US736560A - Method of constructing foundations and tunnels or other structures. - Google Patents

Method of constructing foundations and tunnels or other structures. Download PDF

Info

Publication number
US736560A
US736560A US14682503A US1903146825A US736560A US 736560 A US736560 A US 736560A US 14682503 A US14682503 A US 14682503A US 1903146825 A US1903146825 A US 1903146825A US 736560 A US736560 A US 736560A
Authority
US
United States
Prior art keywords
tunnel
foundation
shield
tunnels
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US14682503A
Inventor
Charles Sooysmith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US14682503A priority Critical patent/US736560A/en
Application granted granted Critical
Publication of US736560A publication Critical patent/US736560A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Definitions

  • My invention relates to the method of building subterranean or submarine structures and their foundations and especially the'method of constructing tunnels and theirfoundations in loose or water-bearing material.
  • Figure l is a longitudinal elevation, mostly in section, on the middle plane of the tunnel.
  • Fig. 2 is avertical cross-'section of the tunnel.
  • l is the lining or skin of the tunnel, preferably of metal and made in sections which may be bolted or otherwise attached each to each.
  • 3 is the siding or framing of the pilot-tunnel and completed foundation.
  • et is the bottom timbers of the tunnelor foundation, shown resting upon the piles 6 and to which the timbers 3 are securely fastened, the angle-irons 5, Fig. 2, assisting ⁇ in this securing.
  • ll represents the upper lining or plate constituting the ceiling or roof of the pilot-tunnel and in and on which the large tunnel rests and is constructed.
  • a B represent divisions or sections of the pilot-tunnel separated each from each bythe interior Walls of timber 3, the portions B B preferably being intended to be iilled in with concrete and the portion A to be left empty, thus providing a passage- Way open at all times both for the purpose of construction and subsequent utilization, as may be desired.
  • I My method of construction is as follows: I first prefer to drive or place in theline of the proposed tunnel a number of piles 6, preferably driven so that their heads shall lie on the line of the bottom of the completed foundation, although if they do not extend quite so deep as this it is immaterial, since they can be easily cut off on the advance of the pilottunnel shield 9.
  • This shield is constructed of such size that a man may Work comfortably within it, as illustrated in the drawings. It may or may not be found necessary'to use compressed air in the operation of this shield, the cross-section of which is that of the foundation, (shown in Fig. 2 as a substantial trapezoid,) only that the upper sidell is concaved.
  • this shield is advanced the pilot-tunnel is excavated and the timbers 4 are laid upon and may be secured to the heads of the piles exposed by the progress of the shield.
  • the timber walls and partitions 3 are then-in place, the latter being set at such angles that the pressure of the surrounding material will be properly resisted and at the same time they will assist to support the main tunnel when completed.
  • the angle-irons 5 assist in securing these timbers.
  • the plate 1l forms the top or roof of this pilot-tunnel and is straight or curved to correspond with the base of the tunnel. I preferably make it curved, as illustrated, in order to serve as a guide or track for the shield l2 and a cradle for the completed tunnel.
  • ad-- IOO sections B B may be filled in with concrete or other solid material; but the portion A is left open for access to the heading for removal of material or for any other purpose to which it may be then or subsequently devoted.
  • the small shield used in the construction of the pilot-tunnel can be much more easily handled than the large one and gotten Well in advance of the main tunnel, and the main tunnel may be constructed of any desired shape and size and follow the pilot-shield without interruption caused by the operation of sawing off piles, &c.
  • the unobstructed and open section A may be used as a conduit for walls, cables, pipes, drainage, or other purpose during and after completion of the work.
  • the pilot-tunnel or foundation may be made at one operation or may be made of separate sections and be constructed simultaneously or successively with the construction of the main tunnel thereupon.
  • I may lomit partitions in the construction of the latter, using posts or omitting them entirely.
  • the interior chamber A may be filled in with concrete or other substance, and this may be done either immediately or subsequently or not at all, and the main tunnel may not rest directly upon the plate or top 1l, but be on slides or rollers, or may be constructed in proximity to this plate, leaving an intervening spacev filled with mud to be subsequently removed and this space filled with groutin g, dac., if desired.
  • this invention is not limited to the construction of tunnels, but may be used in the Vformation of foundations or other structures, such as dockwalls or other structures where it may be advisable to construct a foundation under Water in this manner and thereafter build thereupon.
  • the method of construction which consists in, first, placing a plurality of supports, second, excavating over them by means of a shield, third, constructing a 1 foundation in such excavation upon said supports, fourth, erecting a structure upon such foundation, substantially as described.
  • the method of constructing a tunnel which consists in, first, placing a plurality of piles in line of the proposed tunnel, second, constructing a pilot-tunnel resting upon said IIO piles, third, filling in a portion of said pilottunnel With solid material, fourth, advancing a shield over the foundation thus formeddifth, constructing the lining of a main tunnel upon said foundation, substantially as described.
  • the method of constructing tunnels which consists in placing a plurality of supports, progressively constructing a foundation thereon, and progressively erecting a tunnel on said foundation, substantially as de- 1o scribed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Nm 736,560. PATENTED AUGi 18, l1903. C, SDOYSMITH. METHOD 0F GONSTRUGTING POUNDATIONS AND TUNNELS 0R OTHER STRUCTURES.
APPLIUATION FILED MAR. 9A 1903. No MODEL. 2 sHBETs-sHDzT 1 INVENTOR TTORNE WITNESSES:
` mnxk @Qweg L@ gg mz Norms vargas coV Wmo-uma, wAsmNf-Yon. nv c.
PATENTED AUG. 1s, 1903./
C. SOOYSMITH. METHOD 0F GONSTRUCTING POUNDATIONS AND TUNNELS 0R OTHER STRUCTURES. APPLIUAZTION FILED-MAR, 9. 1903.
2 SHEETS-SHEET 2.
V l ll l l l l//l l N0 MODEL.
SNVENTOR `AT` NY WITNESSES:
Rs co. PHorouTno, wAsHmaTo UNirnD .Simrusl atented August PATENT OFFICE..
CHARLES sooYsMITi-i, oF lNEWYORK, N. Y.
METHOD 0F CONSTRUCTING FOUNDATIONS AND TUNNELS 0R OTHER STRUCTURES.
SPECIFIGATION forming part of Lettera Patent N0. 736,560,vdated August 18, 1903.
Application filed March 9. 1903.
T0 @ZZ whom t may concern:`
Be it known that I, CHARLES SooYsMrrH, a citizen of the United States, and a resident of New York, in the county of New York and State of New York, have invented certain new and useful Improvements in the Methods of Constructing Foundations and Tunnels or other Structures, of which the following is a specification:
My invention relates to the method of building subterranean or submarine structures and their foundations and especially the'method of constructing tunnels and theirfoundations in loose or water-bearing material.
The objects of my invention are, iirst, to
provide a method of construction and especially of constructing tunnels which shall be quick, economical, and easy g second, to provide a method of constructing foundations simultaneously with the construction of the work itself; third, to provide a method of building foundations for the structure which will prevent delay in erecting the structure superimposed thereon 3 fourth, to obviate the danger of disalinement of the main tunnel and its shield. l attain these objects bythe methods and means illustrated in the accompanying drawings and described hereinafter.
In the drawings like letters of reference refer to like parts throughout the respective views.
Figure l is a longitudinal elevation, mostly in section, on the middle plane of the tunnel. Fig. 2 is avertical cross-'section of the tunnel.
ln Fig. 1, l is the lining or skin of the tunnel, preferably of metal and made in sections which may be bolted or otherwise attached each to each.
2 is the interior lining, of concrete or other material.
3 is the siding or framing of the pilot-tunnel and completed foundation.
et is the bottom timbers of the tunnelor foundation, shown resting upon the piles 6 and to which the timbers 3 are securely fastened, the angle-irons 5, Fig. 2, assisting` in this securing.
7 represents the Water under which the tunnel is being constructed.
8 represents the soft bed of the river or other locality through which the tunnel is being excavated.
Serial No. 146,825. iNo model.)
9 represents the shield by the advance of which the pilot-tunnel A B, Fig. 2, is constructed. 10 represents the heading of this pilot-tunnel.
ll represents the upper lining or plate constituting the ceiling or roof of the pilot-tunnel and in and on which the large tunnel rests and is constructed.
Vanced by the usual hydraulic or pneumatic means.
A B represent divisions or sections of the pilot-tunnel separated each from each bythe interior Walls of timber 3, the portions B B preferably being intended to be iilled in with concrete and the portion A to be left empty, thus providing a passage- Way open at all times both for the purpose of construction and subsequent utilization, as may be desired.
I My method of construction is as follows: I first prefer to drive or place in theline of the proposed tunnel a number of piles 6, preferably driven so that their heads shall lie on the line of the bottom of the completed foundation, although if they do not extend quite so deep as this it is immaterial, since they can be easily cut off on the advance of the pilottunnel shield 9. This shield is constructed of such size that a man may Work comfortably within it, as illustrated in the drawings. It may or may not be found necessary'to use compressed air in the operation of this shield, the cross-section of which is that of the foundation, (shown in Fig. 2 as a substantial trapezoid,) only that the upper sidell is concaved. `As this shield is advanced the pilot-tunnel is excavated and the timbers 4 are laid upon and may be secured to the heads of the piles exposed by the progress of the shield. The timber walls and partitions 3 are then putin place, the latter being set at such angles that the pressure of the surrounding material will be properly resisted and at the same time they will assist to support the main tunnel when completed. The angle-irons 5 assist in securing these timbers. The plate 1l forms the top or roof of this pilot-tunnel and is straight or curved to correspond with the base of the tunnel. I preferably make it curved, as illustrated, in order to serve as a guide or track for the shield l2 and a cradle for the completed tunnel. As the latter progresses the 12 is the shield of the main tunnel and ad-- IOO sections B B may be filled in with concrete or other solid material; but the portion A is left open for access to the heading for removal of material or for any other purpose to which it may be then or subsequently devoted. In Fig.
forms the top of the foundation formed by the pilot-tunnel, and the sectional and concrete' or other lining of the main tunnel is constructed upon this plate ll in the usual way in rear of the shield 12.
It will be evident that one of the objects of advancing the pilot-tunnel is to insure the correct alinement of the main tunnel, and it is evidently easier to maintain the alinement of the small shield and pilot-tunnel than one of full size, and this alinement having been once attained the large shield and main tunnel may be advanced and constructed upon the foundation thus secured with a minimum of effort and With a maximum of accuracy.
I-Ieretofore in the construction of tunnels upon piles or other foundations there has been a difficulty and delay in properly embedding and superimposing the structure upon these piles and properly cutting the latter off. Moreover, previous methods have not lent themselves easily to the construction of,
a round tunnel, which latter is for many reasons desirable. It will be evident that the small shield used in the construction of the pilot-tunnel can be much more easily handled than the large one and gotten Well in advance of the main tunnel, and the main tunnel may be constructed of any desired shape and size and follow the pilot-shield without interruption caused by the operation of sawing off piles, &c. The unobstructed and open section Amay be used as a conduit for walls, cables, pipes, drainage, or other purpose during and after completion of the work. It is also evident that the pilot-tunnel or foundation may be made at one operation or may be made of separate sections and be constructed simultaneously or successively with the construction of the main tunnel thereupon.
In describing herein the use of timber as forming the Walls and bottom of this foundation or pilot-tunnel I do not wish to be understood as limiting myself to such material, as timber, metal, or other material may be used in whole or in part, nor do I limit myself to the exact shape as illustrated or any particular size of such foundation or pilot-tunnel. Moreover, while I have indicated that the two outer portions or sections B B of this foundation are filled with concrete and the interior portion A left empty I may reverse or modify this arrangement as I find it desirfor instance, omit entirely the bottom timbers 4, laying my concrete directly upon the heads of the piles. I may not use the shield in the construction of a pilot-tunnel or foundation. I may lomit partitions in the construction of the latter, using posts or omitting them entirely. Moreover, the interior chamber A may be filled in with concrete or other substance, and this may be done either immediately or subsequently or not at all, and the main tunnel may not rest directly upon the plate or top 1l, but be on slides or rollers, or may be constructed in proximity to this plate, leaving an intervening spacev filled with mud to be subsequently removed and this space filled with groutin g, dac., if desired. It Will be clear also that this invention is not limited to the construction of tunnels, but may be used in the Vformation of foundations or other structures, such as dockwalls or other structures where it may be advisable to construct a foundation under Water in this manner and thereafter build thereupon.
What I claim, and desire to prot-ect by Letters Patent, is-
1. The method of constructing foundations which consists in, first, placing a plurality of supports therefor, second, advancing a shield over such supports, third, constructing a foundation in the space so formed and resting upon the supports, substantially as described.
2. The method of construction which consists in, first, placing a plurality of supports, second, excavating over them by means of a shield, third, constructing a 1 foundation in such excavation upon said supports, fourth, erecting a structure upon such foundation, substantially as described.
3. The method of construction which consists in, first, placing a plurality of supports, second, excavating over them by means of a shield, third, constructing a foundation in such excavation upon said supports, fourth,
excavating the material over said foundation by means of a shield and erecting a structure in the latter excavation and resting upon said foundation, substantially as described.
4. The method of constructing tunnels which consists in, first, placing a plurality of supports, second, excavating over the heads of said supports and erecting thereon afoundation, third, excavating over said foundation and erecting a structure thereupon, substantially as described.
5. The method of constructing a tunnel which consists in, first, placing a plurality of piles in line of the proposed tunnel, second, constructing a pilot-tunnel resting upon said IIO piles, third, filling in a portion of said pilottunnel With solid material, fourth, advancing a shield over the foundation thus formeddifth, constructing the lining of a main tunnel upon said foundation, substantially as described.
6. The method of constructing tunnels which consists in placing a plurality of supports, progressively constructing a foundation thereon, and progressively erecting a tunnel on said foundation, substantially as de- 1o scribed.
Signed at NeW York, in the county of Nevr York and State of New York, this 18th day of February, A. D. 1903.
CHARLES SOOYSMITl-I. Witnesses:
Z. ROSENFIELD, WM. H. GRIFFIN, J r.
US14682503A 1903-03-09 1903-03-09 Method of constructing foundations and tunnels or other structures. Expired - Lifetime US736560A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14682503A US736560A (en) 1903-03-09 1903-03-09 Method of constructing foundations and tunnels or other structures.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14682503A US736560A (en) 1903-03-09 1903-03-09 Method of constructing foundations and tunnels or other structures.

Publications (1)

Publication Number Publication Date
US736560A true US736560A (en) 1903-08-18

Family

ID=2805067

Family Applications (1)

Application Number Title Priority Date Filing Date
US14682503A Expired - Lifetime US736560A (en) 1903-03-09 1903-03-09 Method of constructing foundations and tunnels or other structures.

Country Status (1)

Country Link
US (1) US736560A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220316337A1 (en) * 2019-12-04 2022-10-06 Cccc Second Highway Consultants Co., Ltd. Ultra-Long Tunnel Sewage Disposal, Separation and Drainage Structure Suitable for Cold Regions

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220316337A1 (en) * 2019-12-04 2022-10-06 Cccc Second Highway Consultants Co., Ltd. Ultra-Long Tunnel Sewage Disposal, Separation and Drainage Structure Suitable for Cold Regions
US11753937B2 (en) * 2019-12-04 2023-09-12 Cccc Second Highway Consultants Co., Ltd. Ultra-long tunnel sewage disposal, separation and drainage structure suitable for cold regions

Similar Documents

Publication Publication Date Title
JP5103516B2 (en) Pre-support tunnel construction method for large section tunnel
JP6636773B2 (en) Construction structure and construction method of tunnel lining body
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
US736560A (en) Method of constructing foundations and tunnels or other structures.
US1372856A (en) Method of building sewers and tunnels
US960940A (en) Art of constructing tunnels in the earth.
US1800819A (en) Method and means for constructing tunnel stations
US713520A (en) Method of constructing tunnels.
US797524A (en) Subaqueous tunnel.
US3074237A (en) Apparatus for lining mine shafts
US1089573A (en) Method of lining shafts with concrete.
US960941A (en) Constructing concrete and like walls in the earth.
US300469A (en) De witt c
US1896439A (en) Method and apparatus for tunnel construction and the like
US888790A (en) Method and apparatus for constructing subaqueous tunnels.
ES442115A1 (en) Method of and apparatus for handling and erecting builtup steel section supporting frames in large section underground roadways or tunnels
RU2764510C1 (en) Method for constructing a single-vault deep-level metro station
US1320720A (en) Foundations
RU2785718C1 (en) Method for constructing a column of a deep subway station
US736507A (en) Tunnel-section.
SU1645516A1 (en) Method of extraction of inter-chamber pillars
US713519A (en) Method of building tunnels, shafts, &c.
CN102182192A (en) Rear transverse septum type building foundation pit enclosure structure and construction method
US795148A (en) Method of tunneling.
US755955A (en) Method of constructing foundations, tunnels, &c.