WO2012100595A1 PCT/CN2011/083180 CN2011083180W WO2012100595A1 WO 2012100595 A1 WO2012100595 A1 WO 2012100595A1 CN 2011083180 W CN2011083180 W CN 2011083180W WO 2012100595 A1 WO2012100595 A1 WO 2012100595A1
Authority
WO
WIPO (PCT)
Prior art keywords
card
insulator
assembly
porcelain
rod
Prior art date
Application number
PCT/CN2011/083180
Other languages
French (fr)
Chinese (zh)
Inventor
闫旭东
张珣
胡川
王星超
胡振
Original Assignee
湖北省电力公司超高压输变电公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 湖北省电力公司超高压输变电公司 filed Critical 湖北省电力公司超高压输变电公司
Publication of WO2012100595A1 publication Critical patent/WO2012100595A1/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Definitions

  • the invention relates to an insulator replacement tool, in particular to a porcelain rod insulator replacement tool.
  • the structural design form of the same tower double-circuit is widely adopted, which not only improves the transmission capacity per unit area of the line corridor, but also meets the power transmission demand, and reduces the overall cost and Line corridor requirements.
  • the ceramic rod insulator on the double-circuit DC transmission line of the same tower there is no working tool suitable for replacing a single ceramic rod insulator.
  • the porcelain rod insulator has a large weight, when the conventional work tool is used, it is necessary to power off the entire transmission line, and the work of replacing the single insulator is performed by placing seven porcelain rod insulators on the ground at the same time. . In this way, it takes a long time and has many operators, which affects the safe and stable operation of the line.
  • the embodiment of the invention provides a porcelain rod insulator replacement tool.
  • the technical solution is as follows:
  • a porcelain rod insulator replacement tool comprises: a front card, a rear card and a take-up system, the two ends of the wire receiving system are respectively connected with the front card and the rear card, and further comprises a lifting system, the lifting system and the front The card and / or the rear card are connected.
  • the lifting system includes two sets of tripod assemblies and two trolleys, and the two sets of tripod assemblies are respectively fixed on the front card and the rear card, and the two trolleys are respectively hung on the two sets of tripod assemblies, so that two
  • the lift system consisting of a tripod assembly and two trolleys provides two lifting points.
  • the steel rod insulator can be lifted to the desired position by the steel rope, which solves the problem of replacing the porcelain due to the large weight of the porcelain rod insulator.
  • the entire transmission line needs to be powered off, and the problem of replacing a single insulator is performed by placing seven porcelain rod insulators on the ground at the same time.
  • the utility model further comprises a connecting rod, the two ends of the connecting rod are respectively connected with the two sets of tripod assemblies, and the two sets of tripod assemblies are connected by the connecting rod, the strength is higher, thereby providing a more stable lifting point.
  • the utility model further comprises a hook assembly, the hook assembly is connected at one end to the front card and/or the rear card, and the other end is connected to the porcelain
  • the rod-shaped insulator groove is matched with the hook structure, so that when the insulator is replaced, the hook-shaped structure end of the hook assembly is hooked on the side parallel ceramic rod insulator groove, which can effectively maintain the balance of the replacement tool.
  • the middle portion of the hook assembly is a retractable screw structure, so that the length of the calcium hook assembly can be adjusted according to actual conditions to ensure that the balance of the replacement tool can be effectively maintained.
  • the take-up system is composed of a hydraulic telescopic assembly and a retractable screw assembly, and the piston rod of the hydraulic telescopic assembly is connected to the screw of the retractable screw assembly, thereby reducing hydraulic expansion and contraction
  • the volume of the hydraulic cylinder of the assembly reduces the construction space occupied by the take-up system, providing more operating space for the operator.
  • the embodiment of the present invention solves the problem that the porcelain rod insulator has a larger weight by adding a lifting system to the front card and/or the rear card.
  • the entire transmission line needs to be powered off.
  • the present invention can be applied to stop and electrify replacement.
  • the time required for the operation process is greatly shortened, the number of operators is greatly reduced, the cost is reduced, and the single-piece ceramic rod insulator can be replaced by the electric charge; and the added hook assembly can effectively maintain the present
  • the balance of the replacement tool on the other hand, the original full hydraulic take-up system is improved into the combined take-up system, which reduces the construction space occupied by the take-up system, provides more operating space for the operator, and uses more Convenience.
  • FIG. 1 is a schematic view showing the structure of a porcelain rod insulator replacement tool provided in an embodiment of the present invention
  • FIG. 2 is a side view of FIG.
  • FIG. 3 is a schematic structural view of a hook assembly in an embodiment of the present invention.
  • FIG. 4 is a schematic structural view of a lifting system in an embodiment of the present invention.
  • Figure 5 is a side elevational view of Figure 3;
  • Figure 6 is a top plan view of Figure 3.
  • the 2 associative further includes a lifting system 4, which is connected to the front card 1 and the rear card 2.
  • the lifting system 4 includes two sets of tripod assemblies 41 and two trolleys 42, respectively, which are respectively fixed on the front card 1 and the rear card 2, and the two pulleys 42 are respectively hung on the two sets of tripod assemblies.
  • the lifting system 4 consisting of two sets of tripod assembly 41 and two trolleys 42 provides two lifting points, and the steel rod insulator can be lifted to the desired position by the steel wire, thereby solving the problem of the ceramic rod type.
  • the weight of the insulator is large, which leads to the power failure of the entire transmission line when replacing the ceramic rod insulator.
  • the problem of replacing the individual insulators is solved by placing seven ceramic rod insulators on the ground at the same time (see Fig. 2).
  • the present invention further includes a connecting rod 43.
  • the two ends of the connecting rod 43 are respectively connected with two sets of tripod assemblies 41. After the two sets of tripod assemblies 41 are connected by the connecting rods 43, the strength is higher, thereby providing more stability. Hanging point (see Figure 4).
  • the present invention further includes a hook assembly 5, wherein the two hook assemblies are connected to the front card 1 and the rear card 2, respectively, and the other end is a hook structure 51 matched with the porcelain rod insulator groove.
  • the hook-shaped end of the hook assembly is hooked to the side parallel ceramic rod insulator groove, which can effectively maintain the balance of the replacement tool (see Fig. 2).
  • the middle portion of the hook assembly 5 is a retractable screw structure 52, so that the length of the hook assembly 5 can be adjusted according to actual conditions to ensure that the balance of the replacement tool can be effectively maintained.
  • the above-mentioned take-up system 3 is composed of a hydraulic telescopic assembly 31 and a retractable screw assembly 32, and the piston rod of the hydraulic telescopic assembly 31 is connected to the screw of the retractable screw assembly 32.
  • the volume of the hydraulic cylinder of the hydraulic telescopic assembly 31 can be reduced, thereby reducing the construction space occupied by the take-up system 3, and providing more operating space for the operator (see FIG. 2).
  • the front card 1 and the rear card 2 of the replacement tool are respectively fixed to the metal joints at both ends of the porcelain rod insulator 6; then, one ends of the two hook assemblies 5 are respectively The front card 1 and the rear card are connected, and the hook structure 51 at the other end hooks the groove of the side parallel ceramic rod insulator 6 and tightens the retractable screw structure 52 of the middle portion to maintain the balance of the replacement tool.
  • the two sets of tripod assemblies 41 are respectively fixed on the front card 1 and the rear card 2, and the two ends of the connecting rod 43 are respectively connected with the two sets of tripod assemblies 41, and the two pulleys 42 are respectively suspended in two sets.
  • the tripod assembly 41 is provided to provide a replacement of the ceramic rod insulator 6 lifting point.
  • the telescopic screw assembly 32 of the take-up system 3 is manually pre-tensioned; then the take-up system 3 is passed.
  • the hydraulic expansion and contraction unit 31 performs the tensioning force, and transfers the tension of the porcelain.
  • the steel rod is then tied to both ends of the ceramic rod insulator 6 to be replaced, and the ceramic rod type is lifted by the pulley 42 of the lifting system 4.
  • the bowl head of the insulator 6 is smoothly taken out and lowered to the ground; then the new porcelain rod insulator 6 is hoisted to the line for replacement; finally, the replacement tool can be removed after the replacement is completed. (See Figure 2).

Landscapes

  • Electric Cable Installation (AREA)

Abstract

A tool for replacing a ceramic rod type insulator which is suitable for replacing an insulator, including: a front block (1), a back block (2), a line take-up system (3), with the two ends of the line take-up system (3) connected to the front block (1) and the back block (2) respectively, and a lifting system (4), with the lifting system (4) connected to the front block (1) and/or the back block (2). By adding the lifting system (4) at the front block (1) and/or the back block (2), the following problem is solved: since the weight of the ceramic rod type insulator is great, there is a need to switch off the whole power transmission circuit when replacing the ceramic rod type insulator, so as to perform the work of replacing a single insulator by putting seven ceramic rod type insulators on the ground at the same time.

Description

一种瓷棒式绝缘子更换工具 技术领域  Porcelain rod insulator replacement tool
本发明涉及一种绝缘子更换工具, 特别涉及一种瓷棒式绝缘子更换工具。  The invention relates to an insulator replacement tool, in particular to a porcelain rod insulator replacement tool.
背景技术 Background technique
目前, 在超高压输电线路工程改造和新建线路工程设计中, 广泛采用了同塔双回的 结构设计形式,不仅提高了线路走廊单位面积输送容量,满足了电力输送需求,而且减少了 综合造价和线路走廊需求。 但由于该同塔双回直流输电线路上的瓷棒式绝缘子应用时间 较短, 所以暂时没有适合更换单个瓷棒式绝缘子的作业工器具。 而且由于该瓷棒式绝缘 子重量较大, 所以在使用传统的作业工器具时, 需要对整条输电线路进行停电, 通过将 七个瓷棒式绝缘子同时放至地面, 从而进行更换单个绝缘子的工作。 这样, 耗费的时间 长、 作业人员多, 影响线路安全、 稳定运行。  At present, in the design of EHV transmission line engineering and new line engineering design, the structural design form of the same tower double-circuit is widely adopted, which not only improves the transmission capacity per unit area of the line corridor, but also meets the power transmission demand, and reduces the overall cost and Line corridor requirements. However, due to the short application time of the ceramic rod insulator on the double-circuit DC transmission line of the same tower, there is no working tool suitable for replacing a single ceramic rod insulator. Moreover, since the porcelain rod insulator has a large weight, when the conventional work tool is used, it is necessary to power off the entire transmission line, and the work of replacing the single insulator is performed by placing seven porcelain rod insulators on the ground at the same time. . In this way, it takes a long time and has many operators, which affects the safe and stable operation of the line.
发明内容 Summary of the invention
为了解决现有技术中由于瓷棒式绝缘子重量较大, 导致更换瓷棒式绝缘子时, 需对 整条输电线路进行停电, 通过将七个瓷棒式绝缘子同时放至地面, 从而进行更换单个绝 缘子的工作的问题, 本发明实施例提供了一种瓷棒式绝缘子更换工具。 所述技术方案如 下:  In order to solve the problem in the prior art, when the ceramic rod insulator is heavy, the ceramic rod insulator is replaced, the entire transmission line needs to be powered off, and the seven insulator insulators are placed on the ground at the same time, thereby replacing the single insulator. The problem of the work, the embodiment of the invention provides a porcelain rod insulator replacement tool. The technical solution is as follows:
一种瓷棒式绝缘子更换工具, 包括: 前卡、 后卡和收线***, 所述收线***两端分 别与前卡和后卡相联, 还包括升吊***, 该升吊***与前卡和 /或后卡相连。  A porcelain rod insulator replacement tool comprises: a front card, a rear card and a take-up system, the two ends of the wire receiving system are respectively connected with the front card and the rear card, and further comprises a lifting system, the lifting system and the front The card and / or the rear card are connected.
具体地, 所述升吊***包括两套三脚架组件和两个滑车, 所述两套三脚架组件分别 固定在前卡和后卡上, 所述两个滑车分别挂在两套三脚架组件上, 这样两套三脚架组件 和两个滑车所组成的升吊***提供了两个吊点, 通过钢绳可将瓷棒式绝缘子升吊到所需 位置, 解决了由于瓷棒式绝缘子重量较大, 导致更换瓷棒式绝缘子时, 需对整条输电线 路进行停电, 通过将七个瓷棒式绝缘子同时放至地面, 从而进行更换单个绝缘子的工作 的问题。  Specifically, the lifting system includes two sets of tripod assemblies and two trolleys, and the two sets of tripod assemblies are respectively fixed on the front card and the rear card, and the two trolleys are respectively hung on the two sets of tripod assemblies, so that two The lift system consisting of a tripod assembly and two trolleys provides two lifting points. The steel rod insulator can be lifted to the desired position by the steel rope, which solves the problem of replacing the porcelain due to the large weight of the porcelain rod insulator. In the case of a rod insulator, the entire transmission line needs to be powered off, and the problem of replacing a single insulator is performed by placing seven porcelain rod insulators on the ground at the same time.
进一步地, 还包括连杆, 该连杆两端分别与两套三脚架组件相连, 两套三脚架组件 通过该连杆连接后, 强度更高, 从而提供更稳定的吊点。  Further, the utility model further comprises a connecting rod, the two ends of the connecting rod are respectively connected with the two sets of tripod assemblies, and the two sets of tripod assemblies are connected by the connecting rod, the strength is higher, thereby providing a more stable lifting point.
进一步地, 还包括挂钩组件, 该挂钩组件一端与前卡和 /或后卡相连, 另一端为与瓷 棒式绝缘子凹槽相配合的钩状结构, 这样更换绝缘子时, 该挂钩组件的钩状结构端勾住 旁侧平行的瓷棒式绝缘子凹槽处, 能有效地保持本更换工具的平衡。 Further, the utility model further comprises a hook assembly, the hook assembly is connected at one end to the front card and/or the rear card, and the other end is connected to the porcelain The rod-shaped insulator groove is matched with the hook structure, so that when the insulator is replaced, the hook-shaped structure end of the hook assembly is hooked on the side parallel ceramic rod insulator groove, which can effectively maintain the balance of the replacement tool.
再进一步地, 所述所述挂钩组件的中部为可伸縮的丝杆结构, 这样可根据实际情况 调节钙挂钩组件的长度, 以保证能有效地保持本更换工具的平衡。  Further, the middle portion of the hook assembly is a retractable screw structure, so that the length of the calcium hook assembly can be adjusted according to actual conditions to ensure that the balance of the replacement tool can be effectively maintained.
再进一步地, 所述收线***由液压伸縮组件和可伸縮的丝杆组件组成, 所述由液压 伸縮组件的活塞杆与可伸縮的丝杆组件的丝杆相连, 这样, 可减小液压伸縮组件的液压 缸的体积, 进而减小收线***所占的施工空间, 为作业人员提供更多的操作空间。  Still further, the take-up system is composed of a hydraulic telescopic assembly and a retractable screw assembly, and the piston rod of the hydraulic telescopic assembly is connected to the screw of the retractable screw assembly, thereby reducing hydraulic expansion and contraction The volume of the hydraulic cylinder of the assembly, in turn, reduces the construction space occupied by the take-up system, providing more operating space for the operator.
本发明实施例提供的技术方案带来的有益效果是: 相比现有技术, 本发明实施例通 过在前卡和 /或后卡加设升吊***, 解决了由于瓷棒式绝缘子重量较大, 导致更换瓷棒式 绝缘子时, 需对整条输电线路进行停电, 通过将七个瓷棒式绝缘子同时放至地面, 从而 进行更换单个绝缘子的工作的问题, 本发明可应用到停、 带电更换耐张瓷棒式绝缘子作 业当中, 作业过程所需时间大大縮短, 作业人员大幅度减少, 降低了成本, 并可以实现 带电更换单片瓷棒式绝缘子; 而且加设的挂钩组件能有效地保持本更换工具的平衡; 再 一方面, 将原来的全液压式收线***改进为本组合式收线***, 减小收线***所占的施 工空间, 为作业人员提供更多的操作空间, 使用更方便。  The technical solution provided by the embodiment of the present invention has the beneficial effects that: compared with the prior art, the embodiment of the present invention solves the problem that the porcelain rod insulator has a larger weight by adding a lifting system to the front card and/or the rear card. When the ceramic rod insulator is replaced, the entire transmission line needs to be powered off. By placing seven porcelain rod insulators on the ground at the same time, the problem of replacing the individual insulators is solved, and the present invention can be applied to stop and electrify replacement. In the operation of the tensile-resistant porcelain insulator, the time required for the operation process is greatly shortened, the number of operators is greatly reduced, the cost is reduced, and the single-piece ceramic rod insulator can be replaced by the electric charge; and the added hook assembly can effectively maintain the present The balance of the replacement tool; on the other hand, the original full hydraulic take-up system is improved into the combined take-up system, which reduces the construction space occupied by the take-up system, provides more operating space for the operator, and uses more Convenience.
附图说明 DRAWINGS
图 1是本发明实施例中提供的瓷棒式绝缘子更换工具的使用状态结构示意图; 图 2是图 1的侧视结构示意图;  1 is a schematic view showing the structure of a porcelain rod insulator replacement tool provided in an embodiment of the present invention; FIG. 2 is a side view of FIG.
图 3是本发明实施例中挂钩组件的结构示意图;  3 is a schematic structural view of a hook assembly in an embodiment of the present invention;
图 4是本发明实施例中升吊***的结构示意图;  4 is a schematic structural view of a lifting system in an embodiment of the present invention;
图 5是图 3的侧视结构示意图;  Figure 5 is a side elevational view of Figure 3;
图 6是图 3的俯视结构示意图。  Figure 6 is a top plan view of Figure 3.
图中, 1前卡, 2后卡, 3收线***, 31液压伸縮组件, 32可伸縮的丝杆组件, 4 升吊***, 41三脚架组件, 42滑车, 43连杆, 5挂钩组件, 51钩状结构, 52可伸縮的 丝杆结构, 6瓷棒式绝缘子。  In the picture, 1 front card, 2 rear card, 3 wire take-up system, 31 hydraulic telescopic assembly, 32 telescopic screw assembly, 4 liter hoist system, 41 tripod assembly, 42 pulley, 43 linkage, 5 hook assembly, 51 Hook structure, 52 retractable screw structure, 6 ceramic rod insulators.
具体实施方式 detailed description
为使本发明的目的、 技术方案和优点更加清楚, 下面将结合附图对本发明实施方式 作进一步地详细描述。 如图 1所示, 本发明提供的一种瓷棒式绝缘子更换工具, 包括: 前卡 1、 后卡 2和 收线*** 3, 所述收线*** 3两端分别与前卡 1和后卡 2相联, 还包括升吊*** 4, 该升 吊*** 4与前卡 1和后卡 2相连。 所述升吊*** 4包括两套三脚架组件 41和两个滑车 42, 所述两套三脚架组件 41分别固定在前卡 1和后卡 2上, 所述两个滑车 42分别挂在 两套三脚架组件 41上,这样两套三脚架组件 41和两个滑车 42所组成的升吊*** 4提供 了两个吊点, 通过钢绳可将瓷棒式绝缘子升吊到所需位置, 解决了由于瓷棒式绝缘子重 量较大, 导致更换瓷棒式绝缘子时, 需对整条输电线路进行停电, 通过将七个瓷棒式绝 缘子同时放至地面, 从而进行更换单个绝缘子的工作的问题 (参见图 2)。 The embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. As shown in FIG. 1 , a porcelain rod insulator replacement tool provided by the present invention comprises: a front card 1, a rear card 2 and a wire take-up system 3, and the two ends of the wire take-up system 3 respectively have a front card 1 and a rear card. The 2 associative, further includes a lifting system 4, which is connected to the front card 1 and the rear card 2. The lifting system 4 includes two sets of tripod assemblies 41 and two trolleys 42, respectively, which are respectively fixed on the front card 1 and the rear card 2, and the two pulleys 42 are respectively hung on the two sets of tripod assemblies. 41, the lifting system 4 consisting of two sets of tripod assembly 41 and two trolleys 42 provides two lifting points, and the steel rod insulator can be lifted to the desired position by the steel wire, thereby solving the problem of the ceramic rod type. The weight of the insulator is large, which leads to the power failure of the entire transmission line when replacing the ceramic rod insulator. The problem of replacing the individual insulators is solved by placing seven ceramic rod insulators on the ground at the same time (see Fig. 2).
如图 3所示,本发明还包括连杆 43,该连杆 43两端分别与两套三脚架组件 41相连, 两套三脚架组件 41通过该连杆 43连接后, 强度更高, 从而提供更稳定的吊点 (参见图 4)。  As shown in FIG. 3, the present invention further includes a connecting rod 43. The two ends of the connecting rod 43 are respectively connected with two sets of tripod assemblies 41. After the two sets of tripod assemblies 41 are connected by the connecting rods 43, the strength is higher, thereby providing more stability. Hanging point (see Figure 4).
如图 1所示,本发明还包括挂钩组件 5,两个挂钩组件 5—端分别与前卡 1和后卡 2 相连, 另一端为与瓷棒式绝缘子凹槽相配合的钩状结构 51, 这样更换绝缘子时, 该挂钩 组件的钩状结构端勾住旁侧平行的瓷棒式绝缘子凹槽处, 能有效地保持本更换工具的平 衡 (参见图 2)。 当然, 使用时可以只用一个挂钩组件 5或更多挂钩组件 5。  As shown in FIG. 1, the present invention further includes a hook assembly 5, wherein the two hook assemblies are connected to the front card 1 and the rear card 2, respectively, and the other end is a hook structure 51 matched with the porcelain rod insulator groove. When the insulator is replaced in this way, the hook-shaped end of the hook assembly is hooked to the side parallel ceramic rod insulator groove, which can effectively maintain the balance of the replacement tool (see Fig. 2). Of course, it is possible to use only one hook component 5 or more hook components 5 when in use.
如图 5所示, 上述所述挂钩组件 5的中部为可伸縮的丝杆结构 52, 这样可根据实际 情况调节挂钩组件 5的长度, 以保证能有效地保持本更换工具的平衡。  As shown in Fig. 5, the middle portion of the hook assembly 5 is a retractable screw structure 52, so that the length of the hook assembly 5 can be adjusted according to actual conditions to ensure that the balance of the replacement tool can be effectively maintained.
如图 1所示, 上述收线*** 3由液压伸縮组件 31和可伸縮的丝杆组件 32组成, 所 述由液压伸縮组件 31的活塞杆与可伸縮的丝杆组件 32的丝杆相连, 这样, 可减小液压 伸縮组件 31的液压缸的体积,进而减小收线*** 3所占的施工空间,为作业人员提供更 多的操作空间 (参见图 2)。  As shown in FIG. 1, the above-mentioned take-up system 3 is composed of a hydraulic telescopic assembly 31 and a retractable screw assembly 32, and the piston rod of the hydraulic telescopic assembly 31 is connected to the screw of the retractable screw assembly 32. The volume of the hydraulic cylinder of the hydraulic telescopic assembly 31 can be reduced, thereby reducing the construction space occupied by the take-up system 3, and providing more operating space for the operator (see FIG. 2).
本发明使用时, 如图 1所示, 首先, 将本更换工具的前卡 1和后卡 2分别固定住瓷 棒式绝缘子 6的两端金属接头;然后将两个挂钩组件 5的一端分别与前卡 1和后卡相连, 另一端的钩状结构 51勾住旁侧平行的瓷棒式绝缘子 6凹槽处,并收紧其中部的可伸縮的 丝杆结构 52, 保持本更换工具的平衡; 再然后将两套三脚架组件 41分别固定在前卡 1 和后卡 2上, 并将连杆 43的两端分别对应与两套三脚架组件 41相连, 所述两个滑车 42 分别挂在两套三脚架组件 41上,以提供更换瓷棒式绝缘子 6吊点。各部件安装完毕之后, 先手动将收线*** 3 的可伸縮的丝杆组件 32进行预收紧张力; 然后再通过收线*** 3 的液压伸縮组件 31进行收紧张力,将瓷 ^ . ^张力进行转移;再然后用钢绳系 住需更换的瓷棒式绝缘子 6两端,并利用升吊*** 4的滑车 42将瓷棒式绝缘子 6的碗头 顺利脱出、 下降到地面; 接着将新的瓷棒式绝缘子 6上吊到线路上进行更换; 最后, 完 成更换后拆掉本更换工具即可。 (参见图 2)。 When the present invention is used, as shown in FIG. 1, first, the front card 1 and the rear card 2 of the replacement tool are respectively fixed to the metal joints at both ends of the porcelain rod insulator 6; then, one ends of the two hook assemblies 5 are respectively The front card 1 and the rear card are connected, and the hook structure 51 at the other end hooks the groove of the side parallel ceramic rod insulator 6 and tightens the retractable screw structure 52 of the middle portion to maintain the balance of the replacement tool. Then, the two sets of tripod assemblies 41 are respectively fixed on the front card 1 and the rear card 2, and the two ends of the connecting rod 43 are respectively connected with the two sets of tripod assemblies 41, and the two pulleys 42 are respectively suspended in two sets. The tripod assembly 41 is provided to provide a replacement of the ceramic rod insulator 6 lifting point. After the components are installed, the telescopic screw assembly 32 of the take-up system 3 is manually pre-tensioned; then the take-up system 3 is passed. The hydraulic expansion and contraction unit 31 performs the tensioning force, and transfers the tension of the porcelain. The steel rod is then tied to both ends of the ceramic rod insulator 6 to be replaced, and the ceramic rod type is lifted by the pulley 42 of the lifting system 4. The bowl head of the insulator 6 is smoothly taken out and lowered to the ground; then the new porcelain rod insulator 6 is hoisted to the line for replacement; finally, the replacement tool can be removed after the replacement is completed. (See Figure 2).
以上所述仅为本发明的较佳实施例, 并不用以限制本发明, 凡在本发明的精神和原则之 内, 所作的任何修改、 等同替换、 改进等, 均应包含在本发明的保护范围之内。 The above is only the preferred embodiment of the present invention, and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., which are within the spirit and scope of the present invention, should be included in the protection of the present invention. Within the scope.

Claims

权利要求书 Claim
1、 一种瓷棒式绝缘子更换工具, 包括: 前卡、 后卡和收线***, 所述收线***两端 分别与前卡和后卡相联, 其特征在于, 还包括升吊***, 该升吊***与前卡和 /或后卡相 连。 1. A porcelain rod insulator replacement tool, comprising: a front card, a rear card and a take-up system, wherein the two ends of the wire receiving system are respectively associated with a front card and a rear card, and the utility model further comprises a lifting system. The lift system is connected to the front card and/or the rear card.
2、根据权利要求 1所述的一种瓷棒式绝缘子更换工具, 其特征在于, 所述升吊*** 包括两套三脚架组件和两个滑车, 所述两套三脚架组件分别固定在前卡和后卡上, 所述 两个滑车分别挂在两套三脚架组件上。 2 . The porcelain rod insulator replacement tool according to claim 1 , wherein the lifting system comprises two sets of tripod assemblies and two trolleys, wherein the two sets of tripod assemblies are respectively fixed on the front card and the rear On the card, the two trolleys are respectively hung on two sets of tripod assemblies.
3、 根据权利要求 2所述的一种瓷棒式绝缘子更换工具, 其特征在于, 还包括连杆, 该连杆两端分别与两套三脚架组件相连。 3. A porcelain rod insulator replacement tool according to claim 2, further comprising a connecting rod, the two ends of the connecting rod being respectively connected to the two sets of tripod assemblies.
4、根据权利要求 1或 2或 3所述的一种瓷棒式绝缘子更换工具, 其特征在于, 还包 括挂钩组件, 该挂钩组件一端与前卡和 /或后卡相连, 另一端为与瓷棒式绝缘子凹槽相配 合的钩状结构。 A porcelain rod insulator replacement tool according to claim 1 or 2 or 3, further comprising a hook assembly, the hook assembly being connected at one end to the front card and/or the rear card, and at the other end to the porcelain A rod-like structure in which the rod insulator grooves are fitted.
5、根据权利要求 4所述的一种瓷棒式绝缘子更换工具, 其特征在于, 所述所述挂钩 组件的中部为可伸縮的丝杆结构。 A porcelain rod insulator replacement tool according to claim 4, wherein the middle portion of the hook assembly is a retractable screw structure.
6、根据权利要求 1或 2或 3所述的一种瓷棒式绝缘子更换工具, 其特征在于, 所述 收线***由液压伸縮组件和可伸縮的丝杆组件组成, 所述由液压伸縮组件的活塞杆与可 伸縮的丝杆组件的丝杆相连。 6. A porcelain rod insulator replacement tool according to claim 1 or 2 or 3, wherein said wire take-up system consists of a hydraulic telescopic assembly and a retractable screw assembly, said hydraulic expansion and contraction assembly The piston rod is connected to the screw of the retractable screw assembly.
PCT/CN2011/083180 2011-01-25 2011-11-29 Tool for replacing ceramic rod type insulator WO2012100595A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110026677.9 2011-01-25
CN2011100266779A CN102163823A (en) 2011-01-25 2011-01-25 Ceramic rod type insulator replacing tool

Publications (1)

Publication Number Publication Date
WO2012100595A1 true WO2012100595A1 (en) 2012-08-02

Family

ID=44464874

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/083180 WO2012100595A1 (en) 2011-01-25 2011-11-29 Tool for replacing ceramic rod type insulator

Country Status (2)

Country Link
CN (1) CN102163823A (en)
WO (1) WO2012100595A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103995317A (en) * 2014-06-13 2014-08-20 国家电网公司 Upper-air optical cable welding device
CN112636240A (en) * 2020-11-24 2021-04-09 广西电网有限责任公司玉林供电局 Replacement device for supporting insulator

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163823A (en) * 2011-01-25 2011-08-24 湖北省超能超高压电力科技开发有限公司 Ceramic rod type insulator replacing tool
CN102403676B (en) * 2011-11-15 2013-11-06 江苏省电力公司徐州供电公司 Insulator cradle for whole string-replaceable 500kV strain busbar porcelain insulator
CN105119186A (en) * 2015-08-14 2015-12-02 国家电网公司 Device for replacing strain rod porcelain insulator in 660kV
CN105119187A (en) * 2015-08-14 2015-12-02 国家电网公司 Device for replacing insulator
CN108054674A (en) * 2017-12-16 2018-05-18 广西电网有限责任公司电力科学研究院 A kind of substation's suspension insulator replacement operation robot system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2404241Y (en) * 1999-11-12 2000-11-01 湖南省长沙电业局 Apparatus capable of changing strain insulator-chain electrical insulator
CN2552142Y (en) * 2002-04-22 2003-05-21 杨福民 Tension-proof horizontal isolator hot-line replacing device
JP2004171946A (en) * 2002-11-20 2004-06-17 Chubu Electric Power Co Inc Replacing method of whole or part of insulation device, and supporting device used for the method
CN201312082Y (en) * 2008-12-01 2009-09-16 河南省电力公司焦作供电公司 500kV strain insulator series combined replacement tool
CN201332232Y (en) * 2008-12-31 2009-10-21 河南送变电建设公司 Large-tonnage porcelain insulator clamp apparatus
CN201629516U (en) * 2009-12-15 2010-11-10 湖北省电力公司超高压输变电公司 Three-connected extension-resisting clamp for extra HVDC transmission line
CN102163823A (en) * 2011-01-25 2011-08-24 湖北省超能超高压电力科技开发有限公司 Ceramic rod type insulator replacing tool
CN201966537U (en) * 2011-01-25 2011-09-07 湖北省超能超高压电力科技开发有限公司 Porcelain strut insulator replacing tool

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4073086B2 (en) * 1998-08-10 2008-04-09 中部電力株式会社 Insulator replacement device for double tension insulators
CN2857291Y (en) * 2005-12-22 2007-01-10 邱文彬 Porcelain insulator stand of fixed wire and fixed wire device
CN2912031Y (en) * 2006-06-16 2007-06-13 冯海潮 Live replacing device for strain 4-string insulator string
CN102005706A (en) * 2010-11-04 2011-04-06 江苏省电力公司无锡供电公司 Clamping apparatus of live line tools
CN202014054U (en) * 2010-12-28 2011-10-19 河北省电力公司超高压输变电分公司 Overhaul tool for dead end insulator on +/- 660kV DC power transmission line

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2404241Y (en) * 1999-11-12 2000-11-01 湖南省长沙电业局 Apparatus capable of changing strain insulator-chain electrical insulator
CN2552142Y (en) * 2002-04-22 2003-05-21 杨福民 Tension-proof horizontal isolator hot-line replacing device
JP2004171946A (en) * 2002-11-20 2004-06-17 Chubu Electric Power Co Inc Replacing method of whole or part of insulation device, and supporting device used for the method
CN201312082Y (en) * 2008-12-01 2009-09-16 河南省电力公司焦作供电公司 500kV strain insulator series combined replacement tool
CN201332232Y (en) * 2008-12-31 2009-10-21 河南送变电建设公司 Large-tonnage porcelain insulator clamp apparatus
CN201629516U (en) * 2009-12-15 2010-11-10 湖北省电力公司超高压输变电公司 Three-connected extension-resisting clamp for extra HVDC transmission line
CN102163823A (en) * 2011-01-25 2011-08-24 湖北省超能超高压电力科技开发有限公司 Ceramic rod type insulator replacing tool
CN201966537U (en) * 2011-01-25 2011-09-07 湖北省超能超高压电力科技开发有限公司 Porcelain strut insulator replacing tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103995317A (en) * 2014-06-13 2014-08-20 国家电网公司 Upper-air optical cable welding device
CN103995317B (en) * 2014-06-13 2016-08-17 国家电网公司 Optical cable high-altitude fusion splicing devices
CN112636240A (en) * 2020-11-24 2021-04-09 广西电网有限责任公司玉林供电局 Replacement device for supporting insulator

Also Published As

Publication number Publication date
CN102163823A (en) 2011-08-24

Similar Documents

Publication Publication Date Title
WO2012100595A1 (en) Tool for replacing ceramic rod type insulator
CN204281108U (en) A kind of transfer crane
CN101814707B (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN105305305B (en) The device and application method of charged for replacement cross-arm and insulator chain
CN202423969U (en) Overhead ground wire lifter
CN202308909U (en) Clamping device for live line insulator string replacement
CN204737645U (en) Hoisting accessory
CN206349693U (en) Conductors on quad bundled Split type line lifter and its application structure
CN205377164U (en) Special fixture of large -tonnage II type suspension insulator wire end
CN203545559U (en) Electric meter box hoisting tool
CN205104846U (en) A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool
CN202906291U (en) Operation rope ladder hanging equipment
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN202897816U (en) Steel bar lifting hook
CN206432624U (en) Transmission line tangent tower first insulator changes instrument
CN204680963U (en) A kind of SF 6the safety device of the anti-height pendant of switch maintenance
CN108639989A (en) A kind of cement rod-type power transmission line overhead ground wire auxiliary device
CN103579951A (en) Upturned tackle for replacing tension insulators
CN202864676U (en) Electrolytic pole plate lifting device
CN206685805U (en) Change anchor support insulator labor-saving tool
CN203612809U (en) Steel wire coil hoisting fixture
CN204778358U (en) Prebake positive pole unburned bricks lift by crane special fixture
CN203871743U (en) Iron tower overhead grounding wire elevator

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11857414

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11857414

Country of ref document: EP