WO1993025772A1 - Dismountable systems for pillars and supports of buildings - Google Patents
Dismountable systems for pillars and supports of buildings Download PDFInfo
- Publication number
- WO1993025772A1 WO1993025772A1 PCT/ES1992/000064 ES9200064W WO9325772A1 WO 1993025772 A1 WO1993025772 A1 WO 1993025772A1 ES 9200064 W ES9200064 W ES 9200064W WO 9325772 A1 WO9325772 A1 WO 9325772A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pillars
- supports
- systems
- anchoring
- pillar
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/022—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
Definitions
- the present intention of the construction system is due to the current shortage of construction work. qualified and at the high cost of it as well as the need to increase yields to achieve an adequate relation in term-quality-cost.
- Figure 1 gives us a perspective view, elevation plan and a section of an anchor plate with their corresponding clubs and bundles thereof.
- FIG. 3 is a general perspective view where in addition to the 1st phase we see its connection with the phases
- the sanitation network will be made with PVC pipes that can be hung from lattice girders and slab modules, and can be brought out through the bases by service openings.
- Figure 3 shows a perspective representing the connection between the 1st and 2nd phase, as well as the connection between the 2nd and 5th phase.
- Figure 4 shows different views of Base pieces or base plan, perspective and elevation.
- Figure 5 shows a variant of foundation by points using pillars instead of clubs. To do this, stick the foot into the filling with the push screw. The studs are inserted into the Pile after removing the push screw and then the push screw is screwed in again, which will open the studs that will be embedded in the ground. An anchor plate or the base piece or base can be placed on the piles.
- the Pile tubes will be joined by threading them and placing the studs of the size of the resulting pile.
- Figure 6 shows an adjustment piece built on laminated profiles instead of sheet metal.
- Figure 8 shows a perspective view with the support detail of lattice girders.
- the lattice girders (figure 8) are made to coincide by their holes in the support plates at the ends, with the threaded rounds carried by the bases on the wings, and then the nuts are tightened on them.
- Pillar base in the corner.
- Shaft pillar corner pieces 4.- Pieces with a pillar shaft between pillars, straight outer section.
- the camera system (figure 26) will be the same as that of the 6th phase enclosure, screwing the partitions together and to the camera forming modules.
- the modules are like the plants forged but with the nails or "V" flanges arranged as indicated in Figures 31 and 32.
- 11th phase Boards are screwed to the modules and may be made of fiber cement, etc.
- the enclosure can be made of concrete or board as planned in the 6th phase. 13th phase
- the frame will adapt to the size of the tile and the number of pieces of it.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Rod-Shaped Construction Members (AREA)
- Tents Or Canopies (AREA)
Abstract
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19920918318 EP0598829A1 (en) | 1992-06-16 | 1992-08-07 | Dismountable systems for pillars and supports of buildings |
AU24840/92A AU2484092A (en) | 1992-06-16 | 1992-08-07 | Dismountable systems for pillars and supports of buildings |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES9201244A ES2063651B1 (en) | 1992-06-16 | 1992-06-16 | DETACHABLE SYSTEM FOR PILLARS AND BUILDING SUPPORTS. |
ES9201244 | 1992-06-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1993025772A1 true WO1993025772A1 (en) | 1993-12-23 |
Family
ID=8277348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/ES1992/000064 WO1993025772A1 (en) | 1992-06-16 | 1992-08-07 | Dismountable systems for pillars and supports of buildings |
Country Status (3)
Country | Link |
---|---|
AU (1) | AU2484092A (en) |
ES (1) | ES2063651B1 (en) |
WO (1) | WO1993025772A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GR1003471B (en) * | 1998-11-18 | 2000-11-03 | Self-packaged electromechanical and bearing construction frame | |
EP1748119A3 (en) * | 2005-07-28 | 2011-06-01 | GOLDBECK GmbH | Prefabricated foundation and pillar assembly for building constructions |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE203046C (en) * | ||||
US3785097A (en) * | 1972-11-06 | 1974-01-15 | W Seymour | Adjustable anchor bolt & block building and leveling means |
EP0112300A2 (en) * | 1982-12-16 | 1984-06-27 | Giovanni Gianini | Modular elements for constructing disassemblable already equipped containers to be used as working rooms of movable stations |
FR2546953A1 (en) * | 1983-06-02 | 1984-12-07 | Chenel Guy | Dismountable construction, particularly for a temporary exhibition |
EP0361039A2 (en) * | 1988-09-28 | 1990-04-04 | Ministero Dell' Universita' E Della Ricerca Scientifica E Tecnologica | Prefabricated building |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES554798A0 (en) * | 1986-05-09 | 1987-03-01 | Jimenez Belinchon Construccion | IMPROVEMENTS IN THE PURPOSE OF MAIN PAT. N. 536,874 FOR IMPROVEMENTS IN THE CONSTRUCTION OF LIGHTWEIGHT SUPPORTS FOR ELECTRICAL AND-OR SIMILAR CONDUCTIONS. |
-
1992
- 1992-06-16 ES ES9201244A patent/ES2063651B1/en not_active Expired - Lifetime
- 1992-08-07 AU AU24840/92A patent/AU2484092A/en not_active Abandoned
- 1992-08-07 WO PCT/ES1992/000064 patent/WO1993025772A1/en not_active Application Discontinuation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE203046C (en) * | ||||
US3785097A (en) * | 1972-11-06 | 1974-01-15 | W Seymour | Adjustable anchor bolt & block building and leveling means |
EP0112300A2 (en) * | 1982-12-16 | 1984-06-27 | Giovanni Gianini | Modular elements for constructing disassemblable already equipped containers to be used as working rooms of movable stations |
FR2546953A1 (en) * | 1983-06-02 | 1984-12-07 | Chenel Guy | Dismountable construction, particularly for a temporary exhibition |
EP0361039A2 (en) * | 1988-09-28 | 1990-04-04 | Ministero Dell' Universita' E Della Ricerca Scientifica E Tecnologica | Prefabricated building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GR1003471B (en) * | 1998-11-18 | 2000-11-03 | Self-packaged electromechanical and bearing construction frame | |
EP1748119A3 (en) * | 2005-07-28 | 2011-06-01 | GOLDBECK GmbH | Prefabricated foundation and pillar assembly for building constructions |
Also Published As
Publication number | Publication date |
---|---|
ES2063651R (en) | 1995-08-16 |
ES2063651B1 (en) | 1996-03-01 |
ES2063651A2 (en) | 1995-01-01 |
AU2484092A (en) | 1994-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10260224B1 (en) | Simplified precast concrete system with rapid assembly formwork | |
US9206597B2 (en) | Unitized post tension block system for masonry structures | |
ES2809717T3 (en) | Stacked structural steel wall brackets | |
US4239176A (en) | Concrete construction system | |
WO2012021055A2 (en) | Building assembly system | |
WO2012088588A1 (en) | Modular construction system and components and method | |
WO2013014305A1 (en) | Modular construction system | |
WO1995012034A1 (en) | A method of constructing a roofed structure | |
USRE21905E (en) | Building construction | |
WO1993025772A1 (en) | Dismountable systems for pillars and supports of buildings | |
EP1669503A1 (en) | Building construction method and modular shuttering method | |
US2139907A (en) | Building construction | |
WO2012106650A1 (en) | Precast construction method and apparatus | |
WO2016081989A1 (en) | Method of constructing a concrete wall in a multi-storey building | |
US1955584A (en) | Plank construction system | |
RU2323307C2 (en) | Construction method for double-sided mutually stressed reinforced concrete wall structure with heat-insulation voids | |
WO2005019550A1 (en) | Building construction method and modular shuttering method | |
JP2004316090A (en) | Construction method of block construction building | |
GB2140053A (en) | Building system | |
WO2020051002A1 (en) | Simplified precast concrete system with rapid assembly formwork | |
HRP20010056A2 (en) | The flat-soffit large-span industrial building system | |
RU2185485C1 (en) | Method for erection of building external wall | |
KR100414594B1 (en) | Block for a Steel House and The Constructing Method | |
WO2006050572A1 (en) | Modular building construction apparatus and methods | |
AU700655B2 (en) | A method of constructing a roofed structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AT AU BB BG BR CA CH CS DE DK ES FI GB HU JP KP KR LK LU MG MN MW NL NO PL RO RU SD SE US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL SE BF BJ CF CG CI CM GA GN ML MR SN TD TG |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1992918318 Country of ref document: EP |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWP | Wipo information: published in national office |
Ref document number: 1992918318 Country of ref document: EP |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 1992918318 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
NENP | Non-entry into the national phase |
Ref country code: CA |