US779880A - Forming concrete piles and preparatory piles therefor. - Google Patents

Forming concrete piles and preparatory piles therefor. Download PDF

Info

Publication number
US779880A
US779880A US20287504A US1904202875A US779880A US 779880 A US779880 A US 779880A US 20287504 A US20287504 A US 20287504A US 1904202875 A US1904202875 A US 1904202875A US 779880 A US779880 A US 779880A
Authority
US
United States
Prior art keywords
pile
preparatory
hollow
piles
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US20287504A
Inventor
Constantine Shuman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US20287504A priority Critical patent/US779880A/en
Application granted granted Critical
Publication of US779880A publication Critical patent/US779880A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

3 SHEETS-SHEET 1,
PATENTED JAN.10, 1905. C. SHUMAN.
APPLIOATIONHLBD APR. 12. 1904.
FCRMING CONCRETE PILES AND PREPARATORY PILES THEREFOR.
PATENTED JAN. 1o, 1905.
. y 0. SEUMAN. EOEMING CONCRETE PILES AND PEEPAEATOEY PILES THEEEEOE.
APPLICATION FILED APR. l2, 1904.
3 SHBETS-SHBET 2.
O O O O O O O O O O C O O O O O O O G O O O .O O O O O O O O O O O O O O O O O O O O u a Il lnfnlfanum.
No` 779,880. PATENTED JAN. l0, 1905. C. SHUMAN. EORMING CONCRETE PILES AND PREPARATORY PILES THEREEOE. APPLICATION FILED 113.12, 1904.
a sHBETs-SHBET s.
f//vvwmvvvvvvmvv O 0 O O L a O 0 im O O UNITEDA STATES Patented January 10, 1905.
PATENT OFFICE.
TO FRANK SHUMAN, OF PHILADELPHIA, PENNSYLVANIA.
FORIVIING CONCRETE PILES AND PREPARATORY PILES THEREFOR SPECIFICATION forming part of Letters Patent No. 779,880, dated January 10, 1905.
Application filed .April l2, 1904- Sellal N0. 202,875.
To @ZZ whom t may concern:
Beitlmown that I, CoNsTAN'rINE SHUEAN, a citizen of the United States, residing in Philadelphia, Pennsylvania, have invented certain Improvements in Forming Concrete Piles and in Preparatory Piles Therefor, of which the following is a specification.
My invention relates to that method of forming concrete piles which consists in first driving into the ground a hollow preparatory pile and then filling the opening thus formed with the concrete of which the permanent pile is to be composed, said concrete being fed into the opening through the hollow pile and said hollow pile being either slowly or intermittently withdrawn as the filling in of the concrete progresses or being withdrawn after it has been completely filled with concrete, so as to permit the latter to flow from its lower end into the opening. Hitherto the hollow preparatory pile has for this purpose been provided with a detachable point at its lower end, said point being permitted to remain at the bottom of the opening when the hollow pile was Withdrawn, so that it served as a base or foundation for the concrete pile.
The object of my present invention is to dispense with the use of this detachable point, and this objectI attain by the use of a hollow pile having' a valved lower end, the leaves or members of, the valve being so shaped as to form a closed and preferably tapered point thereon to facilitate the driving' of the pile, but being so hung to the hollow pile that when the latter is being withdrawn they can swing outwardly, and thus provide for the free egress of the concrete from the lower end of the hollow pile.
In the accompanying drawings, Figure l is aview illustrating the formationof an opeuing in the ground by means of a preparatory pile having a valved lower end in accordance with my present invention. Fig. 2 is a view .illustrating the position of the valve members during the withdrawal of the hollow pile and the lling in of the concrete through the same. Fig. 3 is a sectional plan View of the pile on the line e c, Fig. I. Figs. 4 and 5 are views similar to Figs. l and 2, respectively, but illustrating the use of another form of preparatory pile made in accordance with my invention. Fig. 6 is a transverse section of said pile. Fig. 7 is a sectional plan view of two of said piles disposed side by side. Fig. 7 is a similar view illustrating a modification. Fig. 8 is a view, partly in section and partly in elevation, of another form of preparatory pile embodying my invention, the parts being shown in the relation occupied by them during the drivingof thepile. Fig. 9 isasimilar view showing the relation of the parts when the preparatory pile is being withdrawn. Fig. 10 is atransverse section on the line Fig. 9. Fig. 1l is a sectional plan view on the line Z (Z, Fig. 8; and Fig. l2 is a sectional plan view on the line ff, Fig. 9.
The hollow preparatory pile I (shown in Fig. l) is of cylindrical cross-section and has at its Lipper end a suitable driving-head 2 and at its lower end a ring, to which are pivoted the upper ends of the various members 4 of the valve which constitutes the point or closure for the lower end of the hollow pile during the driving operation, these members or sections of the valve being so formed that when they are closed together a tapering point or closure for the lower end of the hollow pile will be produced, so as to facilitate the driving' of the same into the ground. In order to further facilitate such d riving operation, the butts 5 of the hinges whereby the valve members are pivoted to the lower end of the preparatory pile are so formed as to constitute a rib of slightly greater diameter than the pile I, so as to form, in effect, an enlarged head or point and relieve the sides of the pile l from frictional contact with the walls of the opening Jformed by the driving of said pile into the ground, as shown in Fig. I. In order to protect the pointed lower ends of the valve members I from the shock or strain which would otherwise be exerted upon them during the driving of the preparatory pile, as well as to firmly locl these valve members together during the driving operation, I provide a shoe 12, to which the lower ends of the valve members are snugly fitted, this shoe having any desired external configuration which will not interfere with the driving of the same into the ground. IVhen the driving of lthe pile has been completed the concrete ot' which the permanent pile is to be composed is introduced into the hollow pile and the latter is then withdrawn vertically, the valve members 4 swinging outwardly, as shown in Fig. 2, so as to permitot` the free egress oil the concrete from the lower end of the hollow pile, said concrete consequently as the hollow pile is withdrawn iilling the opening' which was formed by the driving oi' said pile, the shoe 12 remaining at the bottom of the opening, as shown in Fig. 2. The concrete may be gradually i'ed into the hollow pile as the latter is being withdrawn, or, on the other hand, the hollow pile may be iilled with concrete before beginning to withdraw the same.
It will be evident that by providing` the hollow preparatory pile with a valve at the lower end in the manner described the use of a detachable point to be let't in the opening is rendered unnecessary and the expense oi' such detachable point is saved, the expense ot' the small shoe 12 being' inconsiderable.
The hollow preparatory pile shown in Figs. 4 to 7 is of rectangular instead of cylindrical crosssection, and its valved lower end or point consists oi' two members which on the withdrawal of the pile can swing down into line with the sides oit' the pile to which they are hinged. Hence it is not necessary with apile oil this character' to form an opening in the ground of larger size than the pile itseli` in order to permit ot' the swinging open oi' the valve members, as in the pile shown in Figs. 1 and 2. The hinge-butts 5 in this pile project beyond the sides oi' the pile, and consequently form grooves or channels in the sides of the opening; but it will be evident that the hinges may be so constructed that'no portion of the same will project beyond the sides of the pile. The point member 3 of this pile has but two swinging sides or valve members 4, the other two sides 6 being permanent and the swinging' sides or valve members either closing against the edges et these permanent sides if the latter are of the proper wedge shape or swinging between said permanent sides it' the latter retain their full width. One of the permanent sides 6 of the point member 3 oi' this pile is preferably beveled or inclined transversely, as shown in Fig. 6, so that in driving the pile there is a constant tendency to move the point of the same laterally or in the direction of the arrow r11, Fig. 6, a pile oi' this character being designed especially for being driven closclyside by side with another pile of the same character, so that the lateral thrust imparted to the point of the pile by the beveled side 6 of said point tends to cause it to bear [irmly against the side of a previously-driven pile and prevent the entrance of earth between the two during the driving operation. In order to lock together and maintain in a straight line a series of these piles which are being successively driven side by side, each pile has at one side projecting edge flanges 7, as shown in Fig. 7, and at the opposite side corresponding recesses 8, so that the iianges of one pile can enter the recesses of an adjoining pile, and thus. serve to hold the series in proper alinement as shown in Fig. 7. In the pile shown in Fig. 7 L a central projection 7 on one side of the pile and a corresponding central recess 8u on the opposite side ot' the pile take the place of the edge flanges and recesses of the pile shown in Fig. 7.
The pile shown in Figs. 8 to 12 is of cylindrical cross-section, and its valved lower end or point is so constructed that its members when open will occupy the same plane as the walls of the pile, and hence can open to the full extent in an opening of the same diam-v eter as the pile itself. Each of these vaive members 4b when open constitutes a segment of a circle of the same diameter as that of the pile 1", but has its upper and inner edges 9 and 10 beveled, as shown in Fig. 9, so as to permit of the closing together of the two members, as shown in Fig. 8, after the manner of the two shells of a clam or mussel, the rela; tion oi' the members when closed being as represented in Fig. 1 and their relation when open being that represented in Fig. 12. In this pile, as in that shown in Figs. 4 to 7, the projecting butts oi' the hinges whereby the valve members 4b are hung to the ring 3 form grooves or channels in the walls of the opening produced by driving the pile into the ground; but the hinges may be so constructed as to present no portions projecting beyond the pile, if desired.
In both the ,pile shown in Figs. 4 to 7 and in that shown in Figs. 8 to 12 the projecting and retaining shoe l2 is employed for the same purpose as in the pile shown in Figs. 1 and 2. Y
Having thus described my invention, I claim and desire to secure by Letters Patent@1 1. The mode herein described of forming concrete piles, said mode consisting in providing a hollow preparatory pile with valve members normally closing its lower end, driving said pile into the ground, and then withdrawing the same with its valve members, and as it is being withdrawn, introducing concrete through it into the opening which it has formed, said concrete escaping between the open valve members at the bottom of the pref paratory pile.
2. The mode herein described of forming concrete piles, said mode consisting in providing a hollow preparatory pile with valve members normally closing its lower end, locking and protecting the lower portions oi' said valve members by means of a shoe applied thereto, driving said preparatory pile and shoe into the ground, and, as it is being withdrawn, filling TOC IOE
concrete through it into the opening which it has formed, said concrete escaping between the open valve members.
3. A hollow preparatory pile for concrete piling, said pile havingswinging valve members which normally close its lower end.
4. A hollow preparatory pile having swinging valve members which normally close its lower end and form a tapering nose or point thereon.
5. A hollow preparatory pile having' swing` ing valve members which normally close its lower end and form a tapering nose or point thereon, and a shoe engaging the lower ends of said valve members, and serving to prote 13t and retain them during the driving of the p1 e. l
6. A hollow preparatory pile having swinging valve members which normally close the lower end ot' the pile, and which, when open, are substantially in line with the sides of the pile.
7. A hollow preparatory pilehaving a point structure with opposite stationary sides and opposite swinging valve members which normally close the lower end of the pile.
8. A hollow preparatory pile having a point structure with opposite stationary sides and opposite swinging valve members which normally close the lower end of the pile, one of said stationary sides being inclined or beveled so as to impart side thrust to the point ot' the pile as it is being driven.
9. A hollow preparatory pile having at its lower end a point structure, one of whose sides is beveled so as to impart side thrust to the point of the pile as it is being driven.
10. A hollow preparatory pile having portions whereby it can be locked laterally to an adjoining pile.
11. A hollow preparatory pile, having portions whereby it can be locked laterally to a pile adjoining the same on each side.
12. A hollow preparatory pile having portions whereby it can be locked laterally to an adjoining pile, and having a point structure with inclined or beveled side which imparts side thrust to the pile as it is being driven.
13. A hollow preparatory pile having portions whereby it can be locked laterally to a pile on each side of the same, and having a point structure with inclined or beveled side which imparts side thrust to the pile, as it is being driven.
14. A hollow preparatory pile having edge anges or recesses whereby it can belocked laterally to an adjoining pile.
15. A hollow preparatory pile, having edge flanges and recesses whereby it can be locked laterally to a pile adjoining the same on each side.
16. A hollow preparatory pile having edge fianges or `recesses whereby it can be locked laterally to an adjoining pile, and having a point structure with inclined or beveled side which 'imparts side thrust to the pile as it is being driven.
17. A hollow preparatory pile having edge flanges and recesses whereby it can be locked laterally to a pile on each side of the same, and having' a point structure with inclined or beveled side which imparts side thrust to the pile, as it is being driven.
In testimony whereof I have signed my name to this specification in the presence of two subscribing witnesses.
CONSTANTINE SHUMAN. Witnesses:
JAMES MoMoRRIs, J os. H. KLEIN.
US20287504A 1904-04-12 1904-04-12 Forming concrete piles and preparatory piles therefor. Expired - Lifetime US779880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US20287504A US779880A (en) 1904-04-12 1904-04-12 Forming concrete piles and preparatory piles therefor.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US20287504A US779880A (en) 1904-04-12 1904-04-12 Forming concrete piles and preparatory piles therefor.

Publications (1)

Publication Number Publication Date
US779880A true US779880A (en) 1905-01-10

Family

ID=2848364

Family Applications (1)

Application Number Title Priority Date Filing Date
US20287504A Expired - Lifetime US779880A (en) 1904-04-12 1904-04-12 Forming concrete piles and preparatory piles therefor.

Country Status (1)

Country Link
US (1) US779880A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2576507A (en) * 1949-02-14 1951-11-27 Ben C Gerwick Inc Hollow mandrel for placement of discrete material
US3830072A (en) * 1972-03-02 1974-08-20 B Visconti Footing form for casting in the ground foundation piles
US4126007A (en) * 1977-01-03 1978-11-21 L.B. Foster Company Compaction of soil
US5176219A (en) * 1991-01-31 1993-01-05 Conoco Inc. Method of sealing holes in the ground
US20080031694A1 (en) * 2004-10-27 2008-02-07 Wissmann Kord J Method of providing a rammed aggregate pier
US20080159813A1 (en) * 2004-10-27 2008-07-03 Wissmann Kord J Method of and apparatus for providing a rammed aggregate pier
US20100028087A1 (en) * 2008-07-29 2010-02-04 Geopier Foundation Company, Inc. Shielded Tamper and Method of Use for Making Aggregate Columns
US8562258B2 (en) 2008-07-29 2013-10-22 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
CN107130626A (en) * 2017-07-11 2017-09-05 湖南匡楚科技有限公司 The ground pilework of municipal concrete steel structure viaduct
CN107130599A (en) * 2017-07-11 2017-09-05 湖南匡楚科技有限公司 The pile and its installation method of municipal concrete steel structure viaduct
CN107152024A (en) * 2017-07-11 2017-09-12 湖南匡楚科技有限公司 Municipal concrete steel structure road and bridge and its installation method
CN107152023A (en) * 2017-07-11 2017-09-12 湖南匡楚科技有限公司 Municipal concrete steel structure viaduct
CN107246009A (en) * 2017-07-11 2017-10-13 湖南匡楚科技有限公司 Municipal concrete steel structure viaduct and its installation method
WO2019077416A1 (en) * 2017-10-20 2019-04-25 Olivier Industrie Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2576507A (en) * 1949-02-14 1951-11-27 Ben C Gerwick Inc Hollow mandrel for placement of discrete material
US3830072A (en) * 1972-03-02 1974-08-20 B Visconti Footing form for casting in the ground foundation piles
US4126007A (en) * 1977-01-03 1978-11-21 L.B. Foster Company Compaction of soil
US5176219A (en) * 1991-01-31 1993-01-05 Conoco Inc. Method of sealing holes in the ground
US20080031694A1 (en) * 2004-10-27 2008-02-07 Wissmann Kord J Method of providing a rammed aggregate pier
US20080159813A1 (en) * 2004-10-27 2008-07-03 Wissmann Kord J Method of and apparatus for providing a rammed aggregate pier
US8573892B2 (en) 2004-10-27 2013-11-05 Geopier Foundation Company, Inc. Method of providing a support column
US7963724B2 (en) * 2004-10-27 2011-06-21 Geopier Foundation Company, Inc. Method of providing a support column
US8043028B2 (en) 2004-10-27 2011-10-25 Geopier Foundation Company, Inc. Apparatus for providing a support column
US8562258B2 (en) 2008-07-29 2013-10-22 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
US8128319B2 (en) 2008-07-29 2012-03-06 Geopier Foundation Company, Inc. Shielded tamper and method of use for making aggregate columns
US20100028087A1 (en) * 2008-07-29 2010-02-04 Geopier Foundation Company, Inc. Shielded Tamper and Method of Use for Making Aggregate Columns
CN107246009A (en) * 2017-07-11 2017-10-13 湖南匡楚科技有限公司 Municipal concrete steel structure viaduct and its installation method
CN107130599A (en) * 2017-07-11 2017-09-05 湖南匡楚科技有限公司 The pile and its installation method of municipal concrete steel structure viaduct
CN107152024A (en) * 2017-07-11 2017-09-12 湖南匡楚科技有限公司 Municipal concrete steel structure road and bridge and its installation method
CN107152023A (en) * 2017-07-11 2017-09-12 湖南匡楚科技有限公司 Municipal concrete steel structure viaduct
CN107130626A (en) * 2017-07-11 2017-09-05 湖南匡楚科技有限公司 The ground pilework of municipal concrete steel structure viaduct
WO2019077416A1 (en) * 2017-10-20 2019-04-25 Olivier Industrie Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile
BE1025657B1 (en) * 2017-10-20 2019-05-23 Olivier Industrie Nv GROUND-DRILLING DRILL AND METHOD FOR CONVERTING A GROUND-DRILLING DRILL
AU2018352172B2 (en) * 2017-10-20 2021-08-26 Olivier Industrie Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile
US11268255B2 (en) 2017-10-20 2022-03-08 Olivier Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile
US20220127809A1 (en) * 2017-10-20 2022-04-28 Olivier Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile
US11655606B2 (en) * 2017-10-20 2023-05-23 Olivier Industrie Nv Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile

Similar Documents

Publication Publication Date Title
US779880A (en) Forming concrete piles and preparatory piles therefor.
US1270659A (en) Works such as retaining-walls, piers, and wharves.
US1940430A (en) Peg for holding tents or hangars or for anchoring aircraft and the like
US978505A (en) Metallic fence-post.
US2160773A (en) Building construction
US884354A (en) Marine concrete construction.
US4544515A (en) Method for producing in-situ concreted piles with enlarged bases
US994742A (en) Fence-post foundation.
US1275470A (en) Apparatus for setting piles.
US415037A (en) Metal pile
US1403766A (en) Apparatus for making concrete piles
US999431A (en) Method of forming concrete piles.
US1157444A (en) Method of placing and driving concrete piles.
US2323772A (en) Construction of concrete piles or the like
US763213A (en) Method of forming concrete piles.
US1654644A (en) Constructing piles
US739268A (en) Process of making concrete piles.
US2027511A (en) Method of casting bell-bottom place-piling in soft sandy material
US817595A (en) Setting concrete piles.
US997852A (en) Anchor for wire fences.
US756805A (en) Removable pile for forming concrete piling.
US1127081A (en) Incased concrete piling.
US1009312A (en) Lining-wall for shafts.
US898013A (en) Piling and method of constructing the same.
US898517A (en) Concrete pile and process of constructing the same.