US3564855A - Method and device for making slit walls - Google Patents
Method and device for making slit walls Download PDFInfo
- Publication number
- US3564855A US3564855A US308757*[A US3564855DA US3564855A US 3564855 A US3564855 A US 3564855A US 3564855D A US3564855D A US 3564855DA US 3564855 A US3564855 A US 3564855A
- Authority
- US
- United States
- Prior art keywords
- slit
- bucket chain
- chain excavator
- bucket
- excavator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/06—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging elements mounted on an endless chain
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/13—Foundation slots or slits; Implements for making these slots or slits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/182—Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/185—Bulkheads or similar walls made solely of concrete in situ with flexible joint members between sections
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/12—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with equipment for back-filling trenches or ditches
Definitions
- the liquid level in the space located in front of the bucket chain excavator is lowered as compared to the liquid level in the space located behind the bucket chain excavator so that the bucket chain excavator is driven forward by the hydrostatic pressure differential.
- the slit made in this manner is subsequently filled up with concrete.
- This invention relates to methods and devices for making slit walls.
- the slit wall construction practice has acquired a great technical importance in recent years especially for the municipal traific engineering, e.g., for constructing subways. Yet for making constructions in busy townships it is particularly important to maintain the time of construction as short as possible in order to reduce any interruptions of the trailic.
- the object of the invention is to provide a method permitting a more rapid, rationalized and economical execution of the construction work for making slit walls.
- a method of making slit walls wherein a slit section present in the ground is filled with a fluid and excavated at a front end substantially continuously by means of a bucket chain excavator, wherein the bucket chain excavator is sealed off against the side walls of the excavated slit and against the sole of the slit so that at the side of the bucket chain excavator facing said front end of the slit and within the slit there is formed a first fluid-filled 3,564,855 Patented Feb.
- the slit is filled with a thixotropic fluid in any case.
- the force required for the forward drive is obtained in that the liquid level in the working space surrounded by the bucket chain excavator at the end face of the slit is maintained lower than in the slit region lying therebehind.
- a practically uniformly distributed drive-on force acts on the bucket chain excavator, whereby providing the possibility of the effective use of a bucket chain excavator.
- a further object of the invention is to provide a device for carrying out the method according to the invention.
- the device includes a vertical U-shaped steel box, on which two endless and laterally telescoping bucket chains are disposed so that, running from below upwards, they break the soil loose at the front side of the slit and dig it.
- the steel box is slightly narrower than the slit to be formed.
- the space between the steel box and the lateral earth is bridged over by suitable seals so that the working space enclosed by the steel box is sealed off from the remaining slit.
- the back side of the steel box is formed in a fashion favourable for the concreting joints so that during the concreting of the slit walls the steel box can be simultaneously utilized as a joint shuttering too.
- the guidance of the bucket chain excavator in the forward drive direction, especially when curved slit walls are to be produced, is enabled by a guide arm arranged on the device above the level of the terrain.
- FIG. 1a shows a horizontal section through a bucket chain excavator according to the invention
- FIG. 1b shows a horizontal section through a bucket chain excavator with another structure of the back side of the steel box
- FIG. 2 shows a vertical longitudinal section in the center axis of a bucket chain excavator according to the invention.
- the slit 1 is excavated by means of a bucket chain excavator 2 by digging the ground 8 at the front side.
- the bucket chain excavator 2 contains a steel box 3 which is U-shaped with respect to a horizontal sectional plane and which is slightly narrower than the slit 1 to be formed.
- the bucket chains 4 are arranged so that, running from below upwards, they break the ground 8 loose and dig it at the front side of the slit.
- the bucket chains 4a and 4b are formed suitably in that the individual buckets are screwed on cables 15. In the present illustrative embodiment, the guidance of the buckets takes place by means of guide rails 5.
- the working space surrounded by the steel box 3 can be separated from the slit region lying therebehind so that the liquid level 7 in the working space can be lowered in comparison with the liquid level in the slit region lying therebehind. Due to such a lowering, a practically uniformly distributed driveon force acts on the steel box 3. In this way, it is possible to drive the bucket chain excavator forward and to press the buckets onto the front side earth 8 as intensely as desired so that an optimum digging capacity can be achieved.
- the rear corners of the steel box are provided with further seals 12 which may, e.g., have the form of inflatable hoses of some resilient material.
- pipes 14 are arranged within the steel box, through which water, a thixotropic liquid or air can be pressed via nozzles into the joint between the steel box 3 and the concrete 13.
- FIG. 1b shows an alternative to the embodiment according to FIG. 1a.
- the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward drive and is inserted always prior to the concreting of the slit wall into the slit so that it abuts the steel box 3.
- the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward drive and is inserted always prior to the concreting of the slit wall into the slit so that it abuts the steel box 3.
- the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward drive and is inserted always prior to the concreting of the slit wall into the slit so that it abuts the steel box 3.
- the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward drive and is inserted always prior to the concreting of the slit wall into the slit so that it abuts the steel box 3.
- the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward
- the drawing of the joint shuttering 16 after resumption of the forward drive and after sufficient setting of the concrete 13 can likewise be facilitated by pressing in of I suitable means into the joint between the concrete 13 and the joint shuttering 16.
- the separate arrangement of the joint shuttering from the bucket chain excavator and respectively the removal thereof after each use has the advantage that the joint straps 9 outside of the slot can be inserted into the joint shuttering in a simple manner.
- the liquid level 7 in the working space is suitably maintained just as high as in the slit 1 lying therebehind, so that the bucket chains 4a and 4b can start running unloaded.
- the liquid level 7 drops and the necessary drive-on force becomes effective.
- the liquid 7 can be lowered or respectively maintained low by additional pumping work.
- a thixotropic liquid can flow again in the necessary amount through an opening 11 adapted to be shut off, from the slit 1 into the working space.
- a guide arm 17 disposed above the level of the terrain serves for controlling the drive-on direction of the bucket chain excavator. If curved slit walls have to be made, then the bucket chain excavator 2 can thus be easily rotated about its vertical axis because the steel box 3 can be formed sufficiently torsionproof and because the clearance between the steel box and the lateral earth permits rotation.
- the weight of the bucket chain excavator 2 and the reaction forces produced during operation of the bucket chains are suitably received by a gantry crane 10. In this manner, the formation of a vertical slit is ensured, and the friction occurring during the forward drive of the bucket chain excavator is minimized. Besides, the depth of the slit can be varied in accordance with the lifting height of the gantry crane 10.
- a particular advantage of the invention is the high digging capacity which is achieved in that the bucket chains continuously dig the earth, while at the same time the drive-on force which can be increased at will and which is uniformly effective beyond the depth of the slit is of decisive importance.
- a method of making slit walls wherein a slit section present in the ground is filled with a fluid and excavated at a front end substantially continuously by means of a bucket chain excavator, wherein the bucket chain excavator is sealed off against the side walls of the excavated slit and against the sole of the slit so that at the side of the bucket chain excavator facing said front end of the slit and within the slit there is formed a first fluidfilled space separate from the second fluid-filled space located behind the bucket chain excavator, wherein the fluid level in said first fluid-filled space is lowered as compared to the fluid level in said second fluid-filled space so that the bucket chain excavator is driven forward by the hydrostatic pressure differential, and wherein the formed slit is subsequently filled up with concrete.
- a device for producing slit walls comprising a bucket chain excavator which extends down to the sole of the slit wall to be produced and which includes a box which extends along the bucket chains and the breadth of which is less than the breadth of the slit wall to be produced, furthermore containing flexible seals for sealing off said box against the side walls of the excavated slit so that spaces separate from each other can be formed within the excavated slit in front of and behind the bucket chain excavator respectively, said spaces being substantially filled with a liquid and means for lowering the liquid level in said space located in front of the bucket chain excavator as compared to the liquid level in said space located behind the bucket chain excavator.
- a device including a guide arm secured to said box above the level of the terrain for rotation of the bucket chain excavator so as to permit the production of curved slit walls.
- a device wherein said bucket chain excavator contains bucket chaims which can be telescoped with respect to the transverse direction.
- a device wherein the back side of said box of the bucket chain excavator is formed as a joint shuttering and includes separate sealing means adapted to be placed on the respective side walls of the formed slit.
- a device wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the produced slit.
- a device wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the produced slit and secured to said box on both sides thereof, and furthermore wherein between said box and said joint shuttering part there are provided propping means having the form of flexible tubes which are arranged at both sides near to the walls of the slit that was formed, and which are adapted to be selectively inflated or relieved.
- a device wherein the back side of said box of the bucket chain excavator is formed as a joint shuttering and includes separate sealing means adapted to be laid on the respective side walls of the formed slit as well as pressure conduits which terminate and open in the back side of said box and through which a suitable pressure medium can be introduced into the joint between said box and the concrete to thereby detach said box from the solidified concrete of the finished part of the slit wall.
- a device wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box as well as separate sealing means adapted to be laid on the respective side walls of the formed slit, and wherein furthermore said joint shuttering part includes pressure conduits which terminate and open in the back side thereof and through which a suitable pressure medium can be introduced into the joint between said joint shuttering part and the concrete to thereby detach said joint shuttering part from the solidified concrete of the finished part of the slit wall.
- a device wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the formed slit, and wherein furthermore said joint shuttering part includes a receiving device for inserting a joint strap to be concreted therein.
- a device wherein said bucket chain excavator is suspended on a crane.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PROPOSED IS A METHOD OF MAKING SLIT WALLS, WHEREIN A SLIT WALL SECTION PRESENT IN THE SOIL AND FILLED WITH A THIXOTROPIC LIQUID IN A KNOWN MANNER IS EXCAVATED AND RESPECTIVELY DRIVEN AHEAD AT A FRONT END BY MEANS OF A BUCKET CHAIN EXCAVATOR. ON THIS OCCASION, THE BUCKET CHAIN EXCAVATOR IS SEALED OFF AGAINST THE IDE WALLS OF THE EXCAVATED SLIT AND AGAINST THE SOLE OF THE SLIT SO THAT LIQUIDFILLED SPACES SEPARATE FROM EACH OTHER ARE CREATED IN FRONT AND IN THE REAR OF THE BUCKET CHAIN EXCAVATOR RESPECTIVELY. FOR PRODUCING THE DRIVE-ON FORCE FOR THE BUCKET CHAIN EXCAVATOR, THE LIQUID LEVEL IN THE SPACE LOCATED IN FRONT OF THE BUCKET CHAIN EXCAVATOR IS LOWERED AS COMPARED TO THE LIQUID LEVEL IN THE SPACE LOCATED BEHIND THE BUCKET CHAIN EXCAVATOR SO THAT THE BUCKET CHAIN EXCAVATOR IS DRIVEN FORWARD BY THE ROSTATIC PRESSURE DIFFERENTIAL. THE SLIT MADE IN THIS MANNER IS SUBSEQUENTLY FILLED UP WITH CONCRETE.
D R A W I N G
D R A W I N G
Description
Feb. 23, 1971 J MQRNER 3,564,855
METHOD AND DEVICE FOR MAKING SLIT WALLS Filed MarCh 20, 1969 3 Sheets-Sheet l INVF N (OR JOHANN M ORNEH BY ATTORNEY Feb. 23, 1971 J. MORNER METHOD AND DEVICE FOR MAKING SLIT WALLS Filed March 20, 1969 3 Sheets-Sheet 2 INVFN'TOH JOHANN MO'RNER K 7 MA V AT I'ORNLY Feb. 23, 1971 MRNER 3,564,855 7 METHOD AND DEVICE you MAKING :3I..1"r WALL};
Filed March 20, 1969 3 SheetsSheet 3 v mm #4 ran JOHANN MUHNF H ATTORNEY United States Patent O1 fice 3,564,855 METHOD AND DEVICE FOR MAKING SLIT WALLS Johann Miirner, 8207 Endorf, Kurf 7, Germany Filed Mar. 20, 1969, Ser. No. 808,757 Claims priority, application Germany, Apr. 8, 1968,
, P 17 59 188.7 Int. Cl. E02d 5/18 US. Cl. 61-35 14 Claims ABSTRACT OF THE DISCLOSURE Proposed is a method of making slit walls, wherein a slit wall section present in the soil and filled with a thixotropic liquid in a known manner is excavated and respectively driven ahead at a front end by means of a bucket chain excavator. On this occasion, the bucket chain excavator is sealed off against the side walls of the excavated slit and against the sole of the slit so that liquid filled spaces separate from each other are created in front and in the rear of the bucket chain excavator respectively. For producing the drive-on force for the bucket chain excavator, the liquid level in the space located in front of the bucket chain excavator is lowered as compared to the liquid level in the space located behind the bucket chain excavator so that the bucket chain excavator is driven forward by the hydrostatic pressure differential. The slit made in this manner is subsequently filled up with concrete.
BACKGROUND OF THE INVENTION This invention relates to methods and devices for making slit walls.
The slit wall construction practice has acquired a great technical importance in recent years especially for the municipal traific engineering, e.g., for constructing subways. Yet for making constructions in busy townships it is particularly important to maintain the time of construction as short as possible in order to reduce any interruptions of the trailic.
A number of various methods have heretofore been developed for making slit walls, and the slits for the slit walls are excavated mostly by means of rope grabs.
However, it turned out that the grab dredging technique just as the various other methods are very timeconsurning, which has unfavourable consequences and in some cases particularly jeopardizes the profitableness of the slit wall building technique.
Also, by the prior art methods it is mostly impossible to avoid cavities which are formed in adjacent earth areas and lead to a needlessly high consumption of concrete as well as to uneven wall surfaces; according to the known methods, it is also necessary to employ separate end shuttings-off or end shutterings such as, e.g., steel tubes for concreting the slit walls, which is a complicated and expensive practice.
SUMMARY OF THE INVENTION The object of the invention is to provide a method permitting a more rapid, rationalized and economical execution of the construction work for making slit walls.
This and other objects of the invention are achieved by a method of making slit walls, wherein a slit section present in the ground is filled with a fluid and excavated at a front end substantially continuously by means of a bucket chain excavator, wherein the bucket chain excavator is sealed off against the side walls of the excavated slit and against the sole of the slit so that at the side of the bucket chain excavator facing said front end of the slit and within the slit there is formed a first fluid-filled 3,564,855 Patented Feb. 23, 1971 space separate from the second fluid-filled space located behind the bucket chain excavator, and wherein the fluid level in said first fluid-filled space is lowered as compared to the fluid level in said second fluid-filled space so that the bucket chain excavator is driven forward by the hydrostatic pressure differential, and finally, wherein the formed slit is subsequently filled up with concrete.
For securing the earth, the slit is filled with a thixotropic fluid in any case. Hence the force required for the forward drive is obtained in that the liquid level in the working space surrounded by the bucket chain excavator at the end face of the slit is maintained lower than in the slit region lying therebehind. In this manner it is achieved that a practically uniformly distributed drive-on force acts on the bucket chain excavator, whereby providing the possibility of the effective use of a bucket chain excavator.
A further object of the invention is to provide a device for carrying out the method according to the invention. The device includes a vertical U-shaped steel box, on which two endless and laterally telescoping bucket chains are disposed so that, running from below upwards, they break the soil loose at the front side of the slit and dig it. The steel box is slightly narrower than the slit to be formed. The space between the steel box and the lateral earth is bridged over by suitable seals so that the working space enclosed by the steel box is sealed off from the remaining slit.
According to a preferred embodiment of the invention, the back side of the steel box is formed in a fashion favourable for the concreting joints so that during the concreting of the slit walls the steel box can be simultaneously utilized as a joint shuttering too.
The guidance of the bucket chain excavator in the forward drive direction, especially when curved slit walls are to be produced, is enabled by a guide arm arranged on the device above the level of the terrain.
BRIEF DESCRIPTION OF THE DRAWINGS- The invention is elucidated in greater detail hereinafter in the light of exemplary embodiments with reference to the drawings, in which:
FIG. 1a shows a horizontal section through a bucket chain excavator according to the invention,
FIG. 1b shows a horizontal section through a bucket chain excavator with another structure of the back side of the steel box, and
FIG. 2 shows a vertical longitudinal section in the center axis of a bucket chain excavator according to the invention.
In the drawings are elucidated and respectiely represented a method and a device for making a slit wall. The slit 1 is excavated by means of a bucket chain excavator 2 by digging the ground 8 at the front side.
As shown especially in FIGS. la and 1b, the bucket chain excavator 2 contains a steel box 3 which is U-shaped with respect to a horizontal sectional plane and which is slightly narrower than the slit 1 to be formed. The bucket chains 4 are arranged so that, running from below upwards, they break the ground 8 loose and dig it at the front side of the slit. There are provided at least two bucket chains 4a and 4b which are formed so that they are adapted to be telescoped laterally and can run downwardly within the steel box 3, as the man skilled in the art may easily learn from FIGS. la and 1b. The bucket chains 4a and 4b are formed suitably in that the individual buckets are screwed on cables 15. In the present illustrative embodiment, the guidance of the buckets takes place by means of guide rails 5.
With the aid of sealing sheets 6, the working space surrounded by the steel box 3 can be separated from the slit region lying therebehind so that the liquid level 7 in the working space can be lowered in comparison with the liquid level in the slit region lying therebehind. Due to such a lowering, a practically uniformly distributed driveon force acts on the steel box 3. In this way, it is possible to drive the bucket chain excavator forward and to press the buckets onto the front side earth 8 as intensely as desired so that an optimum digging capacity can be achieved.
According to the invention, it is futhermore possible during the concreting of the slit wall to simultaneously utilize said steel box as a joint shuttering. As shown in FIG. 1a, to this end the back side of the steel box 3 is formed in a manner corresponding to the desired concreting joint, while at the same time a possibility for incorporating joint straps 9 may be envisaged.
In order to prevent fresh concrete from penetrating the free space between the steel box 3 and the lateral earth, the rear corners of the steel box are provided with further seals 12 which may, e.g., have the form of inflatable hoses of some resilient material.
In order to achieve a reliable detaching of the bucket chain excavator 2 from the concrete 13 after the setting thereof, pipes 14 are arranged within the steel box, through which water, a thixotropic liquid or air can be pressed via nozzles into the joint between the steel box 3 and the concrete 13. As soon as a sufficiently large gap has been formed after detaching the steel box from the concrete, the forward drive of the bucket chain excavator can be continued in the above-described manner according to the invention.
FIG. 1b shows an alternative to the embodiment according to FIG. 1a. In this case, the joint shuttering 16 is separated from the bucket chain excavator 2 during the forward drive and is inserted always prior to the concreting of the slit wall into the slit so that it abuts the steel box 3. In this manner, the diflicult operative phase of the detaching from the concrete is avoided at the bucket chain excavator itself, because a liquid column necessary for the forward drive is available at any rate on the back side of the steel box. It is advisable to underprop the joint shutter ing 16 at the steel box 3 not directly but by means of detachable connectors. As shown in FIG. 1b, this can be realized by two inflatable hoses 18. When the pressure in the hoses is eliminated before the resumption of the forward drive, the bucket chains 4 pressed against the earth 8 due to the pressure of the fresh concrete will become free again and can start running without load.
The drawing of the joint shuttering 16 after resumption of the forward drive and after sufficient setting of the concrete 13 can likewise be facilitated by pressing in of I suitable means into the joint between the concrete 13 and the joint shuttering 16. Also, the separate arrangement of the joint shuttering from the bucket chain excavator and respectively the removal thereof after each use has the advantage that the joint straps 9 outside of the slot can be inserted into the joint shuttering in a simple manner.
At the beginning of the forward drive, the liquid level 7 in the working space is suitably maintained just as high as in the slit 1 lying therebehind, so that the bucket chains 4a and 4b can start running unloaded. As soon as thixotropic liquid is withdrawn from the working space because of the operation of the bucket chains, the liquid level 7 drops and the necessary drive-on force becomes effective. In the event no effective level lowering should be achieved by the operation of the bucket chains 4a and 4b alone, then the liquid 7 can be lowered or respectively maintained low by additional pumping work. On the other hand, if the liquid level drops too much during the forward drive, then a thixotropic liquid can flow again in the necessary amount through an opening 11 adapted to be shut off, from the slit 1 into the working space.
A guide arm 17 disposed above the level of the terrain serves for controlling the drive-on direction of the bucket chain excavator. If curved slit walls have to be made, then the bucket chain excavator 2 can thus be easily rotated about its vertical axis because the steel box 3 can be formed sufficiently torsionproof and because the clearance between the steel box and the lateral earth permits rotation.
The weight of the bucket chain excavator 2 and the reaction forces produced during operation of the bucket chains are suitably received by a gantry crane 10. In this manner, the formation of a vertical slit is ensured, and the friction occurring during the forward drive of the bucket chain excavator is minimized. Besides, the depth of the slit can be varied in accordance with the lifting height of the gantry crane 10.
A particular advantage of the invention is the high digging capacity which is achieved in that the bucket chains continuously dig the earth, while at the same time the drive-on force which can be increased at will and which is uniformly effective beyond the depth of the slit is of decisive importance.
Thus, it is possible to considerably reduce the time of construction and hence to correspondingly decrease the costs for wages and for materials which must be kept in stock. Also, the formation of cavities in the lateral earth is practically out of the question so that a needlessly high consumption of concrete is avoided and completely even slit walls can be produced.
It is to be understood that the invention is not restricted to the described exemplary embodiments but covers a plurality of modification possibilities.
What is claimed is:
1. A method of making slit walls, wherein a slit section present in the ground is filled with a fluid and excavated at a front end substantially continuously by means of a bucket chain excavator, wherein the bucket chain excavator is sealed off against the side walls of the excavated slit and against the sole of the slit so that at the side of the bucket chain excavator facing said front end of the slit and within the slit there is formed a first fluidfilled space separate from the second fluid-filled space located behind the bucket chain excavator, wherein the fluid level in said first fluid-filled space is lowered as compared to the fluid level in said second fluid-filled space so that the bucket chain excavator is driven forward by the hydrostatic pressure differential, and wherein the formed slit is subsequently filled up with concrete.
2. A method according to claim 1, wherein said slit is filled with a thixotropic liquid.
3. A method according to claim 1, wherein the liquid level in said first liquid-filled space is lowered by the operation of the buckets of the bucket chain excavator.
4. A method according to claim 1, wherein the liquid level in said first liquid-filled space is lowered by pumping off the liquid.
5. A device for producing slit walls, comprising a bucket chain excavator which extends down to the sole of the slit wall to be produced and which includes a box which extends along the bucket chains and the breadth of which is less than the breadth of the slit wall to be produced, furthermore containing flexible seals for sealing off said box against the side walls of the excavated slit so that spaces separate from each other can be formed within the excavated slit in front of and behind the bucket chain excavator respectively, said spaces being substantially filled with a liquid and means for lowering the liquid level in said space located in front of the bucket chain excavator as compared to the liquid level in said space located behind the bucket chain excavator.
6. A device according to claim 5, including a guide arm secured to said box above the level of the terrain for rotation of the bucket chain excavator so as to permit the production of curved slit walls.
7. A device according to claim 5, wherein said bucket chain excavator contains bucket chaims which can be telescoped with respect to the transverse direction.
8. A device according to claim 5, wherein the back side of said box of the bucket chain excavator is formed as a joint shuttering and includes separate sealing means adapted to be placed on the respective side walls of the formed slit.
9. A device according to claim 5, wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the produced slit.
10. A device according to claim 5, wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the produced slit and secured to said box on both sides thereof, and furthermore wherein between said box and said joint shuttering part there are provided propping means having the form of flexible tubes which are arranged at both sides near to the walls of the slit that was formed, and which are adapted to be selectively inflated or relieved.
11. A device according to claim 5, wherein the back side of said box of the bucket chain excavator is formed as a joint shuttering and includes separate sealing means adapted to be laid on the respective side walls of the formed slit as well as pressure conduits which terminate and open in the back side of said box and through which a suitable pressure medium can be introduced into the joint between said box and the concrete to thereby detach said box from the solidified concrete of the finished part of the slit wall.
12. A device according to claim 5, wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box as well as separate sealing means adapted to be laid on the respective side walls of the formed slit, and wherein furthermore said joint shuttering part includes pressure conduits which terminate and open in the back side thereof and through which a suitable pressure medium can be introduced into the joint between said joint shuttering part and the concrete to thereby detach said joint shuttering part from the solidified concrete of the finished part of the slit wall.
13. A device according to claim 5, wherein at the back side of said box of the bucket chain excavator there are provided a joint shuttering part extending parallel to said box, as well as separate sealing means adapted to be laid on the respective side walls of the formed slit, and wherein furthermore said joint shuttering part includes a receiving device for inserting a joint strap to be concreted therein.
14. A device according to claim 5, wherein said bucket chain excavator is suspended on a crane.
References Cited UNITED STATES PATENTS 3,385,068 5/1968 Armentrout 61-35X 3,416,322 12/1968 Bodine 6135 3,464,665 9/1969 Schoewert 6135X DAVID J. WILLIAMOWSKY, Primary Examiner P. C. KANNAN, Assistant Examiner
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19681759188 DE1759188C (en) | 1968-04-08 | Method for producing diaphragm walls |
Publications (1)
Publication Number | Publication Date |
---|---|
US3564855A true US3564855A (en) | 1971-02-23 |
Family
ID=5695438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US308757*[A Expired - Lifetime US3564855A (en) | 1968-04-08 | 1969-03-20 | Method and device for making slit walls |
Country Status (2)
Country | Link |
---|---|
US (1) | US3564855A (en) |
AT (1) | AT297611B (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3893302A (en) * | 1973-10-25 | 1975-07-08 | Rapidex Inc | Machine and method for excavating trenches and for constructing walls in trenches |
US3968658A (en) * | 1973-09-12 | 1976-07-13 | Schlegel Engineering Gmbh | Method and apparatus for introducing water-proof sheeting into the ground in a vertical position |
FR2473091A1 (en) * | 1980-01-08 | 1981-07-10 | Sif Entreprise Bachy | Mechanically stripped end shutter for underground concrete walls - has inflatable tubes forcing shutter free of set concrete and forming shaped face for next section |
EP0048444A2 (en) * | 1980-09-19 | 1982-03-31 | Robert Pföderl | Method and shuttering element for producing slit walls in the ground |
US4329083A (en) * | 1977-01-26 | 1982-05-11 | Societe Soletanche | Methods of laying underground conduits |
US4379658A (en) * | 1980-12-03 | 1983-04-12 | Thatcher Engineering Corporation | Method and apparatus for constructing slurry walls |
FR2542780A1 (en) * | 1983-03-18 | 1984-09-21 | Intrafor Cofor | Method and device for improving the joint between successive panels of a reinforced concrete wall cast in the ground |
EP0185418A1 (en) * | 1984-11-29 | 1986-06-25 | Hollandsche Beton Groep N.V. | Method and device for the installation of a watertight shield in the soil |
EP0186921A1 (en) * | 1984-11-29 | 1986-07-09 | Hollandsche Beton Groep N.V. | Device for the construction of a vertical channel in the soil |
FR2648848A1 (en) * | 1989-06-23 | 1990-12-28 | Buchenaud Joel | Pneumatic joint between panels of cast walls |
US5056242A (en) * | 1989-05-12 | 1991-10-15 | Finic, B.V. | Underground wall construction method and apparatus |
US5247743A (en) * | 1992-07-02 | 1993-09-28 | Eagle-Picher Industries, Inc. | Method and apparatus for digging trenches |
WO2008022393A1 (en) * | 2006-08-24 | 2008-02-28 | Leigh Goullet | Method and means for creating subterranean excavations and/or constructions |
EP2028319A1 (en) * | 2007-08-23 | 2009-02-25 | BAUER Maschinen GmbH | Milling device for earth working. |
US11560684B2 (en) * | 2018-06-27 | 2023-01-24 | Soletanche Freyssinet | Formwork element provided with sacrificial sections |
-
1969
- 1969-03-20 US US308757*[A patent/US3564855A/en not_active Expired - Lifetime
- 1969-04-03 AT AT326869A patent/AT297611B/en not_active IP Right Cessation
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3968658A (en) * | 1973-09-12 | 1976-07-13 | Schlegel Engineering Gmbh | Method and apparatus for introducing water-proof sheeting into the ground in a vertical position |
US3893302A (en) * | 1973-10-25 | 1975-07-08 | Rapidex Inc | Machine and method for excavating trenches and for constructing walls in trenches |
US4329083A (en) * | 1977-01-26 | 1982-05-11 | Societe Soletanche | Methods of laying underground conduits |
FR2473091A1 (en) * | 1980-01-08 | 1981-07-10 | Sif Entreprise Bachy | Mechanically stripped end shutter for underground concrete walls - has inflatable tubes forcing shutter free of set concrete and forming shaped face for next section |
EP0048444A2 (en) * | 1980-09-19 | 1982-03-31 | Robert Pföderl | Method and shuttering element for producing slit walls in the ground |
EP0048444A3 (en) * | 1980-09-19 | 1982-06-09 | Robert Pfoderl | Method and shuttering element for producing slit walls in the ground |
US4379658A (en) * | 1980-12-03 | 1983-04-12 | Thatcher Engineering Corporation | Method and apparatus for constructing slurry walls |
FR2542780A1 (en) * | 1983-03-18 | 1984-09-21 | Intrafor Cofor | Method and device for improving the joint between successive panels of a reinforced concrete wall cast in the ground |
EP0185418A1 (en) * | 1984-11-29 | 1986-06-25 | Hollandsche Beton Groep N.V. | Method and device for the installation of a watertight shield in the soil |
EP0186921A1 (en) * | 1984-11-29 | 1986-07-09 | Hollandsche Beton Groep N.V. | Device for the construction of a vertical channel in the soil |
US5056242A (en) * | 1989-05-12 | 1991-10-15 | Finic, B.V. | Underground wall construction method and apparatus |
FR2648848A1 (en) * | 1989-06-23 | 1990-12-28 | Buchenaud Joel | Pneumatic joint between panels of cast walls |
US5247743A (en) * | 1992-07-02 | 1993-09-28 | Eagle-Picher Industries, Inc. | Method and apparatus for digging trenches |
WO2008022393A1 (en) * | 2006-08-24 | 2008-02-28 | Leigh Goullet | Method and means for creating subterranean excavations and/or constructions |
EP2028319A1 (en) * | 2007-08-23 | 2009-02-25 | BAUER Maschinen GmbH | Milling device for earth working. |
US11560684B2 (en) * | 2018-06-27 | 2023-01-24 | Soletanche Freyssinet | Formwork element provided with sacrificial sections |
Also Published As
Publication number | Publication date |
---|---|
DE1759188B1 (en) | 1972-07-06 |
AT297611B (en) | 1972-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3564855A (en) | Method and device for making slit walls | |
US3893302A (en) | Machine and method for excavating trenches and for constructing walls in trenches | |
US4696607A (en) | Slurry trench method and apparatus for constructing underground walls | |
US5056242A (en) | Underground wall construction method and apparatus | |
EP0407934A2 (en) | Method for executing monolithic continuous straights or circular structural walls and a machine for realizing such a method | |
JPS604358B2 (en) | A shield excavation device for excavating a graben using an open sheet pile enclosure and laying pipe rows within the graben. | |
KR20040097967A (en) | Construction method of three arch excavation tunnel | |
CN106759463A (en) | A kind of hypogee and its construction method | |
US4943189A (en) | Method of contructing a vertical barrier wall in the ground, as well as apparatus for applying this method | |
US3636715A (en) | Method of and machine for erecting long straggling subterraneous buildings | |
JPH09158174A (en) | Water stopping mechanism and method between case bodies of underground continuous wall | |
EP0665917B1 (en) | Polder principle using shielding walls and method for producing said polder | |
JP2849822B2 (en) | Underground diaphragm wall excavation method and its equipment | |
CN110424331A (en) | A kind of power station pin-connected panel water-drawing channel and construction method | |
US933776A (en) | Sinking shafts and the like. | |
RU2058464C1 (en) | Method for making foundation | |
JP2673940B2 (en) | How to build a horizontal plate-like structure in the ground | |
JP3159082B2 (en) | Cutting joint structure and flute excavator | |
GB1314933A (en) | Methods and apparatus for excavating trenches and casting diaphragm walls | |
JPS61274016A (en) | Continuous sheathing work | |
JP2592902B2 (en) | How to put a long pipe into the groove in sheet pile construction | |
JP2821933B2 (en) | Underground structure construction method | |
JPH054490B2 (en) | ||
JPS59203191A (en) | Opening, drilling and propelling construction method | |
JPH11152988A (en) | Construction method of underground structure |