WO2011080905A1 - 充電システム及び充電システムの制御方法 - Google Patents

充電システム及び充電システムの制御方法 Download PDF

Info

Publication number
WO2011080905A1
WO2011080905A1 PCT/JP2010/007498 JP2010007498W WO2011080905A1 WO 2011080905 A1 WO2011080905 A1 WO 2011080905A1 JP 2010007498 W JP2010007498 W JP 2010007498W WO 2011080905 A1 WO2011080905 A1 WO 2011080905A1
Authority
WO
WIPO (PCT)
Prior art keywords
vehicle
charging
vehicle group
power
electric
Prior art date
Application number
PCT/JP2010/007498
Other languages
English (en)
French (fr)
Inventor
吉村 康男
工藤 貴弘
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to US13/384,378 priority Critical patent/US20120112698A1/en
Priority to CN2010800326862A priority patent/CN102473262A/zh
Priority to JP2011547324A priority patent/JP5274674B2/ja
Priority to EP10840765A priority patent/EP2521085A1/en
Publication of WO2011080905A1 publication Critical patent/WO2011080905A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/10Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
    • B60L53/14Conductive energy transfer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/64Optimising energy costs, e.g. responding to electricity rates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/65Monitoring or controlling charging stations involving identification of vehicles or their battery types
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • B60L53/665Methods related to measuring, billing or payment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L55/00Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/04Billing or invoicing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
    • G07F15/005Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity dispensed for the electrical charging of vehicles
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • B60L2240/72Charging station selection relying on external data
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/12Billing, invoicing, buying or selling transactions or other related activities, e.g. cost or usage evaluation

Definitions

  • the present invention relates to a charging system that charges an electric vehicle that travels with charged electric power such as an electric vehicle or a plug-in hybrid vehicle, and a control method of the charging system.
  • car sharing is introduced in an apartment house, rather than preparing one or more parking lot facilities for each household, car sharing is performed in the apartment house to reduce the parking lot facilities in the entire apartment area. There is merit to use effectively.
  • a parking lot for one vehicle is prepared in each household, and when a second or later vehicle is required, car sharing can be used.
  • residents use their own vehicles for weekday commuting and holiday trips, and use car sharing when their vehicles are on the go or when their vehicles are inconvenient.
  • the number of private parking lots will be reduced, for example by installing solar power generators or parking lots for third parties. It can be rented to bring new value to the housing complex.
  • the charge control device is a charge control device that individually controls charging from an external power source of the power storage device of a plurality of vehicles each equipped with a power storage device, and each vehicle and the external power source are combined.
  • a storage state detection unit that detects a storage state of the power storage device at a time, an expected power consumption calculation unit that detects an expected power consumption amount for each of the plurality of vehicles, and a storage state detected for each vehicle,
  • a required charge power amount calculation unit that calculates a required charge power amount based on the predicted power consumption amount,
  • a use time detection unit that detects a use start time of each vehicle, each of the required charge amount and the use start time
  • a charging schedule creation unit that determines a charging schedule for a charging time and a charging power amount of the vehicle; and a control unit that charges a power storage device mounted on the vehicle based on the charging schedule. That.
  • the charging schedule is determined by determining the electric vehicle to be prioritized from the charging power and the charging time required for the plurality of electric vehicles.
  • the allowable power is determined by contract for the power supplied from the power company, the power consumption of the entire apartment exceeds the allowable power when simultaneously charging a large number of parked electric vehicles.
  • the power supply from the electric power company is cut off, or that the power charge of the entire apartment building becomes high due to a contract with the electric power company.
  • the power supplied to the charging device for use in charging by an electric vehicle from an electric power company can be charged when charging a large number of parked electric vehicles at the same time if the allowable power is determined by contract.
  • the power used exceeds the allowable power, there is a problem that the power supplied from the power company is cut off, or the power charge used for charging is increased due to a contract with the power company.
  • the present invention has been made in view of such circumstances, and when charging a large number of parked electric vehicles at the same time, a charging system and a charging system capable of efficiently charging within a limited supply power It is an object to provide a control method.
  • the charging system according to the present invention is divided into a first vehicle group that is individually owned by a vehicle parked in a parking space and a second vehicle group that is shared by a plurality of people, and the number of parked vehicles in the first vehicle group.
  • a parking number detection means for detecting a parking rate
  • a charge control device for charging an electric vehicle of the first vehicle group and the second vehicle group, the charge control device,
  • Priority order determining means for determining a priority order of charging from the first vehicle group or the second vehicle group according to the number of parked vehicles or the parking rate detected by the parking number detecting means;
  • Charging power supply means for charging the electric vehicle according to the priority order determined by the priority order determination means.
  • the priority order for charging with priority from the first vehicle group or the second vehicle group is determined according to the number of parked vehicles or the parking rate of the first vehicle group, and the determined priority Since the electric vehicles are charged according to the order, when the first vehicle group and the second vehicle group are connected to the respective charging devices, it is possible to charge efficiently with limited supply power.
  • the priority order determination unit is prioritized from the electric vehicle of the first vehicle group when the number of parked vehicles or the parking rate of the first vehicle group detected by the parked vehicle number detecting unit is a predetermined value or more. Then, when the number of parked vehicles or the parking rate is less than a predetermined value, the electric vehicles in the second vehicle group are preferentially charged.
  • the electric vehicle of the first vehicle group when the number of parked vehicles or the parking rate of the first vehicle group is equal to or higher than a predetermined value, the electric vehicle of the first vehicle group is preferentially charged, and when it is less than the predetermined value, the second vehicle group is charged. Since charging is prioritized from the electric vehicle, the priority order of charging is switched between the first vehicle group and the second vehicle group in accordance with the number of parked vehicles or the parking rate of the first vehicle group, so limited supply It becomes possible to charge efficiently in electric power.
  • the charging system according to the present invention is divided into a first vehicle group that is individually owned by a vehicle parked in a parking space and a second vehicle group that is shared by a plurality of people, the first vehicle group and the first vehicle group.
  • Charging power supply means for charging the electric vehicle according to the priority order determined by the order determination means.
  • the power that can be used to charge the electric vehicle is measured, and the first vehicle group or the second vehicle group is preferentially charged according to the measured usable power. Since the priority order is determined and the electric vehicle is charged according to the determined priority order, when the first vehicle group and the second vehicle group are connected to the respective charging devices, the efficiency is limited within the limited supply power. It becomes possible to charge well.
  • the priority order determination means preferentially charges the electric vehicles of the first vehicle group when the available power measured by the available power measurement means is equal to or greater than a predetermined value, and the usable power is available.
  • the usable electric power measured by the electric power measuring means is less than a predetermined value, the electric vehicle in the second vehicle group is preferentially charged.
  • the electric vehicle in the first vehicle group when the measured available power is equal to or higher than the predetermined value, the electric vehicle in the first vehicle group is charged with priority, and when it is lower than the predetermined value, the electric vehicle in the second vehicle group has priority. Since charging priority is switched between the first vehicle group and the second vehicle group in accordance with the available power, charging can be performed efficiently with limited supply power.
  • the charging system according to the present invention is divided into a first vehicle group that is individually owned by a vehicle parked in a parking space and a second vehicle group that is shared by a plurality of people, the first vehicle group and the first vehicle group.
  • Priority order determining means for determining a priority order of charging from the first vehicle group or the second vehicle group, and the electric vehicle according to the priority order determined by the priority order determining means.
  • the priority order of the first vehicle group or the second vehicle group to be preferentially charged is determined according to the time of day or day of week, and the electric vehicle is charged according to the priority order. Therefore, when the first vehicle group and the second vehicle group are connected to the respective charging devices, it is possible to efficiently charge within the limited supply power.
  • the vehicle further includes home detection means for detecting the home status of the owner's residence for each electric vehicle of the first vehicle group, and the priority order determination means includes the electric vehicle whose owner is home. Charge with priority over absent electric vehicles.
  • the home state of the owner's residence is detected for each electric vehicle in the first vehicle group, and the owner preferentially charges the electric vehicle at home over the electric vehicle without the owner. Therefore, when the first vehicle group and the second vehicle group are connected to the respective charging devices, it is possible to charge efficiently with limited supply power.
  • the information processing apparatus further includes storage means for storing the detection result of the at-home detection means and vehicle information included in the owner's electric vehicle, and the priority order determination means charges the first vehicle group.
  • the vehicle information acquired from the electric vehicle to be charged is compared with the vehicle information stored in the storage unit, and there is corresponding vehicle information, the detection by the home detection unit associated with the vehicle information is performed. The result is obtained, and the owner charges the electric vehicle at home with priority over the electric vehicle without the owner.
  • the home state of the owner's residence is detected for each electric vehicle of the first vehicle group, the detection result and the vehicle information included in the owner's electric vehicle are stored in association with each other,
  • the vehicle information acquired from the electric vehicle to be charged is checked against the stored vehicle information, and if there is corresponding vehicle information, the home detection associated with the vehicle information is detected.
  • the owner charges the electric vehicle at home in preference to the electric vehicle without the owner, so the first vehicle group and the second vehicle group are connected to the respective charging devices. When it does, it becomes possible to charge efficiently within the limited supply electric power.
  • the charging control device includes notification means for notifying an owner of an electric vehicle in the first electric vehicle group, and the priority order determination means is configured such that the electric vehicle in the second vehicle group is the first vehicle.
  • the notification means is used to notify the availability of the second vehicle group.
  • the availability of the second vehicle group is notified, so the first vehicle group is notified.
  • the owner of the electric vehicle to which the user belongs can know that the second vehicle group (shared vehicle) is charged and usable even when the electric vehicle owned by the owner is uncharged, for example.
  • the charging system control method is divided into a first vehicle group owned by a person who owns a vehicle parked in a parking space and a second vehicle group shared by a plurality of people, and the first vehicle group.
  • Control of a charging system comprising: a parking number detecting means for detecting the number of parked vehicles or a parking rate; and a charging control device for charging an electric vehicle in the first vehicle group and the second vehicle group.
  • a priority order for deciding a priority order for charging with priority from the first vehicle group or the second vehicle group according to the number of parked vehicles or the parking rate detected by the parking number sensing means.
  • the priority order of charging from the first vehicle group or the second vehicle group is determined according to the number of parked vehicles or the parking rate of the first vehicle group, and the priority is determined. Since the electric vehicles are charged according to the order, when the first vehicle group and the second vehicle group are connected to the respective charging devices, it is possible to charge efficiently with limited supply power.
  • the program of the present invention causes a computer to execute the control method of the charging system.
  • the present invention can efficiently charge a large number of parked electric vehicles with limited power supply.
  • the figure which shows schematic structure of the charging system which concerns on Embodiment 1 of this invention, and its periphery The block diagram which shows schematic structure of the charging system which concerns on Embodiment 1 of this invention.
  • the figure which shows the characteristic of the charging system of FIG. Flow chart for explaining the operation of the charging system of FIG. Flow chart for explaining the operation of the charging system of FIG. The block diagram which shows schematic structure of the charging system which concerns on Embodiment 2 of this invention.
  • the figure which shows the characteristic of the charging system of FIG. Flowchart for explaining the operation of the charging system of FIG. Flowchart for explaining the operation of the charging system of FIG. The block diagram which shows schematic structure of the charging system which concerns on Embodiment 3 of this invention.
  • the block diagram which shows schematic structure of the charging system which concerns on Embodiment 5 of this invention.
  • the figure which shows the characteristic of the charging system of FIG. The figure which shows the characteristic of the application example of the charging system of FIG.
  • the figure which shows the characteristic of the application example of the charging system of FIG. The figure which shows the characteristic of the application example of the charging system of FIG. Flowchart for explaining the operation of the charging system of FIG.
  • FIG. 1 is a diagram showing a schematic configuration of a charging system and its surroundings according to Embodiment 1 of the present invention.
  • a charging system 401 is installed in an apartment house and charges an electric vehicle using electric power supplied from an electric power company 402 and electric power generated by a photovoltaic power generator 403 installed on the roof of the apartment house. .
  • M vehicles shared vehicle
  • N vehicles electric vehicle owned by a resident individual who is parked in a private parking lot in an apartment house
  • the power supplied from the power company 402 can be used anytime for 24 hours as long as it is within the range of power contracted with the power company.
  • power contracts there are a form in which the upper limit of power supply is determined by the charging system of the apartment house and a form in which the upper limit of power supply is determined as a whole including the residence of the apartment house.
  • the charging control device 406 supplies the electric power supplied from the electric power company 402 and the solar power generation device 403 to the shared vehicle charging device group 404 within a range not exceeding the upper limit of the supplied power. Even if a large number of electric vehicles are simultaneously charged with the charging device group 405 of privately owned vehicles, control is performed to efficiently charge the battery with limited supply power.
  • Embodiment 1 a charging system for an apartment house that does not include a solar power generation device will be described.
  • a charging system provided in a housing complex with a solar power generation device will be described in Embodiment 2.
  • the range of the upper limit of power supply determined by a contract with the electric power company is limited to the charging system.
  • a third embodiment will be described in which the upper limit of power supply is determined for the entire apartment house including the residence in addition to the charging system device.
  • a charging system that solves the problems of the present invention will be described as another embodiment of the first to third embodiments.
  • FIG. 2 is a block diagram showing a schematic configuration of the charging system according to Embodiment 1 of the present invention.
  • a charging system 1 according to the present embodiment includes a power consumption measuring device 2, a charging control device 3, a parking number detecting device 4, a first charging device 5, and a second charging device 6. It has.
  • the charging system 1 is divided into a first vehicle group that is individually owned by a vehicle parked in a parking space and a second vehicle group that is shared by a plurality of people.
  • the number of parked vehicles in the first vehicle group ( Alternatively, the priority order of charging from the first vehicle group or the second vehicle group is determined according to the parking rate), and the electric vehicle is charged according to the priority order.
  • FIG. 3 is a diagram showing the characteristics of the charging system of the present embodiment.
  • the used power measuring device 2 measures the used power within the contract power with the power company.
  • the number-of-parking number detection device 4 detects the number of parked vehicles (or parking rate) of the N first vehicle groups including the privately owned electric vehicle group.
  • the charging control device 3 includes an available power measuring unit 31, a priority order determining unit 32, and a charging power supply unit 33.
  • the usable power measuring unit 31 measures usable power.
  • the priority determining unit 32 preferentially charges from either the first vehicle group or the second vehicle group according to the number of parked vehicles (or the parking rate) of the first vehicle group detected by the parked vehicle number detection device 4. Decide the priority of whether to do.
  • the charging power supply unit 33 supplies power for charging the electric vehicle according to the priority order determined by the priority order determination unit 32.
  • the first charging device 5 charges the personally-owned electric vehicle 10 with the electric power supplied from the charging control device 3, and includes a charge amount measuring unit 51 and a vehicle information acquiring unit 52.
  • the charge amount measuring unit 51 measures the amount required for charging from the remaining amount of the storage battery 101 mounted on the personally owned electric vehicle 10.
  • the vehicle information acquisition unit 52 acquires vehicle information such as a vehicle ID, a charge reservation, and a use reservation from the vehicle management device 102 mounted on the personally owned electric vehicle 10, and sends the acquired vehicle information to the charge control device 3. Since the first charging device 5 charges one electric vehicle, a plurality of the first charging devices 5 are prepared so that all the electric vehicles constituting the first vehicle group can be charged.
  • the electricity charge of the electric power charged to the personally owned electric vehicle 10 by the first charging device 5 is charged by the electric power company together with the electricity charge of the individual residence.
  • an electric contract for charging is performed separately from the residence and billed by the power company.
  • the first charging device 5 is provided with a settlement means (not shown) and pays an electric charge for charging by credit card settlement or electronic money settlement.
  • the parking number detection apparatus 4 cooperates with the vehicle information acquisition part 52 of the 1st charging device 5, it can detect the parking number (parking rate) of an electric vehicle among 1st vehicle groups.
  • vehicle detection means for example, an infrared sensor, an image recognition sensor, a weight sensor, etc. for each vehicle space
  • vehicle detection means can be provided in the parking lot. That's fine.
  • the privately-owned electric vehicle 10 is equipped with the above-described storage battery 101 and a vehicle management device 102 that manages vehicle information such as a vehicle ID, a charge reservation, and a use reservation. Moreover, the parking number detection apparatus 4 mentioned above of the electric vehicle which belongs to a 1st vehicle group based on vehicle ID in the vehicle information managed by the vehicle management apparatus 102 mounted in the electric vehicle 10 owned by an individual. The number of parked vehicles (or parking rate) is detected, and the detected number of parked vehicles (or parking rate) is sent to the charging control device 3 as information on the number of parked vehicles in the first vehicle group.
  • the electric vehicle 10 may be equipped with a car navigation device or a storage battery charge state management device, and may share a part of the functions with the vehicle management device 102.
  • the second charging device 6 charges the electric vehicle 20 shared by the resident with the electric power supplied from the charging control device 3, and includes a charge amount measuring unit 61 and a vehicle information acquiring unit 62.
  • the charge amount measurement unit 61 measures the amount required for charging from the remaining amount of the storage battery 201 mounted on the electric vehicle 20 shared by the resident.
  • the vehicle information acquisition unit 62 acquires vehicle information such as a vehicle ID, a charge reservation, and a use reservation from the vehicle management device 202 mounted on the electric vehicle 20 shared by the resident, and sends the acquired vehicle information to the charge control device 3. . Since the second charging device 6 charges one electric vehicle, a plurality of the second charging devices 6 are prepared so that all the electric vehicles constituting the second vehicle group can be charged.
  • the resident-shared electric vehicle 20 is equipped with the above-described storage battery 201 and a vehicle management device 202 that manages vehicle information such as a vehicle ID, a charge reservation, and a use reservation.
  • the car sharing operator pays the electricity charge of the electric power charged in the shared electric vehicle 20 by the second charging device 6 once.
  • the electricity charge for charging is included in the car sharing fee charged to the car sharing user.
  • Car sharing usage fees often consist of two fees: a basic fee, which is a membership fee (a fixed amount is monthly), and a fee that is paid only for use (time and distance using a shared electric vehicle).
  • the car sharing usage fee settlement process can be incorporated into the car sharing management system and billed for each user in cooperation with the reservation of the shared electric vehicle.
  • the vehicle management devices 102 and 202 are in-vehicle terminals connected to an apartment housing charge reservation system (not shown). Moreover, the vehicle management apparatus 202 of a shared vehicle is an in-vehicle terminal connected to a car sharing management system (not shown).
  • a resident uses a personally owned electric vehicle
  • he / she accesses the charge reservation system using a personal computer or a mobile phone, and inputs a time zone for using the personally owned electric vehicle and a required travel distance.
  • the charging reservation system calculates the time required for charging and the power required for charging from the charging state of the electric vehicle owned by the individual, the required travel distance, and the time zone to be used, and makes a reservation in the charging reservation system for the entire apartment house.
  • the reservation contents are transferred to the in-vehicle terminal of the personally owned vehicle and used for authentication of vehicle confirmation between the charge control device and the electric vehicle at the time of charging.
  • a resident when a resident makes a reservation for a shared electric vehicle, he / she accesses the car sharing management system using a personal computer or a mobile phone, and inputs the time zone where the shared vehicle is to be used and the required mileage.
  • the car sharing management system calculates the time required for charging and the power required for charging from the charging status and required mileage of the personally owned electric vehicle, and the time zone used. The most suitable vehicle is selected, and the vehicle and charging are reserved in the car sharing management system. Then, a reservation for charging is made in cooperation with the charging reservation system for the housing complex. Furthermore, the reservation content is transferred to the in-vehicle terminal of the corresponding shared vehicle and used for authentication of vehicle confirmation between the charging control device and the electric vehicle at the time of charging, or for confirmation between the electric vehicle and the driver at the time of boarding.
  • the shared vehicle is used within the distance that the electric vehicle owned by the individual can travel by using the time range in which the electric vehicle is used and the required mileage.
  • the resident may be informed that the shared vehicle can be used.
  • the electric power that can be used to charge the electric vehicle is limited and there are many personally owned vehicles that should be charged, this can be guided to the use of a shared vehicle for efficient charging. it can. In such a case, it is possible to cooperate with efficient charging, so it is conceivable to make the shared vehicle usage fee lower than usual.
  • Each electric vehicle includes a car navigation device, shares a part of the functions with the vehicle management device 202, and may be accessed from the car navigation device by connecting to a charging reservation system for an apartment house or a car sharing management system. .
  • vehicle information is acquired from each of the N first charging devices 5 and the M second charging devices 6 (step 10, priority determination unit 32).
  • vehicle information is obtained only from the charging device to which the electric vehicle is connected, and if it is wireless communication, the vehicle is parked in a state where the electric vehicle is not connected.
  • Vehicle information can also be acquired for existing vehicles. By identifying whether it is a privately owned vehicle or a shared vehicle from the acquired vehicle information, the privately owned vehicle does not always have to be parked in the designated parking space, and the privately owned vehicle and the shared vehicle are mixed. Then you can park. For example, when renting a shared vehicle, it is possible to park in a parking space convenient for residents.
  • step 11 the electric vehicle having a charge time reservation by the user is charged with the highest priority (step 11, charging power supply unit 33).
  • the personally owned electric vehicle reserved in the above-described apartment house charge reservation system and the shared electric vehicle are charged.
  • the number of parked cars in the first vehicle group is detected (step 12, parked car number detecting device 4). Then, it is determined whether or not the detected number of parked vehicles in the first vehicle group is equal to or greater than a predetermined value X1 (for example, when 70% or more of the registered number of vehicles in the first vehicle group are parked) (step 13).
  • the priority order determination unit 32 when the number of parked vehicles in the first vehicle group is equal to or greater than the predetermined value X1, the electric vehicle 10 in the first vehicle group is charged before the electric vehicle 20 in the second vehicle group (step) 14, charging power supply unit 33).
  • step 15 the current used power is measured (step 15, used power measuring device 2), and then the available power obtained by subtracting the current used power from the contract power with the power company is calculated (step 16, usable). Power measuring unit 31).
  • the calculated usable power is less than a predetermined value P1 (for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment), Since the available power is small, in order to secure the power required for charging the above-mentioned highest priority vehicle, the number of vehicles or the amount of charge in the first vehicle group to be charged is reduced and adjusted to be equal to or greater than the predetermined value P1 ( Step 17, charging power supply unit 33).
  • a predetermined value P1 for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment
  • step 18 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P1 in this determination, the available power is still small, so the process returns to step 14 and the processing from step 14 to step 18 is repeated until the available power becomes greater than or equal to the predetermined value P1.
  • This adjusts the number of vehicles or the amount of charge of the first vehicle group that is charged so that the available electric power becomes equal to or higher than the predetermined value P1 with priority given to the charging of the first vehicle group, that is, the personally owned electric vehicle.
  • the second vehicle group is charged when there is a surplus in usable power and the predetermined value P1 or more.
  • the electric vehicles of a plurality of second vehicle groups are parked, the electric vehicles with the highest frequency of use, the electric vehicles with the longest travel distance, the electric vehicles with the most charge / discharge of the storage battery in the year or month Charge in the order of.
  • the electric vehicles of the second vehicle group are charged (step 19, charging power supply unit 33).
  • the current used power is measured (step 20, used power measuring device 2), and then the available power obtained by subtracting the current used power from the contract power with the power company is calculated (step 21, usable). Power measuring unit 31).
  • the number of second vehicle groups to be charged or the amount of charge is adjusted to be equal to or greater than the predetermined value P2 (Ste 22, charging power supply unit 33).
  • step 23 charge amount measuring unit 61
  • step 24 charging power supply unit 33
  • step 25 charging power supply unit 33
  • step 25 the charging power supply unit 33
  • the second vehicle group that is, the shared electric vehicle is charged when there is a surplus available power and the predetermined value P1 or more.
  • the second vehicle group so that the available power is equal to or greater than the predetermined value P2, and then adjust the number of vehicles or the amount of charge in the first and second vehicle groups again to charge at the predetermined value Q1 or higher.
  • the predetermined values P1 and P2 are adjusted so as to be 20% of the contract power. However, by providing a width and hysteresis such as 20 to 30%, or by making the predetermined values different between P1 and P2 ( For example, P1 ⁇ P2) The convenience of the user may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the electric vehicle 20 of the vehicle group is charged before the electric vehicle 10 of the first vehicle group (step 30, charging power supply unit 33).
  • step 31 used power measuring device 2
  • step 32 usable
  • Power measuring unit 31 If the calculated available power is less than a predetermined value P3 (for example, less than 20% of the contract power), the number of vehicles or the amount of charge in the second vehicle group to be charged is reduced and adjusted to be equal to or greater than the predetermined value P3 (step) 33, charging power supply unit 33).
  • P3 for example, less than 20% of the contract power
  • step 34 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P3 in this determination, the available power is still small, so the process returns to step 30 and the processing from step 30 to step 34 is repeated until the available power becomes greater than or equal to the predetermined value P3.
  • a predetermined value P3 for example, 20% or more of the contract power
  • step 36 used power measuring device 2
  • step 37 available power obtained by subtracting the current used power from the contract power with the power company is calculated (step 37, available).
  • Power measuring unit 31 If the calculated usable power is less than the predetermined value P4 (for example, less than 20% of the contract power), the number of first vehicle groups to be charged or the amount of charge is reduced and adjusted to exceed the predetermined value P4 (step 38). , Charging power supply unit 33).
  • step 39 charge amount measurement part 51
  • step 40 charging power supply unit 33
  • step 41 charging power supply unit 33
  • step 41 charging power supply unit 33
  • the first vehicle group that is, the personally owned electric vehicle is charged when there is a surplus in usable power and the predetermined value P3 or more.
  • the first vehicle group so that the available power is equal to or greater than the predetermined value P4.
  • the number of vehicles or the charge amount of the second and first vehicle groups is adjusted again, and charged at the predetermined value Q2 or higher.
  • the predetermined values P3 and P4 are adjusted to be 20% of the contract power, for example, but the width and hysteresis are set to 20 to 30%, or the predetermined values are made different between P3 and P4. (For example, P3 ⁇ P4)
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the first electric vehicle is preferentially charged by differentiating the predetermined values P1 and P3, P2 and P4, and Q1 and Q2
  • the second electric vehicle is preferentially charged.
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging.
  • the charge amount of an electric vehicle owned by an individual it is desirable to charge all of them to a predetermined value or more, but in the middle of the process, the charge amount is maintained while maintaining the same charge amount so as not to be unfair. It is preferable to charge at the supplied power and the charging speed.
  • the charge amount of the shared electric vehicle it is desirable to charge all to a predetermined value or more, but as the process in the middle, the charge amount is changed little by little and the user's request (distance required for traveling) Depending on the situation, a shared vehicle with various charge amounts is prepared.
  • the vehicles parked in the parking space are divided into the first vehicle group owned by the individual and the second vehicle group shared by a plurality of people, A parking number detecting device 4 for detecting the number of parked vehicles or a parking rate of one vehicle group, and a charging control device 3 for charging an electric vehicle of the first vehicle group and the second vehicle group, and charging
  • the control device 3 preferentially charges from the electric vehicle of the first vehicle group, and when the number is less than the predetermined value, Since charging is performed preferentially from the electric vehicles of the two vehicle groups, it is possible to efficiently charge within a limited supply power when simultaneously charging a large number of parked electric vehicles.
  • FIG. 6 is a block diagram showing a schematic configuration of the charging system according to Embodiment 2 of the present invention.
  • the same reference numerals are given to the parts common to the charging system of FIG. 2 described above, and the description thereof is omitted.
  • the vehicle parked in the parking space is divided into a first vehicle group that is privately owned and a second vehicle group that is shared by a plurality of people.
  • the charging system 70 includes a power generation device 2, a charging control device 3, a first charging device 5, and a second charging device 6, as well as a natural power generation device such as a solar power generation device or a wind power generation device.
  • the power generation amount measuring device 71 that measures the power generated by the energy power generation device 200 is provided, the power that can be used to charge the electric vehicle is measured, and the first vehicle group is determined according to the measured usable power. And the second vehicle group are prioritized for charging, and the electric vehicle is charged according to the priority.
  • FIG. 7 is a diagram showing the characteristics of the charging system of the present embodiment.
  • the element for example, charging power supply part 33 which performs the said step is described collectively in description of each step.
  • the power of the solar power generator is used as the natural energy power generator 200, but it may be wind power or geothermal power.
  • the power generation device which can be installed in apartment houses, such as a fuel cell, may be used. These do not always supply a constant electric power, but change depending on the state of the sun, the wind, the geothermal state, and the operating state of a power generator such as a fuel cell. Including this, the available power is measured.
  • step 50 vehicle information is acquired from each of the N first charging devices 5 and the M second charging devices 6 (step 50, priority determination unit 32).
  • vehicle information is obtained only from the charging device to which the electric vehicle is connected.
  • step 51 charging power supply unit 33.
  • step 52 power generation amount measuring device 71
  • step 53 power usage measuring device 2
  • step 54 available power measuring unit 31
  • step 55 priority order determination unit 32.
  • step 56 charging power supply unit 33.
  • the current power consumption and power generation amount are measured (step 57, power consumption measurement device 2, power generation amount measurement device 71), and then the current available power is calculated from the contract power with the power company ( Step 58, usable power measuring unit 31). If the calculated usable power is less than a predetermined value P11 (for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment), The number of vehicles or the amount of charge in the first vehicle group to be charged is reduced and adjusted to be equal to or greater than a predetermined value P11 (step 59, charging power supply unit 33).
  • a predetermined value P11 for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment
  • step 60 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P11 in this determination, the available power is still small, so the process returns to step 52, and the processing from step 52 to step 60 is repeated until the available power becomes greater than or equal to the predetermined value P11.
  • the current power consumption and power generation amount are measured (step 62, power consumption measurement device 2, power generation amount measurement device 71), and then the current available power is calculated from the contract power with the power company (Ste 63, usable power measuring unit 31). Then, if the calculated usable power is less than a predetermined value P12 (for example, less than 20% of the contract power), the number of second vehicle groups to be charged or the charge amount is reduced and adjusted to exceed the predetermined value P12 (step 64). , Charging power supply unit 33).
  • a predetermined value P12 for example, less than 20% of the contract power
  • step 65 charge amount measurement unit 61
  • step 66 charging power supply unit 33
  • step 67 the charging power supply unit 33
  • step 67 the charging power supply unit 33
  • the second vehicle group that is, the shared electric vehicle is charged when there is a surplus in usable power and the predetermined value P11 or more.
  • the electric vehicles of a plurality of second vehicle groups are parked, the electric vehicles with the highest frequency of use, the electric vehicles with the longest travel distance, the electric vehicles with the most charge / discharge of the storage battery in the year or month Charge in the order of.
  • the predetermined values P11 and P12 are adjusted to be, for example, 20% of the contract power. However, by giving a width and hysteresis such as 20 to 30%, or by making the predetermined values different between P11 and P12. (For example, P11 ⁇ P12)
  • the user's convenience may be improved by changing the adjustment of the usable electric power by charging between the first electric vehicle and the second electric vehicle.
  • the electric vehicle 20 of the second vehicle group is moved from the electric vehicle 10 of the first vehicle group.
  • Charge first step 70, charging power supply unit 33.
  • the current power consumption and power generation amount are measured (step 71, power consumption measurement device 2, power generation amount measurement device 71), and then the current available power is calculated from the contract power with the power company ( Step 72, usable power measuring unit 31).
  • Step 73 charging power supply unit 33.
  • step 74 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P13 in this determination, the process returns to step 52, and the processing from step 52 to step 74 is repeated until the available power is greater than or equal to the predetermined value P13.
  • the current power consumption and power generation amount are measured (step 76, power consumption measurement device 2, power generation amount measurement device 71), and then the current available power is calculated from the contract power with the power company ( Step 77, usable power measuring unit 31). Then, if the calculated usable power is less than a predetermined value P14 (for example, less than 20% of the contract power), the number of first vehicle groups to be charged or the amount of charge is reduced and adjusted to exceed the predetermined value P14 (step 78). , Charging power supply unit 33).
  • a predetermined value P14 for example, less than 20% of the contract power
  • step 65 charge amount measurement unit 51
  • step 66 charging power supply unit 33
  • step 67 charging power supply unit 33
  • step 67 charging power supply unit 33
  • the first vehicle group that is, the personally owned electric vehicle is charged when there is a surplus in usable power and the predetermined value P13 or more.
  • the number of vehicles or the charge amount of the second and first vehicle groups is adjusted again and charged at the predetermined value Q12 or higher.
  • the predetermined values P13 and P14 are adjusted to be, for example, 20% of the contract power. However, by providing a width or hysteresis such as 20 to 30%, or by making the predetermined values different between P13 and P14. (For example, P13 ⁇ P14)
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the first electric vehicle is preferentially charged by differentiating the predetermined values P11 and P13, P12 and P14, and Q11 and Q12, and when the second electric vehicle is preferentially charged.
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging.
  • the vehicles parked in the parking space are divided into the first vehicle group owned by the individual and the second vehicle group shared by a plurality of people, Power generation for measuring electric power generated by a charging control device 3 for charging an electric vehicle in one vehicle group and a second vehicle group, and a natural energy power generation device 200 such as a solar power generation device or a wind power generation device
  • the charge control device 3 is provided with a quantity measuring device 71 and measures the electric power (including natural energy) that can be used to charge the electric vehicle.
  • the first When charging a large number of parked electric vehicles at the same time, charging is performed with priority from the electric vehicles of the vehicle group, and charging is prioritized from the electric vehicles of the second vehicle group when the value is less than the predetermined value. It can be efficiently charged in a limited supplied electric power.
  • the residents are prepared to use their own electric vehicles with priority given to the charging of their own electric vehicles.
  • priority is given to charging of the shared electric vehicle, and preparation is made so that the shared vehicle can be used even if the privately owned vehicle cannot be used without being charged.
  • the power is concentrated on a shared vehicle and charged in a short time.
  • FIG. 10 is a block diagram showing a schematic configuration of the charging system according to Embodiment 3 of the present invention.
  • the same reference numerals are given to the parts common to the charging system of FIG. 2 described above, and the description thereof is omitted.
  • the vehicle parked in the parking space is divided into a first vehicle group that is privately owned and a second vehicle group that is shared by a plurality of people.
  • the charging system 80 includes the first charging device 5 and the second charging device in addition to the used power measuring device 2, the charging control device 3, the first charging device 5 and the second charging device 6.
  • a second used power measuring device 81 that measures the used power other than the charging of the device 6 is provided, the power that can be used to charge the electric vehicle is measured, and the first power is measured according to the measured available power.
  • a priority order for charging with priority from the vehicle group or the second vehicle group is determined, and the electric vehicle is charged according to the priority order.
  • FIG. 11 is a diagram showing the characteristics of the charging system of the present embodiment.
  • the charging system 80 includes a second power consumption measuring device that measures power used in a housing complex other than charging an electric vehicle, such as a residential house 82 or a shared facility. 81.
  • step 80 vehicle information is acquired from each of the N first charging devices 5 and the M second charging devices 6 (step 80, priority determination unit 32).
  • vehicle information is obtained only from the charging device to which the electric vehicle is connected.
  • step 81 charging power supply unit 33.
  • the personally owned electric vehicle reserved in the above-described apartment house charge reservation system and the shared electric vehicle are charged.
  • step 82 the used power used for other than charging is measured (step 82, second used power measuring device 81), and then the available power obtained by subtracting the used power other than the current charge from the contract power with the power company. Calculate (step 83, usable power measuring unit 31).
  • step 84 priority order determination unit 32.
  • a predetermined value X3 for example, 50% or more of contract power
  • step 85 charging power supply unit 33.
  • the current used power is measured (step 85, used power measuring device 2), and the current available power is calculated from the contract power with the power company (step 87, available power measuring unit 31). ). If the calculated usable power is less than a predetermined value P21 (for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment), The number of vehicles or the amount of charge of the first vehicle group to be charged is reduced and adjusted to be equal to or greater than a predetermined value P21 (step 88, charging power supply unit 33).
  • a predetermined value P21 for example, less than 20% of contract power usable in the entire apartment, or less than 20% of contract power usable in the entire charging device of the apartment
  • step 89 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P21 in this determination, the available power is still small, so the process returns to step 82, and the processing from step 82 to step 89 is repeated until the available power becomes greater than or equal to the predetermined value P21.
  • the second vehicle group is charged when there is a surplus in usable power and the predetermined value P21 or more.
  • the electric vehicles of a plurality of second vehicle groups are parked, the electric vehicles with the highest frequency of use, the electric vehicles with the longest travel distance, the electric vehicles with the most charge / discharge of the storage battery in the year or month Charge in the order of.
  • step 90 charging power supply unit 33.
  • step 91 used power measuring device 2
  • step 92 available power measuring unit 31.
  • the number or the charge amount of the second vehicle group to be charged is reduced and adjusted to exceed the predetermined value P22 (step 93). , Charging power supply unit 33).
  • step 94 charge amount measurement part 61
  • step 95 charging power supply unit 33
  • step 96 the charging power supply unit 33
  • step 96 the charging power supply unit 33
  • the second vehicle group that is, the shared electric vehicle is charged when there is a surplus available power and the predetermined value P21 or more.
  • the number of vehicles or the amount of charge in the first and second vehicle groups is adjusted again and charged at a predetermined value Q21 or higher.
  • the predetermined values P21 and P22 are adjusted to be 20% of the contract power, for example, but the width and hysteresis are set to 20 to 30%, or the predetermined values are made different between P21 and P22. (For example, P21 ⁇ P22)
  • the user's convenience may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the electric vehicle 20 of the second vehicle group is moved from the electric vehicle 10 of the first vehicle group. Charge first (step 100, charging power supply unit 33).
  • step 101 used power measuring device 2
  • step 102 available power measuring unit 31
  • the calculated usable power is less than a predetermined value P23 (for example, less than 20% of the contract power)
  • the number of vehicles or the amount of charge in the second vehicle group to be charged is reduced and adjusted to be equal to or greater than the predetermined value P23.
  • Step 103 charging power supply unit 33
  • step 104 when reducing the number of vehicles, for example, adjustment to reduce one by one. After making this adjustment, it is determined whether the available power is equal to or greater than a predetermined value (step 104, priority order determination unit 32). If the available power is not yet greater than or equal to the predetermined value P23 in this determination, the process returns to step 82, and the processing from step 82 to step 104 is repeated until the available power becomes greater than or equal to the predetermined value P23.
  • the current used power is measured (step 106, used power measuring device 2), and the current available power is calculated from the contract power with the power company (step 107, available power measuring unit 31). ). If the calculated usable power is less than a predetermined value P24 (for example, less than 20% of the contract power), the number of first vehicle groups to be charged or the amount of charge is reduced and adjusted to exceed the predetermined value P24 (step 108). , Charging power supply unit 33).
  • a predetermined value P24 for example, less than 20% of the contract power
  • step 94 charge amount measurement unit 51
  • step 95 charging power supply unit 33
  • step 96 charging power supply unit 33
  • step 96 charging power supply unit 33
  • the first vehicle group that is, the personally owned electric vehicle is charged when there is a surplus in usable power and the predetermined value P23 or more.
  • the number of vehicles or the amount of charge in the second and first vehicle groups is adjusted again and charged at the predetermined value Q22 or higher.
  • the predetermined values P23 and P24 are adjusted to be 20% of the contract power, for example, but the width and hysteresis are set to 20 to 30%, or the predetermined values are made different between P23 and P24. (For example, P23 ⁇ P24)
  • the user's convenience may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the first electric vehicle is preferentially charged by differentiating the predetermined values P21 and P23, P22 and P24, and Q21 and Q22, and when the second electric vehicle is preferentially charged.
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging.
  • the vehicles parked in the parking space are divided into the first vehicle group owned by the individual and the second vehicle group shared by a plurality of people.
  • the electric power that can be used for charging the electric vehicle subtracting the electric power used other than the current charging is calculated, and the calculated electric power that is used is equal to or greater than a predetermined value
  • the electric vehicle in the first vehicle group has priority. If it is less than the predetermined value, it is preferentially charged from the electric vehicles of the second vehicle group, so when charging a large number of parked electric vehicles simultaneously, the efficiency is limited within the limited supply power. Charge well It is possible.
  • a natural energy power generation device 200 such as a solar power generation device and a power generation amount measuring device 71 are provided as in the second embodiment, and the power generation and the power supplied from the power company are combined.
  • the charging control device may calculate the usable power within the range and control the charging device.
  • FIG. 14 is a block diagram showing a schematic configuration of a charging system according to Embodiment 4 of the present invention.
  • the same reference numerals are given to the parts common to the charging system of FIG. 2 described above, and the description thereof is omitted.
  • the vehicle parked in the parking space is divided into a first vehicle group that is individually owned and a second vehicle group that is shared by a plurality of people.
  • the charging system 90 includes a time measuring device 91 that outputs time or day of week information in addition to the power consumption measuring device 2, the charging control device 3, the first charging device 5, and the second charging device 6. And determining the priority order of charging from the first vehicle group or the second vehicle group according to the time and day of the week counted by the time measuring device 91, and the electric motor is operated according to the priority order. The vehicle is charged.
  • FIG. 15 is a diagram showing the characteristics of the charging system of the present embodiment.
  • the first group of electric vehicles used for commuting is charged preferentially at night, and the second group of electric vehicles that are used mainly from morning to evening and frequently park and go out are in that time zone.
  • the battery is charged with priority.
  • the time measuring device 91 may measure the time including the month and year in addition to the time and day of the week, and may determine the priority order including them.
  • Some electricity price discounts vary during the year in the summer (July 1 to September 30 every year) and other seasons. Also, since the sunrise and sunset times differ greatly between the summer and winter seasons, the rate of discounts on electricity charges may change according to the season as the proportion of solar power generation equipment in the power generation equipment of the power company increases.
  • vehicle information is acquired from each of the N first charging devices 5 and the M second charging devices 6 (step 110, priority determination unit 32).
  • vehicle information is obtained only from the charging device to which the electric vehicle is connected.
  • the electric vehicle in which the charging time is reserved by the user is charged with the highest priority (step 111, charging power supply unit 33).
  • the personally owned electric vehicle reserved in the above-described apartment house charge reservation system and the shared electric vehicle are charged.
  • step 112 timing device 91
  • step 113 priority determining unit 32
  • step 114 charging power supply unit 33
  • step 114 charging power supply unit 33
  • step 115 used power measuring device 2
  • step 116 available power measuring unit 31
  • a predetermined value P31 for example, less than 20% of the contract power usable in the entire apartment, or less than 20% of the contract power usable in the entire charging device of the apartment
  • P31 for example, less than 20% of the contract power usable in the entire apartment, or less than 20% of the contract power usable in the entire charging device of the apartment
  • step 118 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P31 in this determination, the process returns to step 112, and the processing from step 112 to step 118 is repeated until the available power is greater than or equal to the predetermined value P31.
  • the electric vehicles of a plurality of second vehicle groups are parked, the electric vehicles with the highest frequency of use, the electric vehicles with the longest travel distance, the electric vehicles with the most charge / discharge of the storage battery in the year or month Charge in the order of.
  • step 119 charging power supply unit 33.
  • step 120 used power measuring device 2
  • step 121 available power measuring unit 31.
  • the calculated usable power is less than a predetermined value P32 (for example, less than 20% of the contract power)
  • a predetermined value P32 for example, less than 20% of the contract power
  • the number or the charge amount of the second vehicle group to be charged is reduced and adjusted to exceed the predetermined value (step 122, Charging power supply unit 33).
  • the charge amount of each electric vehicle is measured (step 123, charge amount measurement unit 61), and it is determined whether or not all of them are a predetermined value Q31 or more (for example, the predetermined value is 80 or more when the fully charged state is 100). (Step 124, charging power supply unit 33). If all are equal to or greater than the predetermined value Q31, the charging is terminated (step 125, charging power supply unit 33). If any one is less than the predetermined value Q31, the process returns to step 112, and the processes of steps 112 to 125 are repeated. .
  • the second vehicle group that is, the shared electric vehicle is charged when there is a surplus in usable power and the predetermined value P31 or more.
  • the predetermined values P31 and P32 are adjusted so as to be 20% of the contract power, for example, but the width and hysteresis are set to 20 to 30%, or the predetermined values are made different between P31 and P32. (For example, P31 ⁇ P32)
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • step 113 if it is determined in step 113 that the priority is given to the time or day of the week in the second vehicle group, the electric vehicle 20 in the second vehicle group is charged before the electric vehicle 10 in the first vehicle group. (Step 130, charging power supply unit 33).
  • the current power consumption is measured (step 131, power consumption measuring device 2), and then the current available power is calculated from the contract power with the power company (step 132, available power measurement unit 31). ). If the calculated usable power is less than a predetermined value P33 (for example, less than 20% of the contract power), the number of vehicles or the amount of charge in the second vehicle group to be charged is reduced and adjusted to be equal to or greater than the predetermined value P33. (Step 133, charging power supply unit 33).
  • a predetermined value P33 for example, less than 20% of the contract power
  • step 134 priority order determination unit 32. If the available power is not yet greater than or equal to the predetermined value P33 in this determination, the process returns to step 112, and the processing from step 112 to step 134 is repeated until the available power is greater than or equal to the predetermined value P33.
  • the first vehicle group is charged when there is a surplus in usable power and the predetermined value P33 or more. If the available power is equal to or greater than the predetermined value P33, the electric vehicles of the first vehicle group are charged (step 135, charging power supply unit 33).
  • the current used power is measured (step 136, used power measuring device 2), and the current available power is calculated from the contract power with the power company (step 137, available power measuring unit 31). ).
  • the calculated usable power is less than the predetermined value P34 (for example, less than 20% of the contract power)
  • the number of first vehicle groups to be charged or the amount of charge is reduced and adjusted to exceed the predetermined value P34 (step 138). , Charging power supply unit 33).
  • Step 123 charge amount measurement unit 51
  • all are predetermined values Q32 or more for example, if the fully charged state is 100, the minimum charge amount is 80 or more.
  • Step 124 charging power supply unit 33. If all are equal to or greater than the predetermined value Q32, the charging is terminated (step 125, the charging power supply unit 33). If any one is less than the predetermined value Q32, the process returns to step 112, and the processes of steps 112 to 124 are repeated. .
  • the first vehicle group that is, the electric vehicle owned by the individual, is charged when there is a sufficient available power and the predetermined value P33 or more. Charge the first vehicle group so that the available power is equal to or greater than the predetermined value P34. The number of vehicles or the amount of charge in the second and first vehicle groups is adjusted again and charged at the predetermined value Q32 or higher. To complete.
  • the predetermined values P33 and P34 are adjusted to be, for example, 20% of the contract power. However, by giving a width and hysteresis such as 20 to 30%, or by making the predetermined values different between P33 and P34. (For example, P33 ⁇ P34)
  • the user's convenience may be improved by changing the adjustment of the usable power by charging between the first electric vehicle and the second electric vehicle.
  • the first electric vehicle is preferentially charged and the second electric vehicle is preferentially charged by differentiating the predetermined values P31 and P33, P32 and P34, and Q31 and Q32, respectively.
  • the convenience of the user may be improved by changing the adjustment of the usable power by charging.
  • the vehicles parked in the parking space are divided into the first vehicle group owned by the individual and the second vehicle group shared by a plurality of people.
  • the vehicle is parked because the priority order of the first vehicle group or the second vehicle group is determined according to the time and day of the week, and the electric vehicle is charged according to the priority order.
  • the resident when it is expected that the use of privately owned vehicles will increase according to the time and day of the week, or when the electricity charge for charging will be reduced, the resident will give priority to charging privately owned electric vehicles, Prepare for use. Then, when it is expected that the use of the shared electric vehicle such as shopping and pick-up will increase according to the time and day of the week, the shared electric vehicle is preferentially charged so that the shared electric vehicle can be used.
  • a natural energy power generation device 200 such as a solar power generation device and a power generation amount measuring device 71 are provided as in the second embodiment, and the power generation and the power supplied from the power company are combined.
  • the charging device may control the charging device by calculating usable power within the range.
  • the second power consumption measuring device 81 is provided as in the third embodiment, and the charge control device includes the power that can be used by the charge control device including the power used in the residence 82 other than the charging system. You may calculate and control a charging device.
  • FIG. 18 is a block diagram showing a schematic configuration of a charging system according to Embodiment 5 of the present invention.
  • the same reference numerals are given to the parts common to the charging system of FIG. 2 described above, and the description thereof is omitted.
  • the vehicle parked in the parking space is divided into a first vehicle group that is privately owned and a second vehicle group that is shared by a plurality of people.
  • the charging system 110 includes a power consumption measuring device 2, a charging control device 3A, a first charging device 5, a second charging device 6, a home detection device 111, and a storage device 112.
  • a vehicle that is privately owned and in which the owner is at home is charged with particular priority. That is, the home state of the owner's residence is detected for each electric vehicle of the first vehicle group, the detection result and the vehicle information included in the electric vehicle of the owner are stored in association with each other, and the first vehicle group The vehicle information acquired from the electric vehicle to be charged is compared with the stored vehicle information, and when there is corresponding vehicle information, the detection result of home detection associated with the vehicle information is acquired. Then, the owner charges the electric vehicle at home with priority over the electric vehicle without the owner.
  • the charging control device 3A includes an available power measurement unit 31, a priority order determination unit 32A, a charging power supply unit 33, and a notification unit 34.
  • the notification unit 34 is a portable information terminal (owned by the owner) ( For example, the information from the priority determining unit 32A is transmitted to a mobile phone), a personal computer, a home TV, and the display device 113. From the notification unit 34, “charge amount of owner's vehicle”, “current charge priority”, “recommendation to use the second vehicle group”, and the like are transmitted.
  • the home detection device 111 detects the home of each owner's residence, and provides home detection information to the storage device 112. For example, linking with home security home / outing settings, detecting usage status of living infrastructure such as power, water, gas, etc., detecting operating status of household appliances such as lighting, air conditioning, TV, heating toilet seat equipment, water heater, etc. Or detecting the locking of the door and the answering machine mode setting of the answering machine to detect whether the user is at home or absent.
  • the storage device 112 has a nonvolatile memory such as a flash memory, and stores the vehicle information given from the priority determining unit 32A and the vehicle owner's home result (home detection information) of the vehicle information in association with each other.
  • the priority order determination unit 32A charges the first vehicle group, the vehicle information acquired from the electric vehicle to be charged is compared with the vehicle information stored in the storage device 112, and when there is corresponding vehicle information, The detection result of the home detection device 111 associated with the vehicle information is acquired, and the owner decides to give priority to the electric vehicle at home over the electric vehicle without the owner.
  • the method of the first to fourth embodiments described above determines which of the first vehicle group (electric vehicle owned by an individual) and the second vehicle group (electric vehicle shared by residents) has priority. Any one of the above or a combination of the first to third embodiments is possible. This embodiment is a combination with the first embodiment as shown in FIG.
  • FIG. 19 is a diagram showing the characteristics of the charging system 110 of the present embodiment when the method of the first embodiment is used. That is, when the number of parked vehicles in the first vehicle group is equal to or greater than the predetermined value X1 (for example, when 70% or more of the number of registered vehicles in the first vehicle group is parked), the first vehicle group is given priority. When the number of parked vehicles in the vehicle group is less than the predetermined value X1, the second vehicle group is prioritized. As described above, in the present embodiment, priority is given to the vehicle in which the owner is at home in the first vehicle group.
  • the predetermined value X1 for example, when 70% or more of the number of registered vehicles in the first vehicle group is parked
  • FIG. 20 is a diagram illustrating characteristics of the charging system 110 when the method of the second embodiment or the third embodiment is used. That is, when the power that can be used for charging is a predetermined value X2 or X3 or more (for example, 50% or more of contract power that can be used in the entire apartment, or 50% or more of contract power that can be used in the entire charging device of the apartment) The first vehicle group is prioritized, and when the power available for charging is less than the predetermined value X2 or X3, the second vehicle group is prioritized.
  • X2 or X3 or more for example, 50% or more of contract power that can be used in the entire apartment, or 50% or more of contract power that can be used in the entire charging device of the apartment
  • a natural energy power generation device 200 such as a solar power generation device and a power generation amount measuring device 71 are provided, and the charge control device is within a range in which the power generation and the power supplied from the power company are combined. Calculates the available power and controls the charging device.
  • the second power consumption measuring device 81 is provided, and the charge control device calculates the usable power including the power used in the residence 82 other than the charging system and Take control.
  • FIG. 21 is a diagram illustrating characteristics of the charging system 110 when the method of the fourth embodiment is used.
  • the first vehicle group is given priority during the night from 23:00 to 7:00 am on Saturdays, Sundays, national holidays, and the previous day. Give priority to vehicle groups.
  • the timing device 91 is provided as in the fourth embodiment, and the charging control device controls the charging device according to time or day information.
  • FIG. 22 is a diagram showing characteristics of charging system 110 when the methods of Embodiments 1 to 3 are combined. That is, when the number of parked vehicles in the first vehicle group is equal to or greater than the predetermined value X1 (for example, when 70% or more of the registered number of the first vehicle group is parked), the power available for charging is equal to the predetermined value X2 or When it is X3 or higher (for example, 50% or more of the contract power that can be used in the entire housing complex, or 50% or more of the contract power that can be used in the entire charging device of the housing complex), the first vehicle group is given priority for charging. When the available power is less than the predetermined value X2, the second vehicle group is prioritized. When the number of parked vehicles in the first vehicle group is less than the predetermined value X1, the second vehicle group is prioritized regardless of whether or not the power available for charging is greater than or less than the predetermined value X2 or X3.
  • the predetermined value X1 for example, when 70% or more of the registered number of the first
  • the home status of the owner's residence is detected periodically (for example, at intervals of 15 minutes) for each vehicle in the first vehicle group (step 150, home detection device 111), and the home status is stored for each owner ( Step 151, storage device 112). Alternatively, the home status may be stored for each owner when the home status changes. Further, the vehicle information of each vehicle is acquired, and the storage device 112 is inquired about the home status of the owner of the vehicle (step 152, priority order determination unit 32A).
  • step 153 priority order determination unit 32A
  • step 154 charging power supply unit 33
  • the available power is less than the predetermined value P41 (for example, less than 20% of the contract power)
  • the number of vehicles in the house to be charged or the amount of charge is reduced and adjusted to be equal to or greater than the predetermined value P41 (step 155, charging power).
  • Supply unit 33 the predetermined value P41 (for example, less than 20% of the contract power)
  • step 156 available power measurement unit 31. If the available power is less than the predetermined value P42 in this determination, the present process is terminated. If the available power is equal to or greater than the predetermined value P42, the vehicles of the first vehicle group without the owner are charged (step 157, the charging power supply unit 33). ).
  • a predetermined value P42 for example, 20% or more of the contract power
  • the order of the electric vehicle with the highest frequency of use, the order of the electric vehicle with the longer mileage, and the charging / discharging of the storage battery during the year or month Charging is done according to the order of the electric vehicles with the most.
  • step 158 charging power supply unit 33.
  • step 153 if there is no vehicle in the first vehicle group that is parked and the owner is at home, the process proceeds to step 156 as it is.
  • step 14 step 35, step 56, step 75, step 85, step 105, step 114, Step 135).
  • the predetermined values P41 and P42 are adjusted to be, for example, 20% of the contract power. However, by giving a width and hysteresis such as 20 to 30%, or by making the predetermined values different between P41 and P42 (for example, P41 ⁇ P42) Among the first electric vehicles, the user's convenience may be improved by changing the adjustment of usable electric power by charging between the electric vehicle owned by the occupant and the electric vehicle owned by the absentee.
  • the vehicles parked in the parking space are divided into the first vehicle group owned by the individual and the second vehicle group shared by a plurality of people.
  • a home detection device 111 that detects the home status of the owner's residence for each electric vehicle of one vehicle group, and a storage that stores the detection result of the home detection device 111 and the vehicle information of the owner's electric vehicle in association with each other.
  • the charging control device 3A charges the first vehicle group, the vehicle information acquired from the electric vehicle to be charged is compared with the vehicle information stored in the storage device 112, and the corresponding vehicle information is provided.
  • the detection result of the home detection device 111 associated with the vehicle information is acquired, and the owner charges the electric vehicle at home with priority over the electric vehicle without the owner.
  • the owner charges the electric vehicle at home with priority over the electric vehicle without the owner.
  • the electric vehicle owned by the person who is at home is detected first by detecting the home status of the owner's residence. Charge. Subsequently, since the electric vehicle of the absent person is charged, the owned vehicle can be charged even for a person who has gone out without using the privately owned vehicle.
  • the charging system 110 is used to set the charging priority according to the home status of the owner of the parked personally owned electric vehicle.
  • Vehicle group shared electric vehicle (second vehicle group), absentee electric vehicle (first vehicle group) in order, and the priority order is shared electric vehicle (second vehicle group), It is possible to set the order of the electric vehicle (first vehicle group) of the resident and the electric vehicle (first vehicle group) of the absent person.
  • a notification unit 34 that notifies the owner of the electric vehicle of the first electric vehicle group is provided, and the notification unit is provided when the electric vehicle of the second vehicle group is charged with priority over the first vehicle group. 34 is used to notify that the second vehicle group can be used. Therefore, the owner of the electric vehicle belonging to the first vehicle group is, for example, the second vehicle group even if the electric vehicle owned by the owner is uncharged. You can know that (shared vehicle) is charged and available.
  • the first vehicle group may not be sufficiently charged. That is, if a resident tries to use an electric vehicle owned by the resident, the amount of charge is insufficient and the travelable distance is short. In such a case, the resident uses the collective housing charge reservation system as described above to enter the required travel distance and the time to use the personally owned electric vehicle, and reserve the charge for his own electric vehicle. Then charge it as the top priority. If it still takes time to charge, it may not be in time.
  • the charge reservation system is linked with the car sharing management system, the conditions for the time zone where the resident wants to use the vehicle and the required mileage can be used for searching for the shared vehicle in the car sharing management system. It is possible to use the shared vehicle for the residents when the shared vehicle can be used at a time when the shared vehicle can be used within the time range when using a privately owned electric vehicle and judging from the required travel distance. This is notified by the notification unit 34, the in-vehicle terminal, a personal computer or a mobile phone.
  • the power that can be used for charging the electric vehicle is limited as shown in FIGS. 20 and 22, and the second vehicle group is given priority.
  • the resident may be informed that the shared vehicle can be used.
  • the present invention has an effect that when a large number of parked electric vehicles are charged at the same time, it can be efficiently charged with limited supply power, and is applied to a parking facility that introduces car sharing. Is possible.
  • the present invention controls charging of a privately owned vehicle and a shared vehicle in a shared parking lot, a commercial facility, or a public facility.
  • the invention is effective when charging a mixture of personally owned electric vehicles and shared electric vehicles, such as control of charging between corporate owned vehicles and shared vehicles in a company.
  • electric vehicles are not limited to automobiles, but parking of vehicles that need to be charged with storage batteries such as electric bicycles, electric motorcycles, electric wheelchairs, electric four-wheeled vehicles, electric agricultural equipment, electric vehicles handled in factories and warehouses, etc. Effective for space (charging space).

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Finance (AREA)
  • Health & Medical Sciences (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Electrochemistry (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 本発明の課題は、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することができる充電システム及び充電システムの制御方法を提供することである。 使用電力計測装置(2)と、充電制御装置(3)と、駐車台数検知装置(4)と、第1の充電装置(5)と、第2の充電装置(6)とを備え、駐車空間に駐車する車両を個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分け、第1の車両グループの駐車台数(又は駐車率)が所定値以上のとき(例えば、第1の車両グループの登録台数の70%以上が駐車しているとき)に第1の車両グループを優先して充電し、第1の車両グループの駐車台数(又は駐車率)が所定値未満のときに第2の車両グループを優先して充電する。

Description

充電システム及び充電システムの制御方法
 本発明は、電気自動車やプラグインハイブリッド車等の充電した電力で走行する電動車両に充電を行う充電システム及び充電システムの制御方法に関する。
 近年、複数の家庭で1台(あるいは数台)の車両を共有するカーシェアリングが普及し始めている。現在、カーシェアリングで使用されている車両はガソリンで走行するものが主流であるが、1回の使用で走行する距離が短いことが多いこともあって(例えば買い物や送り迎え)、将来的には電気自動車やプラグインハイブリッド車のような電動車両が使用される可能性が高い。
 また、集合住宅においてカーシェアリングが導入されると、各家庭に1台以上の駐車場設備を用意するよりも、集合住宅内でカーシェアリングを行って集合住宅全体での駐車場設備を減らし敷地面積の有効利用を行うメリットがある。
 例えば、導入の最初は各家庭に車両1台分の駐車場を用意し、2台目以降の車両が必要なときはカーシェアリングを利用してもらう形態が考えられる。住居者は平日の通勤や休日の旅行に自身が所有する車両を使用し、自身の車両が外出で使用中のときや自身の車両の都合が悪いときにカーシェアリングを利用する。
 集合住宅の住居者の中でカーシェアリングの利用が増え個人所有の車両が不要となる家庭が増えれば、個人の駐車場を減らし、例えば太陽光発電装置を設置したり第三者に駐車場を貸したりして集合住宅に新たな価値をもたらすことができる。
 このように、カーシェアリングに参加する家庭のなかには個人所有の車両を持つ家庭があるため、集合住宅では個人所有車と共有車が混在することになる。また個人の車両としては電動車両と非電動車両(ガソリン車やディーゼル車)とがある。したがって、集合住宅としては、複数の住居者で共有する電動車両、住居者個人が所有する電動車両、住居者個人が所有する非電動車両の3種類が少なくとも存在する可能性がある。そして、これらの電動車両を充電するために駐車場に設置される充電システムは、多数の電動車両を効率よく充電できる機能を持たせる必要がある。
 このような機能を持った従来の充電システムとして、例えば特許文献1で開示された充電制御装置が知られている。この充電制御装置は、各々が蓄電装置を搭載する複数台の車両の前記蓄電装置の外部電源からの充電を個々に制御する充電制御装置であって、各車両と前記外部電源とが結合されたときの前記蓄電装置の蓄電状態を検出する蓄電状態検出部と、前記複数台の車両の各々について、予想消費電力量を検出する予想消費電力算出部と、各車両について、検出された蓄電状態と予想消費電力量とに基づいて必要な充電電力量を算出する必要充電電力量算出部と、各車両の使用開始時刻を検出する使用時刻検出部と、前記必要充電量と前記使用開始時刻から各車両の充電時間と充電電力量についての充電スケジュールを決定する充電スケジュール作成部と、前記充電スケジュールに基づいて前記車両に搭載された蓄電装置を充電する制御部とを備えている。
 すなわち、複数の電動車両に必要な充電の電力と充電の時間とから優先すべき電動車両を決定し充電スケジュールを作成するものである。
日本国特開2009-136109号公報
 ところで、電力会社から集合住宅に供給される電力は契約で許容電力が決められているので、駐車している多数の電動車両を同時に充電する場合に、集合住宅全体の使用電力が許容電力を超えると電力会社からの供給電力が遮断したり、電力会社との契約によって集合住宅全体の電力料金が高くなったりする課題がある。
 あるいは電力会社から電動車両で充電に使用するために充電装置に供給される電力は契約で許容電力が決められている場合は、駐車している多数の電動車両を同時に充電する場合に、充電に使用する電力が許容電力を超えると電力会社からの供給電力が遮断したり、電力会社との契約によって充電に使用する電力料金が高くなったりする課題がある。
 これを回避するために、許容電力を超えないように電動車両の充電で使用する電力を減らして調整を行う必要がある。
 そして、カーシェアリングを行っている集合住宅では、個人所有の電動車両と複数人で共有する電動車両とについて、住居者の生活に不便とならないよう効率的に充電を行う必要がある。例えば、住居者の生活パターンや共有車両の使い方、充電に使用可能な電力の状況、各電動車両の充電状況などに応じて充電の優先順位を設定する。特許文献1にこのような記載は見あたらない。
 本発明は、係る事情に鑑みてなされたものであり、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することができる充電システム及び充電システムの制御方法を提供することを目的とする。
 本発明の充電システムは、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループの駐車台数又は駐車率を検知する駐車台数検知手段と、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、を備え、前記充電制御装置は、前記駐車台数検知手段で検知された駐車台数又は駐車率に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた。
 上記構成によれば、第1の車両グループの駐車台数又は駐車率に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定し、決定した優先順位に従って電動車両を充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 上記構成において、前記優先順位決定手段は、前記駐車台数検知手段で検知された前記第1の車両グループの駐車台数又は駐車率が所定値以上のときは前記第1の車両グループの電動車両から優先して充電し、前記駐車台数又は駐車率が所定値未満のときは前記第2の車両グループの電動車両から優先して充電する。
 上記構成によれば、第1の車両グループの駐車台数又は駐車率が所定値以上のときは第1の車両グループの電動車両から優先して充電し、所定値未満のときは第2の車両グループの電動車両から優先して充電するので、第1の車両グループの駐車台数又は駐車率に応じて第1の車両グループと第2の車両グループとで充電の優先順位を切り替えるので、限られた供給電力の中で効率良く充電することが可能となる。
 本発明の充電システムは、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置を備え、前記充電制御装置は、前記電動車両を充電するために使用可能な電力を計測する使用可能電力計測手段と、前記使用可能電力計測手段で計測された使用可能電力に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた。
 上記構成によれば、電動車両を充電するために使用可能な電力を計測し、計測した使用可能電力に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定し、決定した優先順位に従って電動車両を充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 上記構成において、前記優先順位決定手段は、前記使用可能電力計測手段で計測された使用可能電力が所定値以上のときは前記第1の車両グループの電動車両から優先して充電し、前記使用可能電力計測手段で計測された使用可能電力が所定値未満のときは前記第2の車両グループの電動車両から優先して充電する。
 上記構成によれば、計測した使用可能電力が所定値以上のときは第1の車両グループの電動車両から優先して充電し、所定値未満のときは第2の車両グループの電動車両から優先して充電するので、使用可能電力に応じて第1の車両グループと第2の車両グループとで充電の優先順位を切り替えるので、限られた供給電力の中で効率良く充電することが可能となる。
 本発明の充電システムは、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、時刻や曜日を計時する計時手段と、を備え、前記充電制御装置は、前記計時手段が計時した時刻や曜日に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた。
 上記構成によれば、計時した時刻や曜日に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 上記構成において、前記第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知する在宅検知手段を更に備え、前記優先順位決定手段は、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電する。
 上記構成によれば、第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知して、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 上記構成において、前記在宅検知手段の検知結果と前記所有者の電動車両が備える車両情報とを対応づけて記憶する記憶手段を更に備え、前記優先順位決定手段は、前記第1の車両グループを充電するときは、充電する電動車両から取得した車両情報を前記記憶手段に記憶された車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた前記在宅検知手段の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電する。
 上記構成によれば、第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知して、その検知結果と前記所有者の電動車両が備える車両情報とを対応づけて記憶し、第1の車両グループを充電するときは、充電する電動車両から取得した車両情報を記憶している車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた在宅検知の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 上記構成において、前記充電制御装置は、前記第1の電動車両グループの電動車両の所有者へ報知する報知手段を備え、前記優先順位決定手段は、前記第2の車両グループの電動車両が前記第1の車両グループに優先して充電されているときは、前記報知手段を用いて前記第2の車両グループの使用可能を報知する。
 上記構成によれば、第2の車両グループの電動車両が第1の車両グループに優先して充電されているときは、第2の車両グループの使用可能を報知するので、第1の車両グループに属する電動車両の所有者は、例えば自身が所有する電動車両が未充電であっても第2の車両グループ(共有の車両)が充電済みで使用可能であることを知ることができる。
 本発明の充電システムの制御方法は、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループの駐車台数又は駐車率を検知する駐車台数検知手段と、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、を備えた充電システムの制御方法において、前記駐車台数検知手段で検知された駐車台数又は駐車率に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定ステップと、前記優先順位決定ステップで決定された優先順位に従って電動車両を充電する充電電力供給ステップと、を備えた。
 上記方法によれば、第1の車両グループの駐車台数又は駐車率に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するので、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 本発明のプログラムは、前記充電システムの制御方法をコンピュータに実行させるものである。
 上記プログラムによれば、第1の車両グループと第2の車両グループとをそれぞれの充電装置に接続したときに、限られた供給電力の中で効率良く充電することが可能となる。
 本発明は、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することができる。
本発明の実施の形態1に係る充電システムとその周辺の概略構成を示す図 本発明の実施の形態1に係る充電システムの概略構成を示すブロック図 図2の充電システムの特徴を示す図 図2の充電システムの動作を説明するためのフロー図 図2の充電システムの動作を説明するためのフロー図 本発明の実施の形態2に係る充電システムの概略構成を示すブロック図 図6の充電システムの特徴を示す図 図6の充電システムの動作を説明するためのフロー図 図6の充電システムの動作を説明するためのフロー図 本発明の実施の形態3に係る充電システムの概略構成を示すブロック図 図10の充電システムの特徴を示す図 図10の充電システムの動作を説明するためのフロー図 図10の充電システムの動作を説明するためのフロー図 本発明の実施の形態4に係る充電システムの概略構成を示すブロック図 図14の充電システムの特徴を示す図 図14の充電システムの動作を説明するためのフロー図 図14の充電システムの動作を説明するためのフロー図 本発明の実施の形態5に係る充電システムの概略構成を示すブロック図 図18の充電システムの特徴を示す図 図18の充電システムの応用例の特徴を示す図 図18の充電システムの応用例の特徴を示す図 図18の充電システムの応用例の特徴を示す図 図18の充電システムの動作を説明するためのフロー図
 以下、本発明を実施するための好適な実施の形態について、図面を参照して詳細に説明する。
 (実施の形態1)
 図1は、本発明の実施の形態1に係る充電システムとその周辺の概略構成を示す図である。同図において、充電システム401は集合住宅に設置し、電力会社402から供給される電力と集合住宅の屋上等に設置した太陽光発電装置403で発電される電力を利用して電動車両を充電する。
 電動車両を充電するため、集合住宅でカーシェアリングを行い住居者が利用する共有の車(M台)の充電するためカーシェアリングの駐車場にとめた電動車両を充電するための充電装置群404と、集合住宅内の個人駐車場に駐車された住居者個人が所有する電動車両(N台)を充電する充電装置群405とからなる(一般にM<N)。
 ここで、電力会社402から供給される電力は電力会社と契約した電力の範囲内であれば24時間いつでも使用することができる。電力の契約に関しては、集合住宅の充電システムで供給電力の上限を定める形態と、集合住宅の住居を含めた全体で供給電力の上限を定める形態とが考えられる。
 一方、太陽光発電装置403で発電される電力は時刻や天候、季節により大きく変動する。これらの電力事情を考慮して、充電制御装置406は電力会社402と太陽光発電装置403とから供給される電力を、上記供給電力上限を超えない範囲で、共有の車の充電装置群404と個人所有の車の充電装置群405とで多数の電動車両を同時に充電したとしても限られた供給電力の中で効率良く充電する制御を行う。
 制御の詳細について以降に説明するが、まず実施の形態1では太陽光発電装置を備えない集合住宅の充電システムについて説明する。太陽光発電装置を集合住宅が備える充電システムについては実施の形態2で説明する。
 また、実施の形態1、2では電力会社との契約で決まる供給電力上限の範囲を充電システムに限定して考えている。充電システム装置以外に住居を含めた集合住宅全体で供給電力の上限を定める形態を実施の形態3で説明する。実施の形態4以後は上記実施の形態1~3の別の形態として本発明の課題を解決する充電システムを説明する。
 図2は、本発明の実施の形態1に係る充電システムの概略構成を示すブロック図である。同図において、本実施の形態に係る充電システム1は、使用電力計測装置2と、充電制御装置3と、駐車台数検知装置4と、第1の充電装置5と、第2の充電装置6とを備えている。この充電システム1は、駐車空間に駐車する車両が個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分けられていて、第1の車両グループの駐車台数(又は駐車率)に応じ第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するものである。
 更に詳しくは、第1の車両グループの駐車台数(又は駐車率)が所定値X1以上のとき(例えば、第1の車両グループの登録台数の70%以上が駐車しているとき)に第1の車両グループを優先して充電し、第1の車両グループの駐車台数(又は駐車率)が所定値X1未満のときに第2の車両グループを優先して充電するものである。図3は、本実施の形態の充電システムの特徴を示す図である。
 使用電力計測装置2は、電力会社との契約電力内での使用電力を計測する。駐車台数検知装置4は、個人所有の電動車両群を含めたN台の第1の車両グループの駐車台数(又は駐車率)を検知する。充電制御装置3は、使用可能電力計測部31と、優先順位決定部32と、充電電力供給部33とを備えている。使用可能電力計測部31は、使用可能な電力を計測する。優先順位決定部32は、駐車台数検知装置4で検知された第1の車両グループの駐車台数(又は駐車率)に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定する。充電電力供給部33は、優先順位決定部32で決定された優先順位に従って電動車両を充電する電力を供給する。
 第1の充電装置5は、充電制御装置3から供給される電力で個人所有の電動車両10に充電を行うものであり、充電量計測部51と車両情報取得部52を有している。充電量計測部51は、個人所有の電動車両10に搭載された蓄電池101の残量から充電に必要な量を計測する。車両情報取得部52は、個人所有の電動車両10に搭載された車両管理装置102から車両ID、充電予約、使用予約等の車両情報を取得し、取得した車両情報を充電制御装置3に送る。第1の充電装置5は1台の電動車両に対して充電を行うことから、第1の車両グループを構成する全ての電動車両に対して充電ができるように、複数台用意される。
 なお、第1の充電装置5によって個人所有の電動車両10に充電した電力の電気料金はその個人の住居の電気料金とあわせて電力会社から請求される。あるいは、住居とは別に充電専用の電気契約を行って電力会社から請求される。もしくは、ガソリンスタンドのように第1の充電装置5に精算手段(図示しない)を備えてクレジットカード決済や電子マネー決済で充電の電気料金を支払う。
 なお、駐車台数検知装置4は第1の充電装置5の車両情報取得部52と連携すれば第1の車両グループのうち電動車両の駐車台数(駐車率)を検知することができる。非電動車両(ガソリン車やディーゼル車)を加えた駐車台数を検知するには駐車場に車両検知手段(例えば、1台の車両空間毎に赤外線センサや画像認識センサ、重量センサなど)を設ければよい。
 個人所有の電動車両10には、上述した蓄電池101と、車両ID、充電予約、使用予約等の車両情報を管理する車両管理装置102が搭載されている。また、上述した駐車台数検知装置4は、個人所有の電動車両10に搭載された車両管理装置102で管理されている車両情報の中に車両IDを元に第1の車両グループに属する電動車両の駐車台数(又は駐車率)を検知し、検知した駐車台数(又は駐車率)を第1の車両グループの駐車台数の情報として充電制御装置3に送る。また、電動車両10はカーナビゲーション装置や蓄電池の充電状態管理装置を搭載し、車両管理装置102と機能の一部を共有してもよい。
 第2の充電装置6は、充電制御装置3から供給される電力で住居者共有の電動車両20に充電を行うものであり、充電量計測部61と車両情報取得部62を有している。充電量計測部61は、住居者共有の電動車両20に搭載された蓄電池201の残量から充電に必要な量を計測する。車両情報取得部62は、住居者共有の電動車両20に搭載された車両管理装置202から車両ID、充電予約、使用予約等の車両情報を取得し、取得した車両情報を充電制御装置3に送る。第2の充電装置6は1台の電動車両に対して充電を行うことから、第2の車両グループを構成する全ての電動車両に対して充電ができるように、複数台用意される。住居者共有の電動車両20には、上述した蓄電池201と、車両ID、充電予約、使用予約等の車両情報を管理する車両管理装置202が搭載されている。
 なお、第2の充電装置6によって共有の電動車両20に充電した電力の電気料金は一旦、カーシェアリング運営者が支払う。そして、カーシェアリングの利用者に請求するカーシェアリング料金に充電の電気料金を含める。カーシェアリングの利用料金は、会費である基本料金(月額で定額が多い)と利用しただけ支払う料金(共有の電動車両を使用した時間や距離)の2つから構成される場合が多い。カーシェアリング利用料金の精算処理はカーシェアリング運営システムに組み込んで共有の電動車両の予約と連携して利用者毎に請求することができる。
 なお、車両管理装置102、202は、集合住宅の充電予約システム(図示しない)と接続した車載端末である。また、共有車両の車両管理装置202はカーシェアリング運営システム(図示しない)と接続した車載端末である。住居者が個人所有の電動車両を使用するときはパソコンや携帯電話を用いて充電予約システムにアクセスして、個人所有の電動車両を使用する時間帯、必要な走行距離を入力する。充電予約システムは個人所有の電動車両の充電状態と必要な走行距離、使用する時間帯から充電に必要な時間と充電に必要な電力を算出し集合住宅全体の充電予約システムの中で予約する。そして個人所有の車両の車載端末に予約内容を転送し、充電時に充電制御装置と電動車両との車両確認の認証に用いる。
 また、住居者が共有の電動車両を予約するときはパソコンや携帯電話を用いてカーシェアリング運営システムにアクセスして、共有車両の使用したい時間帯、必要な走行距離を入力する。カーシェアリング運営システムは個人所有の電動車両の充電状態と必要な走行距離、使用する時間帯から充電に必要な時間と充電に必要な電力を算出し、その条件の中で複数の共有車両の中から最適な車両を選択し、カーシェアリング運営システムの中で車両と充電とを予約する。そして、集合住宅の充電予約システムと連携して充電の予約を行う。さらに該当する共有車両の車載端末に予約内容を転送し、充電時に充電制御装置と電動車両との車両確認の認証に用いたり、乗車時に電動車両と運転者との確認に用いる。
 なお、住居者が個人所有の電動車両の充電予約を行うときに、個人所有の電動車両を使用する時間帯、必要な走行距離から判断して共有車両でも走行可能な距離で、共有車両が使用可能な時間帯であるときには、住居者に共有車両の利用が可能なことを知らせてもよい。特に後述するように、電動車両の充電に使用可能な電力が限られていて充電すべき個人所有の車両が多いときは、これを共有車両の利用に誘導して充電を効率的に行うことができる。また、このようなときは効率的な充電への協力になるので共有車両の利用料金を通常より安くすることが考えられる。
 なお、各電動車両はカーナビゲーション装置を備えて、車両管理装置202と機能の一部を共有し、カーナビゲーション装置から集合住宅の充電予約システムやカーシェアリング運営システムと接続してアクセスしてもよい。
 次に、図4及び図5に示すフローチャートを参照して、本実施の形態に係る充電システム1の動作を説明する。なお、各ステップの説明中に当該ステップを実行するエレメント(例えば、充電電力供給部33)を併せて記載する。
 まずN台の第1の充電装置5及びM台の第2の充電装置6のそれぞれから車両情報を取得する(ステップ10、優先順位決定部32)。この場合、有線通信(例えば充電線による電力線通信)であれば電動車両が接続されている充電装置からのみ車両情報が得られ、無線通信であれば電動車両が接続されていない状態で駐車している車両についても車両情報を取得できる。取得した車両情報から個人所有の車両か共有の車両かを識別することで、個人所有車はいつも指定された駐車空間に駐車しなくてもよく、また個人所有の車両と共有の車両とが混在して駐車してもよい。例えば、共有の車両を借りているときは住居者に都合のよい駐車空間に駐車することができる。
 各電動車両の車両情報を取得した後、まず使用者による充電時間の予約が入っている電動車両の充電を最優先で行う(ステップ11、充電電力供給部33)。これにより上記の集合住宅の充電予約システムに予約されている個人所有の電動車両と共有の電動車両が充電される。
 次いで、第1の車両グループの駐車台数を検知する(ステップ12、駐車台数検知装置4)。そして、検知した第1の車両グループの駐車台数が所定値X1以上(例えば、第1の車両グループの登録台数の70%以上が駐車しているとき)であるか否かを判断し(ステップ13、優先順位決定部32)、第1の車両グループの駐車台数が所定値X1以上の場合は第1の車両グループの電動車両10を第2の車両グループの電動車両20より先に充電する(ステップ14、充電電力供給部33)。複数の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 そして、このとき現在の使用電力を計測し(ステップ15、使用電力計測装置2)、続いて電力会社との契約電力から現在の使用電力を減算した使用可能電力を算出する(ステップ16、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値P1未満(例えば集合住宅全体で使用可能な契約電力の20%未満、あるいは集合住宅の充電装置全体で使用可能な契約電力の20%未満)であれば、使用可能電力が少ないので上記の最優先の車両の充電に必要な電力を確保するために、充電する第1の車両グループの車両台数又は充電量を減らして所定値P1以上となるよう調整する(ステップ17、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P1以上になったかどうか判定する(ステップ18、優先順位決定部32)。この判定で使用可能電力が未だ所定値P1以上になっていなければ使用可能電力がまだ少ないのでステップ14に戻り、使用可能電力が所定値P1以上になるまでステップ14からステップ18の処理を繰り返す。これにより第1の車両グループ、つまり個人所有の電動車両の充電を優先して使用可能電力が所定値P1以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。
 そして、第1の車両グループの充電を優先しても使用可能電力に余裕があって所定値P1以上であるときに第2の車両グループの充電を行う。複数の第2の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 使用可能電力が所定値P1以上であると、第2の車両グループの電動車両を充電する(ステップ19、充電電力供給部33)。そして、このとき現在の使用電力を計測し(ステップ20、使用電力計測装置2)、続いて電力会社との契約電力から現在の使用電力を減算した使用可能電力を算出する(ステップ21、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値P2未満(例えば契約電力の20%未満)であれば、充電する第2の車両グループの台数又は充電量を減らして所定値P2以上となるよう調整する(ステップ22、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ23、充電量計測部61)、全てが所定値Q1以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判定する(ステップ24、充電電力供給部33)。全てが所定値Q1以上であれば充電を終了し(ステップ25、充電電力供給部33)、いずれか1つでも所定値Q1未満であればステップ14に戻り、ステップ14~ステップ24の処理を繰り返す。
 これにより第1の車両グループの充電をしても使用可能電力に余裕があって所定値P1以上であるときに第2の車両グループ、つまり共有の電動車両の充電を行う。第2の車両グループの充電を行って使用可能電力が所定値P2以上となるように充電する第1、第2の車両グループの車両台数又は充電量を再び調整して、所定値Q1以上で充電を完了する。
 なお、上記では所定値P1、P2を契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P1とP2とで所定値を異ならせることで(例えばP1<P2)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 一方、上記ステップ13の判断において、第1の車両グループの駐車台数が所定値X1未満(例えば、第1の車両グループの登録台数の70%未満が駐車しているとき)の場合は第2の車両グループの電動車両20を第1の車両グループの電動車両10より先に充電する(ステップ30、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ31、使用電力計測装置2)、続いて電力会社との契約電力から現在の使用電力を減算した使用可能電力を算出する(ステップ32、使用可能電力計測部31)。算出した使用可能電力が所定値P3未満(例えば契約電力の20%未満)であれば、充電する第2の車両グループの車両台数又は充電量を減らして所定値P3以上となるよう調整する(ステップ33、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P3以上になったかどうか判定する(ステップ34、優先順位決定部32)。この判定で使用可能電力が未だ所定値P3以上になっていなければまだ使用可能電力が少ないのでステップ30に戻り、使用可能電力が所定値P3以上になるまでステップ30からステップ34の処理を繰り返す。
 これにより第2の車両グループ、つまり共有の電動車両の充電を優先して使用可能電力が所定値P3以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。そして、第2の車両グループの充電を優先しても使用可能電力に余裕があって所定値P3以上であるときに第1の車両グループの充電を行う。使用可能電力が所定値P3以上(例えば契約電力の20%以上)であると、第1の車両グループの電動車両を充電する(ステップ35、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ36、使用電力計測装置2)、続いて電力会社との契約電力から現在の使用電力を減算した使用可能電力を算出する(ステップ37、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P4未満(例えば契約電力の20%未満)であれば充電する第1の車両グループの台数又は充電量を減らして所定値P4を超えるよう調整する(ステップ38、充電電力供給部33)。
 そして、各電動車両の充電量を計測し(ステップ39、充電量計測部51)、全てが所定値Q2以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判定する(ステップ40、充電電力供給部33)。全てが所定値Q2以上であれば充電を終了し(ステップ41、充電電力供給部33)、いずれか1つでも所定値Q2未満であればステップ30に戻り、ステップ30~ステップ40の処理を繰り返す。
 これにより第2の車両グループの充電をしても使用可能電力に余裕があって所定値P3以上であるときに第1の車両グループ、つまり個人所有の電動車両の充電を行う。第1の車両グループの充電を行って使用可能電力が所定値P4以上となるように充電する第2、第1の車両グループの車両台数又は充電量を再び調整して、所定値Q2以上で充電を完了する。
 なお、上記では所定値P3、P4を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P3とP4とで所定値を異ならせることで(例えばP3<P4)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。また、上記の所定値P1とP3、P2とP4、Q1とQ2とを異ならせることで第1の電動車両を優先して充電するときと第2の電動車両を優先して充電するときとで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 例えば、個人所有の電動車両の充電量については、全てを所定値以上に充電することが望ましいが、その途中の過程においても不公平のないように同等の蓄電量を保ちながら充電する、同等の供給電力、充電速度で充電するのが好ましい。一方、共有の電動車両の充電量については、全てを所定値以上に充電することが望ましいが、その途中の過程として、充電量を少しずつ異ならせて使用者の要望(走行に必要な距離)に応じて多様な充電量の共有車両を用意する。
 つまり、複数の電動車両の充電量を同等としながら充電すると、例えば全ての共有の電動車両の充電状態が未だ半分程度だとすると、長距離走行を必要とする使用者の要望に応えられない。そこで複数の共有の電動車両について、長距離走行が可能な充電量の車両、中距離走行が可能な充電量の車両、短距離走行が可能な充電量の車両というように充電状態を異ならせながら充電していけば充電の途中であっても使用者の要望を可能な限りかなえることができる。
 このように本実施の形態の充電システム1によれば、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、第1の車両グループの駐車台数又は駐車率を検知する駐車台数検知装置4と、第1の車両グループと第2の車両グループのうちの電動車両を充電するための充電制御装置3とを備え、充電制御装置3が、駐車台数検知装置4で検知された駐車台数(又は駐車率)が所定値以上のときは第1の車両グループの電動車両から優先して充電し、所定値未満のときは第2の車両グループの電動車両から優先して充電するので、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することが可能となる。
 すなわち、個人所有の車両の駐車台数が多い又は駐車率が高いときは個人所有の電動車両の充電を優先して住居者が自身の所有車両を使用できるよう準備する。そして、個人所有の車両の駐車台数が少ない又は駐車率が低いときは共有の電動車両の充電を優先して、住居者自身の所有車両が外出していて2台目の車両を必要とするときに備えて共有の車両を充電する。
 (実施の形態2)
 図6は、本発明の実施の形態2に係る充電システムの概略構成を示すブロック図である。なお、同図において前述した図2の充電システムと共通する部分には同一の符号を付けてその説明を省略する。また、本実施の形態においても駐車空間に駐車する車両を個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分けるようにしている。
 本実施の形態に係る充電システム70は、使用電力計測装置2、充電制御装置3、第1の充電装置5及び第2の充電装置6の他に、太陽光発電装置や風力発電装置などの自然エネルギー発電装置200で発電された電力を計測する発電量計測装置71を備えており、電動車両を充電するために使用可能な電力を計測し、計測した使用可能電力に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するものである。
 更に詳しくは、計測した使用可能電力が所定値X2以上(例えば集合住宅全体で使用可能な契約電力の50%以上、あるいは集合住宅の充電装置全体で使用可能な契約電力の50%以上)のときは第1の車両グループの電動車両から優先して充電し、所定値X2未満のときは第2の車両グループの電動車両から優先して充電するものである。図7は、本実施の形態の充電システムの特徴を示す図である。
 次に、図8及び図9に示すフローチャートを参照して、本実施の形態に係る充電システム70の動作を説明する。なお、各ステップの説明中に当該ステップを実行するエレメント(例えば、充電電力供給部33)を併せて記載する。また、この動作説明では、自然エネルギー発電装置200として太陽光発電装置の電力を利用しているが、風力発電や地熱発電などでもよい。また、自然エネルギー発電装置ではないが燃料電池など集合住宅に設置できる発電装置でもよい。これらは常時一定の電力を供給するものではなく、太陽や風、地熱の状態、燃料電池などの発電装置の稼働状態によって変化する。これを含めて使用可能電力を計測する。
 まずN台の第1の充電装置5及びM台の第2の充電装置6のそれぞれから車両情報を取得する(ステップ50、優先順位決定部32)。この場合、電動車両が接続されている充電装置からのみ車両情報が得られる。各電動車両の車両情報を取得した後、まず使用者による充電時間の予約が入っている電動車両の充電を最優先で行う(ステップ51、充電電力供給部33)。次に、太陽光発電装置で発電される電力を計測し(ステップ52、発電量計測装置71)、続いて現在の使用電力を計測する(ステップ53、使用電力計測装置2)。次いで、現在の太陽光発電装置の発電量に電力会社との契約電力を加えたものから現在の使用電力を減算して使用可能電力を算出する(ステップ54、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値X2以上(例えば契約電力の50%以上)であるか否かを判断し(ステップ55、優先順位決定部32)、使用可能電力が所定値X2以上の場合は、第1の車両グループの電動車両10を第2の車両グループの電動車両20より先に充電する(ステップ56、充電電力供給部33)。複数の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 そして、このとき現在の使用電力と発電量を計測し(ステップ57、使用電力計測装置2、発電量計測装置71)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ58、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P11未満(例えば集合住宅全体で使用可能な契約電力の20%未満、あるいは集合住宅の充電装置全体で使用可能な契約電力の20%未満)であれば、充電する第1の車両グループの車両台数又は充電量を減らして所定値P11以上となるよう調整する(ステップ59、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P11以上か否かを判断する(ステップ60、優先順位決定部32)。この判定で使用可能電力が未だ所定値P11以上になっていなければ使用可能電力がまだ少ないのでステップ52に戻り、使用可能電力が所定値P11以上になるまでステップ52からステップ60の処理を繰り返す。
 これにより第1の車両グループ、つまり個人所有の電動車両の充電を優先して使用可能電力が所定値P11以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。そして、第1の車両グループの充電を優先しても使用可能電力に余裕があって所定値P11以上であるときに第2の車両グループの充電を行う。使用可能電力が所定値P11以上であると、第2の車両グループの電動車両を充電する(ステップ61、充電電力供給部33)。
 そして、このとき現在の使用電力と発電量を計測し(ステップ62、使用電力計測装置2、発電量計測装置71)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ63、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P12未満(例えば契約電力の20%未満)であれば充電する第2の車両グループの台数又は充電量を減らして所定値P12を超えるよう調整する(ステップ64、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ65、充電量計測部61)、全てが所定値Q11以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判断する(ステップ66、充電電力供給部33)。全てが所定値Q11以上であれば充電を終了し(ステップ67、充電電力供給部33)し、いずれか1つでも所定値Q11未満であればステップ52に戻り、ステップ52~ステップ66の処理を繰り返す。
 これにより第1の車両グループの充電をしても使用可能電力に余裕があって所定値P11以上であるときに第2の車両グループ、つまり共有の電動車両の充電を行う。複数の第2の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 第2の車両グループの充電を行って使用可能電力が所定値P12以上となるように充電する第1、第2の車両グループの車両台数又は充電量を再び調整して、所定値Q11以上で充電を完了する。
 なお、上記では所定値P11、P12を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P11とP12とで所定値を異ならせることで(例えばP11<P12)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 一方、上記ステップ55の判断において、使用可能電力が所定値X2未満(例えば契約電力の50%未満)の場合は、第2の車両グループの電動車両20を第1の車両グループの電動車両10より先に充電する(ステップ70、充電電力供給部33)。そして、このとき現在の使用電力と発電量を計測し(ステップ71、使用電力計測装置2、発電量計測装置71)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ72、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P13未満(例えば契約電力の20%未満)であれば、充電する第2の車両グループの車両台数又は充電量を減らして所定値P13以上となるよう調整する(ステップ73、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P13以上か否かを判断する(ステップ74、優先順位決定部32)。この判定で使用可能電力が未だ所定値P13以上になっていなければステップ52に戻り、使用可能電力が所定値P13以上になるまでステップ52からステップ74の処理を繰り返す。
 これにより第2の車両グループ、つまり共有の電動車両の充電を優先して使用可能電力が所定値P13以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。そして、第2の車両グループの充電を優先しても使用可能電力に余裕があって所定値P13以上であるときに第1の車両グループの充電を行う。使用可能電力P13が所定値以上であると、第1の車両グループの電動車両を充電する(ステップ75、充電電力供給部33)。
 そして、このとき現在の使用電力と発電量を計測し(ステップ76、使用電力計測装置2、発電量計測装置71)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ77、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P14未満(例えば契約電力の20%未満)であれば充電する第1の車両グループの台数又は充電量を減らして所定値P14を超えるよう調整する(ステップ78、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ65、充電量計測部51)、全てが所定値Q12以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判断する(ステップ66、充電電力供給部33)。全てが所定値Q12以上であれば充電を終了し(ステップ67、充電電力供給部33)、いずれか1つでも所定値Q12未満であればステップ52に戻り、ステップ52~ステップ66の処理を繰り返す。
 これにより第2の車両グループの充電をしても使用可能電力に余裕があって所定値P13以上であるときに第1の車両グループ、つまり個人所有の電動車両の充電を行う。第1の車両グループの充電を行って使用可能電力が所定値P14以上となるように充電する第2、第1の車両グループの車両台数又は充電量を再び調整して、所定値Q12以上で充電を完了する。
 なお、上記では所定値P13、P14を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P13とP14とで所定値を異ならせることで(例えばP13<P14)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 また、上記の所定値P11とP13、P12とP14、Q11とQ12とを異ならせることで第1の電動車両を優先して充電するときと第2の電動車両を優先して充電するときとで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 このように本実施の形態の充電システム70によれば、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、第1の車両グループと第2の車両グループのうちの電動車両を充電するための充電制御装置3と、太陽光発電装置や風力発電装置などの自然エネルギー発電装置200で発電された電力を計測する発電量計測装置71を備え、充電制御装置3が、電動車両を充電するために使用可能な電力(自然エネルギー分も含む)を計測し、計測した使用可能電力が所定値以上のときは第1の車両グループの電動車両から優先して充電し、所定値未満のときは第2の車両グループの電動車両から優先して充電するので、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することが可能となる。
 すなわち、自然エネルギー発電装置による発電が多いときは個人所有の電動車両の充電を優先して住居者が自身の電動車両を使用できるよう準備する。そして、使用可能電力が少ないときは共有の電動車両の充電を優先して、個人所有の車両が未充電で使用できなくても共有の車両が使えるように準備する。個人所有の複数の車両に広く薄く長時間かけて充電するよりも、共有の車両に電力を集中して短時間で充電する。
 (実施の形態3)
 図10は、本発明の実施の形態3に係る充電システムの概略構成を示すブロック図である。なお、同図において前述した図2の充電システムと共通する部分には同一の符号を付けてその説明を省略する。また、本実施の形態においても駐車空間に駐車する車両を個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分けるようにしている。
 本実施の形態に係る充電システム80は、使用電力計測装置2、充電制御装置3、第1の充電装置5及び第2の充電装置6の他に、第1の充電装置5及び第2の充電装置6の充電以外の使用電力を計測する第2の使用電力計測装置81を備えており、電動車両を充電するために使用可能な電力を計測し、計測した使用可能電力に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するものである。
 更に詳しくは、充電に使用可能電力が所定値X3以上(例えば集合住宅全体で使用可能な契約電力の50%以上、あるいは集合住宅の充電装置全体で使用可能な契約電力の50%以上)のときは第1の車両グループの電動車両から優先して充電し、所定値X3未満のときは第2の車両グループの電動車両から優先して充電するものである。図11は、本実施の形態の充電システムの特徴を示す図である。
 前述した実施の形態2の充電システム70と異なる点は、実施の形態2の充電システム70が太陽光発電装置や風力発電装置などの自然エネルギー発電装置で発電された電力を計測する発電量計測装置71を備えているのに対し、本実施の形態の充電システム80は住宅の住居82や共有施設など、集合住宅において電動車両の充電以外で使用される電力を計測する第2の使用電力計測装置81を有している点である。
 次に、図12及び図13に示すフローチャートを参照して、本実施の形態に係る充電システム80の動作を説明する。なお、各ステップの説明中に当該ステップを実行するエレメント(例えば、充電電力供給部33)を併せて記載する。
 まずN台の第1の充電装置5及びM台の第2の充電装置6のそれぞれから車両情報を取得する(ステップ80、優先順位決定部32)。この場合、電動車両が接続されている充電装置からのみ車両情報が得られる。各電動車両の車両情報を取得した後、まず使用者による充電時間の予約が入っている電動車両の充電を最優先で行う(ステップ81、充電電力供給部33)。これにより上記の集合住宅の充電予約システムに予約されている個人所有の電動車両と共有の電動車両が充電される。
 次に、充電以外で使用される使用電力を計測し(ステップ82、第2の使用電力計測装置81)、次いで電力会社との契約電力から現在の充電以外の使用電力を減算した使用可能電力を算出する(ステップ83、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値X3以上(例えば契約電力の50%以上)であるか否かを判断し(ステップ84、優先順位決定部32)、使用可能電力が所定値X3以上の場合は第1の車両グループの電動車両10を第2の車両グループの電動車両20より先に充電する(ステップ85、充電電力供給部33)。複数の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 そして、このとき現在の使用電力を計測し(ステップ85、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ87、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P21未満(例えば集合住宅全体で使用可能な契約電力の20%未満、あるいは集合住宅の充電装置全体で使用可能な契約電力の20%未満)であれば、充電する第1の車両グループの車両台数又は充電量を減らして所定値P21以上となるよう調整する(ステップ88、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P21以上か否かを判断する(ステップ89、優先順位決定部32)。この判定で使用可能電力が未だ所定値P21以上になっていなければまだ使用可能電力が少ないのでステップ82に戻り、使用可能電力が所定値P21以上になるまでステップ82からステップ89の処理を繰り返す。
 これにより第1の車両グループ、つまり個人所有の電動車両の充電を優先して使用可能電力が所定値P21以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。
 そして、第1の車両グループの充電を優先しても使用可能電力に余裕があって所定値P21以上であるときに第2の車両グループの充電を行う。複数の第2の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 使用可能電力が所定値P21以上であると、第2の車両グループの電動車両を充電する(ステップ90、充電電力供給部33)。そして、このとき現在の使用電力を計測し(ステップ91、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ92、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値P22未満(例えば契約電力の20%未満)であれば充電する第2の車両グループの台数又は充電量を減らして所定値P22を超えるよう調整する(ステップ93、充電電力供給部33)。
 そして、各電動車両の充電量を計測し(ステップ94、充電量計測部61)、全てが所定値Q21以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判断する(ステップ95、充電電力供給部33)。全てが所定値Q21以上であれば充電を終了し(ステップ96、充電電力供給部33)、いずれか1つでも所定値Q21未満であればステップ82に戻り、ステップ82~ステップ95の処理を繰り返す。
 これにより第1の車両グループの充電をしても使用可能電力に余裕があって所定値P21以上であるときに第2の車両グループ、つまり共有の電動車両の充電を行う。第2の車両グループの充電を行って使用可能電力が所定値P22以上となるように充電する第1、第2の車両グループの車両台数又は充電量を再び調整して、所定値Q21以上で充電を完了する。
 なお、上記では所定値P21、P22を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P21とP22とで所定値を異ならせることで(例えばP21<P22)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 一方、上記ステップ84の判断において、使用可能電力が所定値X3未満(例えば契約電力の50%未満)の場合は、第2の車両グループの電動車両20を第1の車両グループの電動車両10より先に充電する(ステップ100、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ101、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ102、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P23未満(例えば契約電力の20%未満)であれば、充電する第2の車両グループの車両台数又は充電量を減らして所定値P23以上となるよう調整する(ステップ103、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値以上か否かを判断する(ステップ104、優先順位決定部32)。この判定で使用可能電力が未だ所定値P23以上になっていなければステップ82に戻り、使用可能電力が所定値P23以上になるまでステップ82からステップ104の処理を繰り返す。
 これにより第2の車両グループ、つまり共有の電動車両の充電を優先して使用可能電力が所定値P23以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。そして、第2の車両グループの充電を優先しても使用可能電力に余裕があって所定値P23以上であるときに第1の車両グループの充電を行う。使用可能電力が所定値P23以上であると、第1の車両グループの電動車両を充電する(ステップ105、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ106、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ107、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P24未満(例えば契約電力の20%未満)であれば充電する第1の車両グループの台数又は充電量を減らして所定値P24を超えるよう調整する(ステップ108、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ94、充電量計測部51)、全てが所定値Q22以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判断する(ステップ95、充電電力供給部33)。全てが所定値Q22以上であれば充電を終了し(ステップ96、充電電力供給部33)、いずれか1つでも所定値Q22未満であればステップ82に戻り、ステップ82~ステップ95の処理を繰り返す。
 これにより第2の車両グループの充電をしても使用可能電力に余裕があって所定値P23以上であるときに第1の車両グループ、つまり個人所有の電動車両の充電を行う。第1の車両グループの充電を行って使用可能電力が所定値P24以上となるように充電する第2、第1の車両グループの車両台数又は充電量を再び調整して、所定値Q22以上で充電を完了する。
 なお、上記では所定値P23、P24を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P23とP24とで所定値を異ならせることで(例えばP23<P24)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 また、上記の所定値P21とP23、P22とP24、Q21とQ22とを異ならせることで第1の電動車両を優先して充電するときと第2の電動車両を優先して充電するときとで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 このように本実施の形態の充電システム80によれば、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、第1の車両グループと第2の車両グループのうちの電動車両を充電するための充電制御装置3と、充電以外の使用電力を計測する第2の使用電力計測装置81とを備え、充電制御装置3が、現在の充電以外の使用電力を減算した電動車両を充電するために使用可能な電力を算出し、算出した使用可能電力が所定値以上のときは第1の車両グループの電動車両から優先して充電し、所定値未満のときは第2の車両グループの電動車両から優先して充電するので、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することが可能となる。
 すなわち、電動車両の充電以外に集合住宅で使用する電力が少なくて使用可能電力が多いときは個人所有の電動車両の充電を優先して住居者が自身の電動車両を使用できるよう準備する。そして、使用可能電力が少ないときは共有の電動車両の充電を優先して、個人所有の車両が未充電で使用できなくても共有の車両が使えるように準備する。
 なお、実施の形態3において、実施の形態2のように太陽光発電装置などの自然エネルギー発電装置200と発電量計測装置71を備えて、この発電と電力会社から供給される電力とを合わせた範囲内で充電制御装置が使用可能電力を算出して充電装置の制御を行っても構わない。
 (実施の形態4)
 図14は、本発明の実施の形態4に係る充電システムの概略構成を示すブロック図である。なお、同図において前述した図2の充電システムと共通する部分には同一の符号を付けてその説明を省略する。また、本実施の形態においても駐車空間に駐車する車両を個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分けるようにしている。
 本実施の形態に係る充電システム90は、使用電力計測装置2、充電制御装置3、第1の充電装置5及び第2の充電装置6の他に、時刻又は曜日の情報を出力する計時装置91を備えており、計時装置91が計時した時刻や曜日に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するものである。
 例えば、平日においては電気料金の割引のある夜間23時~午前7時や、個人所有の車両を使って家族旅行に行く機会が増える土曜日、日曜日、祝日の全日及び前日のときは第1の車両グループの電動車両から優先して充電し、それ以外のときは第2の車両グループの電動車両から優先して充電するものである。図15は、本実施の形態の充電システムの特徴を示す図である。
 例えば通勤に使用される第1グループの電動車両は夜間に優先して充電され、主に朝から夕方に利用され駐車と外出とが頻繁に繰り返されるような第2グループの電動車両はその時間帯に優先して充電される。もちろん、計時装置91は時刻や曜日以外に月や年を含めて計時し、それらを含めて優先順位を決定してもよい。電気料金割引の中には1年間の中で夏季(毎年7月1日から9月30日)とそれ以外の季節とで電気料金を異ならせるものがある。また日の出・日没の時刻が夏季と冬季とで大きく異なるから太陽光発電装置が電力会社の発電装置の中で占める割合が増えると、季節別に電気料金割引の時刻が変わることも考えられる。
 次に、図16及び図17に示すフローチャートを参照して、本実施の形態に係る充電システム90の動作を説明する。なお、各ステップの説明中に当該ステップを実行するエレメント(例えば、充電電力供給部33)を併せて記載する。
 まずN台の第1の充電装置5及びM台の第2の充電装置6のそれぞれから車両情報を取得する(ステップ110、優先順位決定部32)。この場合、電動車両が接続されている充電装置からのみ車両情報が得られる。各電動車両の車両情報を取得した後、まず使用者による充電時間の予約が入っている電動車両の充電を最優先で行う(ステップ111、充電電力供給部33)。これにより上記の集合住宅の充電予約システムに予約されている個人所有の電動車両と共有の電動車両が充電される。
 次に、時刻や曜日を計時し(ステップ112、計時装置91)、前述したように時刻や曜日によって優先するのはどちらのグループかを判断する(ステップ113、優先順位決定部32)。第1の車両のグループを優先する場合は第1の車両グループの電動車両10を第2の車両グループの電動車両20より先に充電する(ステップ114、充電電力供給部33)。複数の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 そして、このとき現在の使用電力を計測し(ステップ115、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ116、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値P31未満(例えば集合住宅全体で使用可能な契約電力の20%未満、あるいは集合住宅の充電装置全体で使用可能な契約電力の20%未満)であれば、充電する第1の車両グループの車両台数又は充電量を減らして所定値P31以上となるよう調整する(ステップ117、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P31以上か否かを判断する(ステップ118、優先順位決定部32)。この判定で使用可能電力が未だ所定値P31以上になっていなければステップ112に戻り、使用可能電力が所定値P31以上になるまでステップ112からステップ118の処理を繰り返す。
 これにより第1の車両グループ、つまり個人所有の電動車両の充電を優先して使用可能電力が所定値P31以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。そして、第1の車両グループの充電を優先しても使用可能電力に余裕があって所定値P31以上であるときに第2の車両グループの充電を行う。複数の第2の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 使用可能電力が所定値P31以上であると、第2の車両グループの電動車両を充電する(ステップ119、充電電力供給部33)。そして、このとき現在の使用電力を計測し(ステップ120、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ121、使用可能電力計測部31)。
 そして、算出した使用可能電力が所定値P32未満(例えば契約電力の20%未満)であれば充電する第2の車両グループの台数又は充電量を減らして所定値を超えるよう調整する(ステップ122、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ123、充電量計測部61)、全てが所定値Q31以上(例えば満充電状態を100とすると所定値は80以上)であるか否かを判断する(ステップ124、充電電力供給部33)。全てが所定値Q31以上であれば充電を終了し(ステップ125、充電電力供給部33)、いずれか1つでも所定値Q31未満であればステップ112に戻り、ステップ112~ステップ125の処理を繰り返す。
 これにより第1の車両グループの充電をしても使用可能電力に余裕があって所定値P31以上であるときに第2の車両グループ、つまり共有の電動車両の充電を行う。第2の車両グループの充電を行って使用可能電力が所定値P32以上となるように充電する第1、第2の車両グループの車両台数又は充電量を再び調整して、所定値Q31以上で充電を完了する。
 なお、上記では所定値P31、P32を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P31とP32とで所定値を異ならせることで(例えばP31<P32)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 一方、上記ステップ113の判断において、時刻や曜日で優先するのが第2の車両のグループの場合は、第2の車両グループの電動車両20を第1の車両グループの電動車両10より先に充電する(ステップ130、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ131、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ132、使用可能電力計測部31)。そして、算出した使用可能電力が所定値P33未満(例えば契約電力の20%未満)であれば、充電する第2の車両グループの車両台数又は充電量を減らして所定値P33以上となるよう調整する(ステップ133、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P33以上か否かを判断する(ステップ134、優先順位決定部32)。この判定で使用可能電力が未だ所定値P33以上になっていなければステップ112に戻り、使用可能電力が所定値P33以上になるまでステップ112からステップ134の処理を繰り返す。
 これにより第2の車両グループ、つまり共有の電動車両の充電を優先して使用可能電力が所定値P33以上となるように充電する第1の車両グループの車両台数又は充電量を調整する。
 そして、第2の車両グループの充電を優先しても使用可能電力に余裕があって所定値P33以上であるときに第1の車両グループの充電を行う。使用可能電力が所定値P33以上であると、第1の車両グループの電動車両を充電する(ステップ135、充電電力供給部33)。
 そして、このとき現在の使用電力を計測し(ステップ136、使用電力計測装置2)、続いて電力会社との契約電力とから現在の使用可能電力を算出する(ステップ137、使用可能電力計測部31)。次いで、算出した使用可能電力が所定値P34未満で(例えば契約電力の20%未満)あれば充電する第1の車両グループの台数又は充電量を減らして所定値P34を超えるよう調整する(ステップ138、充電電力供給部33)。
 次いで、各電動車両の充電量を計測し(ステップ123、充電量計測部51)、全てが所定値Q32以上(例えば満充電状態を100とすると必要最低な充電量として80以上とする)であるか否かを判断する(ステップ124、充電電力供給部33)。全てが所定値Q32以上であれば充電を終了し(ステップ125、充電電力供給部33)、いずれか1つでも所定値Q32未満であればステップ112に戻り、ステップ112~ステップ124の処理を繰り返す。
 これにより第2の車両グループの充電をしても使用可能電力に余裕があって所定値P33以上であるときに第1の車両グループ、つまり個人所有の電動車両の充電を行う。第1の車両グループの充電を行って使用可能電力が所定値P34以上となるように充電する第2、第1の車両グループの車両台数又は充電量を再び調整して、所定値Q32以上で充電を完了する。
 なお、上記では所定値P33、P34を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P33とP34とで所定値を異ならせることで(例えばP33<P34)第1の電動車両と第2の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 また、上記の所定値P31とP33、P32とP34、Q31とQ32とを異ならせることで第1の電動車両を優先して充電するときと第2の電動車両を優先して充電するときとで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 このように本実施の形態の充電システム90によれば、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、第1の車両グループと第2の車両グループのうちの電動車両を充電するための充電制御装置3と、時刻や曜日を計時する計時装置91とを備え、充電制御装置3が、計時装置91が計時した時刻や曜日に応じて第1の車両グループと第2の車両グループのどちらから優先して充電するかの優先順位を決定して、その優先順位に従って電動車両を充電するので、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することが可能となる。
 すなわち、時刻や曜日に応じて個人所有の車両の利用が多くなることが予想されたり充電の電気料金が安くなるときは個人所有の電動車両の充電を優先して住居者が自身の電動車両を使用できるよう準備する。そして、時刻や曜日に応じてお買い物や送迎など共有の電動車両の利用が多くなることが予想されるときは共有の電動車両の充電を優先して共有の電動車両が使えるように準備する。
 このような時刻や曜日に応じて個人所有の車両と共有の車両のどちらが多く使用されるかについては集合住宅によって異なるところがあるので、実際に本発明を運用しながら駐車台数検知手段や充電装置によって外出中の個人所有の車両台数、外出中の共有の車両台数を検知しそれを充電制御装置に反映させるような学習制御を取り入れてもよい。
 なお、実施の形態4において、実施の形態2のように太陽光発電装置などの自然エネルギー発電装置200と発電量計測装置71を備えて、この発電と電力会社から供給される電力とを合わせた範囲内で充電装置が使用可能電力を算出して充電装置の制御を行っても構わない。
 また、実施の形態4において、実施の形態3のように第2の使用電力計測装置81を備えて、充電システム以外の住居等82で使用される電力を含めて充電制御装置が使用可能電力を算出して充電装置の制御を行っても構わない。
 (実施の形態5)
 図18は、本発明の実施の形態5に係る充電システムの概略構成を示すブロック図である。なお、同図において前述した図2の充電システムと共通する部分には同一の符号を付けてその説明を省略する。また、本実施の形態においても駐車空間に駐車する車両を個人で所有する第1の車両グループと、複数人で共有する第2の車両グループとに分けるようにしている。
 本実施の形態に係る充電システム110は、使用電力計測装置2と、充電制御装置3Aと、第1の充電装置5と、第2の充電装置6と、在宅検知装置111と、記憶装置112とを備えており、個人所有の車両で所有者が在宅している車両を特に優先して充電するものである。すなわち、第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知して、その検知結果と所有者の電動車両が備える車両情報とを対応づけて記憶し、第1の車両グループを充電するときは、充電する電動車両から取得した車両情報を記憶している車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた在宅検知の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電する。
 充電制御装置3Aは、使用可能電力計測部31と、優先順位決定部32Aと、充電電力供給部33と、報知部34とを備えており、報知部34は所有者が所持する携帯情報端末(例えば携帯電話)やパソコン、家庭内のTVや表示装置113に向けて優先順位決定部32Aからの情報を送信する。報知部34からは、「所有者の車両の充電量」、「現在の充電の優先順位」、「第2の車両グループの使用のお薦め」等が送信される。
 在宅検知装置111は、各所有者の住居の在宅を検知し、在宅検知情報を記憶装置112に与える。例えば、ホームセキュリティの在宅・外出設定と連携したり、電力や水道、ガスなど生活インフラの使用状態を検知したり、照明や空調、テレビ、暖房便座機器、給湯器など家電機器の動作状態を検知したり、ドアの施錠や留守番電話の留守番モードの設定を検知して在宅であるか不在であるかを検知する。
 記憶装置112は、フラッシュメモリ等の不揮発性メモリを有し、優先順位決定部32Aから与えられる車両情報と、該車両情報の車両所有者の在宅結果(在宅検知情報)を対応付けて記憶する。優先順位決定部32Aは、第1の車両グループを充電するときは、充電する電動車両から取得した車両情報を記憶装置112に記憶された車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた在宅検知装置111の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先するよう決定する。
 第1の車両グループ(個人所有の電動車両)と第2の車両グループ(住居者で共有する電動車両)のどちらのグループを優先するかは、前述した実施の形態1~実施の形態4の方法のいずれか1つ、あるいは実施の形態1~実施の形態3の組み合わせが可能である。本実施の形態は、図18に示すように実施の形態1と組み合わせたものである。
 図19は、実施の形態1の方法を用いた場合の本実施の形態の充電システム110の特徴を示す図である。すなわち、第1の車両グループの駐車台数が所定値X1以上のとき(例えば第1の車両グループの登録台数の70%以上が駐車しているとき)は第1の車両グループを優先し、第1の車両グループの駐車台数が所定値X1未満のときは第2の車両グループを優先する。なお、前述したように本実施の形態では第1の車両グループの中で所有者が在宅している車両を特に優先する。
 図20は、実施の形態2又は実施の形態3の方法を用いた場合の充電システム110の特徴を示す図である。すなわち、充電に使用可能な電力が所定値X2またはX3以上のとき(例えば集合住宅全体で使用可能な契約電力の50%以上、あるいは集合住宅の充電装置全体で使用可能な契約電力の50%以上のとき)は第1の車両グループを優先し、充電に使用可能な電力が所定値X2またはX3未満のときは第2の車両グループを優先する。
 すなわち、実施の形態2のように太陽光発電装置などの自然エネルギー発電装置200と発電量計測装置71を備えて、この発電と電力会社から供給される電力とを合わせた範囲内で充電制御装置は使用可能電力を算出して充電装置の制御を行う。
 また、実施の形態3のように第2の使用電力計測装置81を備えて、充電システム以外の住居等82で使用される電力を含めて充電制御装置は使用可能電力を算出して充電装置の制御を行う。
 図21は、実施の形態4の方法を用いた場合の充電システム110の特徴を示す図である。すなわち、平日においては電気料金の割引のある夜間23時~午前7時、土曜日、日曜日、祝日の全日及び前日のときは第1の車両グループを優先し、その時間帯以外のときは第2の車両グループを優先する。
 すなわち、実施の形態4のように計時装置91を備えて、充電制御装置は時刻または曜日の情報によって充電装置の制御を行う。
 図22は、実施の形態1~実施の形態3の各方法を組み合わせた場合の充電システム110の特徴を示す図である。すなわち、第1の車両のグループの駐車台数が所定値X1以上(例えば第1の車両グループの登録台数の70%以上が駐車しているとき)で、充電に使用可能な電力が所定値X2またはX3以上のとき(例えば集合住宅全体で使用可能な契約電力の50%以上、あるいは集合住宅の充電装置全体で使用可能な契約電力の50%以上)は第1の車両グループを優先し、充電に使用可能な電力が所定値X2未満のときは第2の車両グループを優先する。また、第1の車両のグループの駐車台数が所定値X1未満のときは、充電に使用可能な電力が所定値X2またはX3以上又は未満に関わらず第2の車両グループを優先する。
 次に、図23に示すフローチャートを参照して、本実施の形態に係る充電システム110における第1の車両グループ充電時の動作を説明する。なお、各ステップの説明中に当該ステップを実行するエレメント(例えば、充電電力供給部33)を併せて記載する。
 まず、定期的(例えば15分間隔で)第1の車両グループの車両毎に所有者の住居の在宅状況を検知し(ステップ150、在宅検知装置111)、所有者毎に在宅状況を記憶する(ステップ151、記憶装置112)。あるいは在宅状況が変化したときに所有者毎に在宅状況を記憶してもよい。また、各車両の車両情報を取得し、車両の所有者の在宅状況を記憶装置112に問い合わせる(ステップ152、優先順位決定部32A)。そして、駐車中の車両で所有者が在宅する車両があるかどうか判断し(ステップ153、優先順位決定部32A)、所有者が在宅する車両がある場合はまず所有者在宅の第1の車両グループの車両を優先して充電する(ステップ154、充電電力供給部33)。複数の所有在宅の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 このとき使用可能電力が所定値P41未満(例えば契約電力の20%未満)であれば、充電する住宅の車両台数又は充電量を減らして所定値P41以上となるよう調整する(ステップ155、充電電力供給部33)。
 ここで、車両台数を減らす場合は、例えば1台ずつ減らす調整を行う。この調整を行った後、使用可能電力が所定値P42以上(例えば契約電力の20%以上)か否かを判断する(ステップ156、使用可能電力計測部31)。この判定で使用可能電力が所定値P42未満であれば本処理を終了し、所定値P42以上であれば所有者不在の第1の車両グループの車両を充電する(ステップ157、充電電力供給部33)。複数の所有者不在の第1の車両グループの電動車両が駐車しているときは、年間や月間にて、使用頻度の高い電動車両の順、走行距離の長い電動車両の順、蓄電池の充放電の多い電動車両の順、などによって充電を行う。
 このとき使用可能電力が所定値P42未満であれば、充電する不在の車両台数又は充電量を減らして所定値P42以上となるよう調整する(ステップ158、充電電力供給部33)。
 上記ステップ153において、駐車中の第1の車両グループの車両で所有者が在宅する車両がない場合は、そのままステップ156に進む。
 以上の図23で説明したフローチャートを、実施の形態1~4において第1の車両グループを充電するときに行う(ステップ14、ステップ35、ステップ56、ステップ75、ステップ85、ステップ105、ステップ114、ステップ135)。
 上記では所定値P41、P42を例えば契約電力の20%となるように調整したが20~30%のように幅やヒステリシスを持たせたり、P41とP42とで所定値を異ならせることで(例えばP41<P42)第1の電動車両の中で在宅者が所有の電動車両と不在者が所有の電動車両とで充電による使用可能電力の調整を変えて使用者の利便性を高めてもよい。
 このように本実施の形態の充電システム110によれば、駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知する在宅検知装置111と、在宅検知装置111の検知結果と所有者の電動車両が備える車両情報とを対応づけて記憶する記憶装置112とを備え、充電制御装置3Aが、第1の車両グループを充電する際に、充電する電動車両から取得した車両情報を記憶装置112に記憶された車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた在宅検知装置111の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電するので、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することが可能となる。
 すなわち、個人所有の車両を充電するときに使用の可能性が高い車両を優先して充電するため、所有者の住居の在宅状態を検知して在宅している人の所有する電動車両から先に充電する。続いて、不在の人の電動車両を充電するので個人所有の車両を使わずに外出している人についても所有の車両を充電することができる。
 あるいは図示しないが、本実施の形態の充電システム110を利用して、駐車している個人所有の電動車両の所有者の在宅状況に応じて充電の優先順位を、在宅者の電動車両(第1の車両グループ)、共有の電動車両(第2の車両グループ)、不在者の電動車両(第1の車両グループ)の順としたり、優先順位を、共有の電動車両(第2の車両グループ)、在宅者の電動車両(第1の車両グループ)、不在者の電動車両(第1の車両グループ)の順とすることも可能である。
 また、第1の電動車両グループの電動車両の所有者へ報知する報知部34を備え、第2の車両グループの電動車両が第1の車両グループに優先して充電されている場合に、報知部34を用いて第2の車両グループの使用可能を報知するので、第1の車両グループに属する電動車両の所有者は、例えば自身が所有する電動車両が未充電であっても第2の車両グループ(共有の車両)が充電済みで使用可能であることを知ることができる。
 例えば上記の図19、図20、図21、図22において第2の車両グループを優先して充電しているときは、第1の車両グループの充電が十分でない場合がある。すなわち、住居者が自身の所有する電動車両を使用しようとしたら充電量が不足して走行可能距離が短い。このようなとき住居者は前述のように集合住宅の充電予約システムを利用して個人所有の電動車両を使用する時間帯、必要な走行距離を入力して自身の所有する電動車両の充電を予約し最優先として充電をする。それでも充電に時間を要する場合は間に合わないことがある。
 そこで、充電予約システムはカーシェアリング運営システムと連携しているので、住居者が車両を使用したい時間帯、必要な走行距離の条件はカーシェアリング運営システムの共有車両の検索に利用することができる。個人所有の電動車両を使用する時間帯、必要な走行距離から判断して共有車両でも走行可能な距離で、共有車両が使用可能な時間帯であるときには、住居者に共有車両の利用が可能なことを報知部34や車載端末、個人のパソコンや携帯電話によって知らせる。
 また、上記のように充電予約システムやカーシェアリング運営システムと連携するだけでなく、図20や図22のように電動車両の充電に使用可能な電力が限られていて第2の車両グループを優先して充電を行っているとき、また第2の車両グループの充電が優先して完了しているときは住居者に共有車両の利用が可能なことを知らせるようにしてもよい。
 充電に使用可能な電力に対して充電すべき個人所有の車両が多いときは、これを共有車両の利用に誘導して充電を効率的に行うことができる。このように共有車両の利用を住居者に知らせて利用を促進しているときは効率的な充電への協力になるのでカーシェアリング運営システムは共有車両の利用料金(例えば時間当たりの料金、走行距離当たりの料金)を通常より安くしたり、クーポン券やポイント加算で優遇することが考えられる。
 本発明を詳細にまた特定の実施態様を参照して説明したが、本発明の精神と範囲を逸脱することなく様々な変更や修正を加えることができることは当業者にとって明らかである。
 本出願は、2009年12月28日出願の日本特許出願(特願2009-298751)に基づくものであり、その内容はここに参照として取り込まれる。
 本発明は、駐車している多数の電動車両を同時に充電するときに、限られた供給電力の中で効率良く充電することができるといった効果を有し、カーシェアリングを導入した駐車設備への適用が可能である。
 また、集合住宅における個人所有車と共有車との充電の制御について実施の形態で説明したが、本発明は、共同駐車場や商業施設、公共施設における個人所有車と共有車との充電の制御、会社における法人所有車と共有車との充電の制御など、個人所有の電動車両と共有の電動車両が混在して充電するときに有効な発明である。
 また電動車両は自動車に限らず、電動自転車、電動二輪車、電動車いす、電動四輪車、電動農作業機器、工場や倉庫などで扱う電動運搬車、など蓄電池を備えて充電する必要のある車両の駐車空間(充電する空間)に有効である。
 1、70、80、90、110、401 充電システム
 2 使用電力計測装置
 3、3A、406 充電制御装置
 4 駐車台数検知装置
 5、405 第1の充電装置
 6、404 第2の充電装置
 10、20 電動車両
 31 使用可能電力計測部
 32、32A 優先順位決定部
 33 充電電力供給部
 34 報知部
 51、61 充電量計測部
 52、62 車両情報取得部
 71 発電量計測装置
 81 第2の使用電力計測装置
 82 住宅の住居等
 91 計時装置
 101、201 蓄電池
 102、202 車両管理装置
 111 在宅検知装置
 112 記憶装置
 113 携帯情報端末
 200 自然エネルギー発電装置
 402 電力会社
 403 太陽光発電装置

Claims (10)

  1.  駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループの駐車台数又は駐車率を検知する駐車台数検知手段と、
     前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、を備え、
     前記充電制御装置は、前記駐車台数検知手段で検知された駐車台数又は駐車率に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた充電システム。
  2.  前記優先順位決定手段は、前記駐車台数検知手段で検知された前記第1の車両グループの駐車台数又は駐車率が所定値以上のときは前記第1の車両グループの電動車両から優先して充電し、前記駐車台数又は駐車率が所定値未満のときは前記第2の車両グループの電動車両から優先して充電する請求項1に記載の充電システム。
  3.  駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置を備え、
     前記充電制御装置は、前記電動車両を充電するために使用可能な電力を計測する使用可能電力計測手段と、前記使用可能電力計測手段で計測された使用可能電力に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた充電システム。
  4.  前記優先順位決定手段は、前記使用可能電力計測手段で計測された使用可能電力が所定値以上のときは前記第1の車両グループの電動車両から優先して充電し、前記使用可能電力計測手段で計測された使用可能電力が所定値未満のときは前記第2の車両グループの電動車両から優先して充電する請求項3に記載の充電システム。
  5.  駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、
     時刻や曜日を計時する計時手段と、を備え、
     前記充電制御装置は、前記計時手段が計時した時刻や曜日に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定手段と、前記優先順位決定手段で決定された優先順位に従って前記電動車両を充電する充電電力供給手段と、を備えた充電システム。
  6.  前記第1の車両グループの電動車両毎に所有者の住居の在宅状態を検知する在宅検知手段を更に備え、
     前記優先順位決定手段は、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電する請求項1乃至請求項5のいずれか一項に記載の充電システム。
  7.  前記在宅検知手段の検知結果と前記所有者の電動車両が備える車両情報とを対応づけて記憶する記憶手段を更に備え、
     前記優先順位決定手段は、前記第1の車両グループを充電するときは、充電する電動車両から取得した車両情報を前記記憶手段に記憶された車両情報と照合し、対応する車両情報がある場合に、該車両情報に対応付けられた前記在宅検知手段の検知結果を取得し、所有者が在宅の電動車両を所有者が不在の電動車両よりも優先して充電する請求項6に記載の充電システム。
  8.  前記充電制御装置は、前記第1の電動車両グループの電動車両の所有者へ報知する報知手段を備え、
     前記優先順位決定手段は、前記第2の車両グループの電動車両が前記第1の車両グループに優先して充電されているときは、前記報知手段を用いて前記第2の車両グループの使用可能を報知する請求項1乃至請求項7のいずれか一項に記載の充電システム。
  9.  駐車空間に駐車する車両が個人で所有する第1の車両グループと複数人で共有する第2の車両グループとに分けられていて、前記第1の車両グループの駐車台数又は駐車率を検知する駐車台数検知手段と、
     前記第1の車両グループと前記第2の車両グループのうちの電動車両を充電するための充電制御装置と、を備えた充電システムの制御方法において、
     前記駐車台数検知手段で検知された駐車台数又は駐車率に応じて前記第1の車両グループと前記第2の車両グループのどちらから優先して充電するかの優先順位を決定する優先順位決定ステップと、前記優先順位決定ステップで決定された優先順位に従って電動車両を充電する充電電力供給ステップと、を備えた充電システムの制御方法。
  10.  請求項9に記載の充電システムの制御方法をコンピュータに実行させるプログラム。
PCT/JP2010/007498 2009-12-28 2010-12-24 充電システム及び充電システムの制御方法 WO2011080905A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US13/384,378 US20120112698A1 (en) 2009-12-28 2010-12-24 Charging system and method for controlling charging system
CN2010800326862A CN102473262A (zh) 2009-12-28 2010-12-24 充电***和控制充电***的方法
JP2011547324A JP5274674B2 (ja) 2009-12-28 2010-12-24 充電システム及び充電システムの制御方法
EP10840765A EP2521085A1 (en) 2009-12-28 2010-12-24 Charging system and method for controlling charging system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-298751 2009-12-28
JP2009298751 2009-12-28

Publications (1)

Publication Number Publication Date
WO2011080905A1 true WO2011080905A1 (ja) 2011-07-07

Family

ID=44226332

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/007498 WO2011080905A1 (ja) 2009-12-28 2010-12-24 充電システム及び充電システムの制御方法

Country Status (5)

Country Link
US (1) US20120112698A1 (ja)
EP (1) EP2521085A1 (ja)
JP (1) JP5274674B2 (ja)
CN (1) CN102473262A (ja)
WO (1) WO2011080905A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012100449A (ja) * 2010-11-02 2012-05-24 Sharp Corp 充電制御装置、充電制御装置の制御方法、制御プログラム、および、記録媒体
JP2013046518A (ja) * 2011-08-25 2013-03-04 Panasonic Corp 電気車両用充電装置
JP2013118759A (ja) * 2011-12-02 2013-06-13 Chugoku Electric Power Co Inc:The 複数台の普通充電器に対応する充電制御装置
JP2013118758A (ja) * 2011-12-02 2013-06-13 Chugoku Electric Power Co Inc:The 複数台の急速充電器に対応する充電制御装置
EP2735072A1 (de) * 2011-08-18 2014-05-28 Siemens Aktiengesellschaft Bereitstellung elektrischer energie
JP2017162180A (ja) * 2016-03-09 2017-09-14 株式会社デンソー カーシェアリングサービスの運用システム

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8725330B2 (en) 2010-06-02 2014-05-13 Bryan Marc Failing Increasing vehicle security
US8730062B2 (en) 2010-10-14 2014-05-20 Xerox Corporation Computer-implemented system and method for providing gun shot detection through a centralized parking services server
US8799037B2 (en) 2010-10-14 2014-08-05 Palto Alto Research Center Incorporated Computer-implemented system and method for managing motor vehicle parking reservations
JP5214764B2 (ja) * 2011-03-25 2013-06-19 株式会社東芝 電気自動車充電スケジューリングシステム
JP5919525B2 (ja) * 2011-11-22 2016-05-18 パナソニックIpマネジメント株式会社 車両管理システム
JP6043918B2 (ja) * 2012-03-12 2016-12-14 日本システムバンク株式会社 冗長性のある時間貸し駐車場用の充電システム
CN104321943B (zh) * 2012-03-30 2016-08-24 索尼公司 能量存储
US9852386B2 (en) 2012-05-18 2017-12-26 Charepoint, Inc. Flexible administrative model in an electric vehicle charging service network
US8816879B2 (en) 2012-09-21 2014-08-26 Palo Alto Research Center Incorporated Computer-implemented system and method for managing interchangeable parking spaces
US9779365B2 (en) 2012-09-21 2017-10-03 Conduent Business Services, Llc Computer-implemented system and method for managing interchangeable EV charging-capable parking spaces
US9213957B2 (en) 2012-09-21 2015-12-15 Palo Alto Research Center Incorporated Computer-implemented system and method for providing just-in-time loading zone parking
JP5911783B2 (ja) * 2012-10-02 2016-04-27 株式会社デンソー 蓄電手段の利用予測装置
FR2999032B1 (fr) * 2012-12-04 2014-12-19 Renault Sa Procede de gestion distribuee de la charge de batteries de traction de vehicules electriques
US9064417B2 (en) 2012-12-21 2015-06-23 Palo Alto Research Center Incorporated Computer-implemented system and method for directing users to available parking spaces
US9087453B2 (en) 2013-03-01 2015-07-21 Palo Alto Research Center Incorporated Computer-implemented system and method for spontaneously identifying and directing users to available parking spaces
US9994118B2 (en) * 2013-05-29 2018-06-12 General Motors Llc Optimizing vehicle recharging to maximize use of energy generated from particular identified sources
TWI505224B (zh) * 2013-08-12 2015-10-21 Nat Univ Chung Hsing 停車場車輛電力回充集合式住宅公共用電系統之裝置
CN105637553B (zh) * 2013-10-10 2021-05-18 日产自动车株式会社 车辆管理***以及车辆管理方法
CN106295830A (zh) * 2016-08-27 2017-01-04 许继电气股份有限公司 一种充电桩***
US10793013B2 (en) * 2017-01-27 2020-10-06 Toyota Motor Engineering & Manufacturing North America, Inc. Automatic timer cancellation for charging vehicle
DE102017112663A1 (de) * 2017-06-08 2018-12-13 Vorwerk & Co. Interholding Gmbh Verfahren zum Betrieb eines einen Akkumulator aufweisenden Haushaltsgerätes
JP2019101920A (ja) * 2017-12-06 2019-06-24 トヨタ自動車株式会社 情報処理装置および情報処理方法
CN107833374B (zh) * 2017-12-12 2024-04-26 谭飞伍 太阳能公共充电设备及其***
US20190308510A1 (en) * 2018-04-06 2019-10-10 Here Global B.V. Method, apparatus, and system for providing a time-based representation of a charge or fuel level
CN110497816B (zh) * 2019-07-17 2023-03-21 青岛海尔空调器有限总公司 用于管理车辆充电的方法及装置
JP2022126449A (ja) * 2021-02-18 2022-08-30 トヨタ自動車株式会社 制御装置、方法、及びプログラム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000209707A (ja) * 1999-01-07 2000-07-28 Mitsubishi Electric Corp 電気自動車の充電計画装置
JP2006074868A (ja) * 2004-08-31 2006-03-16 Fuji Heavy Ind Ltd 電気自動車のバッテリ充電システム
JP2008245416A (ja) * 2007-03-27 2008-10-09 Osaka Gas Co Ltd 車両、及び、電力システム
WO2009032673A1 (en) * 2007-09-05 2009-03-12 Consolidated Edison Company Of New York, Inc. Hybrid vehicle recharging system and method of operation
WO2009069481A1 (ja) * 2007-11-30 2009-06-04 Toyota Jidosha Kabushiki Kaisha 充電制御装置および充電制御方法
JP2009298751A (ja) 2008-06-17 2009-12-24 Kao Corp 固形状油中水型乳化化粧料

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000209707A (ja) * 1999-01-07 2000-07-28 Mitsubishi Electric Corp 電気自動車の充電計画装置
JP2006074868A (ja) * 2004-08-31 2006-03-16 Fuji Heavy Ind Ltd 電気自動車のバッテリ充電システム
JP2008245416A (ja) * 2007-03-27 2008-10-09 Osaka Gas Co Ltd 車両、及び、電力システム
WO2009032673A1 (en) * 2007-09-05 2009-03-12 Consolidated Edison Company Of New York, Inc. Hybrid vehicle recharging system and method of operation
WO2009069481A1 (ja) * 2007-11-30 2009-06-04 Toyota Jidosha Kabushiki Kaisha 充電制御装置および充電制御方法
JP2009136109A (ja) 2007-11-30 2009-06-18 Toyota Motor Corp 充電制御装置および充電制御方法
JP2009298751A (ja) 2008-06-17 2009-12-24 Kao Corp 固形状油中水型乳化化粧料

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2521085A4

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012100449A (ja) * 2010-11-02 2012-05-24 Sharp Corp 充電制御装置、充電制御装置の制御方法、制御プログラム、および、記録媒体
EP2735072A1 (de) * 2011-08-18 2014-05-28 Siemens Aktiengesellschaft Bereitstellung elektrischer energie
JP2013046518A (ja) * 2011-08-25 2013-03-04 Panasonic Corp 電気車両用充電装置
JP2013118759A (ja) * 2011-12-02 2013-06-13 Chugoku Electric Power Co Inc:The 複数台の普通充電器に対応する充電制御装置
JP2013118758A (ja) * 2011-12-02 2013-06-13 Chugoku Electric Power Co Inc:The 複数台の急速充電器に対応する充電制御装置
JP2017162180A (ja) * 2016-03-09 2017-09-14 株式会社デンソー カーシェアリングサービスの運用システム
WO2017154341A1 (ja) * 2016-03-09 2017-09-14 株式会社デンソー カーシェアリングサービスの運用システム

Also Published As

Publication number Publication date
US20120112698A1 (en) 2012-05-10
EP2521085A4 (en) 2012-11-07
JPWO2011080905A1 (ja) 2013-05-09
CN102473262A (zh) 2012-05-23
JP5274674B2 (ja) 2013-08-28
EP2521085A1 (en) 2012-11-07

Similar Documents

Publication Publication Date Title
JP5274674B2 (ja) 充電システム及び充電システムの制御方法
JP6692841B2 (ja) 電気自動車のためのネットワーク制御式充電システム
KR101759246B1 (ko) 전기자동차 충전시스템
US7917251B2 (en) Metering system and method of operation
CN105122585B (zh) 电动车辆管理***
Dost et al. Charging behavior of users utilizing battery electric vehicles and extended range electric vehicles within the scope of a field test
CN103123732B (zh) 一种公用充电管理***及充电方法
US11498452B2 (en) Vehicle charging control systems and methods
JP5418163B2 (ja) 情報管理装置、情報管理装置の制御方法、およびそのプログラム
WO2013125217A1 (ja) 車載装置、充放電器、及び、充放電システム
CN106327916A (zh) 基于蓝牙地锁的智能停车管理***及管理方法
JP6384339B2 (ja) 車両用電池の充電情報報知システム及び充電情報報知プログラム
JP2011034500A (ja) 電気自動車の給電課金システム
KR20180007765A (ko) 충전서비스모드에 따라 차별화된 충전비용을 정산하는 충전방법과 급속충전시스템
CN106836919A (zh) 一种具有充电功能立体车库及其控制***
US11926243B2 (en) Confidence-based vehicle charge control
Grahn et al. The customer perspective of the electric vehicles role on the electricity market
CN111356622A (zh) 用于为机动车生成当前的运行策略建议的方法
CN106364360A (zh) 一种电动汽车充电站
CN108928249A (zh) 电动车辆充电灯杆及充电灯杆管理***
CN103186132B (zh) 基于虚拟充电站模式的电动汽车充电设施管理***及方法
CN208291012U (zh) 电动车辆充电灯杆及充电灯杆管理***
WO2023148620A1 (en) Techniques for charging electric vehicles for ridesharing
JP6227323B2 (ja) 電気自動車の充電課金方法、及び電気自動車の充電課金システム
KR102230787B1 (ko) 홈 에너지 관리 시스템을 이용한 전기차량 충전장치 및 그 방법

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080032686.2

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10840765

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13384378

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2010840765

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2011547324

Country of ref document: JP

Ref document number: 1006/CHENP/2012

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE