AN ARRANGEMENT FOR DRILLING AND WORKOVER OF OIL AND GAS WELLS
The present invention relates to an apparatus for drilling and wor over of oil and gas wells, said wells being pressurized or not. The arrangement may be utilized both on floating and fixed drilling and production installations, as well as on land based installations. The arrangement comprises one or two parallel pipe feeding systems so that the machine does not have to be stopped for coupling of a new pipe length, this making it possible to carry out work- overs through continuous lowering of pipe lengths. The connection process is carried out during the actual lowering process .
Prior art Currently used arrangements for work in living wells are arranged with two sets of suspending wedges, the lower set being fixed and the upper set being hoistable and lowerable as compared to the lower set of wedges by means of cylinders .
NO patent publication no. 153 865 discloses a wedge arrangement that can be placed on to a rotary table or some other device . In order to remove the wedges the arrangement has to be lifted up and opened, i.e. taken out from the drilling string.
NO patent publication no. 300 390 discloses a wedge arrangement where the wedge size can be swapped without removing the holding part, i.e. the drilling string or an other pipe may still be left and extend through the holding part during swapping of the wedge size. This is particularly advantageous when using drilling strings where different string elements have different outer diameters.
NO patent publication no. 301 847 discloses a snubbing device comprising hoisting and lowering means for feeding pipes inn or out of a oil or gas well, preferably in the form of one lower and one upper wedge arrangement which
both are arranged to grab around the pipe and carry a vertical load, at least one of the wedges being vertically movable and the snubbing device furthermore being arranged to be feed through a rotary table in a drilling deck and suspended in the rotary table . The snubbing arrangement is provided with securing organs that are arranged to fix the snubbing arrangement to the existing structure in order to transmit vertical forces.
All the known arrangements are feed with pipe lengths from a pipe depot to the top of the arrangement by means of cranes, winches or by means of a pipe handler that feeds individual pipes for coupling to the string. The arrangement therefore has to be stopped while the coupling takes place.
Short description of the invention
The aim of the present invention is to provide an arrangement that can carry out operations in pressureless or liv- ing production wells such that coupled pipe lengths are continuously feed into a snubbing arrangement, the snubbing arrangement either being placed in a rotary table or a universal snubbing frame when a snubbing unit is utilized outside a drilling tower.
The invention furthermore aims at providing an arrangement for transporting pipe lengths inn and out of above arrangement, as well as showing how the snubbing arrangement disclosed in NO patent 301 847 may carry vertical loads aris- ing between a snubbing arrangement and a production tree with safety valves.
Short description of the drawings
Figure 1 shows an embodiment in a 3-D perspective of an ar- rangement according to the present invention, especially how pipe 17a/b is transported into and out of the arrangement in order to carry out a continuous lowering.
Figure 2 shows in greater detail a 3-D perspective describing the individual embodiments.
Figure 3 is a 3-D perspective of the double pipe handling arrangement showing how two independent top driven pipe manipulators 9a/9b brings pipe 17a/b up to a double pipe feeding mast 4 by means of two independent tension adjusted hoisting systems lOa/b.
Figure 4 is a 2-D section showing how the double pipe handling arrangement of figure 3 is arranged.
Figure 5 is a 3-D perspective of a double pipe feeding frame 5 comprising two pipe feeders 7a/b and two pipe feed- ing magazines 6.
Figure 6 shows how the top driven pipe manipulators 9a/b move from their respective hoisting positions 33/34 and swing to a common drilling center 11.
Figure 7 shows a snubbing unit 3 as disclosed in NO patent 301 847, the snubbing unit being positioned in a rotary table 2 or a universal snubbing frame 8 with an auxiliary arrangement comprising swivels 21/23 and a rotary tong 20 ar- ranged above the unit 30 and a compensatory frame 19 arranged below the unit 3.
Figure 8 shows a sequential drawing with the snubbing unit in a starting position, the snubbing unit 3 hoisting cylin- ders 24 being in a lower contracted position and the pipe length 17c clamped in the lower wedge arrangement 25/26, while the pipe length 17b takes on the coupling position in the drilling center 11.
Figure 9 shows a sequential drawing with the snubbing unit 3 being operated such that the movable upper arrangement comprising swivels 21/23, wedges 22a/b and rotary tong 20 is lifted to a upper position by means of hoisting cylin-
ders 24. The pipe lengths 17c and 17b are thereby feed automatically to engagement and may be coupled by means of the rotary tong while continuous lowering of the pipes takes place. The coupling is completed before the snubbing unit reaches its lower starting position. Pipe length 17a is lifted to its vertical starting position.
Figure 10 shows a sequential drawing where the pipe length 17b/c is lowered to its lower starting position while pipe length 17a is waiting in its vertical position on a signal to move from the hoisting position 33 to drilling center 11.
Figure 11 shows a sequential drawing where the top driven pipe manipulator 9b is on its way down to get a new pipe length. In the mean time snubbing unit 3 undergoes stepwise hoisting and lowering operations by means of the stationary lower wedge arrangement 25/26 and the upper movable wedge arrangements 22a/b, thereby continuously lowering (or lift- ing) the sting out of the well without the usual stops for coupling or de-coupling pipe lengths.
Figure 12 shows a sequential drawing where the top driven pipe manipulator 9a has moved the new pipe length 17a from the hoisting position 34 to the drilling center 11. This takes place before the snubbing unit 3 undergoes its last stepwise hoisting/lowering operation of the string 17b/c down into the pressurized or pressureless well . The top driven pipe manipulator 9b is on its way to get a new pipe length.
Description of an embodiment
Figure 1 shows an embodiment of an arrangement according to the invention for work in pressurized wells. Figure 1 par- ticularly shows how pipes are transported to and from the arrangement .
β CO 4J CQ 1 |
00 cn ve o 4 CO f Φ rt ^ CQ td td A | tn -H φ φ β ,β ft td . lH 1 cn .. β 1 1 -H CQ 1 1 4-) ft 4-) I
© e β β H A -H 4J ■H υ id 0 si •H 4-> - l Λ ε A cn β CQ 0 tn 1 Ό Cn -rl β CQ CQ
■H Φ β Φ 4-> • ft -d ϋ cn β 0 td 4-> td Φ Φ -H β β β Φ Φ ft
Λ 5 ^1 CO 4-) Λ Φ 0 Cn φ 4-1 td 4-) β u Cn Φ > CQ O fd φ υ
4H A 4-1 β 4-1 ■H V4 CQ CQ β H > ε Φ
A 0 cn β β H u ε U H n Φ ft 4-> β 4-> β CO 0 φ CO β 0 •H 4-> fd φ Φ Φ H 4-1 Cn JH n 1X1 φ Cn CO
H β •H w £ CO *• φ H r"* CQ β • Φ A U H Φ Φ β 0 •H CQ φ T3 β υ CQ Cn A φ fd Cn td u ft § ε o A En 5 A -H MH A Φ ft fd 0 Ό β Λ ^ φ >H 0 TJ β ε ■H β 0 Φ u β 0 4J 0 φ > 4J ro 4-1 β •H Cn Φ rd ■H β a S 4H •H Φ -H 4-> 0 β 4-) 0 •H . ■4H ft cn CQ 0 fd Cn -H ft β -d Λ
H β 0 rt tn 4-> « u ϋ J CQ β A ^1 β CQ -rl rd Φ ε H 4-1 β N •H fd φ ■H
4-1 H CQ 4-> Cn ft β CQ cn fd H ft Φ td Cn ft CQ ft -H Φ td <4H S N !H rd •H 0 β fd ■H H 4-1 cn cn Φ Cn β » -H td β H Cn 0 0 Φ -r) U
Λ Φ Cn ■H Φ (H 0 H ft β » • φ Φ 5 • \ -rl φ U) ) β td H Λ n CO
4-) T3 £1 T3 β Λ ,β H Λ φ 0 Cn l ft A 4-) H 4-) A CN td τi φ Φ ε Cn H 4-1 β φ
4J Φ -H Λ 4J rd S H fd β β 4J Φ •rl <4H 4-> β X Cn ft β 0 CQ )
Hi fd M H β U td ι τi - l 0 cn -Q 0 -H IT) 4-> fd -rl β . -rl Cn -rl Ή & CO
-rl .. -H H β ε cn 0 CQ ε ^1 0 H Φ ε H tn CN td MH -rl r- ft β rt 0 Φ φ β H Vt •H CQ 0 -H CQ 4-> T3 ft 0 - β \ A 4-> Λ CN -rl φ Φ A A
4J ■H •3 Cn Φ 0 fd β ^ -rl φ 0 H -H CN 4-1 β β Λ 4-) XI 5 A ft 4-1 n Φ CQ Ό H 4H CQ β H β u Cn td Φ ft MH Cn IH rd A CN Φ 0 β Φ td Φ 0 4-1 τi td ■ CQ rd Λ •H Φ β A ft β u CQ 4-> ε β Φ A Φ H Φ td Cn φ β Φ φ CQ CQ 4 rt cn 0 -H O CQ (d Φ •H β cn β Φ T) CQ 4-> *4H β A β
4-> 4-1 .β ^ Cn Φ β fd 4-1 cn Φ CQ Ό Φ 4-> ft 4-1 Φ n Φ 4 4-) H •rl 0 ■H
0 β υ ft 4-> Φ Φ β S CQ β ft I 1 Φ rt β ε β CQ φ 0 φ fd rt 4-> CQ
•H β β > 4H Φ 0 CQ ~ -rl 4-) o 4H fd 4-J Φ :>ι Φ Φ td β A β CQ ft Λ • U β
^ 0 ^ β Φ - l 4H H rH Φ ft Φ : ι ft Cn in *4H > Λ tΛ ε u 4-) 0 -rl 4-) CQ -H φ ft E= 4-1 0 -d β •H 0 ■n CQ β -H cn β Φ fd Φ -H Ό ft H φ >
CQ -H β •"d φ Φ ft 4-3 3 Φ β -d -H 0 Φ H Cn H td Λ Φ 4-J Φ ^ CQ Ό cn φ ε Cn M CQ PJ A CQ 0 • Φ H β -rl Λ rH β ft !H υ 4 fd fd β φ
0 α ^ 4-1 H φ ■H 4 CQ 4-> Φ C 4-> 4-) Φ td CQ H φ β U s 0 cn ft
■H U 0 3 rd ft 0 0 β A fd Φ H U 5 ^1 -rl H H ! τj β β β -rl ■rl >s
*4H φ Φ s 0 β 0 • 4-> ■rl 4-> ft β 0 β cn -α φ β S 0 φ fd β ft PQ
Λ Ό T) ε I Φ n Cn Φ -rl td ε Φ ■d Φ TJ td & 0 4-) φ -rl 4-> co ^ ) •H ^ 0 • Φ Cn cn β ft ft υ n ε 0 -H Φ rH n ft CQ S Λ 4-> -H Cn •
^ 4-) o φ > Φ -H N β β Φ 0 Φ td ^1 >H N φ td Ό β β 4-> u β β CQ
Φ 0 β M-l rH -H A β -H -H o r-\ in β A ft ■rl Cn o φ td o Φ 0 φ β 0 4-) •H r-i
MH M-l Φ H ■n ij 0 « H > ■H CN 0 4-> M-l fd rt ■ -H N ε •H Λ u Λ CQ V β ^ H m ε τi rd β !H ■H CQ β fd 4-1 φ rH 1 ■H ^ Φ u β Φ 4-) •H 4-> 4-> Φ φ Φ
-H τi Φ φ 4 -rl β 4-> β CQ £1 td ft Φ o 4-1 β >H A CQ S ^1 4-1 td CQ ) β 4-) ε & & τj φ cn 4-> CQ 4H rcf 0 CQ •H 4-> J β MH 0 4-1 σi CQ Φ β ^1 H 0 -H φ -rl β -H 0
4-> β O β OS H -H Φ 4-) φ ft 0 φ 4J H Φ Φ > CQ fd H 4-> φ 0 T) H CQ
4-) u rd β ■H 4-) H 4 β ft ε β > 4-> td τi ^1 A CQ fd 4-> 4H ro 0 rd β β ^ SH β β rd fd ft 0 0 IW φ β β β CQ β Φ ft 4-> Φ Φ 4J τi β τi β Cn
Φ !H 4-) Φ -H Φ 4J n J=i o rl -rl Φ β td ε A 0 CQ φ Φ Φ 4-) Φ β 4-> ε ■i Φ **\ ε 4 fd CQ Λ ε CQ Φ β 4-) Gi fd Φ -H -H φ ι-\ φ cn β 4-) Φ β 4-) ε Φ A 4-1 ft -H
Φ ft ro !H A Cn in -H υ Φ fd β -g ft -H -H β Cn Λ 0 S •rl
Cn β Cn 0 !>ι β Cn ■H 0 S ■H β 4-1 4J β Cn ε MH 4-1 β ft ft Φ Cn β SH β 0 β 0 β u rd Φ β cn 4-> -H -H Φ β 0 4-) 0 β ^1 τj β β rd td cn β td H Cn υ β CO
•f rd U -H ε £ rd Φ en H 4-1 cn rH S Φ cn fd o -H ε ,β fd Φ Φ rH Cn φ ^ Λ β O β •H ft r-i Φ β 0 0 4-> tn β A CQ 0 CQ β l*H 0 CO o ro rH β » Cn 4J •H 0 0 o β . Λ fd β 4-1 β 0 E-< td υ β -H φ 0 •H φ
! 5 fd -H -H CQ β r Λ 4-) A 0 cn -H ft td fd m ft -rl -H A td 0 Λ Λ 4J H
4-> φ rH rd 4 Λ - u 0 cn 4-) Cn CQ β M 4-> • τi >. β Λ β υ Φ φ -H τi XI rH ^ Φ td β -ϋ Φ φ 1 r-\ cn Φ Φ fd β β Cn U td H β H φ β β 0 β rt o A β Φ Λ ! β β ■H .β Φ 0 O A Λ A -H Φ β [- -H 4J Φ td -d Λ ■H β rd • l β β
E-< β rd fO & td E-< 4 CQ td 4-) 3 β ft 4-) H 4-> Λ ft -H rH ft cn CQ r-\ -H E-i 4J CQ ε 4-> 4H CO
ID O o
H ro ro
the arrangement may be used to hoist pipe lengths out of a pressurized or pressureless well.
The arrangement comprises a pipe feeding magazine 6 that is placed on the drilling arrangement deck structure 1. Between the pipe feeding magazine 6 and the universal snubbing frame 8 there is arranged a single or double pipe feeding frame 5 comprising two side mounted pipe feeders 7a/7b with a centrally positioned skid for other equipment to be transported between the deck of the vessel 1 and the snubbing unit 3. The pipe feeders 7a/7b comprise a frame shaped structure with a feeding wagon that is driven along the frame structure by means of hydraulic or electric power. The pipe feeding magazine 6 is arranged with auto- matic loading and unloading of pipe lengths between the pipe feeding magazine 6 and the pipe feeders 7a/7b.
A snubbing unit 3 is mounted inside a universal snubbing frame 8 that is placed above a production tree on the deck structure 1 of the arrangement. The snubbing unit is landed on a shoulder in a rotary table 2 and is locked onto the production tree 27 by means of a compensator frame 19. The compensator frame comprises an upper and lower steel frame between which are arranged a set of compensator cylinders 28 that connect with a set of accumulators 29. By pressurising the accumulator system a adjustable but constant pressure makes sure that the snubbing unit has the necessary vertical tension independent of how the vessel moves vertically and which pressure conditions exists in the pro- duction tree 27. On top of the snubbing unit 3 there is arranged an upper swivel 21 and a lower swivel 23. The upper swivel is mounted to a rotation tong 20 comprising a rotary unit, coupling unit and a pipe coupler. The rotation tong 20 is vertically guided in rail 14. On top of the universal snubbing frame 8 is arranged a double pipe handling mast 4 comprising a double framelike structure with guiding rails for guiding of two top driven pipe manipulators 9A/9B up and down along the double pipe handling mast. The pipe han-
dling mast 4 furthermore comprises support bars 16 and access ladders 15. The arrangement may alternatively be equipped with a single mast comprising a pipe manipulator that has to run twice as fast, thereby ensuring that the coupling of pipe lengths may be undertaken while the step- wise lowering is carried out.
The top driven pipe manipulator 9A/9B comprises a revolving pipe claw 13A/13B, a hydraulic or electric revolving motor, circulation pipes 18A/18B, hydraulic fluid swivels, pipe coupling ends as well as a revolving element 12A/12B that moves a hanging pipe length from the hoisting position 33/34 to the drilling centre 11. The top driven pipe manipulators are hoisted up or lowered along the mast 4 by means of a tension adjusted balance winch system 10A/10B.
The starting position of the functional description is while the pipe lengths are positioned in a pipe feeding magazine 6 and where the arrangement is controlled from two control cabins 30/31.
Pipe length 17B is rolled from the pipe feeding magazine 6 to the pipe feeder 7B whereupon the wagon pushes the pipe to a fixed position by the universal snubbing frame 3. The top driven pipe manipulator 9B is positioned in its lower position with the revolving pipe claw 13B in an angle corresponding to the angle of the pipe feeder 7B. The pipe 17B is pushed directly into the pipe claw 13B by means of the pipe feeder 7B. The pipe claw 13B is locked around the pipe length 17B whereupon the pipe length is hoisted in the double pipe handling mast 4 until the pipe reaches its upper starting position 34 ready for revolving into the drilling centre 11.
The starting position of snubbing unit 3 comprises compressed hoisting cylinders 24 in its lower position. The string is locked in the lower wedge arrangement 25/26. The upper wedge arrangement 22A/B with rotation tong 20 is on