WO2001033034A1 - An arrangement for drilling and workover of oil and gas wells - Google Patents

An arrangement for drilling and workover of oil and gas wells Download PDF

Info

Publication number
WO2001033034A1
WO2001033034A1 PCT/NO2000/000368 NO0000368W WO0133034A1 WO 2001033034 A1 WO2001033034 A1 WO 2001033034A1 NO 0000368 W NO0000368 W NO 0000368W WO 0133034 A1 WO0133034 A1 WO 0133034A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
arrangement
hoisting
wells
pipes
Prior art date
Application number
PCT/NO2000/000368
Other languages
French (fr)
Other versions
WO2001033034B1 (en
Inventor
Svein Gleditsch
Børre FOSSLI
Dicky Robichaux
Original Assignee
Mercur Slimhole Drilling And Intervention As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from NO995426A external-priority patent/NO995426D0/en
Application filed by Mercur Slimhole Drilling And Intervention As filed Critical Mercur Slimhole Drilling And Intervention As
Priority to AU11809/01A priority Critical patent/AU1180901A/en
Publication of WO2001033034A1 publication Critical patent/WO2001033034A1/en
Publication of WO2001033034B1 publication Critical patent/WO2001033034B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • E21B19/155Handling between horizontal and vertical position
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • E21B19/06Elevators, i.e. rod- or tube-gripping devices
    • E21B19/07Slip-type elevators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/20Combined feeding from rack and connecting, e.g. automatically

Definitions

  • the present invention relates to an apparatus for drilling and wor over of oil and gas wells, said wells being pressurized or not.
  • the arrangement may be utilized both on floating and fixed drilling and production installations, as well as on land based installations.
  • the arrangement comprises one or two parallel pipe feeding systems so that the machine does not have to be stopped for coupling of a new pipe length, this making it possible to carry out work- overs through continuous lowering of pipe lengths.
  • the connection process is carried out during the actual lowering process .
  • Prior art Currently used arrangements for work in living wells are arranged with two sets of suspending wedges, the lower set being fixed and the upper set being hoistable and lowerable as compared to the lower set of wedges by means of cylinders .
  • NO patent publication no. 153 865 discloses a wedge arrangement that can be placed on to a rotary table or some other device . In order to remove the wedges the arrangement has to be lifted up and opened, i.e. taken out from the drilling string.
  • NO patent publication no. 300 390 discloses a wedge arrangement where the wedge size can be swapped without removing the holding part, i.e. the drilling string or an other pipe may still be left and extend through the holding part during swapping of the wedge size. This is particularly advantageous when using drilling strings where different string elements have different outer diameters.
  • NO patent publication no. 301 847 discloses a snubbing device comprising hoisting and lowering means for feeding pipes inn or out of a oil or gas well, preferably in the form of one lower and one upper wedge arrangement which both are arranged to grab around the pipe and carry a vertical load, at least one of the wedges being vertically movable and the snubbing device furthermore being arranged to be feed through a rotary table in a drilling deck and suspended in the rotary table .
  • the snubbing arrangement is provided with securing organs that are arranged to fix the snubbing arrangement to the existing structure in order to transmit vertical forces.
  • the aim of the present invention is to provide an arrangement that can carry out operations in pressureless or liv- ing production wells such that coupled pipe lengths are continuously feed into a snubbing arrangement, the snubbing arrangement either being placed in a rotary table or a universal snubbing frame when a snubbing unit is utilized outside a drilling tower.
  • the invention furthermore aims at providing an arrangement for transporting pipe lengths inn and out of above arrangement, as well as showing how the snubbing arrangement disclosed in NO patent 301 847 may carry vertical loads aris- ing between a snubbing arrangement and a production tree with safety valves.
  • Figure 1 shows an embodiment in a 3-D perspective of an ar- rangement according to the present invention, especially how pipe 17a/b is transported into and out of the arrangement in order to carry out a continuous lowering.
  • Figure 2 shows in greater detail a 3-D perspective describing the individual embodiments.
  • Figure 3 is a 3-D perspective of the double pipe handling arrangement showing how two independent top driven pipe manipulators 9a/9b brings pipe 17a/b up to a double pipe feeding mast 4 by means of two independent tension adjusted hoisting systems lOa/b.
  • Figure 4 is a 2-D section showing how the double pipe handling arrangement of figure 3 is arranged.
  • Figure 5 is a 3-D perspective of a double pipe feeding frame 5 comprising two pipe feeders 7a/b and two pipe feed- ing magazines 6.
  • Figure 6 shows how the top driven pipe manipulators 9a/b move from their respective hoisting positions 33/34 and swing to a common drilling center 11.
  • Figure 7 shows a snubbing unit 3 as disclosed in NO patent 301 847, the snubbing unit being positioned in a rotary table 2 or a universal snubbing frame 8 with an auxiliary arrangement comprising swivels 21/23 and a rotary tong 20 ar- ranged above the unit 30 and a compensatory frame 19 arranged below the unit 3.
  • Figure 8 shows a sequential drawing with the snubbing unit in a starting position, the snubbing unit 3 hoisting cylin- ders 24 being in a lower contracted position and the pipe length 17c clamped in the lower wedge arrangement 25/26, while the pipe length 17b takes on the coupling position in the drilling center 11.
  • Figure 9 shows a sequential drawing with the snubbing unit 3 being operated such that the movable upper arrangement comprising swivels 21/23, wedges 22a/b and rotary tong 20 is lifted to a upper position by means of hoisting cylin- ders 24.
  • the pipe lengths 17c and 17b are thereby feed automatically to engagement and may be coupled by means of the rotary tong while continuous lowering of the pipes takes place. The coupling is completed before the snubbing unit reaches its lower starting position. Pipe length 17a is lifted to its vertical starting position.
  • Figure 10 shows a sequential drawing where the pipe length 17b/c is lowered to its lower starting position while pipe length 17a is waiting in its vertical position on a signal to move from the hoisting position 33 to drilling center 11.
  • Figure 11 shows a sequential drawing where the top driven pipe manipulator 9b is on its way down to get a new pipe length.
  • snubbing unit 3 undergoes stepwise hoisting and lowering operations by means of the stationary lower wedge arrangement 25/26 and the upper movable wedge arrangements 22a/b, thereby continuously lowering (or lift- ing) the sting out of the well without the usual stops for coupling or de-coupling pipe lengths.
  • Figure 12 shows a sequential drawing where the top driven pipe manipulator 9a has moved the new pipe length 17a from the hoisting position 34 to the drilling center 11. This takes place before the snubbing unit 3 undergoes its last stepwise hoisting/lowering operation of the string 17b/c down into the pressurized or pressureless well .
  • the top driven pipe manipulator 9b is on its way to get a new pipe length.
  • Figure 1 shows an embodiment of an arrangement according to the invention for work in pressurized wells.
  • Figure 1 par- ticularly shows how pipes are transported to and from the arrangement .
  • ⁇ CO 4J CQ 1
  • the arrangement may be used to hoist pipe lengths out of a pressurized or pressureless well.
  • the arrangement comprises a pipe feeding magazine 6 that is placed on the drilling arrangement deck structure 1. Between the pipe feeding magazine 6 and the universal snubbing frame 8 there is arranged a single or double pipe feeding frame 5 comprising two side mounted pipe feeders 7a/7b with a centrally positioned skid for other equipment to be transported between the deck of the vessel 1 and the snubbing unit 3.
  • the pipe feeders 7a/7b comprise a frame shaped structure with a feeding wagon that is driven along the frame structure by means of hydraulic or electric power.
  • the pipe feeding magazine 6 is arranged with auto- matic loading and unloading of pipe lengths between the pipe feeding magazine 6 and the pipe feeders 7a/7b.
  • a snubbing unit 3 is mounted inside a universal snubbing frame 8 that is placed above a production tree on the deck structure 1 of the arrangement.
  • the snubbing unit is landed on a shoulder in a rotary table 2 and is locked onto the production tree 27 by means of a compensator frame 19.
  • the compensator frame comprises an upper and lower steel frame between which are arranged a set of compensator cylinders 28 that connect with a set of accumulators 29.
  • a double pipe handling mast 4 comprising a double framelike structure with guiding rails for guiding of two top driven pipe manipulators 9A/9B up and down along the double pipe handling mast.
  • the pipe han- dling mast 4 furthermore comprises support bars 16 and access ladders 15.
  • the arrangement may alternatively be equipped with a single mast comprising a pipe manipulator that has to run twice as fast, thereby ensuring that the coupling of pipe lengths may be undertaken while the step- wise lowering is carried out.
  • the top driven pipe manipulator 9A/9B comprises a revolving pipe claw 13A/13B, a hydraulic or electric revolving motor, circulation pipes 18A/18B, hydraulic fluid swivels, pipe coupling ends as well as a revolving element 12A/12B that moves a hanging pipe length from the hoisting position 33/34 to the drilling centre 11.
  • the top driven pipe manipulators are hoisted up or lowered along the mast 4 by means of a tension adjusted balance winch system 10A/10B.
  • the starting position of the functional description is while the pipe lengths are positioned in a pipe feeding magazine 6 and where the arrangement is controlled from two control cabins 30/31.
  • Pipe length 17B is rolled from the pipe feeding magazine 6 to the pipe feeder 7B whereupon the wagon pushes the pipe to a fixed position by the universal snubbing frame 3.
  • the top driven pipe manipulator 9B is positioned in its lower position with the revolving pipe claw 13B in an angle corresponding to the angle of the pipe feeder 7B.
  • the pipe 17B is pushed directly into the pipe claw 13B by means of the pipe feeder 7B.
  • the pipe claw 13B is locked around the pipe length 17B whereupon the pipe length is hoisted in the double pipe handling mast 4 until the pipe reaches its upper starting position 34 ready for revolving into the drilling centre 11.
  • the starting position of snubbing unit 3 comprises compressed hoisting cylinders 24 in its lower position.
  • the string is locked in the lower wedge arrangement 25/26.
  • the upper wedge arrangement 22A/B with rotation tong 20 is on

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein a snubbing unit (3) continuously may be fed with pipes while the stepwise hoisting or lowering operation is carried out, such that the snubbing unit does not stop for coupling or de-coupling a new pipe length (17).

Description

AN ARRANGEMENT FOR DRILLING AND WORKOVER OF OIL AND GAS WELLS
The present invention relates to an apparatus for drilling and wor over of oil and gas wells, said wells being pressurized or not. The arrangement may be utilized both on floating and fixed drilling and production installations, as well as on land based installations. The arrangement comprises one or two parallel pipe feeding systems so that the machine does not have to be stopped for coupling of a new pipe length, this making it possible to carry out work- overs through continuous lowering of pipe lengths. The connection process is carried out during the actual lowering process .
Prior art Currently used arrangements for work in living wells are arranged with two sets of suspending wedges, the lower set being fixed and the upper set being hoistable and lowerable as compared to the lower set of wedges by means of cylinders .
NO patent publication no. 153 865 discloses a wedge arrangement that can be placed on to a rotary table or some other device . In order to remove the wedges the arrangement has to be lifted up and opened, i.e. taken out from the drilling string.
NO patent publication no. 300 390 discloses a wedge arrangement where the wedge size can be swapped without removing the holding part, i.e. the drilling string or an other pipe may still be left and extend through the holding part during swapping of the wedge size. This is particularly advantageous when using drilling strings where different string elements have different outer diameters.
NO patent publication no. 301 847 discloses a snubbing device comprising hoisting and lowering means for feeding pipes inn or out of a oil or gas well, preferably in the form of one lower and one upper wedge arrangement which both are arranged to grab around the pipe and carry a vertical load, at least one of the wedges being vertically movable and the snubbing device furthermore being arranged to be feed through a rotary table in a drilling deck and suspended in the rotary table . The snubbing arrangement is provided with securing organs that are arranged to fix the snubbing arrangement to the existing structure in order to transmit vertical forces.
All the known arrangements are feed with pipe lengths from a pipe depot to the top of the arrangement by means of cranes, winches or by means of a pipe handler that feeds individual pipes for coupling to the string. The arrangement therefore has to be stopped while the coupling takes place.
Short description of the invention
The aim of the present invention is to provide an arrangement that can carry out operations in pressureless or liv- ing production wells such that coupled pipe lengths are continuously feed into a snubbing arrangement, the snubbing arrangement either being placed in a rotary table or a universal snubbing frame when a snubbing unit is utilized outside a drilling tower.
The invention furthermore aims at providing an arrangement for transporting pipe lengths inn and out of above arrangement, as well as showing how the snubbing arrangement disclosed in NO patent 301 847 may carry vertical loads aris- ing between a snubbing arrangement and a production tree with safety valves.
Short description of the drawings
Figure 1 shows an embodiment in a 3-D perspective of an ar- rangement according to the present invention, especially how pipe 17a/b is transported into and out of the arrangement in order to carry out a continuous lowering. Figure 2 shows in greater detail a 3-D perspective describing the individual embodiments.
Figure 3 is a 3-D perspective of the double pipe handling arrangement showing how two independent top driven pipe manipulators 9a/9b brings pipe 17a/b up to a double pipe feeding mast 4 by means of two independent tension adjusted hoisting systems lOa/b.
Figure 4 is a 2-D section showing how the double pipe handling arrangement of figure 3 is arranged.
Figure 5 is a 3-D perspective of a double pipe feeding frame 5 comprising two pipe feeders 7a/b and two pipe feed- ing magazines 6.
Figure 6 shows how the top driven pipe manipulators 9a/b move from their respective hoisting positions 33/34 and swing to a common drilling center 11.
Figure 7 shows a snubbing unit 3 as disclosed in NO patent 301 847, the snubbing unit being positioned in a rotary table 2 or a universal snubbing frame 8 with an auxiliary arrangement comprising swivels 21/23 and a rotary tong 20 ar- ranged above the unit 30 and a compensatory frame 19 arranged below the unit 3.
Figure 8 shows a sequential drawing with the snubbing unit in a starting position, the snubbing unit 3 hoisting cylin- ders 24 being in a lower contracted position and the pipe length 17c clamped in the lower wedge arrangement 25/26, while the pipe length 17b takes on the coupling position in the drilling center 11.
Figure 9 shows a sequential drawing with the snubbing unit 3 being operated such that the movable upper arrangement comprising swivels 21/23, wedges 22a/b and rotary tong 20 is lifted to a upper position by means of hoisting cylin- ders 24. The pipe lengths 17c and 17b are thereby feed automatically to engagement and may be coupled by means of the rotary tong while continuous lowering of the pipes takes place. The coupling is completed before the snubbing unit reaches its lower starting position. Pipe length 17a is lifted to its vertical starting position.
Figure 10 shows a sequential drawing where the pipe length 17b/c is lowered to its lower starting position while pipe length 17a is waiting in its vertical position on a signal to move from the hoisting position 33 to drilling center 11.
Figure 11 shows a sequential drawing where the top driven pipe manipulator 9b is on its way down to get a new pipe length. In the mean time snubbing unit 3 undergoes stepwise hoisting and lowering operations by means of the stationary lower wedge arrangement 25/26 and the upper movable wedge arrangements 22a/b, thereby continuously lowering (or lift- ing) the sting out of the well without the usual stops for coupling or de-coupling pipe lengths.
Figure 12 shows a sequential drawing where the top driven pipe manipulator 9a has moved the new pipe length 17a from the hoisting position 34 to the drilling center 11. This takes place before the snubbing unit 3 undergoes its last stepwise hoisting/lowering operation of the string 17b/c down into the pressurized or pressureless well . The top driven pipe manipulator 9b is on its way to get a new pipe length.
Description of an embodiment
Figure 1 shows an embodiment of an arrangement according to the invention for work in pressurized wells. Figure 1 par- ticularly shows how pipes are transported to and from the arrangement . β CO 4J CQ 1 |
00 cn ve o 4 CO f Φ rt ^ CQ td td A | tn -H φ φ β ,β ft td . lH 1 cn .. β 1 1 -H CQ 1 1 4-) ft 4-) I
© e β β H A -H 4J H υ id 0 si •H 4-> - l Λ ε A cn β CQ 0 tn 1 Ό Cn -rl β CQ CQ
H Φ β Φ 4-> • ft -d ϋ cn β 0 td 4-> td Φ Φ -H β β β Φ Φ ft
Λ 5 ^1 CO 4-) Λ Φ 0 Cn φ 4-1 td 4-) β u Cn Φ > CQ O fd φ υ
4H A 4-1 β 4-1 H V4 CQ CQ β H > ε Φ
A 0 cn β β H u ε U H n Φ ft 4-> β 4-> β CO 0 φ CO β 0 H 4-> fd φ Φ Φ H 4-1 Cn JH n 1X1 φ Cn CO
H β H w £ CO *• φ H r"* CQ β • Φ A U H Φ Φ β 0 •H CQ φ T3 β υ CQ Cn A φ fd Cn td u ft § ε o A En 5 A -H MH A Φ ft fd 0 Ό β Λ ^ φ >H 0 TJ β ε H β 0 Φ u β 0 4J 0 φ > 4J ro 4-1 β •H Cn Φ rd H β a S 4H •H Φ -H 4-> 0 β 4-) 0 •H . 4H ft cn CQ 0 fd Cn -H ft β -d Λ
H β 0 rt tn 4-> « u ϋ J CQ β A ^1 β CQ -rl rd Φ ε H 4-1 β N •H fd φ H
4-1 H CQ 4-> Cn ft β CQ cn fd H ft Φ td Cn ft CQ ft -H Φ td <4H S N !H rd •H 0 β fd H H 4-1 cn cn Φ Cn β » -H td β H Cn 0 0 Φ -r) U
Λ Φ Cn H Φ (H 0 H ft β » • φ Φ 5 \ -rl φ U) ) β td H Λ n CO
4-) T3 £1 T3 β Λ ,β H Λ φ 0 Cn l ft A 4-) H 4-) A CN td τi φ Φ ε Cn H 4-1 β φ
4J Φ -H Λ 4J rd S H fd β β 4J Φ •rl <4H 4-> β X Cn ft β 0 CQ )
Hi fd M H β U td ι τi - l 0 cn -Q 0 -H IT) 4-> fd -rl β . -rl Cn -rl Ή & CO
-rl .. -H H β ε cn 0 CQ ε ^1 0 H Φ ε H tn CN td MH -rl r- ft β rt 0 Φ φ β H Vt H CQ 0 -H CQ 4-> T3 ft 0 - β \ A 4-> Λ CN -rl φ Φ A A
4J H 3 Cn Φ 0 fd β ^ -rl φ 0 H -H CN 4-1 β β Λ 4-) XI 5 A ft 4-1 n Φ CQ Ό H 4H CQ β H β u Cn td Φ ft MH Cn IH rd A CN Φ 0 β Φ td Φ 0 4-1 τi td CQ rd Λ •H Φ β A ft β u CQ 4-> ε β Φ A Φ H Φ td Cn φ β Φ φ CQ CQ 4 rt cn 0 -H O CQ (d Φ •H β cn β Φ T) CQ 4-> *4H β A β
4-> 4-1 .β ^ Cn Φ β fd 4-1 cn Φ CQ Ό Φ 4-> ft 4-1 Φ n Φ 4 4-) H •rl 0 H
0 β υ ft 4-> Φ Φ β S CQ β ft I 1 Φ rt β ε β CQ φ 0 φ fd rt 4-> CQ
•H β β > 4H Φ 0 CQ ~ -rl 4-) o 4H fd 4-J Φ :>ι Φ Φ td β A β CQ ft Λ • U β
^ 0 ^ β Φ - l 4H H rH Φ ft Φ : ι ft Cn in *4H > Λ tΛ ε u 4-) 0 -rl 4-) CQ -H φ ft E= 4-1 0 -d β •H 0 n CQ β -H cn β Φ fd Φ -H Ό ft H φ >
CQ -H β •"d φ Φ ft 4-3 3 Φ β -d -H 0 Φ H Cn H td Λ Φ 4-J Φ ^ CQ Ό cn φ ε Cn M CQ PJ A CQ 0 • Φ H β -rl Λ rH β ft !H υ 4 fd fd β φ
0 α ^ 4-1 H φ H 4 CQ 4-> Φ C 4-> 4-) Φ td CQ H φ β U s 0 cn ft
H U 0 3 rd ft 0 0 β A fd Φ H U 5 ^1 -rl H H ! τj β β β -rl rl >s
*4H φ Φ s 0 β 0 • 4-> rl 4-> ft β 0 β cn -α φ β S 0 φ fd β ft PQ
Λ Ό T) ε I Φ n Cn Φ -rl td ε Φ d Φ TJ td & 0 4-) φ -rl 4-> co ^ ) •H ^ 0 • Φ Cn cn β ft ft υ n ε 0 -H Φ rH n ft CQ S Λ 4-> -H Cn •
^ 4-) o φ > Φ -H N β β Φ 0 Φ td ^1 >H N φ td Ό β β 4-> u β β CQ
Φ 0 β M-l rH -H A β -H -H o r-\ in β A ft rl Cn o φ td o Φ 0 φ β 0 4-) •H r-i
MH M-l Φ H n ij 0 « H > H CN 0 4-> M-l fd rt -H N ε •H Λ u Λ CQ V β ^ H m ε τi rd β !H H CQ β fd 4-1 φ rH 1 H ^ Φ u β Φ 4-) •H 4-> 4-> Φ φ Φ
-H τi Φ φ 4 -rl β 4-> β CQ £1 td ft Φ o 4-1 β >H A CQ S ^1 4-1 td CQ ) β 4-) ε & & τj φ cn 4-> CQ 4H rcf 0 CQ •H 4-> J β MH 0 4-1 σi CQ Φ β ^1 H 0 -H φ -rl β -H 0
4-> β O β OS H -H Φ 4-) φ ft 0 φ 4J H Φ Φ > CQ fd H 4-> φ 0 T) H CQ
4-) u rd β H 4-) H 4 β ft ε β > 4-> td τi ^1 A CQ fd 4-> 4H ro 0 rd β β ^ SH β β rd fd ft 0 0 IW φ β β β CQ β Φ ft 4-> Φ Φ 4J τi β τi β Cn
Φ !H 4-) Φ -H Φ 4J n J=i o rl -rl Φ β td ε A 0 CQ φ Φ Φ 4-) Φ β 4-> ε i Φ **\ ε 4 fd CQ Λ ε CQ Φ β 4-) Gi fd Φ -H -H φ ι-\ φ cn β 4-) Φ β 4-) ε Φ A 4-1 ft -H
Φ ft ro !H A Cn in -H υ Φ fd β -g ft -H -H β Cn Λ 0 S •rl
Cn β Cn 0 !>ι β Cn H 0 S H β 4-1 4J β Cn ε MH 4-1 β ft ft Φ Cn β SH β 0 β 0 β u rd Φ β cn 4-> -H -H Φ β 0 4-) 0 β ^1 τj β β rd td cn β td H Cn υ β CO
f rd U -H ε £ rd Φ en H 4-1 cn rH S Φ cn fd o -H ε ,β fd Φ Φ rH Cn φ ^ Λ β O β •H ft r-i Φ β 0 0 4-> tn β A CQ 0 CQ β l*H 0 CO o ro rH β » Cn 4J H 0 0 o β . Λ fd β 4-1 β 0 E-< td υ β -H φ 0 •H φ
! 5 fd -H -H CQ β r Λ 4-) A 0 cn -H ft td fd m ft -rl -H A td 0 Λ Λ 4J H
4-> φ rH rd 4 Λ - u 0 cn 4-) Cn CQ β M 4-> • τi >. β Λ β υ Φ φ -H τi XI rH ^ Φ td β -ϋ Φ φ 1 r-\ cn Φ Φ fd β β Cn U td H β H φ β β 0 β rt o A β Φ Λ ! β β H .β Φ 0 O A Λ A -H Φ β [- -H 4J Φ td -d Λ H β rd • l β β
E-< β rd fO & td E-< 4 CQ td 4-) 3 β ft 4-) H 4-> Λ ft -H rH ft cn CQ r-\ -H E-i 4J CQ ε 4-> 4H CO
ID O o
H ro ro
the arrangement may be used to hoist pipe lengths out of a pressurized or pressureless well.
The arrangement comprises a pipe feeding magazine 6 that is placed on the drilling arrangement deck structure 1. Between the pipe feeding magazine 6 and the universal snubbing frame 8 there is arranged a single or double pipe feeding frame 5 comprising two side mounted pipe feeders 7a/7b with a centrally positioned skid for other equipment to be transported between the deck of the vessel 1 and the snubbing unit 3. The pipe feeders 7a/7b comprise a frame shaped structure with a feeding wagon that is driven along the frame structure by means of hydraulic or electric power. The pipe feeding magazine 6 is arranged with auto- matic loading and unloading of pipe lengths between the pipe feeding magazine 6 and the pipe feeders 7a/7b.
A snubbing unit 3 is mounted inside a universal snubbing frame 8 that is placed above a production tree on the deck structure 1 of the arrangement. The snubbing unit is landed on a shoulder in a rotary table 2 and is locked onto the production tree 27 by means of a compensator frame 19. The compensator frame comprises an upper and lower steel frame between which are arranged a set of compensator cylinders 28 that connect with a set of accumulators 29. By pressurising the accumulator system a adjustable but constant pressure makes sure that the snubbing unit has the necessary vertical tension independent of how the vessel moves vertically and which pressure conditions exists in the pro- duction tree 27. On top of the snubbing unit 3 there is arranged an upper swivel 21 and a lower swivel 23. The upper swivel is mounted to a rotation tong 20 comprising a rotary unit, coupling unit and a pipe coupler. The rotation tong 20 is vertically guided in rail 14. On top of the universal snubbing frame 8 is arranged a double pipe handling mast 4 comprising a double framelike structure with guiding rails for guiding of two top driven pipe manipulators 9A/9B up and down along the double pipe handling mast. The pipe han- dling mast 4 furthermore comprises support bars 16 and access ladders 15. The arrangement may alternatively be equipped with a single mast comprising a pipe manipulator that has to run twice as fast, thereby ensuring that the coupling of pipe lengths may be undertaken while the step- wise lowering is carried out.
The top driven pipe manipulator 9A/9B comprises a revolving pipe claw 13A/13B, a hydraulic or electric revolving motor, circulation pipes 18A/18B, hydraulic fluid swivels, pipe coupling ends as well as a revolving element 12A/12B that moves a hanging pipe length from the hoisting position 33/34 to the drilling centre 11. The top driven pipe manipulators are hoisted up or lowered along the mast 4 by means of a tension adjusted balance winch system 10A/10B.
The starting position of the functional description is while the pipe lengths are positioned in a pipe feeding magazine 6 and where the arrangement is controlled from two control cabins 30/31.
Pipe length 17B is rolled from the pipe feeding magazine 6 to the pipe feeder 7B whereupon the wagon pushes the pipe to a fixed position by the universal snubbing frame 3. The top driven pipe manipulator 9B is positioned in its lower position with the revolving pipe claw 13B in an angle corresponding to the angle of the pipe feeder 7B. The pipe 17B is pushed directly into the pipe claw 13B by means of the pipe feeder 7B. The pipe claw 13B is locked around the pipe length 17B whereupon the pipe length is hoisted in the double pipe handling mast 4 until the pipe reaches its upper starting position 34 ready for revolving into the drilling centre 11.
The starting position of snubbing unit 3 comprises compressed hoisting cylinders 24 in its lower position. The string is locked in the lower wedge arrangement 25/26. The upper wedge arrangement 22A/B with rotation tong 20 is on
Figure imgf000010_0001

Claims

C l a i m s
1. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein a snubbing unit (3) continuously may be fed with pipes while the stepwise hoisting or lowering operation is carried out, such that the snubbing unit does not stop for coupling or de-coupling a new pipe length (17) .
2. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein a universal snubbing frame with a snubbing unit (3) is mounted on the deck of the vessel in order to carry out work in wells through production trees (27) .
3. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the upper wedge set (22A/B) comprises swivels (21/23) with a rotation tong (20) for drilling in pressurized or pressureless wells.
4. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the upper wedge set (22A/B) comprises swivels (21/23) with rotation tong (20) for continuous coupling of pipe lengths while the stepwise lowering or hoisting of pipe lengths (17) is carried out.
5. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the top of the universal snubbing frame (8) comprises a single or double pipe handling mast (4) with guid- ing rails for one or more pipe handling manipulators (9A/B) .
6. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the pipe manipulators (9A/B) comprises revolving elements (12A/B) for alternating sideways movement of pipe lengths (17A/B) from hoisting position (33/34) to drilling centre 11.
7. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the pipe manipulators (9A/B) comprise a revolvable pipe claw (13A/B) for coupling pipe length (17A/B) to the pipe manipulator (9A/B) .
8. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the pipe manipulators (9A/B) comprise a hydraulic or electric rotary motor for coupling of pipe lengths (12A/B) .
9. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the pipe manipulators (9A/B) comprise circulation pipes and liquid swivels (18A/B) , thereby pumping liquids under pressure through the pipe manipulators (9A/B) .
10. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein a compensator frame (19) is arranged between the lower wedge set (25/26) on the snubbing unit (3) and the production tree (27) .
11. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the pipe manipulators (9A/B) comprise a locking device between the liquid swivel (18A/B) and the pipe connection for thereby coupling a pipe length to the pipe manipulator pipe connection for circulation of liquid down through the string.
12. Arrangement for continuous lowering or hoisting of pipes in pressurized or pressureless wells, wherein the compensator frame (19) comprises compensator cylinders and accumulators (29) such that snubbing can be carried out from moving vessels (1) , with a constant but adjustable tension between the snubbing unit (3) and the stationary production tree (27) .
PCT/NO2000/000368 1999-11-05 2000-11-03 An arrangement for drilling and workover of oil and gas wells WO2001033034A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU11809/01A AU1180901A (en) 1999-11-05 2000-11-03 An arrangement for drilling and workover of oil and gas wells

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
NO19995426 1999-11-05
NO995426A NO995426D0 (en) 1999-11-05 1999-11-05 Device for drilling and overhaul of oil and gas wells
NO19995641A NO995641L (en) 1999-11-05 1999-11-17 Device for drilling and overhaul of oil and gas wells
NO19995641 1999-11-17

Publications (2)

Publication Number Publication Date
WO2001033034A1 true WO2001033034A1 (en) 2001-05-10
WO2001033034B1 WO2001033034B1 (en) 2001-10-11

Family

ID=26649012

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2000/000368 WO2001033034A1 (en) 1999-11-05 2000-11-03 An arrangement for drilling and workover of oil and gas wells

Country Status (3)

Country Link
AU (1) AU1180901A (en)
NO (1) NO995641L (en)
WO (1) WO2001033034A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2401471A4 (en) * 2009-02-26 2015-09-02 West Drilling Products As Method for withdrawal and insertion of a drill pipe string in a borehole and also a device for use when practising the method
US9790752B2 (en) 2012-06-28 2017-10-17 Atlas Copco Craelius Ab Handling device and method for handling drill string components in rock drilling and rock drill rig
EP3186469A4 (en) * 2014-08-26 2018-05-30 Raptor Rig Inc. Dual device apparatus and methods usable in well drilling and other well operations
NO20162037A1 (en) * 2016-12-21 2018-06-22 Mhwirth As System and method for handling a pipe string
CN112814587A (en) * 2019-11-15 2021-05-18 四川宏华石油设备有限公司 Formula of sinking christmas tree moves fortune dolly
US11118415B2 (en) 2016-07-15 2021-09-14 Rigtec As Method and arrangement for transporting drill pipes

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390654A (en) * 1967-03-27 1968-07-02 Automatic Drilling Mach Stabilized offshore drilling apparatus
US3949883A (en) * 1974-06-13 1976-04-13 Global Marine Inc. Hydraulically operated heavy lift system for vertically moving a string of pipe
WO1999035367A1 (en) * 1997-12-22 1999-07-15 Dolphin As Arrangements in snubbing rigs

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390654A (en) * 1967-03-27 1968-07-02 Automatic Drilling Mach Stabilized offshore drilling apparatus
US3949883A (en) * 1974-06-13 1976-04-13 Global Marine Inc. Hydraulically operated heavy lift system for vertically moving a string of pipe
WO1999035367A1 (en) * 1997-12-22 1999-07-15 Dolphin As Arrangements in snubbing rigs

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2401471A4 (en) * 2009-02-26 2015-09-02 West Drilling Products As Method for withdrawal and insertion of a drill pipe string in a borehole and also a device for use when practising the method
AU2010218497C1 (en) * 2009-02-26 2017-09-28 West Drilling Products As Method for withdrawal and insertion of a drill pipe string in a borehole and also a device for use when practising the method
US9790752B2 (en) 2012-06-28 2017-10-17 Atlas Copco Craelius Ab Handling device and method for handling drill string components in rock drilling and rock drill rig
EP3186469A4 (en) * 2014-08-26 2018-05-30 Raptor Rig Inc. Dual device apparatus and methods usable in well drilling and other well operations
US10920505B2 (en) 2014-08-26 2021-02-16 Raptor Rig Ltd. Dual device apparatus and methods usable in well drilling and other operations
US11118415B2 (en) 2016-07-15 2021-09-14 Rigtec As Method and arrangement for transporting drill pipes
EP3485132B1 (en) * 2016-07-15 2022-10-12 Rigtec AS Method and arrangement for transporting drill pipes
NO20162037A1 (en) * 2016-12-21 2018-06-22 Mhwirth As System and method for handling a pipe string
WO2018117853A1 (en) 2016-12-21 2018-06-28 Mhwirth As System and method for handling a pipe string
NO343305B1 (en) * 2016-12-21 2019-01-28 Mhwirth As System and method for handling a pipe string
CN112814587A (en) * 2019-11-15 2021-05-18 四川宏华石油设备有限公司 Formula of sinking christmas tree moves fortune dolly
CN112814587B (en) * 2019-11-15 2024-04-09 四川宏华石油设备有限公司 Sinking type christmas tree transporting trolley

Also Published As

Publication number Publication date
NO995641D0 (en) 1999-11-17
AU1180901A (en) 2001-05-14
NO995641L (en) 2001-05-07
WO2001033034B1 (en) 2001-10-11

Similar Documents

Publication Publication Date Title
US6857483B1 (en) Drilling device and method for drilling a well
US7083004B2 (en) Cantilevered multi purpose tower and method for installing drilling equipment
US10718162B2 (en) Servicing a top drive device of a wellbore drilling installation
EP2847417B1 (en) Offshore vessel and method of operation of such an offshore vessel
EP2823105B1 (en) An offshore system comprising a rig and a cantilever
US3883009A (en) Racking arm for pipe sections, drill collars, riser pipe, and the like used in well drilling operations
US6343662B2 (en) Hydraulic drilling rig
US7878735B2 (en) Marine pipelay system and method
CN201419983Y (en) Folding arm type crane of drilling platform
GB2354028A (en) Heave-compensating arrangement for a floating device.
EP3204589B1 (en) Marine riser section for subsea wellbore related operations
WO2020245408A1 (en) Retrofitting an existing offshore drilling vessel
EP0365672B1 (en) Deepwater extended hook travel attachment
AU1786399A (en) Device for moving an elongated object, in particular a riser part or a drill pipe cassette
NO163890B (en) DEVICE FOR THE REMOVAL OF A COMPONENT FROM, OR THE APPLICATION OF A COMPONENT TO, A UNDERWATER INSTALLATION.
WO2001033034A1 (en) An arrangement for drilling and workover of oil and gas wells
WO1999011518A1 (en) Apparatus for a mobile installation, especially an offshore vessel
US4231681A (en) Structure for sea-bed exploitation allowing the various functions inherent in such exploitation to be performed
CN108178110A (en) A kind of deep-sea mining water surface supports pipeline to lay recovery system
WO2021165143A1 (en) Offshore drilling vessel and installation for performing subsea wellbore related activities.
CN214397139U (en) Vessel for performing subsea wellbore related activities such as workover activities, well maintenance, installing objects on a subsea wellbore
US20220219951A1 (en) Vessel and crane for offshore operations involving energy consuming equipment or tools
CN102199996B (en) Stand connection method and device thereof
GB2226539A (en) Improvements in load handling
CN111936382A (en) Semi-submersible drilling vessel for use in, for example, harsh environments

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ CZ DE DE DK DK DM DZ EE EE ES FI FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
AK Designated states

Kind code of ref document: B1

Designated state(s): AE AG AL AM AT AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ CZ DE DE DK DK DM DZ EE EE ES FI FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: B1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

B Later publication of amended claims
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase