. 34 shows a case where a PCell change notification is notified by PCell.
  • FIG. 35 shows a case where a PCell or SCell change notification is sent by PCell or SCell.
  • step S95 a control signal for changing SCell to PCell is created.
  • step S96 the control signal is encoded, mapped to a radio channel in step S97, and modulated in step S98.
  • step S99 this is converted into a radio signal (frequency conversion (up-conversion)), amplified in step S100, and transmitted from the antenna in step S101.
  • step S105 a control signal for changing PCell to SCell is created. This is encoded in step S106, mapped to a radio channel in step S107, and modulated in step S108.
  • step S109 the signal is converted into a radio signal (frequency conversion (up-conversion)), amplified in step S110, and transmitted from the antenna in step S111.
  • step S115 a control signal for changing SCell to PCell is created.
  • step S116 a control signal for changing PCell to SCell is created.
  • step S117 and step S117a are encoded in step S117 and step S117a, and mapped to a radio channel in step S118.
  • step S117 only one encoding unit may be provided and each control signal may be encoded, or two encoding units may be provided and encoded in parallel as in step S117a. .
  • This is modulated in step S119, converted into a radio signal (frequency conversion (up-conversion)) in step S120, amplified in step S121, and transmitted from the antenna in step S122.
  • 36 to 42 are diagrams illustrating a second configuration example of the present embodiment.
  • the terminal UE determines the necessity of changing the PCell and the SCell, and notifies the base station eNB of the PCell and SCell change request.
  • the base station eNB determines the necessity of changing the PCell and the SCell based on the radio channel quality measured by the terminal UE and reported (notified) to the base station eNB.
  • FIG. 36 is a block diagram of the base station.
  • FIG. 37 is a block diagram of a terminal. 36, the same reference numerals are given to the same components as those in FIG. In FIG. 37, components similar to those in FIG. 22 are denoted by the same reference numerals.
  • the terminal UE receives the pilot signal transmitted from the base station eNB, and measures the radio channel quality in the radio channel quality measurement and calculation unit 27. Note that only PCell and SCell may be measured, or all CCs transmitted by the base station eNB (that is, CCs other than PCell and SCell) may be measured.
  • the wireless quality measurement result is notified to the wireless channel quality information creation unit 37.
  • the radio channel quality information creating unit 37 sets the measurement result as a discrete numerical value based on a calculation formula or the like, and obtains radio channel quality (Channel Quality) or a radio channel quality index (CQI: Channel Quality Indicator). Hereinafter, it is collectively referred to as wireless channel quality.
  • the obtained radio channel quality is encoded / modulated by the encoding / modulation unit 32, converted into a radio signal by the transmission radio unit 33, and transmitted to the base station eNB via the antenna.
  • the radio channel quality measured in all CCs may be transmitted only by PCell, or the radio channel quality may be transmitted by the measured CC.
  • the base station eNB that has received the radio channel quality via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates and decodes the signal in the demodulation / decoding unit 17 as a received signal Reproduce.
  • the radio channel quality information extracting unit 21 extracts at least the PCell and SCell radio channel quality from the reproduced received signal and notifies the bandwidth control unit 20 of the extracted radio channel quality.
  • the bandwidth control unit 20 compares the radio channel quality of PCell and other SCells based on at least the radio channel quality of PCell and SCell.
  • the radio channel quality of SCell CC2
  • the radio channel quality of PCell CC1
  • the bandwidth control unit 20 determines that it is necessary to change (exchange) the PCell and the SCell.
  • Other operations are the same as those in the first configuration example.
  • the terminal that has measured and calculated the radio channel quality notifies the base station of the calculated radio channel quality information.
  • the radio channel quality information is a value calculated based on the measured radio channel quality or a discrete value as described above.
  • This radio channel quality information is encoded in the same way as when sending a change control (notification) signal in FIGS. 33 to 35, mapped to an uplink control channel, modulated, converted into a radio signal, converted to a radio signal, and sent to a base station via an antenna. Send.
  • the radio channel quality information may be transmitted only by PCell or SCell, or may be transmitted by PCell and SCell.
  • the base station that has received the radio channel quality information from the terminal compares the radio channel quality of the PCell and other SCells based on at least the radio channel quality of the PCell and SCell.
  • the radio channel quality of SCell CC2
  • the radio channel quality of PCell CC1
  • the bandwidth control unit 20 determines that it is necessary to change (exchange) the PCell and the SCell.
  • the operation after the determination is the same as that in the first configuration example.
  • FIG. 39 is a flowchart of radio channel quality information transmission processing.
  • step S130 radio channel quality information is created.
  • step S131 the radio channel quality information is encoded, mapped to a radio channel in step S132, and modulated in step S133.
  • step S134 this is converted into a radio signal (frequency conversion (up-conversion)), amplified in step S135, and transmitted from the antenna in step S136.
  • FIG. 40 is a flowchart of another example of transmission processing of wireless channel quality information.
  • step S137 PCell wireless channel quality information is created.
  • step S138 SCell radio channel quality information is created. These are encoded in step S139 and step S139a, and mapped to a radio channel in step S140.
  • step S139 For the encoding in step S139, only one encoding unit may be provided and each control signal may be encoded, or two encoding units may be provided and encoded in parallel as in step S139a.
  • This is modulated in step S141, converted into a radio signal (frequency conversion (up-conversion)) in step S142, amplified in step S143, and transmitted from the antenna in step S144.
  • FIG. 41 is a flowchart of radio channel quality information reception processing in the base station.
  • the wireless channel is received via the antenna and amplified in step S146.
  • this is converted into a baseband signal (frequency conversion (down-conversion)), demodulated in step S148, and decoded in step S149.
  • radio channel quality information is extracted.
  • the base station performs a change determination based on at least the PCell and SCell radio channel quality notified from the terminal. For example, compare SCell's radio channel quality (or radio channel quality information) with PCell's radio channel quality (or radio channel quality information), and if the former is good, determine that it is necessary to change PCell and SCell. .
  • other factors for example, cell priority and change to prevent frequent occurrence of cell priorities and changes
  • the change determination may be performed in consideration of parameters and the like.
  • the determination is performed in the same manner as in the case of one SCell, such as selecting the SCell having the best radio channel quality. Thereafter, the same processing as in the case of one SCell is performed.
  • PCell, SCell change request signal is encoded, mapped to a radio channel (radio control channel or radio shared channel), modulated, converted to radio frequency (radio signal), and sent to the terminal via an antenna Sent.
  • radio channel radio control channel or radio shared channel
  • mapping to a radio channel there are two possible cases: encoding after mapping to a radio channel and mapping to a radio channel after encoding.
  • FIG. 42 is a flowchart of the PCell / SCell change determination process in FIG.
  • radio channel quality information for example, RSRP
  • step S152 it is determined whether the RSRP of the SCell is larger than the RSRP of the PCell (quality is good). If the determination in step S152 is no, the process proceeds to step S151. If the determination in step S152 is Yes, a PCell / SCell change request signal is created in step S153.
  • 43 to 48 are diagrams for explaining a third configuration example of the present embodiment.
  • the PCell and the SCell are changed simultaneously or sequentially, regardless of whether the Cross Carrier Scheduling is performed.
  • the third configuration example when Cross Carrier Scheduling is being performed, all cells or SCells to be changed to PCell are changed from Non-scheduling Cell to Scheduling Cell, and then PCell and SCell are changed simultaneously. Or execute sequentially.
  • the cell (or CC) to be changed is changed from Non-scheduling Cell to Scheduling Cell in the process of change.
  • CC1 is a PCell and scheduling cell
  • CC2 is a SCell and non-scheduling cell.
  • SCell is changed to Scheduling Cell. That is, the PDCCH of SCell is transmitted by SCell.
  • both CC1 and CC2 are Scheduling Cell.
  • change (exchange) the settings of PCell and SCell.
  • CC1 becomes SCell and CC2 becomes PCell. Up to this point, the processing may be terminated, but in order to return to Cross ⁇ Carrier Scheduling, SCell (CC1) is changed to Non-scheduling Cell. That is, the PDCCH for SCell is transmitted by PCell.
  • CC1 becomes Non-scheduling Cell in SCell
  • CC2 becomes Scheduling Cell in PCell.
  • (1) to (4) in FIG. 44 correspond to (1) to (4) in FIG. 43, respectively.
  • CC1 since CC1 is PCell and Scheduling Cell, it has a downlink radio control channel PDCCH and a downlink shared channel PDSCH.
  • CC2 is a SCell and is a non-scheduling cell, and therefore has only PDSCH.
  • the SCell By setting the SCell as Scheduling Cell, the PDCCH for SCell transmitted by the PCell is removed, and the PDCCH for SCell is added to the SCell. In other words, the SDC PDCCH has been moved from the PCell to the SCell.
  • both CC1 and CC2 have PDCCH and PDSCH.
  • CC1 is changed to SCell and CC2 is changed to PCell.
  • CC1 is set to Non-scheduling Cell and CC2 is set to Scheduling Cell. That is, PDCCH for CC1 (new SCell) transmitted in CC1 (new SCell) is deleted (or released), and PDCCH for CC1 (new SCell) is added to CC2 (new PCell). Accordingly, CC1 (new SCell) has only PDSCH, and CC2 (new PCell) has PDCCH and PDSCH.
  • FIG. 45 is a block diagram of the base station.
  • FIG. 46 is a block diagram of the terminal. 45, the same components as those in FIG. 21 are denoted by the same reference numerals, and the description thereof is omitted. In FIG. 46, the same components as those in FIG. 22 are denoted by the same reference numerals, and description thereof will be omitted.
  • the terminal UE determines the necessity of PCell / SCell change, and notifies the base station eNB of the PCell / SCell change request.
  • the base station eNB Upon receiving this, the base station eNB notifies the terminal that the bandwidth control unit 20 is changing at least the SCell that is a Non-scheduling Cell from the Non-scheduling Cell to the Scheduling Cell. Specifically, the downlink radio control channel of the scheduling cell that transmits a control signal to the non-scheduling cell is changed to non-scheduling cell.
  • information related to the change and a change notification are transmitted using the downlink radio control channel of Scheduling Cell (PCell or other SCell).
  • PCell or other SCell may be control signals included in the radio channel reconfiguration message (RRCConnectionReconfiguration) message) as described in the first configuration example.
  • the change timing may also be notified. All SCells may be changed to SchedulingulCell. Specifically, TS36.331 6.3.2 CrossCarrierSchedulingConfig may be notified as schedulingCellId of IE.
  • the terminal UE and the base station eNB that have received this change at least, and change the SCell that is Non-scheduling Cell from Non-scheduling Cell to Scheduling Cell, and the change target, SCell that is Non-scheduling Cell
  • the downlink radio control channel (PDCCH) for the packet is changed from the PCell that is the scheduling Cell to the SCell that becomes the Scheduling Cell. (Delete (release) PDCCH of PCell and add (set) PDCCH to SCell.)
  • a radio channel reconfiguration complete message (RRCConnectionReconfigurationComplete message) may be returned from the terminal UE to the base station eNB.
  • the terminal UE may notify the base station eNB of a failure to reconfigure the radio channel.
  • PCell and SCell are changed (exchanged) as in the first configuration example.
  • the control signal for the change (exchange) request transmitted at the time of change (exchange) is transmitted on the downlink radio control channel PDCCH of only one of PCell or SCell, or on the downlink radio control channel PDCCH of both PCell and SCell. To do.
  • PCell former SCell
  • SCell former SCell
  • PCell former SCell
  • SCell former PCell
  • SCell former PCell
  • other SCells former SCell
  • the SCell (former PCell) that is the target of the change is changed from Scheduling Cell to Non-scheduling Cell.
  • one of the downlink radio control channels PDCCH of PCell (original SCell) or SCell (original PCell), or both downlink radio control channels PDCCH, SCell (original PCell) is transferred from Non-scheduling to Cell Change to.
  • it may be a control signal included in a radio channel reconfiguration complete message (RRCConnectionReconfigurationComplete message) as in the first configuration example.
  • RRCConnectionReconfigurationComplete message radio channel reconfiguration complete message
  • the control signal for change is described as being transmitted using the downlink radio control channel PDCCH, but may be transmitted using the downlink shared data channel PDSCH.
  • FIG. 47 is a sequence diagram showing the flow of processing of the third configuration example.
  • An RS (Pilot) is transmitted from the base station.
  • the terminal measures the radio channel quality. For example, measure RSRP.
  • change determination is performed based on at least the wireless channel quality of PCell and SCell. For example, compare SCell's radio channel quality (or radio channel quality information) with PCell's radio channel quality (or radio channel quality information), and if the former is good, determine that it is necessary to change PCell and SCell. .
  • PCell radio channel quality or radio channel quality information
  • SCell radio channel quality information or radio channel quality information
  • the change determination may be performed in consideration of parameters and the like.
  • a PCell / SCell change request is transmitted from the terminal to the base station.
  • the base station performs PCell and SCell change control.
  • the base station notifies the terminal to change the SCell to the Scheduling Cell, and sets the SCell as the Scheduling Cell.
  • a PCell / SCell change notification is transmitted from the base station to the terminal.
  • the base station notifies the terminal of changing the SCell to a non-scheduling cell.
  • SCell is set to Non-scheduling Cell. That is, the downlink radio control channel PDCCH of the SCell that was transmitted in the SCell (that is, the scheduling cell) is released (deleted), and the downlink radio control channel PDCCH for the SCell is added (set) to the PCell.
  • FIG. 48 is a flowchart showing the flow of processing of the third configuration example.
  • step S160 wireless channel quality is measured, and in step S161, a cell to be PCell is selected.
  • step S162 a PCell / SCell change request is transmitted.
  • step S163 SCell setting change control is performed to make the SCell a Scheduling Cell.
  • step S164 the setting of PCell and SCell is changed by PCell and SCell change control.
  • the SCell is changed to a non-scheduling cell by SCell setting change control.
  • Non-scheduling Cell is set to Scheduling Cell by changing the PDCCH setting. Specifically, this is realized by changing the PDCCH that has been transmitted by the PCell until then to be transmitted by SCell.
  • FIG. 49 to 51 are diagrams for explaining a fourth configuration example of the present embodiment.
  • FIG. 49 is a block configuration diagram of the base station
  • FIG. 50 is a block configuration diagram of the terminal. 49, the same components as those in FIG. 36 are denoted by the same reference numerals, and the description thereof is omitted. In FIG. 50, the same components as those in FIG. 37 are denoted by the same reference numerals, and the description thereof will be omitted.
  • the fourth configuration example shows a case where the base station makes a change determination in the third configuration example.
  • the PCell / SCell change determination by the base station of the second configuration example is applied to the third configuration example.
  • the terminal UE receives the pilot signal (RS) transmitted from the base station eNB, and measures the radio channel quality in the radio channel quality measurement and calculation unit 27.
  • RS pilot signal
  • PCell and SCell may be measured, or all CCs transmitted by the base station eNB (that is, CCs other than PCell and SCell) may be measured.
  • the wireless quality measurement result is notified to the wireless channel quality information creation unit 37.
  • the radio channel quality information creating unit 37 sets the measurement result as a discrete numerical value based on a calculation formula or the like, and obtains radio channel quality (Channel Quality) or a radio channel quality index (CQI: Channel Quality Indicator).
  • the obtained radio channel quality is encoded and modulated by the encoding / modulation unit 32, converted into a radio signal by the transmission radio unit 33, and transmitted to the base station eNB via the antenna.
  • the measured radio channel quality may be transmitted only by PCell, or the radio channel quality may be transmitted by the measured CC.
  • the base station eNB that has received the radio channel quality via the antenna 13 converts the radio signal into a baseband signal in the reception radio unit 16, demodulates and decodes the signal in the demodulation / decoding unit 17 as a received signal Reproduce.
  • the radio channel quality information extracting unit 21 extracts at least the PCell and SCell radio channel quality from the reproduced received signal and notifies the bandwidth control unit 20 of the extracted radio channel quality.
  • the bandwidth control unit 20 determines the necessity of changing the PCell and SCell based on the channel quality of the PCell and other SCells based on at least the radio channel quality of the PCell and SCells.
  • the radio channel quality of SCell CC2
  • the radio channel quality of PCell CC1
  • the bandwidth control unit 20 determines that it is necessary to change (exchange) the PCell and the SCell.
  • FIG. 51 is a sequence diagram showing a process flow of the fourth configuration example.
  • a terminal that receives an RS from a base station performs radio channel quality measurement and sends a radio channel quality report to the base station.
  • the base station performs PCell and SCell change determination. For example, if the SCell radio channel quality is better than the PCell radio channel quality, it is determined that the PCell and SCell need to be changed. Subsequently, the base station notifies the terminal to change the SCell to the Scheduling Cell. And SCell is set to Scheduling Cell and the radio
  • Processing to change PCell and SCell is performed while maintaining the wireless line. Then, the base station notifies the terminal that the SCell is changed to a non-scheduling cell. And SCell is set to Non-scheduling Cell. As a result, the SCell radio control channel is deleted (or released), and the radio control channel is set to PCell.
  • transmission delay does not occur or increases as compared with the conventional method. Further, the transmission speed does not decrease. That is, transmission delay can be reduced. Moreover, since the number of component carriers is not reduced, the transmission rate can be improved as compared with the conventional case. ⁇ Do not implement hard handover. ⁇ Do not reduce the number of component carriers to be connected.
  • the time required for changing the PCell and SCell can be shortened compared to the conventional case. That is, when the PCell and SCell are changed, in this embodiment, since the line is not disconnected, there is no need to perform synchronization establishment or random access again, so the time required for the change can be shortened in the present embodiment compared to the conventional case. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

 伝送速度を低下させず、かつ、回線を切断することなしでPCellとSCellを変更することができる無線通信装置を提供する。回線接続を維持したまま、例えばSCell(CC2)を新PCell(CC2)に変更し、続いて元PCell(CC1)を新SCell(CC1)に変更する設定を行う。

Description

無線通信装置
 以下の実施形態は、無線通信装置に関する。
 現在、3GPP(3rd Generation Partnership Project)において、第4世代移動通信と言われているLTE(Long Term Evolution)-Advancedシステムの仕様が検討されている。そして、LTE-Advancedシステムの仕様の初版であるLTE Release 10の仕様が策定され、現在Release 11仕様の検討が行われている。なお、以後、例えばRelease 8をRel’8と略す。
 LTE-Advancedシステムに先行して仕様が策定されたLTEシステム(Rel’8及びRel’9)は、日本始め各国でサービスが開始されており、日本ではNTT docomoが2010年12月にサービスを開始している。
 LTEシステムを発展させたLTE-Advancedシステムでは、Carrier Aggregation、上りMIMO(Multi-Input-Multi-Output)伝送や無線中継装置(Relay)などの技術がRel’10で新たに追加された。今後、CoMP(Coordinate Multi Point transmission & reception)や8x8 MIMO伝送などを導入すべく検討が継続されている。
 また、前述のようにLTE-Advancedシステムは、LTEシステムを発展させたものであることから、LTEシステムを含んだ構成となっており、LTE Rel’8やRel’9のみに対応した端末も収容できなければいけない。すなわち、LTE-Advancedシステムの仕様はLTEシステムの仕様に対してUpper compatible(上位互換)でなければならない。
 上述のCarrier Aggregationについて考える。
・Carrier Aggregationについて.
 LTE-Advancedシステムの最大の特徴は、帯域幅の拡大である。ここでは、帯域幅の拡大を実現する方法について説明する。
 LTEシステムでは、上り/下り帯域幅を、1.4MHz、3MHz、5MHz、10MHz、15MHz、20MHzと設定することが可能である(TS36.101V10.4.0 5.6参照)。また、このように設定された帯域をComponent Carrier(CC)と定義している。複数の帯域幅が設定されている理由は、従来のGSM(Global System for Mobile Communications)システムやW-CDMA(Wideband-Code Divisional Multiple Access)システムに対して割り当てられた帯域幅をそのまま使用することを前提としているためである。
 一方で、LTEシステムは、従来のGSMシステムやW-CDMAシステムと比較し、高速伝送を実現しなければならない。よって、これらのシステムと比較し、帯域幅が広帯域でなければならない。
 一般的に、無線通信システムで使用する帯域及び周波数帯(band)は、国毎の事情により異なる。更に、欧州では、陸続きで他国と隣接しており、干渉を考慮する必要が生じ、各国間で使用周波数帯域を調整している。この結果、使用できる帯域幅は減少し、また細切れとなっている。一方で、上述の通りLTEシステムは広帯域でなければならない。
 そこで、狭く、かつ、細切れになっている帯域を統合し、広帯域化する方法が導入されることとなった。これがCarrier Aggregationである。
 図1~図7は、Carrier Aggregationについて説明する図である。
 Carrier Aggregationは、上述のように設定された帯域幅を持つ複数の帯域を統合するものであり、以下の3つのパターンが3GPP仕様に示されている。
1)同一周波数帯の連続した帯域を統合する   図1参照
2)同一周波数帯の不連続の帯域を統合する  図2参照
3)異なる周波数帯域の帯域を統合する。       図3参照
 図1では、同一周波数帯にComponent Carrier(CC2, CC3, CC4, CC5)があり、そのうち、連続したCC2、CC3をCarrier Aggregationしている。図2では、同一周波数帯のCC2~CC5のうち、不連続なCC2とCC4をCarrier Aggregationしている。図3では、CC1からなる周波数帯と、CC2~CC5からなる周波数帯が存在し、異なる帯域かつ不連続なCC1とCC2をCarrier Aggregationしている。
 なお、LTE仕様(例えばRel’ 8)において規定された帯域幅を持つ帯域を一つの単位として捉え、LTE-Advancedシステムでは、帯域をComponent Carrierと呼んでいる。すなわち、Carrier Aggregationは、複数のComponent CarrierをAggregate(統合)するものであるとされている。
 上記の内、技術的に最も実現し易い1)のうち2CCを統合する技術をLTE Rel’10で導入することとなった。今後、統合される最大CC数の増加や2)および3)の統合が、今後発行されるRelease(Rel’ 11以降)において仕様化される予定である。
 なお、Carrier Aggregationを別な観点で捉えると、複数の帯域を同時に用いてデータ伝送を行う技術と捉えることができる。
・Primary CellとSecondary Cellについて
 Carrier Aggregationを実施する際は、主となるComponent Carrierを用いたCellが設定される。これをPrimary Cell(以後PCellと略す)と呼んでいる。
 PCellは、TS36.331V10.3.0 3.1の定義より、初期接続時、再接続時、再設定時またはハンドオーバ時に設定される。これら初期接続等では2つ以上のCCを同時に用いて接続(初期回線設定)は行われないことから、端的には初期接続時(初期回線設定時)等に使用したセルであるとも言える。
 このPCellに対して、少なくとも一つの第2のComponent Carrierを用いたCellが統合される。このCellをSecondary Cell(以後SCellと呼ぶ)と呼んでいる。
 なお、SCellは最大7つまで設定可能である(TS36.331V10.3.0 6.3.4 SCellIndex参照 1~7)。
 すなわち、PCellと合わせて最大8つのComponent Carrierを用いてCarrier Aggregationが可能とされている。なお、LTE-Advancedシステムでは、最大100MHzの帯域幅が想定されており、1CC 20MHzの場合、SCellは最大4つ、PCellと合わせて最大5つのComponent Carrierを用いてCarrier Aggregationが可能とされている。
 言い換えれば、Carrier Aggregationとは、PCellと少なくとも一つのSCellを統合するものである。図4では、CC1のPCellに対し、CC2のSCellがCarrier Aggregationとしている。
 なお、3GPPのCellの定義は、「一つの周波数を用いて一つのサービスエリアを構成するもの」である。よって、Component Carrierに対して一つのCellが構成されると定義される。したがって、一つのセルを構成するComponent CarrierをCellと呼んでいる。
 上記PCellとSCellの他に、Serving Cellも定義されている(TS21.905V10.3.0 3及びTS36.331V10.3.0 3.1, 6.3.4 ServCellIndex参照)。
 Serving Cellとは、TS21.905の定義によれば、端末がキャンプしているセルのことである。言い換えれば、端末が在圏しているセルである。一方、TS36.331の定義によれば、CA(Carrier Aggregation)が定義されていな場合は、PCellが、たった一つのserving Cellである。また、CAが定義されている場合、PCellとSCellを合わせたセルがServing Cellである。つまり、PCellとSCellの両方ともServing Cellである。
 Serving Cellは0~7まで定義される。更に、0はPCellであり、1~7はSCellとして定義されている。
 以上より、最大8CCのCAが可能であることがわかる。
 以下、簡単のために、ある端末UE(User Equipment)に対して、2つのCCでCarrier Aggregationを実施する場合を考える。すなわち、一方(第1)のCCをPCellとし、他方(第2)のCCをSCellとする場合を考える。
 上記のCarrier Aggregationを実施する方法には、以下の2通りが考えられる。
・各Component Carrierにおいて、下り制御チャネル(PDCCH: Physical Downlink Control CHannel)を設定し、下り制御チャネル(PDCCH)で伝送される制御信号を用いて、そのCCにおいて上りまたは上りと下りのデータ伝送を実施する。
・PCellに対してのみ、下り制御チャネル(PDCCH)を設定し、この制御チャネルで伝送される制御信号を用いて、各CCにおいて上りまたは上りと下りのデータ伝送を実施する。これをCross Carrier Schedulingと呼んでいる。図5に示されるように、PCellに下り制御チャネルPDCCHが設定され、PCellの下り無線共有データチャネルPDSCH(Physical Downlink Shared CHannel)とSCellの下り無線共有データチャネルPDSCHのスケジューリングが行われる。なお、図5の左図と右図の相違については後述する。なお、下り無線共有チャネルを単に下りデータチャネルと呼ぶ場合もある。
 上記は、従来の方法を各CCに適用したものである。この場合、CC単位の伝送が並列に複数あるイメージとなる。
・PCell、SCellの設定方法について
・・PCellの設定について
 PCellは、上述のように、初期接続時、再設定時またはハンドオーバ時に設定される。ここでは、ハンドオーバ時の設定について説明する。
 一般的には、ハンドオーバの説明では、ハンドオーバ元基地局(以後Source eNB(E-UTRAN Node B)とする)から、ハンドオーバ先基地局(以後 Target eNB)へのハンドオーバとして説明されているが、ハンドオーバには、同じ基地局または別の基地局の別な周波数へハンドオーバする異周波数ハンドオーバも含まれている。つまり、異周波数ハンドオーバとは、異なる周波数に切り替えることを指す。
 また、3GPPでは、1つのセルに対して1つの基地局が設定されると定義している。また、セルは、1つの周波数がサービスする領域と定義されている。
 また、一般的な基地局は、複数の周波数を用いて、複数のセクタ(例えば、3セクタや6セクタ)を設定し、通信を行っている。よって、一般的な基地局は、複数のセルを構成する作りとなっている。言い換えれば、外観または装置全体として見た場合の1つの基地局は、機能として複数の基地局の集合体であるとも言える。
 以上を踏まえて、ハンドオーバ元セルを以後Source Cellとし、ハンドオーバ先セルを以後 Target Cellとして以下の説明を行う。
 ハンドオーバにおいては、Source Cellから端末に対してハンドオーバコマンドが送信され、これを受けて端末はハンドオーバを実施する。このハンドオーバコマンドには、Target Cellやハンドオーバタイミングが指定されている。具体的には以下の通りである。
 HandoverCommand messageは、RRC (Radio Resouce Control) ConnectionReconfiguration messageを含むDL-DCCH (DownLink-Dedicated Control CHannel)-Messageに含まれる。
 更に、HandoverCommandMessageは、Target eNBで作成され、Source eNBへX2インターフェイスで伝送され、Source eNBからUEへ送信される。
 なお、同一基地局が構成するセルに対してSource CellとTarget Cellが選択された場合は、同一基地局内であるためX2インターフェイスを使用せず伝送してもよい。また、外観として1つの基地局であり、かつ機能としては複数の基地局である場合に、機能としての基地局間で、上記X2インターフェイスを備え、X2インターフェイスを用いてHandoverCommadMessageが伝送されたとしても何ら問題ない。また、端末に対しては、Handover command messageが送信されるために、本質的に問題ない。
 なお、X2インターフェイスとは、基地局間同士の論理的なインターフェイスである。なお、X2インターフェイスが設定されているからといって、物理的に直接接続されているとは限らない。
 DL-DCCH-MessageにRRC ConnectionReconfiguration messageが含まれている。また、DL-DCCH-Messageは、E-UTRAN(基地局)からUEへ下り論理チャネルDL DCCHで伝送される。
 RRC ConnectionReconfiguration messageには、MobilityControlInfo IEが含まれている。また、SCellの追加/削除(または解放)等の設定が含まれている。
 更に、RRC ConnectionReconfiguration messageは、E-UTRAN(基地局)からUE(端末)へ通知される。
 MobilityControlInfo IEにtargetPhysCellId (target Physical Cell ID)が含まれている。つまり、これは、ハンドオーバ先のセルを指定している。このtarget CellがPCellとなることから、基地局がPCellを通知している。すなわち、基地局が端末に対して、PCellの設定/変更を通知する。
 なお、target Cellが指定された場合の端末の動作も、規定されている。
・SCellの設定について
 RRC ConnectionReconfigurationに、SCellの追加/削除(または解放)等の設定が含まれている。その際に、追加/削除(または解放)されるSCellは、物理セルID(Physical Cell ID)で指定されている。
 よって、基地局から端末に対してSCellの追加/削除(または解放)など通知されることが分かる。ハンドオーバ時の動作も規定されている。
 また、RRC ConnectionReconfigurationにmobilityControlInfo IEが含まれていない場合についても、同様な動作が端末に対して規定されている。これらの動作により、SCellの削除(または解放(release))と追加が実行される。
・Cross Carrier Schedulingについて
・・Schedulingについて
 Cross Carrier Schedulingの説明の前に、3GPPにおけるSchedulingについて説明する。
 3GPPにおいてスケジューリングが導入されたのは、HSDPA(High-Speed Downlink Packet Access;W-CDMA Rel’5)からである。
 一般的に、パケット伝送では、基地局端末間の無線回線が、その端末に対して固定的に割り当てられるものではなく、無線回線(無線チャネル)を複数の端末間で共有(share)する方法がとられている。共有するためには、無線回線(リソース、無線リソース)を、複数ある端末のどの端末に割り当てるかを選択する必要があり、これをスケジューリングと呼んでいる。スケジューリングの方法としては、CIR(Carrier to Interference Ratio)の高い端末から選択するMax CIR法、無線回線品質(Radio Channel Quality)を基に各端末に公平に無線リソースを割り当てるproportional fairness法、全ての端末に均等に無線リソースを割り当てるRound Robin法などが有名である。
 なお、ここで、無線リソースとは、CDMA(Code Divisional Multiple Access)であれば、拡散符号と時間で構成されるものである。また、OFDMA(Orthogonal Frequency Division Multiple Access)であれば、サブキャリアと時間で構成されるものである。なお、共有されるチャネルを共有チャネル(Shared Channel)と呼んでいる。
 更に、スケジューリングによって、選択した端末に対して、データを伝送する際の方法(例えば、変調方式や符号化率など)やデータを伝送する際に用いる無線リソースを選択する(なお、これらも含めてスケジューリングと呼ぶ場合もある)。
 更に、選択した端末に対して、選択した変調方式、符号化率及び無線リソースを示す制御信号を、データ伝送に先立って端末に通知し、端末はそれら制御信号に従うことで、共有チャネルで伝送されるデータの受信が可能となる。
 下りデータ伝送においては、各端末が基地局から送信されたパイロット信号(または参照信号 RS(Reference Signal))を測定し、算出することで得られた下り無線回線品質(Downlink channel quality)が基地局に通知される。基地局は、これを基にスケジューリングを実施し、スケジューリングによって得られた下りデータ送信に関する制御信号を端末に送信し、続いて、下りデータ伝送を実施する。
 上りデータ伝送においては、各端末から送信されたパイロット(または参照信号)を測定・算出して得られた上り無線回線品質(Uplink channel quality)を基にスケジューリングを行う。スケジューリングによって得られた上りデータ送信に関する制御信号を端末に送信し、端末は、この制御信号に基づいて上りデータ伝送を実施する。
 このように、スケジューリングに伴ってデータ伝送に関する制御信号を端末に伝送する必要がある。
・・Cross Carrier Schedulingについて
 再び2つのCCでCAを実施した場合を考える(図4参照)。
 このとき、それぞれのCCで制御信号を伝送することも可能であるが、PCell(Scheduling Cell)からのみ制御信号を伝送することも可能である。このとき、PCell(Scheduling Cell)で制御信号を伝送し、データはSCell(Non-scheduling Cell)で伝送される。これを、Cross Carrier schedulingと呼んでいる。なお、同時にPCell(Scheduling Cell)でデータとそのデータを伝送するための制御信号を伝送してもよい。逆に言えば、Cross Carrier Schedulingでは、PCell(Scheduling Cell)でデータ伝送を行わなくても良い。
 つまり、PCell(Scheduling Cell)では、
1)PCell(Scheduling Cell)の下り無線共有データチャネル(PDSCH: Physical Downlink Shared CHannel)を用いてデータ伝送を実施するための制御信号を伝送する下り無線制御チャネル(PDCCH: Physical Downlink Control CHannel)
2)上記下り無線制御チャネルで伝送される制御情報を用いてPCellで下りデータを伝送するPCellの下り無線共有データチャネル(PDSCH;Physical Downlink Shared CHannel)
3)SCell(Non-scheduling Cell)の下り無線共有データチャネル(PDSCH: Physical Downlink Shared CHannel)のための制御信号を伝送する下り無線制御チャネル(PDCCH) が送信される。
 また、この下り無線制御チャネル(PDCCH)や下り無線共有データチャネル(PDSCH)の中には、どのCCがSCell(Scheduling Cell)であるかを示す制御情報を含んでいる。
 無線報知チャネル(PBCH: Physical Broadcast CHannel)や無線同期信号(Physical Synchronisation Signal)、無線制御フォーマットインジケータチャネル(PCFICH: Physical Control Format Indicator CHannel)、無線H-ARQインジケータチャネル(PHICH: Physical Hybrid-ARQ Indicator CHannel)も下りの回線で伝送される。PCell(Scheduling Cell)では、2つの下り無線制御チャネルPDCCHが送信される。
 以上のように、少なくとも1)~3)の3つの無線チャネルが下り回線で伝送される。なお、実際には、無線報知チャネル(PBCH: Physical Broadcast CHannel)や無線同期信号(Physical Synchronisation Signal)、無線制御フォーマットインジケータチャネル(PCFICH: Physical Control Format Indicator CHannel)、無線H-ARQインジケータチャネル(PHICH: Physical Hybrid-ARQ Indicator CHannel)も下り回線で伝送される。
 一方で、SCell(Non-scheduling Cell)では、
・PCellの下り無線制御チャネル(PDCCH)で伝送されるSCellの下り無線共有データチャネルのための制御情報を用いて、SCellで下りデータを伝送するSCellの下り無線共有チャネル(PDSCH)が伝送される。
 なお、実際にはSCell(Non-scheduling Cell)でも、無線報知チャネル(PBCH: Physical Broadcast CHannel)や無線同期信号(Physical Synchronisation Signal)、無線制御フォーマットインジケータチャネル(PCFICH: Physical Control Format Indicator CHannel)、無線H-ARQインジケータチャネル(PHICH: Physical Hybrid-ARQ Indicator CHannel)、他の端末向けの下り無線制御チャネル(PDCCH)も伝送される。
 しかし、Cross Carrier Schedulingを実施している端末にとっては、少なくとも無線制御フォーマットインジケータチャネル(PCFICH)、無線H-ARQインジケータチャネル(PHICH)、他の端末向けの下り無線制御チャネル(PDCCH)は、使用しない制御信号であり、受信することは無意味である。よって、これらは無視され、あたかも伝送されていないかのように扱われる。
 図5にCross Carrier Schedulingのモデルを示す。図5左図では、下り無線制御チャネルが一つになっているが、実際にはCC毎に下り無線制御チャネルが設定される。すなわち図5右図となる。なお、図5左図では一つの端末向けの下り無線制御チャネルのみ記載しているが、実際には他の端末向けの下り無線制御チャネルも存在する。
 なお、上記では簡単のために2CCでPCellをScheduling Cellとし、SCellをNon-scheduling Cellとして説明した。しかし、3CC以上でCAを実施する場合も考えられる。
 図6は、3つのCCがある場合について説明する図である。
 3CCでCAを実施した場合(すなわちSCellが複数ある場合)は、全てのSCellに対してCross Carrier Schedulingを適用しなくてもよい。つまり、SCellをScheduling Cellとしてもよい。
 つまり、SCellが複数ある場合、あるSCellに対してCross Carrier Schedulingを適用し、他のSCellには適用しないことも可能である。更に、あるSCellが他のSCellに対するScheduling Cellとなることも可能である。図7に示されるように、PCellを構成する基地局は、PCell自身とSCell1のスケジューリングを行い、SCell2を構成する基地局が、SCell2自身とSCell3のスケジューリングを行うためのPDCCHを有することも可能である。以下、簡単のためにPCellがスケジューリングすると記す場合、PCellを構成する基地局がスケジューリングすることを意味する。SCellについても同様である。
 Cross Carrier Schedulingを実施するための制御信号は、TS36.331V10.3.0に規定されている。
 Scheduling Cellは、Serving Cell IDで指定される。例えば、Serving Cell ID = 0で指定された場合、PCellがScheduling Cellとなる。更に、Cross Carrier Schedulingには、TS36.300V10.5.0で制限が設定されている。
 PCellに対してCross Carrier Schedulingを実施しないこと。すなわち、PCellがNon-scheduling Cellとはならないことが規定されている。また、SCellに下り無線制御チャネルPDCCHが設定されている場合、Cross carrier schedulingは適用されないこと、すなわち、Cross carrier schedulingが設定される場合、そのSCellには下り無線制御チャネルPDCCHが設定されないことが規定されている。
 以後、スケジューリングを行うセルをScheduling Cell、スケジューリングを行わないセルをNon-scheduling Cellとして説明する。
・Cross Carrier Schedulingにおける、無線制御チャネルを用いたNon-scheduling Cellの指定方法
 Scheduling Cellから伝送される制御信号の中には、どのセル(CC)がNon-scheduling Cell)であるかを示す情報も含んでいる。正確には、ある制御信号が、どのセル(CC)のための制御信号であるかを示すために、セル(CC)の情報が制御信号に含まれている。
 具体的には、下り制御チャネルPDCCHの中に、その制御チャネルがどのセル(CC)のためのものかを示すために、セルIDが含まれている。これは、TS36.212 5.3.3.1.1, 5.3.3.1.2, 5.3.3.1.3, 5.3.3.1.3A, 5.3.3.1.4A, 5.3.3.1.5, 5.3.3.1.5A, 5.3.3.1.5B, 5.3.3.1.5C, 5.3.3.1.8で規定されている。
 たとえば下り制御情報のフォーマット(DCI(Downlink Control Information) format)1に、Carrier indicator、すなわち、3ビットの情報として規定されている。この3ビットは、上述のServCellIndex IEで規定された0~7、すなわち、3ビットに一致する。DCI Format 1は、下り共有チャネルPDSCHのための制御信号である。DCIは、PDCCHで伝送される。
 DCIは、下り無線制御チャネルPDCCHで端末に伝送される。下り無線制御チャネルPDCCHにどのCC(Cell)に対する制御信号であるかを示す情報が含まれており、端末へ送信される。
 PCellを主帯域(master band、main band)、SCellを従属帯域(slave bandまたは拡張帯域(extended band))と解釈することもできる。なお、3GPPでは、PCellをアンカーコンポーネント(Anchor Component)と呼ぶ場合もある。
 更に、Cross carrier schedulingを実施した場合、PCellはScheduling Cellとなり、SCellはScheduling CellまたはNon-scheduling Cellとなる。
 上述と同じように、ある帯域CC1と別な帯域CC2をCarrier Aggregationし、基地局端末間で通信している場合を考える。CC1は、PCellかつscheduling Cellとし、CC2はSCellかつNon-scheduling Cellとする。更に、CC1とCC2は同じ基地局eNB1(e Node B1)が構成するCC(またはセル)であるとする。
 ある端末UEにおいて、PCellとSCellの無線回線品質を基にPCell及びSCellの変更の必要性を判断する。あるいは、端末UEから送られてきた無線回線品質にしたがって、PCell及びSCellの変更の必要性を、基地局で判断しても良い。ここでは、PCellとSCellの変更(交換)の場合を例として説明する。PCellとSCellの無線回線品質を比較した結果SCellとの無線回線品質がPCellとの無線回線品質より良好であった場合、PCellとSCellを変更する必要ありと判断する。なお、無線回線制御等の制御を考慮した場合、PCellの受信品質がSCellの受信品質よりも良いことが望ましい。そのためには無線回線品質のよりよいCC(またはセル)をPCellとすることが望ましい。この結果、PCellとSCellを変更する必要があると判断される。特にCross carrier schedulingを実施している場合、PCellの下り制御チャネルPDCCHを伝送することから、PCellの伝送品質が良い方がよい。このとき、端末UEは、基地局に対してPCellとSCellを変更(交換)することを要求する (以後、PCell、SCell変更要求と略す)。あるいは、基地局内部で、PCellとSCellを変更することを決定する。
 なお、上記では無線回線品質として説明したが、一般的には無線回線品質には受信電力も含まれており、受信電力を基に判断を実施してもよい。
 具体的には、例えば、CC1がPCellで、CC2がSCellであったが、CC2をPCell、CC1をSCellへと変更することを要求する。
 要求を受けた基地局eNB、あるいは、自身で変更することを決定した基地局eNBは、まず端末UEに対してSCellを削除(または解放)することを通知する。すなわち、SCellでの通信を停止(または中断)することを通知する。通知を受けた端末UEは、SCellを削除(または解放)し、PCellのみを用いて基地局eNB1と通信を継続する。基地局eNBは、SCellを削除(または解放)し、PCellのみを端末UEとの通信に用いる。
 更に、基地局eNBは、端末UEに対して、CC2(すなわち、元のSCell)へ異周波数ハンドオーバ(ハードハンドオーバ)を実施するよう通知する。基地局eNBと通知を受けた端末UEは、CC2へ異周波数ハンドオーバを実施する。異周波数ハンドオーバを実行するため、ランダムアクセス(TS36.300V 10.1.5.2のNon-contention based random accessを参照のこと)を行うことで、回線接続を行う。
 CC2にハンドオーバすることで、CC2がPCellとなる(他のCCに接続していないため、必然的にPCellとなる。)。
 更に、基地局eNB1は、CC2(PCell)を用いて、SCell(CC1)の追加を端末に通知する。基地局eNBと通知を受けた端末UE1はSCell(CC1)を追加する。
 以下、図8~図12は、従来の技術を説明する図である。
 なお、簡単のために、CC1をPCellとしCC2をSCellとして、2CCで、CAを実施しているとする。
 図8は、基地局のブロック図であり、図9は、端末のブロック図である。
 基地局eNBは、送信部50aのパイロット信号作成部10においてパイロット信号を作成し、符号化・変調部11において変調を施す。送信部50aの送信無線部12において変調されたパイロット信号を無線信号に変換し、アンテナ13を介してパイロット信号を、全てのCC(Component Carrier)を用いてまたは全てのセルで、その基地局eNB配下の少なくとも一つの端末UEへ送信する。なお、パイロット信号作成部10、ハンドオーバ制御信号作成部14、帯域制御信号作成部15の信号作成部と、符号化・変調部11及び送信無線部12をまとめて送信部50aまたは送信手段と呼ぶ。なお、パイロット信号は、パイロットまたは参照信号(RS: Reference Signal)とも呼ばれる。制御部51aのハンドオーバ制御信号作成部14は、ハンドオーバを制御するために端末UEに送信する制御信号を生成する。送信部50aの帯域制御信号作成部15は、端末UEと通信するための帯域を制御するための信号を生成する。
 アンテナ34を介してパイロット信号を受信した端末UE(図9参照)は、受信部53aの受信無線部25において無線信号をベースバンド信号に変換し、復調・、復号部26において復調する。受信部53aの無線回線品質測定及び算出部27において、パイロット信号を抽出し、パイロット信号の受信電力や受信品質を測定、算出する。同様に、全てのCC(セル)において無線回線品質を測定する。具体的には、パイロット受信電力(RSRP: Reference Signal Received Power)や、パイロット受信品質(RSRQ: Reference Signal Received Quality)や、CIR(Carrier to Interference Ratio)やSIR(Signal to Interference Ratio)等を取得する。得られた無線回線品質は、無線回線品質情報作成部37において、算出式等を基に測定結果を離散的な数値とし、無線回線品質(Channel Quality)または無線回線品質指標(CQI: Channel Quality Indicator)を求める。以後無線回線品質と総称する。求められた無線回線品質は、送信部55aの符号化・変調部32に送られる。制御部54aの帯域制御部35は、端末UEが通信に使う帯域を制御するもので、端末設定及び送受信制御部36は、帯域制御部35の制御の下、端末UEの送受信処理を制御する。なお、受信無線部25、復調・復号部26、無線回線品質測定及び算出部27、帯域制御情報抽出部28、ハンドオーバ制御信号抽出部29を合わせて受信部53aまたは受信手段と呼ぶ。ハンドオーバ制御信号抽出部29は、基地局eNBからのハンドオーバを制御する信号を受信信号から抽出するものである。
 更に、端末UEが測定算出した無線回線品質を制御部51aのハンドオーバ制御部30に通知する。ハンドオーバ制御部30は、全てのCC(セル)の無線回線品質を基に、PCellとSCellの回線品質を比較する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき、ハンドオーバ制御部30は、PCellとSCellの変更が必要と判断し、変更を実行するためにハンドオーバが必要であると判断する。続いて、この判断結果をハンドオーバ要求信号作成部31へ通知し、ハンドオーバ要求信号作成部31はハンドオーバ要求信号を作成する。符号化・変調部32において符号化し、変調を施し、送信無線部33において無線信号に変換し、アンテナ34を介して基地局eNBへ送信する。
 アンテナ13を介してハンドオーバ要求信号を受信した基地局eNBは、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において、復調し、復号することで信号を受信信号として再生する。ハンドオーバ要求信号抽出部18は、再生された受信信号からハンドオーバ要求信号を抽出し、ハンドオーバ制御部19へ通知する。通知を受けたハンドオーバ制御部19は、帯域制御部20に対してSCellの削除(または解放)を要求する。帯域制御部20は、送信無線部12、受信無線部16、符号化・変調部11、復調・復号部17及び帯域制御信号作成部15に対してSCellの削除(または解放)を通知する。帯域制御信号作成部15は、SCellの削除(または解放)及びSCellに対するPCellで送信される下り無線制御チャネルPDCCHの削除(または解放)に関連する制御信号(SCell削除通知信号またはSCell解放通知)を作成する。符号化・変調部11において符号化し、変調を施し、送信無線部12において無線信号に変換し、アンテナ13を介して端末UEへ送信する。なお、SCellの削除(または解放)の通知は、上述の無線回線再設定メッセージ(RRCConnectionReconfiguration message)としてもよい。
 通知を受けた端末UEと基地局eNBは、SCellを削除(または解放)し、PCellで伝送されるSCellのための無線制御チャネルを削除(または解放)する。なお、SCellの削除(または解放)に伴って、端末UEとの通信で使用していた下り無線共有チャネルPDSCH、上り無線共有チャネルPUSCH、上り無線制御チャネルPUCCH等の無線チャネルも削除(または解放)する。
 なお、上記SCellの削除(または解放)が、端末UEにおいて問題なく実施できた場合には、無線回線再設定完了メッセージ(RRCConnectionReconfigurationComplete message)を、端末UEから基地局eNBへ返信してもよい。更に失敗した場合には、端末UEから基地局eNBに対してハンドオーバ失敗(handover failure)を通知する。
 上記完了及び失敗の通知についても上記と同様に、端末UEにおいて信号を作成し、変調し、無線信号に変換し、基地局eNBへ送信する。また、基地局eNBにおいて、ベースバンド信号に変換し、復調し、通知信号を抽出する。なお、今後、同様の処理については省略する。
 SCellの削除(または解放)が完了したことを認識した基地局eNBのハンドオーバ制御部19は、PCellの異周波数ハンドオーバ(CC1から元SCell(CC2)へのハンドオーバ)の実行を制御する。具体的には、ハンドオーバ先やハンドオーバタイミングなどのハンドオーバ制御情報を決定し、これを基にハンドオーバ制御信号作成部14に対して、ハンドオーバ制御制御信号の作成を通知する。ハンドオーバ制御信号作成部14は、上記情報を基にハンドオーバ制御信号を作成し、端末UEへ通知する。
 通知を受けた端末UEと基地局eNBは、ハンドオーバ制御信号(ハンドオーバ制御情報)を基に、PCellをCC1からCC2へハードハンドオーバする。具体的には、TS36.331 6.3.4のMobilityControlInfo IEに含まれるtargerPhysCellIdで、ハンドオーバ先のCCを指定する。端末UEは、SCell削除(または解放)と同様にハンドオーバ完了または失敗を基地局eNBへ通知する。
 通知を受けた基地局eNBは、帯域制御部20に対してSCellの追加と、SCellで伝送されるSCellでのデータ伝送のための下り無線制御チャネルの設定を要求する。帯域制御信号作成部15は、SCellの追加及びSCellで送信される下り無線制御チャネルPDCCHの追加に関連する制御信号(SCell追加制御信号)を作成し、端末UEへ送信する。
 通知を受けた端末UEと基地局eNBは、SCellを追加し、PCellで伝送されるSCellのための無線制御チャネルを追加(設定)する。なお、SCellの追加に伴って、端末UEとの通信で使用される下り無線共有チャネルPDSCH、上り無線共有チャネルPUSCH、上り無線制御チャネルPUCCH等の無線チャネルも追加(設定)する。
 端末UEは、SCell削除(または解放)とSCellの追加の完了または失敗を基地局eNBへ通知する。端末UEは、SCell削除(または解放)と同様にハンドオーバ完了または失敗を基地局eNBへ通知する。
 以上により、PCellとSCellの変更(交換)が実施される。
 なお、上記では端末が、PCell、SCellの変更のための異周波数ハンドオーバを要求したが、基地局が判断してもよい。上記の端末が判断した場合の説明と重複する部分を除き、以下に説明する。
 端末UEは、基地局eNBが送信したパイロット信号を受信し、無線回線品質測定及び算出部27において無線回線品質を測定する。この無線品質測定結果を、無線回線品質情報作成部37に通知する。無線回線品質情報作成部37は、算出式等を基に測定結果を離散的な数値とし、無線回線品質(Channel Quality)または無線回線品質指標(CQI: Channel Quality Indicator)を求める。以後無線回線品質と総称する。求められた無線回線品質を符号化・変調部32において符号化し、変調を施す。そして、送信無線部33において無線信号に変換し、アンテナ34を介して基地局eNBへ送信する。なお、全てのCC(セル)において測定した無線回線品質をPCellでのみ送信してもよいし、測定したCC(すなわちここではPCellまたはSCell)それぞれで無線回線品質を送信してもよい。
 アンテナ13を介して無線回線品質を受信した基地局eNBは、受信無線部16において、無線信号をベースバンド信号に変換し、復調・復号部17において復調し、復号することで信号を受信信号として再生する。無線回線品質情報抽出部21は、再生された受信信号から無線回線品質を抽出し、帯域制御部20と、ハンドオーバ制御部19へ通知する。
 ハンドオーバ制御部19は、全てのCC(またはセル)に対する無線回線品質を基に、PCellと他のSCellの回線品質を比較する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき、ハンドオーバ制御部19は、PCellとSCellの変更(交換)が必要と判断し、変更(交換)を実行するためにハンドオーバが必要であると判断する。なお、無線回線制御等の制御を考慮した場合、PCellの受信品質がSCellの受信品質よりも良いことが望ましい。このため、PCellとSCellを変更する必要があると判断される。続いて、この判断結果を基に、帯域制御部20に対してPCellとSCellの変更(交換)を通知する。帯域制御部20は、送信無線部12、受信無線部16、符号化・変調部11、復調・復号部17及び帯域制御信号作成部15に対してSCellの削除(または解放)を通知する。帯域制御信号作成部15は、SCellの削除(または解放)及びSCellに対するPCellで送信される下り無線制御チャネルPDCCHの削除(または解放)に関連する制御信号(SCell削除通知信号またはSCell解放通知)を作成する。符号化・変調部11において符号化し、変調を施し、送信無線部12において無線信号に変換し、アンテナ13を介して端末UEへ送信する。なお、SCellの削除(または解放)の通知は、上述の無線回線再設定メッセージ(RRCConnectionReconfiguration message)としてもよい。
 アンテナ34を介して通知を受信した端末UEは、受信無線部25において、無線信号をベースバンド信号に変換し、復調・復号部26において復調し、復号することで信号を受信信号として再生する。帯域制御情報抽出部28は、前記通知を抽出し、帯域制御部へ通知する。通知を受けた帯域制御部は、SCellを削除(または解放)し、PCellで伝送されるSCellのための無線制御チャネルを削除(または解放)する。基地局もSCellを削除(または解放)し、PCellで伝送されるSCellのための無線制御チャネルを削除(または解放)する。なお、SCellの削除(または解放)に伴って、端末UEとの通信で使用していた下り無線共有チャネルPDSCH、上り無線共有チャネルPUSCH、上り無線制御チャネルPUCCH等の無線チャネルも削除(または解放)する。
 なお、上記SCellの削除(または解放)が、端末UEにおいて問題なく実施できた場合には、無線回線再設定完了メッセージ(RRCConnectionReconfigurationComplete message)を、端末UEから基地局eNBへ返信してもよい。更に失敗した場合には、端末UEから基地局eNBに対してハンドオーバ失敗(handover failure)を通知する。
 上記完了及び失敗の通知についても上記と同様に、端末UEにおいて信号を作成し、変調し、無線信号に変換し、基地局eNBへ送信する。また、基地局eNBにおいて、ベースバンド信号に変換し、復調し、通知信号を抽出する。なお、帯域制御部35またはハンドオーバ制御部30において完了及び失敗を判断し、判断結果を完了及び失敗等制御信号作成部(図示せず)に通知し、通知を受けた完了及び失敗等制御信号作成部は、完了または失敗等制御信号を作成し、符号化・変調部32において完了または失敗等制御信号を符号化し、変調し、送信無線部33で無線周波数に変換の後、アンテナ34を介して基地局へ送信する。
 アンテナ13を介して完了または失敗等制御信号を受信した基地局は、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において復調し、復号することで信号を受信信号として再生する。完了及び失敗等制御信号抽出部(図示せず)において、生された受信信号から完了及び失敗等制御信号を抽出し、帯域制御部20及びハンドオーバ制御部19へ通知する。SCellの削除(または解放)が完了したことを認識した基地局eNBのハンドオーバ制御部19は、PCellの異周波数ハンドオーバ(CC1から元SCell(CC2)へのハンドオーバ)の実行を制御する。具体的には、ハンドオーバ先やハンドオーバタイミングなどのハンドオーバ制御情報を決定し、これを基にハンドオーバ制御信号作成部14に対して、ハンドオーバ制御制御信号の作成を通知する。ハンドオーバ制御信号作成部14は、上記情報を基にハンドオーバ制御信号を作成し、端末UEへ通知する。
 通知を受けた端末UEと基地局eNBは、ハンドオーバ制御信号(ハンドオーバ制御情報)を基に、PCellをCC1からCC2へハードハンドオーバする。具体的には、TS36.331 6.3.4のMobilityControlInfo IEに含まれるtargerPhysCellIdで、ハンドオーバ先のCCを指定する。端末UEは、SCell削除(または解放)と同様にハンドオーバ完了または失敗を基地局eNBへ通知する。
 通知を受けた基地局eNBは、帯域制御部20に対してSCellの追加と、SCellで伝送されるSCellでのデータ伝送のための下り無線制御チャネルの設定を要求する。帯域制御信号作成部15は、SCellの追加及びSCellで送信される下り無線制御チャネルPDCCHの追加に関連する制御信号(SCell追加制御信号)を作成し、端末UEへ送信する。
 通知を受けた端末UEと基地局eNBは、SCellを追加し、PCellで伝送されるSCellのための無線制御チャネルを追加(設定)する。なお、SCellの追加に伴って、端末UEとの通信で使用される下り無線共有チャネルPDSCH、上り無線共有チャネルPUSCH、上り無線制御チャネルPUCCH等の無線チャネルも追加(設定)する。
 端末UEは、SCell削除(または解放)とSCellの追加の完了または失敗を基地局eNBへ通知する。端末UEは、SCell削除(または解放)と同様にハンドオーバ完了または失敗を基地局eNBへ通知する。
 図10及び図11は、従来技術のPCell及びSCell変更の動作イメージを示す図である。
 図10の(1)において、基地局eNBからCC1とCC2を用いて通信が行われているとする。ここで、CC1がPCellであり、CC2がSCellである。(2)において、SCellを削除(または解放)し、PCellのみの通信とする。次に、(3)で、PCellのCC1をCC2に異周波数ハンドオーバする。次に、(4)で、CC1をSCellとして追加する。
 図11のシーケンス図によると、最初、基地局eNBからパイロット信号を端末UEにむけて送信する。端末UEでは、無線回線品質を測定し、無線回線品質報告を基地局eNBに対して行う。基地局eNBは、PCell、SCellの変更判定を行う。変更が決定されると、SCell削除通知(または解放通知)が端末UEに送られる。そして、SCellが削除(または解放)され、基地局eNBから異周波数ハンドオーバ要求が端末UEになされる。この従来の異周波数ハンドオーバは、いったん回線を切って、周波数を変えてから、回線を接続しなおすというハードハンドオーバである。したがって、回線を接続しなおすため、再度、同期検出、ランダムアクセスなどが行われる。PCellから旧SCellに異周波数ハンドオーバを行い、次に、基地局eNBがどのSCellを追加するかの選択を行う。基地局eNBから新SCellとしてどのSCellを使うかの通知が行われ、SCell追加が行われる。
 図12のフローチャートに従えば、ステップS10において、無線回線品質を測定し、ステップS11において、PCellとするセルのセル選択が行われる。ステップS12において、PCell、SCell変更要求が基地局eNBから送られる。ステップS13において、SCellを削除(または解放)し、ステップS14において、PCellの異周波数ハンドオーバを行う。そして、ステップS15において、SCellを追加して、処理を終わる。
 従来技術には、キャリアアグリゲーションにて、コンポーネントキャリアを追加/削除(解放)し、端末に追加/削除(解放)情報を通知するものや、キャリアアグリゲーションにて、端末から品質情報に基づいてコンポーネントキャリアを割り当てるものがある。
特開2011-166701号公報 特開2010-41285号公報
 しかしながら、上記従来の方法には以下の問題がある。
・異周波数ハンドオーバが、ハードハンドオーバであり、回線を切り、再接続を行う必要があること。
・2CCで通信していたものが、1CCに変更されること。(すなわち、2つの帯域を同時に用いて通信していた状態から1つの帯域のみを用いて通信する状態へ変更されたこと)
 上記2点から、異周波数ハンドオーバの期間では、伝送速度がそれまでの伝送速度の半分以下となってしまう。また、回線が切れてしまう。これにより、伝送遅延が発生する。これらは、動画伝送やリアルタイム伝送等の高速かつ多量のデータを伝送しなければならないサービスにとっては致命的である。すなわち、所要伝送速度や所要最大伝送遅延が設定されているデータの伝送(またはサービス)にとっては、致命的な障害である。
 以下の実施形態では、伝送速度を低下させず、かつ、回線を切ることなしでPCell(第1の帯域)とSCell(第2の帯域)の変更を行うことのできる無線通信装置を提供する。
 以下の実施形態の一側面における無線通信装置は、第1のデータと該第1のデータ伝送するための第1の制御信号と、第2の帯域で伝送される第2のデータのための第2の制御信号とを、伝送する第1の帯域と、前記第2のデータを伝送する第2の帯域とを同時に用いて、無線通信装置間でデータ伝送を行う無線通信装置において、回線接続を維持したまま、該第1の帯域と第2の帯域の変更を制御する帯域制御部を備える。
 以下の実施形態によれば、伝送速度を低下させず、かつ、回線を切ることなしでPCell(第1の帯域)とSCell(第2の帯域)の変更を行うことのできる無線通信装置を提供することができる。
Carrier Aggregationについて説明する図(その1)である。 Carrier Aggregationについて説明する図(その2)である。 Carrier Aggregationについて説明する図(その3)である。 Carrier Aggregationについて説明する図(その4)である。 Carrier Aggregationについて説明する図(その5)である。 Carrier Aggregationについて説明する図(その6)である。 Carrier Aggregationについて説明する図(その7)である。 従来の技術を説明する図(その1)である。 従来の技術を説明する図(その2)である。 従来の技術を説明する図(その3)である。 従来の技術を説明する図(その4)である。 従来の技術を説明する図(その5)である。 Scheduling CellとNon-scheduling Cellを変更(交換)する際の動作のイメージを示す図(その1)である。 Scheduling CellとNon-scheduling Cellを変更(交換)する際の動作のイメージを示す図(その2)である。 本実施形態のPCell、SCell変更処理のイメージを説明する図である。 SCell 1(Scheduling Cell)とSCell 2(Non-scheduling Cell)とを変更(交換)する場合を説明するイメージ図である。 本実施形態の第1の構成例をより詳細に説明する図(その1)である。 本実施形態の第1の構成例をより詳細に説明する図(その2)である。 本実施形態の第1の構成例をより詳細に説明する図(その3)である。 本実施形態の第1の構成例をより詳細に説明する図(その4)である。 本実施形態の第1の構成例をより詳細に説明する図(その5)である。 本実施形態の第1の構成例をより詳細に説明する図(その6)である。 本実施形態の第1の構成例をより詳細に説明する図(その7)である。 本実施形態の第1の構成例をより詳細に説明する図(その8)である。 本実施形態の第1の構成例をより詳細に説明する図(その9)である。 本実施形態の第1の構成例をより詳細に説明する図(その10)である。 本実施形態の第1の構成例をより詳細に説明する図(その11)である。 本実施形態の第1の構成例をより詳細に説明する図(その12)である。 本実施形態の第1の構成例をより詳細に説明する図(その13)である。 本実施形態の第1の構成例をより詳細に説明する図(その14)である。 本実施形態の第1の構成例をより詳細に説明する図(その15)である。 本実施形態の第1の構成例をより詳細に説明する図(その16)である。 本実施形態の第1の構成例をより詳細に説明する図(その17)である。 本実施形態の第1の構成例をより詳細に説明する図(その18)である。 本実施形態の第1の構成例をより詳細に説明する図(その19)である。 本実施形態の第2の構成例を説明する図(その1)である。 本実施形態の第2の構成例を説明する図(その2)である。 本実施形態の第2の構成例を説明する図(その3)である。 本実施形態の第2の構成例を説明する図(その4)である。 本実施形態の第2の構成例を説明する図(その5)である。 本実施形態の第2の構成例を説明する図(その6)である。 本実施形態の第2の構成例を説明する図(その7)である。 本実施形態の第3の構成例を説明する図(その1)である。 本実施形態の第3の構成例を説明する図(その2)である。 本実施形態の第3の構成例を説明する図(その3)である。 本実施形態の第3の構成例を説明する図(その4)である。 本実施形態の第3の構成例を説明する図(その5)である。 本実施形態の第3の構成例を説明する図(その6)である。 本実施形態の第4の構成例を説明する図(その1)である。 本実施形態の第4の構成例を説明する図(その2)である。 本実施形態の第4の構成例を説明する図(その3)である。
 以下、LTE-AdvancedシステムにおけるCarrier Aggregationを例として説明する。なお、複数の帯域を同時に使用する無線通信システムであれば適用可能である。
・PCellとSCellの変更(交換)
 以下の実施形態では、伝送速度を低下させず、かつ、回線を切ることなしに(すなわち接続するCC(セル)数を減少させることなく)、PCellとSCellの変更を行う方法を提案する。
 以下、簡単のためにSCellが一つの場合で説明する。なお、SCellが複数ある場合は、そのなかの回線品質の最もよい一つのSCellを対象として、PCellとSCellの変更を行うこととなり、同様の動作となる。
 基地局eNBは、端末から通知された無線回線品質に基づいて、PCell、SCellの変更をすべきか判断し、先の帯域(CC、セル)とその変更タイミングを通知する。すなわち、PCellとするセル(またはセルID)を通知する。更に、変更に伴ってSCellとするセル(またはセルID)も通知する。
 通知を受けた端末UEは、通知されたタイミングに従って以下のような変更を行う。
(1)-元SCell(CC2)を新PCell(CC2)に変更し、続いて元PCell(CC1)を新SCell(CC1)に変更する。(2)-元PCell(CC1)を新SCell(CC1)に変更し、続いて元SCell(CC2)を新PCell(CC2)に変更する。(3)-元SCell(CC2)を新PCell(CC2)に変更し、かつ同時に元SCell(CC2)を新PCell(CC2)に変更する。すなわち、PCellとSCellを順次または同時に変更する。これは、単に、PCellとSCellの設定を変更するのみでよい。なお、ある瞬間においてPCellが必ず存在するように変更する。以上により、PCell及びSCellと端末UEは、回線を維持する。すなわち、データ伝送を継続することで、伝送速度の低下を防止する。以下、簡単のために(1)の場合について説明するが、断りのない限り(2)及び(3)の場合に対しても同等の処理が可能である。
・Cross Carrier Scheduling時のPCellとSCellの変更(交換)
 更に、Cross Carrier Schedulingが実施され、PCellがScheduling CellでありSCellがNon-scheduling Cellであったとする。基地局eNBは元PCell(CC1)で伝送される下り無線制御チャネルPDCCHを用いて、PCell、SCellの変更と、元SCell(CC2)を新PCell(CC2)に変更することを端末UEに通知する。通知を受けた端末UEと基地局eNBは、元SCell(CC2)を新PCell(CC2)に変更すると共に、下り無線制御チャネルPDCCHを元PCell(CC1)から新PCell(CC2)に変更する(再設定する。回線を張り替える)。続いて、新PCell(CC2)で伝送される下り無線制御チャネルPDCCHを用いて元PCell(CC1)を新SCell(CC1)に変更することを端末UEに通知する。通知を受けた端末UEと基地局eNBは、PCell(CC1)を新SCell(CC1)に変更する。以上により、PCellとSCellの両方と端末UEは回線を維持する。すなわち、CC数を減らすことなくデータ伝送を継続することで、伝送速度の低下を防止する。
 言い換えれば、変更元(source)のPCellは、Scheduling CellからNon-scheduling Cellへ、変更元(source)のSCellは、Non-scheduling CellからScheduling Cellへと変更する。
 上記では、PCell(Scheduling Cell)とSCell(Non-scheduling Cell)を直接変更(交換)する場合、言い換えれば1 stepの場合を説明した。以下に、SCellをNon-scheduling CellからScheduling Cellに変更し、PCellとSCellを変更(交換)し、新SCellをScheduling CellからNon-scheduling Cellへと変更する。言い換えれば3 stepの場合を説明する。
 Cross Carrier Schedulingが実施され、PCellがScheduling CellでありSCellがNon-scheduling Cellであった場合、基地局eNBは元PCell(CC1)で伝送される下り無線制御チャネルPDCCHまたは下り無線共有データチャネル(PDSCH)を用いて、元SCellをscheduling Cellに変更することを端末UEに通知する。これを受けた端末UEと基地局eNBは、元PCell(CC1)で伝送されていた元SCellのための下り無線制御チャネルPDCCHを元PCellで伝送するよう変更する(再設定する。回線を張り替える)。すなわち、Scheduling Cellに変更する。
 続いて、基地局eNBは元PCell(CC1)または/及び元SCell(CC2)で伝送される下り無線制御チャネルPDCCHまたは下り無線共有データチャネル(PDSCH)を用いて、PCell、SCellの変更を端末UEに通知する。すなわち、元PCell(CC1)を新SCell(CC1)に、元SCell(CC2)を新PCell(CC2)に変更することを通知する。この際、元PCell、新PCell、元SCell、新SCellのすべてはScheduling Cellである。
 通知を受けた端末UEと基地局eNBは、元SCell(CC2)を新PCell(CC2)に変更する。
 続いて元PCell(CC1)で伝送される下り無線制御チャネルPDCCHまたは下り無線共有データチャネル(PDSCH)を用いて元PCell(CC1)を新SCell(CC1)に変更することを端末UEに通知する。
 通知を受けた端末UEと基地局eNBは、PCell(CC1)を新SCell(CC1)に変更する。続いて、新PCell(CC2)で伝送される下り無線制御チャネルPDCCHまたは下り無線共有データチャネル(PDSCH)を用いて、新SCell(CC1)をNon-scheduling Cellに変更することを通知する。
 これを受けた端末UEと基地局eNBは、新SCell(CC1)で伝送されていた新SCellのための無線制御チャネルPDDCHを新PCellで伝送するよう変更する。
 以上により、PCell及びSCellと端末UEは回線を維持する。すなわち、データ伝送を継続することで、伝送速度の低下を防止する。
 言い換えれば、変更元(source)のSCellを、Non-scheduling CellからScheduling Cellへ変更し、PCellとSCellの変更を行い、変更後(target)のSCellをScheduling CellからNon-scheduling Cellへと変更する。
・Cross Carrier SchedulingにおけるScheduling Cellの変更(交換)
 上記では、Cross Carrier SchedulingにおけるPCellとSCellの変更(交換)について説明した。ここでは、図7に示すように、複数のSCellが存在し、少なくとも一つのSCellがScheduling CellとなってCross Carrier Schedulingを行う場合を考える。このとき、他のSCellのための無線制御チャネルを伝送するSCell(Scheduling Cell)と、自Cellのための無線制御チャネルが他のSCellで伝送されるSCell(Non-scheduling Cell)の変更(交換)について説明する。
 図13及び図14は、Scheduling CellとNon-scheduling Cellを変更(交換)する際の動作のイメージを示す図である。
・単純な変更
 SCellかつScheduling CellとSCellかつNon-scheduling Cellとを直接変更(交換)する。
 なお、Non-scheduling Cellは一つとは限らないため、SCellかつScheduling CellのCellと、SCellかつNon-scheduling Cellの一つのCellとを直接変更(交換)する。すなわち、SCell 1(Scheduling Cell)とSCell 2(Non-scheduling Cell)とを、1 stepで変更(交換)する。
 図13では、PCellと、SCell 1がScheduling Cellとなっており、SCell 2がNon-scheduling Cellとなっている。これを、図14にあるように、Scheduling Cellの設定を変えることにより、Scheduling CellをPCellとSCell 2に変更する。
 図15は、本実施形態のPCell、SCell変更処理のイメージを説明する図である。
 図15の(1)において、CC1がPCellでScheduling Cellであり、CC2がSCell 1でScheduling Cellであり、CC3がSCell 2でNon-scheduling Cellである。ここで、(2)に示すように、SCell 2をScheduling Cellに変更し、SCell 1をNon-scheduling Cellに変更する。これは、セルに含まれる、どのセルをScheduling Cellにするかを設定する情報を変更すればよい。
 なお、PCellは必ず存在しなければならないため、上記の変更時にもPCellが別に存在しており、変更対象となっていない。
 元Non-scheduling CellをScheduling Cellに変更後、元Scheduling CellをNon-scheduling cellに変更している。
 SCell 1(Scheduling Cell)とSCell 2(Non-scheduling Cell)とを変更(交換)する場合を考える。
 図16は、SCell 1(Scheduling Cell)とSCell 2(Non-scheduling Cell)とを変更(交換)する場合を説明するイメージ図である。
 図16は、3ステップで変更を行う場合である。
 図16の(1)において、CC1が、PCellでScheduling Cellであり、CC2がSCell 1でScheduling Cellであり、CC3がSCell 2でNon-scheduling Cellである。まず、SCell 1で伝送されるSCell 2の制御信号を用いて、SCell 2をNon-scheduling cellからScheduling Cellに変更する(図16の(2))。続いて、SCell 2で伝送される制御信号か、SCell 1で伝送される制御信号を用いてSCell 1をNon-scheduling Cellに変更する。これにより、SCell 1(Scheduling cell)とSCell 2(Non-scheduling)が、SCell 1(Non-scheduling Cell)とSCell 2(Scheduling Cell)に変更される(図16の(3))。
 なお、PCellは必ず存在しなければならないため、上記の変更時にもPCellが別に存在しており、変更対象となっていない。
 なお、下り制御チャネル(PDCCH)には、無線レイヤの制御信号が、下り無線共有データチャネル(PDSCH)には、無線レイヤの上位のレイヤの制御信号が入れられている。PCell、SCellの設定情報は、データチャネルの制御信号に入っている。したがって、PCell、SCellの変更は、この無線レイヤの上位のレイヤの制御信号の設定を書き換えることで実現することができる。また、Scheduling Cell、Non-scheduling Cellの設定は、制御チャネルをあるCellに実際に載せるか否かによって示される。
 また、制御チャネルの変調方式等は予め決まっており、どの移動端末も決まった方式で復調できるようになっており、他の移動端末の情報も復調できるようになっているが、自分むけの制御情報のみ復号できる。復号した制御情報を基にデータチャネルの変調方式やタイミング等を取得して、データを得る。
 無線回線品質(CQI)の測定は、使用している帯域(またはセル)のみを測定してもよいし、使用していない帯域(またはセル)も含めて、全帯域を測定してもよい。測定結果は、上りの制御チャネルを用いて送信する。
 無線回線品質は、下りのPCellあるいはSCellに対応する上りのPCellあるいはSCellの上り制御チャネルを用いて送信してよいし、下りのPCellに対応する上りのPCellの上り制御チャネルに集約して送信してもよい。
 図17~図35は、本実施形態の第1の構成例をより詳細に説明する図である。
 なお、簡単のために、CC1をPCellとしCC2をSCellとし、2CCでのCAを実施しているとする。
 なお、以下の2点を実現する。
・PCell、SCellの変更において、異周波数(ハード)ハンドオーバを実行しない(伝送速度を低下させない。伝送遅延を発生させない、増加させない)。
・接続するCCを減らさない(伝送速度を低下させない。伝送遅延を発生させない、増加させない)。
 図17は、第1の構成例の動作イメージであり、図18は、図17において、PDCCHとPDSCHがどのように伝送されるかを示した図である。
 図17の(1)にあるように、CC1をPCellかつScheduling Cellとし、CC2をSCellかつNon-scheduling Cellとする。そこで、PCellとSCellを変更(交換)する。図17の(2)にあるように、CC1をSCellかつNon-scheduling Cellとする。また、CC2をPCellかつScheduling Cellとする。図18の(1)で、CC1は、PCellでScheduling Cellであり、PDCCHとPDSCHを有し、CC2は、SCellでNon-scheduling Cellであり、PDSCHを有している。ここで、SCellをPCellに、PCellをSCellに変更し、PDCCHを付け替える。図18の(2)に示されるように、CC2が、PCellで、Scheduling Cellとなり、PDCCHとPDSCHを有するようになる。図19において、上側(すなわち時間的に前)で第1の帯域がPrimary Cellであり、第2の帯域がSecondary Cellとなっている。これが、PCellとSCellの変更により、下側(すなわち時間的に後)で第1の帯域がSecondary Cell、第2の帯域がPrimary Cellとなっている。あるいは、図20のように、第1の帯域がPrimary Cellであり、第2の帯域がSecondary Cellであり、第3の帯域もSecondary Cellであるとき、第1の帯域のPrimary Cellと第2の帯域のSecondary Cellの設定を変更する。これにより、第1及び第3の帯域がSecondary Cellとなり、第2の帯域がPrimary Cellとなる。
 なお、図19及び図20では、簡単のためにそれぞれ帯域が隣接(または連続)して書かれているが、隣接(または連続)していなくてもよい。
 図21は、本実施形態の基地局のブロック構成図である。図22は、本実施形態の端末のブロック構成図である。
 図21において、図8と同様な構成要素には同様な参照符号を付す。図22において、図9と同様な構成要素には同様な参照符号を付す。
 基地局eNBは、パイロット信号作成部10においてパイロット信号を作成し、符号化・変調部11において変調を施す。送信無線部12において変調されたパイロット信号を無線信号に変換し、アンテナ13を介してパイロット信号を、全てのCC(Component Carrier)で、その基地局eNB配下の少なくとも一つの端末UEへ送信する。なお、パイロット信号作成部10、帯域制御信号作成部15の信号作成部、符号化・変調部11及び送信無線部12をまとめて送信部50または送信手段と呼ぶ。なお、パイロット信号は、パイロットまたは参照信号(RS: Reference Signal)とも呼ばれる。
 アンテナ34を介してパイロット信号を受信した端末UEは、受信無線部25において無線信号をベースバンド信号に変換し、復調・復号部26において復調する。無線回線品質測定及び算出部27において、パイロット信号を抽出し、パイロット信号の受信電力や受信品質を測定、算出する。同様に、全てのCCにおいて無線回線品質を測定する。具体的には、パイロット受信電力(RSRP: Reference Signal Received Power)や、パイロット受信品質(RSRQ: Reference Signal Received Quality)や、CIR(Carrier to Interference Ratio)やSIR(Signal to Interference Ratio)等の情報を得る。なお、受信無線部25、復調・復号部26、無線回線品質測定及び算出部27、帯域制御情報抽出部28を合わせて受信部53または受信手段と呼ぶ。
 更に、測定算出した無線回線品質を帯域制御部35に通知する。帯域制御部35は、全てのCCに対する無線回線品質を基に、PCellと他のSCellの回線品質を比較する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき帯域制御部35は、PCellとSCellの変更(交換)が必要と判断する。続いて、この判断結果をPCell、SCell変更要求信号作成部41に通知する。PCell、SCell変更信号作成部41はPCell、SCell変更要求信号を作成し、符号化・変調部32において、符号化し、変調を施す。送信無線部33において無線信号に変換し、アンテナ34を介して基地局eNBへ送信する。また、帯域制御部35は、端末設定及び送受信制御部36に帯域の設定指示を通知する。これにより、通信に使われる帯域を変更する。なお、帯域制御部35と端末設定及び送受信制御部36をまとめて制御部54または制御手段と呼ぶ。
 アンテナ13を介して、PCell、SCell変更要求信号を受信した基地局eNBは、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において、復調する。復号することで信号を受信信号として再生する。PCell、SCell変更要求信号抽出部40は、再生された受信信号からPCell、SCell変更要求信号を抽出し、帯域制御部20へ通知する。なお、受信無線部16、復調・復号部17、無線回線品質情報抽出部21、PCellSCell変更要求信号抽出部40をまとめて受信部52または受信手段と呼ぶ。
 通知を受けた帯域制御部20は、送信無線部12、受信無線部16、符号化・変調部11、復調・復号部17及び帯域制御信号作成部15に対して、PCell、SCellの変更要求を通知する。なお、変更要求と変更タイミングとを同時に通知してもよい。また、PCellとSCellの変更を同時に行っても良い。なお、帯域制御部20を制御部51または制御手段と呼ぶ。通知を受けた帯域制御信号作成部15は、PCellの変更及びSCellの変更に関連する制御信号を作成する。
 なお、送信無線部12、符号化・変調部11、帯域制御信号作成部15、パイロット信号作成部10を合わせて、基地局eNBの送信部50と呼ぶ。また、送信無線部33、符号化・変調部32、PCell、SCell変更要求信号作成部41、無線回線品質情報作成部37を合わせて、端末UEの送信部55と呼ぶ。
 または、PCellをSCellに変更すること、SCellの内の一つをPCellに変更すること、及び、それらの変更タイミングに関する制御信号を作成する。具体的には、例えば、PCellのCell IDとSCellのCell IDを入れ換えるなどの制御信号としてもよいし、PCellのCell IDとして元のSCellのCell IDを指定し、SCellのCell IDとして元のPCellのCell IDを指定するなどの制御信号としてもよい。
 上記のように作成されたPCell、SCell変更のための制御信号は、符号化・変調部11において、符号化され、変調が施される。送信無線部12において、これを無線信号に変換し、アンテナ13を介して端末UEへ送信する。なお、SCellの削除(または解放)の通知は、上述の無線回線再設定メッセージ(RRCConnectionReconfiguration message)としてもよい(つまり、SCellの削除(または解放)の制御信号を、無線回線際設定メッセージに含まれる制御信号としてもよい)。
 通知を受けた端末UEと基地局eNBは、PCell及びSCellの変更を行う。
 すなわち、アンテナ34を介して通知を受信した端末UEは、受信無線部25において、無線信号をベースバンド信号に変換し、復調・復号部26において復調し、復号することで信号を受信信号として再生する。帯域制御情報抽出部28は、前記通知を抽出し、帯域制御部へ通知する。通知を受けた帯域制御部は、SCellを削除(または解放)し、PCellで伝送されるSCellのための無線制御チャネルを削除(または解放)する。基地局もSCellを削除(または解放)し、PCellで伝送されるSCellのための無線制御チャネルを削除(または解放)する。なお、SCellの削除(または解放)に伴って、端末UEとの通信で使用していた下り無線共有チャネルPDSCH、上り無線共有チャネルPUSCH、上り無線制御チャネルPUCCH等の無線チャネルも削除(または解放)する。
 なお、上記PCell、SCell変更が、端末UEにおいて問題なく実施できた場合には、無線回線再設定完了メッセージ(RRCConnectionReconfigurationComplete message)を、端末UEから基地局eNBへ返信してもよい。更に、失敗した場合には、端末UEから基地局eNBに対して無線回線際設定失敗を通知するとしてもよい。
 上記完了及び失敗の通知についても上記と同様に、端末UEにおいて信号を作成し、変調し、無線信号に変換し、基地局eNBへ送信する。また、基地局eNBにおいて、ベースバンド信号に変換し、復調し、通知信号を抽出する。なお、帯域制御部35において完了及び失敗を判断し、判断結果を完了及び失敗等制御信号作成部(図示せず)に通知し、通知を受けた完了及び失敗等制御信号作成部は、完了または失敗等制御信号を作成し、符号化・変調部32において完了または失敗等制御信号を符号化し、変調し、送信無線部33で無線周波数に変換の後、アンテナ34を介して基地局へ送信する。
 アンテナ13を介して完了または失敗等制御信号を受信した基地局は、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において復調し、復号することで信号を受信信号として再生する。完了及び失敗等制御信号抽出部(図示せず)において、受信された受信信号から完了及び失敗等制御信号を抽出し、帯域制御部20へ通知する。なお、今後、同様の処理については説明を省略する。
 以上により、PCellとSCellの変更(交換)が可能となる。
 なお、上記では基地局eNBと端末UEを例として説明したが、基地局eNBとリレー(RN: Relay NodeまたはRS: Relay Station)であっても、リレーRNと端末UEであってもよい。また、基地局eNBは、フェムトセル(Femto cell、HeNB: Home eNB)と言われる小型基地局であってもよい。
 図23は、本実施形態の概略フローチャートである。
 このフローは、端末と基地局とで行われる処理の全体を示す(以下、同様)。
 ステップS20において、無線回線品質の測定が端末で行われる。ステップS21において、端末でPCellとするセルを選択する。ステップS22において、端末あるいは基地局において、PCell、SCellの変更要求を行う。ステップS23において、基地局でPCell、SCell変更制御を行う。ステップS24において、端末でもPCell、SCell変更が完了する。
 図24~図35は、本実施形態の処理のシーケンスとその詳細フローチャートである。
 図24において、基地局から端末へパイロット信号が送信されている。端末では、無線回線品質測定が行われる。そして、測定された無線回線品質からPCell、SCell変更判定を行う。図24では、PCell、SCell変更判定は、端末が行うことになっているが、基地局が無線回線品質を端末から得て、判定を行うようにしてもよい。PCell、SCell変更要求が発行されると、基地局で、PCell、SCell変更制御が行われる。そして、基地局から端末に、PCell、SCell変更通知がなされる。そして、基地局と端末の両方で、PCellをSCellに、SCellをPCellに変更する。このとき、無線回線を維持したまま処理が行われるため、回線の切断は起こらない。
 RS(Pilot)送信であるが、基地局が端末に対して送信する共通パイロット(基地局の構成するセルに存在する1つ以上の端末に対して共通のパイロット(common pilot)またはセル固有のパイロット(Cell specific pilot or Cell specific RS)または個別パイロット(基地局が構成するセルに存在するある一つの端末に対してのみ送信するパイロットまたは端末固有パイロット(UE specific pilot or UE specific pilot))を送信する。送信のための処理は、例えば、図25のフローとなる。
 なお、パイロット信号はパイロットチャネルにマッピングし、または、無線信号として予め決められた無線リソースにマッピングし、またはフレームフォーマットにマッピングし送信される。LTEシステムでは、パイロットチャネルがなく、物理信号(Physical signal)として定義され、制御チャネルやデータチャネル(共有チャネル)と同様に無線フレームフォーマットにマッピングされて送信される。
 基地局から送信されたパイロット信号を、アンテナを介して受信した端末は、例えば、図26または図27に示すフローによって、無線回線品質を測定する。なお、無線回線品質とは、RSRP、RSRQ、SNR(Signal to Noise Ratio)、SIR(Signal to Interference Ratio)やCQIなどである。図26及び図27はRSRPを例として示している。なお、CQIは無線回線品質を基に離散的な数値に変換(算出)したものである。更に、RSRQやSIR等は測定した受信信号電力と雑音電力とから算出されるものである。
 なお、PCellに対する無線回線品質測定とSCellに対する無線回線品質測定は、同時に実施することが望ましいが、同時に実施しなくてもよい。
 更に、測定した無線回線品質を基に算出した無線回線品質またはそれを離散的な値に変換したものを無線回線品質情報とする。
 続いて、PCell、SCellの変更判定について説明する。図28にPCellと1つのSCellのみ無線品質測定を実施する場合を示す。図28は、PCellとSCellの無線回線品質を測定する。少なくともPCellとSCellの無線回線品質を基に変更判定を行う。例えばSCellの無線回線品質(または無線回線品質情報)とPCellの無線回線品質(または無線回線品質情報)を比較し、前者が良い場合はPCellとSCellを変更することが必要と判断する。また、PCellの無線回線品質(または無線回線品質情報)とSCellの無線回線品質(または無線回線品質情報)に他の要素(例えばセルの優先度や変更が頻繁に生じないようにするためのパラメータ等)を考慮して変更判定を行ってもよい。
 なお、SCellが複数ある場合は、図示しないが、最も無線回線品質の良いSCellを選択し、変更対象としてもよい。以降、SCellが1つの場合と同様に処理する。
 PCellとSCellの変更が必要と判断した端末は、PCell、SCell変更要求信号を作成し、基地局に対して通知する。図29に示すように、PCell、SCell変更要求信号は、符号化され、無線チャネル(無線制御チャネルまたは無線共有チャネル)にマッピングされる。そして、変調の後、無線周波数に変換されて(無線信号化され)、増幅後にアンテナを介して端末に送信される。符号化については、無線チャネルにマッピング後に符号化する場合と、符号化後に無線チャネルにマッピングする場合の2通りが考えられる。
 基地局は、例えば図30に示したように、無線チャネルを、アンテナを介して受信し、増幅し、ベースバンド信号に周波数変換し、復調・復号し、得られた信号からPCell、SCell変更要求信号を抽出する。
 PCell、SCell変更要求信号(基地局が変更判断する場合は、PCell、SCell変更通知信号(あるいは、変更不要の場合も含めて、変更制御信号とも呼ぶ)となる)は、従来技術で示したように、PCellのCell indexを指定するものであり、SCellのCell indexを指定するものである。
 上記のように作成したPCell、SCell変更制御信号は、図31に示したように、符号化され、無線チャネル(無線制御チャネルまたは無線共有チャネル)にマッピングされ、変調の後、無線周波数に変換されて(無線信号化され)、アンテナを介して端末に送信される。
 なお、PCellに対する変更制御信号は、PCellで伝送される無線チャネルを用いて伝送し、SCellに対する変更制御信号は少なくとも1つのSCellで伝送される無線チャネルを用いて伝送してもよい。また、PCell及びSCellに対する変更制御信号をPCellまたはSCellで伝送される無線チャネルを用いて伝送してもよい。すなわち、ある1つのCellで伝送してもよい。
 上記変更制御信号は、例えば図32に示したように端末で受信される。続いて、抽出した変更制御信号に従い、PCellとSCellの変更を行う。同様に基地局も変更を実施する。
 なお、変更は、変更制御信号に含まれる変更タイミングに基づいて端末及び基地局において同時に実施してもよい。
 図25は、図24の基地局のパイロット信号送信処理の詳細フローチャートである。
 ステップS30において、RS(Reference Signal;Pilot)を作成する。ステップS31において、無線チャネルまたは予め決められて無線リソースにRSをマッピングする。ステップS32において、マッピングされたRSを変調し、ステップS33において、無線信号化(周波数変換(アップコンバート))を行う。ステップS34で、無線信号を増幅し、ステップS35において、アンテナから送信する。
 図26及び図27は、図24の無線回線品質測定処理の詳細フローチャートである。
 図26において、ステップS40において、PCell及びSCell、または、PCell、SCell及び他のCellのRS(Pilot)を受信する。ステップS41において、RSを復調する。ステップS42において、無線回線品質測定及び算出を行う。無線回線品質としては、前述のRSRP、RSRQ、SIRなどがある。
 あるいは、図27のような処理とすることも可能である。ステップS43において、PCell及びSCellまたは、PCell、SCell及び他のCellのRSをアンテナで受信する。ステップS44において、RSを増幅し、ステップS45において、ベースバンド信号化(周波数変換(ダウンコンバート))をし、ステップS46において、RSを復調する。ステップS47において、無線回線品質測定及び算出を行う。
 図28は、図24のPCell、SCell変更判定処理のフローチャートである。
 ステップS50において、無線回線品質情報(たとえば、RSRP)を受信し、ステップS51において、SCellのRSRPのほうが、PCellのRSRPより大きいか(品質がよいか)を判断する。ステップS51の判断がNoの場合には、ステップS50に進む。ステップS51の判断がYesの場合には、ステップS52において、PCell、SCell変更要求信号を作成する。
 図29は、図24のPCell、SCell変更要求信号の送信処理のフローチャートである。
 ステップS53において、PCell、SCell変更要求信号を作成し、ステップS54において、符号化する。ステップS55において、これを無線チャネルにマッピングし、ステップS56において、変調して、ステップS57において、無線信号化(周波数変換(アップコンバート))する。ステップS58において、無線信号を増幅し、ステップS59において、アンテナから送信する。
 図30は、図24におけるPCell、SCell変更要求信号の受信処理のフローチャートである。
 ステップS60において、無線チャネルを、アンテナを介して受信し、ステップS61において、これを増幅する。ステップS62において、これを、ベースバンド信号化(周波数変換(ダウンコンバート))し、ステップS63において、復調し、ステップS64で復号し、ステップS65において、PCell、SCell変更要求信号を抽出する。
 図31は、図24のPCell、SCell変更通知の送信処理のフローチャートである。
 ステップS70において、PCell、SCell変更通知信号を作成する。ステップS71において、符号化し、ステップS72において、無線チャネルにこれをマッピングし、ステップS73において、変調し、ステップS74において、無線信号化(周波数変換(アップコンバート))する。ステップS75において、これを増幅し、ステップS76において、アンテナから送信する。
 図32は、図24におけるPCell、SCell変更通知の受信処理のフローチャートである。
 ステップS77において、PCell、SCell変更通知の無線チャネルを、アンテナを介して受信し、ステップS78において、増幅する。ステップS79において、これをベースバンド信号化(周波数変換(ダウンコンバート))し、ステップS80において、復調し、ステップS81において、復号する。ステップS82において、PCell、SCell変更通知信号を抽出する。
 図33~図35は、図24のPCell、SCell変更制御及び通知の処理フローチャートである。
 図33は、SCellの変更通知をSCellで通知する場合である。図34は、PCellの変更通知をPCellで通知する場合である。図35は、PCell、SCellの変更通知をPCellまたはSCellで通知する場合である。
 図33では、ステップS95において、SCellをPCellに変更する制御信号を作成する。ステップS96において、制御信号を符号化し、ステップS97において、無線チャネルにマッピングし、ステップS98において、変調する。ステップS99において、これを無線信号化(周波数変換(アップコンバート))し、ステップS100で増幅し、ステップS101でアンテナから送信する。
 図34では、ステップS105において、PCellをSCellに変更する制御信号を作成する。ステップS106において、これを符号化し、ステップS107において、無線チャネルにマッピングし、ステップS108において、変調する。そして、ステップS109において、無線信号化(周波数変換(アップコンバート))し、ステップS110において、増幅し、ステップS111において、アンテナから送信する。
 図35では、ステップS115において、SCellをPCellに変更する制御信号を作成する。ステップS116においては、PCellをSCellに変更する制御信号を作成する。ステップS117及びステップS117aにおいて、これらを符号化し、ステップS118において、無線チャネルにマッピングする。ステップS117の符号化は、符号化部を1つだけ設け、それぞれの制御信号を符号化しても良いし、符号化部を2つ設け、ステップS117aのように、並列して符号化しても良い。ステップS119において、これを変調し、ステップS120において、無線信号化(周波数変換(アップコンバート))し、ステップS121において、増幅し、ステップS122において、アンテナから送信する。
 以上の実施形態により、以下の効果が得られる。
・ハードハンドオーバ(例えば異周波数ハンドオーバ)による回線断がない。
・2CCでの通信を維持する。
・従来の方法より、変更に必要となる期間が短い。
 本実施形態では、ハードハンドオーバを行わないので、回線断が生じない。また、CCの数(すなわち帯域幅)を減らすことが無いので、通信帯域が広いまま維持される。更に、従来の変更はハードハンドオーバとなっていたため、回線を切断し、再接続する必要があった。そのため、回線を再接続するとき、同期確立の処理や、ランダムアクセスなどを実施しなければならなかったため、変更時間が大きかった。本実施形態では、回線が維持されたままなので、同期確立やランダムアクセス処理を行う必要が無く、変更時間が短縮できる。
 更に、以上により、伝送速度の低下が小さい、または、低下が生じないという効果が得られる。また、伝送遅延を小さくすることができる。
 図36~図42は、本実施形態の第2の構成例を説明する図である。
 第1の構成例では、端末UEがPCellとSCellの変更の必要を判断し、基地局eNBに対してPCell、SCell変更要求を通知した。第2の構成例では、端末UEが測定し、基地局eNBに報告(通知)した無線回線品質を基に、基地局eNBが、PCellとSCellの変更の必要を判断する。
 図36は、基地局のブロック図である。図37は、端末のブロック図である。図36において、図21と同様の構成要素には同様の参照符号を付す。図37において、図22と同様の構成要素には同様の参照符号を付す。
 端末UEは、基地局eNBが送信したパイロット信号を受信し、無線回線品質測定及び算出部27において無線回線品質を測定する。なお、測定はPCellとSCellのみ測定してもよいし、基地局eNBが送信する全てのCC(すなわち、PCell及びSCell以外のCCも含む)を測定してもよい。
 この無線品質測定結果を、無線回線品質情報作成部37に通知する。無線回線品質情報作成部37は、算出式等を基に測定結果を離散的な数値とし、無線回線品質(Channel Quality)または無線回線品質指標(CQI: Channel Quality Indicator)を求める。以後無線回線品質と総称する。求められた無線回線品質を符号化・変調部32において、符号化・変調を施し、送信無線部33において無線信号に変換し、アンテナ34を介して基地局eNBへ送信する。なお、全てのCCにおいて測定した無線回線品質をPCellでのみ送信してもよいし、測定したCCで無線回線品質を送信してもよい。
 アンテナ13を介して無線回線品質を受信した基地局eNBは、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において、復調し、復号することで信号を受信信号として再生する。無線回線品質情報抽出部21は、再生された受信信号から少なくともPCell及びSCellの無線回線品質を抽出し、帯域制御部20へ通知する。
 帯域制御部20は、少なくともPCell及びSCellの無線回線品質を基に、PCellと他のSCellの無線回線品質を比較する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき帯域制御部20は、PCellとSCellの変更(交換)が必要と判断する。
 その他の動作は、第1の構成例と同様である。
 以下に、基地局が変更判断を行う場合の詳細を説明する。
 図38に示す処理シーケンス例の詳細について、以下に説明する。なお、端末判断時と同じ動作については説明を省略する。
 端末判断時と同様に、無線回線品質を測定・算出した端末は、算出した無線回線品質情報を基地局へ通知する。なお、無線回線品質情報とは、上記で説明のように、測定した無線回線品質を基に算出した値、または、それを離散的な値としたものである。この無線回線品質情報を、図33~図35における変更制御(通知)信号送出時と同様に符号化し、上り制御チャネルにマッピングし、変調し、無線信号に周波数変換しアンテナを介して基地局へ送信する。
 なお、無線回線品質情報は、PCellまたはSCellでのみ送信しても良いし、PCell及びSCellで送信してもよい。
 端末から無線回線品質情報を受信した基地局は、少なくともPCell及びSCellの無線回線品質を基に、PCellと他のSCellの無線回線品質を比較する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき帯域制御部20は、PCellとSCellの変更(交換)が必要と判断する。判断後の動作は、第1の構成例と同様の動作をする。
 図39は、無線回線品質情報の送信処理のフローチャートである。
 図39では、ステップS130において、無線回線品質情報を作成する。ステップS131において、無線回線品質情報を符号化し、ステップS132において、無線チャネルにマッピングし、ステップS133において、変調する。ステップS134において、これを無線信号化(周波数変換(アップコンバート))し、ステップS135で増幅し、ステップS136でアンテナから送信する。
 図40は、無線回線品質情報の送信処理の別の例のフローチャートである。
 図40では、ステップS137において、PCellの無線回線品質情報を作成する。ステップS138においては、SCellの無線回線品質情報を作成する。ステップS139及びステップS139aにおいて、これらを符号化し、ステップS140において、無線チャネルにマッピングする。ステップS139の符号化は、符号化部を1つだけ設け、それぞれの制御信号を符号化しても良いし、符号化部を2つ設け、ステップS139aのように、並列して符号化しても良い。ステップS141において、これを変調し、ステップS142において、無線信号化(周波数変換(アップコンバート))し、ステップS143において、増幅し、ステップS144において、アンテナから送信する。
 図41は、基地局における無線回線品質情報の受信処理のフローチャートである。
 ステップS145において、無線チャネルを、アンテナを介して受信し、ステップS146において、増幅する。ステップS147において、これをベースバンド信号化(周波数変換(ダウンコンバート))し、ステップS148において、復調し、ステップS149において、復号する。ステップS150において、無線回線品質情報を抽出する。
 続いて、PCell、SCellの変更判定について説明する。基地局は、端末から通知された少なくともPCellとSCellの無線回線品質を基に変更判定を行う。例えば、SCellの無線回線品質(または無線回線品質情報)とPCellの無線回線品質(または無線回線品質情報)とを比較し、前者が良い場合は、PCellとSCellを変更することが必要と判断する。また、PCellの無線回線品質(または無線回線品質情報)とSCellの無線回線品質情報(または無線回線品質情報)に他の要素(例えばセルの優先度や変更が頻繁に生じないようにするためのパラメータ等)を考慮して変更判定を行ってもよい。
 なお、SCellが複数ある場合は図示しないが、例えば最も無線回線品質の良いSCellを選択するなどSCellが一つの場合と同様に判定を行う。以降、SCellが1つの場合と同様に処理する。
 PCellとSCellの変更が必要と判断した基地局は、PCell、SCell変更要求信号を作成し、端末に対して通知する。PCell、SCell変更要求信号は、符号化され、無線チャネル(無線制御チャネルまたは無線共有チャネル)にマッピングされ、変調の後、無線周波数に変換されて(無線信号化され)、アンテナを介して端末に送信される。
 これは無線チャネルにマッピング後に符号化する場合と符号化後に無線チャネルにマッピングする場合の2通りが考えられるためである。
 図42は、図38におけるPCell、SCell変更判定処理のフローチャートである。
 ステップS151において、無線回線品質情報(たとえば、RSRP)を受信し、ステップS152において、SCellのRSRPのほうが、PCellのRSRPより大きいか(品質がよいか)を判断する。ステップS152の判断がNoの場合には、ステップS151に進む。ステップS152の判断がYesの場合には、ステップS153において、PCell、SCell変更要求信号を作成する。
 図43~図48は、本実施形態の第3の構成例を説明する図である。
 第1の構成例では、Cross Carrier Schedulingの実施の如何を問わない状態で、PCellとSCellの変更を同時または順次変更することとした。第3の構成例では、Cross Carrier Schedulingを実施している場合に、全てのCell、または、PCellに変更するSCellをNon-scheduling CellからScheduling Cellへ変更し、その後、PCellとSCellの変更を同時または順次実行する。
 つまり、変更対象のCell(またはCC)を、変更の過程において、Non-scheduling CellからScheduling Cellへと変更する。
 図43において、(1)では、CC1がPCellでScheduling Cellであり、CC2がSCellでNon-scheduling Cellである。ここで、SCellをScheduling Cellに変更する。すなわち、SCellのPDCCHをSCellで伝送する。(2)では、CC1とCC2の両方が、Scheduling Cellとなっている。そして、PCellとSCellの設定を変更(交換)する。(3)では、CC1がSCellとなり、CC2がPCellとなる。ここまでで、処理を終了してもよいが、Cross Carrier Schedulingに戻すために、SCell(CC1)をNon-scheduling Cellに変更する。すなわち、SCell用のPDCCHをPCellで伝送する。(4)において、CC1がSCellでNon-scheduling Cellとなり、CC2がPCellでScheduling Cellとなる。
 図44の(1)~(4)は、図43の(1)~(4)にそれぞれ対応している。最初、(1)では、CC1がPCellで、Scheduling Cellなので、下り無線制御チャネルPDCCHと下り共有チャネルPDSCHを有している。CC2は、SCellで、Non-scheduling Cellであるので、PDSCHのみを有している。SCellをScheduling Cellとすることにより、PCellで送信していたSCell用のPDCCHが取り除かれ、SCellにSCell用のPDCCHが追加される。言い換えれば、SCell用のPDCCHをPCellからSCellへと移したことになる。(2)で、CC1、CC2とも、PDCCHとPDSCHを有するようになる。(3)で、CC1がSCellに、CC2がPCellに変更されている。(4)で、CC1がNon-scheduling Cellに、CC2がScheduling Cellに設定されている。すなわち、CC1(新しいSCell)で伝送されていたCC1(新しいSCell)のためのPDCCH削除(または解放)し、CC2(新しいPCell)にCC1(新しいSCell)のためのPDCCHを追加する。これにより、CC1(新しいSCell)は、PDSCHのみを有し、CC2(新しいPCell)は、PDCCHとPDSCHを有するようになる。
 図45は、基地局のブロック構成図である。図46は、端末のブロック構成図である。図45において、図21と同様の構成要素には同様の参照符号を付して、それらの説明を省略する。また、図46において、図22と同様の構成要素には同様の参照符号を付して、それらの説明を省略する。
 端末UEがPCell、SCell変更の必要を判断し、基地局eNBに対してPCell、SCell変更要求を通知する。
 これを受けた基地局eNBは、帯域制御部20において、少なくとも変更対象であり、Non-scheduling CellであるSCellをNon-scheduling CellからScheduling Cellへと変更することを端末に通知する。具体的には、そのNon-scheduling Cellに対して制御信号を伝送するScheduling Cellの下り無線制御チャネルを、Non-scheduling Cellに変更する。変更に際しては、Scheduling Cell(PCellまたは他のSCell)の下り無線制御チャネルを用いて変更に関する情報や変更通知を伝送する。なお、これらは、第1の構成例で説明したように、無線回線再設定メッセージ(RRCConnectionReconfiguration message)に含まれる制御信号としてもよい。また、変更タイミングも合わせて通知してもよい。なお、全てのSCellをScheduling Cellに変更してもよい。具体的には、TS36.331 6.3.2 CrossCarrierSchedulingConfig IEのschedulingCellIdとして通知してもよい。
 これを受けた端末UEと基地局eNBは、少なくとも変更対象であり、Non-scheduling CellであるSCellをNon-scheduling CellからScheduling Cellに変更すると共に、変更対象であり、Non-scheduling CellであるSCellのための下り無線制御チャネル(PDCCH)をscheduling CellであるPCellからScheduling CellになったSCellへ変更する。(PCellのPDCCHを削除(解放)し、SCellにPDCCHを追加(設定)する。)
 なお、上記SCellのScheduling Cellへの変更が、端末UEにおいて問題なく実施できた場合には無線回線再設定完了メッセージ(RRCConnectionReconfigurationComplete message)を、端末UEから基地局eNBへ返信してもよい。更に失敗した場合には、端末UEから基地局eNBに対して無線回線再設定失敗を通知するとしてもよい。
 続いて、第1の構成例と同様にPCellとSCellとを変更(交換)する。なお、変更(交換)に際して送信される変更(交換)要求の制御信号は、PCellかSCellのどちらか一方のみの下り無線制御チャネルPDCCHか、またはPCellとSCellの両方の下り無線制御チャネルPDCCHで伝送する。
 PCellとSCellの変更(交換)が完了した時点では、PCell(元SCell)とSCell(元SCell)または、PCell(元SCell)とSCell(元PCell)及び他のSCell(元SCell)は、Scheduling Cellである。この状態でPCellとSCellの変更を終了してもよい。
 続いて、変更の対象となったSCell(元PCell)をScheduling CellからNon-scheduling Cellへ変更する。具体的には、PCell(元SCell)かSCell(元PCell)のどちらか一方の下り無線制御チャネルPDCCHか、または両方の下り無線制御チャネルPDCCHでSCell(元PCell)をScheduling CellからNon-scheduling Cellへ変更する。変更に際しては、第1の構成例と同様に無線回線再設定完了メッセージ(RRCConnectionReconfigurationComplete message)に含まれる制御信号としてもよい。上記では変更のための制御信号を下り無線制御チャネルPDCCHを用いて伝送するとして説明したが、下り共有データチャネルPDSCHを用いて伝送するとしてもよい。
 図47は、第3の構成例の処理の流れを示すシーケンス図である。
 基地局からは、RS(Pilot)が送出される。端末では、無線回線品質を測定する。たとえば、RSRPを測定する。そして、少なくともPCellとSCellの無線回線品質を基に変更判定を行う。例えば、SCellの無線回線品質(または無線回線品質情報)とPCellの無線回線品質(または無線回線品質情報)とを比較し、前者が良い場合は、PCellとSCellを変更することが必要と判断する。また、PCellの無線回線品質(または無線回線品質情報)とSCellの無線回線品質情報(または無線回線品質情報)に他の要素(例えばセルの優先度や変更が頻繁に生じないようにするためのパラメータ等)を考慮して変更判定を行ってもよい。変更が必要と判定された場合PCell、SCell変更要求を端末から基地局に送信する。基地局は、PCell、SCell変更制御を行う。そして、基地局から端末に、SCellをScheduling Cellに変更する通知を行い、SCellをScheduling Cellに設定する。すなわち、PCell(すなわちScheduling Cell)で伝送されていたSCell(すなわちNon-Scheduling Cell)のための下り無線制御チャネルPDCCHを解放(削除)し、SCellにSCellのための下り無線制御チャネルPDCCHを追加(設定)する。次に、基地局から端末に、PCell、SCell変更通知を送信する。次に、基地局から端末に、SCellをNon-scheduling Cellに変更する通知を行う。そして、SCellをNon-scheduling Cellに設定する。すなわち、SCell(すなわちScheduling Cell)で伝送されていたSCellのの下り無線制御チャネルPDCCHを解放(削除)し、PCellに、SCellのための下り無線制御チャネルPDCCHを追加(設定)する。
 図48は、第3の構成例の処理の流れを示すフローチャートである。
 ステップS160において、無線回線品質測定を行い、ステップS161において、PCellとするセルを選択する。ステップS162において、PCell、SCell変更要求を送信する。ステップS163において、SCellをScheduling Cellとするために、SCell設定変更制御を行う。ステップS164において、PCell、SCell変更制御で、PCellとSCellの設定を変更する。ステップS165において、SCell設定変更制御で、SCellをNon-scheduling Cellとする。
 第3の構成例では、Non-scheduling CellをScheduling Cellに設定するのは、PDCCHの設定を変えることによって行わる。具体的には、基地局がそれまでPCellで伝送していたPDCCHを、SCellで伝送するよう変更することによって実現される。
 図49~図51は、本実施形態の第4の構成例を説明する図である。
 図49は、基地局のブロック構成図であり、図50は、端末のブロック構成図である。図49において、図36と同様の構成要素には同様の参照符号を付して、それらの説明を省略する。また、図50において、図37と同様の構成要素には同様の参照符号を付して、それらの説明を省略する。
 第4の構成例では、第3の構成例において、基地局が変更判断を行う場合を示す。
 第3の構成例に対して、第2の構成例の基地局によるPCell、SCell変更の判断を適用する。
 すなわち、端末UEは、基地局eNBが送信したパイロット信号(RS)を受信し、無線回線品質測定及び算出部27において無線回線品質を測定する。なお、測定はPCellとSCellのみ測定してもよいし、基地局eNBが送信する全てのCC(すなわち、PCell及びSCell以外のCCも含む)を測定してもよい。
 この無線品質測定結果を、無線回線品質情報作成部37に通知する。無線回線品質情報作成部37は、算出式等を基に測定結果を離散的な数値とし、無線回線品質(Channel Quality)または無線回線品質指標(CQI: Channel Quality Indicator)を求める。求められた無線回線品質を符号化・変調部32において、符号化し、変調を施し、送信無線部33において無線信号に変換し、アンテナ34を介して基地局eNBへ送信する。なお、測定した無線回線品質をPCellでのみ送信してもよいし、測定したCCで無線回線品質を送信してもよい。
 アンテナ13を介して無線回線品質を受信した基地局eNBは、受信無線部16において無線信号をベースバンド信号に変換し、復調・復号部17において、復調し、復号することで信号を受信信号として再生する。無線回線品質情報抽出部21は、再生された受信信号から少なくともPCell及びSCellの無線回線品質を抽出し、帯域制御部20へ通知する。
 帯域制御部20は、少なくともPCell及びSCellの無線回線品質を基に、PCellと他のSCellの回線品質とを基にPCell及びSCellの変更の必要性を判断する。ここでは、SCell(CC2)の無線回線品質がPCell(CC1)の無線回線品質より良好であるとする。このとき帯域制御部20は、PCellとSCellの変更(交換)が必要と判断する。
 以下は、第3の構成例と同様に動作する。
 図51は、第4の構成例の処理の流れを示すシーケンス図である。
 図51において、RSを基地局から受信した端末は、無線回線品質測定を行い、無線回線品質の報告を基地局に送る。基地局は、PCell、SCell変更判定を行う。例えば、SCellの無線回線品質がPCellの無線回線品質より良い場合、PCellとSCellの変更が必要と判断する。続いて基地局はSCellをScheduling Cellに変更することを端末に通知する。そして、SCellをScheduling Cellに設定し、SCellの無線制御チャネルをSCellに設定する。次に、基地局はPCellとSCellを変更することを端末に通知する。無線回線を維持したまま、PCellとSCellを変更する処理が行われる。そして、基地局は端末に対して、SCellをNon-scheduling Cellに変更することを通知する。そして、SCellをNon-scheduling Cellに設定される。これにより、SCellの無線制御チャネルが削除(または解放)され、その無線制御チャネルがPCellに設定される。
 なお、SCell (Scheduling cell)とSCell (Non-scheduling cell)の変更処理については、第3の構成例のPCellとSCellとをSCell (Scheduling cell)とSCell (Non-scheduling cell)とに変更するだけで、ほぼ同様の動作となるので、説明を省略する。
 以上、本実施形態によれば、PCell及びSCellの変更時に、以下により、従来の方法と比較し、伝送遅延が発生しない、または増加しない。また、伝送速度の低下が生じない。すなわち、伝送遅延を低減できる。また、コンポーネントキャリア数を減少しないので、従来に比べて伝送速度を改善できる。
・ハードハンドオーバを実施しない。
・接続するコンポーネントキャリア数を削減しない。
 また、上記により、従来と比較しPCellとSCellの変更に要する時間を短縮することができる。すなわち、PCellとSCellの変更に際し、本実施形態では、回線を切断しないので、改めて同期確立やランダムアクセスなどを実施する必要が無いので、従来に比べ本実施形態のほうが変更にかかる時間を短縮できる。
10   パイロット信号作成部
11、32   符号化・変調部
12、33   送信無線部
13、34   アンテナ
14   ハンドオーバ制御信号作成部
15   帯域制御信号作成部
16、25   受信無線部
17、26   復調・復号部
18   ハンドオーバ要求信号抽出部
19、30   ハンドオーバ制御部
20、35   帯域制御部
21   無線回線品質情報抽出部
27   無線回線品質測定及び算出部
28   帯域制御情報抽出部
29   ハンドオーバ制御信号抽出部
31   ハンドオーバ要求信号作成部
36   端末設定及び送受信制御部
37   無線回線品質情報作成部
40   PCell、SCell変更要求信号抽出部
41   PCell、SCell変更要求信号抽出部
50,50a,55,55a   送信部
51,51a,54,54a   制御部
52,52a,53,53a   受信部

Claims (17)

  1. 複数の帯域を集約して無線通信装置間でデータ伝送を行う無線通信装置であって、
     第1のデータを第1の帯域で伝送させ、第2のデータを前記第1の帯域とは異なる他の帯域である第2の帯域で伝送させ、前記第1の帯域で伝送される第1のデータを伝送するための第1の制御信号と前記第2の帯域で伝送される第2のデータを伝送するための第2の制御信号とを前記第1の帯域で伝送させる帯域制御部を備え、
     前記帯域制御部は、該第1の帯域と該第2の帯域と帯域を変更する処理を開始する際に、前記第2の制御信号を前記第2の帯域で伝送させる動作状態に移行した後、前記帯域の変更処理を実行することを特徴とする無線通信装置。
  2.  前記帯域制御部は、前記帯域の変更処理を開始する際に、前記第2の制御信号を前記第2の帯域で伝送させる動作状態に移行した後も、前記第1の制御信号を前記第1の帯域で伝送させることを特徴とする請求項1に記載の無線通信装置。
  3.  前記帯域制御部は、前記第2の制御信号を前記第2の帯域で伝送させる動作状態に移行した後に、前記第1の帯域を新たな第2の帯域とし、前記第2の帯域を新たな第1の帯域とする変更を行い、前記第2の制御信号を該新たな第1の帯域で伝送するように変更することを特徴とする請求項2に記載の無線通信装置。
  4.  前記帯域制御部は、
     該第1の帯域の無線回線品質と第2の帯域の無線回線品質を基に、変更を行うことを特徴とする請求項1に記載の無線通信装置。
  5.  前記無線回線品質は、自無線通信装置の無線回線品質測定部で測定されることを特徴とする請求項4に記載の無線通信装置。
  6.  前記無線回線品質は、通信相手の無線通信装置から送信され、受信部において受信されたものであることを特徴とする請求項4に記載の無線通信装置。
  7.  前記第2の制御信号の伝送方法の変更と、前記第1の帯域及び前記第2の帯域の変更を行うための制御信号を作成する帯域制御信号作成部と、
    該制御信号を通知する送信部、
    を更に備えることを特徴とする請求項1に記載の無線通信装置。
  8.  前記帯域制御部は、通信相手の無線通信装置からの要求に従い、前記第1の帯域と前記第2の帯域の変更を制御することを特徴とする請求項1に記載の無線通信装置。
  9.  請求項1の無線通信装置を備えた基地局。
  10.  請求項1の無線通信装置を備えた端末。
  11.  複数の帯域を同時に用いて、基地局と端末間でデータ伝送を行う無線通信システムにおいて、
     ある端末との通信に用いている第1の帯域及び一つまたは複数の第2の帯域に対して、該第2の帯域の一つの帯域を新たな第1の帯域とし、該第1の帯域を第2の帯域または第2の帯域の一つに変更すること制御する帯域制御部と、
     該新たな第1の帯域及び該新たなの第2の帯域に関する情報を端末に通知する帯域情報通知部と
     該変更後の第1の帯域及び該変更後の第2の帯域を用いてデータ通信行う送信部及び受信部と、
    を備えた基地局と
     該基地局から通知された該新たな第1の帯域及び新たな第2の帯域に関する情報を受信する受信部と、
    を備えた端末と、
    を備えることを特徴とする無線通信システム。
  12.  前記基地局は、
     受信部において、前記端末より通知された第1及び少なくとも一つの第2の帯域の無線回線品質情報を受信する、
    ことを特徴とする請求項11に記載の無線通信システム。
  13.  前記端末は、
     該第1の帯域と該第2の帯域において、無線回線品質を測定する測定部と
     該測定結果を前記基地局へ通知する送信部と、
    を更に備える
    ことを特徴とする請求項11に記載の無線通信システム。
  14.  前記基地局は、
     前記第1の帯域及び前記第2の帯域を用いてデータ伝送を行うための第1及び第2の制御信号を作成する帯域制御信号作成部と、
     該第1帯域を用いて、該第1及び第2の制御信号を送信する送信部と
    を更に備える
    ことを特徴とする請求項11に記載の無線通信システム。
  15.  前記基地局は、
     前記新たな第1の帯域及び前記新たな第2の帯域を用いてデータ伝送を行うための第1及び第2の制御信号を作成する帯域制御信号作成部と、
     該新たな第1帯域を用いて、該第1及び第2の制御信号を送信する送信部と
    を更に備える
    ことを特徴とする請求項11に記載の無線通信システム。
  16.  第1のデータと該第1のデータを伝送するための第1の制御信号と、第2の周波数範囲の第2の帯域で伝送される第2のデータのための第2の制御信号とを、第1の周波数範囲で伝送する第1の帯域と、第2のデータを伝送する第2の帯域とを同時に用いて、無線通信装置間でデータ伝送を行う無線通信方法において、
     該第2の帯域の無線回線品質が、該第1の帯域の無線回線品質より良い場合には、回線接続を維持したまま、該第1の帯域を該第2の周波数範囲に変更し、該第2の帯域を該第1の周波数範囲に変更する設定を行う、
    ことを特徴とする無線通信方法。
  17.  複数の帯域を同時に用いて、基地局と少なくとも一つの端末間でデータ伝送を行う無線通信システムにおける通信方法において、
     該基地局は、
     ある端末との通信に用いている第1の帯域及び少なくとも一つの第2の帯域に対して、該第1の帯域を新たな少なくとも一つの第2の帯域に変更し、該第2の帯域の中の一つの帯域を新たな第1の帯域に変更し、
     該新たな第1の帯域及び該新たな第2の帯域に関する情報を端末に通知し、
     該端末は、
     該基地局から通知された、該新たな第1の帯域及び該新たな第2の帯域に関する情報を受信することを特徴とする無線通信方法。
PCT/JP2012/057082 2012-03-19 2012-03-19 無線通信装置 WO2013140533A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/057082 WO2013140533A1 (ja) 2012-03-19 2012-03-19 無線通信装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/057082 WO2013140533A1 (ja) 2012-03-19 2012-03-19 無線通信装置

Publications (1)

Publication Number Publication Date
WO2013140533A1 true WO2013140533A1 (ja) 2013-09-26

Family

ID=49222027

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/057082 WO2013140533A1 (ja) 2012-03-19 2012-03-19 無線通信装置

Country Status (1)

Country Link
WO (1) WO2013140533A1 (ja)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015141842A1 (ja) * 2014-03-20 2015-09-24 京セラ株式会社 通信制御方法及びユーザ端末
WO2015159399A1 (ja) * 2014-04-16 2015-10-22 富士通株式会社 システム、基地局および端末
JP2016005261A (ja) * 2014-06-19 2016-01-12 富士通株式会社 基地局装置
CN108029103A (zh) * 2015-09-29 2018-05-11 华为技术有限公司 一种载波聚合技术中载波选择方法和设备
CN109565719A (zh) * 2016-08-03 2019-04-02 瑞典爱立信有限公司 用于主小区改变的方法、设备和计算机程序
JP2019510445A (ja) * 2016-04-01 2019-04-11 華為技術有限公司Huawei Technologies Co.,Ltd. モビリティ管理方法、装置、及びシステム
US10555298B2 (en) 2014-04-11 2020-02-04 Fujitsu Limited Wireless communication system, base station, and terminal
US10575190B2 (en) 2014-04-04 2020-02-25 Fujitsu Limited Wireless communication system, base station, and terminal for selecting at least one cell from among multiple cells
JP2021022937A (ja) * 2016-08-03 2021-02-18 テレフオンアクチーボラゲット エルエム エリクソン(パブル) プライマリセル変更のための方法、デバイス及びコンピュータプログラム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011105138A1 (ja) * 2010-02-25 2011-09-01 ソニー株式会社 ハンドオーバを制御するための方法、端末装置、基地局及び無線通信システム
JP2012039467A (ja) * 2010-08-09 2012-02-23 Panasonic Corp 無線通信装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011105138A1 (ja) * 2010-02-25 2011-09-01 ソニー株式会社 ハンドオーバを制御するための方法、端末装置、基地局及び無線通信システム
JP2012039467A (ja) * 2010-08-09 2012-02-23 Panasonic Corp 無線通信装置

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10172054B2 (en) 2014-03-20 2019-01-01 Kyocera Corporation Communication control method and user terminal
WO2015141842A1 (ja) * 2014-03-20 2015-09-24 京セラ株式会社 通信制御方法及びユーザ端末
JPWO2015141842A1 (ja) * 2014-03-20 2017-04-13 京セラ株式会社 通信制御方法及びユーザ端末
US10575190B2 (en) 2014-04-04 2020-02-25 Fujitsu Limited Wireless communication system, base station, and terminal for selecting at least one cell from among multiple cells
US10555298B2 (en) 2014-04-11 2020-02-04 Fujitsu Limited Wireless communication system, base station, and terminal
US10257778B2 (en) 2014-04-16 2019-04-09 Fujitsu Limited Wireless communication system, base station, and terminal
WO2015159399A1 (ja) * 2014-04-16 2015-10-22 富士通株式会社 システム、基地局および端末
JPWO2015159399A1 (ja) * 2014-04-16 2017-04-13 富士通株式会社 無線通信システム、基地局および端末
JP2016005261A (ja) * 2014-06-19 2016-01-12 富士通株式会社 基地局装置
JP2018528724A (ja) * 2015-09-29 2018-09-27 ホアウェイ・テクノロジーズ・カンパニー・リミテッド キャリアアグリゲーション技術におけるキャリア選択方法およびデバイス
CN108029103A (zh) * 2015-09-29 2018-05-11 华为技术有限公司 一种载波聚合技术中载波选择方法和设备
KR20180059508A (ko) * 2015-09-29 2018-06-04 후아웨이 테크놀러지 컴퍼니 리미티드 캐리어 어그리게이션 기술에서의 캐리어 선택 방법과 장치
KR102041174B1 (ko) * 2015-09-29 2019-11-06 후아웨이 테크놀러지 컴퍼니 리미티드 캐리어 어그리게이션 기술에서의 캐리어 선택 방법과 장치
JP2019510445A (ja) * 2016-04-01 2019-04-11 華為技術有限公司Huawei Technologies Co.,Ltd. モビリティ管理方法、装置、及びシステム
US10721658B2 (en) 2016-04-01 2020-07-21 Huawei Technologies Co., Ltd. Mobility management method, apparatus, and system
CN109565719A (zh) * 2016-08-03 2019-04-02 瑞典爱立信有限公司 用于主小区改变的方法、设备和计算机程序
JP2019523594A (ja) * 2016-08-03 2019-08-22 テレフオンアクチーボラゲット エルエム エリクソン(パブル) プライマリセル変更のための方法、デバイス及びコンピュータプログラム
JP2021022937A (ja) * 2016-08-03 2021-02-18 テレフオンアクチーボラゲット エルエム エリクソン(パブル) プライマリセル変更のための方法、デバイス及びコンピュータプログラム
US10945176B2 (en) 2016-08-03 2021-03-09 Telefonaktiebolaget Lm Ericsson (Publ) Method, device and computer program for primary cell change
CN109565719B (zh) * 2016-08-03 2021-04-02 瑞典爱立信有限公司 用于主小区改变的方法、设备和计算机程序

Similar Documents

Publication Publication Date Title
US10536986B2 (en) Control method for supporting multiple connections in mobile communication system and apparatus for supporting multiple connections
WO2013140533A1 (ja) 無線通信装置
US11812491B2 (en) Communications device, infrastructure equipment, mobile communications network and methods
JP6862363B2 (ja) 無線通信システムにおける通信方法及び装置
JP5059062B2 (ja) 通信システム、移動局装置および基地局装置
CN110583044B (zh) 移动通信网络、通信装置、基础设施设备和方法
WO2015141825A1 (ja) 端末装置、および、基地局装置
US20200314725A1 (en) Method and apparatus for carrier aggregation communication in wireless communication system
KR102459886B1 (ko) 무선 통신 시스템에서 복수의 셀을 사용한 통신을 위한 방법 및 장치
TW201127114A (en) Method and apparatus for performing component carrier-specific reconfiguration
KR20220017967A (ko) 무선 통신 시스템에서 반송파 결합 통신 방법 및 장치
JP2015070300A (ja) 通信制御方法、基地局、及びユーザ端末
CN107454622B (zh) 一种配置无线资源的方法及基站和用户终端
KR102445757B1 (ko) 무선 이동 통신 시스템에서 세컨더리 기지국을 변경하는 방법 및 장치
KR102445759B1 (ko) 무선 이동 통신 시스템에서 세컨더리 기지국을 변경하는 방법 및 장치
KR102470541B1 (ko) 무선 이동 통신 시스템에서 세컨더리 기지국을 변경하는 방법 및 장치
KR102445758B1 (ko) 무선 이동 통신 시스템에서 세컨더리 기지국을 변경하는 방법 및 장치
WO2014203298A1 (ja) 無線通信方法、無線通信システム、無線局および無線端末
KR102357413B1 (ko) 무선 통신 시스템에서 반송파 결합 통신 방법 및 장치
JP2015008541A (ja) 通信システム、移動局装置、基地局装置
KR20230127606A (ko) 무선 이동 통신 시스템에서 부 셀그룹을 활성화하거나 비활성화하는 방법 및 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12871740

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12871740

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP