USH1815H - Method of offshore platform construction using a tension-moored barge - Google Patents

Method of offshore platform construction using a tension-moored barge Download PDF

Info

Publication number
USH1815H
USH1815H US08/821,951 US82195197A USH1815H US H1815 H USH1815 H US H1815H US 82195197 A US82195197 A US 82195197A US H1815 H USH1815 H US H1815H
Authority
US
United States
Prior art keywords
barge
deck
offshore platform
tethers
substructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US08/821,951
Inventor
Robert B. Campbell
Stephen D. Vaughn
John B. Wardell
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
Exxon Production Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxon Production Research Co filed Critical Exxon Production Research Co
Priority to US08/821,951 priority Critical patent/USH1815H/en
Assigned to EXXON PRODUCTION RESEARCH COMPANY reassignment EXXON PRODUCTION RESEARCH COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: VAUGHN, STEPHEN D., WARDELL, JOHN B., CAMPBELL, ROBERT B.
Application granted granted Critical
Publication of USH1815H publication Critical patent/USH1815H/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B77/00Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge

Definitions

  • the present invention relates generally to construction of marine structures used in offshore petroleum operations. More particularly, but not by way of limitation, the present invention relates to a method of installing an integrated deck structure onto an offshore platform substructure. Specifically, the invention pertains to a method for using a tension-moored barge to minimize wave-induced motion, and damages resulting therefrom, during mating of an integrated deck structure with an offshore platform substructure.
  • an offshore platform comprising a trussed steel framework substructure secured to the seafloor with an above-water deck mounted on top is commonly used to drill for and produce oil and gas.
  • the trussed steel framework substructure is commonly referred to as a "jacket”.
  • a traditional approach to constructing an offshore platform is to lift individual components of a deck structure onto a preinstalled jacket with a barge-mounted crane and then to interconnect the components and the jacket.
  • This approach can be quite expensive due to the extensive offshore construction required.
  • Offshore construction costs can be high due to the need for special offshore construction vessels and because of downtime caused by such uncontrollable factors as inclement weather and rough seas.
  • offshore construction may require many months to complete.
  • integrated deck approach In an alternate approach to offshore platform construction, known as the "integrated deck approach", a one-piece deck structure or “integrated deck” is used, with most or all components being integrated at an onshore construction yard. The integrated deck is then transported by a vessel such as a barge to the location of a preinstalled jacket, where the integrated deck and the jacket are mated.
  • a vessel such as a barge
  • the integrated deck and the jacket are mated.
  • an integrated deck is mated to a preinstalled jacket either by the use of cranes on offshore crane vessels or by lowering the deck onto the jacket using a float-on deck setting procedure.
  • the second method involves mounting the deck onto a barge, maneuvering the barge into a slot in the jacket framework, properly aligning the barge/deck combination with the jacket, then lowering the deck until it engages the jacket structure.
  • the deck is lowered by ballasting the barge; however, alternatively, a deck-lowering mechanism can be incorporated into the barge.
  • the deck load is then transferred to the jacket and the barge is disconnected from the deck and removed from the jacket slot.
  • U.S. Pat. No. 5,219,451 (Datta et al.) describes an integrated deck provided with shock absorbing stabbing tip assemblies for engagement with the upstanding columns of a jacket substructure.
  • the stabbing tip assemblies include coaxially arranged locating pins which are dropped into position to restrict lateral movement of the deck relative to the upstanding columns and annular resilient collars for transferring vertical and lateral shock loads between the columns and the deck.
  • 4,930,938 (Rawstron et al.) describes a deck-to-jacket mating assembly fitted with primary and secondary load transfer devices, wherein both devices utilize compression spring systems for transferring vertical and lateral shock loads between the columns and the deck.
  • U.S. Pat. No. 4,848,967 (Weyler) describes a deck to jacket load transfer system which utilizes a non-linear spring system for a soft response at initial impact which transitions to a stiff response.
  • U.S. Pat. No. 4,655,641 (Weyler) describes the use of a stabbing pin assembly which accommodates for wave-induced lateral movement by use of cantilevered springs which are received by receiving members in the jacket structure.
  • Each receiving member is secured in a manner which permits it to tilt in response to lateral forces applied to the receiving member above its bottom end, but which does not permit the receiving member to tilt in response to lateral forces applied to the receiving member at its bottom end.
  • a resilient member adapted to apply a restoring force to the receiving member when the receiving member tilts, surrounds each receiving member.
  • the offshore petroleum industry has sought to alleviate the problems associated with wave-induced motion during mating of an integrated deck structure to a preinstalled jacket structure with an ever-growing array of load transference and alignment devices. While these devices can enable deck setting procedures in periods of relatively fair weather and calm water, such conditions often do not coincide with an optimum project completion schedule, and the costs associated with such devices can be substantial.
  • mooring methods as currently utilized do not alleviate the shock load damage potential of current deck installation methods. Therefore, a need exists for a deck setting procedure operable in inclement weather and rough seas.
  • the present invention is a method of mating a barge-borne integrated deck with a preinstalled offshore jacket. More particularly, the invention is a method of reducing shock load damage potential associated with mating the integrated deck with the offshore jacket by securing tethers from the barge to foundation elements and then tensioning the tethers so as to reduce wave-induced motions of the barge.
  • U.S. Pat. Nos. 3,577,946 (Horton), 3,648,638 (Blenkarn) and 3,780,685 (Horton) discuss methods for using tensioned mooring to control wave-induced motions of an offshore platform. However, these patents do not disclose or suggest implementation of tensioned mooring to alleviate shock load damage potential associated with installation of an integrated deck onto an offshore jacket.
  • the barge/deck combination is positioned within a receiving slot in the jacket to approximately align the deck with the jacket onto which it will be installed. Tethers are then secured between the barge and foundation elements. The lower ends of the tethers are connected to the foundation elements either prior to or after positioning of the barge/deck combination in the jacket slot. The upper ends of the tethers are generally connected to the barge/deck combination after it is positioned in the jacket slot, but may be connected to the barge/deck combination before it is positioned in the jacket slot. Once connected to both the barge and the foundation elements, the tethers are tensioned to secure the barge against wave-induced motion.
  • the simultaneous lowering is accomplished by ballasting the barge while simultaneously jacking/lifting on the tethers to maintain the tension loads in the tethers at an approximately constant value.
  • This simultaneous jacking/lifting and ballasting operation continues in a gradual manner until initial contact is made between the bottom of the deck and the top of the jacket.
  • interface guides engage to provide proper positioning of the deck in the longitudinal and transverse directions. Final lowering is initiated only when lateral motion shock loads are within the tolerance designed into the jacket interface.
  • a lowering method such as a sand jack system, a system of hydraulic jacks, or other similar system incorporated into the deck-to-barge support system, can be used to lower only the deck while the barge remains stationary.
  • Interface guides are employed, as above, to provide for proper positioning of the deck in the longitudinal and transverse directions.
  • FIG. 1A is a front elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to the seafloor;
  • FIG. 1B and FIG. 1C are sketches illustrating how interface guides engage to align deck legs to jacket legs.
  • FIG. 2 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to the seafloor;
  • FIG. 3 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to tether base structures attached to the jacket;
  • FIG. 4 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to skirt piles attached to the jacket.
  • the method of installing an integrated deck onto an offshore substructure having a slot in an upper end thereof for receiving a barge carrying the integrated deck comprises the steps of: (a) positioning the barge within the slot in the offshore substructure such that the integrated deck is approximately aligned with the offshore substructure; (b) installing a plurality of tethers between the barge and a plurality of foundation elements; (c) tensioning the tethers such that the barge is maintained at a deeper draft than would be provided by the buoyancy of the barge alone; (d) lowering the integrated deck to contact the offshore substructure; and (d) ballasting the barge to assist in transferring the weight of the deck onto the offshore substructure.
  • FIG. 1A The method of the present invention can be better understood by reference to FIG. 1A.
  • An integrated deck 12, supported by a barge 14, is transported to and positioned within the slot 13 of a jacket 10 fixed to the seafloor 3.
  • the deck 12 includes drilling, hydrocarbon processing, and other equipment as required for a particular application.
  • the barge 14 may be any suitable vessel known to those skilled in the art for transporting the integrated deck 12 to the jacket 10.
  • the integrated deck 12 is connected to the barge 14 by a deck-to-barge support system 16.
  • the integrated deck 12 has a plurality of downwardly extending deck legs 21 designed to mate with corresponding, upwardly extending jacket legs 22.
  • the barge 14/integrated deck 12 combination is maneuvered into the slot 13 of the jacket 10, providing for appropriate vertical and lateral clearances, and is positioned so as to approximately align the deck legs 21 with their corresponding jacket legs 22.
  • Tethers 18 are then connected between the barge 14 and foundation elements.
  • the foundation elements can be special purpose foundation elements such as the anchor piles 20 embedded into the seafloor as shown in FIG. 1A and FIG. 2.
  • the foundation elements can be a part of the jacket structure, such as the tether base structures 23 attached to the jacket 10 as shown in FIG. 3; or other structures, such as skirt piles 25 (shown in FIG. 4) can serve as foundation elements.
  • the tethers 18, are connected to foundation elements such as anchor piles 20, and then fixed to the barge 14 at tether supports 19 incorporated into the barge 14.
  • the tethers 18 can be connected to the foundation elements before the arrival of the barge 14 and then connected to the barge 14 after its arrival.
  • jacking/lifting devices are incorporated into the tether connections for use in controlling the tension loads in the tethers.
  • the barge 14 is preferably ballasted so that the barge 14/integrated deck 12 combination can be tensioned by subsequent deballasting. If ballasted during the positioning procedure, the barge 14 is then deballasted, increasing the tension loads on the tethers 18, such that vertical wave-induced motion is minimized and lateral wave-induced motion is limited.
  • the integrated deck 12 can then be lowered onto the jacket 10, with minimum impact from wave-induced motion, using any suitable procedure.
  • the tethers 18 may be tensioned with jacking/lifting devices incorporated into the tether connections.
  • both the barge 14 and integrated deck 12 are lowered together.
  • the tethers 18 are jacked/lifted to force the barge 14 downward while the barge 14 is simultaneously ballasted, so as to maintain the tension loads in the tethers 18 at an approximately constant value.
  • the jacking/lifting and ballasting continues so as to lower the integrated deck 12 gradually towards the jacket 10.
  • interface guides 26 Prior to vertical contact between the deck legs 21 and the jacket legs 22, interface guides 26 (see FIG. 1B and FIG. 1C) are engaged to properly align the deck legs 21 to the jacket legs 22 in the longitudinal and transverse directions.
  • Final lowering of the integrated deck 12 to the jacket 10 commences when the shock loads associated with lateral motions of the barge 14 are within the structural tolerance of the jacket legs 22.
  • the tethers 18 are jacked/lifted and the barge 14 is ballasted to maintain tension loads in the tethers 18, thus still minimizing wave-induced motions during transfer of weight of the integrated deck 12 to the jacket 10.
  • the barge 14 is disconnected from the integrated deck 12 by disconnect means, such as spacer/drop blocks (not shown) incorporated into the deck-to-barge support system. Jacking/lifting of the tethers 18 is reversed and ballasting of the barge 14 continues, thus unloading tension from the tethers 18.
  • the tethers 18 are then disconnected from the tether supports 19 and the barge 14 is maneuvered out of the jacket slot 13.
  • the integrated deck 12 alone is lowered while the barge 14 draft remains unchanged.
  • a jack system (not shown), such as a sand jack system or hydraulic jack system, incorporated into the deck-to-barge support system 16 gradually lowers the integrated deck 12 towards the jacket 10.
  • the interface guides 26 Prior to vertical contact between the deck legs 21 and the jacket legs 22, the interface guides 26 are engaged to properly align the deck legs 21 to the jacket legs 22 in the longitudinal and transverse directions.
  • Final lowering of the integrated deck 12 to the jacket 10 commences when the shock loads associated with lateral motions of the barge 14 are within the structural tolerance of the jacket legs 22.
  • the tethers 18 are jacked/lifted as necessary and the barge 14 is ballasted to maintain tension loads in the tethers 18, thus still minimizing wave-induced motions during transfer of the weight of the integrated deck 12 to the jacket 10.
  • the barge 14 is disconnected from the integrated deck 12 by disconnect means such as spacer/drop blocks incorporated into the deck-to-barge support system. Jacking/lifting of the tethers 18 is reversed and ballasting of the barge 14 continues, thus unloading tension from the tethers 18.
  • the tethers 18 are then disconnected from the tether supports 19 and the barge 14 is maneuvered out of the jacket slot 13.
  • the alignment-aiding, load transfer method of the present invention provides an effective means for mating an integrated deck with an offshore substructure.
  • the method reduces the possibility of shock load damage by minimizing the shock loads associated with wave-induced motion, rather than attempting to compensate for it.
  • the above-described method should effect a significant reduction in the installation time of an integrated deck, thereby reducing the cost of the operation and making such float-on deck setting procedures possible in areas given to extended periods of adverse weather with relatively short windows of opportunity for performing such a procedure.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

A method of installing an integrated deck onto an offshore platform substructure. The integrated deck is held by a support structure on a barge and transported to a preinstalled offshore platform substructure which is adapted to receive the barge and allow aligning of the integrated deck with the substructure for mating operations. Once the barge is positioned within the substructure, tethers are connected between the barge and anchoring foundation elements to moor the barge. Then the tethers are tensioned to minimize both vertical movement and lateral movement caused by wave action. Mating of the integrated deck and the substructure proceeds while tension loads in the tethers are maintained.

Description

FIELD OF THE INVENTION
The present invention relates generally to construction of marine structures used in offshore petroleum operations. More particularly, but not by way of limitation, the present invention relates to a method of installing an integrated deck structure onto an offshore platform substructure. Specifically, the invention pertains to a method for using a tension-moored barge to minimize wave-induced motion, and damages resulting therefrom, during mating of an integrated deck structure with an offshore platform substructure.
BACKGROUND
In offshore petroleum operations, an offshore platform comprising a trussed steel framework substructure secured to the seafloor with an above-water deck mounted on top is commonly used to drill for and produce oil and gas. The trussed steel framework substructure is commonly referred to as a "jacket".
A traditional approach to constructing an offshore platform is to lift individual components of a deck structure onto a preinstalled jacket with a barge-mounted crane and then to interconnect the components and the jacket. This approach can be quite expensive due to the extensive offshore construction required. Offshore construction costs can be high due to the need for special offshore construction vessels and because of downtime caused by such uncontrollable factors as inclement weather and rough seas. In the case of very large platforms, or platforms located in remote areas, offshore construction may require many months to complete.
In an alternate approach to offshore platform construction, known as the "integrated deck approach", a one-piece deck structure or "integrated deck" is used, with most or all components being integrated at an onshore construction yard. The integrated deck is then transported by a vessel such as a barge to the location of a preinstalled jacket, where the integrated deck and the jacket are mated. By using the integrated deck approach, offshore construction time can be greatly reduced. This not only substantially reduces offshore construction costs, but makes the integrated deck approach attractive for offshore areas having short windows of time suitable for construction due to periods of inclement weather or rough seas.
Typically, an integrated deck is mated to a preinstalled jacket either by the use of cranes on offshore crane vessels or by lowering the deck onto the jacket using a float-on deck setting procedure. The second method involves mounting the deck onto a barge, maneuvering the barge into a slot in the jacket framework, properly aligning the barge/deck combination with the jacket, then lowering the deck until it engages the jacket structure. Typically, the deck is lowered by ballasting the barge; however, alternatively, a deck-lowering mechanism can be incorporated into the barge. The deck load is then transferred to the jacket and the barge is disconnected from the deck and removed from the jacket slot. Such a procedure is described in greater detail in U.S. Pat. No. 4,242,011 (Karsan et al.).
Major complications can arise during the integrated deck/jacket mating procedure, due in large part to significant wave-induced relative vertical motion between the barge-mounted integrated deck and the bottom-founded jacket. The shock of wave-induced contact between the deck and jacket can cause appreciable damage to both structures, resulting in delays in completing construction of the offshore platform and in extra expense to repair or replace any damaged equipment.
Attempts to accommodate the wave-induced motion are described in various U.S. patents. For example, U.S. Pat. No. 5,219,451 (Datta et al.) describes an integrated deck provided with shock absorbing stabbing tip assemblies for engagement with the upstanding columns of a jacket substructure. The stabbing tip assemblies include coaxially arranged locating pins which are dropped into position to restrict lateral movement of the deck relative to the upstanding columns and annular resilient collars for transferring vertical and lateral shock loads between the columns and the deck. U.S. Pat. No. 4,930,938 (Rawstron et al.) describes a deck-to-jacket mating assembly fitted with primary and secondary load transfer devices, wherein both devices utilize compression spring systems for transferring vertical and lateral shock loads between the columns and the deck. U.S. Pat. No. 4,848,967 (Weyler) describes a deck to jacket load transfer system which utilizes a non-linear spring system for a soft response at initial impact which transitions to a stiff response. U.S. Pat. No. 4,655,641 (Weyler) describes the use of a stabbing pin assembly which accommodates for wave-induced lateral movement by use of cantilevered springs which are received by receiving members in the jacket structure. Each receiving member is secured in a manner which permits it to tilt in response to lateral forces applied to the receiving member above its bottom end, but which does not permit the receiving member to tilt in response to lateral forces applied to the receiving member at its bottom end. A resilient member, adapted to apply a restoring force to the receiving member when the receiving member tilts, surrounds each receiving member.
In addition, the well known maritime practice of mooring, for holding a vessel in position within an acceptable range of lateral movement, has been used in association with integrated deck installation procedures. U.S. Pat. Nos. 4,648,751 (Coleman), 4,744,697 (Coppens), and 5,037,241 (Vaughn et al.) all describe the mooring of a barge/vessel in relation to the position of an offshore platform substructure such as a jacket.
As indicated by the foregoing, the offshore petroleum industry has sought to alleviate the problems associated with wave-induced motion during mating of an integrated deck structure to a preinstalled jacket structure with an ever-growing array of load transference and alignment devices. While these devices can enable deck setting procedures in periods of relatively fair weather and calm water, such conditions often do not coincide with an optimum project completion schedule, and the costs associated with such devices can be substantial. In addition, mooring methods as currently utilized do not alleviate the shock load damage potential of current deck installation methods. Therefore, a need exists for a deck setting procedure operable in inclement weather and rough seas.
SUMMARY OF THE INVENTION
The present invention is a method of mating a barge-borne integrated deck with a preinstalled offshore jacket. More particularly, the invention is a method of reducing shock load damage potential associated with mating the integrated deck with the offshore jacket by securing tethers from the barge to foundation elements and then tensioning the tethers so as to reduce wave-induced motions of the barge. U.S. Pat. Nos. 3,577,946 (Horton), 3,648,638 (Blenkarn) and 3,780,685 (Horton), for example, discuss methods for using tensioned mooring to control wave-induced motions of an offshore platform. However, these patents do not disclose or suggest implementation of tensioned mooring to alleviate shock load damage potential associated with installation of an integrated deck onto an offshore jacket.
In the method of the present invention, the barge/deck combination is positioned within a receiving slot in the jacket to approximately align the deck with the jacket onto which it will be installed. Tethers are then secured between the barge and foundation elements. The lower ends of the tethers are connected to the foundation elements either prior to or after positioning of the barge/deck combination in the jacket slot. The upper ends of the tethers are generally connected to the barge/deck combination after it is positioned in the jacket slot, but may be connected to the barge/deck combination before it is positioned in the jacket slot. Once connected to both the barge and the foundation elements, the tethers are tensioned to secure the barge against wave-induced motion.
The barge and deck are then simultaneously lowered, in order to lower the deck onto the jacket. In one embodiment of the present invention, the simultaneous lowering is accomplished by ballasting the barge while simultaneously jacking/lifting on the tethers to maintain the tension loads in the tethers at an approximately constant value. This simultaneous jacking/lifting and ballasting operation continues in a gradual manner until initial contact is made between the bottom of the deck and the top of the jacket. Just before vertical contact is made, interface guides engage to provide proper positioning of the deck in the longitudinal and transverse directions. Final lowering is initiated only when lateral motion shock loads are within the tolerance designed into the jacket interface.
In an alternative embodiment, a lowering method, such as a sand jack system, a system of hydraulic jacks, or other similar system incorporated into the deck-to-barge support system, can be used to lower only the deck while the barge remains stationary. Interface guides are employed, as above, to provide for proper positioning of the deck in the longitudinal and transverse directions.
In both cases, once the deck has engaged the jacket, simultaneous jacking/lifting and ballasting maintains tension in the tethers while the weight of the deck is transferred to the jacket. When the load transfer is complete, the barge is separated from the deck. The jacking/lifting of the tethers is then reversed and ballasting is continued in order to unload tension from the tethers, which are then disconnected. The barge is then removed from the jacket slot, completing the operation.
BRIEF DESCRIPTION OF THE DRAWINGS
The present invention and its advantages will be better understood by referring to the following detailed description and the attached drawings in which:
FIG. 1A is a front elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to the seafloor;
FIG. 1B and FIG. 1C are sketches illustrating how interface guides engage to align deck legs to jacket legs.
FIG. 2 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to the seafloor;
FIG. 3 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to tether base structures attached to the jacket; and
FIG. 4 is a side elevational view of a barge-borne integrated deck positioned within a receiving slot of an offshore jacket with the barge tension-moored to skirt piles attached to the jacket.
While the invention will be described in connection with its preferred embodiments, it will be understood that the invention is not limited thereto. On the contrary, the invention is intended to cover all alternatives, modifications, and equivalents which may be included within the spirit and scope of the invention, as defined by the appended claims.
DETAILED DESCRIPTION OF THE INVENTION
The method of installing an integrated deck onto an offshore substructure having a slot in an upper end thereof for receiving a barge carrying the integrated deck, comprises the steps of: (a) positioning the barge within the slot in the offshore substructure such that the integrated deck is approximately aligned with the offshore substructure; (b) installing a plurality of tethers between the barge and a plurality of foundation elements; (c) tensioning the tethers such that the barge is maintained at a deeper draft than would be provided by the buoyancy of the barge alone; (d) lowering the integrated deck to contact the offshore substructure; and (d) ballasting the barge to assist in transferring the weight of the deck onto the offshore substructure.
The method of the present invention can be better understood by reference to FIG. 1A. Although the following discussion will refer to installation of an integrated deck onto a steel "jacket", it will be recognized that the discussion will be equally applicable to installation of any number of deck structures, including without limitation steel and/or concrete deck structures, onto any number of substructures, including without limitation steel, concrete, and/or gravity substructures. An integrated deck 12, supported by a barge 14, is transported to and positioned within the slot 13 of a jacket 10 fixed to the seafloor 3. The deck 12 includes drilling, hydrocarbon processing, and other equipment as required for a particular application. The barge 14 may be any suitable vessel known to those skilled in the art for transporting the integrated deck 12 to the jacket 10. The integrated deck 12 is connected to the barge 14 by a deck-to-barge support system 16. The integrated deck 12 has a plurality of downwardly extending deck legs 21 designed to mate with corresponding, upwardly extending jacket legs 22.
The barge 14/integrated deck 12 combination is maneuvered into the slot 13 of the jacket 10, providing for appropriate vertical and lateral clearances, and is positioned so as to approximately align the deck legs 21 with their corresponding jacket legs 22. Tethers 18 are then connected between the barge 14 and foundation elements. The foundation elements can be special purpose foundation elements such as the anchor piles 20 embedded into the seafloor as shown in FIG. 1A and FIG. 2. Alternatively, the foundation elements can be a part of the jacket structure, such as the tether base structures 23 attached to the jacket 10 as shown in FIG. 3; or other structures, such as skirt piles 25 (shown in FIG. 4) can serve as foundation elements.
Referring again to FIG. 1A, the tethers 18, are connected to foundation elements such as anchor piles 20, and then fixed to the barge 14 at tether supports 19 incorporated into the barge 14. Alternatively, the tethers 18 can be connected to the foundation elements before the arrival of the barge 14 and then connected to the barge 14 after its arrival. Preferably, jacking/lifting devices (not shown) are incorporated into the tether connections for use in controlling the tension loads in the tethers. Once the tethers 18 are connected to both the barge 14 and the foundation elements, the position of the tethers 18 may be vertical (FIGS. 1A, 2, and 3) or inclined from vertical (FIG. 4).
During the positioning of the barge 14, the barge 14 is preferably ballasted so that the barge 14/integrated deck 12 combination can be tensioned by subsequent deballasting. If ballasted during the positioning procedure, the barge 14 is then deballasted, increasing the tension loads on the tethers 18, such that vertical wave-induced motion is minimized and lateral wave-induced motion is limited. The integrated deck 12 can then be lowered onto the jacket 10, with minimum impact from wave-induced motion, using any suitable procedure. Alternatively, the tethers 18 may be tensioned with jacking/lifting devices incorporated into the tether connections.
In one embodiment of the invention, both the barge 14 and integrated deck 12 are lowered together. The tethers 18 are jacked/lifted to force the barge 14 downward while the barge 14 is simultaneously ballasted, so as to maintain the tension loads in the tethers 18 at an approximately constant value. The jacking/lifting and ballasting continues so as to lower the integrated deck 12 gradually towards the jacket 10. Prior to vertical contact between the deck legs 21 and the jacket legs 22, interface guides 26 (see FIG. 1B and FIG. 1C) are engaged to properly align the deck legs 21 to the jacket legs 22 in the longitudinal and transverse directions. Final lowering of the integrated deck 12 to the jacket 10 commences when the shock loads associated with lateral motions of the barge 14 are within the structural tolerance of the jacket legs 22. After the deck 12 engages the jacket 10, the tethers 18 are jacked/lifted and the barge 14 is ballasted to maintain tension loads in the tethers 18, thus still minimizing wave-induced motions during transfer of weight of the integrated deck 12 to the jacket 10. When the load transfer is completed, the barge 14 is disconnected from the integrated deck 12 by disconnect means, such as spacer/drop blocks (not shown) incorporated into the deck-to-barge support system. Jacking/lifting of the tethers 18 is reversed and ballasting of the barge 14 continues, thus unloading tension from the tethers 18. The tethers 18 are then disconnected from the tether supports 19 and the barge 14 is maneuvered out of the jacket slot 13.
In an alternate embodiment, the integrated deck 12 alone is lowered while the barge 14 draft remains unchanged. A jack system (not shown), such as a sand jack system or hydraulic jack system, incorporated into the deck-to-barge support system 16 gradually lowers the integrated deck 12 towards the jacket 10. Prior to vertical contact between the deck legs 21 and the jacket legs 22, the interface guides 26 are engaged to properly align the deck legs 21 to the jacket legs 22 in the longitudinal and transverse directions. Final lowering of the integrated deck 12 to the jacket 10 commences when the shock loads associated with lateral motions of the barge 14 are within the structural tolerance of the jacket legs 22. After the integrated deck 12 is sufficiently lowered by the jack system to engage the jacket 10, the tethers 18 are jacked/lifted as necessary and the barge 14 is ballasted to maintain tension loads in the tethers 18, thus still minimizing wave-induced motions during transfer of the weight of the integrated deck 12 to the jacket 10. When the load transfer is completed, the barge 14 is disconnected from the integrated deck 12 by disconnect means such as spacer/drop blocks incorporated into the deck-to-barge support system. Jacking/lifting of the tethers 18 is reversed and ballasting of the barge 14 continues, thus unloading tension from the tethers 18. The tethers 18 are then disconnected from the tether supports 19 and the barge 14 is maneuvered out of the jacket slot 13.
The alignment-aiding, load transfer method of the present invention provides an effective means for mating an integrated deck with an offshore substructure. The method reduces the possibility of shock load damage by minimizing the shock loads associated with wave-induced motion, rather than attempting to compensate for it. In addition, the above-described method should effect a significant reduction in the installation time of an integrated deck, thereby reducing the cost of the operation and making such float-on deck setting procedures possible in areas given to extended periods of adverse weather with relatively short windows of opportunity for performing such a procedure.
The present invention is subject to variations, modifications, and changes in detail, and it is therefore intended that all subject matter discussed above and shown in the accompanying drawings be interpreted as illustrative and not in a limiting sense. For example, the method could be used to mate an integrated deck to a gravity base substructure, or to a tension leg platform substructure, or in any instance where a platform substructure is secured to the seafloor. Any such variations, modifications, and changes in detail are included within the scope of the present invention as defined by the following claims.

Claims (15)

We claim:
1. A method of installing an integrated deck onto an offshore platform substructure having a slot in an upper end thereof for receiving a barge carrying said integrated deck, comprising the steps of:
(a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;
(b) installing a plurality of tethers between said barge and a plurality of foundation elements;
(c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;
(d) lowering said integrated deck to contact said offshore platform substructure; and
(e) ballasting said barge to assist in transferring the weight of said deck onto said offshore platform substructure.
2. The method of claim 1, wherein said method further comprises the steps of:
(f) disconnecting said integrated deck from said barge;
(g) disconnecting said tethers from said barge; and
(h) removing said barge from said slot in said offshore platform substructure.
3. The method of claim 1, wherein said step (b) is replaced with the step of:
(b) installing a plurality of tethers between said barge and a plurality of anchor piles driven into the seafloor.
4. The method of claim 1, wherein said step (b) is replaced with the step of:
(b) installing a plurality of tethers between said barge and a plurality of tether base structures incorporated into said offshore platform substructure.
5. The method of claim 1, wherein said tethers are tensioned by deballasting said barge.
6. The method of claim 1, where said tethers are tensioned by jacking against said barge.
7. The method of claim 1, wherein said integrated deck structure is lowered onto said offshore platform substructure by simultaneous ballasting of said barge and jacking of said tethers against said barge.
8. The method of claim 1, wherein said integrated deck structure is supported on said barge by a deck-to-barge support system and is lowered by lowering means incorporated into the deck-to-barge support system.
9. The method of claim 1, wherein said integrated deck structure is supported on said barge by a deck-to-barge support system and is lowered by a plurality of sand jacks incorporated into the deck-to-barge support system.
10. The method of claim 1, wherein said integrated deck structure is supported on said barge by a deck-to-barge support system and is lowered by a plurality of hydraulic jacks incorporated into the deck-to-barge support system.
11. A method of installing an integrated deck onto an offshore platform substructure, comprising a steel jacket substructure anchored to the seafloor, and having a slot in an upper end thereof for receiving a barge carrying said integrated deck, said method comprising the steps of:
(a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;
(b) installing a plurality of tethers between said barge and a plurality of foundation elements;
(c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;
(d) lowering said integrated deck to contact said offshore platform substructure; and
(e) ballasting said barge to assist in transferring the weight of said deck onto said offshore platform substructure.
12. A method of installing an integrated deck onto an offshore platform substructure, comprising a gravity base substructure resting on the seafloor, and having a slot in an upper end thereof for receiving a barge carrying said integrated deck, said method comprising the steps of:
(a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;
(b) installing a plurality of tethers between said barge and a plurality foundation elements;
(c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;
(d) lowering said integrated deck to contact said offshore platform substructure; and
(e) ballasting said barge to assist in transferring the weight of said deck onto said offshore platform substructure.
13. A method of installing an integrated deck onto an offshore platform substructure, comprising a tension leg platform substructure tension-moored to the seafloor, and having a slot in an upper end thereof for receiving a barge carrying said integrated deck, said method comprising the steps of:
(a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;
(b) installing a plurality of tethers between said barge and a plurality of foundation elements;
(c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;
(d) lowering said integrated deck to contact said offshore platform substructure; and
(e) ballasting said barge to assist in transferring the weight of said deck onto said offshore platform substructure.
14. A method of installing an integrated deck onto an offshore platform substructure having a slot in an upper end thereof for receiving a barge carrying said integrated deck, comprising the steps of:
(a) positioning said barge within said slot in said offshore platform substructure such that said integrated deck is approximately aligned with said offshore platform substructure;
(b) installing a plurality of tethers between said barge and a plurality of foundation elements;
(c) tensioning said tethers such that said barge is maintained at a deeper draft than would be provided by the buoyancy of said barge alone;
(d) lowering said integrated deck to contact said offshore platform substructure;
(e) transferring the weight of said deck onto said offshore platform substructure; and
(f) removing said barge from said slot in said offshore platform substructure.
15. The method of claim 14, wherein step (f) comprises:
(a) disconnecting said integrated deck from said barge; and
(b) disconnecting said tethers from said barge.
US08/821,951 1997-03-24 1997-03-24 Method of offshore platform construction using a tension-moored barge Abandoned USH1815H (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US08/821,951 USH1815H (en) 1997-03-24 1997-03-24 Method of offshore platform construction using a tension-moored barge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US08/821,951 USH1815H (en) 1997-03-24 1997-03-24 Method of offshore platform construction using a tension-moored barge

Publications (1)

Publication Number Publication Date
USH1815H true USH1815H (en) 1999-11-02

Family

ID=25234693

Family Applications (1)

Application Number Title Priority Date Filing Date
US08/821,951 Abandoned USH1815H (en) 1997-03-24 1997-03-24 Method of offshore platform construction using a tension-moored barge

Country Status (1)

Country Link
US (1) USH1815H (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001086074A1 (en) * 2000-05-09 2001-11-15 Mannesmann Rexroth Ag Device and method for the removal of offshore platforms at sea
US6612781B1 (en) * 1997-10-31 2003-09-02 Ove Arup Partnership Limited Method of transporting and installing an offshore structure
FR2838100A1 (en) * 2002-04-03 2003-10-10 Doris Engineering Positioning and installation of structure on floating platform at sea, employs vertically-tethered barge for location, then varies line tension and ballasting to deposit structure
US20130071207A1 (en) * 2011-09-20 2013-03-21 Technip France Quick release system for topsides float-over installation on offshore platforms
US20150154556A1 (en) * 2013-11-29 2015-06-04 Fedex Corporate Services, Inc. Methods and apparatus for monitoring a conveyance coupling connection using elements of a wireless node network
WO2016105192A1 (en) * 2014-12-23 2016-06-30 Heerema Marine Contractors Nederland Se Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
US9904902B2 (en) 2014-05-28 2018-02-27 Fedex Corporate Services, Inc. Methods and apparatus for pseudo master node mode operations within a hierarchical wireless network
US9973391B2 (en) 2015-07-08 2018-05-15 Fedex Corporate Services, Inc. Systems, apparatus, and methods of enhanced checkpoint summary based monitoring for an event candidate related to an ID node within a wireless node network
US9992623B2 (en) 2016-03-23 2018-06-05 Fedex Corporate Services, Inc. Methods, apparatus, and systems for enhanced multi-radio container node elements used in a wireless node network
US10572851B2 (en) 2015-02-09 2020-02-25 Fedex Corporate Services, Inc. Methods, apparatus, and systems for generating a pickup notification related to an inventory item
CN115071908A (en) * 2021-10-29 2022-09-20 中国石油工程建设有限公司 Structure of offshore platform upper module and design method and installation method thereof

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2612025A (en) * 1949-07-07 1952-09-30 William A Hunsucker Prefabricated marine structure
US2907172A (en) * 1955-09-19 1959-10-06 Shell Dev Method and apparatus for constructing offshore drilling platforms
US2934905A (en) * 1957-12-16 1960-05-03 Moore Corp Lee C Barge-carried oil well drilling equipment
US3036438A (en) * 1958-04-04 1962-05-29 Jersey Prod Res Co Caisson with float releasably attached
US3577946A (en) * 1969-02-06 1971-05-11 Deep Oil Technology Inc Stable marine construction
US3589133A (en) * 1969-05-15 1971-06-29 Combustion Eng Method of and means for mounting equipment at a subsea location
US3648638A (en) * 1970-03-09 1972-03-14 Amoco Prod Co Vertically moored platforms
CA936005A (en) * 1971-05-31 1973-10-30 Peter Bawden Drilling Services Ltd. Off shore drilling platform construction
US3780685A (en) * 1971-04-09 1973-12-25 Deep Oil Technology Inc Tension leg offshore marine apparatus
US4242011A (en) * 1978-04-03 1980-12-30 Brown & Root, Inc. Method and apparatus for forming integrated deck sub-structure assembly including arch-vessel passage means
US4648751A (en) * 1985-11-12 1987-03-10 Exxon Production Research Co. Method and apparatus for erecting offshore platforms
US4655641A (en) * 1985-10-18 1987-04-07 Exxon Production Research Co. Apparatus for aligning a platform deck and jacket
US4662788A (en) * 1985-02-01 1987-05-05 Conoco Inc. Offshore platform leg-mating apparatus and a method of assembly
US4690586A (en) * 1985-12-31 1987-09-01 Mobil Oil Corporation Method and apparatus for positioning an offshore platform jacket
US4714382A (en) * 1985-05-14 1987-12-22 Khachaturian Jon E Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
US4729695A (en) * 1985-06-19 1988-03-08 Saipem, S.P.A. Process for the installation of the enbloc superstructure of an offshore platform, and equipment for carrying it practically
US4744697A (en) * 1985-04-29 1988-05-17 Heerema Engineering Service Bv Installation and removal vessel
US4848968A (en) * 1987-02-12 1989-07-18 Heerema Engineering Services BV Stabilization system
US4848967A (en) * 1988-01-04 1989-07-18 Exxon Production Research Company Load-transfer system for mating an integrated deck with an offshore platform substructure
US4930938A (en) * 1989-06-02 1990-06-05 Exxon Production Research Company Offshore platform deck/jacket mating system and method
US4938630A (en) * 1988-08-22 1990-07-03 Conoco Inc. Method and apparatus to stabilize an offshore platform
US5037241A (en) * 1990-03-29 1991-08-06 Exxon Production Research Company Method and apparatus for setting a superstructure onto an offshore platform
US5219451A (en) * 1992-04-24 1993-06-15 Atlantic Richfield Company Offshore deck to substructure mating system and method
US5237949A (en) * 1992-05-29 1993-08-24 Shell Offshore Inc. Floating platform shallow draft hull/deck mating

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2612025A (en) * 1949-07-07 1952-09-30 William A Hunsucker Prefabricated marine structure
US2907172A (en) * 1955-09-19 1959-10-06 Shell Dev Method and apparatus for constructing offshore drilling platforms
US2934905A (en) * 1957-12-16 1960-05-03 Moore Corp Lee C Barge-carried oil well drilling equipment
US3036438A (en) * 1958-04-04 1962-05-29 Jersey Prod Res Co Caisson with float releasably attached
US3577946A (en) * 1969-02-06 1971-05-11 Deep Oil Technology Inc Stable marine construction
US3589133A (en) * 1969-05-15 1971-06-29 Combustion Eng Method of and means for mounting equipment at a subsea location
US3648638A (en) * 1970-03-09 1972-03-14 Amoco Prod Co Vertically moored platforms
US3780685A (en) * 1971-04-09 1973-12-25 Deep Oil Technology Inc Tension leg offshore marine apparatus
CA936005A (en) * 1971-05-31 1973-10-30 Peter Bawden Drilling Services Ltd. Off shore drilling platform construction
US4242011A (en) * 1978-04-03 1980-12-30 Brown & Root, Inc. Method and apparatus for forming integrated deck sub-structure assembly including arch-vessel passage means
US4252469A (en) * 1978-04-03 1981-02-24 Brown & Root, Inc. Method and apparatus for installing integrated deck structure and rapidly separating same from supporting barge means
US4252468A (en) * 1978-04-03 1981-02-24 Brown & Root, Inc. Method and apparatus for installing deck structures entailing composite shock absorbing and alignment aspects
US4662788A (en) * 1985-02-01 1987-05-05 Conoco Inc. Offshore platform leg-mating apparatus and a method of assembly
US4744697A (en) * 1985-04-29 1988-05-17 Heerema Engineering Service Bv Installation and removal vessel
US4714382A (en) * 1985-05-14 1987-12-22 Khachaturian Jon E Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
US4729695A (en) * 1985-06-19 1988-03-08 Saipem, S.P.A. Process for the installation of the enbloc superstructure of an offshore platform, and equipment for carrying it practically
US4655641A (en) * 1985-10-18 1987-04-07 Exxon Production Research Co. Apparatus for aligning a platform deck and jacket
US4648751A (en) * 1985-11-12 1987-03-10 Exxon Production Research Co. Method and apparatus for erecting offshore platforms
US4690586A (en) * 1985-12-31 1987-09-01 Mobil Oil Corporation Method and apparatus for positioning an offshore platform jacket
US4848968A (en) * 1987-02-12 1989-07-18 Heerema Engineering Services BV Stabilization system
US4848967A (en) * 1988-01-04 1989-07-18 Exxon Production Research Company Load-transfer system for mating an integrated deck with an offshore platform substructure
US4938630A (en) * 1988-08-22 1990-07-03 Conoco Inc. Method and apparatus to stabilize an offshore platform
US4930938A (en) * 1989-06-02 1990-06-05 Exxon Production Research Company Offshore platform deck/jacket mating system and method
US5037241A (en) * 1990-03-29 1991-08-06 Exxon Production Research Company Method and apparatus for setting a superstructure onto an offshore platform
US5219451A (en) * 1992-04-24 1993-06-15 Atlantic Richfield Company Offshore deck to substructure mating system and method
US5237949A (en) * 1992-05-29 1993-08-24 Shell Offshore Inc. Floating platform shallow draft hull/deck mating

Cited By (71)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6612781B1 (en) * 1997-10-31 2003-09-02 Ove Arup Partnership Limited Method of transporting and installing an offshore structure
WO2001086074A1 (en) * 2000-05-09 2001-11-15 Mannesmann Rexroth Ag Device and method for the removal of offshore platforms at sea
FR2838100A1 (en) * 2002-04-03 2003-10-10 Doris Engineering Positioning and installation of structure on floating platform at sea, employs vertically-tethered barge for location, then varies line tension and ballasting to deposit structure
US20130071207A1 (en) * 2011-09-20 2013-03-21 Technip France Quick release system for topsides float-over installation on offshore platforms
US8708604B2 (en) * 2011-09-20 2014-04-29 Technip France Quick release system for topsides float-over installation on offshore platforms
US10762465B2 (en) 2013-11-29 2020-09-01 Fedex Corporate Services, Inc. Node-enabled management of delivery of a shipped item using elements of a wireless node network
US10846649B2 (en) 2013-11-29 2020-11-24 Fedex Corporate Services, Inc. Node-enabled proactive notification of a shipping customer regarding an alternative shipping solution
US12014318B2 (en) 2013-11-29 2024-06-18 Fedex Corporate Services, Inc. Node-enabled logistics receptacle in a wireless node network
US20170311280A1 (en) * 2013-11-29 2017-10-26 Fedex Corporate Services, Inc. Methods and apparatus for monitoring a conveyance coupling connection using elements of a wireless node network
US9854556B2 (en) 2013-11-29 2017-12-26 Fedex Corporate Services, Inc. Determining node location using a master node association in a wireless node network
US11847607B2 (en) 2013-11-29 2023-12-19 Fedex Corporate Services, Inc. Multi-entity management of a node in a wireless node network
US9913240B2 (en) 2013-11-29 2018-03-06 Fedex Corporate Services, Inc. Methods and systems for automating a logistics transaction using an autonomous vehicle and elements of a wireless node network
US11734644B2 (en) 2013-11-29 2023-08-22 Fedex Corporate Services, Inc. Node-enabled shipping without a shipping label using elements of a wireless node network
US9930635B2 (en) 2013-11-29 2018-03-27 Fedex Corporate Services, Inc. Determining node location using a lower level node association in a wireless node network
US9949228B2 (en) 2013-11-29 2018-04-17 Fedex Corporation Services, Inc. Autonomous transport navigation to a shipping location using elements of a wireless node network
US9974042B2 (en) 2013-11-29 2018-05-15 Fedex Corporate Services, Inc. Node-enabled monitoring of a piece of equipment using a hierarchical node network
US11720852B2 (en) 2013-11-29 2023-08-08 Fedex Corporate Services, Inc. Node association payment transactions using elements of a wireless node network
US9974041B2 (en) 2013-11-29 2018-05-15 Fedex Corporate Services, Inc. Methods and apparatus for adjusting a broadcast setting of a node in a wireless node network
US11227255B2 (en) 2013-11-29 2022-01-18 Fedex Corporate Services Inc. Node-enabled delivery notification using elements of a wireless node network
US9984350B2 (en) 2013-11-29 2018-05-29 Fedex Corporate Services, Inc. Determining node location using chaining triangulation in a wireless node network
US9984348B2 (en) 2013-11-29 2018-05-29 Fedex Corporate Services, Inc. Context management of a wireless node network
US11164142B2 (en) 2013-11-29 2021-11-02 Fedex Corporate Services, Inc. Multi-entity management of a node in a wireless node network
US9984349B2 (en) 2013-11-29 2018-05-29 Fedex Corporate Services, Inc. Methods and apparatus for assessing a current location of a node-enabled logistics receptacle
US11023847B2 (en) * 2013-11-29 2021-06-01 Fedex Corporate Services, Inc. Methods and apparatus for monitoring a conveyance coupling connection using elements of a wireless node network
US10977607B2 (en) 2013-11-29 2021-04-13 Fedex Corporate Services, Inc. Node-enabled packaging materials used to ship an item
US10839340B2 (en) 2013-11-29 2020-11-17 Fedex Corporate Services, Inc. Methods and systems for automating a logistics transaction using an autonomous vehicle and elements a wireless node network
US10839339B2 (en) 2013-11-29 2020-11-17 Fedex Corporate Services, Inc. Node-enabled sharing of shipment condition information in a wireless node network
US10074069B2 (en) 2013-11-29 2018-09-11 Fedex Corporate Services, Inc. Hierarchical sensor network for a grouped set of packages being shipped using elements of a wireless node network
US10078811B2 (en) 2013-11-29 2018-09-18 Fedex Corporate Services, Inc. Determining node location based on context data in a wireless node network
US10102494B2 (en) 2013-11-29 2018-10-16 Fedex Corporate Services, Inc. Detecting a plurality of package types within a node-enabled logistics receptacle
US10157363B2 (en) 2013-11-29 2018-12-18 Fedex Corporate Services, Inc. Proximity based adaptive adjustment of node power level in a wireless node network
US20150154556A1 (en) * 2013-11-29 2015-06-04 Fedex Corporate Services, Inc. Methods and apparatus for monitoring a conveyance coupling connection using elements of a wireless node network
US10229382B2 (en) 2013-11-29 2019-03-12 Fedex Corporate Services, Inc. Methods and apparatus for proactively reporting a content status of a node-enabled logistics receptacle
US10762466B2 (en) 2013-11-29 2020-09-01 Fedex Corporate Services, Inc. Node-enabled order pickup using elements of a wireless node network
US10748111B2 (en) 2013-11-29 2020-08-18 Fedex Corporate Services, Inc. Node-enabled generation of a shipping label using elements of a wireless node network
US10740717B2 (en) 2013-11-29 2020-08-11 Fedex Corporate Services, Inc. Methods and apparatus for deploying a plurality of pickup entities for a node-enabled logistics receptacle
US10733564B2 (en) 2013-11-29 2020-08-04 Fedex Corporate Services, Inc. Methods and apparatus for proactively reporting a content status of a node-enabled logistics receptacle
US10579954B2 (en) 2013-11-29 2020-03-03 Fedex Corporate Services, Inc. Node-enabled preparation related to medical treatment for a patient using a hierarchical node network
US9978035B2 (en) 2013-11-29 2018-05-22 Fedex Corporate Services, Inc. Proximity node location using a wireless node network
US10521759B2 (en) * 2013-11-29 2019-12-31 Fedex Corporate Services, Inc. Methods and apparatus for monitoring a conveyance coupling connection using elements of a wireless node network
US9904902B2 (en) 2014-05-28 2018-02-27 Fedex Corporate Services, Inc. Methods and apparatus for pseudo master node mode operations within a hierarchical wireless network
US10453023B2 (en) 2014-05-28 2019-10-22 Fedex Corporate Services, Inc. Methods and node apparatus for adaptive node communication within a wireless node network
GB2553893B (en) * 2014-12-23 2021-03-24 Heerema Marine Contractors Nl Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
NL2014042B1 (en) * 2014-12-23 2016-10-12 Heerema Marine Contractors Nl Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure.
GB2553893A (en) * 2014-12-23 2018-03-21 Heerema Marine Contractors Nl Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
WO2016105192A1 (en) * 2014-12-23 2016-06-30 Heerema Marine Contractors Nederland Se Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
US10592845B2 (en) 2015-02-09 2020-03-17 Fedex Corporate Services, Inc. Methods, apparatus, and systems for transmitting a corrective pickup notification for a shipped item accompanying an ID node moving with a courier away from a master node
US10726383B2 (en) 2015-02-09 2020-07-28 Fedex Corporate Services, Inc. Methods, apparatus, and systems for generating a corrective pickup notification for a shipped item based upon an intended pickup master node
US10860973B2 (en) 2015-02-09 2020-12-08 Fedex Corporate Services, Inc. Enhanced delivery management methods, apparatus, and systems for a shipped item using a mobile node-enabled logistics receptacle
US10671962B2 (en) 2015-02-09 2020-06-02 Fedex Corporate Services, Inc. Methods, apparatus, and systems for transmitting a corrective pickup notification for a shipped item accompanying an ID node based upon intended pickup master node movement
US11238397B2 (en) 2015-02-09 2022-02-01 Fedex Corporate Services, Inc. Methods, apparatus, and systems for generating a corrective pickup notification for a shipped item using a mobile master node
US10572851B2 (en) 2015-02-09 2020-02-25 Fedex Corporate Services, Inc. Methods, apparatus, and systems for generating a pickup notification related to an inventory item
US10726382B2 (en) 2015-02-09 2020-07-28 Fedex Corporate Services, Inc. Methods, apparatus, and systems for transmitting a corrective pickup notification for a shipped item to a courier master node
US9985839B2 (en) 2015-07-08 2018-05-29 Fedex Corporate Services, Inc. Systems, apparatus, and methods of event monitoring for an event candidate within a wireless node network based upon sighting events, sporadic events, and benchmark checkpoint events
US10305744B2 (en) 2015-07-08 2019-05-28 Fedex Corporate Services, Inc. System, apparatus, and methods of event monitoring for an event candidate related to an ID node within a wireless node network
US10057133B2 (en) 2015-07-08 2018-08-21 Fedex Corporate Services, Inc. Systems, apparatus, and methods of enhanced monitoring for an event candidate associated with cycling power of an ID node within a wireless node network
US10313199B2 (en) 2015-07-08 2019-06-04 Fedex Corporate Services, Inc. Systems, apparatus, and methods of enhanced management of a wireless node network based upon an event candidate related to elements of the wireless node network
US10491479B2 (en) 2015-07-08 2019-11-26 Fedex Corporate Services, Inc. Systems, apparatus, and methods of time gap related monitoring for an event candidate related to an ID node within a wireless node network
US10033594B2 (en) 2015-07-08 2018-07-24 Fedex Corporate Services, Inc. Systems, apparatus, and methods of checkpoint summary based monitoring for an event candidate related to an ID node within a wireless node network
US9973391B2 (en) 2015-07-08 2018-05-15 Fedex Corporate Services, Inc. Systems, apparatus, and methods of enhanced checkpoint summary based monitoring for an event candidate related to an ID node within a wireless node network
US10484820B2 (en) 2016-03-23 2019-11-19 Fedex Corporate Services, Inc. Methods and systems for container node-based enhanced management of a multi-level wireless node network
US11096009B2 (en) 2016-03-23 2021-08-17 Fedex Corporate Services, Inc. Methods and systems for motion-based management of an enhanced logistics container
US11843990B2 (en) 2016-03-23 2023-12-12 Fedex Corporate Services, Inc. Methods and systems for motion-based management of an enhanced logistics container
US10271165B2 (en) 2016-03-23 2019-04-23 Fedex Corporate Services, Inc. Methods, apparatus, and systems for improved node monitoring in a wireless node network
US9992623B2 (en) 2016-03-23 2018-06-05 Fedex Corporate Services, Inc. Methods, apparatus, and systems for enhanced multi-radio container node elements used in a wireless node network
US10271166B2 (en) 2016-03-23 2019-04-23 Fedex Corporate Services, Inc. Methods, non-transitory computer readable media, and systems for improved communication management of a plurality of wireless nodes in a wireless node network
US11843991B2 (en) 2016-03-23 2023-12-12 Fedex Corporate Services, Inc. Methods and systems for motion-based management of an enhanced logistics container
US10187748B2 (en) 2016-03-23 2019-01-22 Fedex Corporate Services, Inc. Methods and systems for motion-enhanced package placement tracking using a container node associated with a logistic container
US10952018B2 (en) 2016-03-23 2021-03-16 Fedex Corporate Services, Inc. Systems, apparatus, and methods for self- adjusting a broadcast setting of a node in a wireless node network
US10057722B2 (en) 2016-03-23 2018-08-21 Fedex Corporate Services, Inc. Methods and systems for active shipment management using a container node within a wireless network enabled vehicle
CN115071908A (en) * 2021-10-29 2022-09-20 中国石油工程建设有限公司 Structure of offshore platform upper module and design method and installation method thereof

Similar Documents

Publication Publication Date Title
US4655641A (en) Apparatus for aligning a platform deck and jacket
US6340272B1 (en) Method for constructing an offshore platform
USH1815H (en) Method of offshore platform construction using a tension-moored barge
US4435108A (en) Method of installing sub-sea templates
NO861689L (en) MODULE INSTALLATION AND REMOVAL SYSTEM.
US4417831A (en) Mooring and supporting apparatus and methods for a guyed marine structure
US20080017093A1 (en) Drawdown apparatus and installation method for a floating platform
CA2476754A1 (en) A method for underwater transportation and installation or removal of objects at sea
US5423632A (en) Compliant platform with slide connection docking to auxiliary vessel
US5486070A (en) Method for conducting offshore well operations
US6135673A (en) Method/apparatus for assembling a floating offshore structure
US8708604B2 (en) Quick release system for topsides float-over installation on offshore platforms
US5439324A (en) Bumper docking between offshore drilling vessels and compliant platforms
US20080089745A1 (en) Method And Device For Connecting A Riser To A Target Structure
US20100221070A1 (en) Topsides load-out to barge catamaran for float-over installation
EP2364909B1 (en) Deep Water Offshore Apparatus Assembly Method
USRE32119E (en) Mooring and supporting apparatus and methods for a guyed marine structure
WO1999048753A9 (en) Spar construction method
US6968797B2 (en) Method for installing a self-floating deck structure onto a buoyant substructure
EP0908382A2 (en) Methods of assembling floating offshore structures
Tribout et al. Float-overs offshore west Africa
US20060039758A1 (en) Apparatus and method of installation of a mono-column floating platform
US6648553B2 (en) Load transfer unit and method for removing off-shore platform from substructure
US20060204340A1 (en) Floating construction, a platform construction, a method for placing a floating platform construction at sea, and a method for removing a platform construction at sea
EP1257460A1 (en) A semi-submersible offshore lifting structure, and a method for using the same

Legal Events

Date Code Title Description
AS Assignment

Owner name: EXXON PRODUCTION RESEARCH COMPANY, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CAMPBELL, ROBERT B.;VAUGHN, STEPHEN D.;WARDELL, JOHN B.;REEL/FRAME:008467/0922;SIGNING DATES FROM 19970213 TO 19970303

STPP Information on status: patent application and granting procedure in general

Free format text: DEFENSIVE PUBLICATION OR SIR FILE