US3199301A - Foundation pile - Google Patents

Foundation pile Download PDF

Info

Publication number
US3199301A
US3199301A US56409A US5640960A US3199301A US 3199301 A US3199301 A US 3199301A US 56409 A US56409 A US 56409A US 5640960 A US5640960 A US 5640960A US 3199301 A US3199301 A US 3199301A
Authority
US
United States
Prior art keywords
stalk
pile
group
extend downwardly
branch members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US56409A
Inventor
Chitis Wolf
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3199301A publication Critical patent/US3199301A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length

Definitions

  • the present invention relates to foundation piles and its main object is to provide foundation piles Comprising an upper solid portion and a lower portion branching out in a plurality of smaller diameter stumps.
  • a foundation pile which is in accordance with the above mentioned requisites, and namely same is constituted by an upper portion having a remarkable diameter, so as to withstand very well even to the tangential stresses, while the lower portion of said pile is constituted by a certain number of smaller diameter, vertical or inclined, roots or stumps and such that the perimetrical total development of this plurality of stumps be remarkably hi her that the perimetrical development of the solid upper large diameter stalk.
  • FIG. 1 shows an axial section of a pile according to the invention
  • FIG. 2 shows the cross-section of said pile, taken along the line A-B in FIG. 1.
  • pile according to the invention comprises an upper portion 1, of a rather large diameter, remaining practically the same over all its length, While to said first portion there follows a second portion formed by a plurality of smaller diameter stumps, such as those shown with 2, 3, 4-, 5, 6, 7, 8, 9, 1f), 11 and 12, in the drawing. From FIGURES l and 2 taken together, it can be seen that the smaller diameter stumps 8, 9, f0, 6, l1 and 12 comprise a first group of branch members which are integral with the upper portion 1 at their upper ends and extend downwardly therefrom to a greater depth.
  • the stumps or branches 8, 9, Ill, 6, 11 and 12 approximately converge at their upper ends and extend downwardly and outwardly at an angle of inclination to the axis of the upper portion 1 so as to define a generally conical surface substantially concentric relative to the upper portion 1.
  • the smaller diameter stumps 2, 3, 4 and 5 comprise a second group of branch members which are integral with the upper portion 1 at their upper ends and extend downwardly therefrom to a greater depth.
  • the stumps or branches 2, 3, 4 and 5 also approximately converge at their upper ends and extend downwardly and outwardly at a greater angle of inclination to the upper portion 1 than the first group of branches so as to define a second generally conical surface which surrounds the first group of branch members and is substantially concentric with respect thereto.
  • stumps, branching out from the upper stalk of the pile may have an inclined position, with a larger or lesser opening, according to cases, or else they may even be parallel to one another; however, in all cases, there will be obtained what was sought, namely that the upper portion be particularly adapted to withstand especially transverse and tangential stresses, While the lower portion offers a great friction resistance with the ground and therefore can carry very high loads. In this way there are achieved with a limited amount of materials, for instance concrete foundation piles capable of carrying very high loads.
  • piles may also be realized using prefabricated elements whether made of concrete, metal or Wood, and in the upper stall; there can be foreseen suitable recesses for successively realizing the lower stumps; all these variants however, will all fall into the scope of the present invention.
  • a foundation pile for construction works comprising an upper stalk extending downwardly into the ground to a relatively shallow depth, a first group of branch members which are integral with said stalk at their upper ends and extend downwardly therefrom to a greater depth, said members being arranged so as to approach one another and thereby approximately converge at their upper ends and to extend downwardly and outwardly at an angle of inclination to the axis of said stalk so as to define an approximately conical surface substantially concentric with respect to said stalk, and a second group of branch members which are integral with said stalk at their upper.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

Aug. 10, 1965 w. cHrrls FOUNDATION PILE Filed Sept. 16. 1960 INVf/W'UR WOLF CHITIS ATTORNE'SAS United States Patent 3,199,391 FSUNDATK KBN MILE Wolf Grids, Via Verdi 35, Naples, litaly Filed Sept. 16, 195i), Ser. No. 56,4-il9 Claims priority, application ltaly, 23, E59, Patent 625,364 2 Claims. (Cl. er-s3.s
The present invention relates to foundation piles and its main object is to provide foundation piles Comprising an upper solid portion and a lower portion branching out in a plurality of smaller diameter stumps.
It is known the use, in carrying out foundations for construction works, of piles made of concrete, prepared in the field, and successively driven into the ground, or else directly poured in situ, after boring the ground. In most cases, when no bed of rock or of particularly resisting soil may be found, on which to prop and abut the foot of the pile or foundation, the capacity of said pile to support a load is essentially based on the resistance that arises by adherence, between the lateral surface of the pile and the adjacent soil. Consequently the load carrying capacity of the pile will be the higher as the greater will be the extension of the contact surface with the ground.
For this reason there are often used piles of rather large diameter, when the load carrying capacity of the pile has to be great. On the other side however, it has to be noted that with increasing pile diameter, While its circumference, which actually defines the friction surface, increases directly with the diameter, the pile cross-section, which determines its cost, increases with the diameter square. Hence the convenience, when carrying out a foundation, to employ several piles of small diameter rather than a small number of large diameter piles.
However, in some particularly important cases, there are used piles of a remarkable diameter because of the fact that said piles, besides carrying the normal vertical loads, are capable to better withstand eventual tangential stresses in correspondence with the region of application of the building superstructures. Moreover, if the foundation pile diameter is rather large, the load stresses in said attachment region are maintained within reduced limits, what is highly desirable.
As a result of the foregoing remarks, it is convenient to have foundation piles, having a suitable load carrying capacity in their upper portion, for the reason already set out above, while in depth, the tangential stresses acting on the very pile. have a tendency to decrease by effect of the supporting action exercised by the ground. However, in the depth, it is more desirable the possibility of having maximum development of the contact surface between pile and ground, inasmuch as this is what determines the load carrying capacity of the pile.
It is the object of the present invention a foundation pile which is in accordance with the above mentioned requisites, and namely same is constituted by an upper portion having a remarkable diameter, so as to withstand very well even to the tangential stresses, while the lower portion of said pile is constituted by a certain number of smaller diameter, vertical or inclined, roots or stumps and such that the perimetrical total development of this plurality of stumps be remarkably hi her that the perimetrical development of the solid upper large diameter stalk.
The accompanying drawing illustrates diagrammatically and in the way of an example, a pile according to the invention, and precisely:
FIG. 1 shows an axial section of a pile according to the invention, and
FIG. 2 shows the cross-section of said pile, taken along the line A-B in FIG. 1.
As it is apparent from the FIG. 1, in the drawing, the
"ice
pile according to the invention comprises an upper portion 1, of a rather large diameter, remaining practically the same over all its length, While to said first portion there follows a second portion formed by a plurality of smaller diameter stumps, such as those shown with 2, 3, 4-, 5, 6, 7, 8, 9, 1f), 11 and 12, in the drawing. From FIGURES l and 2 taken together, it can be seen that the smaller diameter stumps 8, 9, f0, 6, l1 and 12 comprise a first group of branch members which are integral with the upper portion 1 at their upper ends and extend downwardly therefrom to a greater depth. The stumps or branches 8, 9, Ill, 6, 11 and 12 approximately converge at their upper ends and extend downwardly and outwardly at an angle of inclination to the axis of the upper portion 1 so as to define a generally conical surface substantially concentric relative to the upper portion 1. It will further be seen from the drawings that the smaller diameter stumps 2, 3, 4 and 5 comprise a second group of branch members which are integral with the upper portion 1 at their upper ends and extend downwardly therefrom to a greater depth. The stumps or branches 2, 3, 4 and 5 also approximately converge at their upper ends and extend downwardly and outwardly at a greater angle of inclination to the upper portion 1 than the first group of branches so as to define a second generally conical surface which surrounds the first group of branch members and is substantially concentric with respect thereto.
As already mentioned above, such stumps, branching out from the upper stalk of the pile, may have an inclined position, with a larger or lesser opening, according to cases, or else they may even be parallel to one another; however, in all cases, there will be obtained what was sought, namely that the upper portion be particularly adapted to withstand especially transverse and tangential stresses, While the lower portion offers a great friction resistance with the ground and therefore can carry very high loads. In this way there are achieved with a limited amount of materials, for instance concrete foundation piles capable of carrying very high loads.
It is also an object of the present invention the way of realising such piles: according to same, by means of standard facilities, there is bored a hole having the diameter and depth of the upper portion 1 of the piles, and the concrete or another similar material is directly poured therein. successively, said stalk l is bored itself and these borings extend in the ground below it, in the number and with a predetermined path in order to realize the plurality of lower stumps constituting the deeper portion of the pile; and in these borings there is poured the concrete to form the corresponding smaller diameter stumps, thus obtaining in a simple way and with -a reduced amount of material, foundation piles according to the invention, and capable to withstand easily to all stresses.
According to a variant for the realization of these piles first all the boring work is carried out; that is first there is bored 21 large hole to a depth correspondng to the portion 1, and successively there are bored also the deeper and smaller holes for the stumps with the successive reference numbers and then there is simultaneously poured the concrete for both the small diameter stumps and the upper solid, large diameter, stalk of the pile.
Of course, these methods of obtaining these piles have no limiting value inasmuch as said piles may also be realized using prefabricated elements whether made of concrete, metal or Wood, and in the upper stall; there can be foreseen suitable recesses for successively realizing the lower stumps; all these variants however, will all fall into the scope of the present invention.
There is also foreseen, in embodying piles according to the present invention, and in order to obtain a first compacting of the footing of said upper stalk of the pile,
from which there are to be branched the lower stumps, to subject the upper stalk to a certain load and thereafter, that is upon obtainment of the compacting of the foot of said upper-stalk, there are bored the holes for obtaining the lower multiple branch stumps of the pile.
What I claim is:
1. A foundation pile for construction works comprising an upper stalk extending downwardly into the ground to a relatively shallow depth, a first group of branch members which are integral with said stalk at their upper ends and extend downwardly therefrom to a greater depth, said members being arranged so as to approach one another and thereby approximately converge at their upper ends and to extend downwardly and outwardly at an angle of inclination to the axis of said stalk so as to define an approximately conical surface substantially concentric with respect to said stalk, and a second group of branch members which are integral with said stalk at their upper. ends and extend downwardly therefrom to a greater ,depth, said second branch members being arranged so as to approach one another and thereby approximately ,converge at their upper ends and to extend downwardly and outwardly at a greater angle of inclination to the axis of said upper stalk than said first group of branch members so as to define a second approximately conical References Cited by the Examiner UNITED STATES PATENTS 794,971 7/05 Ericsson 61'50 1,443,306 1/23 Blumenthal 61-53.6 1,609,260 11/26 Malone 61-53.6 X
' 2,082,773 7/37 Adams 6150 FOREIGN PATENTS 2,929 1855 Great Britain. 567,908 3/ 45 Great Britain.
60,410 11/42 Denmark;
335,259 a 3/21 Germany.
502,416 8/56 Italy.
245 ,930 8/47 Switzerland.
EARL I. NITMER, Primary Examiner.
WILLIAM I. MUSHAKE, JACOB L. NACKENOFF,
' Examiners.

Claims (1)

1. A FOUNDATION PILE FOR CONSTRUCTION WORKS COMPRISING AN UPPER STALK EXTENDING DOWNWARDLY INTO THE GROUND TO A RELATIVELY SHALLOW DEPTH, A FIRST GROUP OF BRANCH MEMBERS WHICH ARE INTEGRAL WITH SAID STALK AT THEIR UPPER ENDS AND EXTEND DOWNWARDLY THEREFROM TO A GREATER DEPTH SAID MEMBERS BEING ARRANGED SO AS TO APPROACH ONE ANOTHER AND THEREBY APPROXIMATELY CONVERGE AT THEIR UPPER ENDS AND TO EXTEND DOWNWARDLY AND OUTWARDLY AT AN ANGLE OF INCLINATION TO THE AXIS OF SAID STALK SO AS TO DEFINE AN APPROXIMATELY CONICAL SURFACE SUBSTANTIALLY CONCENTRIC WITH RESPECT TO SAID STALK, AND A SECOND GROUP OF BRANCH MEMBERS WHICH ARE INTEGRAL WITH SAID STALK AT THEIR UPPER ENDS AND EXTEND DOWNWARDLY THEREFROM TO A GREATER DEPTH, SAID SECOND BRANCH MEMBERS BEING ARRANGED SO AS TO APPROCAH ONE ANOTHER AND THEREBY APPROXIMATELY CONVERGE AT THEIR UPPER ENDS AND TO EXTEND DOWNWARDLY AND OUTWARDLY AT A GREATER ANGLE OF INCLINATION TO THE AXIS OF SAID UPPER STALK THAN SAID FIRST GROUP OF BRANCH MEMBERS SO AS TO DEFINE TO A SECOND APPROXIMATELY CONICAL SURFACE SURROUNDING SAID FIRST GROUP OF BRANCH MEMBERS AND SUBSTANIALLY CONCENTRIC WITH RESPECT THERETO.
US56409A 1959-09-23 1960-09-16 Foundation pile Expired - Lifetime US3199301A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT3199301X 1959-09-23

Publications (1)

Publication Number Publication Date
US3199301A true US3199301A (en) 1965-08-10

Family

ID=11437064

Family Applications (1)

Application Number Title Priority Date Filing Date
US56409A Expired - Lifetime US3199301A (en) 1959-09-23 1960-09-16 Foundation pile

Country Status (1)

Country Link
US (1) US3199301A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4040260A (en) * 1975-03-26 1977-08-09 Pynford Limited Pile with downwardly extending elongated elements
DE102018119673A1 (en) 2017-08-15 2019-02-21 General Electric Company Selective modification of building strategy parameters for additive manufacturing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US794971A (en) * 1904-02-23 1905-07-18 Henry Ericsson Foundation.
DE335259C (en) * 1920-04-21 1921-03-29 August Wolfsholz Foundation for large power machines
US1443306A (en) * 1919-08-05 1923-01-23 Blumenthal Maurice Means for and method of producing concrete piles
US1609260A (en) * 1923-10-03 1926-11-30 Blaw Knox Co Ground anchorage for upright structures
US2082773A (en) * 1934-05-02 1937-06-08 William G Adams Method and apparatus for building subaqueous foundations
DK60410C (en) * 1938-05-09 1942-12-07 Frankignoul Pieux Armes Procedure for the Execution of Foundations of Pillars for Bridges and Similar Structures.
GB567908A (en) * 1943-09-02 1945-03-07 Ronald Aver Duncan Improvements in or relating to foundations for building structures
CH245930A (en) * 1944-12-22 1946-12-15 Leemann Edwin Pressed concrete construction process for the production of building structures under water.

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US794971A (en) * 1904-02-23 1905-07-18 Henry Ericsson Foundation.
US1443306A (en) * 1919-08-05 1923-01-23 Blumenthal Maurice Means for and method of producing concrete piles
DE335259C (en) * 1920-04-21 1921-03-29 August Wolfsholz Foundation for large power machines
US1609260A (en) * 1923-10-03 1926-11-30 Blaw Knox Co Ground anchorage for upright structures
US2082773A (en) * 1934-05-02 1937-06-08 William G Adams Method and apparatus for building subaqueous foundations
DK60410C (en) * 1938-05-09 1942-12-07 Frankignoul Pieux Armes Procedure for the Execution of Foundations of Pillars for Bridges and Similar Structures.
GB567908A (en) * 1943-09-02 1945-03-07 Ronald Aver Duncan Improvements in or relating to foundations for building structures
CH245930A (en) * 1944-12-22 1946-12-15 Leemann Edwin Pressed concrete construction process for the production of building structures under water.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4040260A (en) * 1975-03-26 1977-08-09 Pynford Limited Pile with downwardly extending elongated elements
DE102018119673A1 (en) 2017-08-15 2019-02-21 General Electric Company Selective modification of building strategy parameters for additive manufacturing

Similar Documents

Publication Publication Date Title
US3391544A (en) Means and method of forming concrete piles
US3087308A (en) Method of installing piles for resisting upward soil movements
US3903662A (en) Method of securing structural support elements in soil
CN208563346U (en) A kind of large span band angle brace prestressing force Double-row Piles Support system
US3992890A (en) Method of forming foundations
CN103485351A (en) Inclined pile vertical anchor rod supporting structure for foundation pit supporting and construction method thereof
US3199301A (en) Foundation pile
US2063052A (en) Self-securing and propelling anchor
US4040260A (en) Pile with downwardly extending elongated elements
CN207159983U (en) A kind of soft clay area building lot structure of cement mixing method combination Pulling-Resistant Anchor Rod
CN203498841U (en) Inclined pile vertical anchor rod supporting structure used for foundation pit supporting
CN205276289U (en) Prestressed concrete beam formula double row pile struts system
JP4960492B2 (en) Foundation structure and construction method of foundation structure
US3333427A (en) Boot for pilot timber pile
KR102272452B1 (en) Spiral pile constructing method and spiral pile applied by the same
SU937617A1 (en) Pile foundation
JPH05311649A (en) Conical multi-blade steel tube friction pile and its burying method
JPH0355612B2 (en)
CN211872979U (en) Multi-row ultra-deep oblique composite anchor rod pile for narrow space
JPS62268424A (en) Underground pile used in common for earth anchor
CN219568940U (en) Civil construction foundation pile device
GB794842A (en) Improvements in or relating to the formation of subterranean anchorages
SU687184A1 (en) Pile foundation
CN211228519U (en) Opposite-pulling supporting structure
JPH0351365Y2 (en)