WO2009057819A1 - 溶融亜鉛めっき鋼板の製造設備 - Google Patents

溶融亜鉛めっき鋼板の製造設備 Download PDF

Info

Publication number
WO2009057819A1
WO2009057819A1 PCT/JP2008/070246 JP2008070246W WO2009057819A1 WO 2009057819 A1 WO2009057819 A1 WO 2009057819A1 JP 2008070246 W JP2008070246 W JP 2008070246W WO 2009057819 A1 WO2009057819 A1 WO 2009057819A1
Authority
WO
WIPO (PCT)
Prior art keywords
dip galvanized
hot
steel sheet
galvanized steel
steel plate
Prior art date
Application number
PCT/JP2008/070246
Other languages
English (en)
French (fr)
Inventor
Nobuyuki Sato
Takahiro Sugano
Hiroki Yamagami
Takayuki Fukui
Original Assignee
Jfe Steel Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfe Steel Corporation filed Critical Jfe Steel Corporation
Priority to KR1020127029746A priority Critical patent/KR20120135436A/ko
Priority to CN200880114216A priority patent/CN101842510A/zh
Priority to CA2701060A priority patent/CA2701060C/en
Priority to EP08844330.4A priority patent/EP2204464B1/en
Priority to KR1020107008699A priority patent/KR101237318B1/ko
Priority to US12/738,647 priority patent/US9222146B2/en
Publication of WO2009057819A1 publication Critical patent/WO2009057819A1/ja

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/50Controlling or regulating the coating processes
    • C23C2/51Computer-controlled implementation
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • C21D9/54Furnaces for treating strips or wire
    • C21D9/56Continuous furnaces for strip or wire
    • C21D9/561Continuous furnaces for strip or wire with a controlled atmosphere or vacuum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C11/00Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
    • B05C11/10Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
    • B05C11/1002Means for controlling supply, i.e. flow or pressure, of liquid or other fluent material to the applying apparatus, e.g. valves
    • B05C11/1015Means for controlling supply, i.e. flow or pressure, of liquid or other fluent material to the applying apparatus, e.g. valves responsive to a conditions of ambient medium or target, e.g. humidity, temperature ; responsive to position or movement of the coating head relative to the target
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C18/00Chemical coating by decomposition of either liquid compounds or solutions of the coating forming compounds, without leaving reaction products of surface material in the coating; Contact plating
    • C23C18/16Chemical coating by decomposition of either liquid compounds or solutions of the coating forming compounds, without leaving reaction products of surface material in the coating; Contact plating by reduction or substitution, e.g. electroless plating
    • C23C18/1601Process or apparatus
    • C23C18/1633Process of electroless plating
    • C23C18/1689After-treatment
    • C23C18/1692Heat-treatment
    • C23C18/1696Control of atmosphere
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/34Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
    • C23C2/36Elongated material
    • C23C2/40Plates; Strips
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/50Controlling or regulating the coating processes
    • C23C2/52Controlling or regulating the coating processes with means for measuring or sensing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C3/00Apparatus in which the work is brought into contact with a bulk quantity of liquid or other fluent material
    • B05C3/02Apparatus in which the work is brought into contact with a bulk quantity of liquid or other fluent material the work being immersed in the liquid or other fluent material
    • B05C3/12Apparatus in which the work is brought into contact with a bulk quantity of liquid or other fluent material the work being immersed in the liquid or other fluent material for treating work of indefinite length
    • B05C3/125Apparatus in which the work is brought into contact with a bulk quantity of liquid or other fluent material the work being immersed in the liquid or other fluent material for treating work of indefinite length the work being a web, band, strip or the like

Definitions

  • the present invention relates to equipment for stably producing a hot dip galvanized steel sheet.
  • Hot-dip galvanized steel sheets are widely used in a wide range of fields, especially for automobile body applications, due to their excellent weldability and paintability. Hot-dip galvanized steel sheets for such applications are used after being pressed.
  • the hot dip galvanized steel sheet has the disadvantage that the press formability is inferior to that of the cold rolled steel sheet. This is because the sliding resistance of the hot-dip galvanized steel sheet in the press die is larger than that of the cold-rolled steel sheet. In other words, the hot-dip galvanized steel sheet is less likely to flow into the press mold at the part where the sliding resistance between the mold and the bead is large, and the steel sheet tends to break.
  • an alloyed hot-dip galvanized steel sheet is subjected to heat treatment after galvanizing the steel sheet, and Fe in the steel sheet and Zn in the galvanized layer diffuse to cause an alloying reaction.
  • a Zn alloy phase is formed, but this Fe-Zn alloy phase is usually a film composed of a ⁇ phase, a ⁇ i phase, and a ⁇ phase, and as the Fe concentration decreases, that is, a ⁇ phase phase ⁇
  • the melting point tends to decrease as the hardness increases. For this reason, from the viewpoint of slidability, it is effective to use a coating film with high hardness and high melting point that has a high melting point and is less likely to cause adhesion. Manufactured to increase the average Fe concentration in the film.
  • a coating with a high Fe concentration has a problem that a hard and brittle ⁇ phase is easily formed at the interface between the plated steel sheet and the phenomenon of peeling from the interface during processing, so-called powdering.
  • the flat portion on the surface of the galvannealed steel plate exists as a convex portion as compared with the surroundings.
  • the flat part is the main component that actually contacts the press mold during press molding. Therefore, if the sliding resistance at the flat part is reduced, the press formability can be improved.
  • it is effective to prevent adhesion between the plating layer and the mold. To that end, a hard and high melting point film must be formed on the surface of the plating layer. Is effective.
  • An object of the present invention is to propose a facility for manufacturing a hot-dip galvanized steel sheet that is easy to put into practical use and can stably form a necessary oxide film without impairing the appearance of the steel sheet surface. Disclosure of the invention
  • the gist of the present invention is as follows.
  • a hot-dip galvanized steel plate manufacturing facility comprising a hot-dip galvanizing device, a temper rolling mill, an acidic solution contact device, and a cleaning device, the acidic solution contact device and the cleaning device
  • the apparatus is disposed with a space between the acidic solution contact apparatus and the cleaning apparatus.
  • a facility for producing hot-dip galvanized steel sheets comprising a hot-dip zinc plating device, an alloying heating furnace, a cooling device, a temper rolling mill, an acidic solution contact device, and a cleaning device.
  • the acidic solution contact device and the cleaning device are arranged with a space therebetween, and means for controlling absolute humidity is provided between the acidic solution contact device and the cleaning device.
  • Manufacturing equipment for hot-dip galvanized steel sheets comprising a hot-dip zinc plating device, an alloying heating furnace, a cooling device, a temper rolling mill, an acidic solution contact device, and a cleaning device.
  • the means for controlling the absolute humidity covers the upper and lower surfaces of the steel plate, and a force par that allows the steel plate to penetrate
  • An apparatus for producing a hot-dip galvanized steel sheet comprising: blowing means for blowing water vapor or dry air; and measuring means for measuring temperature, relative humidity, or dew point.
  • FIG. 1 is a diagram showing an outline of a method for producing a hot dip galvanized steel sheet.
  • FIG. 2 is a diagram showing the formation mechanism of the oxide film.
  • Fig. 3 is a schematic diagram summarizing the factors affecting the amount of change in the liquid film.
  • FIG. 4 is a diagram showing an embodiment of a production facility for hot-dip galvanized steel sheets according to the present invention.
  • Figure 5 shows the relationship between absolute humidity and oxide film thickness.
  • FIG. 6 is a schematic explanatory view showing another embodiment of the production facility for hot dip galvanized steel sheet according to the present invention.
  • FIG. 7 is a schematic explanatory view showing another embodiment of the production facility for hot dip galvanized steel sheet according to the present invention.
  • the hot dip galvanized steel sheet in the present invention covers both hot dip galvanized steel sheets that are not subjected to alloying treatment and galvannealed steel sheets that are subjected to alloying treatment after plating.
  • steel sheets subjected to hot dip galvanization or subsequently alloyed by heat treatment and subjected to temper rolling are brought into contact with an acidic solution, and after contact is completed, 1 to: 120 seconds. Then, by washing with water, the present invention relates to an improved facility for manufacturing an alloyed hot dip galvanized steel sheet that forms a Zn-based oxide layer of 10 nm or more on the surface of the galvanized steel sheet, that is, an oxide film.
  • the manufacturing equipment for the hot dip galvanized steel sheet comprises a hot dip galvanizing device, a temper rolling mill, an acidic solution contact device, and a cleaning device, and the acidic solution contact device and the cleaning device.
  • the devices are spaced apart.
  • an alloying heating furnace and a cooling device are provided between the hot-dip zinc plating device and the temper rolling mill.
  • means for controlling the absolute humidity between the acidic solution contact device and the cleaning device for example, blowing air containing moisture opens and closes the valve, and automatically or manually adjusts the opening of the flow rate adjusting valve.
  • the number of air inlets can be changed arbitrarily, and the amount of water in the air can be changed arbitrarily using a moisture absorbent material or steam.
  • the means for controlling the absolute humidity covers the upper and lower surfaces and both side surfaces of the steel plate, and a cover through which the steel plate can penetrate, and a blow in which steam or dry air is blown into the cover in parallel with the steel plate traveling direction.
  • Measuring means for example, a thermometer and a hygrometer, a dew point meter, a device for measuring the dew point and absolute humidity from the temperature and humidity, etc.
  • a means for controlling the absolute humidity between the acidic solution contact device and the cleaning device preferably providing a cover, a blowing means, and a measuring means is a feature of the present invention and is an important feature. It is matter.
  • the reaction process region Zn-based oxides are formed on the steel plate surface, and an acid film is formed on the plated surface of the steel sheet. Is formed.
  • the reaction process region By providing means for controlling the absolute humidity between the acidic solution contact device and the cleaning device, which are such reaction process regions, it becomes possible to stably form an oxide film on the plated surface of the steel sheet.
  • the cover, the blowing means and the measuring means the atmosphere in the reaction process area can be controlled more strictly, and as a result, a more stable oxide film can be obtained. be able to.
  • FIG. 1 is a diagram showing an outline of a method for manufacturing a hot-dip galvanized steel sheet in which an oxide film is formed by applying an acidic solution to the surface of the hot-dip galvanized steel sheet and allowing it to stand for a certain period of time.
  • the region between the acid solution contact step and the cleaning step is a reaction process region where an oxide film is formed. In this reaction process region, how stably an acid film is formed on the surface. Is important.
  • Figure 2 shows the formation mechanism of the oxide film. According to Fig. 2, while the amount of liquid film is sufficient, the pH in the liquid film increases as the reaction proceeds, but when the amount of liquid film decreases, the reaction proceeds because the concentration of zinc ions increases. It can be seen that the oxidation reaction stops completely when the liquid film is completely dried.
  • Fig. 3 is a schematic diagram summarizing the factors affecting the amount of change in the liquid film.
  • the amount of change in the liquid film can be divided into two, the decrease Q1 due to drying and the decrease Q2 due to the acid-acid reaction.
  • the decrease Q1 due to drying is a decrease in the ambient temperature and humidity during the reaction process. It can be seen that acid treatment increases with increasing liquid temperature and line speed. From Fig. 3, the amount of oxide film generated is considered to be correlated with the volume change of the liquid film, and the following relational expression is estimated.
  • Oxide film thickness F (T, P, Ts, V, Q2)
  • the liquid film reduction amount Q1 can be reduced and the oxide film amount can be stabilized.
  • a stable oxide film can be obtained by providing a humidifier that can control the (dew point) and controlling the humidity.
  • a means for controlling the absolute humidity is provided between the acidic solution contact device, which is the reaction process region, and the cleaning device.
  • the absolute temperature indicates the amount of water contained in the atmosphere and is the product of saturated vapor pressure and relative humidity.
  • FIG. 4 is a diagram showing an embodiment of the present invention.
  • the hot dip galvanizing device 7 for plating the steel plate surface, the temper rolling machine 8 for adjusting the roughness of the plating surface, and the temper rolling after the plating treatment is applied to the surface.
  • An acidic solution contact device 1 for applying an acidic solution to a steel plate and a cleaning device 2 for cleaning an excess acidic solution after forming an acid film on the plating surface are connected in series.
  • the acidic solution contact device 1 and the cleaning device 2 are arranged with a space therebetween.
  • a cover 3 between the acidic solution contact device 1 and the cleaning device 2 covers the upper and lower surfaces and both side surfaces of the steel plate as means for controlling the absolute humidity, and allows the steel plate to penetrate therethrough.
  • a blowing means 5 for blowing water vapor into the cover, and a measuring means 6 for measuring temperature and relative humidity or dew point are provided.
  • the following shows an example of a method for forming an oxide film on the plating surface using this device shown in Fig. 4.
  • the steel sheet S is annealed in a continuous annealing furnace 11 provided in front of the hot dip galvanizing equipment, and is struck by a hot dip galvanizing apparatus 7.
  • the hot dip galvanizing device 7 for example, the steel sheet S heated to the vicinity of the galvanizing bath temperature is continuously guided to the galvanizing bath, and after being drawn out of the plating bath, the amount of plating adhered is reduced by gas wiping. It is controlled in to 120 g / m 2.
  • the steel sheets that have been hot-dip galvanized in this way are further guided to an alloying furnace (not shown) and subjected to thermal diffusion. An alloyed hot-dip galvanized steel sheet containing about 6 to 15% by mass of Fe in the plating layer is obtained.
  • the heating method is not limited, but it is advantageous to use a high frequency induction heating furnace. This is because the steel plate itself can be heated instantaneously by using the high frequency induction heating method. Uniform alloying is possible, and there is little variation in the width direction and length direction of the steel sheet.
  • the steel sheet S that has been subjected to hot dip galvanizing and further subjected to alloying treatment has a high temperature. Therefore, it is preferable to cool the steel sheet S to about room temperature by a cooling device using a blower or the like.
  • the plated steel sheet s is guided to a temper rolling machine 8 in order to control the material and adjust the roughness of the plating surface.
  • the unevenness of plating is relaxed, and a flat portion is formed on the plating surface. Since the slidability of the hot-dip galvanized steel sheet is improved by the relief of the unevenness, it is important to have a flat part on the plating surface.
  • the part that is not flattened (recessed part) retains the lubricating oil and prevents oil shortage during press molding, so the presence of a recessed part is also important. From this point of view, it is effective that the area ratio of the flat part of the plating surface is in the range of 20 to 80%, and the reduction ratio during temper rolling should be adjusted so as to be the area ratio of the flat part ' Is preferred.
  • the tempered rolled steel sheet S after the temper rolling is guided to the acidic solution contact device 1 and subjected to a treatment for forming a Zn-based oxide on the plated surface flat portion.
  • a treatment for forming a Zn-based oxide on the plated surface flat portion is because when the acidic solution is brought into contact with the plated steel sheet S, the plating component Zn dissolves, and the pH of the solution rises due to the hydrogen generation reaction that accompanies this, so that the Zn hydroxide precipitates on the plating surface.
  • it is thought that this is because a Zn-based oxide is formed.
  • simply contacting with an acidic solution only causes dissolution of Zn, and no Zn-based oxide is formed.
  • the region 3 between the acidic solution contact device 1 and the cleaning device 2 is set as a reaction process region, and the region 3 is left for a certain period of time.
  • the plated steel sheet S and the acidic solution are brought into contact with each other.
  • a device that performs immersion treatment in the acidic solution, a spray device for the acidic solution, a device that applies the acidic solution using a roll, etc. Can be given. It is desirable that it is finally a thin liquid film and exists on the steel sheet surface. This is because when the amount of acidic solution present on the steel plate surface is large, The pH of the solution does not increase even if it occurs, and only the dissolution of zinc occurs one after another. Not only does it take a long time to form the oxide layer, but the plating layer is severely damaged. This is because it is considered that the role as a fender is also lost. From this viewpoint, it is preferable and effective to adjust the amount of the acidic solution film formed on the steel sheet surface to 50 g / m 2 or less. The amount of the solution film can be adjusted with a squeeze roll or air wiping.
  • the pH needs to be controlled to about 1.0 to 0.
  • hydrochloric acid, sulfuric acid, nitric acid, etc. can be used, and solutions containing compounds such as salt, sulfate, nitrate, etc. may be used. .
  • the temperature of the acidic solution is preferably in the range of 20 to 70 ° C. If it is less than 20 ° C, the production reaction of the oxide layer takes a long time, and the productivity may be reduced. On the other hand, when the temperature is high, the reaction proceeds relatively quickly S, and on the other hand, unevenness of processing tends to occur on the surface of the steel sheet.
  • the oxide film is formed by leaving the hot-dip galvanized steel plate for a certain period of time. Therefore, in the present invention, as described above, a means for controlling the absolute humidity is provided on this region 3.
  • the blowing means 5 and the measuring means 6 as the means for controlling the absolute humidity, the atmosphere in the reaction process region where the Zn-based oxyhydride is formed is controlled. It is possible to do.
  • the temperature and relative humidity, or dew point is measured every predetermined time or constantly by the measuring means 6. Then, based on the result of the measuring means 6, the amount of water vapor in the reaction process region (in the power par) is reduced by blowing water vapor from the blowing means 5 into the cover 4 so that the oxide film is formed more stably. adjust. As a result, the oxide film can be formed more stably. Note that it is not necessary to directly apply water vapor to the steel sheet, and it is preferable to blow it substantially parallel to the direction of travel of the steel sheet. As described above, the absolute humidity control means in the present invention has a function of adjusting the absolute degree according to the atmosphere in the reaction process region so that the oxide film formation reaction proceeds stably and surely.
  • a means having a humidifying function and a means having a dehumidifying function can be fisted.
  • a control method for example, temperature and relative humidity or dew point are measured, and humidification and dehumidification are performed based on the results.
  • the size, material, and the like of the cover 4 are not particularly limited as long as the cover 4 covers the upper and lower surfaces and both side surfaces of the steel plate and can penetrate the steel plate.
  • the cross-sectional shape of the force par 4 in the traveling direction of the steel plate is not particularly limited, and may be circular or rectangular.
  • the blowing means 5 is for blowing water vapor or dry air into the force par 4.
  • a steam pipe is installed for each predetermined section in the traveling direction of the steel sheet, and a plurality of outlets are arranged in the steam pipe. You can also In this case, the pipe length, the number of outlets, and the like are appropriately set according to the equipment length of the cover 4. Note that the steam or dry air is preferably blown in substantially parallel to the traveling direction of the steel sheet.
  • It can be installed on either or both of the front and back sides of the steel plate. Furthermore, it is preferable to install it at a distance of 500 mm or more in the vertical direction from the steel plate surface so that water vapor or the like does not directly hit the steel plate. It can also be installed on the bottom of the facility.
  • Delivery direction of the steam or dry air is preferably a steel sheet traveling direction and substantially parallel to steam nozzle conditions, as a guide for the diffusion in the cover 4 is sufficiently performed, be carried out by the following vapor pressure 0. 5kg f / cm 2 Is preferred. By carrying out under such conditions, the blown out water vapor is sufficiently diffused into the cover 4.
  • the measuring means 6 is for measuring temperature and relative humidity, or dew point. More specifically, it is a thermometer, hygrometer, or dew point meter, etc. It is preferable to install in the range. In addition, it is preferable to install it at a distance of lm or more from the air outlet so as not to be affected by water vapor or dry air. Furthermore, the measuring means is preferably attached to the side opposite to the air outlet.
  • Figure 5 shows that the oxide film thickness increases with increasing absolute humidity.
  • the line speed reaction time
  • the line speed is taken into account, for example, 2000 mass ppm or more is required to secure the required film thickness.
  • absolute humidity is required. Therefore, in order to prevent drying of the acidic solution on the steel sheet surface layer and to secure an oxide film thickness that is greater than the required film thickness, the water vapor amount is 2000 masses using the cover 7, blowing means 8 and measuring means 6 in FIG. It will be kept above ppm (dew point: 12.7 ° C or higher).
  • the absolute humidity is too high, the oxide film thickness becomes too thick, which adversely affects the paintability. Therefore, the upper limit of absolute humidity should be determined according to the required paintability.
  • the steel sheet that has passed through the reaction process region is subjected to a washing process 2 in which the acidic solution component remaining on the surface is washed away. If this ⁇ purification treatment is inadequate, the acidic solution component remains on the plating surface, which may promote corrosion when it becomes an actual product. For this reason, it is also effective to neutralize the acidic solution component remaining on the plating surface by introducing it to a neutralization treatment device instead of washing the steel plate with water.
  • the solution used for the neutralization treatment is not particularly limited as long as it is an alkaline solution, and an aqueous solution such as sodium hydroxide or sodium phosphate can be used.
  • the Zn-based oxide layer in the present invention is a layer made of an oxide containing Z as an essential component and Z or hydroxide.
  • the average thickness of the oxide layer containing Zn as an essential component is 10 nm or more in the pressure-regulating portion surface layer and the unregulated portion surface layer. It is necessary. If the average thickness of the oxide layer is reduced to less than lOnm in the pressure-regulating part and the non-pressure-regulating part, the effect of reducing the sliding resistance becomes insufficient. On the other hand, when the average thickness of the oxide layer containing Zn as an essential component exceeds lOOnm in the pressure-regulating part and the non-pressure-adjusting part, the film breaks down during press molding, and the sliding resistance increases. In addition, the weldability tends to decrease, which is not preferable.
  • the additive element components other than A1 are not particularly limited. That is, even if Pb, Sb, Si, Sn, Mg, Mn, Ni, Ti, Li, Cu or the like is contained or added in addition to A1, the effect of the present invention is not impaired.
  • FIG. 6 is a schematic explanatory view showing another embodiment of the production facility for hot dip galvanized steel sheet according to the present invention.
  • the same components as those in FIG. 4 are denoted by the same reference numerals, and detailed description thereof is omitted.
  • a humidifying device 9 for controlling the atmosphere in the reaction process region.
  • blowing means 5 and measuring means 6 for measuring temperature and relative humidity or dew point. Details of each facility are as follows.
  • the area that seems to be the most dry 3 depends on the temperature, relative humidity, and plate-feeding speed during the reaction process. Within 14m immediately after contact device 1. Therefore, it is preferable to install the humidifying equipment 9 at this position, and in FIG. 6, it is installed at 1 m immediately after the acidic solution contact apparatus 1.
  • the cross-sectional shape in the traveling direction of the steel plate was a square, and the material used was chlor chloride.
  • the distance between the acidic solution contact device 1 and the cleaning device 2 is 30 m.
  • the humidification range in the humidification equipment 9 is preferably 6 m or more, and in FIG.
  • the time for the steel sheet to pass through the humidification equipment 9 was set to 2 seconds.
  • Delivery direction of the steam is substantially parallel to the steel sheet travel direction, the steam nozzle conditions, as a guide for the diffusion of the humidifying equipment 9 is performed sufficiently, and less vapor pressure 0. 5kgf / C m 2.
  • a dehumidifier 10 is installed instead of the humidifier 9 in Fig. 6 (Fig. 7).
  • the dehumidifying equipment 10 was dehumidified by blowing dry air in place of the water vapor blowing of the humidifying means 9.
  • the absolute humidity of the dry air can be selected according to the required humidity conditions.
  • the inlet position, conditions, etc. are the same as for the humidifier 9.
  • a measuring means is attached in the vicinity of the plate surface on the side opposite to the air outlet. In Fig. 6, the dew point was measured by the measuring means.
  • the hot dip galvanized steel sheet was manufactured using the hot dip galvanized manufacturing equipment shown in Fig. 6 or Fig. 7 above.
  • an alloyed hot-dip galvanized film was formed on a cold-rolled steel sheet with a thickness of 0.8 mm by a conventional method, and further subjected to temper rolling. Thereafter, 50 ° C, is led into P H2.
  • Acid solution contacting device 1 filled with sulfuric acid solution of 0, plated steel sheet S immersed in acidic solution, the coated steel sheet S in Rukoto be advanced over area 3 1 After contact with the atmosphere for 3 seconds, washing with the washing device 2 and removing water with a drying device (not shown), a hot-dip galvanized steel sheet with an oxide film formed on the plating surface was obtained. Finally, a simple fouling oil was applied and coiled into a product.
  • the line speed was 100 mpm.
  • the dew point in the humidifying equipment 9 or the dehumidifying equipment 10 is measured by the measuring means 6 when the steel sheet S passes through the humidifying equipment 9 or the dehumidifying equipment 10, and the humidifying equipment is used by the blowing means 5 based on this result. Steam or dry air was blown so that the dew point in 9 or dehumidification facility 10 was -12. 7 ° C or higher and below the dew point upper limit value set from the upper limit value of the oxide film thickness.
  • the film thickness of the oxide layer of the pressure regulation part of a plating surface layer and the non-pressure regulation part was measured with the following method. As a result, it was confirmed that an oxide film sufficient to improve the slidability was formed in the pressure adjusting part and the non-pressure adjusting part.
  • the content (at.%) Of each element was measured for the pressure-adjusted and unadjusted parts of the surface layer by Auger electron spectroscopy (AES), and subsequently Ar-sputtered to a predetermined depth, and then measured by AES.
  • AES Auger electron spectroscopy
  • the composition distribution of each element in the depth direction was measured.
  • the depth that is 1/2 of the sum of the maximum value and the constant value is the thickness of the oxide, 2 parts of oxide each against the yopi unregulated part
  • the thickness was measured, and the average value of these values was defined as the oxide thickness of the pressure-regulating part and the non-pressure-regulating part, respectively.
  • Ar contamination was performed for 30 seconds to remove the contamination layer on the specimen surface.
  • the necessary acid-oxide film can be reliably formed on the plated steel sheet surface without impairing the appearance of the steel sheet surface. Then, for example, without blowing steam directly, such as the amount of water vapor in the reaction step can be adjusted to more than 2000 mass ppm, an easy equipment commercialized q
  • the necessary oxide film can be stably formed without impairing the appearance of the steel sheet surface, so that it can be applied in a wide range of fields, mainly for automobile body applications.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Coating With Molten Metal (AREA)
  • Other Surface Treatments For Metallic Materials (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

溶融亜鉛めっき鋼板の製造設備は、溶融亜鉛メッキ装置と、調質圧延機と、酸性溶液接触装置と、洗浄装置が連設され、前記酸性溶液接触装置と前記洗浄装置は間隔を設けて配置され、この間隔内には絶対湿度を制御する手段が設けられている。該絶対湿度の制御手段としては、鋼板の上下面および両側面を覆い、かつ、鋼板が貫通可能なカバーと、前記カバー内に、水蒸気又は乾燥空気を吹き込む吹き込み手段と、温度と相対湿度、又は露点を測定する測定手段を設けることが例示できる。この溶融亜鉛めっき鋼板の製造設備により、溶融亜鉛めっき鋼板表面に鋼板表面の外観を損なわず必要な酸化膜を安定して確実に形成させることができる。

Description

明 細 書 溶融亜鉛めつき鋼板の製造設備 技術分野
本発明は、 溶融亜鉛めつき鋼板を安定して製造する設備に関するものである。 背景技術
溶融亜鉛めつき鋼板は溶接性およぴ塗装性に優れること力 ら、 自動車車体用途を 中心に広範な分野で広く利用されている。 そのような用途での溶融亜鉛めつき鋼板 は、 プレス成形を施されて使用に供される。 しかし、 溶融亜鉛めつき鋼板は、 冷延 鋼板に比べてプレス成形性が劣るという欠点を有する。 これはプレス金型での溶融 めっき鋼板の摺動抵抗が冷延鋼板に比べて大きいことが原因である。 すなわち、 金 型とビードでの摺動抵抗が大きい部分で溶融亜鉛めつき鋼板がプレス金型に流入し にくくなり、 鋼板の破断が起こりやすい。
例えば、 合金化溶融亜鉛めつき鋼板は、 鋼板に亜鉛めつきを施した後、 加熱処理 を行い、 鋼板中の Feとめつき層中の Znが拡散し合金ィヒ反応が生じることにより、 Fe— Zn合金相を形成させたものであるが、 この Fe— Zn合金相は、 通常、 Γ相、 δ i相、 ζ相からなる皮膜であり、 Fe濃度が低くなるに従い、 すなわち、 Γ相 相→ζ相の順で、 硬度ならぴに融点が低下する傾向がある。 このため、 摺動性の観 点からは、 高硬度で、 融点が高く凝着の起こりにくい高 Fe濃度の皮膜が有効であ り、 プレス成形性を重視する合金化溶融亜鉛めつき鋼板は、 皮膜中の平均 Fe濃度 を高めに製造されている。
しかしながら、 高 Fe濃度の皮膜では、 めっき一鋼板界面に硬くて脆い Γ相が形 成されやすく、 加工時に界面から剥離する現象、 いわゆるパウダリングが生じやす い問題を有している。
本発明者らは、 上記課題に対して、 鋭意研究を重ねた結果、 以下の知見を得、 特 許出願 (特開 2003— 306781号公報) した。 合金化溶融亜鉛めつき鋼板表面の上記平坦部は、 周囲と比較すると凸部として存 在する。 プレス成形時に実際にプレス金型と接触するのは、 この平坦部が主体とな るため、 この平坦部における摺動抵抗を小さくすれば、 プレス成形性を改善するこ とができる。 この平坦部における摺動抵抗を小さくするには、 めっき層と金型との 凝着を防ぐのが有効であり、 そのためには、 めっき層の表面に、 硬質かつ高融点の 皮膜を形成することが有効である。 この観点から検討を進めた結果、 平坦部表層の 酸ィ匕膜厚さを制御することが有効であり、 こうして平坦部表層の酸化膜厚さを制御 すると、 めっき層と金型の凝着が生じず、 良好な摺動性を示すことを見出した。 ま た、 このような酸ィ匕膜の形成には、 酸性溶液と接触させてめっき表層に Zn系の酸 化物層を形成する方法が有効なことが明らかになった。 そして、 合金化溶融亜鉛め つき鋼板を酸性溶液に接触させることで鋼板表面に Zn を主体とする酸化物 (以下、 Zn系酸化物と称す) を形成させ、 めっき層とプレス金型の凝着を抑制し、 摺動性 を向上させる技術を出願した。
さらに、 上記技術に基づき、 鋼板表面に短時間で確実に酸ィヒ膜を形成させること を目的に、 酸性処理液塗布後の鋼板に温度 100度以上の水蒸気を吹き付ける製造方 法を出願 (特許第 3608519号公報) した。
しかしながら、 この製造方法においては、 鋼板表面に均一に水蒸気を吹き付ける ことは困難であり、 実際には不均一に鋼板表面に水蒸気が吹き付けられることにな り鋼板表面にムラが発生し外観が損われる。
本発明は、 力かる事情に鑑み、 鋼板表面の外観の損なわず必要な酸化膜を安定し て形成できる実用化に容易な溶融亜鉛めつき鋼板の製造設備を提案することを目的 とする。 発明の開示
本発明の要旨は以下の通りである。
[ 1 ] 溶融亜鉛めつき装置と、 調質圧延機と、 酸性溶液接触装置と、 洗浄装置が 連設してなる溶融亜鉛めっき鋼板の製造設備であって、 前記酸性溶液接触装置と前 記洗浄装置は間隔を設けて配置され、 さらに、 前記酸性溶液接触装置から前記洗浄 装置までの間には絶対湿度を制御する手段が設けられていることを特徴とする溶融 亜鉛めつき鋼板の製造設備。
[ 2 ] 溶融亜鉛メツキ装置と、 合金化加熱炉と、 冷却装置と、 調質圧延機と、 酸 性溶液接触装置と、 洗浄装置が連設してなる溶融亜鉛めつき鋼板の製造設備であつ て、 前記酸性溶液接触装置と前記洗浄装置は間隔を設けて配置され、 さらに、 前記 酸性溶液接触装置から前記洗浄装置までの間には絶対湿度を制御する手段が設けら れていることを特徴とする溶融亜鉛めつき鋼板の製造設備。
[ 3 ] 前記 [ 1 ] または [ 2 ] において、 前記絶対湿度を制御する手段は、 鋼板 の上下面おょぴ両側面を覆い、 かつ、 鋼板が貫通可能な力パーと、 前記力パー内に、 水蒸気又は乾燥空気を吹き込む吹き込み手段と、 温度と相対湿度、 又は露点を測定 する測定手段とを有することを特徴とする溶融亜鉛めつき鋼板の製造設備。 図面の簡単な説明
図 1は、 溶融亜鉛めつき鋼板の製造方法の概略を示す図である。
図 2は、 酸化膜の形成メカニズムを示す図である。
図 3は、 液膜変化量への影響因子を整理した模式図である。
図 4は、 本発明の溶融亜鉛めつき鋼板の製造設備の一実施形態を示す図である。 図 5は、 絶対湿度と酸化膜厚との関係を示す図である。
図 6は、 本発明の溶融亜鉛めつき鋼板の製造設備の他の実施形態を示す概略説明 図である。
図 7は、 本発明の溶融亜鉛めつき鋼板の製造設備の他の実施形態を示す概略説明 図である。 発明を実施するための最良の形態
本発明における溶融亜鉛めつき鋼板とは、 合金化処理を行わない溶融亜鉛めつき 鋼板、 めっき処理後合金化処理を行う合金化亜鉛めつき鋼板のいずれも対象とする。 本発明は、 溶融亜鉛めつきを施し、 または、 引き続き加熱処理により合金化し、 調質圧延を施した鋼板に対して、 酸性溶液に接触させ、 接触終了後 1〜: 120秒放置 した後、 水洗を行うことにより、 亜鉛めつき鋼板表面に 10nm以上の Zn系酸化物層 すなわち酸化膜を形成する合金化溶融亜鉛めつき鋼板の製造設備の改良設備に関す る。
具体的には、 本発明の溶融亜鉛メツキ鋼板の製造設備は、 溶融亜鉛メツキ装置と、 調質圧延機と、 酸性溶液接触装置と、 洗浄装置が連設され、 該酸性溶液接触装置と 該洗浄装置は間隔を設けて配置されている。 合金化溶融亜鉛めつき鋼板を製造する 場合は、 前記溶融亜鉛メツキ装置と調質圧延機の間に、 合金化加熱炉と冷却装置が 設けてある。 そして、 本発明では、 前記酸性溶液接触装置から前記洗浄装置までの 間に絶対湿度を制御する手段 (例えば、 水分を含む空気の吹き込みをバルブの開閉、 流量調整バルブの開度調整を自動または手動で行つたり、 吹き込み口の数を任意に 変更したり、 さらには吹き込まれる空気の水分の量を吸湿材ゃ蒸気等で任意に変更 する方法) を設けることとする。 さらには、 前記絶対湿度を制御する手段は、 鋼板 の上下面および両側面を覆い、 かつ、 鋼板が貫通可能なカバーと、 前記カバー内に、 水蒸気又は乾燥空気を鋼板進行方向と平行に吹き込む吹き込み手段 (例えば、 ひと つ以上のスプレーノズルを設置したり適当な穴をあけたりした配管を設置する方法 やノズルヘッダーや吹き込み口を直接設置する方法) と、 温度と相対湿度、 又は露 点を測定する測定手段 (例えば、 温度計と湿度計、 露点計、 温度と湿度から露点や 絶対湿度を計測する装置等) とを有することが好ましい。 このように、 酸性溶液接 触装置から洗浄装置までの間に絶対湿度を制御する手段を設けること、 好ましくは カバーと吹き込み手段と測定手段を設けることは、 本発明の特徴であり、 重要な要 件である。
酸性溶液に接触後の鋼板が洗浄を施されるまでの間 (以下、 反応工程領域と称 す) に、 鋼板めつき表面には Zn系酸化物が生成し鋼板のめっき表面に酸ィ匕膜が形 成される。 このような反応工程領域である酸性溶液接触装置から洗浄装置までの間 に、 絶対湿度を制御する手段を設けることで、 鋼板のめっき表面に酸化膜を安定し て形成することが可能となる。 さらには、 前記カバー、 前記吹き込み手段および前 記測定手段を設けることで、 反応工程領^の雰囲気の制御がより厳密に行われるこ とになり、 その結果、 さらに安定した酸ィ匕膜を得ることができる。 以下に、 本発明を完成するに至った経緯について説明する。
図 1は、 溶融亜鉛めつき鋼板の表面に酸性溶液を塗布し一定時間放置することで 酸化膜を形成させる溶融亜鉛めつき鋼板の製造方法の概略を示す図である。 図 1に おいて、 酸性液接触工程と洗浄工程の間は、 酸化膜を形成させる反応工程領域であ り、 この反応工程領域において、 いかに安定して酸ィ匕膜をめつき表面に形成させる かが重要となる。
ここで、 酸ィ匕膜の形成メカニズムを図 2に示す。 図 2によれば、 液膜量が十分な うちは反応の進行に従って液膜中の pHが上昇するが、 液膜量が減少してくると亜 鉛イオン濃度が高くなるため反応が進む。 液膜が完全に乾燥すると酸化反応も完全 に停止することがわかる。
図 3は、 液膜変化量への影響因子を整理した模式図である。 図 3によれば、 液膜 の変化量は乾燥による減少 Q1と酸ィ匕反応による減少 Q2の二つに分けられ、 特に乾 燥による減少量 Q1は反応工程中の雰囲気温度および雰囲気湿度の低下、 酸性処理 液温度の上昇、 ライン速度の上昇により增加することがわかる。 そして、 図 3より、 酸化膜生成量は液膜の体積変化量と相関があると考えられ、 以下の関係式が推定さ れる。
酸化膜厚量 =F (T · P · Ts · V · Q2)
T:雰囲気温度
Ρ :雰囲気湿度
Ts:酸性処理液の温度
V:ライン速度
Q2:酸化反応による減少量
これより、 上記式のうち雰囲気温度 Tと雰囲気湿度 Pを調整可能とすることで液 膜減少量 Q1を削減して酸化膜量の安定ィ匕が図れることがわかる。
この結果を踏まえて、 さらに検討を進めたところ、 反応工程領域において表層の 酸性溶液が乾燥して酸ィ匕膜の形成を妨げないように、 例えば、 反応工程領域の雰囲 気中の水蒸気量 (露点) を制御することが可能な加湿設備を設けて湿度を制御する ことにより安定した酸ィ匕膜を得ることが可能となることがわかった。 すなわち、 本 発明では上記検討結果を基に、 反応工程領域である酸性溶液接触装置と洗浄装置の 間に絶対湿度を制御する手段を設けることとする。 なお、 上記絶対温度とは、 大気 中に含まれる水分量を示すものであり、 飽和蒸気圧と相対湿度の積である。
図 4は、 本発明の一実施形態を示す図である。 図 4では、 鋼板表面にめっき処理 を施す溶融亜鉛めつき装置 7と、 めっき表面の粗度を調整する調質圧延機 8と、 表 面にめっき処理を施された後調質圧延を施された鋼板に酸性溶液を塗布するための 酸性溶液接触装置 1と、 めっき表面に酸ィ匕膜を形成させた後に余分な酸性溶液を洗 浄するための洗浄装置 2とが連設しており、 前記酸性溶液接触装置 1と前記洗浄装 置 2は間隔を設けて配置されている。 図 4においては、 さらに、 前記酸性溶液接触 装置 1と前記洗浄装置 2の間 3には、 絶対湿度を制御する手段として、 鋼板の上下 面および両側面を覆い、 かつ、 鋼板が貫通可能なカバー 4と、 前記カバー内に水蒸 気を吹き込む吹き込み手段 5と、 温度と相対湿度、 又は露点を測定する測定手段 6 が設けられている。
以下に、 図 4の本装置を用いて、 めっき表面に酸化膜を形成する方法の一例を示 す。
溶融亜鉛めつき処理
通常、 溶融亜鉛めつき鋼板を製造するに際しては、 鋼板 Sは溶融亜鉛めつき設備の 前に設けられている連続焼鈍炉 1 1で焼鈍され、 溶融亜鉛めつき装置 7でめつきさ れる。
溶融亜鉛めつき装置 7としては、 例えば、 亜鉛めつき浴温度近傍まで加熱された 鋼板 Sを連続的に亜鉛めつき浴へ導き、 めっき浴から引き出された後に、 ガスワイ ビングによりめっき付着量を 20〜120g/m2に制御される。 合金化溶融亜鉛めつき鋼 板を製造する場合は、 このようにして溶融亜鉛めつきを施された鋼板に対して、 さ らに合金化加熱炉 (図示せず) に導かれ、 熱拡散によりめつき層中へ Feが 6〜15 質量 %程度含有せしめた合金化溶融亜鉛めつき鋼板となる。 この際、 所定温度に加 熱でき、 めっき層中へ所定量の Feを拡散させることができれば、 その加熱方式に 制限はないが、 高周波誘導加熱方式の加熱炉を用いると有利である。 これは、 高周 波誘導加熱方式を用いることにより、 鋼板自体を瞬時に加熱できるため、 短時間で 均一な合金化が可能であり、 また、 鋼板幅方向、 長さ方向でパラツキが少ないため 、ある。
上記のように、 溶融亜鉛めつき、 さらには合金化処理を施された鋼板 Sは、 高温 であるため、 例えば送風機などを用いた冷却装置により、 常温程度まで冷却するの が好ましい。
調質圧延
その後、 材質の制御、 めっき表面の粗度を調整するため、 めっき鋼板 sは調質圧 延機 8に導かれる。 この調質圧延時には、 めっきの凹凸が緩和され、 めっき表面に は平坦部が形成される。 この凹凸の緩和により溶融亜鉛めつき鋼板の摺動性は向上 するため、 めっき表面に平坦部を存在させることは重要である。 一方、 平坦化され ない部分 (凹部) は、 潤滑油を保持し、 プレス成形時の油切れを防止する役割があ ることから、 凹部の存在も重要である。 この観点から、 めっき表面の平坦部の面積 率は 20〜80%の範囲にあることが有効であり、 調質圧延時の圧下率は、 前記平坦部 'の面積率となるように調整することが好ましい。
酸性溶液処理
引き続き、 調質圧延後のめ,つき鋼板 Sは、 酸性溶液接触装置 1に導かれ、 めっき 表面平坦部に Zn系酸化物を形成する処理が施される。 これは、 めっき鋼板 Sに酸 性溶液を接触させると、 めっき成分である Znが溶解し、 これに伴う水素発生反応 により液の pHが上昇するため、 Znの水酸化物がめっき表面へ沈殿し、 その結果、 Zn系酸ィ匕物が形成されるためであると考えられる。 し力 しながら、 単に酸性溶液 と接触させただけでは、 Znの溶解が生じるのみで、 Zn系酸化物は形成されない。 Z n系酸ィ匕物を形成するためには、 酸性溶液と接触後一定時間放置することが必要で ある。 そこで、 本発明では、 酸性溶液接触装置 1から洗浄装置 2までの間 3を反応 工程領域とし、 この領域 3で一定時間放置することとする。
酸性溶液接触装置 1では、 めっき鋼板 Sと酸性溶液の接触が行われればよく、 酸 性溶液への浸漬処理を行う装置、 酸性溶液のスプレー装置、 酸性溶液をロールなど を用いて塗布する装置等があげられる。 最終的に薄い液膜状で鋼板表面に存在する ことが望ましい。 これは、 鋼板表面に存在する酸性溶液の量が多いと、 亜鉛の溶解 が生じても溶液の pHが上昇せず、 次々と亜鉛の溶解が生じるのみであり、 酸ィ匕物 層を形成するまでに長時間を有するだけでなく、 めっき層の損傷も激しく、 本来の 防鲭鋼板としての役割も失うことが考えられるためである。 この観点から、 鋼板表 面に形成する酸性溶液膜の付着量を 50g/m2以下に調製することが好ましく有効で ある。 なお、 溶液膜量の調整は、 絞りロール、 エアワイビング等で行うことができ る。
また、 使用する酸性溶液は、 めっき層中の Znを溶解する必要があるため、 pHは 1. 0〜 0程度に制御する必要がある。 pHがこの範囲にあれば、 その他に制限はな く、 塩酸、 硫酸、 硝酸などを用いることができ、 また塩ィ匕物、 硫酸塩、 硝酸塩など の化合物類を添加した溶液を用いてもよい。
酸性溶液の温度は、 20〜70°Cの範囲であることが好ましい。 20°C未満では、 酸化 物層の生成反応に長時間を有し、 生産性の低下を招く場合がある。 一方、 温度が高 い場合には、 反応は比較的すばやく進行する力 S、 逆に鋼板表面に処理ムラを発生し やすくなる。
酸化膜形成処理
めっき鋼板 Sと酸性溶液の接触後、 酸性溶液接触装置 1から洗浄装置 2までの間 3では、 溶融亜鉛めつき鋼板を一定時間放置することで酸化膜を形成する。 そのた め、 本発明では、 前述した通り、 この領域 3上には絶対湿度を制御する手段を設け る。
ここで、 図 4によれば、 絶対湿度を制御する手段として、 カバー 4、 吹き込み手 段 5および測定手段 6を設けることで、 Zn系酸ィヒ物を形成する反応工程領域の雰 囲気を制御することが可能となっている。
まず、 測定手段 6により、 温度と相対湿度、 又は露点を所定時間毎に、 または、 常時測定する。 そして、 前記測定手段 6の結果に基づき、 酸化膜がより安定して形 成されるように前記吹き込み手段 5から水蒸気をカバー 4内に吹き込むことで反応 工程領域 (力パー内) の水蒸気量を調整する。 その結果、 より安定して酸化膜を形 成することができる。 なお、 水蒸気は鋼板に直接当てる必要はなく、 鋼板進行方向 と略平行に吹き込むことが好ましい。 以上のように、 本発明における前記絶対湿度制御手段とは、 酸化膜形成反応が安 定して確実に進行するように、 反応工程領域の雰囲気に応じて、 絶対 度を調整す る機能を有するものであり、 例えば加湿機能を有する手段、 除湿機能を有する手段 が拳げられる。 また、 その制御方法としては、 例えば、 温度と相対湿度、 又は露点 を測定し、 この結果に基づき、 加湿や除湿を行うものである。 '
また、 前記カバー 4とは、 前述したとおり、 鋼板の上下面および両側面を覆い、 かつ、 鋼板が貫通可能となっていれば、 大きさ、 材質等は特に限定されない。 また、 前記力パー 4の鋼板の進行方向の断面形状も特に限定されず、 円状であっても矩形 であってもよい。 設置するにあたっては、 例えば加湿機能を有する設備の場合は、 酸性溶液接触装置と洗浄装置の間 3で最も乾燥すると思われる領域に設置すること が好ましい。 反応工程中の温度 ·相対湿度 ·通板速度に乾燥状態は依存するものの、 通常の操業条件にて行った場合、 酸性処理液接触装置 1直後から 14m以内である。 ゆえに加湿設備はこの位置に設置すること
が好ましい。
前記吹き込み手段 5とは、 前記力パー 4内に、 水蒸気又は乾燥空気を吹き込むも のであり、 例えば、 鋼板の進行方向に一定区間毎に蒸気配管を設置し、 蒸気配管に 複数の吹き出し口を配置することもできる。 この場合の配管長さや吹き出し口の数 などは、 前記カバー 4の設備長に応じて適宜設定される。 なお、 水蒸気又は乾燥空 気は鋼板の進行方向と略平行に吹き込むことが好ましい。
また、 鋼板の表裏面のいずれか、 もしくは、 両方の面に設置することが可能であ る。 さらに、 水蒸気等が鋼板に直接あたらないように、 鋼板表面から鉛直方向に 5 00mm以上離れたところに設置するのが好ましい。 設備底面に設置することも可能 である。
水蒸気又は乾燥空気の吹出方向は好ましくは鋼板進行方向と略平行とし、 水蒸気 ノズル条件は、 前記カバー 4内の拡散が十分に行われる目安として、 蒸気圧 0. 5kg f /cm2以下で行うことが好ましい。 このような条件で行うことで、 吹き出された水 蒸気が前記カバー 4内に十分に拡散される。 ' 前記測定手段 6とは、 温度と相対湿度、 又は露点を測定するものであり、 より具 体的には、 温度計、 湿度計または露点計などであり、 鋼板表面に対し鉛直方向に 5 00讓以内の範囲に設置するのが好ましい。 また、 水蒸気又は乾燥空気の影響を受 けないように吹出口から lm以上離して設置するのが好ましい。 さらに、 測定手段 は、 吹出口と反対側に取り付けるのが好ましい。
なお、 前述したように、 本発明では絶対湿度を制御することで、 めっき表面に安 定して酸ィヒ膜を形成するものであり、 本発明において、 絶対湿度とは、 飽和蒸気圧 X相対湿度 =大気中に含まれる水分量を示すものである。
図 5によると、 絶対湿度が高くなると酸化膜厚も増加することが示されている。 図 5によれば、 絶対湿度が同じであればライン速度 (反応時間) に影響を受けるた め、 ライン速度を考慮にいれると、 例えば、 必要膜厚を確保するには 2000質量 pp m以上の絶対湿度が必要となることがわかる。 そのため、 鋼板表層の酸性溶液の乾 燥を防止し必要膜厚以上の酸化膜厚を確保するためには、 上記図 4におけるカバー 7と吹き込み手段 8および測定手段 6を用いて水蒸気量を 2000質量 ppm以上 (露 点一 12. 7°C以上) に保持することとなる。 また、 絶対湿度が高くなりすぎると酸化 膜厚が厚くなりすぎ、 塗装性へ悪影響を与える。 従って、 要求される塗装性に応じ て絶対湿度の上限値を決定すればよい。
洗浄処理
こうして反応工程領域を通過した鋼板は、 洗浄装置 2にて、 表面に残存した酸性 溶液成分を洗レヽ流す処理が施される。 この Φ浄処理が不十分であると、 酸性溶液成 分がめっき表面に残存し、 実際の製品となった場合に腐贪を促進する恐れがある。 このため、 鋼板を水洗するかわりに、 中和処理装置に導くことにより、 めっき表面 に残存した酸性溶液成分を中和する処理を施すことも効果的である。 中和処理に使 用する溶液は、 アルカリ性の溶液であれば特に制限はなく、 水酸化ナトリウム、 リ ン酸ナトリウムなどの水溶液を使用することができる。
なお、 本発明における Zn系酸化物層とは、 Znを必須として含んだ酸化物及び Z 又は水酸化物などからなる層のことである。 このような Znを必須成分として含む 酸化物層の平均厚さが調圧部表層および未調圧部表層において、 10nm以上である ことが必要である。 酸化物層の平均厚さが調圧部および未調圧部において、 lOnm 未満に薄くなると摺動抵抗を低下させる効果が不十分となる。 一方、 Znを必須成 分として含む酸化物層の平均厚さが調圧部およぴ未調圧部で lOOnmを越えると、 プ レス成形中に皮膜が破壌し摺動抵抗が上昇し、 また溶接性が低下する傾向にあるた め好ましくない。
また、 本発明に係るめっき鋼板を製造するに関しては、 Znめっき浴中に A1が添 加されていることが必要であるが、 A1以外の添加元素成分は特に限定されない。 すなわち、 A1の他に Pb、 Sb、 Si、 Sn、 Mg、 Mn、 Ni、 Ti、 Li、 Cuなどが含有または 添加されていても、 本発明の効果が損なわれるものではない。
さらに、 酸ィ匕処理などに使用する処理液中に不純物が含まれることにより S、 N、 Pb、 Cl、 Na、 Mn、 Ca、 Mg、 Ba、 Sr、 Siなどが酸ィ匕物層中に取り込まれても、 本発 明の効果が損なわれるものではない。
以上、 本発明のめっき鋼板の製造設備によれば、 調質圧延が施されためっき鋼板 表面に、 必要な酸化膜を確実に形成する処理を施すことで良好な摺動性を安定的に 得ることができるようになる。
さらに、 プレス成形時の荷重が高くなる場合では、 鋼板表面の未調圧部も調圧部 と併せて金型との直接接触が起こることが予想される。 よって、 溶融亜鉛めつき鋼 板表面の調圧部およぴ未調圧部には、 金型との凝着を防止する硬質かつ高融点の物 質が存在することが、 摺動性の向上には重要である。 この点で、 鋼板表面に酸化物 層を存在させることは、 酸化物層が金型との凝着を防止するため、 摺動特性の向上 に有効である。 実施例
次に、 本発明を実施例により更に詳細に説明する。
図 6は、 本発明の溶融亜鉛めつき鋼板の製造設備の他の実施形態を示す概略説明 図である。 なお、 図 6において、 図 4の構成と同一の部分には同一の符号を付して、 詳細な説明は省略する。 図 6では、 酸性溶液接触装置 1と洗浄装置 2の間 3には、 反応工程領域の雰囲気を制御するための、 加湿設備 9が設けてある。 また、 前記カロ 湿設備 9内には、 吹き込み手段 5と、 温度と相対湿度、 又は露点を測定するための 測定手段 6が設けてある。 各設備の詳細は以下の通りである。
加湿設備 9
酸性溶液接触装置 1と洗浄装置 2の間 3で最も乾燥すると思われる領域は、 反応 工程中の温度 ·相対湿度 ·通板速度に依存するものの、 通常の操業条件にて行った 場合、 酸性溶液接触装置 1の直後から 14m以内である。 ゆえに加湿設備 9はこの位 置に設置することが好ましく、 図 6では酸性溶液接触装置 1の直後 1 mに設置した。 鋼板進行方向断面形状は四角であり、 材質は塩化ビュルを用いた。 酸性溶液接触装 置 1から洗浄装置 2の間の距離は 30mである。
また、 加湿設備 9内の加湿範囲は 6m以上が好ましく、 図 6では 7mとした。 ま た、 鋼板が加湿設備 9を通過する時間は 2秒とした。
吹き込み手段 5として鋼板進行方向 3m毎に蒸気配管を 2本設置し、 1本の蒸気 配管あたり 5箇所吹き出し口を配置した。
また、 鋼板の表裏面どちらか、 もしくは両方に設置することが可能であるため、 図 6では、 鋼板の裏面側とし、 鋼板下表面から鉛直方向に 500mm以上離れた加湿設備 9の底面に設置した。
水蒸気の吹出方向は鋼板進行方向とほぼ平行とし、 水蒸気ノズル条件は、 加湿設 備 9内の拡散が十分に行われる目安として、 蒸気圧 0. 5kgf/Cm2以下とした。
除湿設備 1 0
絶対湿度を制御しない状態で絶対湿度が上限値を超えている場合は、 図 6の加湿 設備 9に代えて、 除湿設備 10を設ける (図 7) 。 除湿設備 10は、 加湿手段 9の水 蒸気吹き込みに代えて、 乾燥空気を吹き込むことで除湿を行った。 乾燥空気の絶対 湿度は必要な湿度条件に応じて選択すればよい。 ·
吹込口位置、 条件等は加湿設備 9と同様である。
測定手段 6
鋼板表面に対して鉛直方向に 500讓以内の範囲に設置するのが好ましく、 図 6お ょぴ図 7では鋼板上表面に対して鉛直方向に 300m位置に設置した。 また、 水蒸気 又は乾燥空気の影響を受けないように吹出口から lm以上離して設置した。 さらに、 吹出口と反対側に敢り付けるのが好ましく、 図 6および図 7では吹出口と反対側で ある板表面近傍に測定手段を取り付けた。 なお、 図 6では測定手段により、 露点の 測定を行った。
上記図 6又は図 7の溶融亜鉛めつきの製造設備を用いて、 溶融亜鉛めつき鋼板を 製造した。
まず、 板厚 0. 8讓の冷延鋼板上に、 常法により合金化溶融亜鉛めつき皮膜を形成 し、 更に調質圧延を行った。 その後、 50°C、 PH2. 0の硫酸酸性溶液を満たした酸性 溶液接触装置 1に導かれ、 酸性溶液に浸漬しためつき鋼板 Sは、 領域 3上を進行す ることでめっき鋼板 Sを 1 3秒間大気に接触させ、 洗浄装置 2で水洗した後、 乾燥 装置 (図示せず) で水分を除去することにより、 めっき表面に酸化膜を形成した溶 融亜鉛めつき鋼板が得られた。 最終的には、 簡易防鲭油を塗布しコイル状に卷き取 り製品とした。
なお、 ライン速度は 1 0 0 m p mとした。 また、 加湿設備 9又は除湿設備 10内 をめつき鋼板 Sが通過時に、 測定手段 6により、 加湿設備 9又は除湿設備 10内の 露点を測定し、 この結果に基づき、 吹き込み手段 5により、 加湿設備 9又は除湿設 備 10内の露点が - 12. 7°C以上で酸化膜厚上限値から設定した露点上限値以下となる ように、 水蒸気又は乾燥空気を吹き込んだ。
以上により得られた溶融亜鉛めつき鋼板について、 以下の方法にて、 めっき表層 の調圧部およぴ未調圧部の酸化物層の膜厚を測定した。 その結果、 調圧部おょぴ未 調圧部において摺動性を向上させるのに十分な酸化膜が形成されていることが確認 できた。
酸化膜厚の測定
ォージェ電子分光 (AES) によりめつき表層の調圧部および未調圧部について、 各元素の含有率 (at. %)を測定し、 引き続いて所定の深さまで、 Arスパッタリング した後、 AESによりめつき皮膜中の各元素の含有率の測定を行い、 これを繰り返す ことにより、 深さ方向の各元素の組成分布を測定した。 酸化物、 水酸化物に起因す る 0の含有率が、 最大値より深い位置で、 最大値と一定値との和の 1/2となる深さ を酸化物の厚さとし、 調圧部およぴ未調圧部に対してそれぞれ 2箇所づっ酸化物の 厚さを測定し、 これらの平均値をそれぞれ調圧部および未調圧部の酸化物の厚さと した。 なお、 予備処理として 30秒の Arスパッタリングを行って、 供試材表面のコ ンタミネーションレイヤーを除去した。
上述のように、 本発明の溶融亜鉛めつきの製造設備によれば、 鋼板表面の外観を 損なわず、 めっき鋼板表面に必要な酸ィ匕膜を確実に形成することができる。 そして、 例えば、 水蒸気を直接吹き付けることなしに、 反応工程中の水蒸気量を 2000質量 ppm以上に調整することができる等、 実用化に容易な設備となる q
さらに、 以上より、 本発明の溶融亜鉛めつきの製造設備を用いることで、 プレス 成形時の摺動特性に優れた合金化溶融亜鉛めつき鋼板を工業的規模で安定して製造 することが可能となり、 工業的に大きな効果を奏する発明とレ、える。 産業上の利用可能性
溶融亜鉛めつき鋼板の製造設備によれば、 鋼板表面の外観の損なわず必要な酸化 膜を安定して形成できることから、 自動車車体用途を中心に広範な分野で適用でき る。

Claims

1 . 溶融亜鉛めつき装置と、 調質圧延機と、 酸性溶液接触装置と、 洗浄装置が連 設してなる溶融亜鉛めつき鋼板の製造設備であって、 前記酸性溶液接触装置と前記 洗浄装置は間隔を設けて配置され、 さらに、 前記酸性溶液接触装置から前記洗浄装 置までの間には絶対湿度を制御する手段が設けられていることを特徴とする溶融亜 鉛めつき鋼板の製造設備。
p有
2 . 溶融亜鉛メツキ装置と、 合金化加熱炉と、 冷却装置と、 調質圧延機と、 酸性 の
溶液接触装置と、 洗浄装置が連設してなる溶融亜鉛めつき鋼板の製造設備であつて、 前記酸性溶液接触装置と前記洗浄装置は間隔を設けて配置され、 さらに、 前記酸性 囲
溶液接触装置から前記洗浄装置までの間には絶対湿度を制御する手段が設けられて いることを特徴とする溶融亜鉛めつき鋼板の製造設備。
3 . 前記絶対湿度を制御する手段は、 鋼板の上下面おょぴ両側面を覆い、 かつ、 鋼板が貫通可能なカバーと、 前記カバー内に、 水蒸気又は乾燥空気を吹き込む吹き 込み手段と、 温度と相対湿度、 又は露点を測定する測定手段とを有することを特徴 とする請求項 1または 2に記載の溶融亜鉛めつき鋼板の製造設備。
PCT/JP2008/070246 2007-10-31 2008-10-30 溶融亜鉛めっき鋼板の製造設備 WO2009057819A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1020127029746A KR20120135436A (ko) 2007-10-31 2008-10-30 용융 아연 도금 강판의 제조 설비
CN200880114216A CN101842510A (zh) 2007-10-31 2008-10-30 热镀锌钢板的制造设备
CA2701060A CA2701060C (en) 2007-10-31 2008-10-30 Apparatus for manufacturing molten zinc coated steel sheet
EP08844330.4A EP2204464B1 (en) 2007-10-31 2008-10-30 Equipment for producing hot dip galvanized steel plate
KR1020107008699A KR101237318B1 (ko) 2007-10-31 2008-10-30 용융 아연 도금 강판의 제조 설비
US12/738,647 US9222146B2 (en) 2007-10-31 2008-10-30 Apparatus for manufacturing molten zinc coated steel sheet

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2007282805A JP5211642B2 (ja) 2007-10-31 2007-10-31 溶融亜鉛めっき鋼板の製造設備及び溶融亜鉛めっき鋼板の製造方法
JP2007-282805 2007-10-31

Publications (1)

Publication Number Publication Date
WO2009057819A1 true WO2009057819A1 (ja) 2009-05-07

Family

ID=40591192

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2008/070246 WO2009057819A1 (ja) 2007-10-31 2008-10-30 溶融亜鉛めっき鋼板の製造設備

Country Status (8)

Country Link
US (1) US9222146B2 (ja)
EP (1) EP2204464B1 (ja)
JP (1) JP5211642B2 (ja)
KR (2) KR101237318B1 (ja)
CN (1) CN101842510A (ja)
CA (1) CA2701060C (ja)
TW (1) TWI449805B (ja)
WO (1) WO2009057819A1 (ja)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2835432B1 (en) * 2012-04-06 2016-11-02 JFE Steel Corporation Continuous hot-dip zinc plating facility
JP5962168B2 (ja) * 2012-04-20 2016-08-03 Jfeスチール株式会社 外観性に優れた高潤滑溶融亜鉛めっき鋼板の製造方法
JP5335159B1 (ja) * 2012-04-25 2013-11-06 日新製鋼株式会社 黒色めっき鋼板の製造方法および黒色めっき鋼板の成形体の製造方法
JP6137089B2 (ja) * 2014-09-02 2017-05-31 Jfeスチール株式会社 冷延鋼板の製造方法および冷延鋼板の製造設備
JP5907324B1 (ja) * 2014-10-17 2016-04-26 Jfeスチール株式会社 高強度溶融亜鉛めっき鋼板
JP6269547B2 (ja) * 2015-03-23 2018-01-31 Jfeスチール株式会社 連続溶融亜鉛めっき装置及び溶融亜鉛めっき鋼板の製造方法
CN105861970B (zh) * 2016-05-30 2018-08-03 浙江慧钢技术发展有限公司 一种高效的热浸镀锌生产线
CN111676434A (zh) * 2020-06-09 2020-09-18 首钢集团有限公司 一种耐黑变锌铝镁镀层钢板及其制备方法
KR20230090142A (ko) * 2021-12-14 2023-06-21 주식회사 엘지에너지솔루션 절대 습도 산출 장치 및 그것의 동작 방법

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0681166A (ja) * 1991-10-14 1994-03-22 Toyota Motor Corp 鉄鋼材の表面処理方法
JP2003306781A (ja) 2002-04-18 2003-10-31 Jfe Steel Kk 合金化溶融亜鉛めっき鋼板の製造方法
JP3608519B2 (ja) 2001-03-05 2005-01-12 Jfeスチール株式会社 合金化溶融亜鉛めっき鋼板の製造方法および合金化溶融亜鉛めっき鋼板

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2656284A (en) * 1949-09-07 1953-10-20 Ohio Commw Eng Co Method of plating rolled sheet metal
US3857362A (en) * 1972-05-23 1974-12-31 D Brooks Metal powder coating apparatus
JPH01108358A (ja) 1987-10-21 1989-04-25 Nippon Steel Corp 溶融合金化亜鉛メッキ鋼板のメッキ層表面酸化物生成方法
JPH02190460A (ja) 1989-01-18 1990-07-26 Nippon Steel Corp スポット溶接性に優れた合金化亜鉛めっき鋼板の製造方法
JPH1043652A (ja) * 1996-08-07 1998-02-17 Fuji Xerox Co Ltd 浸漬塗布方法および浸漬塗布装置
JP3397150B2 (ja) * 1998-11-25 2003-04-14 住友金属工業株式会社 溶融亜鉛系めっき鋼板
US7238430B2 (en) * 1999-10-07 2007-07-03 Isg Technologies Inc. Composition for controlling spangle size, a coated steel product, and a coating method
KR100495443B1 (ko) * 1999-10-07 2005-06-14 아이에스쥐 테크놀로지 인코포레이티드 강 제품 코팅 조성물, 코팅된 강 제품 및 강 제품 코팅방법
US6428851B1 (en) * 2000-03-01 2002-08-06 Bethlehem Steel Corporation Method for continuous thermal deposition of a coating on a substrate
JP2001355078A (ja) * 2000-04-11 2001-12-25 Toshiba Tec Corp ニッケルメッキ方法及びその装置並びに被メッキ物
WO2002018065A2 (en) * 2000-09-01 2002-03-07 Bethlehem Steel Corporation Process for applying a coating to a continuous steel sheet and a coated steel sheet product therefrom
JP2003137512A (ja) * 2001-11-02 2003-05-14 Rigaku Corp 金属酸化物の製造方法,半導体装置及び金属酸化物製造装置
KR100704692B1 (ko) * 2002-09-13 2007-04-10 제이에프이 스틸 가부시키가이샤 용융도금 금속대의 제조방법 및 제조장치
DE10255994A1 (de) * 2002-11-30 2004-06-09 Sms Demag Ag Verfahren und Vorrichtung zur Schmelztauchbeschichtung eines Metallstranges
FR2876710B1 (fr) * 2004-10-19 2014-12-26 Kappa Thermline Procede et dispositif de limitation de la vibration de bandes d'acier ou d'aluminium dans des zones de refroidissement par soufflage de gaz ou d'air
JP2007010267A (ja) 2005-07-01 2007-01-18 Daikin Ind Ltd 空気調和装置
JP4650128B2 (ja) * 2005-07-06 2011-03-16 Jfeスチール株式会社 合金化溶融亜鉛めっき鋼板の製造方法および合金化溶融亜鉛めっき鋼板
JP4692120B2 (ja) 2005-07-19 2011-06-01 Jfeスチール株式会社 合金化溶融亜鉛めっき鋼板の製造方法
US8025835B2 (en) * 2007-07-31 2011-09-27 ArcelorMittal Investigación y Desarrollo, S.L. Furnace configured for use in both the galvannealing and galvanizing of a metal strip
EP2835432B1 (en) * 2012-04-06 2016-11-02 JFE Steel Corporation Continuous hot-dip zinc plating facility

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0681166A (ja) * 1991-10-14 1994-03-22 Toyota Motor Corp 鉄鋼材の表面処理方法
JP3608519B2 (ja) 2001-03-05 2005-01-12 Jfeスチール株式会社 合金化溶融亜鉛めっき鋼板の製造方法および合金化溶融亜鉛めっき鋼板
JP2003306781A (ja) 2002-04-18 2003-10-31 Jfe Steel Kk 合金化溶融亜鉛めっき鋼板の製造方法

Also Published As

Publication number Publication date
CA2701060C (en) 2012-09-11
KR101237318B1 (ko) 2013-02-28
KR20100057908A (ko) 2010-06-01
EP2204464A1 (en) 2010-07-07
CN101842510A (zh) 2010-09-22
TW200932949A (en) 2009-08-01
CA2701060A1 (en) 2009-05-07
US9222146B2 (en) 2015-12-29
JP2009108377A (ja) 2009-05-21
US20100212590A1 (en) 2010-08-26
TWI449805B (zh) 2014-08-21
KR20120135436A (ko) 2012-12-13
JP5211642B2 (ja) 2013-06-12
EP2204464A4 (en) 2010-10-27
EP2204464B1 (en) 2013-10-30

Similar Documents

Publication Publication Date Title
WO2009057819A1 (ja) 溶融亜鉛めっき鋼板の製造設備
JP3807341B2 (ja) 合金化溶融亜鉛めっき鋼板の製造方法
JP5677289B2 (ja) 外観が改善された被覆金属ストリップを製造する方法
JP3608519B2 (ja) 合金化溶融亜鉛めっき鋼板の製造方法および合金化溶融亜鉛めっき鋼板
CN105177573A (zh) 钢带连续热镀锌与镀锌镁合金的联合机组及其生产方法
CN110499485B (zh) 一种制备高抗粉化热镀锌镀层的合金化处理方法
US20110226387A1 (en) Galvanized steel sheet and method for manufacturing the same
JP5071065B2 (ja) 合金化溶融亜鉛めっき鋼板の製造方法および合金化溶融亜鉛めっき鋼板
CN2915880Y (zh) 一种带钢连续热镀锌生产线的节能型连续退火炉
US4285995A (en) Process for increasing alloying rate of galvanized coating on steel
CA2742354C (en) Galvanized steel sheet and method for manufacturing the same
CA2745332C (en) Galvanized steel sheet and method for producing the same
CN113802079B (zh) 一种生产高表面质量镀铝硅钢带的方法
US20110236677A1 (en) Galvanized steel sheet and method for producing the same
JP7364092B2 (ja) 溶融亜鉛めっき鋼板の製造方法
JP2006183147A (ja) 合金化溶融亜鉛めっき鋼板の製造設備
JP2005139518A (ja) 化成処理金属帯の製造設備および製造方法
JP2003231959A (ja) 合金化溶融亜鉛めっき鋼板の製造設備
RU2434072C1 (ru) Способ производства горячеоцинкованной стальной полосы
JPS6059057A (ja) 差厚片面合金化処理鋼板の製造方法
JP5187349B2 (ja) めっき表面に酸化物層を有する合金化溶融亜鉛めっき鋼板の製造装置
JPS6112026B2 (ja)
JPS6054388B2 (ja) 合金化溶融亜鉛めつき鋼板の製造方法
JPS6059056A (ja) 差厚片面合金化処理鋼板の製造方法
JPH01177347A (ja) 差厚合金化溶融亜鉛めっき鋼板の製造方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200880114216.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08844330

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2008844330

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2701060

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 12738647

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1393/KOLNP/2010

Country of ref document: IN

ENP Entry into the national phase

Ref document number: 20107008699

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE