WO2012092878A1 - 上行功率控制方法、功率控制参数配置方法及其装置 - Google Patents

上行功率控制方法、功率控制参数配置方法及其装置 Download PDF

Info

Publication number
WO2012092878A1
WO2012092878A1 PCT/CN2012/070115 CN2012070115W WO2012092878A1 WO 2012092878 A1 WO2012092878 A1 WO 2012092878A1 CN 2012070115 W CN2012070115 W CN 2012070115W WO 2012092878 A1 WO2012092878 A1 WO 2012092878A1
Authority
WO
WIPO (PCT)
Prior art keywords
pucch
uplink control
control information
user equipment
transmission mode
Prior art date
Application number
PCT/CN2012/070115
Other languages
English (en)
French (fr)
Inventor
高雪娟
沈祖康
潘学明
Original Assignee
大唐移动通信设备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大唐移动通信设备有限公司 filed Critical 大唐移动通信设备有限公司
Priority to EP12732187.5A priority Critical patent/EP2706795B1/en
Priority to JP2013547803A priority patent/JP5669959B2/ja
Priority to KR1020137014608A priority patent/KR101618333B1/ko
Priority to US13/978,530 priority patent/US9538481B2/en
Publication of WO2012092878A1 publication Critical patent/WO2012092878A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/146Uplink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • H04L1/0041Arrangements at the transmitter end
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • H04L1/0056Systems characterized by the type of code used
    • H04L1/0057Block codes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • H04L1/0072Error control for data other than payload data, e.g. control data
    • H04L1/0073Special arrangements for feedback channel
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/1607Details of the supervisory signal
    • H04L1/1692Physical properties of the supervisory signal, e.g. acknowledgement by energy bursts
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/28TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission
    • H04W52/286TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission during data packet transmission, e.g. high speed packet access [HSPA]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/32TPC of broadcast or control channels
    • H04W52/325Power control of control or pilot channels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/38TPC being performed in particular situations
    • H04W52/42TPC being performed in particular situations in systems with time, space, frequency or polarisation diversity
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0023Systems modifying transmission characteristics according to link quality, e.g. power backoff characterised by the signalling
    • H04L1/0026Transmission of channel quality indication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0023Systems modifying transmission characteristics according to link quality, e.g. power backoff characterised by the signalling
    • H04L1/0028Formatting
    • H04L1/0031Multiple signaling transmission

Definitions

  • the present invention relates to the field of wireless communication technologies, and in particular, to an uplink power control method, a power control parameter configuration, and a device thereof. Background technique
  • LTE-A Long Term Evolution-Advanced
  • CA carrier aggregation
  • One LTE-A UE User Equipment
  • the intra feedback corresponds to ACK (ACKnowledgement)/NACK (Non-ACKnoledgement) feedback information of multiple downlink carriers and downlink subframes.
  • ACK/NACK code number ACK/NACK codebook
  • the ACK/NACK codebook depends on the number of downlink carriers configured by the UE and the transmission mode of each downlink carrier, that is, the UE needs to feed back N+N1 in one uplink subframe.
  • N is the number of downlink carriers configured by the UE, and N1 is the number of downlink carriers whose transmission mode is multiple codewords; for a TDD (Time Division Duplex) system, the ACK/NACK codebook depends on the configuration of the UE The number of downlink carriers, the transmission mode of each downlink carrier, and the number of downlink subframes that the UE needs to perform ACK/NACK feedback in the same uplink subframe, that is, the UE needs to feed back M x (N+N1) bits in one uplink subframe. NACK, where M is on the same The number of downlink subframes in which the subframes perform ACK/NACK feedback.
  • the values of M are different, that is, the number of each column K in Table 1, and, for different carriers, M The value may also be different.
  • the UE needs feedback in an uplink subframe .
  • the number of downlink subframes for ACK/NACK feedback on the same uplink subframe on carrier i depends on the uplink and downlink configuration of carrier i.
  • NACK/DTX Discontinuous Transmission
  • the LTE-A system defines a new PUCCH (Physical Uplink Control Channel) transmission format 1 - PUCCH format (format) 3.
  • the transport format supports up to 20-bit ACK/NACK feedback, as shown in Figure 1.
  • the ACK/NACK information that the UE needs to feed exceeds the above threshold, the ACK/NACK information needs to be merged (Bundling), so that the number of feedback bits is less than or equal to the above threshold, and spatial combining (Space Bundling) and time domain combining (Time- Domain Bundling or Frequency-Domain Bundling.
  • PUCCH format 3 uses different encoding methods for different ACK/NACK feedback bits.
  • ACK/NACK feedback bits When the number of ACK/NACK feedback bits is less than or equal to 11 bits, re-use Rel-Lul-8 (Release-8, Version 8) system RM (Reed-Muller) , Rhett-Muller encoding, ie RM(32,0) + Repetition encoding, encoding ACK/NACK feedback bits into 48-bit encoded bits (coded bits); when ACK/NACK feedback bits exceeds 11 Bit, The Dual-RM (double RM) coding mode is adopted. As shown in FIG. 2, the ACK/NACK feedback bits are first divided into two groups, and each group adopts RM (32, 0) + truncation coding method to ACK/ NACK feedback bit code is 24-bit coded bits
  • the power control of PUCCH in the LTE-A system uses the power control method of the LTE Rel-8/9 system as much as possible.
  • the power control formula for defining the PUCCH is as follows:
  • PL C is the path loss compensation value of carrier C, which is obtained by downlink carrier measurement of the upper layer configuration
  • Po is the target value of the transmit power, and the cell-specific part configured by the upper layer P Pt/ca ⁇ P
  • the UE exclusive part d ⁇ is composed of two parts
  • a F PUCCH (F) is a high-level configuration indicating a power offset of different PUCCH formats relative to PUCCH format la, including PUCCH format 1/1 a/ lb/2/2 a/2b and PUCCH format 3 multiple formats, Further compensation for the power adjustment error of h ⁇ n CQI , ⁇ leg Q , n SR );
  • a D (F,) is configured by a higher layer, and is configured independently for each PUCCH format, indicating the power offset of different PUCCH formats in multi-antenna port transmission (ie, transmit diversity in Rel-10); Power control command word cumulant.
  • the value of / ⁇ ⁇ can be:
  • the UE is configured with only 1 carrier, / ⁇ , , / ⁇ , / ⁇ ⁇ ;
  • the number of ACK/NACK codebooks (ACK/NACK codebook) determined by the UE according to its own configuration is always greater than or equal to the number of data packets actually received by the UE, especially when the UE is configured with multiple carriers, but the eNB only schedules a small number or When only one carrier/subframe is scheduled, the number of valid ACK/NACK bits in the ACK/NACK codebook (the number of ACK/NACK feedback bits corresponding to the data packet actually received or actually scheduled by the UE) is much smaller than ACK/NACK.
  • the codebook size, the eNB can only detect the valid information part according to the specific scheduling situation to improve the checking performance.
  • e 1 ⁇ 2 should be calculated based on the number of valid feedback bits of the UE :
  • TB Transport Block
  • SPS Semi- Persistent Scheduling, semi-persistent scheduling
  • the number of PDCCHs released by the resource is determined, so as to ensure that the transmission power of the UE on the PUCCH channel corresponds to the number of downlink carriers and downlink subframes that are actually scheduled to avoid power waste;
  • the combined ACK/NACK transmission, the number of combined information bits actually transmitted by the UE is smaller than the actually received
  • the number of transport blocks, the number of feedback bits shall be determined in accordance with the combined "2, in order to avoid waste of UE power and reduce interference.
  • the coding mode when the ACK/NACK codebook is greater than 11 bits, the ACK/NACK feedback information needs to be grouped, due to the randomness of the eNB scheduling, ACK
  • the valid ACK/NACK bits in the /NACK codebook are not guaranteed to be evenly distributed to each group, so each group of RM-coded ACK/NACK effective code rates are different, resulting in a decrease in ACK/NACK check performance.
  • Figure 3 when the ACK/NACK codebook[bO, bl, ... bll] is divided into two groups, the 6 bits in the first group [b0, bl, ...
  • the effective coding rate is 6/24. Only the b6 and b7 in the second group [b6, b7, ... bll] are valid information, and the other bits are the placeholder information generated by the UE.
  • the effective coding rate is 2/24. , resulting in a decrease in the overall transmission performance of ACK/NACK. RM coding does not require grouping, so there is no performance degradation due to unbalanced packets of valid information.
  • the PUCCH format 3 supports the multi-antenna port transmission mode, and the 2-antenna port in the Rel-10 uses SORTD (Spatial Orthogonal Resource Transmit Diversity) as the transmission diversity transmission scheme. SORTD and single-antenna port transmissions themselves differ in transmission performance.
  • PUCCH format 3 uses RM and Dual-RM to have different transmission performances for different effective bit numbers.
  • PUCCH format 3 uses single antenna port transmission mode and multi-antenna port transmission mode to have different transmission performance for different effective bit numbers.
  • the prior art has not given a solution to how to improve the accuracy of power control and thereby improve the transmission performance of ACK/NACK. Summary of the invention
  • An object of the present invention is to provide an uplink power control method, a power control parameter configuration method, and The device is used to improve the accuracy of the power control, thereby improving the transmission performance of the uplink control information.
  • the embodiment of the present invention adopts the following technical solutions:
  • An uplink power control method includes the following steps:
  • the user equipment receives data in the M downlink subframes of the N downlink carriers, and generates uplink control information, where N ⁇ l, M>1, and the uplink control information of the M downlink subframes is in the same uplink subframe.
  • Medium transmission
  • the user equipment determines, according to whether the number of bits of the uplink control information is greater than a set threshold, an A f used to calculate an uplink control channel PUCCH transmit power, and where
  • a F PUCCH (F) is used to indicate a power offset of a PUCCH of a different format relative to a PUCCH format 1 a, the power offset indicating a number of bits corresponding to a PUCCH transmission bit;
  • the user equipment calculates a transmit power of the PUCCH according to the determined Af PUCCH (F) sum, and sends the generated uplink control information on the PUCCH by using the calculated transmit power.
  • a user equipment including:
  • a receiving module configured to receive data in M downlink subframes of N downlink carriers; where, N ⁇ l, M>1;
  • control information generating module configured to generate uplink control information of the M downlink subframes that can be transmitted in the same uplink subframe
  • the power control module is configured to determine, according to whether the number of bits of the uplink control information generated by the control information generating module is greater than a set threshold, determine a sum ⁇ ) used to calculate an uplink control channel PUCCH transmit power, and according to the determined A f ccff (F) and ⁇ ), calculating a transmit power for transmitting the uplink control information on the PUCCH, where the A f is used to indicate a power offset of a PUCCH of a different format relative to the PUCCH format la, Representing a power offset corresponding to the number of PUCCH transmission bits;
  • a power control parameter configuration method includes:
  • the network side configures a PUCC A parameter of the uplink control channel transmit power to the user equipment, where the Af PUCCH (F) is used to indicate a power offset of the PUCCH of different formats relative to the PUCCH format la;
  • the network side receives the uplink control information sent by the user equipment on the uplink control channel PUCCH, where the transmit power on the PUCCH is determined by the user equipment according to the configured A f PUCCH (F).
  • a network device including:
  • a configuration module configured to configure an A f parameter of the uplink control channel transmit power to the user equipment, where the A f P[/CC// (F) is used to indicate a power offset of the PUCCH of different formats relative to the PUCCH format la ;
  • a receiving module configured to receive uplink control information sent by the user equipment on an uplink control channel PUCCH, where a transmit power on the PUCCH is configured by the user equipment according to the configuration
  • the user equipment may determine, according to whether the number of bits of the uplink control information is greater than a set threshold, the Af used to calculate the uplink control channel transmit power, and further calculate the PUCCH transmit power, thereby ensuring that the user equipment is as follows Appropriate power to transmit data, avoid power waste, improve power utilization of user equipment, improve the accuracy of power control, and improve the transmission performance of uplink control information.
  • FIG. 1 is a schematic diagram of a PUCCH format 3 transmission structure in a conventional CP in the prior art
  • FIG. 2 is a schematic diagram of a Dual-RM coding structure in the prior art
  • FIG. 4 is a schematic flowchart of an uplink power control process according to an embodiment of the present invention
  • FIG. 5 is a schematic diagram of uplink power control in a scenario according to an embodiment of the present invention
  • FIG. 5 is a schematic diagram of uplink power control in a scenario according to an embodiment of the present invention
  • FIG. 6 is a schematic diagram of uplink power control in scenario 2 according to an embodiment of the present invention.
  • FIG. 7 is a schematic structural diagram of a user equipment according to an embodiment of the present disclosure.
  • FIG. 8 is a schematic structural diagram of a network device according to an embodiment of the present invention.
  • PUCCH format 3 is defined as a multiplexing transmission scheme of ACK NACK.
  • PUCCH format 3 uses RM and Dual-RM to have different transmission performance for different effective bit numbers, and for ACK/NACK feedback, M c , n HMQ , n SR )
  • the number of feedback bits corresponding to the transport block actually received by the UE is calculated. It can be seen that the feedback multiplier is greater than 11 bits or less than or equal to 11 bits.
  • the function adjusts the power of different bit numbers for 4h, and should also be independently configured for the case where the number of feedback bits is greater than 11 bits or less than 11 bits.
  • PUCCH uses single-antenna port transmission and multi-antenna port (LTE-ARel-10 middle finger transmit diversity, ie, SORTD scheme).
  • LTE-ARel-10 middle finger transmit diversity ie, SORTD scheme.
  • the transmission performance when transmitting ACK/NACK is also different. It also needs to use different ⁇ , ⁇ , ⁇ )function.
  • an embodiment of the present invention provides a scheme for selecting PUCCH power control according to the number of ACK/NACK feedback bits.
  • the power control process of the uplink control channel may include:
  • Step 401 The UE receives data in the M downlink subframes of the N downlink carriers, and generates uplink control information, where 1, M>1, and the uplink control information of the M downlink subframes are on the same uplink.
  • the uplink control information may include one or more of ACK/NACK feedback information, CSI, and SR information.
  • the CSI information may include one or more of the CQI, the PMI, the RI, the PTI, and the like.
  • the uplink control information may be the combined feedback information, and the merge mode may be a spatial merge, a time domain merge, or the like.
  • the uplink control information is ACK/NACK
  • the number of bits of the uplink control information may be according to the configured number of downlink carriers, the transmission mode of each configured downlink carrier, and the number of downlink subframes corresponding to one uplink subframe that need to be fed back ACK/NACK.
  • the number of bits of the uplink control information may also be the number of combined ACK/NACK feedback information bits after the combining.
  • Step 402 The UE determines, according to whether the number of bits of the uplink control information is greater than a threshold L bit, determining an appropriate AF PUCCH (F) and h[ c , n leg Q , n SR ) functions for calculating an uplink control channel (eg, PUCCH). Transmit power, the A f is used to indicate the power offset of the PUCCH and the PUCCH format la of different formats, and the / ⁇ ⁇ ⁇ ⁇ is used to indicate the power offset corresponding to the number of PUCCH transmission bits.
  • the threshold L can be taken as 11.
  • the UE may determine the A f ca / (F) and / ⁇ ⁇ , / ⁇ ⁇ , / ⁇ ) functions in the following manner:
  • the UE determines the A f and function corresponding to the RM coding mode, and is used to calculate the transmission power of the PUCCH. .
  • the UE determines A F PUCCH ( ) and h ⁇ CQI , n HARQ , n SR corresponding to the Dual-RM coding mode. Function, used to calculate the transmit power of the PUCCH.
  • a F PUCCH (F) ⁇ 2,3,4,5 ⁇ dB or A f ccff (F) e ⁇ 3,4,5,6 ⁇ dB , h(n CQI , n legs Q , n SR ) 0.25 ⁇ (n HARQ + n SR ) - 0.75.
  • the number of uplink control information bits is not greater than L bits and greater than L bits.
  • the E , 1 ⁇ 2J functions may be the same or different.
  • the number of uplink control information bits is not greater than L bits and greater than L bits.
  • the above-mentioned uplink control information is the same as the / ⁇ , / ⁇ , / ⁇ ) function when the number of bits of the uplink control information is not greater than L bits;
  • the A F (F) value corresponding to the number of bits not greater than L bits and greater than L bits may be the same or may be different.
  • a F can be configured as follows:
  • the high-level signaling pre-configures two PUCCH ( ) values A F PUCCH and - PUCCH - 2 (F), respectively indicating that the number of uplink control information bits is not greater than L and greater than L.
  • a F PUCCH (parameter value; correspondingly, the UE may select A f when the number of bits of the uplink control information is not greater than the threshold L bit - select njccH F when the number of bits of the uplink control information is greater than the threshold L bit, where
  • the control information is ACK/NACK, preferably, A F PUCCH l (F)e ⁇ -1, 0X2 ⁇ dB , A F PUCCH 2 (F) e ⁇ 2, 3, 4, 5 ⁇ dB or
  • Method (2) The high-level signaling is pre-configured with an A F CCFF (F) value, and the remaining A F CCFF (F) values are obtained by the configured value and a value, which are pre-agreed or pre-configured by higher layer signaling.
  • the high-level signaling is pre-configured with a value A f indicating that the number of uplink control information bits is not greater than the A F PUCCH corresponding to the L bits (the parameter value, the number of uplink control information bits is greater than the A F 2 corresponding to the L bit ( ⁇ according to Pre-configured or agreed offsets are based on acquisitions,
  • the uplink control information is ACK/NACK
  • the UE can select ⁇ F_PUCCH (F) when the number of bits of the uplink control information is not greater than the threshold L bit, and is used when the number of bits of the uplink control information is greater than the threshold L bit.
  • — PUCCH ⁇ — PUCCH — F + ⁇ .
  • it may be equal to 0, that is, whether the number of uplink control information bits is greater than L bits, the same A F PUCCH (parameter value, which may not be pre-configured or agreed upon at this time, the base station may be in the CCFF (F) set ⁇
  • An appropriate value is selected in the -10123456 ⁇ , and is directly configured to the UE through the high layer signaling, and is used as the Af PUCCH ⁇ F, value corresponding to the PUCCH format3.
  • Step 403 The UE calculates a transmit power of an uplink control channel (such as a PUCCH) according to the determined F CCH (F) and hn CQI , n legs Q , n SR ), and uses the calculated transmit power on the uplink control channel (PUCCH).
  • the uplink control information determined in step 401 is sent.
  • the PUCCH channel may be a PUCCH format lb channel of a PUCCH format lb with a channel selection transmission scheme; or may be a DFT-S-OFDM (Discrete Fourier Transform-Spread-Orthogonal Frequency Division Multiplexing) Frequency division multiplexing) A channel of a transmission scheme combined with time domain spreading, such as PUCCH format 3 channel.
  • DFT-S-OFDM Discrete Fourier Transform-Spread-Orthogonal Frequency Division Multiplexing
  • Frequency division multiplexing A channel of a transmission scheme combined with time domain spreading, such as PUCCH format 3 channel.
  • the UE may further determine Af and 3 ⁇ 4?/ e , 1 ⁇ 2J functions according to the transmission mode of the PUCCH, that is,
  • the specific process of determining, by the UE, whether the number of bits of the uplink control information is greater than a threshold L bit to determine an appropriate CCH (F) and hi ⁇ , n-leg Q , n SR ) function may include:
  • the UE determines the A f TOCC ff (F) and / i ( « ce , « functions corresponding to the RM coding mode in the single antenna port transmission mode, and is used to calculate the transmission power of the PUCCH.
  • the UE determines to use the RM coding mode corresponding to the multi-antenna port transmission mode.
  • the A f TOCCff (F) and / i ( « ce , « ⁇ / ⁇ ) functions are used to calculate the transmit power of the PUCCH.
  • the UE determines a PUCCH (F) and h (n CQI , n HARQ , n SR ) functions corresponding to the Dual-RM coding mode in the single antenna port transmission mode, and is used for calculation.
  • the UE determines the Dual-RM coding mode in the multi-antenna port transmission mode.
  • Corresponding ⁇ PUCCH (F) and h ⁇ CQI , n HARQ , n SR ) functions are used to calculate the transmit power of the PUCCH.
  • a F PUCCH (F) ⁇ , 3 , 5 ⁇ dB or A f TOCCff (F) e ⁇ 3,4,5,6 ⁇ dB , h(n CQI , n HARQ ,n SR ) 0.25 ⁇ [n HARQ +n SR ) - 0.75
  • Whether the number of uplink control information bits is greater than L bits can independently distinguish the PUCCH transmission mode, and can further distinguish the PUCCH transmission mode only for the case where the number of uplink control information bits is not greater than L bits, or only the number of uplink control information bits.
  • the case that is greater than the L bit further distinguishes the PUCCH transmission mode, and may also simultaneously control the number of information bits not greater than and greater than the L bit while further distinguishing the PUCCH transmission mode.
  • the configuration of A f ccff (F) may follow the manners (1) and (2) in step 402 above, that is, only the number of uplink control information bits is not greater than and greater than L bits, and eight PUCCH ( ) is configured.
  • the same number of uplink control information bits adopt the same A f ccff (F) value in the multi-antenna port transmission mode and the single-antenna port transmission mode; or, the following manner can be adopted:
  • the PUCCH transmission mode is further distinguished, and when the number of uplink control information bits is >1, the PUCCH transmission mode is not distinguished, that is, the number of uplink control information bits is >1 ⁇ , and the single antenna port transmission mode and multiple antennas are used.
  • the port transfer mode uses the same A f value, and the following A f ccff (F) configuration method can be used:
  • the high-level signaling is pre-configured with three A f ccff (F) values, which respectively indicate the A F PUCCH (F) parameter corresponding to the single-antenna port transmission mode and the multi-antenna port transmission mode when the number of uplink control information bits L is respectively The value, and the value of the eight PUCCH (F) parameter corresponding to the number of uplink control information bits > L, for example:
  • the high layer signaling is preconfigured with 3 A f — ccff (FM A F — Pt/CCH ⁇ ), A F PUCCH l 2 (F), and
  • L i ( ⁇ indicates the A f parameter value corresponding to the single antenna port transmission single antenna port transmission mode when the number of uplink control information bits is L; for ACK/NACK transmission, preferably, A Pt/CCH 1 1 ( )e ⁇ -1 , 0,1,2 ⁇ dB;
  • ⁇ F _ P UCCHJ_2 (F) indicates the multi-antenna port transmission mode corresponding to the number L of uplink control information bits
  • ⁇ — n 2 (F) represents the number of uplink control information bits > L corresponding to PUCCH (parameter value, ie for the number of uplink control information bits) L does not distinguish PUCCH transmission mode, single antenna port transmission mode and multi-antenna port transmission mode Use the same ⁇ PUCCH (F) value; for ACK/NACK transmission, better, A F Pt / CCH 2 (ie ⁇ 3, 4, 5, 6 ⁇ dB;
  • the UE can determine whether the number of bits of the uplink control information is greater than a threshold L bit and For the PUCCH transmission mode, select the appropriate A f PUCCH (F) parameter value.
  • mode (3) can also be evolved into high-level signaling to configure only part of the A F PUCCH (F) (at least one) parameter value, and the remaining parameter values are obtained by pre-agreed or high-level configuration offsets, namely:
  • the high-level signaling may pre-configure two eight PUCCH (F) parameter values corresponding to the single-antenna port transmission mode and the multi-antenna port transmission mode, and the number of uplink control information bits >1 ⁇ , respectively, when the number of uplink control information bits is 1 ⁇ .
  • Two of the corresponding TOCCff (F) parameter values, the remaining parameter values are obtained based on the configured _ ccff (F) parameter value according to a pre-configured or agreed offset, for example:
  • Mode (3-1) The high layer signaling pre-configures 2 A f — TOCCff (F) values A F — n L and A F PUCCH 2 (F) , where:
  • ⁇ F _PUCCH_I_I(F) indicates the A F PUCCH (F) parameter value corresponding to the single antenna port transmission mode when the number of uplink control information bits L;
  • ⁇ — n 2 (F) represents the number of uplink control information bits > L corresponding to PUCCH (parameter value, ie for the number of uplink control information bits) L does not distinguish PUCCH transmission mode, single antenna port transmission mode and multi-antenna port transmission mode Use the same ⁇ value; for ACK/NACK transmission, better, A F PUCCH 2 (F) e ⁇ 3,4,5,6 ⁇ dB;
  • «/ CRA — L i ( ⁇ indicates the A F PUCCH (F) parameter value corresponding to the single antenna port transmission mode when the number of uplink control information bits is L; for ACK/NACK transmission, preferably, A F — Pt/CCH ⁇ F ) e ⁇ -1,0,1,2 ⁇ dB;
  • ⁇ PUCCH — (Represents the multi-antenna port transmission mode corresponding to the number of uplink control information bits L
  • a F PUCCH (F) parameter value ' for ACK/NACK transmission, better, A F — Pt/CCH ⁇ 2 (F) e ⁇ _1,0,1,2 ⁇ dB or A F Volunteer j 2 ( e ⁇ -2,-1,0,1 ⁇ dB;
  • the UE when the UE determines the corresponding ⁇ parameter value ⁇ ⁇ when the number of uplink control information bits is >1 ⁇ , it may be based on a pre-configured or agreed offset based on / ⁇ - n (F) or
  • the UE can determine whether the number of bits of the uplink control information is greater than a threshold L bit and For the PUCCH transmission mode, select the appropriate A f PUCCH (F) parameter value.
  • the high-level signaling may further configure one parameter corresponding to the PUCCH a value corresponding to the single-antenna port transmission mode and the multi-antenna port transmission mode, and the corresponding parameter when the number of uplink control information bits is > L.
  • the remaining TOCCff (F) parameter values are obtained based on the configured A f PUCCH , F , and value based on a pre-configured or agreed offset, for example:
  • Mode (3-3) High-level signaling is pre-configured with 1 A f — ccff (F) value
  • a F — n L represents the value of the A f parameter corresponding to the single-antenna port transmission mode when the number of uplink control information bits is L;
  • the A F PUCCH (F) parameter value A corresponding to the parameter value _ « / ⁇ 2 (F) corresponding to the multi-antenna port transmission mode and the number of uplink control information bits > L when the UE determines the number L of uplink control information bits F PUCCH 2 (F) can be based on pre-configured or agreed offsets and based on (obtained, ie:
  • the value may be pre-configured or agreed upon; the value may be A F — n 2 (F)e ⁇ 3, 4, 5, 6 ⁇ , and the specific value may be 3 or 4; in particular, when the eNB and the UE pre-agreed the uplink control When the number of information bits >1 ⁇ and the number of uplink control information bits 1 ⁇ use the same A f _ ccff (F) parameter value, At this time, it may not be pre-con
  • the UE may select an appropriate A f PUCCH (F) parameter value according to whether the number of bits of the uplink control information is greater than a threshold L bit and a PUCCH transmission mode.
  • F PUCCH
  • Mode (4) The high-level signaling is pre-configured with three PUCCH (F) values, which respectively indicate the corresponding PUCCH (the parameter value and the number of uplink control information bits) when the number of uplink control information bits is 1 ⁇ . >L
  • the single-antenna port transmission mode and the multi-antenna port transmission mode correspond to the A f PUCCH (F) parameter values, for example:
  • the high layer signaling is preconfigured with 3 A f — ccff ( MA F — Pt ⁇ , A F _ PUCCH 2 l (F) , and
  • Denotes the uplink control corresponding to the number of information bits L A f - ccff parameter value (F.), I.e. for the uplink control information bits L does not distinguish PUCCH transmission mode, a single antenna port transmission mode and multi-antenna port transmission mode using the same A f value; for ACK/NACK transmission, preferably, A F — Pt ⁇ ⁇ — 1,0,1,2 ⁇ dB;
  • ⁇ n ⁇ — 2 2 ( ⁇ indicates the number of AW PUCCH (F) parameters corresponding to the multi-antenna port transmission mode when the number of uplink control information bits >L;
  • the UE may determine whether the number of bits of the uplink control information is greater than a threshold L bit and
  • mode (4) can also be evolved into higher-level signaling with only part of the A f ccff (F) (at least one) parameter value, and the remaining parameter values are obtained by pre-agreed or high-level configuration offsets, ie:
  • the high-level signaling may pre-configure two PUCCH (F) parameter values corresponding to the number of uplink control information bits 1 ⁇ , and the single-antenna port transmission mode and the multi-antenna port transmission mode when the number of uplink control information bits is >1 ⁇ respectively 2 of the corresponding A f parameter values, the rest
  • the A F ccff (F) parameter value is obtained based on the pre-configured or agreed offset based on the configured A f PUCCH (F) parameter value, for example:
  • Mode (4-1) The high layer signaling pre-configures 2 Af - ccff (F) values A F - n and PUCCH 2 1 , where
  • Denotes the uplink control corresponding to the number of information bits L A f - ccff parameter value (F.), I.e. for the uplink control information bits L does not distinguish PUCCH transmission mode, a single antenna port transmission mode and multi-antenna port transmission mode using the same ⁇ PUCCH (F) value; for ACK/NACK transmission, better, A F — Pt ⁇ — 1,0,1,2 ⁇ dB;
  • a F — Pt ⁇ F indicates the A f parameter value corresponding to the single antenna port transmission single antenna port transmission mode when the number of uplink control information bits is >1 ⁇ ; for ACK/NACK transmission, preferably,
  • the A ⁇ /CO/) parameter value _ «/ CC H ⁇ 2(F) can be based on a pre-configured or agreed offset based on - PUCCH JF) PUCCH — 2 F) , ie:
  • the UE may determine whether the number of bits of the uplink control information is greater than a threshold L bit and
  • Denotes the uplink control corresponding to the number of information bits L A f - ccff parameter value (F.), I.e. for the uplink control information bits L does not distinguish PUCCH transmission mode, a single antenna port transmission mode and multi-antenna port transmission mode using the same ⁇ value; for ACK/NACK transmission, better, A F — Pt ⁇ — 1,0,1,2 ⁇ dB;
  • ⁇ n ⁇ — 2 2 ( ⁇ indicates the Af PUCCH (F) parameter value corresponding to the multi-antenna port transmission mode when the number of uplink control information bits>L;
  • the parameter value corresponding to the single antenna port transmission mode - ccH - 2 - may be based on a pre-configured or agreed offset based on
  • the UE may select an appropriate A f PUCCH (F) parameter value according to whether the number of bits of the uplink control information is greater than a threshold L bit and a PUCCH transmission mode.
  • F A f PUCCH
  • high-level signaling can also be pre-configured. 1 indicates the number of uplink control information bits.
  • the ⁇ A F PUCCH (F) parameter value is obtained based on the configured CCH (F) parameter value based on a pre-configured or agreed offset, for example:
  • a F — TOCCff (F) value A F — n represents the A f TOCCff (F) parameter value corresponding to the uplink control information bit number L, that is, for the uplink control information
  • the number of bits 1 ⁇ does not distinguish the PUCCH transmission mode, and the single antenna port transmission mode and the multi-antenna port transmission mode use the same A f PUCCH (F) value; for ACK/NACK transmission, preferably,
  • the UE determines the ⁇ F _PUCCH (F) parameter value corresponding to the single antenna port transmission mode - PUCCH - ⁇ and the multi-antenna port transmission mode - PUCCH - 2 - 2 when determining the number of uplink control information bits > 1 ⁇ (F, When obtained, it can be obtained according to the pre-configured or agreed offset and based on eight ⁇ ), namely:
  • ⁇ and can be the same or different, the value can be
  • a F PUCCH 2 l (F)e ⁇ 3,4,5,6 ⁇ which can be 3 or 4; e ⁇ 2,3,4,5 ⁇ dB or A F _ PUCCH _ 2 2 (F) e ⁇ 3,4,5,6 ⁇ dB, specifically 3 or 4; in particular, when the eNB and the UE pre-agreed
  • the single antenna port transmission mode and the multi-antenna port mode adopt the same A F parameter value, or when the eNB and the UE pre-agreed the uplink control information bit t>L and the uplink control information bit number 1 ⁇ , the same A f parameter value is used.
  • W is + Only one value can be configured or agreed; in particular, when the eNB and the UE pre-agreed the number of uplink control information bits!
  • the UE may determine whether the number of bits of the uplink control information is greater than a threshold L bit and
  • the PUCCH transmission mode select the appropriate A f PUCCH (F) parameter value.
  • the PUCCH transmission mode is further distinguished by the number of uplink control information bits 1 ⁇ and >1 ⁇ , that is, the uplink control information bit number 1 ⁇ and >1 ⁇ are independent in the single antenna port transmission mode and the multi-antenna port transmission mode.
  • the PUCCH (F) value the following A f ccff (F) configuration method can be used: Mode (5): The high-level signaling is pre-configured with four PUCCH (F) values, indicating the single-antenna port when the number of uplink control information bits is L.
  • L i ( ⁇ indicates the A F PUCCH (F) parameter value corresponding to the single antenna port transmission mode when the number of uplink control information bits L;
  • PUCCH ⁇ indicates the multi-antenna port transmission mode corresponding to the number of uplink control information bits L
  • a F PUCCH (F) parameter value ' for ACK/NACK transmission, better, A F — Pt/CCH ⁇ 2 (F) e ⁇ _1,0,1,2 ⁇ dB or A F hinder ⁇ 2 (e ⁇ -2,-1,0,1 ⁇ dB;
  • ⁇ ⁇ m ( ⁇ indicates the number of uplink control information bits > L APF PUCCH (F) parameter value corresponding to the single antenna port transmission mode; for ACK/NACK transmission, better,
  • ⁇ n ⁇ — 2 2 ( ⁇ indicates the A F CC// (F) parameter value corresponding to the multi-antenna port transmission mode when the number of uplink control information bits >L; for ACK/NACK transmission, preferably, A F — Pt/ CCH — 2 — 2 (ie ⁇ 2,3,4,5 ⁇ dB or ⁇ — Pt/CCH — 2 — 2 ( e ⁇ 3,4,5,6 ⁇ dB;
  • the UE may determine whether the number of bits of the uplink control information is greater than a threshold L bit and
  • mode (5) can also evolve into high-level signaling only configuring part of the A F PUCCH (F) (at least one) parameter value, and the remaining parameter values are obtained by pre-agreed or high-level configuration offsets, namely:
  • the high-level signaling may pre-configure two eight PUCCH (F) parameter values corresponding to the single-antenna port transmission mode and the multi-antenna port transmission mode, and the uplink control information bit number > L when the number of uplink control information bits is 1 ⁇ respectively.
  • the antenna port transmission mode and the multi-antenna port transmission mode respectively correspond to two of the A F CCFF (F) parameter values, and the remaining A F CCFF (F) parameter values are based on the configured A F PUCCH according to a pre-configured or agreed offset.
  • (F) Parameter values are obtained, for example: Mode (5-1): High-level signaling pre-configures 2 A f — TOCCff (F iA F — n L and
  • L i ( ⁇ indicates the A F PUCCH (F) parameter value corresponding to the single antenna port transmission mode when the number of uplink control information bits L;
  • ⁇ ⁇ m ( ⁇ indicates the number of uplink control information bits > L APF PUCCH (F) parameter value corresponding to the single antenna port transmission mode; for ACK/NACK transmission, better,
  • the A f ccff (F) parameter value A F Pt/CCH 1 2 corresponding to the multi-antenna port transmission mode when, and determining the number of uplink control information bits > L
  • the transmission mode corresponds to the A f ccff (F) parameter value A F Pt/CCH 2 2 (F)
  • it can be obtained according to the pre-configured or agreed offset and based on A F — pt ⁇ and ⁇ , ie:
  • the sum can be the same or different, and the value can be A F Pt/CCH j 2 (ie ⁇ -l,0,l,2 ⁇ dB or A F — Pt/CCH ⁇ 2 (ie ⁇ _2,_l , 0,l ⁇ dB, the value can be A F — Pt/CCH — 2 — 2 (ie ⁇ 2,3,4,5 ⁇ dB or PUCCH 2 ⁇ 3,4,5,6 ⁇ , the specific value can be 0 or -1; in particular, when the eNB and the UE pre-arrange that the single-antenna port transmission mode and the multi-antenna port transmission mode use the same F PUCCH ( ) parameter value, that is, the value of ⁇ and / or 0 is not Configuration or convention ⁇ and / or value, ie F PUCCH _ ⁇ _2 ⁇ ) ⁇ PUCCH II ( ⁇ ) , ⁇ F PUCCH 2 2 ⁇ ⁇ F PUCCH 2 _ ⁇ ( ⁇
  • the UE may select an appropriate A f PUCCH (F) parameter value according to whether the number of bits of the uplink control information is greater than a threshold L bit and a PUCCH transmission mode.
  • F A f PUCCH
  • L i ( ⁇ indicates the A F PUCCH (F) parameter value corresponding to the single antenna port transmission mode when the number of uplink control information bits L;
  • a F PUCCH _ l 2 (F) indicates the multi-antenna port transmission mode corresponding to the number L of uplink control information bits
  • a F PUCCH (F) parameter value ' for ACK/NACK transmission, better, A F — Pt/CCH ⁇ 2 (F) e ⁇ _1,0,1,2 ⁇ dB or A F hinder ⁇ 2 (e ⁇ -2,-1,0,1 ⁇ dB;
  • the UE in determining the uplink control information bits> parameter value of a single antenna port transmission when the L-mode corresponding - «/ ⁇ - 2 -, and determining the uplink control information bits> L multi-antenna port transmission mode corresponding to the A f
  • the ccff (F) parameter value A F Pt/CCH 2 2 (F) can be obtained according to a pre-configured or agreed offset and based on A f ccff and A f ccff 3 (F), ie:
  • a F PUCCH _ 2 l (F) ⁇ ⁇ 3,4,5,6 ⁇ dB, and 3 take A F — Pt 2 (F) e ⁇ 2,3,4,5 ⁇ dB or A F _ PUCCH _ 2 2 (F)e ⁇ 3A,5,6 ⁇ ⁇ , and 4 specific values may be 3 or 4; in particular, when the eNB and the UE pre-agreed the single antenna port transmission mode and the multi-antenna port transmission mode When the same parameter value is used, the value of ⁇ can be configured without the pre-configured value, ie F-PUCCH-2 2 F, _ PUCCH 2 1 ( ⁇ ) _ ⁇ F PUCCH _ ⁇
  • the UE may determine whether the number of bits of the uplink control information is greater than a threshold L bit and
  • high-level signaling can also be pre-configured. 1 indicates the number of uplink control information bits.
  • the multi-antenna port transmission mode corresponds to -
  • CCH ⁇ 2 the number of uplink control information bits > L corresponds to the single antenna port transmission mode
  • the UE may select an appropriate A f PUCCH (F) parameter value according to whether the number of bits of the uplink control information is greater than a threshold L bit and a PUCCH transmission mode.
  • F A f PUCCH
  • 3 ⁇ 4 ⁇ is the number of ACK/NACK bits used to calculate the power offset of the PUCCH bearer bit number, which is the power offset for calculating the number of PUCCH bearer bits.
  • the ACK/NACK transmission is taken as an example to give h(n CQI , n-leg function formula, and the transmission of other information is not excluded.
  • the antenna port refers to an antenna port corresponding to the PUCCH.
  • the specific power control process is as follows:
  • operations related to uplink power control mainly include configuring A f and receiving data transmitted by the UE on the PUCCH channel according to the estimated PUCCH transmission power.
  • configuration The specific operations of ⁇ F_PUCCH ⁇ F) may include:
  • Adopt mode (1) When configuring: According to the UE configuration, the number of uplink control information bits is less than or equal to
  • the configuration mode (2) According to the configuration of the UE, select a value in the A f PUCCH (F) set ⁇ -1, 0, 1, 2 ⁇ corresponding to the number of uplink control information bits less than or equal to 11 bits, for example,
  • one value is selected from the F PUCCH F, the set ⁇ -1, 0, 1, 2 ⁇ corresponding to the single antenna port transmission mode when the number of uplink control information bits is less than or equal to 11 bits, for example, A.
  • the evolution method of the mode (3) is further adopted, as in the method (3-3): according to the configuration of the UE, when the number of uplink control information bits is less than or equal to 11 bits, the single antenna port transmission mode corresponds to
  • the PUCCH transmission mode is differentiated only when the number of uplink control information bits is greater than 11 bits.
  • the mode (5) When the mode (5) is configured, the number of uplink control information bits is less than or equal to 11 bits and greater than libit, and the PUCCH transmission mode is differentiated.
  • the single antenna port transmission mode corresponds to the number of uplink control information bits being less than or equal to 11 bits.
  • the UE side performs uplink power control, and specifically can perform the following processing for different situations: Case 1: Regardless of whether the PUCCH adopts a single antenna port transmission mode or a multi-antenna port transmission mode, The UE selects the A f and the corresponding number of uplink control information bits greater than 11 bits.
  • a F cc7/ (F) is configured in the above manner ( 1 ):
  • the power offset corresponding to the number of bits carried by the PUCCH
  • the PUCCH transmission mode is differentiated only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits, and the PUCCH transmission mode is not distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits.
  • the PUCCH transmission mode is not distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is greater than 11 bits, and the number of uplink control information bits is less than or equal to 11 bits without distinguishing PUCCH transmission.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is greater than 11 bits, and the number of uplink control information bits is less than or equal to 11 bits, and the PUCCH transmission mode is not distinguished.
  • the configuration mode of the eNB is the above mode (5): that is, the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits, and the PUCCH transmission mode is not distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits, and the PUCCH transmission mode is not distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is greater than 11 bits, and the number of uplink control information bits is less than or equal to 11 bits, and the PUCCH transmission mode is not distinguished.
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is greater than 11 bits, and the number of uplink control information bits is less than or equal to 11 bits, and the PUCCH transmission mode is not distinguished.
  • the configuration mode of - is the above mode (5): that is, the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • the configuration mode of the terminal is the above-mentioned mode (5-3): that is, the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • the specific power control procedure is as follows:
  • the processing operations on the base station can be the same as those in the scenario one, and are not described here.
  • the UE side performs uplink power control, and specifically can perform the following processing for different situations: Case 1: Regardless of whether the PUCCH adopts a single antenna port transmission mode or a multi-antenna port transmission mode,
  • the UE selects the Af P[/cai (F) corresponding to the number of bits of the uplink control information that is less than or equal to 11 bits.
  • the / ⁇ , ⁇ function calculates the transmit power of the PUCCH, ie:
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits without distinguishing PUCCH.
  • the configuration of the PuccH (F) is the above mode (5) or mode (5-3)
  • the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • the power offset corresponding to the number of bits carried by the PUCCH
  • the PUCCH transmission mode is distinguished only when the number of uplink control information bits is less than or equal to 11 bits, and the number of uplink control information bits is greater than 11 bits, and the PUCCH transmission mode is not distinguished.
  • a F t 2 of high-rise configuration (i -2, Calculating the transmit power of the PUCCH in one step;
  • the PUCCH transmission mode is differentiated only when the number of uplink control information bits is less than or equal to 11 bits, and the PUCCH transmission mode is not distinguished by the number of uplink control information bits greater than 11 bits.
  • the configuration mode of - is the above mode (5): that is, the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • ccff (F) is mode (5-3): that is, the number of uplink control information bits is less than or equal to 11 bits and greater than 11 bits, and the PUCCH transmission mode is distinguished.
  • the transmit power of the PUCCH is further calculated.
  • the ACK/NACK feedback information is taken as an example, and the same applies to the PUCCH sending other feedback information.
  • the number of bits according to the uplink feedback information is
  • the method of transmitting power of the PUCCH can ensure that the UE transmits data according to the appropriate power as much as possible, thereby avoiding power waste and improving the power utilization of the UE.
  • the embodiment of the present invention further provides a method applicable to the above process.
  • the home device also provides a network side device.
  • the user equipment provided by the embodiment of the present invention may include:
  • the receiving module 701 is configured to receive data in M downlink subframes of the N downlink carriers, where N>1, M>1;
  • the control information generating module 702 is configured to generate uplink control information of the M downlink subframes that can be transmitted in the same uplink subframe.
  • the power control module 703 is configured to determine, according to whether the number of bits of the uplink control information generated by the control information generating module is greater than a set threshold, to determine A F — PUCCH ( F ) and h ( n ) for calculating an uplink control channel PUCCH transmit power. And calculating a transmit power for transmitting the uplink control information on the PUCCH according to the determined A f TOCCH (F) and ⁇ ); wherein the A f is used to indicate a PUCCH of a different format relative to the PUCCH format la a power offset, the power offset indicating a number of bits corresponding to a PUCCH transmission bit;
  • the sending module 704 is configured to send the generated uplink control information on the PUCCH by using the calculated transmit power.
  • determining a 2 -n + b 2 , where a 2 and b 2 are the coefficient values of the function, or A f TOCCH (F) is determined according to the PUCCH transmission mode and the A F Pt/CCH (F) is determined as the number of uplink control information bits Corresponding to -PUCCH 2 m corresponding to the set threshold, for uplink control
  • the power control module 703 obtains eight PUCCH (F) by one of the following methods.
  • Manner 1 Receive the two A f TOCCH (F) parameter values A f TOCCH and the pre-configured high-level signaling
  • Manner 2 Receive an A f TOCCH (F) value pre-configured by the high layer signaling, and the remaining A f TOCCH (F) values are obtained by the configured A f value and a value; wherein, the pre-agreed or pre-configured by the high layer signaling The offset.
  • the power control module 703 is specifically configured to: when the number of uplink control information bits is not greater than the set threshold, if the PUCCH transmits information by using a single antenna port transmission mode, determine F PUCCH , F , and h (n) is the sum corresponding to the single antenna port transmission mode + where ai - and bi - are the coefficient values of the / function; if the PUCCH transmits information in the multi-antenna port transmission mode, it is determined that A f and A F Pt/CCH ⁇ 2 corresponding to the multi-antenna port transmission mode (and + 2 , where a L2 and b L2 are the coefficient values of the 2 ( «) function.
  • a power control module 703 to obtain A f PUCCH (F) in the following ways; three ways: receiving higher layer signaling preconfigured 3 A f - TOCCH (F) value A F - Pt / CCH - L
  • the power control module 703 obtains A f PUCCH (F) by the following manner: Method 4: Receives three A f TOCCH (F) values A F Pt/CCH pre-configured by the high layer signaling ( ⁇
  • the power control module 703 obtains A f PUCCH (F) in one of the following ways: Mode 5: Four A fs that are pre-configured to receive high layer signaling — TOCCH (F) value A F — Pt/CCH ⁇ L
  • the offset is pre-agreed or pre-configured by higher layer signaling.
  • the " ⁇ +/1 ⁇ 2 , where, " 2 corresponds to the calculation
  • the setting threshold is 11 .
  • the uplink control information includes one of the following information: ACK/NACK feedback information, CQI/PMI/RI/PTI feedback information, and SR information.
  • the uplink control information is merged uplink control information.
  • the network device provided by the embodiment of the present invention may be a station device, and the network device may include:
  • the configuration module 801 is configured to transmit power of the uplink control channel. (F) parameter configuration to the user equipment, where A f P[/eeH ( ) is used to indicate a power offset of the PUCCH of different formats relative to the PUCCH format la;
  • the receiving module 802 is configured to receive uplink control information that is sent by the user equipment on the uplink control channel PUCCH, where the transmit power on the PUCCH is the user equipment according to the configuration.
  • the configuration module 801 can be configured to the user equipment by using one of the following methods: PUCCH ( ⁇ ):
  • Manner 1 Configure the COT (F) values F-PUCCH-F and PUCCH 2 ⁇ ) to the user equipment in advance through high-level signaling.
  • Manner 2 Pre-configure 1 octet PUCCH (F) value to the user equipment through high-level signaling, and the rest
  • the ⁇ F_ «/ CC H(F) value is obtained by the configured AF_TMCCH(F) value and a value;
  • Manner 3 Pre-configure 3 cOT (F) values to the user equipment through high-level signaling.
  • Manner 4 Pre-configure 3 cOT (F) values to the user equipment through high-level signaling.
  • Manner 5 Pre-configure 4 cOT (F) values to the user equipment through high-level signaling.
  • PUCCH lli ⁇ PUCCH 1 2 ⁇ ) ⁇ ⁇ _F
  • Pt/CCH-2 1
  • Pt/CCH-2-2 ⁇ .
  • F PlJCCH — F is a CCH (F) parameter value when the number of uplink control information bits is not greater than a set threshold when the transmission mode is not distinguished
  • F PUCCH — AF is an indistinguishable transmission
  • the number of uplink control information bits is greater than the A f — parameter value when the threshold is set
  • a F — PT/CCH ⁇ L is that the number of uplink control information bits is not greater than the set threshold and the PUCCH transmission mode is a single antenna port.
  • the TOCCH (F) parameter value corresponding to the transmission mode is that the number of uplink control information bits is not greater than the set threshold and the PUCCH transmission mode is A f PUCCH corresponding to the multi-antenna port transmission mode ( F) parameter value,
  • a F — is the A f _ TOCCH (F) parameter value corresponding to the uplink control information bit number being greater than the set threshold and the PUCCH transmission mode is the single antenna port transmission mode,
  • a F Pt/CCH 2 2 (F) For the uplink control information bit number is greater than the set threshold and the multi-antenna port transmission mode corresponds to A f PUCCH (F) ⁇ $, ⁇ is a pre-agreed or pre-configured offset by higher layer signaling.
  • the present invention can be implemented by means of software plus a necessary general hardware platform, and of course, can also be through hardware, but in many cases, the former is a better implementation. the way.
  • the technical solution of the present invention which is essential or contributes to the prior art, may be embodied in the form of a software product stored in a storage medium, including a plurality of instructions for making a
  • the terminal device (which may be a cell phone, a personal computer, a server, or a network device, etc.) performs the methods described in various embodiments of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Description

上行功率控制方法、 功率控制参数配置方法及其装置
本申请要求以下中国专利申请的优先权:
于 2011年 1月 6日提交中国专利局, 申请号为 201110001900.4,发明名称 为 "上行功率控制方法、 功率控制参数配置方法及其装置" 的中国专利申请。 技术领域
本发明涉及无线通信技术领域, 尤其涉及一种上行功率控制方法、 功率控 制参数配置及其装置。 背景技术
LTE-A ( Long Term Evolution- Advanced, 长期演进升级 ) ***目前最多可 支持 5个载波进行载波聚合 ( CA, Carrier Aggregation ), 一个 LTE-A UE ( User Equipment,用户设备)需要在同一个上行子帧内反馈对应多个下行载波及下行 子帧的 ACK ( ACKnowledgement, 肯定确认) /NACK ( Non-ACKnoledgement , 否定确认)反馈信息。 为了避免存在丟包时 eNB ( eNodeB, 演进型基站)和 UE对 ACK/NACK反馈比特数的理解不一致, UE在一个上行子帧需要反馈的 ACK/NACK 比特数(ACK/NACK codebook ), 按照最大配置产生: 对 FDD ( Frequency Division Duplex , 频分双工)***, ACK/NACK codebook取决于 UE配置的下行载波数和每个下行载波的传输模式,即 UE在一个上行子帧需反 馈 N+N1比特 ACK/NACK, 其中 N为 UE配置的下行载波数, N1为传输模式 为多码字的下行载波数; 对 TDD ( Time Division Duplex, 时分双工) ***, ACK/NACK codebook取决于 UE配置的下行载波数、 每个下行载波的传输模 式以及 UE需要在同一个上行子帧进行 ACK/NACK反馈的下行子帧数, 即 UE 在一个上行子帧需反馈 M x ( N+N1 ) 比特 ACK/NACK, 其中 M为在同一上 行子帧进行 ACK/NACK反馈的下行子帧数量, 对于不同的上下行配置及上行 子帧, M的取值不同, 即表 1中每一栏 K的数量, 此外, 对于不同的载波, M 的取值也可能不同,此时 UE在一个上行子帧需反馈 · ;比特 ACK/NACK, 其中 为载波 i的传输模式对应的码字数, 单码字传输模式 ς =ι , 多码字传输 模式 C, =2, Μ,.为载波 i上在同一上行子帧进行 ACK/NACK反馈的下行子帧数 量, 取决于载波 i的上下行配置。 对于不存在调度的下行载波和 /或下行子帧位 置, 产生 NACK/DTX ( Discontinuous Transmission, 非连续发送)作为反馈信 息。
表 1 Downlink association set index (下行关联索引 ) K: {k0, kl,...kM_l} for TDD
Figure imgf000004_0001
为了支持较大的 ACK/NACK反馈比特数传输, LTE-A***定义了一种新 的 PUCCH ( Physical Uplink Control Channel, 物理上行控制信道)传输格式一 — PUCCH format (格式 ) 3。 该传输格式最大支持 20比特 ACK/NACK反馈, 如图 1 所示。 当 UE 需要反馈的 ACK/NACK信息超过上述门限时, 需要对 ACK/NACK信息进行合并(Bundling ), 使反馈比特数小于等于上述门限, 可 采用空间合并( Spatial Bundling )、 时域合并( Time-Domain Bundling )或频域 合并( Frequency-Domain Bundling )。 PUCCH format 3对于不同的 ACK/NACK 反馈比特数采用不同的编码方式, 当 ACK/NACK反馈比特数小于等于 11比特 时, 重用 Rel-8 ( Release-8, 版本 8 ) ***的 RM ( Reed-Muller, 瑞德-穆勒)编 码, 即 RM(32,0) +重复( Repetition )编码方式将 ACK/NACK反馈比特编码为 48比特编码后比特( coded bits ); 当 ACK/NACK反馈比特数超过 11比特时, 采用 Dual-RM (双 RM )编码方式, 如图 2所示, 首先将 ACK/NACK反馈比 特均分为 2组,每组采用 RM( 32 , 0 )+截短( Truncation )编码方式将 ACK/NACK 反馈比特编码为 24比特 coded bits
LTE-A***中 PUCCH的功率控制尽可能沿用 LTE Rel-8/9***的功率控制 方法, 定义 PUCCH的功率控制公式如下:
(0 = ^11 [dBm] (1) 其中:
是载波 c允许的最大发射功率,对 PUCCH而言即上行主载波允许的 最大发送功率;
PLC为载波 C的路径损耗补偿值, 通过高层配置的下行载波测量得到;
Po 为发射功率目标值, 由高层配置的小区专属部分 P Pt/ca^P
UE专属部分 d^两部分相加构成;
h(nCQI , nHARQ , nSR ) 为与 PUCCH发送的不同比特数所对应的功率偏移量, 其中 wcei对应于发送的 CSI ( Channel State Information, 信道状态信息) 比特数 目, CSI包括 CQI( Channel Quality Indicator,信道质量指示)信息、 PMI( Precoding Matrix Indicator, 预编码矩阵指示)信息、 RI ( Rank Indication, 秩指示)信息 和 ΡΉ ( Precoding Type Indicator, 预编码类型指示)信息等, w e对应于发送 的 ACK/NACK 比特数目, ¾ = {0 1}表示在当前上行子帧中是否存在 SR ( Scheduling Request, 调度请求)传输;
AF PUCCH (F)由高层配置 表示不同的 PUCCH format相对于 PUCCH format la的功率偏移量, 包含 PUCCH format 1/1 a/ lb/2/2 a/2b以及 PUCCH format 3多 种格式, 是对 h{nCQI , η腿 Q , nSR )功率调整误差的进一步补偿;
A D (F,)由高层配置, 对每个 PUCCH format独立配置, 表示不同 PUCCH format在多天线端口传输(即 Rel-10中的发送分集) 的功率偏移量; 功率控制命令字累积量。
公式(1 ) 的上述各参数中, /^^ ^的取值可以是:
对于 PUCCH format la/lb , h(nCQ[ , η腿 Q , nSR )=0;
对于 PUCCH format lb with channel selection (基于信道选择的 PUCCH 传输方案, 如果 UE配置了多个载波, 则 inHARQ ~ 1) format lb ) ^η^ , η
2 ' 如果 UE仅配置了 1个载波, 则/ ψ^, , /^^ , /^ ^Ο;
对于 PUCCH format 2/2a/2b , 在常规 CP ( Cyclic Prefix, 循环前缀) 下: h nCQI, nHARQ, nSR J ~ 在 扩 展 CP 下 :
Figure imgf000006_0001
lCQI, nHARQ - 0 otherwise 对于 "HARQ ~ fLS
PUCCH format 3 , h(n CQI, "HARQ
由于 UE 根据自身配置确定的 ACK/NACK反馈比特数(ACK/NACK codebook ) 总是大于等于 UE实际接收到的数据包个数, 特别是当 UE配置了 多个载波, 但 eNB 只调度了少数或仅调度了一个载波 /子帧时, ACK/NACK codebook中的有效 ACK/NACK比特数(与 UE实际接收到或实际存在调度的 数据包相对应的 ACK/NACK反馈比特数)远小于 ACK/NACK codebook大小, eNB 可根据具体调度情况, 只检测有效信息部分以提高检查性能, 因此,
Figure imgf000006_0002
e , ½ 应基于 UE的有效反馈比特数计算: 对于不采用任何合并方案 的 ACK/NACK传输 已经确定 n腿 Q基于 UE实际接收到的 TB( Transport Block, 传输块) 以及指示下行 SPS ( Semi-Persistent Scheduling, 半持续调度) 资源释 放的 PDCCH的个数确定, 从而尽可能保证 UE在 PUCCH信道的发送功率与 实际存在调度的下行载波和下行子帧数相对应, 避免功率浪费; 对于需对进行 合并的 ACK/NACK传输, UE实际传输的合并后信息比特数小于实际接收到的 传输块个数, 应按照合并后的反馈比特数确定《 2 , 以避免 UE功率浪费并降 低干扰。
发明人在实现本发明的过程中, 发现现有技术至少存在以下缺陷: 编码方式, 当 ACK/NACK codebook大于 11比特时, 需对 ACK/NACK反馈信 息进行分组, 由于 eNB 调度的随机性, ACK/NACK codebook 中的有效 ACK/NACK 比特不能保证平均分配到每一组, 因此每一组 RM 编码的 ACK/NACK有效编码码率不同, 从而造成 ACK/NACK检查性能下降。 如图 3 所示, 当将 ACK/NACK codebook[bO,bl,...bll]前后分为两组时, 第一组 [b0,bl,...b5]中的 6 比特都为有效信息, 有效编码码率为 6/24 , 第二组 [b6,b7,...bll]中只有 b6和 b7为有效信息, 其他比特为 UE生成的占位信息, 有效编码码率为 2/24, 从而造成 ACK/NACK总体传输性能的下降。 RM编码 不需要进行分组, 因此不存在由于有效信息不均衡分组造成的性能下降。
此外, PUCCH format 3支持多天线端口传输模式, Rel-10中 2天线端口采 用 SORTD ( Spatial Orthogonal Resource Transmit Diversity, 空域正交资源发射 分集)作为发送分集传输方案。 SORTD 和单天线端口传输在传输性能上本身 就存在差异。
由此可见, PUCCH format 3采用 RM和 Dual-RM对不同有效比特数的传 输性能存在差异, PUCCH format 3 采用单天线端口传输模式和多天线端口传 输模式对不同有效比特数的传输性能也存在差异, 现有技术尚未针对这种差异 给出如何提高功率控制的准确性, 进而提高 ACK/NACK的传输性能的解决方 案。 发明内容
本发明的目的在于提供一种上行功率控制方法、 功率控制参数配置方法及 其装置, 用以提高功率控制的准确性, 进而提高上行控制信息的传输性能, 为 此, 本发明实施例采用如下技术方案:
一种上行功率控制方法, 包括以下步骤:
用户设备在 N个下行载波的 M个下行子帧中接收数据, 并生成上行控制 信息, 其中, N≥l , M>1 , 所述 M个下行子帧的上行控制信息在同一个上行子 帧中传输;
所述用户设备根据所述上行控制信息的比特数是否大于设定门限, 确定用 于计算上行控制信道 PUCCH 发射功率的 Af 和 其中, 所述
AF PUCCH (F)用于表示不同格式的 PUCCH相对于 PUCCH format 1 a的功率偏移 量, 所述 用于表示与 PUCCH传输比特数相对应的功率偏移量;
所述用户设备根据确定出的 Af PUCCH (F)和 ,计算 PUCCH的发射功率, 并采用计算出的发射功率在 PUCCH上发送所述生成的上行控制信息。
一种用户设备, 包括:
接收模块,用于在 N个下行载波的 M个下行子帧中接收数据;其中, N≥l , M>1 ;
控制信息生成模块,用于生成可在同一上行子帧中传输的所述 M个下行子 帧的上行控制信息;
功率控制模块, 用于根据所述控制信息生成模块生成的上行控制信息的比 特数是否大于设定门限, 确定用于计算上行控制信道 PUCCH 发射功率的 和 Φ), 并根据确定出的 Af ccff (F)和 φ) , 计算用于在 PUCCH 上发送所述上行控制信息的发射功率; 其中, 所述 Af 用于表示不同 格式的 PUCCH相对于 PUCCH format la的功率偏移量, 所述 用于表示与 PUCCH传输比特数相对应的功率偏移量;
发送模块, 用于采用计算出的发射功率在 PUCCH上发送所生成的上行控 制信息。 一种功率控制参数配置方法, 包括:
网络侧将上行控制信道发射功率的 ― PUCCA 参数配置到用户设备, 所 述 Af PUCCH (F)用于表示不同格式的 PUCCH相对于 PUCCH format la的功率偏 移量;
网络侧接收所述用户设备在上行控制信道 PUCCH 上发送的上行控制信 息, 其中, PUCCH上的发射功率是所述用户设备根据配置的所述 Af PUCCH (F) 确定出的。
一种网络设备, 包括:
配置模块, 用于将上行控制信道发射功率的 Af 参数配置到用户 设备, 所述 Af P[/CC// (F)用于表示不同格式的 PUCCH相对于 PUCCH format la 的功率偏移量;
接收模块, 用于接收所述用户设备在上行控制信道 PUCCH上发送的上行 控制信息, 其中, PUCCH 上的发射功率是所述用户设备根据配置的所述
△nOT ^>确定出的。
本发明的上述实施例中, 用户设备可根据上行控制信息的比特数是否大于 设定门限, 确定用于计算上行控制信道发射功率的 Af 进而计 算 PUCCH发射功率,因而可以尽可能保证用户设备按照适合的功率发送数据, 避免功率浪费, 提高用户设备的功率利用率, 提高功率控制的准确性, 进而提 高上行控制信息的传输性能。 附图说明
图 1为现有技术中常规 CP下的 PUCCH format 3传输结构示意图; 图 2为现有技术中 Dual-RM编码结构示意图;
图 3为现有技术中的调度示意图;
图 4为本发明实施例提供的上行功率控制流程示意图; 图 5为本发明实施例中场景一下的上行功率控制示意图;
图 6为本发明实施例中场景二下的上行功率控制示意图;
图 7为本发明实施例提供的用户设备的结构示意图;
图 8为本发明实施例提供的网络设备的结构示意图。
实施方式
如背景技术所述, LTE-A***中,定义了 PUCCH format 3作为 ACK NACK 的一种复用传输方案。 PUCCH format 3釆用 RM和 Dual-RM对不同有效比特 数的传输性能存在差异, 而对于 ACK/NACK反馈, M c ,nHMQ,nSR)函^ ^于
UE 实际接收到的传输块所对应的反馈比特数计算功率, 由此可见, 对反馈比 特数大于 11比特或小于等于 11比特两种情况应采用不同的
数进行功率控制,以提高功率控制的准确性。 AFJJt/m/(F)作为
函数对不同比特数功率调整的 4h , 也应对反馈比特数大于 11 比特或小于等 于 11比特两种情况独立配置。 此外, PUCCH采用单天线端口传输和多天线端 口(LTE-ARel-10中指发送分集, 即 SORTD方案)传输 ACK/NACK时的传输 性能也不相同, 也需采用不同的 ψ^,^^,^)函数。 针对上述问题, 本发明 实施例给出了一种根据 ACK/NACK反馈比特数选择 PUCCH功率控制 的 方案。
下面结合附图对本发明实施例进行详细描述。
如图 4所示,在 LTE-A***中, 当 UE被配置了至少 1个下行载波时, UE 在 PUCCH发送上行控制信息时, 上行控制信道(如 PUCCH信道)的功率控 制流程可包括:
步骤 401, UE在 N个下行载波的 M个下行子帧中接收数据, 并生成上行 控制信息,其中论1, M>1 , 所述 M个下行子帧的上行控制信息在同一个上行
更正页 (细则第 91条) 子帧中传输。
其中, 上行控制信息可以包括 ACK/NACK反馈信息、 CSI、 以及 SR信息 等信息中的一种或多种。 所述 CSI信息又包括 CQI、 PMI、 RI、 PTI等信息中 的一种或多种上行控制信息可以为合并后的反馈信息, 合并方式可以为空间合 并、 时域合并等。 当上行控制信息为 ACK/NACK时, 上行控制信息的比特数 可根据配置的下行载波数、 每个配置的下行载波的传输模式以及一个上行子帧 对应的需要反馈 ACK/NACK的下行子帧数确定; 上行控制信息的比特数也可 以是进行了合并后的合并 ACK/NACK反馈信息比特数。
步骤 402, UE根据上行控制信息的比特数是否大于门限 L比特, 确定适 当的 A F PUCCH (F)和 h[ c , n腿 Q , nSR )函数,用于计算上行控制信道(如 PUCCH ) 的发射功率, 所述 Af 用于表示不同格式的 PUCCH与 PUCCH format la的功率偏移量,所述/ ^^ 丽^ ^用于表示 PUCCH传输比特数相对应的 功率偏移量。 其中, 较优的, 门限 L可取值为 11。
具体的, 根据上行控制信息的比特数是否大于门限 L比特, UE可采用以 下方式确定 Af ca/(F)和/^ ^,/^^,/^)函数:
( 1 )如果所产生的上行控制信息比特数不大于 L比特,即采用 RM(32,0)+ 重复编码方式, UE 确定采用 RM 编码方式对应的 Af 和 函数, 用于计算 PUCCH的发射功率。 对于 ACK/NACK传输, 较优的, Af TOCa/ OF) e{- 1,0,1,2} dB, 0.5· e +¾)- 1.3。
(2)如果所生成的上行控制信息比特数大于 L比特, 即采用 Dual-RM编 码方式, UE确定采用 Dual-RM编码方式对应的 Af PUCCH ( )和 h{ CQI , nHARQ , nSR ) 函数, 用于计算 PUCCH 的发射功率。 对于 ACK/NACK传输, 较优的, AF PUCCH(F) {2,3,4,5} dB 或 Af ccff (F) e {3,4,5,6} dB , h(nCQI , n腿 Q ,nSR)= 0.25 · (nHARQ +nSR) - 0.75。 需要说明的是, 当与 PUCCH传输模式相结合时, 在同一种 PUCCH传输 模式下, 上述上行控制信息比特数不大于 L 比特时和大于 L 比特时对应的
Figure imgf000012_0001
E,½J函数可能相同, 也可能不同, 例如, 单天线端口传输模式下, 上述上行控制信息比特数不大于 L 比特时和大于 L 比特时对应的
^^)函数不同, 多天线端口传输模式下, 上述上行控制信息比特数 不大于 L比特时和大于 L比特时对应的 /^^,/ι^^,/^)函数相同;上述上行控 制信息比特数不大于 L比特时和大于 L比特时对应的 AF (F)值可能相同, 也可能不同。
其中, AF 可通过如下方式进行配置:
方式 ( 1 ): 高层信令预先配置 2 个 PUCCH( )值 AF PUCCH 和 — PUCCH— 2(F), 分别表示上行控制信息比特数不大于 L和大于 L两种情况的
AF PUCCH( 参数值; 相应的, UE可在上行控制信息的比特数不大于门限 L比 特时选用 Af— 在上行控制信息的比特数大于门限 L 比特时选用 njccH F、。 其中, 在上行控制信息为 ACK/NACK 时, 优选的, AF PUCCH l(F)e {-1,0X2} dB , AF PUCCH 2(F) e {2,3,4,5} dB 或
PUCCH 2(F) E {3,4,5,6}。
方法(2): 高层信令预先配置一个 AF CCFF(F)值, 其余 AF CCFF(F)值通 过配置的 ^ 值和一个 值获得, 其中 为预先约定或由高层信令预先 配置的偏移量; 例如: 高层信令预先配置 1个值 Af 表示上行控制 信息比特数不大于 L比特对应的 AF PUCCH( 参数值, 上行控制信息比特数大 于 L 比特对应的 AF 2 (^根据预先配置或约定的偏移量 基于 获得,
Figure imgf000012_0002
其中, 在上行控制信 息为 ACK/NACK 时, 优选的, Af TOCa/ ^ei- 1,0,1,2} dB, 的取值可使 AF PUCCH 2(F) e {2,3,4,5} dB或 PUCCH 2(F) e {3,4,5,6}。 较优的, =3或 4 相应的, UE 可在上行控制信息的比特数不大于门限 L 比特时选用 ^F_PUCCH (F) , 在上行控制信息的比特数大于门限 L 比特时使用
— PUCCH Λ = — PUCCH— F + δ。 特别的, 也可以等于 0, 即不论上行控制 信息比特数是否大于 L 比特都采用相同的 AF PUCCH( 参数值, 此时可以不预 先配置或约定 值, 基站可在 ^ CCFF(F)集合 {-10123456}中选择一个适当的 值, 通过高层信令直接配置给 UE,作为 PUCCH format3对应的 Af PUCCH{F、 数值即可。
步骤 403 , UE根据确定出的 F CCH (F)和 h nCQI , n腿 Q , nSR )计算上行控制 信道(如 PUCCH) 的发射功率, 采用计算出的发射功率在该上行控制信道 (PUCCH)发送步骤 401中确定出的上行控制信息。
其中 上述 PUCCH信道可以是 PUCCH format lb with channel selection传 输方案的 PUCCH format lb信道;也可以是基于 DFT-S-OFDM( Discrete Fourier Transform-Spread- Orthogonal Frequency Division Multiplexing,基于离散傅立叶 变换的扩频正交频分复用) 与时域扩频相结合传输方案的信道, 例如 PUCCH format 3信道。
在本发明的另一实施例中, 与图 4所示流程不同的是: 在步骤 402的基础 上, UE 还可以进一步根据 PUCCH 的传输模式确定 Af 和 ¾?/ e,½J函数, 即, UE根据上行控制信息的比特数是否大于门限 L比 特确定适当的 CCH (F)和 hi^ , n腿 Q , nSR )函数的具体过程可包括:
( 1 )在上行控制信息比特数不大于 L比特的情况下:
当 PUCCH采用单天线端口传输模式传输信息时, UE确定采用单天线端口 传输模式下 RM编码方式对应的 Af TOCCff(F)和/ i(«ce ,« 函数, 用于计 算 PUCCH的发射功率。对于 ACK/NACK传输,较优的, Af P[/CCff( ) e {-1,0,1,2} dB , h(nCQI n Q ,nSR)= 0.5 · (n + «ss ) _ 1.3
当 PUCCH采用多天线端口传输模式(在 LTE-A Rel-10***中, 即指发送 分集传输模式, 指 2天线端口传输)传输信息时, UE确定采用多天线端口传 输模式下 RM编码方式对应的 Af TOCCff(F)和/ i(«ce ,« ^/^)函数, 用于计算 PUCCH的发射功率。对于 ACK/NACK传输,较优的, Af P[/CCff( ) e {-1,0,1,2} dB或 Af TOCa/(F) e {-2,-1,0,1} dB, h(nCQI , nHARQ,nSR ) = 0.35 - (nHARQ +nSR) - 0.6„
( 2 )在上行控制信息比特数大于 L比特的情况下:
当 PUCCH采用单天线端口传输模式传输信息时, UE确定采用单天线端口 传输模式下 Dual-RM编码方式对应的 ^ PUCCH (F)和 h(nCQI , nHARQ, nSR)函数, 用 于计算 PUCCH 的发射功率。 对于 ACK/NACK 传输, 较优的, AF_PUCCH (F) e {3,4,5,6} dB , h{nCQI , n腿 Q ,nSR)=03- (nHARQ + ) - 1.5
当 PUCCH采用多天线端口传输模式(在 LTE-A Rel-10***中, 即指发送 分集传输模式, 指 2天线端口传输)传输信息时, UE确定采用多天线端口传 输模式下 Dual-RM编码方式对应的 ^ PUCCH (F)和 h{ CQI , n HARQ , nSR )函数, 用于 计算 PUCCH 的发射功率。 对于 ACK/NACK 传输 较优的 , AF PUCCH(F) { ,3 ,5} dB 或 Af TOCCff (F) e {3,4,5,6} dB , h(nCQI , nHARQ ,nSR)= 0.25 · [nHARQ +nSR) - 0.75
上述上行控制信息比特数是否大于 L 比特的两种情况可以独立区分 PUCCH传输模式, 即可只对上行控制信息比特数不大于 L比特情况进一步区 分 PUCCH传输模式, 也可只对上行控制信息比特数大于 L比特情况进一步区 分 PUCCH传输模式, 也可同时上行控制信息比特数不大于和大于 L比特情况 同时进一步区分 PUCCH传输模式。
其中, Af ccff(F)的配置方式, 可以沿用上述步骤 402中的方式(1 )和 方式( 2 ), 即只对上行控制信息比特数不大于和大于 L比特配置八^ PUCCH ( ) , 同一个上行控制信息比特数在多天线端口传输模式与单天线端口传输模式下 采用相同的 Af ccff(F)值; 或者, 还可采用如下方式:
当只对上行控制信息比特数 L时进一步区分 PUCCH传输模式, 对上行 控制信息比特数>1^时不区分 PUCCH传输模式, 即上行控制信息比特数>1^时 单天线端口传输模式和多天线端口传输模式采用相同的 Af 值, 可采 用如下 Af ccff(F)配置方法:
方式(3): 高层信令预先配置 3 个 Af ccff(F)值, 分别表示上行控制信 息比特数 L 时单天线端口传输模式和多天线端口传输模式分别对应的 AF PUCCH(F)参数值、 以及上行控制信息比特数 >L 时对应的八^ PUCCH(F)参数 值, 例如:
高层信令预先配置 3个 Afccff(FM AFPt/CCH丄 ) 、 AF PUCCH l 2(F)、 和
^■F PUCCH 2 (^ , 其中 ·
L i (^表示上行控制信息比特数 L时单天线端口传输单天线端口 传输模式对应的 Af 参数值; 对于 ACK/NACK 传输, 较优的, A Pt/CCH 1 1( )e {-1,0,1,2} dB;
^F_PUCCHJ_2(F)表示上行控制信息比特数 L时多天线端口传输模式对应的
AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {-1,0,1,2} dB或 F PUCCH— AF、 e {-2,-1,0,1} dB;
Δ — n2(F)表示上行控制信息比特数〉 L时对应的 ^ PUCCH( 参数值, 即对于上行控制信息比特数〉 L不区分 PUCCH传输模式, 单天线端口传输模 式和多天线端口传输模式采用相同的 ^ PUCCH(F)值; 对于 ACK/NACK传输, 较优的, AF Pt/CCH 2(i e{3,4,5,6}dB;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
此外, 方式(3)还可演变为高层信令只配置部分 Af PUCCH(F) (至少一个) 参数值, 其余参数值通过预先约定或高层配置的偏移量得到, 即:
高层信令可预先配置 2 个 分别表示上行控制信息比特数 1^ 时单天线端口传输模式和多天线端口传输模式分别对应的八 PUCCH(F)参数 值、 以及上行控制信息比特数>1^时对应的 TOCCff(F)参数值中的 2个, 其余 参数值根据预先配置或约定的偏移量基于配置的 _ ccff(F)参数 值获得, 例如:
方式 (3-1 ): 高层信令预先配置 2 个 AfTOCCff(F)值 AF— n L 和 AF PUCCH 2(F) , 其中:
^F_PUCCH_I_I(F)表示上行控制信息比特数 L时单天线端口传输模式对应的 AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {-1,0,1,2} dB;
Δ — n2(F)表示上行控制信息比特数〉 L时对应的 ^ PUCCH( 参数值, 即对于上行控制信息比特数〉 L不区分 PUCCH传输模式, 单天线端口传输模 式和多天线端口传输模式采用相同的 ^ 值; 对于 ACK/NACK传输, 较优的, AF PUCCH 2 (F) e {3,4,5,6} dB;
其中, UE 在确定上行控制信息比特数 L 时多天线端口模式对应的 参数值 _TOCCH丄 2(F)时, 可根据预先配置或约定的偏移量 基于 AFPUCCH— F)或 AFPUCCH2(F)获得, 即:
Figure imgf000016_0001
F PUCCH "> 其 中 , ^ 的 取 值 可 使 AF Pt/CCH j 2(i e{-l,0,l,2} dB 或 AF PUCCH , 2( )e{-2,-l,0,l} dB, 具体值可以为 0或 -1; 特别的, 当 eNB和 UE预 先约定单天线端口传输模式和多天线端口传输模式采用相同的 Af PUCCH ( )参 数值时, =0, 即 AFPt/CCH2( =AFPt/CCH丄 或者, 当 eNB和 UE预先约 定上行控制信息比特数 1^和上行控制信息比特数>1^采用相同的 Af PUCCH ( ) 参数值时, 4=0, 即 ^ n L 2(F) = AF— n 2(F),此时可不预先配置或约定 ^ ; 相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
方式 (3-2 ): 高层信令预先配置 2 个 AfTOCCff(F)值 AF— n L 和 F— PUCCH— — 2 F , 其中 ·
«/CRA— L i (^表示上行控制信息比特数 L时单天线端口传输模式对应的 AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {-1,0,1,2} dB;
PUCCH— ( 表示上行控制信息比特数 L时多天线端口传输模式对应的
AF PUCCH(F)参数值', 对于 ACK/NACK传输, 较优的, AFPt/CCH2(F) e {_1,0,1,2} dB或 AF„ j 2( e {-2,-1,0,1} dB;
其中, UE 在确定上行控制信息比特数>1^ 时对应的 ^ 参数值 Η Λ 时, 可根据预先配置或约定的偏移量 基于 /^— n (F)或
Δί· PUCCH 1 2( 获得, 即:
^■F PUCCH PUCCH , , ^ F PUCCH l(^ ~ ^ F PUCCH I l(^ , 其中, 5ι的取值可使 AF PUCCH 2( )e {3,4,5,6} dB, 具体值可以为 3或 4; 特 别的, 当 eNB和 UE预先约定上行控制信息比特数>1^和上行控制信息比特数 L采用相同的 ― H (F)参数值时, =0,即 —PUCCH2 F —PUCCH丄 , 或者, AFPUCCH2(F、 = AF PUCCH2(F) , 此时可不预先配置或约定 ^ ;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
此外, 高层信令还可预先配置 1个 表示上行控制信息比特数 L 时单天线端口传输模式和多天线端口传输模式分别对应的 ^ PUCCHa 数值、 以及上行控制信息比特数 >L时对应的 参数值中的一个, 其 余 TOCCff(F)参数值根据预先配置或约定的偏移量基于配置的 Af PUCCH、F、 数值获得, 例如:
方式(3-3 ): 高层信令预先配置 1 个 Afccff(F)值 AF— n L 表示上 行控制信息比特数 L时单天线端口传输模式对应的 Af 参数值;对于
ACK/NACK传输, 较优的, AF Pt/CCH i ^-lAW} dB;
其中, UE在确定上行控制信息比特数 L 时多天线端口传输模式对应的 参数值 _«/ 丄 2(F), 以及上行控制信息比特数 >L 时对应的 AF PUCCH (F)参数值 AF PUCCH 2(F)时, 可根据预先配置或约定的偏移量 和 基 于 ( 获得, 即:
2(F — A pUCCH i i(F + , _2^)~ ( ^ ) ^2,
其中, 和 可以相同,也可以不同, 的取值可使 AF Pt/CCH j 2(i e{-l,0,l,2} dB A PUCCH ! 2( ) e{-2,-l,0,l} dB, 具体值可以为 0或 -1; 特别的, 当 eNB和 UE 预先约定单天线端口传输模式和多天线端口传输模式采用相同的 参数值时, 4=0, 即 丄 ( , 此时可不预先 配置或约定 ; 的取值可使 AF— n2(F)e{3,4,5,6}, 具体值可以为 3或 4;特别 的, 当 eNB和 UE预先约定上行控制信息比特数>1^和上行控制信息比特数 1^ 采用相同的 Af_ ccff(F)参数值时,
Figure imgf000018_0001
此 时可不预先配置或约定 4;特别的, 当 eNB和 UE预先约定上行控制信息比特 lt>L 时以及上行控制信息比特数 L 时在单天线端口传输模式和多天线端口 传输模式采用 相 同 的 —PUCCAF、参数值时, 4 =0 , δ2 =0 , 即 △WH 2(F) = AF— n1 2( = AFPt/CCH u( ,此时可不预先配置或约定 和 基站可在 ^ ccff(F)集合 {-1,0,1,2,3,4,5,6}中选择一个适当的值,通过高层信令直 接配置给 UE , 作为 PUCCH format3对应的 Af PUCCH (F)参数值即可。
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。 当只对上行控制信息比特数 >L时进一步区分 PUCCH传输模式,对上行控 制信息比特数 L时不区分 PUCCH传输模式, 即单天线端口传输模式和多天 线端口传输模式采用相同的 Af 值,可采用如下 Af 配置方法: 方式(4): 高层信令预先配置 3 个 PUCCH(F)值, 分别表示上行控制信 息比特数 1^时对应的 ^ PUCCH( 参数值、 以及上行控制信息比特数 >L时单 天线端口传输模式和多天线端口传输模式分别对应的 Af PUCCH(F)参数值, 例 如:
高层信令预先配置 3 个 Afccff( M AFPt ^^ 、 AF_PUCCH 2 l(F) , 和
PUCCH 2 2(F), 其中:
(^表示上行控制信息比特数 L 时对应的 Afccff (F)参数值, 即对于上行控制信息比特数 L不区分 PUCCH传输模式, 单天线端口传输模 式和多天线端口传输模式采用相同的 Af 值; 对于 ACK/NACK传输, 较优的, AFPt ^ ^— 1,0,1,2} dB;
— «/Cai2— i (^表示上行控制信息比特数>!^ 时单天线端口传输模式对应的 参数值; 对于 ACK/NACK传输, 较优的, AF ccH 2 ^ ερ, ,ό} dB;
△n^— 2 2 (^表示上行控制信息比特数 > L 时多天线端口传输模式对应 的 Af PUCCH(F) 参 数 值 ; 对 于 ACK/NACK 传 输 , 较 优 的 ,
^F_PUCCH_2_2(F) e {2,3,4,5} dB或 AF _PUCCH _2 2(F) e {3,4,5,6} dB;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
此外, 方式(4)还可演变为高层信令只配置部分 Af ccff(F) (至少一个) 参数值, 其余参数值通过预先约定或高层配置的偏移量得到, 即:
高层信令可预先配置 2 个 分别表示上行控制信息比特数 1^ 时对应的 ^ PUCCH(F)参数值、 以及上行控制信息比特数>1^时单天线端口传输 模式和多天线端口传输模式分别对应的 Af 参数值中的 2 个, 其余
AF ccff(F)参数值根据预先配置或约定的偏移量基于配置的 Af PUCCH(F)参数 值获得, 例如:
方式 ( 4-1 ): 高层信令预先配置 2 个 Afccff(F)值 AF— n 和 PUCCH 2 1 , 其中 ·
(^表示上行控制信息比特数 L 时对应的 Afccff (F)参数值, 即对于上行控制信息比特数 L不区分 PUCCH传输模式, 单天线端口传输模 式和多天线端口传输模式采用相同的 ^ PUCCH(F)值; 对于 ACK/NACK传输, 较优的, AFPt ^— 1,0,1,2} dB;
AFPt ^F)表示上行控制信息比特数>1^ 时单天线端口传输单天线端口 传输模式对应的 Af 参数值; 对于 ACK/NACK 传输, 较优的,
AF_FUCCH 2 l(F)e {3,4,5,6} dB;
其中, UE在确定上行控制信息比特数>1^ 时多天线端口传输模式对应的 A^^/CO/ )参数值 _«/CCH丄 2(F)时, 可根据预先配置或约定的偏移量 基于 — PUCCH JF) PUCCH2 F) , 即:
— PUCCH— 2— 2 F — ― PUCCH—1 F) + , ^-F PUCCH _2_l(^ ~ PUCCH _2_l(^ ~^~ , 其中, 的取值可使 AFPt/CCH22( e {2,3,4,5} dB 或 —PUCCH2 2(F、 e {3,4,5,6} dB, 具体值可以为 3或 4; 特别的, 当 eNB和 UE预先约定上行控制信息比特 ¾>L和上行控制信息比特数 1^采用相同的 Af 参数值时, =0, 即
Figure imgf000021_0001
'或者, 当 eNB和 UE预先约定单天线端口传输模 式和多天线端口传输模式采用相同的 Af 参数值时, 4=0, 即
Figure imgf000021_0002
= ^F_PUCCH_2 (F), 此时可不预先配置或约定 ;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
方式 ( 4-2 ): 高层信令预先配置 2 个 Afccff(F)值 AF— n 和
PUCCH 2 2(F) , 其中:
(^表示上行控制信息比特数 L 时对应的 Afccff (F)参数值, 即对于上行控制信息比特数 L不区分 PUCCH传输模式, 单天线端口传输模 式和多天线端口传输模式采用相同的 ^ 值; 对于 ACK/NACK传输, 较优的, AFPt ^— 1,0,1,2} dB;
△n^— 2 2 (^表示上行控制信息比特数 > L 时多天线端口传输模式对应 的 Af PUCCH(F) 参 数 值 ; 对 于 ACK/NACK 传 输 , 较 优 的 , AF_PUCCH_2_2(F) e {2,3,4,5} dB或 Pt 2(F) e {3,4,5,6} dB;
其中, UE在确定上行控制信息比特数>1^ 时单天线端口传输模式对应的 — 参数值 — ccH2— 时, 可根据预先配置或约定的偏移量 基于
PUCCH l(F) ^ ^F PUCCH 2 2( )获得, 即: F— PUCCH— 2— 1(F — —puccH— 1(F + ,或者, F puccH 2 (F) ~ A F puccH 2 2(F) + , 其中, 的取值可使 AF Pt/CCH 2
Figure imgf000022_0001
具体可以为 3或 4; 特别的, 当 eNB和 UE预先约定上行控制信息比特数>1^和上行控制信息比特数 L采 用相同的 Afccff(F)参数值时, =0, 即 AFPt 2( =AFPt ^), 或者, 当 eNB和 UE预先约定单天线端口传输模式和多天线端口传输模式采用相同的 — 参数值时, =。, 即
Figure imgf000022_0002
, 此时可不预先 配置或约定 ^ ;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
此外, 高层信令还可预先配置 1个 表示上行控制信息比特数
<L时对应的 ^ PUCCH(F)参数值、 以及上行控制信息比特数>1^时单天线端口 传输模式和多天线端口传输模式分别对应的 CCH ( )参数值中的一个, 其
^AF PUCCH (F)参数值根据预先配置或约定的偏移量基于配置的 CCH (F)参 数值获得, 例如:
方式(4-3 ): 高层信令预先配置 1个 AfTOCCff(F)值 AF— n 表示上 行控制信息比特数 L时对应的 Af TOCCff(F)参数值,即对于上行控制信息比特 数 1^不区分 PUCCH传输模式, 单天线端口传输模式和多天线端口传输模式 采用 相 同 的 Af PUCCH(F)值; 对于 ACK/NACK 传输, 较优的 ,
AF PUCCH l(F) {-m,2} dB;
其中, UE在确定上行控制信息比特数>1^ 时单天线端口传输模式对应的 ^F_PUCCH (F)参数值 —PUCCH—^和多天线端口传输模式对应的 — PUCCH22(F、 时, 可根据预先配置或约定的偏移量 和 基于八 ^^^^)获得, 即:
F PUCCH 2 l(^) ~^F PUCCH 1 (^) ' F PUCCH 2 ~ F PUCCH _\ (^) ^"^2,
其 中 , ^ 和 可以相 同 , 也可以 不 同 , 的取值可使
AF PUCCH 2 l(F)e {3,4,5,6} , 具体可 以 为 3 或 4 ; 的 取值 可使
Figure imgf000023_0001
e {2,3,4,5} dB或 AF _PUCCH _2 2(F) e {3,4,5,6} dB,具体可以为 3或 4; 特 别的, 当 eNB和 UE预先约定单天线端口传输模式和多天线端口模式采用相同 的 AF 参数值时,或者,当 eNB和 UE预先约定上行控制信息比特 t>L 和上行控制信息比特数 1^ 采用相同的 Af 参数值时, W 即
Figure imgf000023_0002
+ 可只配置或约定一个 值;特 别的, 当 eNB和 UE预先约定上行控制信息比特数 !^时以及上行控制信息比 特数 >L 时在单天线端口传输模式和多天线端口传输模式采用相同的 F_PUCCH(F) 参 数 值 时 , =0 , S2 =0 , 即 ― PUCcO —PUCCH22(F) = AF PUCCHJ(F 此时可不预先配置或约定 和 S2, 基站可在 ^ ccff(F)集合 {-1,0,1,2,3,4,5,6}中选择一个适当的值, 通过高层信 令直接配置给 UE, 作为 PUCCHformat3对应的 Af ccff (F)参数值即可。
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。 当同时对上行控制信息比特数 1^和>1^ 时都进一步区分 PUCCH传输模 式时, 即上行控制信息比特数 1^和>1^在单天线端口传输模式和多天线端口 传输模式都采用独立的 ^ PUCCH(F)值, 可采用如下 Af ccff(F)配置方法: 方式(5): 高层信令预先配置 4 个 PUCCH(F)值, 分别表示上行控制信 息比特数 L 时单天线端口传输模式和多天线端口传输模式分别对应的 AF PUCCH(F)参数值、 以及上行控制信息比特数 >L时单天线端口传输模式和多 天线端口传输模式分别对应的 PUCCH( 参数值, 例如: 高层信令预先配置 4 个 Af_ ccff(F AFPt/CCH丄 ^) 、 AF PUCCH l 2(F)、 F— PUCCH— 1— F、、 ^ F PUCCH 2 2^) ' ^"申 ·
L i (^表示上行控制信息比特数 L时单天线端口传输模式对应的 AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {-1,0,1,2} dB;
PUCCH丄 Λ 表示上行控制信息比特数 L时多天线端口传输模式对应的
AF PUCCH(F)参数值', 对于 ACK/NACK传输, 较优的, AFPt/CCH2(F) e {_1,0,1,2} dB或 AF„丄 2( e {-2,-1,0,1} dB;
△ ^m (^表示上行控制信息比特数 > L时单天线端口传输模式对应的 AF PUCCH(F) 参 数 值 ; 对 于 ACK/NACK 传 输 , 较 优 的 ,
AF_PUCCH_2 l(F)^{3,4,5,6}d ;
△n^— 2 2 (^表示上行控制信息比特数 > L 时多天线端口传输模式对应 的 AF CC//(F)参数值;对于 ACK/NACK传输,较优的, AFPt/CCH22(i e{2,3,4,5} dB或 Δ — Pt/CCH22( e {3,4,5,6} dB;
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 AF PUCCH (F)参数值。
此外, 方式(5)还可演变为高层信令只配置部分 AF PUCCH(F) (至少一个) 参数值, 其余参数值通过预先约定或高层配置的偏移量得到, 即:
高层信令可预先配置 2 个 分别表示上行控制信息比特数 1^ 时单天线端口传输模式和多天线端口传输模式分别对应的八 PUCCH(F)参数 值、 以及上行控制信息比特数 >L 时单天线端口传输模式和多天线端口传输模 式分别对应的 AF CCFF(F)参数值中的 2个, 其余 AF CCFF(F)参数值根据预先 配置或约定的偏移量基于配置的 AF PUCCH(F)参数值获得, 例如: 方式 ( 5-1 ): 高层信令预先配置 2 个 AfTOCCff(F iAF— n L 和
^■F PUCCH 2 1 (F) , 其中 ·
L i (^表示上行控制信息比特数 L时单天线端口传输模式对应的 AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {- 1,0,1,2} dB;
△ ^m (^表示上行控制信息比特数 > L时单天线端口传输模式对应的 AF PUCCH(F) 参 数 值 ; 对 于 ACK/NACK 传 输 , 较 优 的 ,
AF_PUCCH_2 F) ^ {3,4,5,6}d ;
其中, UE在确定上行控制信息比特数 L 时多天线端口传输模式对应的 Af ccff(F)参数值 AF Pt/CCH 1 2( 时, 以及确定上行控制信息比特数〉 L 时多 天线端口传输模式对应的 Af ccff(F)参数值 AF Pt/CCH 2 2(F)时, 可根据预先配 置或约定的偏移量 和 基于 AFpt ^和 ^ 获得, 即:
F— PUCCH—I— 2(F — A F puccH i F + ,
PUCCH 2 2 ) ~ F PUCCH 2 I (^) + ^2,
其中, 和 可以相同,也可以不同, 的取值可使 AF Pt/CCH j 2(i e{-l,0,l,2} dB 或 AFPt/CCH2(i e{_2,_l,0,l} dB, 的取值可使 AFPt/CCH22(i e{2,3,4,5} dB 或 PUCCH 2 {3,4,5,6}, 具体值可以为 0或-1; 特别的, 当 eNB和 UE预先 约定单天线端口传输模式和多天线端口传输模式采用相同的 F PUCCH ( )参数 值时, 即^和 /或 的值为 0 时, 可不预先配置或约定 ^和 /或 值, 即 F PUCCH _\_2^) ~ PUCCH I I (^) , ^ F PUCCH 2 2 ~ ^ F PUCCH 2 _\ (^),
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
方式 ( 5-2 ): 高层信令预先配置 2 个 TOCCff(F^ AF PUCCH γ F)和 △f t/CCH— 1 2( ) , 其中.
L i (^表示上行控制信息比特数 L时单天线端口传输模式对应的 AF PUCCH(F)参数值; 对于 ACK/NACK传输, 较优的, AFPt/CCH丄 F) e {-1,0,1,2} dB;
AF PUCCH_l 2(F)表示上行控制信息比特数 L时多天线端口传输模式对应的
AF PUCCH(F)参数值', 对于 ACK/NACK传输, 较优的, AFPt/CCH2(F) e {_1,0,1,2} dB或 AF„丄 2( e {-2,-1,0,1} dB;
其中, UE在确定上行控制信息比特数〉 L 时单天线端口传输模式对应的 参数值 —«/^— 2— 时, 以及确定上行控制信息比特数〉 L 时多 天线端口传输模式对应的 Af ccff(F)参数值 AF Pt/CCH 2 2(F)时, 可根据预先配 置或约定的偏移量 和 基于 Af ccff 和 Af ccff 3(F)获得, 即:
^F PUCCH 2 1 (^1) ~ ^F PUCCH I I (^1) + ,
^F_PUCCH _2_2(^)~^F_PUCCH _l_l(^) ~^^2 PUCCH 2 2 (^) ~ PUCCH 1 2 (^) ^3 , 其中 , 、 δ2 . 可以相同 , 也可以不同 , ^ 的取值可使 AF PUCCH_2 l(F)^ {3,4,5,6} dB, 和 3的取值可使 AFPt 2(F) e {2,3,4,5} dB 或 AF_PUCCH_2 2(F)e{3A,5,6} ^ 、 和 4具体值可以为 3或 4; 特别的, 当 eNB和 UE 预先约定单天线端口传输模式和多天线端口传输模式采用相同的 参数值时, 可不预先配置 和 的值, 只配置^ 的值, 即 F— PUCCH— 2— 2 F、 _ PUCCH 2 1 (^) _ ^ F PUCCH _\ _\ (^) + ^\,
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及
PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
此外, 高层信令还可预先配置 1个 表示上行控制信息比特数
<L 时单天线端口传输模式和多天线端口传输模式分别对应的 ^ PUCCH F)参 数值、 以及上行控制信息比特数 >L 时单天线端口传输模式和多天线端口传输 模式分别对应的 Af ccff (F)参数值中的一个, 其余 Af TOCCff (F)参数值根据预 先配置或约定的偏移量基于配置的 Af PUCCH(F)参数值获得, 例如:
方式(5-3 ): 高层信令预先配置 1 PUCCH(F)值 AF PUCCH j 表示上 行控制信息比特数 L时单天线端口传输模式对应的八 PUCCH{F)Mi ;对于 ACK/NACK传输, 较优的, AFPt i
Figure imgf000027_0001
dB;
其中, 上行控制信息比特数 L 时多天线端口传输模式对应的 — ,CCH2( 上行控制信息比特数〉 L 时单天线端口传输模式对应的
^F_PUCCH_2_l(F)和上行控制信息比特数〉 L 时多天线端口传输模式对应的 H—i—i F , 可根据预先配置或约定的偏移量 、 δ2. 基于 Af PUCCH .(F) 获得, 即:
Figure imgf000027_0002
~ _ PUCCH 1 1 (^)十 ,
^■F PUCCH _2_[{^) ~ PUCCH I I ί^) ^2,
^■F PUCCH 2 2 ) ~ F PUCCH I I i^) + ,
其中 , δΊ 4可以相同 , 也可以不同 , ^ 的取值可使 F PUCCH丄 1 F e {-1,0,1,2} dB 或 AF PUCCH , 2{F) e {-2,-1,0,1} dB, S2的取值可使
Figure imgf000027_0003
e {3,4,5,6} dB , δ3的取值可使 AF PUCCH _2 2(F) e {2,3,4,5} dB 或 AF PUCCH_2 2(F)e{3,4,5,6} ^具体值 =0或 -1, 和 具体可以为 3或 4; 特别的, 当 eNB和 UE预先约定单天线端口传输模式和多天线端口传输模式采用相同的 参数值时, = ¾ =0, 即△ w 丄 2( ) =△ w 丄 , ― PUCCH2—2 = 2—、(F = AF PUCCH丄 F) + δ2 , 可不预先配置^和^的值, 只配置 的值; 特别的, 当 eNB和 UE预先约定上行控制信息比特数〉 L和上 行控制信息比特数 L 采用相同的 Af 参数值时, =0 , 即 ― PUCCH2(F、 = —PUCCH丄 (F) , 可不预先配置 4的值, 只配置 和 的值; 特 别的, 当 eNB和 UE预先约定上行控制信息比特数 > L和上行控制信息比特数 L采用相同的 Af PUCCH (F)参数值,且单天线端口传输模式和多天线端口传输 模式采用 相 同 的 Af TOCCff(F) 参数值 时 , = δ2 = S3 =0 , 即
( = PUCCH22(F、 = PUCCH2 ^ = FPUCCO ,此时可不预先配 置 4、 和 的值, 基站可在 TOCCff(F)集合 {-Ι,Ο,Ι,2,3,4,5,6}中选择一个适当的 值, 通过高层信令直接配置给 UE,作为 PUCCH format3对应的 Af PUCCH(F)参 数值即可。
相应的, UE 可根据上行控制信息的比特数是否大于门限 L 比特以及 PUCCH的传输模式, 选用适当的 Af PUCCH (F)参数值。
上述 («ce , nHARQ , nSR )函数中, ¾Αββ为用于计算 PUCCH承载比特数的功率 偏移量的 ACK/NACK比特数目, 为用于计算 PUCCH承载比特数的功率偏 移量的 SR比特数目, 如果当前上行子帧中存在 SR传输, 则/ ½ =1, 如果当前 上行子帧中不存在 SR传输, 则 /½ = 0。
需要说明的是, 上述步骤中以 ACK/NACK传输为例给出 h(nCQI,n腿 函数公式, 不排除其他信息的传输。
需要说明的是, 上述天线端口指的是 PUCCH对应的天线端口。
下面结合具体应用场景, 对本发明实施例进行进一步说明。
场景一: UE配置了 2个下行载波, 都采用双码字传输模式, M=4, 即 UE 在当前上行子帧需要反馈 4个下行子帧的 ACK/NACK反馈信息, 若根据 UE 配置, UE需要反馈 16比特 ACK/NACK信息, 即大于 11比特。 如图 5所示, 采用 PUCCH format 3传输 ACK/NACK, 具体功率控制流程如下:
基站端, 与上行功率控制相关的操作主要包括配置 Af 和按照估 计的 PUCCH发射功率在 PUCCH 信道接收 UE 发送的数据。 其中, 配置 ^F_PUCCH{F)的具体操作可包括:
采用方式(1 ) 配置时: 根据 UE 配置, 在上行控制信息比特数小于等于
11比特对应的 Af PUCCH (F)集合 {-1,0,1,2}和上行控制信息比特数大于 11比特对 应的 AF PUCCH(F)集合 {3,4,5,6}中各选择一个值, 例如 AF PUCCH L(F) = -1和 AF PUCCH 2( ) = 3, 并通过高层信令预先配置给 UE;
采用方式(2) 配置时: 根据 UE 配置, 在上行控制信息比特数小于等于 11 比特对应的 Af PUCCH(F) 集合 {-1,0,1,2} 中选择一个值, 例如,
AF PUCCH !( ) = -1, 并通过高层信令预先配置给 UE; 此外, 基站和 UE预先 约定 = 4;
采用方式(3) 配置时: 只对上行控制信息比特数小于等于 11比特时区分
PUCCH传输模式, 根据 UE配置, 分别在上行控制信息比特数小于等于 11比 特时单天线端口传输模式对应的 F PUCCH F、集合 {-1,0,1,2}中选择一个值, 例 如, AF— ^^) = -1 , 在上行控制信息比特数小于等于 11比特时多天线端口 传输模式对应的 — PuccH 集合 {-2,-1,0,1} 中选择一个值, 例如 AF PUCCH l 2(F) = -2, 在上行控制信息比特数大于 11比特时对应的 Af_TOCCH(F) 集合 {3,4,5,6}中选择一个值, 例如 AF PUCCH 2(F) = 3 , 并通过高层信令预先配置 给 UE;
进一步采用方式(3)的演进方法时, 如方法(3-3): 根据 UE配置, 在上 行控制信息比特数小于等于 11比特时单天线端口传输模式对应的
集合 {-1,0,1,2}中选择一个值, 例如, AF Pt/CCH j ^(^ = -1 , 并通过高层信令预先 配置给 UE; 此外, 基站和 UE预先约定 =-1 , δ2 =4;
采用方式(4)配置时:只对上行控制信息比特数大于 11比特时区分 PUCCH 传输模式,根据 UE配置, 分别在上行控制信息比特数小于等于 11比特时对应 的 TOCCH(F)集合 {- 1,0,1,2}中选择一个值, 例如, AF PUCCH =— 1, 在上 行控制信息比特数大于 11比特时单天线端口传输模式对应的 Af PUCCH(F)集合
{3,4,5,6}中选择一个值, 例如 AF— ^^) = 3, 在上行控制信息比特数大于 11 比特时多天线端口传输模式对应的 Af 集合 {2,3,4,5}中选择一个值, 例 如八 PUCCH 2 2(F) = 2 , 并通过高层信令预先配置给 UE;
进一步采用方式(4)的演进方法时, 如方法(4-3): 根据 UE配置, 在上 行控制信息比特数小于等于 11比特时对应的 Af TOCOT(F)集合 {-1,0,1,2}中选择 一个值, 例如, Af F):- 1, 并通过高层信令预先配置给 UE; 此外, 基站和 UE预先约定 =4 , δ2 =3 ;
采用方式(5)配置时:对上行控制信息比特数小于等于 11比特和大于 libit 同时区分 PUCCH传输模式, 根据 UE配置, 分别在上行控制信息比特数小于 等于 11比特时单天线端口传输模式对应的 Af TOCCH(F)集合 {-1,0,1,2}中选择一 个值, 例如, Pt/CCH ^ ^(^) = -1, 在上行控制信息比特数小于等于 11比特时多 天线端口传输模式对应的 Af TOCCH(F)集合 {-2,-1,0,1}中选择一个值, 例如
L 2(^) = -2,在上行控制信息比特数大于 11比特时单天线端口传输模式 对应的 Af TOCCH(F)集合 {3,4,5,6}中选择一个值, 例如 AF Pt/CCH 2」(^ = 3, 在上 行控制信息比特数大于 11比特时多天线端口传输模式对应的 Af PUCCH(F)集合
{2,3,4,5}中选择一个值,例如 AF Pt/CCH 2 2( = 2 ,并通过高层信令预先配置给 UE; 进一步采用方式(5)的演进方法时, 如方法(5-3): 根据 UE配置, 在上 行控制信息比特数小于等于 11比特时单天线端口传输模式对应的 P[/cai(F) 集合 {-1,0,1,2}中选择一个值, 例如, AF Pt/CCH j ^(^ = -1, 并通过高层信令预先 配置给 UE; 此外, 基站和 UE预先约定 =-1、 4=4、 =3。
UE端: 进行上行功率控制, 具体的可以针对不同情况进行如下处理: 情况一:不论 PUCCH采用单天线端口传输模式还是多天线端口传输模式, UE 选择上行控制信息比特数大于 11 比特时所对应的 Af
/ , 函数计算 PUCCH的发射功率, 即:
UE 采用 /i(«CG¾?SR)= 0.25 · ( ΑΚβSJ— 0.75 =0·25(12+0)-0·75=2·25 计算 PUCCH承载比特数对应的功率偏移量;
当 AF cc7/(F)的配置方式为上述方式 ( 1 ) 时: UE 采用高层配置的
Figure imgf000031_0001
= 3, 进一步计算 PUCCH的发射功率;
TOCCff ( )的配置方式为上述方式(2) 时: UE通过 =4和高层配置 的 — Cn(F) = -l获得 — c2(F)= — 0 (^ + ^-1+4=3,进一步计 算 PUCCH的发射功率。
情况二: PUCCH采用单天线端口传输模式传输时:
UE 采用 /^ ,^^,/^^ (^ 丽 ,^)- 1.5=0·3(12+0)-1·5=2.1 计算
PUCCH承载比特数对应的功率偏移量;
当 的配置方式为上述方式(1 )时: 即单天线端口传输模式和 发送分级模式采用相同的 TOCCH(F)参数值, UE 采用高层配置的 AF PUCCH 2(F) = 3 , 进一步计算 PUCCH的发射功率;
当 的配置方式为上述方式(2)时: 即单天线端口传输模式和 发送分级模式采用相同的 Af 参数值, UE 通过 =4 和高层配置的
Af— ^^— 1获得 A„,C2(F) = Af—™co j(F)+ =-l+4=3,进一步计算 PUCCH的发射功率;
Af 的配置方式为上述方式(3)时: 即只对上行控制信息比特 数小于等于 11比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11 比特不区分 PUCCH传输模式, 此时, UE采用高层配置的 ^ n 2(F) = 3, 进 一步计算 PUCCH的发射功率; 当 A P[/ca/(F)的配置方式为上述方式(3-3) 时: 即只对上行控制信息比 特数小于等于 11 比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11 比特不区分 PUCCH 传输模式, 此时, UE 通过 =4和高层配置的
Figure imgf000032_0001
= F PUCCH_l l(F) + S2 = -1 + 4 = 3 , 进一步计算 PUCCH的发射功率;
当 — «/CCff(F)的配置方式为上述方式(4)时: 即只对上行控制信息比特 数大于 11比特时区分 PUCCH传输模式, 对上行控制信息比特数小于等于 11 比特不区分 PUCCH传输模式, 此时, UE采用高层配置的 TO :/i 2 ,(7 = 3, 进一步计算 PUCCH的发射功率;
当八^ 的配置方式为上述方式(4-3) 时: 即只对上行控制信息比 特数大于 11 比特时区分 PUCCH传输模式, 对上行控制信息比特数小于等于 11 比特不区分 PUCCH 传输模式, 此时, UE 通过 =4和高层配置的 — PUCCH—人 = -1获得 AF PUCCH」——i( = AF PUCCH l(F) + =—1 + 4 = 3, 进一步计算 PUCCH的发射功率;
当八^ 的配置方式为上述方式(5)时: 即对上行控制信息比特数 小于等于 11比特和大于 11比特都区分 PUCCH传输模式,此时, UE采用高层 配置的 Af 2 ,(F) = 3, 进一步计算 PUCCH的发射功率;
当 Af 的配置方式为上述方式(5-3) 时: 即对上行控制信息比特 数小于等于 11比特和大于 11比特都区分 PUCCH传输模式,此时,UE通过 4=4 和 高 层 配 置 的 AFPt L ^^ = -1 获 得 Δ^Ρ^Η_2_ι(^)=Δ^,ί/ΓΓ/ί_1_1(^)+^2 =-1+4=3, 进一步计算 PUCCH的发射功率。
情况三: 若 PUCCH采用多天线端口传输模式传输:
UE 采用 /i(wCG , « ¾?SR)= 0.25 · (¾ΑΚβ 0.75 =0.25(12+0)-0·75=2·25 计算 PUCCH承载比特数对应的功率偏移量; 当 A 的配置方式为上述方式(1 )时: 即单天线端口传输模式和 发送分级模式采用相同的 Af 参数值, UE 采用高层配置的 — PuccH— = 3 , 进一步计算 PUCCH的发射功率;
当 A 的配置方式为上述方式(2)时: 即单天线端口传输模式和 发送分级模式采用相同的 Af 参数值, UE 通过 =4 和高层配置的
△WH F — 1获得 AWH 2(F) = Aw 1(F)+ =-l+4=3,进一步计算 PUCCH的发射功率
当 — ccff(F)的配置方式为上述方式(3)时: 即只对上行控制信息比特 数小于等于 11比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11 比特不区分 PUCCH传输模式, 此时, UE采用高层配置的八 PUCCH 2(F) = 3 , 进 一步计算 PUCCH的发射功率;
当 Af 的配置方式为上述方式(3-3 ) 时: 即只对上行控制信息比 特数小于等于 11 比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11 比特不区分 PUCCH 传输模式, 此时, UE 通过 =4和高层配置的 AF PUCCH l l(F) = -1获得 AF PUCCH 2(F) = AF PUCCH l l(F) + δ2 =-1 + 4 = 3 , 进一步计算 PUCCH的发射功率;
当 Af 的配置方式为上述方式(4)时: 即只对上行控制信息比特 数大于 11比特时区分 PUCCH传输模式, 对上行控制信息比特数小于等于 11 比特不区分 PUCCH传输模式, 此时, UE采用高层配置的 AF— n 2 2(F) = 2 , 进一步计算 PUCCH的发射功率;
当 Af 的配置方式为上述方式(4-3 ) 时: 即只对上行控制信息比 特数大于 11 比特时区分 PUCCH传输模式, 对上行控制信息比特数小于等于 11 比特不区分 PUCCH 传输模式, 此时, UE 通过 =3和高层配置的 PuccH ^^ = -1获得 PUCCH 2 2(F) = AF PUCCH ^) + 32 =-\ + 3 = 2 , 进一步计算 PUCCH的发射功率;
当 — 的配置方式为上述方式(5 )时: 即对上行控制信息比特数 小于等于 11比特和大于 11比特都区分 PUCCH传输模式,此时, UE采用高层 配置的 AF— n 2 2(F) = 2, 进一步计算 PUCCH的发射功率;
当八^ 的配置方式为上述方式(5-3 ) 时: 即对上行控制信息比特 数小于等于 11比特和大于 11比特都区分 PUCCH传输模式,此时,UE通过 =3 和 高 层 配 置 的 AFPt L ^^) = -1 获 得
Figure imgf000034_0001
进一步计算 PUCCH的发射功率。
场景二: UE配置了 2个下行载波, 都采用单码字传输模式, M=4, 即 UE 在当前上行子帧需要反馈 4个下行子帧的 ACK/NACK反馈信息, 根据 UE配 置, UE需要反馈 8比特 ACK/NACK信息, 小于 11比特, 如图 6所示, 采用 PUCCH format 3传输 ACK/NACK, 具体功率控制流程如下:
基站端的处理操作可同场景一中的相应操作, 在此不再赘述。
UE端: 进行上行功率控制, 具体的可以针对不同情况进行如下处理: 情况一:不论 PUCCH采用单天线端口传输模式还是多天线端口传输模式,
UE 选择上行控制信息比特数小于等于 11 比特所对应的 Af P[/cai(F)和
^^?/^^^,^^函数计算 PUCCH的发射功率, 即:
UE采用 "ce, e +¾)-1.3=0.5(6+0)-1.3 =1.7计算 PUCCH 承载比特数相对应的功率偏移量;
当 Af TOCCH(F)的配置方式为上述方式( 1 )或方式(2)时: UE采用高层 配置的 F PUCCH 1(F) = -1 , 进一步计算 PUCCH的发射功率;
情况二: 若 PUCCH采用单天线端口传输模式传输:
UE采用 "ce e +¾)-1.3=0.5(6+0)-1.3 =1.7计算 PUCCH 承载比特数对应的功率偏移量; 当 A P[/COT(F)的配置方式为上述方式(1 )或方式(2) 时: 即单天线端 口传输模式和发送分级模式采用相同的 Af PUCCH{F) Mi , UE采用高层配置 的 (F = -1 , 进一步计算 PUCCH的发射功率;
当 A 的配置方式为上述方式(3)或方式(3-3)时, 即只对上行 控制信息比特数小于等于 11比特时区分 PUCCH传输模式,对上行控制信息比 特数大于 11 比特不区分 PUCCH 传输模式, 此时, UE 采用高层配置的
Figure imgf000035_0001
= , 进一步计算 PUCCH的发射功率;
TOCCff( )的配置方式为上述方式(4)或方式(4-3)时, 即只对上行 控制信息比特数大于 11比特时区分 PUCCH传输模式,对上行控制信息比特数 小于等于 11 比特不区分 PUCCH 传输模式, 此时, UE 采用高层配置的 AF PUCCH L(F) = -\ , 进一步计算 PUCCH的发射功率;
当 PuccH (F)的配置方式为上述方式( 5 )或方式( 5-3 )时, 即对上行控 制信息比特数小于等于 11比特和大于 11比特同时区分 PUCCH传输模式, 此 时, UE采用高层配置的 AF PUCCH L I = -1 , 进一步计算 PUCCH的发射功率; 情况三: 若 PUCCH采用多天线端口传输模式传输:
UE采用 /^ ^
Figure imgf000035_0002
0·6=0·35(6+0)-0·6=1·5计算
PUCCH承载比特数对应的功率偏移量;
TOCCff(F)的配置方式为方式(1 )或方式(2) 时: 即单天线端口传 输模式和发送分级模式采用相同的 Af 参数值, UE 采用高层配置的 AF PUCCH 1(F) = -l , 进一步计算 PUCCH的发射功率;
当 — 的配置方式为方式(3)时: 即只对上行控制信息比特数小 于等于 11比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11比特 不区分 PUCCH传输模式, 此时, UE采用高层配置的 AF t 2(i = -2, 进 一步计算 PUCCH的发射功率;
当 的配置方式为上述方式(3-3 ) 时: 即只对上行控制信息比 特数小于等于 11 比特时区分 PUCCH传输模式, 对上行控制信息比特数大于 11 比特不区分 PUCCH 传输模式, 此时, UE 通过 =-1和高层配置的 ^F_PUCCH_l_l(F = - 1获得 AF_PUCCH_l_2(F) = ^F PUCCH_l_l (^) + = - 1 + - 1 = - 2 ,进一步计 算 PUCCH的发射功率;
当 puccH (F)的配置方式为方式( 4 )或方式( 4-3 )时: 即只对上行控制 信息比特数大于 11比特时区分 PUCCH传输模式,对上行控制信息比特数小于 等于 11 比特不区分 PUCCH 传输模式, 此时, UE 采用高层配置的 AF PUCCH l(F) = -1 , 进一步计算 PUCCH的发射功率;
当 — 的配置方式为上述方式(5)时: 即对上行控制信息比特数 小于等于 11比特和大于 11比特都区分 PUCCH传输模式,此时, UE采用高层 配置的 F PUCCH f、 = -2 , 进一步计算 PUCCH的发射功率;
当 — ccff(F)的配置方式为方式(5-3 ) 时: 即对上行控制信息比特数小 于等于 11比特和大于 11比特都区分 PUCCH传输模式, 此时, UE通过^;=-1 和 高 层 配 置 的 AFPt L F -l 获 得
Figure imgf000036_0001
进一步计算 PUCCH的发射功率。
需要说明的是, 上述实施例中是以 ACK/NACK反馈信息为例描述的, 对 于 PUCCH发送其他反馈信息的情况同样适用。
通过以上描述可以看出, 在 LTE-A***中,根据上行反馈信息的比特数和
/或 PUCCH 的传输模式采用不同的 Af TOCCH(F)和/^ ce , «丽 ^^^函数计算
PUCCH发射功率的方法,可以尽可能保证 UE按照适合的功率发送数据,避免 功率浪费, 提高 UE功率利用率。
基于相同的技术构思, 本发明实施例还提供了一种可应用于上述流程的用 户设备, 还提供了一种网络侧设备。
如图 7所示, 本发明实施例提供的用户设备可包括:
接收模块 701, 用于在 N个下行载波的 M个下行子帧中接收数据; 其中, N>1, M>1;
控制信息生成模块 702,用于生成可在同一上行子帧中传输的所述 M个下 行子帧的上行控制信息;
功率控制模块 703, 用于根据所述控制信息生成模块生成的上行控制信息 的比特数是否大于设定门限, 确定用于计算上行控制信道 PUCCH发射功率的 A FPUCCH(F)和 h(n 并根据确定出的 Af TOCCH(F)和^) , 计算用于在 PUCCH 上发送所述上行控制信息的发射功率; 其中, 所述 Af 用于表示不同 格式的 PUCCH相对于 PUCCH format la的功率偏移量, 所述 用于表示与 PUCCH传输比特数相对应的功率偏移量;
发送模块 704, 用于采用计算出的发射功率在 PUCCH上发送所生成的上 行控制信息。
上述用户设备中, 功率控制模块 703具体用于, 当所述上行控制信息比特 数不大于所述设定门限时,确定 — PUCCH (F) = A Pt/CCH 1 (F) , h(n) = (η)=Άι -n + b,, 其中 &1和1)1为/11(/1)函数的系数值,或根据 PUCCH传输模式确定 Af PUCCH(F)和 h(n); 即确定 AF PUeeH (F)为上行控制信息比特数不大于所述设定门限时对应的
^F_PUCCH_l(F), AW为上行控制信息比特数不大于所述设定门限时对应的 hl(n)=al -n + b^,
当 所述上行控制信息比特数大于所述设定门 限时, 确定
Figure imgf000037_0001
= a2 -n + b2, 其中 a2和 b2为 函数的系 数值, 或根据 PUCCH传输模式确定 Af TOCCH(F)和 即确定 AF Pt/CCH(F)为 上行控制信息比特数大于所述设定门限时对应的 —PUCCH 2m , 为上行控制 信息比特数大于所述设定门限时对应的 W = a2 -n + b2
具体的, 功率控制模块 703确定出的八 Pt/CCH ( e{- J,2}dB, 确定出的 ^(n) = 0.5-/i-1.3。
具体的, 功率控制模块 703 确定出的 AF Pt/CCH 2(F)e{2,3,4,5} dB 或 AF PUCCH 2( )e {3,4,5,6} dB, 确定出的 = 0.25 · "— 0.75。
上述功率控制模块 703通过以下方式之一得到八^ PUCCH(F)
方式一:接收高层信令预先配置的 2个 Af TOCCH(F)参数值 Af TOCCH
PUCCH 2
方式二:接收高层信令预先配置的一个 Af TOCCH(F)值,其余 Af TOCCH(F)值 通过配置的 Af 值和一个 值获得; 其中, 为预先约定或由高层信令 预先配置的偏移量。
上述用户设备中, 功率控制模块 703具体用于, 当所述上行控制信息比特 数不大于所述设定门限时, 若 PUCCH采用单天线端口传输模式传输信息, 则 确定 F PUCCH、F、和 h(n)为单天线端口传输模式对应的 和
Figure imgf000038_0001
+ 其中 ai—和 bi—为/ 函数的系数值; 若 PUCCH采用多 天线端口传输模式传输信息, 则确定 Af 和 为多天线端口传输模式 对应的 AF Pt/CCH2( 和
Figure imgf000038_0002
+ 2 ,其中 aL2和 bL22(«)函数的系数 值。
具体的, 功率控制模块 703确定出的八 Pt/CCH ^ ^-lAW} dB; 确定出 的 ^) = 0.5^-1.3。
具体的, 功率控制模块 703 确定出的 AF Pt/CCH j 2(F)e{-l,0,l,2} dB 或 AF PUCCH t 2( ) e{-2,-l,0,l} dB; 确定出的 2(M)= 0.35 '"— 0.6。
上述用户设备中, 功率控制模块 703具体用于, 当所述上行控制信息比特 数大于所述设定门限时, 若 PUCCH采用单天线端口传输模式传输信息, 则确 定 FPUCCH、F、和 为单天线端口传输模式对应的 FPUCCH2 F"i和 h2 1(«)=a2 n + b2 其中 a2— i和 b2— i为 »函数的系数值; 若 PUCCH采用多 天线端口传输模式传输信息, 则确定 Af 和/ ί( )为多天线端口传输模式 对应的 AFPt/CCH22( 和 2(w)=a22.w + b22, 其中 a2— 2和 b2— 2为 2(M)函数的系 数值。
具体的, 功率控制模块 703确定出的八 Pt/CCH 2
Figure imgf000039_0001
dB; 确定出 jh2 1(w)=0.3-w-1.5
具体的, 功率控制模块 703 确定出的 AF— n 22(F)e{2345} dB 或 AF PUCCH 2 2( )e {3,4,5,6} dB; 确定出的 2 2(w) = 0.25 · w— 0.75
上述用户设备中, 功率控制模块 703通过以下方式得到 Af PUCCH(F); 方式三: 接收高层信令预先配置的 3 个 AfTOCCH(F)值 AFPt/CCH― L
F PUCCH ) ^ ^ F PUCCH
上述用户设备中, 功率控制模块 703通过以下方式得到 Af PUCCH(F); 方式四: 接收高层信令预先配置的 3 个 Af TOCCH(F)值 AF Pt/CCH」(^
^■F PUCCH 2 1 (^) ^ F PUCCH 2
上述用户设备中, 功率控制模块 703通过以下方式之一得到 Af PUCCH(F): 方式五: 接收高层信令预先配置的 4 个 AfTOCCH(F)值 AFPt/CCH― L
F PUCCH ) PUCCH 2 1 (^) ^ ^ F PUCCH 2
方式六:接收高层信令预先配置的至少一个 Af TOCCH(F) ,其余 Af TOCCH(F) 值通过至少一个配置的 Af TOCCH(F)和至少一个 值获得 Af TOCCH
其中, 为预先约定或由高层信令预先配置的偏移量。
上述用户设备中, 所述" = ^+/½, 其中, " 2对应于用于计算 的 ACK/NACK比特数目, nSR = {0,1}表示在当前上行子帧中是否存在 SR传输。 上述用户设备中, 所述设定门限的取值为 11。
上述用户设备中, 所述上行控制信息包括以下信息之一: ACK/NACK反 馈信息、 CQI/PMI/RI/PTI反馈信息、 SR信息。
上述用户设备中, 所述上行控制信息为合并后的上行控制信息。
如图 8所示, 本发明实施例提供的网络设备可以 站设备, 该网络设备 可包括:
配置模块 801,用于将上行控制信道发射功率的
Figure imgf000040_0001
(F)参数配置到用 户设备, 所述 Af P[/eeH( )用于表示不同格式的 PUCCH相对于 PUCCH format la的功率偏移量;
接收模块 802, 用于接收所述用户设备在上行控制信道 PUCCH上发送的 上行控制信息, 其中, PUCCH上的发射功率是所述用户设备根据配置的所述
(^确定出的。
上述网络设备中, 配置模块 801 可采用以下方式之一, PUCCH (^) 数配置到用户设备:
方式一: 通过高层信令预先向用户设备配置 2 卜 cOT(F)值 F— PUCCH— F、和 PUCCH 2^^),
方式二: 通过高层信令预先向用户设备配置 1 个八^ PUCCH (F)值, 其余
△F_«/CCH(F)值通过配置的 AF_™CCH(F)值和一个 值获得;
方式三: 通过高层信令预先向用户设备配置 3 卜 cOT(F)值
^■F—PUCCH— 1— 1 F 、 F PUCCH _\ _2^) ^ ^ F PUCCH ,
方式四: 通过高层信令预先向用户设备配置 3 卜 cOT(F)值
^■F PUCCH 1 (^)、 PUCCH 2 1 (^) ^ ^ F PUCCH 2 _2^),
方式五: 通过高层信令预先向用户设备配置 4 卜 cOT(F)值 PUCCH l l i^)、 PUCCH 1 2 ^) ^ △ _F Pt/CCH— 2 1 (^ 和 Pt/CCH— 2— 2 (^ 。
方式六: 通过高层信令预先向用户设备配置至少一个Δf 其余 值通过至少一个配置的
Figure imgf000041_0001
(F)和至少一个 值获得; 其中, F PlJCCH— F、为不区分传输模式时上行控制信息比特数不大于设定 门限时的 CCH (F)参数值, F PUCCH—AF、为不区分传输模式时上行控制信 息比特数大于所述设定门限时的 Af— 参数值, AFPT/CCH― L 为上行控 制信息比特数不大于所述设定门限且 PUCCH传输模式为单天线端口传输模式 对应的 TOCCH (F)参数值, AF Pt/CCH j 2(F)为上行控制信息比特数不大于所述 设定门限且 PUCCH传输模式为多天线端口传输模式对应的 Af PUCCH (F)参数 值, AF— 为上行控制信息比特数大于设定门限且 PUCCH传输模式为 单天线端口传输模式对应的 Af_TOCCH (F)参数值, AF Pt/CCH 2 2(F)为上行控制信 息比特数大于设定门限且多天线端口传输模式对应的 Af PUCCH (F) ^$ , δ为 预先约定或由高层信令预先配置的偏移量。
通过以上的实施方式的描述, 本领域的技术人员可以清楚地了解到本发明 可借助软件加必需的通用硬件平台的方式来实现, 当然也可以通过硬件, 但很 多情况下前者是更佳的实施方式。 基于这样的理解, 本发明的技术方案本质上 或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来, 该计算机 软件产品存储在一个存储介质中, 包括若干指令用以使得一台终端设备(可以 是手机, 个人计算机, 服务器, 或者网络设备等)执行本发明各个实施例所述 的方法。
以上所述仅是本发明的优选实施方式, 应当指出, 对于本技术领域的普通 技术人员来说, 在不脱离本发明原理的前提下, 还可以做出若干改进和润饰, 这些改进和润饰也应视本发明的保护范围。

Claims

权利要求
1、 一种上行功率控制方法, 其特征在于, 包括以下步骤:
用户设备在 N个下行载波的 M个下行子帧中接收数据, 并生成上行控制 信息, 其中, N≥l, M>1, 所述 M个下行子帧的上行控制信息在同一个上行子 帧中传输;
所述用户设备根据所述上行控制信息的比特数是否大于设定门限, 确定用 于计算上行控制信道 PUCCH 发射功率的 和/ 其中, 所述
AF PUCCH (F)用于表示不同格式的 PUCCH相对于 PUCCH format 1 a的功率偏移 量, 所述 用于表示与 PUCCH传输比特数相对应的功率偏移量;
所述用户设备根据确定出的 TOCCH(F)和^),计算 PUCCH的发射功率, 并采用计算出的发射功率在 PUCCH上发送所述生成的上行控制信息。
2、 如权利要求 1 所述的方法, 其特征在于, 所述用户设备根据所述上行 控制信息的比特数是否大于设定门限, 确定用于计算上行控制信道 PUCCH发 射功率的 Af TOCCH(F)和 φ), 包括:
当所述上行控制信息比特数不大于所述设定门限时, 所述用户设备确定出 的 PUCCH F = F , h(n) = hl(n)=al -n + b, , 其中 a和 为 函数的系 数值, 或根据 PUCCH传输模式确定 Af PUCCH (F)和 η);
当所述上行控制信息比特数大于所述设定门限时, 所述用户设备确定出的
AF_PUCCH (F) = AF_PUCCH_I(F) ' h{n) = h2{n) = a 2 -n + b2 , 其中 a2和 b2为 函数的系 数值, 或根据 PUCCH传输模式确定 Af PUCCH (F)和 η)。
3、 如权利要求 1-2任一项所述的方法, 其特征在于, 所述用户设备通过以 下方式之一得到
方式一: 所述用户设备接收高层信令预先配置的 2 个 值 F— PUCCH— F、和 PUCCH 2^^),
方式二: 所述用户设备接收高层信令预先配置的 1 个 Af 值, 其 余 Af TOCCH(F)值通过配置的 Af TOCCH(F)值和一个 值获得;
其中, 为预先约定或由高层信令预先配置的偏移量。
4、 如权利要求 2所述的方法, 其特征在于, 当所述上行控制信息比特数 不大于所述设定门限时,所述用户设备根据 PUCCH传输模式确定 Af PUCCH (F) 和 φ), 包括:
若 PUCCH采用单天线端口传输模式传输信息, 则所述用户设备确定出的
AF_PUCCH(F)和 h(n)为单天线端 口传输模式对应的 AF PUCCH 1 1(F) 和 1(«)=a1 l -n + b, t, 其中 aL丄和 bL丄为 函数的系数值;
若 PUCCH采用多天线端口传输模式传输信息, 则所述用户设备确定出的 AF PUCCH(F)和 h(n")为 多 天线端 口传输模式对应的 ^FPUCCHl 2(F 和 2(n) = ai i -n + by 2 ^ 其中 aL 2和 bi 2为 h 2 (n)函数的系数值。
5、 如权利要求 2所述的方法, 其特征在于, 当所述上行控制信息比特数 大于所述设定门限时,所述用户设备根据 PUCCH传输模式确定 Af PUCCH (F)和 h{n), 包括:
若 PUCCH采用单天线端口传输模式传输信息, 则所述用户设备确定出的 AF PUCCH(F)和 h(n")为单天线端 口传输模式对应的 ^FPUCCH2 l(F 和 h2 l(n) = a2 l -n + b2 ί , 其中 a2— i和 b2— i为 h2 l (n)函数的系数值;
若 PUCCH采用多天线端口传输模式传输信息, 则所述用户设备确定出的 AF PUCCH(F)和 h(n)为 多 天线端 口传输模式对应的 Pt/CCH 2 2( 和 h2 2(n)=a2 2-n + b2 2 , 其中 a22和 b222(w)函数的系数值。
6、 如权利要求 4所述的方法, 其特征在于, 所述用户设备通过以下方式 得到
方式三: 所述用户设备接收高层信令预先配置的 3 个 值
^■F—PUCCH— 1 1 m、 F PUCCH _\ _2^) ^ ^ F PUCCH _2^)。
7、 如权利要求 5 所述的方法, 其特征在于, 所述用户设备通过以下方式 得到
方式四: 所述用户设备接收高层信令预先配置的 3 个 值 ^F PUCCN l(^)、 PUCCH 2 1 (-^) ^ ^ F PUCCH 2 _2^)。
8、 如权利要求 4-5任一项所述的方法, 其特征在于, 所述用户设备通过以 下方式之一得到
方式五: 所述用户设备接收高层信令预先配置的 4 个 值
^■F—PUCCH— 1 1 F 、 F PUCCH _\ _2^)、 ^ F PUCCH 2 I (^) ^ ^ F PUCCH 2 。
方式六: 所述用户设备接收高层信令预先配置的至少一个 Af
其余 Af TOCCH(F)值通过至少一个配置的 Af TOCCH(F)和至少一个 值获得; 其中, 为预先约定或由高层信令预先配置的偏移量。
9、如权利要求 1-2、 4-5任一项所述的方法,其特征在于, f) i n = nHARQ+nSR , 其中, ¾Ase对应于用于计算 的 ACK/NACK比特数目, ={0,1}表示在当 前上行子帧中是否存在 SR传输。
10、 如权利要求 1-2、 4-5任一项所述的方法, 其特征在于, 所述设定门限 的取值为 11。
11、 如权利要求 1-2、 4-5任一项所述的方法, 其特征在于, 所述上行控制 信息包括以下信息之一: ACK/NACK反馈信息、 CQI/PMI/RI/PTI反馈信息、 SR信息。
12、 如权利要求 1-2、 4-5任一项所述的方法, 其特征在于, 所述上行控制 信息为合并后的控制信息。
13、 如权利要求 1-2、 4-5任一项所述的方法, 其特征在于, 所述 PUCCH 是 PUCCH format lb with channel selection传输方案的 PUCCH format lb信道, 或者是基于 DFT-S-OFDM与时域扩频相结合传输方案的信道。
14、 一种用户设备, 其特征在于, 包括:
接收模块,用于在 N个下行载波的 M个下行子帧中接收数据;其中, N≥l , M>1 ;
控制信息生成模块,用于生成可在同一上行子帧中传输的所述 M个下行子 帧的上行控制信息;
功率控制模块, 用于根据所述控制信息生成模块生成的上行控制信息的比 特数是否大于设定门限, 确定用于计算上行控制信道 PUCCH 发射功率的 △F_«/CCH (F)和 并根据确定出的 AF TOCCH (F)和^) , 计算用于在 PUCCH 上发送所述上行控制信息的发射功率; 其中, 所述 Af 用于表示不同 格式的 PUCCH相对于 PUCCH format la的功率偏移量, 所述 用于表示与 PUCCH传输比特数相对应的功率偏移量;
发送模块, 用于采用计算出的发射功率在 PUCCH上发送所生成的上行控 制信息。
15、 如权利要求 14所述的用户设备, 其特征在于, 所述功率控制模块具 体用于, 当所述上行控制信息比特数不大于所述设定门限时, 确定 AF_PUCCH (F) = AF_PUCCH_I(F) ' h{n) = ^)= Ά , ■ H + 其中 &1和1)1为/¾(")函数的系数 值, 或根据 PUCCH传输模式确定 Af PUCCH (F)和 η); 当 所述上行控制信息比特数大于所述设定门 限时, 确定 AF PUCCH(F) = AF PUCCH 2(F) , h{n)= h2{n) = a2 -n + b2 , 其中 和 b2为 函数的系 数值, 或根据 PUCCH传输模式确定 Af PUCCH (F)和 η)。
16、 如权利要求 14-15任一项所述的用户设备, 其特征在于, 所述功率控 制模块通过以下方式之一得到 CCH (F):
方式一: 接收高层信令预先配置的 2 个 Af TOCCH(F)值 Af TOCCH 和 F— PUCCH— 2 F、, 方式二:接收高层信令预先配置的 1个 Af TOCCH(F)值,其余 Af TOCCH(F)值 通过配置的 Af TOCCH(F)值和一个 值获得; 其中, 为预先约定或由高层信令预先配置的偏移量。
17、 如权利要求 15 所述的用户设备, 其特征在于, 所述功率控制模块具 体用于, 当所述上行控制信息比特数不大于所述设定门限时, 若 PUCCH采用 单天线端口传输模式传输信息, 则确定 Af 和 /i()为单天线端口传输模 式对应的八 Pt/CCH j 和 1(«)=a1 j + j , 其中 a—和 t—为 »函数的系 数值;若 PUCCH采用多天线端口传输模式传输信息,则确定 和 为多天线端口传输模式对应的 F PUCCH2(F和
Figure imgf000046_0001
· n + bi 2 , 其中 aL2和 bj 2为 ^ 2 (n)函数的系数值。
18、 如权利要求 15 所述的用户设备, 其特征在于, 所述功率控制模块具 体用于, 当所述上行控制信息比特数大于所述设定门限时, 若 PUCCH采用单 天线端口传输模式传输信息, 则确定 Af 和/ ί( )为单天线端口传输模式 对应的 AF Pt/CCH 2 和/ ¾ j(«) = a2 j - n + b2_{,其中 a2—和 b2—为 »函数的系数 值;若 PUCCH采用多天线端口传输模式传输信息,则确定 Af PUCCH (F)和 h(n为 多天线端口传输模式对应的八 PUCCH 2 2(F)和 2 (n) = a2 2 - n + b2 2 , 其中 a2 2和 b2 22 ( 函数的系数值。
19、 如权利要求 17所述的用户设备, 其特征在于, 所述功率控制模块通 过以下方式得到八^ P[/ra/(F) ;
方式三: 接收高层信令预先配置的 3 个 AfTOCCH(F)值 AFPt/CCH― L 、
F PUCCH ) ^ ^ F PUCCH 。
20、 如权利要求 18所述的用户设备, 其特征在于, 所述功率控制模块通 过以下方式得到八^ P[/ra/(F) ;
方式四: 接收高层信令预先配置的 3 个 Af TOCCH (F)值 AF Pt/CCH」(^ 、
^■F PUCCH 2 1 (^) ^ F PUCCH 2 。
21、 如权利要求 17-18任一项所述的用户设备, 其特征在于, 所述功率控 制模块通过以下方式之一得到
方式五: 接收高层信令预先配置的 4 个 AfTOCCH(F)值 AFPt/CCH― L 、
F PUCCH )、 — PUCCH— 1— F、 ^ F PUCCH 2 ,
方式六:接收高层信令预先配置的至少一个 Af TOCCH(F) ,其余 Af TOCCH(F) 值通过至少一个配置的 Af PUCCH (F)和至少一个 值获得;
其中, 为预先约定或由高层信令预先配置的偏移量。
22、 如权利要求 14-15、 17-18任一项所述的用户设备, 其特征在于, 所述 n = nHARQ + nSR , 其中, "HASe对应于用于计算 的 ACK/NACK 比特数目, «SR = {0,1}表示在当前上行子帧中是否存在 SR传输。
23、 如权利要求 14-15、 17-18任一项所述的用户设备, 其特征在于, 所述 设定门限的取值为 11。
24、 如权利要求 14-15、 17-18任一项所述的用户设备, 其特征在于, 所述 上行控制信息包括以下信息之一: ACK/NACK反馈信息、 CQI/PMI/RI/PTI反 馈信息、 SR信息。
25、 如权利要求 14-15、 17-18任一项所述的用户设备, 其特征在于, 所述 上行控制信息为合并后的控制信息。
26、 一种功率控制参数配置方法, 其特征在于, 包括:
网络侧将上行控制信道发射功率的 Af 参数配置到用户设备, 所 述 Af puccH (F)用于表示不同格式的 PUCCH相对于 PUCCH format 1 a的功率偏 移量;
网络侧接收所述用户设备在上行控制信道 PUCCH 上发送的上行控制信 息, 其中, PUCCH上的发射功率是所述用户设备根据配置的所述 Af PUCCH (F) 确定出的。
27、 如权利要求 26所述的方法, 其特征在于, 网络侧采用以下方式之一, 将 AF TOCCH (F)参数配置到用户设备:
方式一: 通过高层信令预先向用户设备配置 2 个 Af 值 F— PUCCH— F、和 PUCCH 2 ^^), 方式二: 通过高层信令预先向用户设备配置 1 个 值, 其余
△F_«/CCH (F)值通过配置的 AF_™CCH (F)值和一个 值获得;
方式三: 通过高层信令预先向用户设备配置 3 个 Af 值 — PUCCH丄 ΛΡ)、 — Hj—2(F)和 — PUCCH2(F)', 方式四: 通过高层信令预先向 用 户 设备配置 3 个 F PUCCHm值 FPUCCH— F 、 AF PUCCH_2 l(F) 和
^F_PUCCH_2_2(F);方式五:通过高层信令预先向用户设备配置 4个 值
^■F—PUCCH— 1 1 F 、 F PUCCH _\ _2^)、 ^ F PUCCH 2 I (^) ^ ^ F PUCCH 2 ,
方式六: 通过高层信令预先向用户设备配置至少一个Δf 其余
△ncH(F)值通过至少一个配置的 An^(F)和至少一个 值获得;
其中, F PlJCCH— F、为不区分传输模式时上行控制信息比特数不大于设定 门限时的 CCH (F)参数值, ― PUCCH— F 为不区分传输模式时上行控制信 息比特数大于所述设定门限时的 AF PUCCH(F)参数值, AFPT/CCH― L 为上行控 制信息比特数不大于所述设定门限且 PUCCH传输模式为单端口模式对应的 AF PUCCH (F)参数值 , — ccH— F、为上行控制信息比特数不大于所述设定门 限且 PUCCH 传输模式为发送分集模式对应的 Af 参数值,
(^为上行控制信息比特数大于设定门限且 PUCCH传输模式为单端 口模式对应的 CCH、F、参数值, — PUCCH 2 2(F、为上行控制信息比特数大于 设定门限且发送分集模式对应的 Af PUCCH{F)Mi , 为预先约定或由高层信 令预先配置的偏移量。
28、 一种网络设备, 其特征在于, 包括:
配置模块, 用于将上行控制信道发射功率的 Af 参数配置到用户 设备, 所述 Af P[/ea/(F)用于表示不同格式的 PUCCH相对于 PUCCH format la 的功率偏移量;
接收模块, 用于接收所述用户设备在上行控制信道 PUCCH上发送的上行 控制信息, 其中, PUCCH 上的发射功率是所述用户设备根据配置的所述 ( 确定出的。
29、 如权利要求 28所述的网络设备, 其特征在于, 所述配置模块采用以 下方式之一, 将 参数配置到用户设备:
方式一: 通过高层信令预先向用户设备配置 2 个 Af (^值 PUCCH li^)和 ^F— PUCCH— 2(F), 方式二: 通过高层信令预先向用户设备配置 1 个 AF Pf/ea( 值, 其余
△F_«/CC (F)值通过配置的 Af_TOC (F)值和一个 值获得;
方式三: 通过高层信令预先向用户设备配置 3 个 Af (^值
^■F—PUCCH— 1— 1 m、 F— PUCCH— \— ^ F PUCCH ,
方式四: 通过高层信令预先向用户设备配置 3 个 Af TOetH( 值
^■F PUCCH li^)、 PUCCH 2 1 (^) ^口 ^ F PUCCH 2 ,
方式五: 通过高层信令预先向用户设备配置 4 个 Af (^值
^■F PUCCH _\_\(^)、 F— PUCCH— \— 2 F、、 ^ F PUCCH 2 _\ (^) 口 ^ F PUCCH 2 li^),
方式六: 通过高层信令预先向用户设备配置至少一个八 P[/EEFF(F) , 其余 AF TOCCH(F)值通过至少一个配置的 AF TOCCH(F)和至少一个 值获得; 其中,
Figure imgf000050_0001
(^为不区分传输模式时上行控制信息比特数不大于设定 门限时的 Af 参数值, F PUCCH— F 为不区分传输模式时上行控制信 息比特数大于所述设定门限时的 Af— 参数值, AFPT 为上行控 制信息比特数不大于所述设定门限且 PUCCH传输模式为单天线端口传输模式 对应的 AF PC/CCFF(F)参数值, 2(F)为上行控制信息比特数不大于所述 设定门限且 PUCCH传输模式为多天线端口传输模式对应的 Af PUCCH(F)参数 值, PUCCH 2 为上行控制信息比特数大于设定门限且 PUCCH传输模式为 单天线端口传输模式对应的 F PUCCH (F)参数值, AFPt/CCH 2 2 (F)为上行控制信 息比特数大于设定门限且多天线端口传输模式对应的 Af PUCCH (F)参数值, δ为 预先约定或由高层信令预先配置的偏移量。
PCT/CN2012/070115 2011-01-06 2012-01-06 上行功率控制方法、功率控制参数配置方法及其装置 WO2012092878A1 (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP12732187.5A EP2706795B1 (en) 2011-01-06 2012-01-06 Uplink power control method, power control parameter configuration method and apparatus thereof
JP2013547803A JP5669959B2 (ja) 2011-01-06 2012-01-06 上りパワー制御方法、パワー制御パラメータの配置方法及び装置
KR1020137014608A KR101618333B1 (ko) 2011-01-06 2012-01-06 상향 링크 전력 제어 방법, 전력 제어 파라미터의 배치방법 및 그 장치
US13/978,530 US9538481B2 (en) 2011-01-06 2012-01-06 Uplink power control method, power control parameter configuration method and apparatus thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2011100019004A CN102045827B (zh) 2011-01-06 2011-01-06 上行功率控制方法、功率控制参数配置方法及其装置
CN201110001900.4 2011-01-06

Publications (1)

Publication Number Publication Date
WO2012092878A1 true WO2012092878A1 (zh) 2012-07-12

Family

ID=43911454

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/070115 WO2012092878A1 (zh) 2011-01-06 2012-01-06 上行功率控制方法、功率控制参数配置方法及其装置

Country Status (6)

Country Link
US (1) US9538481B2 (zh)
EP (1) EP2706795B1 (zh)
JP (1) JP5669959B2 (zh)
KR (1) KR101618333B1 (zh)
CN (1) CN102045827B (zh)
WO (1) WO2012092878A1 (zh)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102045827B (zh) * 2011-01-06 2013-07-31 大唐移动通信设备有限公司 上行功率控制方法、功率控制参数配置方法及其装置
GB2492600B (en) * 2011-07-08 2014-02-12 Broadcom Corp Method and apparatus for controlling transmission power
EP2797253B1 (en) 2012-01-27 2016-09-14 LG Electronics Inc. Method and apparatus for transmitting uplink control information in wireless communication system
US9054846B2 (en) 2012-07-31 2015-06-09 Telefonaktiebolaget L M Ericsson (Publ) Power control for simultaneous transmission of ACK/NACK and channel-state information in carrier aggregation systems
US9565669B2 (en) * 2013-01-29 2017-02-07 Sun Patent Trust Base station, terminal, transmission method, and reception method
CN104519561B (zh) * 2013-09-26 2019-02-12 中兴通讯股份有限公司 上行功率削减处理方法、装置、终端及基站
JP6396494B2 (ja) 2014-04-08 2018-09-26 エルジー エレクトロニクス インコーポレイティド 無線リソースの用途変更を支援する無線通信システムにおいて上りリンク制御情報送信方法及びそのための装置
KR20160019867A (ko) * 2014-08-12 2016-02-22 뉴라컴 인코포레이티드 고효율 무선랜 디바이스 전송 전력 제어
JP2018050089A (ja) 2015-01-29 2018-03-29 シャープ株式会社 端末装置、基地局装置、集積回路、および、通信方法
KR102063280B1 (ko) * 2015-05-13 2020-01-07 후아웨이 테크놀러지 컴퍼니 리미티드 전력 제어 방법, 단말 및 기지국
US20170064695A1 (en) * 2015-08-25 2017-03-02 Qualcomm Incorporated Transmission parameter control for immediate response frames
EP3343984B1 (en) 2015-09-25 2019-12-25 Huawei Technologies Co., Ltd. Power control method and apparatus for uplink control channel
CN107026723B (zh) * 2016-02-02 2020-10-09 电信科学技术研究院 一种传输上行控制信息的方法和设备
US11012943B2 (en) * 2016-09-22 2021-05-18 Lg Electronics Inc. Method for reducing interference between uplink signal and downlink signal, and device therefor
CN107888262B (zh) * 2016-09-30 2021-05-11 中兴通讯股份有限公司 通信信道的反馈方法、传输方法、信令传输方法和对应装置
CN109391351B (zh) * 2017-08-10 2021-04-02 电信科学技术研究院 一种物理上行控制信道pucch的功率控制方法和基站
EP3695542A1 (en) * 2017-10-10 2020-08-19 Telefonaktiebolaget LM Ericsson (publ) Physical uplink control channel fallback mode
SG11201912238XA (en) 2017-11-09 2020-05-28 Guangdong Oppo Mobile Telecommunications Corp Ltd Uplink control channel resource determining method, terminal, and network side device
JP2019087965A (ja) * 2017-11-10 2019-06-06 シャープ株式会社 端末装置、基地局装置、および、通信方法
CN109803364B (zh) * 2017-11-17 2021-01-22 电信科学技术研究院有限公司 一种上行功率控制方法及移动通信终端
WO2019095880A1 (zh) * 2017-11-17 2019-05-23 电信科学技术研究院有限公司 上行功率控制方法及移动通信终端
US11419059B2 (en) 2017-11-17 2022-08-16 Datang Mobile Communications Equipment Co., Ltd. Uplink power control method and mobile terminal
CN109842929B (zh) * 2017-11-24 2022-07-05 大唐移动通信设备有限公司 一种功率控制偏移量的获取方法及装置
EP3739997B1 (en) * 2018-01-11 2023-04-26 Datang Mobile Communications Equipment Co., Ltd. Method and device for determining cap of transmission resources available for control information, and communication apparatus
US10966223B2 (en) * 2018-01-22 2021-03-30 Apple Inc. Handling overlapping of PUCCH and PUSCH for new radio systems
US11824811B2 (en) * 2018-02-13 2023-11-21 Lenovo (Beijing) Limited Method and apparatus for fallback operation for semi-static HARQ-ACK codebook determination
WO2019172624A1 (ko) * 2018-03-05 2019-09-12 엘지전자 주식회사 무선 통신 시스템에서 상향링크 채널을 전송하기 위한 방법 및 이를 지원하는 장치
US11076407B2 (en) * 2018-04-27 2021-07-27 Marvell Asia Pte, Ltd. Methods and apparatus for detecting ACK/NACK bits with dual list-RM decoder and symbol regeneration for LTE PUCCH format 3
CN111182619B (zh) * 2018-11-12 2022-04-15 大唐移动通信设备有限公司 一种上行功率控制的方法和设备
CN112399617B (zh) * 2019-08-16 2022-06-28 大唐移动通信设备有限公司 一种信息传输方法、终端及网络侧设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101588226A (zh) * 2009-05-22 2009-11-25 中兴通讯股份有限公司 一种大带宽下多载波***中的终端及应答消息的发送方法
CN101702823A (zh) * 2009-11-04 2010-05-05 中兴通讯股份有限公司 一种发射功率控制命令的发送方法和基站
WO2010148319A1 (en) * 2009-06-19 2010-12-23 Interdigital Patent Holdings, Inc. Signaling uplink control information in lte-a
CN101969685A (zh) * 2010-09-30 2011-02-09 中兴通讯股份有限公司 一种物理上行控制信道的功率设置方法及用户设备
CN102045827A (zh) * 2011-01-06 2011-05-04 大唐移动通信设备有限公司 上行功率控制方法、功率控制参数配置方法及其装置

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004187247A (ja) * 2002-10-08 2004-07-02 Matsushita Electric Ind Co Ltd 基地局装置及び通信端末装置
EP2238704B1 (en) * 2008-02-04 2011-08-31 Telefonaktiebolaget L M Ericsson (publ) Method and arrangement in a telecommunication system in which an acknowledgment message is fed back for a bundle of frames
US8457062B2 (en) * 2008-03-27 2013-06-04 Telefonaktiebolaget Lm Ericsson (Publ) Uplink power control in a TDD communication system
KR20110081954A (ko) * 2008-09-22 2011-07-15 가부시키가이샤 엔티티 도코모 이동국 및 무선기지국
CN101772168B (zh) * 2008-12-31 2013-05-22 电信科学技术研究院 配置资源和数据传输的方法、装置及通信***
CN101772092B (zh) * 2009-01-06 2012-10-03 电信科学技术研究院 一种动态分配上行控制信道预留资源的方法及设备
US8767632B2 (en) * 2009-02-05 2014-07-01 Motorola Mobility Llc Method for uplink acknowledgement/non-acknowledgement messages in a wireless communication system
CN103781163B (zh) * 2009-02-09 2017-07-04 交互数字专利控股公司 在wtru中进行上行链路功率控制的方法和wtru
WO2010107907A2 (en) * 2009-03-17 2010-09-23 Samsung Electronics Co., Ltd. Uplink transmission power control in multi-carrier communication systems
TWI596969B (zh) * 2009-03-17 2017-08-21 內數位專利控股公司 在多輸入多輸出中上鏈功率控制方法和裝置
CN101873205B (zh) * 2009-04-24 2013-03-20 电信科学技术研究院 多载波***中上行控制信道指示和反馈方法、***及设备
CN107104780B (zh) * 2009-10-01 2020-10-16 交互数字专利控股公司 上行链路控制数据传输
CN105024744B (zh) * 2009-10-02 2018-08-28 交互数字专利控股公司 一种用于由wtru执行的pucch功率控制的方法及wtru
KR101784189B1 (ko) * 2009-10-28 2017-10-12 엘지전자 주식회사 다중 반송파 시스템에서 상향링크 제어정보 전송 방법 및 장치
CN101778416B (zh) * 2010-02-10 2015-05-20 中兴通讯股份有限公司 功率上升空间的测量和报告方法及终端
EP2536199A4 (en) * 2010-02-11 2015-07-08 Alcatel Lucent METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING A POWER MARGIN RATIO

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101588226A (zh) * 2009-05-22 2009-11-25 中兴通讯股份有限公司 一种大带宽下多载波***中的终端及应答消息的发送方法
WO2010148319A1 (en) * 2009-06-19 2010-12-23 Interdigital Patent Holdings, Inc. Signaling uplink control information in lte-a
CN101702823A (zh) * 2009-11-04 2010-05-05 中兴通讯股份有限公司 一种发射功率控制命令的发送方法和基站
CN101969685A (zh) * 2010-09-30 2011-02-09 中兴通讯股份有限公司 一种物理上行控制信道的功率设置方法及用户设备
CN102045827A (zh) * 2011-01-06 2011-05-04 大唐移动通信设备有限公司 上行功率控制方法、功率控制参数配置方法及其装置

Also Published As

Publication number Publication date
JP2014502122A (ja) 2014-01-23
US9538481B2 (en) 2017-01-03
CN102045827A (zh) 2011-05-04
US20130286948A1 (en) 2013-10-31
EP2706795A4 (en) 2015-12-23
EP2706795A1 (en) 2014-03-12
KR101618333B1 (ko) 2016-05-04
KR20130105679A (ko) 2013-09-25
CN102045827B (zh) 2013-07-31
EP2706795B1 (en) 2019-07-03
JP5669959B2 (ja) 2015-02-18

Similar Documents

Publication Publication Date Title
WO2012092878A1 (zh) 上行功率控制方法、功率控制参数配置方法及其装置
JP7361154B2 (ja) 多数のキャリアを用いて動作するためのアップリンクフィードバック方法
JP6129794B2 (ja) Lte−aにおけるアップリンク制御情報のシグナリング
AU2021204028A1 (en) Semi-persistent CSI feedback over PUSCH
JP6067137B2 (ja) 変調処理方法及び装置
US8724504B2 (en) Power control method and device for physical uplink control channel
KR101927719B1 (ko) 하향링크 반송파 집적을 채용한 tdd 시스템에서 harq-ack 전송을 코딩하는 방법 및 장치
US20130195008A1 (en) Providing Feedback For Multiple Downlink Multiple-Input-Multiple-Output (MIMO) Streams
CN107079324B (zh) 基站装置、终端装置及通信方法
JP5392523B2 (ja) 物理的アップリンク共有チャンネル上でアップリンク制御情報をマルチプレクスする方法
EP2880801A1 (en) Uplink power control for physical uplink control channel
CA2824041A1 (en) Method and apparatus for sending feedback for multi-cell high speed downlink packet access operations
WO2012146107A1 (zh) Ack/nack反馈信息的传输方法和设备
WO2012065577A1 (zh) 信息传输方法、终端、基站和通信***
WO2013010439A1 (zh) 信道状态信息传输方法和设备
EP3742840B1 (en) Communication method, communication apparatus, and system
CN105230095B (zh) 上行控制信道传输方法、装置及***
WO2017049641A1 (zh) 一种信息传输方法、设备及***

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12732187

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20137014608

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2013547803

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13978530

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2012732187

Country of ref document: EP