US4258794A - Underwater completion habitat - Google Patents

Underwater completion habitat Download PDF

Info

Publication number
US4258794A
US4258794A US06/038,541 US3854179A US4258794A US 4258794 A US4258794 A US 4258794A US 3854179 A US3854179 A US 3854179A US 4258794 A US4258794 A US 4258794A
Authority
US
United States
Prior art keywords
chamber
underwater
well
underwater well
flow line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US06/038,541
Inventor
Phillip S. Sizer
Joseph L. Pearce
Sanford R. Dowden
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Co
Original Assignee
Otis Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Otis Engineering Corp filed Critical Otis Engineering Corp
Priority to US06/038,541 priority Critical patent/US4258794A/en
Application granted granted Critical
Publication of US4258794A publication Critical patent/US4258794A/en
Assigned to HALLIBURTON COMPANY reassignment HALLIBURTON COMPANY MERGER (SEE DOCUMENT FOR DETAILS). Assignors: OTIS ENGINEERING CORPORATION
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C11/00Equipment for dwelling or working underwater; Means for searching for underwater objects
    • B63C11/34Diving chambers with mechanical link, e.g. cable, to a base
    • B63C11/36Diving chambers with mechanical link, e.g. cable, to a base of closed type
    • B63C11/40Diving chambers with mechanical link, e.g. cable, to a base of closed type adapted to specific work
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/037Protective housings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/06Work chambers for underwater operations, e.g. temporarily connected to well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/013Connecting a production flow line to an underwater well head
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/013Connecting a production flow line to an underwater well head
    • E21B43/0135Connecting a production flow line to an underwater well head using a pulling cable
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/26Repairing or joining pipes on or under water

Definitions

  • the present invention relates to a submergible, underwater well completion habitat and a method of employing the same in the completion of wells at extended depths. More particularly, the invention refers to a well completion habitat which may be attached to an underwater well platform and maintained at a pressure of sufficient value to expel sea water from the work chamber and also to maintain it substantially water free so that one or more saturated divers may work within the habitat to complete the well.
  • the chamber must be capable of withstanding full hydrostatic pressure of the sea water acting on its exterior while only one atmosphere of pressure acts on its interior.
  • an effective seal must be provided to close the chamber and this seal, like the walls of the chamber, is subjected to the differential pressure which exists between the exterior and the interior of the chamber.
  • Another object of this invention is to provide an underwater well completion habitat that does not have to withstand the full hydrostatic pressure of the water exterior thereof with only atmosphere pressure therein.
  • An additional object of this invention is to provide an underwater well completion habitat constructed of materials which will withstand impinging water current forces, when in a fixed position in a body of water.
  • Another object of this invention is to provide an underwater well completion habitat whose internal pressure when disposed below the surface will be substantially equal to the hydrostatic pressure of the surrounding water.
  • a still further object is to provide an underwater well completion habitat wherein saturated divers may complete and test an underwater well with equipment, pumps, flow lines and the like which have been carried to the well structure within and attached to the completion habitat.
  • an underwater well completion system comprising: an independently transportable chamber, having a lower open section, capable of being transported to a region above the well, lowered from the surface, and adapted to rest upon an underwater well structure; means for securing said chamber to said well structure in a non-sealing relation; means on said chamber communicating with the surface for evacuating sea water from the inside of said chamber and for maintaining a pressurized breathing atmosphere within said chamber; said chamber being constructed of materials which would only be required to withstand impinging forces of water currents and a very small differential pressure substantially equal to the internal height of the chamber times the maximum water pressure gradient (approximately 0.5 psi/foot, or 0.1153 kg./sq. cm./m.).
  • FIG. 1 is a diagrammatic plan, cross-sectional view of the underwater work habitat being lowered from a drilling platform to the well structure;
  • FIG. 2 is a diagrammatic plan, cross-sectional view of the underwater well completion system, with representative equipment connected therein, with a rig diving bell lowered from a surface structure;
  • FIG. 3 is a diagrammatic plan, cross-sectional view of the underwater well completion system, showing the flow lines connected to the well and the well being rigged for testing;
  • FIG. 4 is a diagrammatic plan, cross-sectional view of the underwater well completion system, showing the flow line loop connected to the well, the work habitat being lowered and with the flow lines connected to and lowered to the well with the habitat;
  • FIG. 5 is a perspective view, partially cut-away, of the underwater well completion system, as illustrated in FIG. 4;
  • FIG. 6 is a perspective, plan view of the flow line connector secured to the side of the work habitat, as viewed from the perspective of view 6--6 in FIG. 4.
  • FIG. 1 is representative of an underwater well installation on the ocean floor.
  • the well may be drilled by floating, semi-submergible or jack-up drilling rigs.
  • a platform 11 is connected to the well casing system 16. This platform 11 is a part of the well's guide system and will provide a work base for divers during later stages of the well completion.
  • the well tubing Following drilling of the well, the well tubing would be landed in the tubing hanger (not shown) on the well casing system 16 and plugged. Surfaced controlled, subsurface safety valves would be closed and back pressure valves may be installed in the tubing hanger, if desired.
  • FIG. 1 shows the work habitat 10, of the invention, being lowered from the drilling rig 35 using a running tool 38 and assisted by the guide system 13 of the well. While FIG. 1 shows the BOP stack 36 still connected to the well, in practice, this would be removed prior to the lowering of the habitat 10.
  • the well system 16 of FIG. 1 depicts a pin pile 14 supported upon a casing 16a and pile support 15, which arrangement provides for moment forces to be applied to the support member 15 rather than the casing 16a.
  • the platform 11 would preferably have a receptacle or flow line funnel 20, at one end of the platform 11, for supporting and connecting a flow line bundle.
  • a flow line nose 17, with control lines 18, is lowered from a support vessel 22, and pulled into place, oriented and locked into the platform 11 flow line funnel 20.
  • a variety of means can be provided for pulling the flow line nose 17 into receptacle 20, such as the cable 21 and pully arrangement 37 and 37a shown in FIG. 1.
  • the habitat 10 is lowered, as described above, and is secured by suitable connectors, latches or other means 10a. It is significant, however, that the habitat 10 is not connected to the platform 11 or well structure 16 in a sealing configuration. Rather, the platform 11 is preferably a metal grating that allows movement of fluid therethrough.
  • FIG. 5 shows the platform 11 in place on the well system 16 prior to lowering the habitat 10. In some instances, however, it may be desirable to lower platform 11 and habitat 10 as a unitary structure, with well completion tools secured therein, as illustrated in FIG. 2.
  • the habitat 10 is sometimes referred to hereinafter as "chamber", to reflect the fact that the internal work space of the habitat provides protection, for the divers, from ocean currents. Also, when the water is pumped from the habitat 10, a water free work space is provided.
  • FIG. 2 also illustrates a lay barge or ship 22 being used in conjunction with the drilling structure 35, whereby the flow lines 18a may be laid by means of a cable 23, or other suitable means used for this purpose. Methods for laying flow lines are well known in the art.
  • the chamber 10 is lowered while the flow lines 18a are being pulled toward the well system 16.
  • connecting of the flow lines with the well can be commenced.
  • the terminal 17 and connectors attached thereto may be connected to the flow lines 18a and pulled across the ocean floor together.
  • the chamber 10 is entered through entranceway 26.
  • This entranceway is provided with non-slip tread means 26a as shown in FIG. 2 to facilitate safe entrance into the chamber 10.
  • the chamber 10 has means 30 for attachment of conduit 30a for communicating with the surface of the ocean and receiving breathable gases for evacuating the water from the chamber.
  • the breathable gases may be pumped through the diving bell 27 and into the chamber 10, via tube 27a.
  • a breathable mixture of gases may be pumped into the chamber 10 through conduit 30a connected to the top of the chamber 10 at connecting means 30.
  • This breathable mixture is forced into the chamber to expel the water therein downwardly and out of the open lower end of the chamber.
  • Such breathable mixture may be forced into the chamber until the water level is near the bottom of the chamber, or even until the water level reaches the bottom and some of the mixture escapes.
  • the excess mixture and at least some of the stale mixture will be displaced outwardly through the open lower end of the chamber, and will maintain the water level at a location level with the bottom of the chamber.
  • the pressure of the breathable mixture in the chamber will always be substantially equal to the hydrostatic pressure of the ocean at the ocean floor. In any case, the pressure of the breathable mixture must always be of sufficient magnitude to depress the water level in the chamber to a level at or near the lower end thereof in order to provide a breathable environment in which the divers can work.
  • FIGS. 4-6 illustrate an alternate means of carrying the flow line terminal or nose 17 to the well site.
  • the terminal 17 may be carried in a housing 20b, which is hinged to the outer wall of one end of the chamber 10.
  • the hinge 20c allows the housing 20b to be rotated downward to rest in a housing support member 20a when the chamber 10 has been secured to the platform 11.
  • the rotation of the housing 20b and preferably, pulling in of the flow line terminal 17, is done by activating a cable 21a or other means suitable for this purpose.
  • Terminal 17 is thus positioned within opening 38 in the chamber 10 for connection to a flow line loop 23.
  • the flow line loop 23 has been installed prior to placing the chamber 10 on the well platform 11.
  • the loop 23 could be placed on the well along with the chamber 10.
  • the chamber 10 has attached thereon the flow line terminal 17 for connection to the loop 23.
  • Sufficient flow line may be laid from a surface vessel at this time or later, as required.
  • a diving bell 27 would then be lowered to the vicinity of the chamber 10. Saturated divers would then enter the chamber 10 through access 26. If the water therein had not been previously evacuated, they could connect bell 27 to the chamber 10 and fill chamber 10 with a pressurized breathable gas. The pressure would preferably be above atmospheric and substantially equal to hydrostatic ocean pressure.
  • the diver(s), working in the pressurized breathing environment, can connect the well head 31 to the flow line 18 via the terminal 17 and install all necessary ocean floor manifold valves 24, which have preferably been carried down with the chamber 10.
  • FIG. 2 illustrates a hoist 25 as one of these work devices that may be carried down to the well structure within the chamber 10.
  • the divers Upon completion of valve operations and pressure testing of all equipment at the well site, the divers would return to the rig diving bell 27, which is then returned to the surface.
  • the well marker buoy (not shown) would then be floated.
  • the pipe laying barge pulley would return to the buoy marking the end of the flow line and pick up the flow line 18a.
  • the flow line 18a is then laid to the production platform (not shown).
  • the flow lines could be laid beforehand from the production platform towards the well system 16.
  • the underwater chamber 10 may be left pressurized or it can be flooded with sea water. Chamber 10 shown in FIG. 4 could not be removed after flowlines are connected without first disconnecting the chamber 10 from the platform 11. Normally, the chamber 10 is left attached to the platform 11 following its use for completing and testing the well although it may be transferred to another well location and reused there. If, subsequent to its original use, there is need to check the well head, valves, guages or the like, a diving bell can lower saturated divers to the chamber 10 following the same sequence as described above. Workers may therefore visit and work in the chamber 10 as required and make as many trips as may be necessary.
  • the advantage of the present system resides in the fact that there is no necessity to provide water tight seals between the chamber and the well structure and the chamber may be constructed of light inexpensive materials as it is not required to withstand higher hydrostatic pressures encountered at extended depths.
  • saturated divers in a work environment that provides shelter from the currents of the surrounding ocean and a breathable atmosphere which may be replenished.
  • standing upon the deck of the chamber a diver can apply leverage to the work pieces he is attempting to manipulate.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A submergible, underwater well completion habitat and a method of employing the same in the completion of wells at extended depths. The well completion habitat may be attached to an underwater well platform and maintained at a pressure of sufficient value to expel water from the work chamber and also to maintain it substantially water free so that one or more saturated divers may work within the chamber to complete the well. This abstract of the invention is neither intended to define the scope of the invention, which, of course, is measured by the claims, nor is it intended to limit the invention in any way.

Description

BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a submergible, underwater well completion habitat and a method of employing the same in the completion of wells at extended depths. More particularly, the invention refers to a well completion habitat which may be attached to an underwater well platform and maintained at a pressure of sufficient value to expel sea water from the work chamber and also to maintain it substantially water free so that one or more saturated divers may work within the habitat to complete the well.
2. The Prior Art
Methods for completing oil and gas wells at depths greater than 200 feet have been the subject of much research and development for many years. Remote control devices have been developed which may be operated from specially equipped ships and barges. However, these systems are complicated and require precise control of automatic devices that may be resting on or near the ocean floor many hundreds of feet below their control vessel.
To avoid the use of remote control devices, much effort has been invested in perfecting underwater work apparatus that permit oilfield specialists to work in a one atmosphere environment. A subsea structure or chamber has been provided that will permit normal breathing and which is sealed from the surrounding ocean. Such a structure is described and claimed in U.S. Pat. No. 3,656,549 to Holbert et al.
In all of these subsea work chambers, there are two requirements which must be met. First, the chamber must be capable of withstanding full hydrostatic pressure of the sea water acting on its exterior while only one atmosphere of pressure acts on its interior. Second, an effective seal must be provided to close the chamber and this seal, like the walls of the chamber, is subjected to the differential pressure which exists between the exterior and the interior of the chamber.
Justification for such one atmosphere subsea chambers is based upon a desire to utilize "oil field" trained workers at the well head, as opposed to "divers" who normally work at these depths but who are not normally trained in oilfield practices. Disadvantages to divers working underwater are their positive buoyancy, restricted maneuverability and visual limitations caused by lack of light and by light blocking or reflecting particles suspended in their water environment.
There are many patents illustrating apparatus which provide an air tight, water-free work environment at an underwater well structure. One of the most recent is U.S. Pat. No. 4,004,635 to R.A.M. Marquarie et al., which describes a bell housing assembly for connecting inflexible pipe onto a well head. However, this chamber, too, is water tight and is designed for one atmosphere operation.
U.S. Pat. No. 3,513,910, to Robert D. Townsend, describes a subsea production satellite having the requirement of a water free chamber capable of sustaining a one atmosphere environment while withstanding the hydrostatic forces surrounding the vessel.
It is an object of this invention to provide an underwater well completion system that will allow one or more saturated divers to complete an underwater well while working in a water free environment.
It is a further object to provide an underwater well completion habitat that can be lowered from the surface of the ocean and attached to an underwater well structure or otherwise disposed in proper position.
It is a still further object of this invention to provide an underwater well completion habitat that can be attached to an underwater well structure in which pressure is of sufficient value to expel water therefrom and also to maintain the chamber substantially water free.
It is another object of this invention to provide an underwater well completion habitat, which when attached to an underwater well structure, provides a water free work environment and a breathable atmosphere therein.
Another object of this invention is to provide an underwater well completion habitat that does not have to withstand the full hydrostatic pressure of the water exterior thereof with only atmosphere pressure therein.
An additional object of this invention is to provide an underwater well completion habitat constructed of materials which will withstand impinging water current forces, when in a fixed position in a body of water.
Another object of this invention is to provide an underwater well completion habitat whose internal pressure when disposed below the surface will be substantially equal to the hydrostatic pressure of the surrounding water.
A still further object is to provide an underwater well completion habitat wherein saturated divers may complete and test an underwater well with equipment, pumps, flow lines and the like which have been carried to the well structure within and attached to the completion habitat.
SUMMARY OF THE INVENTION
According to one aspect of the present invention there is provided an underwater well completion system comprising: an independently transportable chamber, having a lower open section, capable of being transported to a region above the well, lowered from the surface, and adapted to rest upon an underwater well structure; means for securing said chamber to said well structure in a non-sealing relation; means on said chamber communicating with the surface for evacuating sea water from the inside of said chamber and for maintaining a pressurized breathing atmosphere within said chamber; said chamber being constructed of materials which would only be required to withstand impinging forces of water currents and a very small differential pressure substantially equal to the internal height of the chamber times the maximum water pressure gradient (approximately 0.5 psi/foot, or 0.1153 kg./sq. cm./m.).
In addition, there may be provided within said chamber, such items as tools, valves, manifolds and the like for completing said well, which items are preferably secured therein for reasons of safety. There is also provided on the chamber means for securing flow lines and associated equipment.
The invention will be more fully understood from the following description of an embodiment thereof, given by way of example only, with reference to the accompanying drawings.
IN THE DRAWINGS
FIG. 1 is a diagrammatic plan, cross-sectional view of the underwater work habitat being lowered from a drilling platform to the well structure;
FIG. 2 is a diagrammatic plan, cross-sectional view of the underwater well completion system, with representative equipment connected therein, with a rig diving bell lowered from a surface structure;
FIG. 3 is a diagrammatic plan, cross-sectional view of the underwater well completion system, showing the flow lines connected to the well and the well being rigged for testing;
FIG. 4 is a diagrammatic plan, cross-sectional view of the underwater well completion system, showing the flow line loop connected to the well, the work habitat being lowered and with the flow lines connected to and lowered to the well with the habitat;
FIG. 5 is a perspective view, partially cut-away, of the underwater well completion system, as illustrated in FIG. 4; and
FIG. 6 is a perspective, plan view of the flow line connector secured to the side of the work habitat, as viewed from the perspective of view 6--6 in FIG. 4.
DESCRIPTION OF THE PREFERRED EMBODIMENT
In the drawings, FIG. 1 is representative of an underwater well installation on the ocean floor. For the purposes of this invention, it is not critical how the well was drilled. That is to say, the well may be drilled by floating, semi-submergible or jack-up drilling rigs. Typically, a platform 11 is connected to the well casing system 16. This platform 11 is a part of the well's guide system and will provide a work base for divers during later stages of the well completion.
Following drilling of the well, the well tubing would be landed in the tubing hanger (not shown) on the well casing system 16 and plugged. Surfaced controlled, subsurface safety valves would be closed and back pressure valves may be installed in the tubing hanger, if desired.
Once the well has been secured, the blowout preventer (BOP) stack 36 is removed by releasing a hydraulic latch (not shown) either remotely or by using a diving bell and divers which are a part of the drilling rig 35 ancillary services. FIG. 1 shows the work habitat 10, of the invention, being lowered from the drilling rig 35 using a running tool 38 and assisted by the guide system 13 of the well. While FIG. 1 shows the BOP stack 36 still connected to the well, in practice, this would be removed prior to the lowering of the habitat 10.
The well system 16 of FIG. 1 depicts a pin pile 14 supported upon a casing 16a and pile support 15, which arrangement provides for moment forces to be applied to the support member 15 rather than the casing 16a.
The platform 11 would preferably have a receptacle or flow line funnel 20, at one end of the platform 11, for supporting and connecting a flow line bundle. Probably before the habitat 10 is lowered to the well system 16, a flow line nose 17, with control lines 18, is lowered from a support vessel 22, and pulled into place, oriented and locked into the platform 11 flow line funnel 20. A variety of means can be provided for pulling the flow line nose 17 into receptacle 20, such as the cable 21 and pully arrangement 37 and 37a shown in FIG. 1.
The habitat 10 is lowered, as described above, and is secured by suitable connectors, latches or other means 10a. It is significant, however, that the habitat 10 is not connected to the platform 11 or well structure 16 in a sealing configuration. Rather, the platform 11 is preferably a metal grating that allows movement of fluid therethrough.
FIG. 5 shows the platform 11 in place on the well system 16 prior to lowering the habitat 10. In some instances, however, it may be desirable to lower platform 11 and habitat 10 as a unitary structure, with well completion tools secured therein, as illustrated in FIG. 2.
The habitat 10 is sometimes referred to hereinafter as "chamber", to reflect the fact that the internal work space of the habitat provides protection, for the divers, from ocean currents. Also, when the water is pumped from the habitat 10, a water free work space is provided. FIG. 2 also illustrates a lay barge or ship 22 being used in conjunction with the drilling structure 35, whereby the flow lines 18a may be laid by means of a cable 23, or other suitable means used for this purpose. Methods for laying flow lines are well known in the art.
Thus, as the well is being completed, the chamber 10 is lowered while the flow lines 18a are being pulled toward the well system 16. After the chamber 10 has been placed in position on the well, connecting of the flow lines with the well can be commenced. If desired, the terminal 17 and connectors attached thereto may be connected to the flow lines 18a and pulled across the ocean floor together.
Divers can be lowered from the surface in a diving bell 27 or can dive without such bell. In either case, the chamber 10 is entered through entranceway 26. This entranceway is provided with non-slip tread means 26a as shown in FIG. 2 to facilitate safe entrance into the chamber 10.
The chamber 10 has means 30 for attachment of conduit 30a for communicating with the surface of the ocean and receiving breathable gases for evacuating the water from the chamber. Alternatively, the breathable gases may be pumped through the diving bell 27 and into the chamber 10, via tube 27a.
Before the chamber 10 is entered by the divers, a breathable mixture of gases may be pumped into the chamber 10 through conduit 30a connected to the top of the chamber 10 at connecting means 30. This breathable mixture is forced into the chamber to expel the water therein downwardly and out of the open lower end of the chamber. Such breathable mixture may be forced into the chamber until the water level is near the bottom of the chamber, or even until the water level reaches the bottom and some of the mixture escapes. If the divers are to work in the chamber for extended periods of time it is preferable to continue pumping into the chamber such breathable mixture at a rate which is at least as great as that required to maintain a proper environment for the divers, in which case, the excess mixture and at least some of the stale mixture will be displaced outwardly through the open lower end of the chamber, and will maintain the water level at a location level with the bottom of the chamber. The pressure of the breathable mixture in the chamber will always be substantially equal to the hydrostatic pressure of the ocean at the ocean floor. In any case, the pressure of the breathable mixture must always be of sufficient magnitude to depress the water level in the chamber to a level at or near the lower end thereof in order to provide a breathable environment in which the divers can work.
FIGS. 4-6 illustrate an alternate means of carrying the flow line terminal or nose 17 to the well site. As illustrated, the terminal 17 may be carried in a housing 20b, which is hinged to the outer wall of one end of the chamber 10. The hinge 20c allows the housing 20b to be rotated downward to rest in a housing support member 20a when the chamber 10 has been secured to the platform 11. The rotation of the housing 20b and preferably, pulling in of the flow line terminal 17, is done by activating a cable 21a or other means suitable for this purpose. Terminal 17 is thus positioned within opening 38 in the chamber 10 for connection to a flow line loop 23.
In the embodiment of the invention shown in FIG. 4, the flow line loop 23 has been installed prior to placing the chamber 10 on the well platform 11. Alternatively, the loop 23 could be placed on the well along with the chamber 10. On this trip down to the well, the chamber 10 has attached thereon the flow line terminal 17 for connection to the loop 23.
Sufficient flow line may be laid from a surface vessel at this time or later, as required.
Referring to FIG. 2, it is seen where a diving bell 27 would then be lowered to the vicinity of the chamber 10. Saturated divers would then enter the chamber 10 through access 26. If the water therein had not been previously evacuated, they could connect bell 27 to the chamber 10 and fill chamber 10 with a pressurized breathable gas. The pressure would preferably be above atmospheric and substantially equal to hydrostatic ocean pressure.
The diver(s), working in the pressurized breathing environment, can connect the well head 31 to the flow line 18 via the terminal 17 and install all necessary ocean floor manifold valves 24, which have preferably been carried down with the chamber 10.
The divers then operate all valves, downhole and manifold 24, with the use of a portable hydraulic manifold 32 carried down with the rig diving bell 27 and transported to the chamber 10. However, most of the valves, manifolds, connection lines, tools and the like may be carried down within, and attached to, the chamber 10. FIG. 2 illustrates a hoist 25 as one of these work devices that may be carried down to the well structure within the chamber 10.
Upon completion of valve operations and pressure testing of all equipment at the well site, the divers would return to the rig diving bell 27, which is then returned to the surface. The well marker buoy (not shown) would then be floated. The pipe laying barge pulley would return to the buoy marking the end of the flow line and pick up the flow line 18a. The flow line 18a is then laid to the production platform (not shown). Of course, if desired, the flow lines could be laid beforehand from the production platform towards the well system 16.
The underwater chamber 10 may be left pressurized or it can be flooded with sea water. Chamber 10 shown in FIG. 4 could not be removed after flowlines are connected without first disconnecting the chamber 10 from the platform 11. Normally, the chamber 10 is left attached to the platform 11 following its use for completing and testing the well although it may be transferred to another well location and reused there. If, subsequent to its original use, there is need to check the well head, valves, guages or the like, a diving bell can lower saturated divers to the chamber 10 following the same sequence as described above. Workers may therefore visit and work in the chamber 10 as required and make as many trips as may be necessary.
There are, of course, variations in the method and sequence of laying flow lines to or from the well site utilizing the present invention. The advantage of the present system resides in the fact that there is no necessity to provide water tight seals between the chamber and the well structure and the chamber may be constructed of light inexpensive materials as it is not required to withstand higher hydrostatic pressures encountered at extended depths. Thus, it is possible to use saturated divers in a work environment that provides shelter from the currents of the surrounding ocean and a breathable atmosphere which may be replenished. Also, standing upon the deck of the chamber, a diver can apply leverage to the work pieces he is attempting to manipulate.

Claims (6)

What is claimed is:
1. An underwater well completion system comprising:
an independently transportable chamber, having a lower open section, lowerable from the surface and adapted to rest upon an underwater well structure;
means for securing said chamber to said well structure in non-sealing relation;
means on said chamber to communicate with the surface for evacuating sea water from the inside of said chamber;
said chamber being constructed of materials which will withstand impinging forces of underwater currents and a pressure differential equal to the height of the chamber times the hydrostatic pressure gradient of ocean water,
a pivotally mounted housing on said chamber for receiving a flow line terminal,
a housing support on said chamber to support and guide the housing,
an opening in said chamber associated with said housing support to receive said housing upon its pivoting to a position to rest on said housing support.
2. The underwater well completion system of claim 1, including releasable connecting means for connecting said chamber to said underwater well structure.
3. The underwater well completion system of claim 1, wherein said chamber has disposed therein well completion means that are carried with said chamber upon its being lowered to said underwater well structure.
4. The underwater well completion system of claim 1, wherein there is included a flow line terminal received in said housing, whereby said flow line terminal may accompany said chamber when said chamber is lowered to said underwater well structure.
5. The underwater well completion system of claim 4, including flow lines connected to said flow line terminal.
6. The underwater well completion system of claim 4, including means within said chamber to draw said flow line terminal into said chamber for connection of said flow line terminal to a well connection received within said chamber.
US06/038,541 1979-05-14 1979-05-14 Underwater completion habitat Expired - Lifetime US4258794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US06/038,541 US4258794A (en) 1979-05-14 1979-05-14 Underwater completion habitat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US06/038,541 US4258794A (en) 1979-05-14 1979-05-14 Underwater completion habitat

Publications (1)

Publication Number Publication Date
US4258794A true US4258794A (en) 1981-03-31

Family

ID=21900538

Family Applications (1)

Application Number Title Priority Date Filing Date
US06/038,541 Expired - Lifetime US4258794A (en) 1979-05-14 1979-05-14 Underwater completion habitat

Country Status (1)

Country Link
US (1) US4258794A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4421436A (en) * 1982-07-06 1983-12-20 Texaco Development Corporation Tension leg platform system
US4626128A (en) * 1985-04-11 1986-12-02 Devine Thomas H Underwater gas pocket work unit and removal of dangerous fumes and gases therefrom
FR2600711A1 (en) * 1986-06-30 1987-12-31 Inst Francais Du Petrole Device and method for positioning and removing a connector block on/from a base
US4899823A (en) * 1988-09-16 1990-02-13 Otis Engineering Corporation Method and apparatus for running coiled tubing in subsea wells
US5727907A (en) * 1995-11-08 1998-03-17 Silva; Jose De J. Method for the reparation of submerged pipelines
WO1998040602A1 (en) * 1997-02-27 1998-09-17 Abb Offshore Technology As A method and a means for arranging and installing a structure on the sea bed
WO2001063088A1 (en) * 2000-02-18 2001-08-30 Abb As, Abb Offshore Systems Method for thermally protecting subsea installations, and apparatus for implementing such thermal protection
US20060266523A1 (en) * 2005-05-25 2006-11-30 Duron Systems, Inc. Subsea insulating shroud
US20080029270A1 (en) * 2006-06-05 2008-02-07 Henry Wong Insulation shroud with internal support structure
US20080063478A1 (en) * 2006-05-01 2008-03-13 Reddy Sanjay K Subsea connector insulation device
US7694743B1 (en) * 2005-04-12 2010-04-13 Michael Dean Arning ROV-deployable subsea wellhead gas hydrate diverter
CN1877181B (en) * 2006-06-01 2010-05-12 中国石化集团胜利石油管理局钻井工艺研究院 Underwater dry-type repairing work cabin
US20100218401A1 (en) * 2006-05-23 2010-09-02 Cives Corporation Two-stage snow plow
US20110303417A1 (en) * 2009-03-10 2011-12-15 Moegedal Knut Subsea well template
GB2489279A (en) * 2011-03-24 2012-09-26 Viper Subsea Technology Ltd Protective cover and fluid environment for subsea equipment
US20130277061A1 (en) * 2010-11-17 2013-10-24 Ange Luppi Tower for exploiting fluid in an expanse of water and associated installation method
CN103507109A (en) * 2013-10-11 2014-01-15 上海利策科技股份有限公司 Underwater dry type cutting cabin and application method thereof
US20140209008A1 (en) * 2011-09-30 2014-07-31 Xiaoming Shi Atmospheric working cabin for underwater operation
US9382780B1 (en) * 2015-07-21 2016-07-05 Chevron U.S.A. Inc. Vertical swivel connection assembly and systems and methods for use thereof
GB2564982A (en) * 2018-10-04 2019-01-30 Wilson David Apparatus for connecting pipes

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3211223A (en) * 1961-12-26 1965-10-12 Phillips Petroleum Co Underwater well completion
US3421579A (en) * 1965-06-17 1969-01-14 Mobil Oil Corp Underwater completion
US3482410A (en) * 1968-07-01 1969-12-09 Lockheed Aircraft Corp Underwater flowline installation
US3527294A (en) * 1968-10-24 1970-09-08 Lockheed Aircraft Corp Underwater exploration and completion system
US3853183A (en) * 1971-05-27 1974-12-10 G Downs Methods and apparatus for underwater drilling of oil and gas wells
US3924616A (en) * 1971-11-12 1975-12-09 Taylor Diving & Salvage Co Closed circuit, free-flow, underwater breathing system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3211223A (en) * 1961-12-26 1965-10-12 Phillips Petroleum Co Underwater well completion
US3421579A (en) * 1965-06-17 1969-01-14 Mobil Oil Corp Underwater completion
US3482410A (en) * 1968-07-01 1969-12-09 Lockheed Aircraft Corp Underwater flowline installation
US3527294A (en) * 1968-10-24 1970-09-08 Lockheed Aircraft Corp Underwater exploration and completion system
US3853183A (en) * 1971-05-27 1974-12-10 G Downs Methods and apparatus for underwater drilling of oil and gas wells
US3924616A (en) * 1971-11-12 1975-12-09 Taylor Diving & Salvage Co Closed circuit, free-flow, underwater breathing system

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4421436A (en) * 1982-07-06 1983-12-20 Texaco Development Corporation Tension leg platform system
US4626128A (en) * 1985-04-11 1986-12-02 Devine Thomas H Underwater gas pocket work unit and removal of dangerous fumes and gases therefrom
FR2600711A1 (en) * 1986-06-30 1987-12-31 Inst Francais Du Petrole Device and method for positioning and removing a connector block on/from a base
US4899823A (en) * 1988-09-16 1990-02-13 Otis Engineering Corporation Method and apparatus for running coiled tubing in subsea wells
US5727907A (en) * 1995-11-08 1998-03-17 Silva; Jose De J. Method for the reparation of submerged pipelines
WO1998040602A1 (en) * 1997-02-27 1998-09-17 Abb Offshore Technology As A method and a means for arranging and installing a structure on the sea bed
GB2338739A (en) * 1997-02-27 1999-12-29 Abb Offshore Technology As A method and a means for arranging and installing a structure on the sea bed
GB2376702A (en) * 2000-02-18 2002-12-24 Abb As Abb Offshore Systems Method for thermally protecting subsea installations, and apparatus for implementing such thermal protection
GB2376702B (en) * 2000-02-18 2004-01-14 Abb As Abb Offshore Systems Method for thermally protecting subsea installations, and apparatus for implementing such thermal protection
US6889770B2 (en) 2000-02-18 2005-05-10 Abb Offshore Systems As Method for thermally protecting subsea installations, and apparatus for implementing such thermal protection
WO2001063088A1 (en) * 2000-02-18 2001-08-30 Abb As, Abb Offshore Systems Method for thermally protecting subsea installations, and apparatus for implementing such thermal protection
US7694743B1 (en) * 2005-04-12 2010-04-13 Michael Dean Arning ROV-deployable subsea wellhead gas hydrate diverter
US20060266523A1 (en) * 2005-05-25 2006-11-30 Duron Systems, Inc. Subsea insulating shroud
US7661479B2 (en) * 2005-05-25 2010-02-16 Duron Systems, Inc. Subsea insulating shroud
US7784547B2 (en) * 2006-05-01 2010-08-31 Deep Sea Technologies, Inc. Subsea connector insulation device
US20080063478A1 (en) * 2006-05-01 2008-03-13 Reddy Sanjay K Subsea connector insulation device
US20100218401A1 (en) * 2006-05-23 2010-09-02 Cives Corporation Two-stage snow plow
CN1877181B (en) * 2006-06-01 2010-05-12 中国石化集团胜利石油管理局钻井工艺研究院 Underwater dry-type repairing work cabin
US7823643B2 (en) * 2006-06-05 2010-11-02 Fmc Technologies Inc. Insulation shroud with internal support structure
US20080029270A1 (en) * 2006-06-05 2008-02-07 Henry Wong Insulation shroud with internal support structure
US9217315B2 (en) * 2009-03-10 2015-12-22 Aker Subsea As Subsea well template
US20110303417A1 (en) * 2009-03-10 2011-12-15 Moegedal Knut Subsea well template
US20130277061A1 (en) * 2010-11-17 2013-10-24 Ange Luppi Tower for exploiting fluid in an expanse of water and associated installation method
US9322222B2 (en) * 2010-11-17 2016-04-26 Technip France Tower for exploiting fluid in an expanse of water and associated installation method
GB2489279A (en) * 2011-03-24 2012-09-26 Viper Subsea Technology Ltd Protective cover and fluid environment for subsea equipment
US9199708B2 (en) * 2011-09-30 2015-12-01 Xiaoming Shi Atmospheric working cabin for underwater operation
US20140209008A1 (en) * 2011-09-30 2014-07-31 Xiaoming Shi Atmospheric working cabin for underwater operation
CN103507109B (en) * 2013-10-11 2015-07-15 上海利策科技股份有限公司 Underwater dry type cutting cabin and application method thereof
CN103507109A (en) * 2013-10-11 2014-01-15 上海利策科技股份有限公司 Underwater dry type cutting cabin and application method thereof
US9382780B1 (en) * 2015-07-21 2016-07-05 Chevron U.S.A. Inc. Vertical swivel connection assembly and systems and methods for use thereof
GB2564982A (en) * 2018-10-04 2019-01-30 Wilson David Apparatus for connecting pipes
GB2564982B (en) * 2018-10-04 2020-04-01 Wilson David Apparatus for connecting and subsequent disconnection of pipes

Similar Documents

Publication Publication Date Title
US4258794A (en) Underwater completion habitat
US4730677A (en) Method and system for maintenance and servicing of subsea wells
US4149603A (en) Riserless mud return system
US7703534B2 (en) Underwater seafloor drilling rig
US6463801B1 (en) Apparatus, method and system for measurement of sea-floor soil characteristics
CA2415637C (en) Well management system
US3482410A (en) Underwater flowline installation
US3656549A (en) Underwater completion system
US3500906A (en) Subsurface wellhead and connector
AU2001275890A1 (en) Well management system
US3638720A (en) Method and apparatus for producing oil from underwater wells
US3612177A (en) Deep water production system
US3552903A (en) Subsea production satellite
US4626136A (en) Pressure balanced buoyant tether for subsea use
US3602300A (en) Down-hole installation, recovery, and maintenance tool for wells
US3527294A (en) Underwater exploration and completion system
US3330340A (en) Marine conductor pipe assembly
US5984012A (en) Emergency recovery system for use in a subsea environment
US2965174A (en) Off-shore well installation and method
US3705623A (en) Offshore well equipment with pedestal conductor
US3330339A (en) Method of removing a wellhead assembly from the ocean floor
USRE27745E (en) Subsea production system
US3330338A (en) Anchor and method of installing
US3513911A (en) Offshore well workover method
US3916632A (en) Telescopic caisson with intermediately positioned wellhead

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: HALLIBURTON COMPANY, TEXAS

Free format text: MERGER;ASSIGNOR:OTIS ENGINEERING CORPORATION;REEL/FRAME:006779/0356

Effective date: 19930624