US317337A - goodridge - Google Patents

goodridge Download PDF

Info

Publication number
US317337A
US317337A US317337DA US317337A US 317337 A US317337 A US 317337A US 317337D A US317337D A US 317337DA US 317337 A US317337 A US 317337A
Authority
US
United States
Prior art keywords
lagging
beton
concrete
beams
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US317337A publication Critical patent/US317337A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Definitions

  • My invention consists in combiningthe mold with the work itself in suoli a manner that the ordinarily useless portions of the mold form an integral portion'ot the completed work, and add the strength of4 the material of which they are composed to the strength of the beton or concrete; or, in other words, it has been the practice to support the lagging, which gives the desired form to the beton or concrete, upon centers or other heavy timbering placed without the space to -be occupied by the completed work, w-hile my method is to erect the supports for the lagging or centering within the space to be filled with the completed work, and hanging the lagging upon them, so to speak, thus diminishing the working-room required, cheapening the cost of the structure, increasing its strength, and simplifying and eXpediting it.
  • Figures I, 2, and S' represent my method as applied to the lining of railway tunnels or arches.
  • Fig. 4 represents a detail in the saine construction.
  • Fig. 5 represents my method as applied to a bridge-pier or any mass of masonry or of earth or natural rock which it is necessary to strengthen.
  • Iline a tunnel by my method as follows: I provide a sufficient number of iron beams,
  • FIG. l in which A is the natural rock; B, the space to be filled; C, one of the iron beams; D, the contour of the completed lining, and ll the lagging.
  • FIG. 4 Vhere it is not desired to remove the lagging, no special provision need be made for IPO that purpose; but where it is desired I arrange it as shown in Fig. 4.
  • F are iron plates secured to the inner iianges of the beams by screw-bolts and nuts, as shown.
  • E is the lagging resting on said iron plates F.
  • G are the screw bolts screwed into the iron beams and passing through the plates F, and there provided with nuts. These bolts G are surrounded by thimbles H. The beton or concrete is then packed in and around them in the usual manner, and when it has set,by unscrewing the nuts the plates F and the lagging E may be removed.
  • the thimble may be dispensed withand the iron bolts allowed to project, or they may be cut od after the lagging is removed, if preferred. It is obvious that this method is equally applicable to the construction of a shaft by conforming the beams to the required shape of the Work.
  • G C are iron beams erected perpendicularly nt such distances from one another as the nature of the strain they areto endure requiressay, from three to six feet apartand surrounding the work. These are clamped together by tie-rods and braces in the usual manner, thus forming a skeleton framework surrounding the pier.
  • E is the lagging, placed as hereinbefore described, and B the space to be filled.
  • the lagging is placed in position piece by piece as the work progresses, so as to have as little as possible thereof unfilled to be supported against the current of the water.
  • the beton has sct,the beams and their connections are firmly embedded in the beton and become an integral part of the structure, as in the case hereinbefore described.
  • Substantially the saine method is used to incase a mass of earth or rock or any structure like a column or chimney, or it may be built within the structure, as in a well, or lining a monument or statue. In all these cases the lagging may, if necessary, be temporarily braced in position until the filling renders this unnecessary.
  • the herein-described lining or casing for tunnels, shafts, piers, abutment-s, Ste. which consists of aframe of the required shape placed a suitable distance from the structure to be incased, beton or concrete so applied as to enibed said frame therein, and sand ,broken stone, or other cheap material iilled in between the beton or concrete and the surface incased thereby, substantially as set forth.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Bridges Or Land Bridges (AREA)

Description

(No Model.) 2'Sheets-'-Sheet 1.
. J. G. GoopRIDGE, Jr.
METHOD OF REPAIIRING WITH BETONOR GUNGRE'IB.
No. 317,337'. Patented May 5, 1885.
[Flack WITNESSES: l
ATTORNEY n mins, muur-dof. www. 'l C (No Model.) 2 Sheets-Sheet 2. I
J. C. GOODRIDGE, Jr. x
METHOD OF REPAIRING WITH BETON OR GONGRETB.
N0.317,337. A PatentedvMay l51,1885. -ff/ TW ATTORNEY n. unen WMM D' C UNITED' i STATES PATENT OEEICE.
JOHN c. coonmncn, Jn., OE new Yoan, n. r.-
NIETHODOFREPAIRING WITH BETON OR CONCRETE.
SPECIFICATION forming part of Letters Patent No. 317.337, dated May 5,1885.
i Application tiled August 27, 1884. (No model.)
To alt whom, it may concern:
Beit known that I, JOHN C. Gooninnen, J r., of New York, in the county of New York and State of New York, have invented a new and useful Improvement in the Method of Repairing and Building with Beton or Concrete,
v ward to fill the beton or concrete within the mold, allowing the latter to remain until its contents have. hardened, and then to remove the mold. This method is open to this objection: In railroad work-such as lining tunnels, Stef-large and heavy centers and timbers placed within the tunnel so reduce its area as to impede the use of the track altogether. It might further be observed that in all such cases the mold adds nothing to the ultimate strength of the work., while it is an expense.
My invention consists in combiningthe mold with the work itself in suoli a manner that the ordinarily useless portions of the mold form an integral portion'ot the completed work, and add the strength of4 the material of which they are composed to the strength of the beton or concrete; or, in other words, it has been the practice to support the lagging, which gives the desired form to the beton or concrete, upon centers or other heavy timbering placed without the space to -be occupied by the completed work, w-hile my method is to erect the supports for the lagging or centering within the space to be filled with the completed work, and hanging the lagging upon them, so to speak, thus diminishing the working-room required, cheapening the cost of the structure, increasing its strength, and simplifying and eXpediting it.
Figures I, 2, and S'represent my method as applied to the lining of railway tunnels or arches. Fig. 4 represents a detail in the saine construction. Fig. 5 represents my method as applied to a bridge-pier or any mass of masonry or of earth or natural rock which it is necessary to strengthen.
Iline a tunnel by my method as follows: I provide a sufficient number of iron beams,
4the load they are to sustain.
bent to conform to the required arch, and erect them at proper distances from one anothersay from three torsix feet apart-according to These I brace and tie together in the usual manner, thus forming a center within the arch, as shown in Fig. l, in which A is the natural rock; B, the space to be filled; C, one of the iron beams; D, the contour of the completed lining, and ll the lagging.
For important work beams of the cross section shown in Fig. et and of a depth proportional to the load to be borne are preferred, while for minor work old railway-rails will answer every purpose; but the best sectional dimensions for and the intervals between these beams will of course vary with the peculiarities of each individual case, and can readily be calculated by any engineer familiar therewith. I Vhen the center is complete, as aforesaid, the lagging is then placed upon the flanges of the beams by pushing them into place, as shown in Fig. 2, which is a plan view of the work, and in which A indica-tes the natural rock; B, the space to be iilled; C, the iron beams aforesaid; E, the lagging, which may be either of boards, as is usual, or iron plates. The space B between the lagging and t-he natural rock is then filled in the usual nianner with beton or concrete. The beams and their tie-rods and braces thus become solidly embedded in and an integral part of the work, and lend their Strength thereto, while they are completely protected by the subst-ance by which they are incased from deterioration. Often large void spaces intervene between the lagging and the natural rock where the latter has fallen down. These it has been the custom to fill in with the same material as the lining itself at, ofcourse, a like expense per cubic foot. In such cases I proceed as shown in Fig. 3, wherein A is the natural rock; B, the space to be filled; C, iron beams, and E Il two separated layers of lagging, secured as shown. I then fill in the space between the two layers of lagging with the material with which the tunnel is to be lined; but the space I3 between the lagging E and the natural rock I till with broken stone, sand, or other cheap material, which will answer every purpose.
Vhere it is not desired to remove the lagging, no special provision need be made for IPO that purpose; but where it is desired I arrange it as shown in Fig. 4. In that figure F, are iron plates secured to the inner iianges of the beams by screw-bolts and nuts, as shown. E is the lagging resting on said iron plates F. G are the screw bolts screwed into the iron beams and passing through the plates F, and there provided with nuts. These bolts G are surrounded by thimbles H. The beton or concrete is then packed in and around them in the usual manner, and when it has set,by unscrewing the nuts the plates F and the lagging E may be removed. Then by unscrewing the bolts G from the beams only the thimbles remain to be filled. Thus the beams C are completely embedded in the beton, and a smooth inner surface to the tunnel'is obtained. Still the thimble may be dispensed withand the iron bolts allowed to project, or they may be cut od after the lagging is removed, if preferred. It is obvious that this method is equally applicable to the construction of a shaft by conforming the beams to the required shape of the Work. l
It is often desirable to incase a bridge-pier or other structure or a mass of earth or rock. Thishas been done by building a mold Without the structure, supported by timbers sufficiently heavy for the purpose, and filling in between the molds and the structure to be recnforced with beton or concrete; but in addition to the objections already stated there are others which manifest themselves,particu larly in incasing a bridge-pier. Then it is exceedingly difficult and troublesome properly to adjust and retain in place the timbers to sustain the mold against their buoyancy. My method is shown in Fig. 5, in which it is applied to a bridge-pier, and in which I is a masonry pier to be incased.
G C are iron beams erected perpendicularly nt such distances from one another as the nature of the strain they areto endure requiressay, from three to six feet apartand surrounding the work. These are clamped together by tie-rods and braces in the usual manner, thus forming a skeleton framework surrounding the pier.
E is the lagging, placed as hereinbefore described, and B the space to be filled. The lagging is placed in position piece by piece as the work progresses, so as to have as little as possible thereof unfilled to be supported against the current of the water. Then the beton has sct,the beams and their connections are firmly embedded in the beton and become an integral part of the structure, as in the case hereinbefore described. Substantially the saine method is used to incase a mass of earth or rock or any structure like a column or chimney, or it may be built within the structure, as in a well, or lining a monument or statue. In all these cases the lagging may, if necessary, be temporarily braced in position until the filling renders this unnecessary.
I am aware that doors and walls have been constructed of concrete strengthened by iron and wooden girders embedded in said concrete, but do not consider such as equivalents of my invention.
I do not claim in this application the hereindescribed process of lining and repairing with beton and concrete, for the reason that I have made the said process the subjectl of a separate application for Letters Patent,which was led on or about the 4th of February, 1883, Serial N o. 154,948.
Having thus described my invention, what I claim as new, and desire to patent, is-
1. The within-described lining or casing for tunnels, shafts, piers, and abutments, which consists of the frame of the required shape placed a suitable distance from the structure to be strengthened, and the concrete or beton so applied as to embed the said frame therein, substantially as set forth.
2. The herein-described lining or casing for tunnels, shafts, piers, abutment-s, Ste., which consists of aframe of the required shape placed a suitable distance from the structure to be incased, beton or concrete so applied as to enibed said frame therein, and sand ,broken stone, or other cheap material iilled in between the beton or concrete and the surface incased thereby, substantially as set forth.
3. In a lining or casing substantially as herein described, the combination, with the frame forming an integral part thereof, of screw-bolts projecting from said frame and provided With thimbles, bearing-plates, and screw-nuts, the whole so arranged as to removably secure molding-boards to said frame and at the required distance therefrom, as and for the purpose set forth.
In testimony that I claim the foregoing improvement in the'method of repairing or building with beton or concrete, as above described, I have hereunto set my hand this 21st day of August, 1884.
JOHN C. GOODRIDGE, Jn. IVitnesses:
M. A. GooDRiDcn, C. L. RoLLINs.
ICO
US317337D goodridge Expired - Lifetime US317337A (en)

Publications (1)

Publication Number Publication Date
US317337A true US317337A (en) 1885-05-05

Family

ID=2386482

Family Applications (1)

Application Number Title Priority Date Filing Date
US317337D Expired - Lifetime US317337A (en) goodridge

Country Status (1)

Country Link
US (1) US317337A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2419329A (en) * 1944-02-03 1947-04-22 Wilson Alford Donald Gratton Means for lining tunnels
US4464084A (en) * 1981-12-01 1984-08-07 Serni Limited Shoring supports
US6311997B1 (en) 1999-09-13 2001-11-06 LEPLEY JOëL Sidecar assembly for a bicycle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2419329A (en) * 1944-02-03 1947-04-22 Wilson Alford Donald Gratton Means for lining tunnels
US4464084A (en) * 1981-12-01 1984-08-07 Serni Limited Shoring supports
US6311997B1 (en) 1999-09-13 2001-11-06 LEPLEY JOëL Sidecar assembly for a bicycle

Similar Documents

Publication Publication Date Title
JP6448817B2 (en) PC truss wall structure and construction method thereof
US1474808A (en) Method of tunnel construction
Vijay et al. Repair and strengthening of submerged steel piles using GFRP composites
US317337A (en) goodridge
US317338A (en) goodridg-e
US1063672A (en) Process of constructing sewers, aqueducts, &c.
US676568A (en) Building-block.
US1898304A (en) Reenforced concrete construction and method of building same
US718441A (en) Method of making substructures for buildings.
US1006799A (en) Reinforced-concrete lining for mine-shafts and method of the manufacture thereof.
US1167159A (en) Construction of concrete sewers, aqueducts, &c.
US749735A (en) Temporary supporting-form for masonry structures
US925204A (en) Concrete construction and method of producing the same.
JPH06117052A (en) Precast horizontal central pillar
US262402A (en) goodridge
US971758A (en) Reinforced-concrete pit for wagon-scales.
US835159A (en) Art of constructing lining-walls for shafts excavated in the earth.
US1165134A (en) Pile or column construction.
US842552A (en) Art of constructing retaining-walls.
US521767A (en) Centering for tunnels
US637935A (en) Block for building moles, dams, piers, & c.
IL34532A (en) System for the deepening of the bottom in front of moles and retaining walls of marine and river installations and the re-inforced moles so obtained
US875475A (en) Boiler-setting.
US1066020A (en) Bonded concrete construction.
US1227418A (en) Masonry beam.