US2825642A - Method of producing group iv-a metals - Google Patents

Method of producing group iv-a metals Download PDF

Info

Publication number
US2825642A
US2825642A US414946A US41494654A US2825642A US 2825642 A US2825642 A US 2825642A US 414946 A US414946 A US 414946A US 41494654 A US41494654 A US 41494654A US 2825642 A US2825642 A US 2825642A
Authority
US
United States
Prior art keywords
metal
zone
reaction
titanium
melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US414946A
Inventor
Russell B Eaton
Jr Charles H Winter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
EIDP Inc
Original Assignee
EI Du Pont de Nemours and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by EI Du Pont de Nemours and Co filed Critical EI Du Pont de Nemours and Co
Priority to US414946A priority Critical patent/US2825642A/en
Application granted granted Critical
Publication of US2825642A publication Critical patent/US2825642A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B34/00Obtaining refractory metals
    • C22B34/10Obtaining titanium, zirconium or hafnium
    • C22B34/14Obtaining zirconium or hafnium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B34/00Obtaining refractory metals
    • C22B34/10Obtaining titanium, zirconium or hafnium
    • C22B34/12Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08
    • C22B34/1263Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction
    • C22B34/1268Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction using alkali or alkaline-earth metals or amalgams
    • C22B34/1272Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction using alkali or alkaline-earth metals or amalgams reduction of titanium halides, e.g. Kroll process
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S266/00Metallurgical apparatus
    • Y10S266/905Refractory metal-extracting means

Definitions

  • This invention relates to a process for the preparation of the group IV-A metals. More especially, this invention relates to an integrated continuous process for the preparation of titanium metal.
  • Titanium metal is presently commercially produced by utilizing magnesium reduction of titanium tetrachloride.v
  • This process is a batch operation in which the various steps necessary for the production of the metal are carried out in various places and at various times. Batch processes of this type require extensive handling of the metal and the by-product materials are therefore wasteful in time, effort, and equipment, and encourage contamination of the product metal.
  • the ratio of the reactants are not under control; that is, the reducing metal either exists, (l) in the rst instance, in large excess to which is added the titanium tetrahalide; or, (2) in the ysecond case, the titanium halide atmosphere exists within the reactor and the reducing metal magnesium is added to that atmosphere. In both of these no control over the actual amount of reactant taking place in the reaction is maintained. Also, the amount of reactive heat is not under control. The reaction between the reducing metal such as magnesium and titanium tetrachloride releases a large amount of heat. Therefore, the reaction must be controlled within limits of size and shape for the heat release capacity of the apparatus because extreme temperatures will cause reaction between the produced titanium and the reactor walls which are commonly made of iron.
  • this invention includes a continuous process for producing solid forms of refractory metal which comprises continuously and forcibly feeding premix charge of solid reducing metal and solid halide salt composition containing a halide of the refractory metal upwardly into a cooled-Wall reactor, controlling the rate of said feed to establish and maintain a reaction zone at a temperature above the melting point of the halide salt portion of the reaction mass and within the lower portion of said reactor, removing fluid halide salt by-product and any ancillary vapors from the reactor through at least one port situated above the said reaction zone and below a superincumbent melting zone, maintaining an effective pressure of inert gas above said melting zone and a flowof said gas downwardly to the said by-product removal port, melting the solid product metal into a pool within said superincumbent melting zone by means of an electric arc, and draining the molten metal into an associated zone for solidification into the desired form.
  • this invention comprises aV continuous process for producing titanium metal shot which comprises continuously and forcibly feeding premixed charge of solid particles of magnesium and solid particles of a titanium subchloride, with a chlorine to titanium atom ratio less than 4, associated with sodium chloride upwardly into a cooled wall reactor, controlling the rate of said feed to establish and maintain a reaction zone within the lower portion of said reactor, removing uid magnesium chloride and sodium chloride, and argon va pors, from the reactor through at least one port situated above the said reaction zone and below a superincumbent melting zone, maintaining an effective pressure of argon above said melting zone and a ow of said argon downwardly to the said removal port, melting the solid titanium into a pool within said superincumbent melting zone by means of an electric arc, and draining the molten titanium into an associated zone for solidication into titanium shot.
  • the reacting components of the premixed charge are stored in bin 1.
  • This premixed charge consists of the reducing metal and the titanium halide.
  • the titanium halide composition preferably in small particles for ease of mixing', comprises a titanium subchloride, with a chlorine to titanium atom ratio less than 4 associated with at least one chloride selected from a class consisting of the chlorides of the alkali or alkaline earth metals.
  • the reducing metal preferably in the form of small solid particles, is selected from the class consisting of alkali or alkaline earth metals and preferably magnesium partibles. These two reacting constituents are mixed in predetermined proportions to produce the titanium metal;
  • Section 3 serves as av barrier to prevent the inadvertent flareback of the reaction up into the storage bin'.
  • Section 3 has an argon 4purge which prevents contamination of the produced kmetal by absorbed or occluded air.
  • the conduit 3 is :connected to the feeding section 4, which is a waterycooled conduit leading to the lower portionof the reaction chamber 7,
  • the feed conduit 4 contains a screw .force feeding mechanism having a regulatable speed to Icontrol the rate of feed of the premix charge.
  • the walls are water cooled with water entering inlet 5 and exiting lat port o.
  • the reactor vessel 7 is cylindrical in form with .an outer jacket as cooling means.
  • the coolant enters that section at port S and leaves at port 9.
  • the entire section s cooled with a heat transfer salt to about 50 C. above the melting point of the lay-product salt.
  • the lower portion of the reactor is provided with a conical bottom as shown.
  • the reactor has a number of byproduct halide salt removal ports 10a leading through the cooled section to an exterior bustle pipe 10 which drains by line 11 and valve 12 to an exterior catch basin not shown.
  • This is the by-product salt and argon removal section.
  • the premix feed enters through the conduit 4, into the conical bottom of the reaction vessel and within this section the rate of feeding is controlled so that a reaction front is stabilized as shown at point 13.
  • the products of the reaction and the reaction mixture are then pushed by the screw action upwardly in the reactor and when the molten salt has reached the level of the removal ports, asalt level 14 is stabilized. Above the level of 14 the mass of titanium metal contains molten salt draining from the metal and from the outer zone above the drainage section 15.
  • the metal As the metal moves upwardly in the conduit it then passes from the drainage section into a hotter zone in which the temperature exceeds the boiling point of the by-product salt. The by-products are vaporized and this vapor partially coudenses to the liquid form as it progresses downwardly to the drainage section. As the metal product is pushed upwardly by the incoming feed it then approaches the melting zone 17. The melting is accomplished by the arc electrode 18 tted into a Water cooled head 19 to which cooling water is fed through port 20 and leaves through port 21. Power from a D. C. source is supplied to the electrode, from a source not shown with the electrode at a negativepotential and the vessel walls at the positive potential.
  • the conduit 7 has a molten metal discharge port 22 which establishes the level of the molten pool. then falls into a cooling and shotting section 23 which is a water-cooled conduit leading to a storage bin. Water is furnished to the jacket through port 24 and leaves through port 25.
  • the molten metal is continuously formed by the arc melting operation and the metal for the melting operation is continuously fed into the Zone by the action of the force feed of the reactants at the lower portion of the reactor.
  • the solidified titanium shot 26 from the solidiiication conduit fall into an argon purged ein 27 that may be emptied through valve 28 into an intermediate bin 29 which allows discharge of the product metal through valve 30 without substantial loss of argon.
  • the bin 27 is purged of any amount of by-product by an argon flow makeup coming in through line 31 into the recirculation sy'stem consisting of a pump 33 and a cooler 32.
  • the argon pressure within bin 27 causes it to ow back through conduit 23 into the head of the melting section.
  • This argon pressure within the melting head section supplies a owof argon around the edges of the molten pool where a leaking type of seal is obtained.
  • This ow of argon down through the metal mass prevents the by-product salt from entering into the melting section and assists in thevaporization and drainage of the byfproductsalt from the metalV as it follows its upward- Va rate of approximately 6900 pounds per hour.
  • the titanium halide composition and magnesium metal are reacted at a controlled rate to produce an integrated network of sponge titanium metal.
  • this product is pushed upward by incoming feed the bulk of the by-product salt is removed through abustle ring to establish a maximum liquid salt level. within the reactor. Further drainage of the sponge titanium above the salt level is obtained by substituting argon gas for the salt Within the voids. Vaporization of the residual salts from the sponge metal occurs as the mass approaches the shallow pool of molten titanium metal maintained by an arc at the upper portion of the equipment. Internally, condensation of the vaporized salt occurs in that portion of the equipment beneath the vaporization zone but above the salt liquid level.
  • Argon is introduced at -a pressure slightly above the removal pressure to the vapor space above the liquid titanium metal.
  • This argon serves to prevent volatile material rising through the imperfect seal between the liquid titanium metal pool and the cool equipment shell.
  • This Vargon leaves the equipment along with the liquid by-provduct saltand may be recycled.
  • the liquid titanium metal is continuously removed from the shallow pool by overlowing toV a water-cooled conduit. This liquid titanium metal on freezing forms small globules resembling shot material.
  • the solid titanium halide composition comprises a titanium sub-chloride with a chlorine to titanium ratio less than 4 associated with at least one chloride salt selected from the class consisting of the chlorides of the alkali or alkaline earth metals.
  • the titanium halide composition reactant may be obtained from several sources of which the following are illustrative: 1) the addition of pure sub-chloride to the associated salt; (2) the formation of a salt mixture by the reduction of titanium tetrachloride with the proper amount of a reducing metal; and (3) the reduction of titanium tetrachloride by hydrogen in the presence of a molten salt as an absorbing medium. In the solid state, then the composition is nesiurn or the titanium metal product.
  • the halide salt composition may contain either the metal or metal halide of the material desired in the titanium alloy, for instance iron chloride may be included ifa titanium-iron alloy is desired, or, nickel chloride, tungsten chloride,
  • the solid reducing metal is selected from the class consisting of alkali or alkaline earth metals and preferably is magnesium.
  • the preferred reductant, magnesium particles or droplets to be applied in the reduction system may be produced by agitation, shotting, atomization, from reduction reactions which produce particulate magnesium, and from the usual commercial sources.
  • the particle size desired may be obtained from these sources by control of the variants available in the various production methods.-
  • the reactants are mixed in the proportions required to produce titanium metal and by-product salt.
  • the particlesize of the reducing metal and the titanium subchloride composition are adjusted to obtain a desired reaction propagation rate. This together with the method of adjusting the feeding rate allows complete control over the rate of production of a reactor unit.
  • this process has been discussed as applied to titanium as the metal to be produced, it is also applicable for the production of the group IV-A metals in general; that is, titanium, zirconium, and hafnium; and may be extended to other metals wherein a solid halide or metal salt may be reacted with a reducing agent to produce a solid metal structure and a by-product material which is molten and vaporizable below this The Y melting temperature.
  • the preferred titanium salt utilized in the operation is a sub-chloride as previously discussed, and it is preferred because of the economic advantage obtained when utilizing this common halogen component.
  • the other solid halides of the halogens may be utilized, but because of their economic position the titaniumv salts of these elements are not preferred.
  • the tetrachloride salt may be utilized because it is a solid which may be mixed with the magnesium particles to produce a premixed charge suitable for the operation of the method of this invention. Certain factors are to be considered in the choice of the metal salt reactant and the reductant utilized inour process.
  • the metal salt should be solid at temperatures prevailing in the reactor feeding process.
  • the reductant should be solid at this same temperature.
  • the by-product salt obtained from the reaction should melt and be vaporized below the melting temperature of the product metal.
  • Vthe reductant metal should be vaporized below this temperature if a pure product metal is desired.
  • the alloying element either as particles of metal; or if the product metal may be obtained by reduction of a salt by the reducing agent employed, then a salt of the alloying ingredient may be added to the charge whereupon both the product metal and the alloying metal will be obtained by the reduction and -an lalloy produced in the melting step.
  • the reactor 7 shown in the drawing and applied in the example was a cylindrical vessel, but this shape is not critical, and rectangular, square, or other shape vessels may be equally satisfactory.
  • the reactor was operated in a vertical position with the reactants being fed into the lower portion.
  • the reactor may be in inclined positions up to nearly the horizontal position with the limitation that the flow of the reactants to the nal product is in an upwardly direction.
  • This invention allows complete control over the rate of production of titanium metal because the reaction rate may be controlled as previously discussed by4 the .sizing of the reactants.
  • the feed rate is controllable over wide limits and therefore may be stabilized at that value set by the reactivity of the premix charge in order that a stable reaction front, as shown in the drawing at 13, may be established.
  • the rate of production per reactor unit will depend upon the size of the equipment.
  • the material enters an in-line processing unit at the base as reactants and the desired metal is discharged from the upper portion as a finished product eminently suitable for the metallurgical uses.
  • the shot form of titanium is particularly useful for producing a feed for a melting furnace to produce pure or alloyed metal.
  • a continuous process for producing a solid form of group IV-A refractory metal selected from the group consisting of titanium, zirconium, and hafnium comprising forcibly and continuously charging a mixture comprising predetermined amounts of a solid reducing metal selected from the group consisting of alkali, alkaline earth metals and magnesium, and a solid metal halide salt of said refractory metal upwardly into a cooled wall reactor for reaction therein at an elevated temperature,
  • a continuous process. for producing a solid form of titanium metal comprising forcibly. and continuously charging-a mixture of predetermined lamounts of a solid reducing metal. selected from the group consistingy of alkali, alkaline earth metals and-magnesium, and a solid metall halide saltl composition containingl a halide of titanium anda halide of'ametaliselected from the group consisting of alkali and alkalineearth metals, upwardly into a cooledwall reactor forreaction thereinat an elevated temperature, charging said mixture at such a rate that a reaction zone isestablished and maintained within the lower portion of said reactor at a temperature above the melting point4 of the, ⁇ halide salt portion of the mass undergoing reaction and below the vaporization temperature of titanium and'said reducing metal, maintaining a superincumbent melting zone above said reaction zone to form a molten pool of said refractory product during said reaction, removing fluid halide salt reaction by-productand ancillary vapors from the
  • a continuous process for producing titanium metal shot which comprises continuously and forcibly feeding a premiXed charge of predetermined amounts of solid particles of magnesium, and solid particles ofv a titanium sub-chloride having a chlorine to titanium atom ratio of less than 4 and sodium chloride, upwardly for reaction into a cooled wall reactor for reaction therein at an elevatedV temperature, controlling the rate of said forcible feeding to establish and maintain a reaction zone within ⁇ the lower portion of said reactor at a temperature above the melting point of the chloride salt by-products and below the vaporization temperature of titanium and magnesium, maintaining a superincumbent melting zone above 4said reaction zone to form a molten pool of said refractory product during said reaction, draining uid magnesium chloride and sodium chloride from the reactor through at least one port situated above said reaction zone and below said vsuperincumbent melting zone, maintaining an effective pressure of argon above said melting zone and llowing said argon downwardly around the edges of said'moiten pool to and out said removal port, arc
  • a continuous process for producing a solid form of a group lV-A refractory metal selected from the group consisting of titanium, zirconium, and hafnium which comprises continuously and forcibly feeding upwardly into an externally cooled reactor a premixed reactant charge: comprising predetermined quantities of. al solid reducing. metal selected from.
  • A continuous process for producing'titanium metal in individualisolidparticles,which comprises continuously and forcibly feeding upwardly into an externally wallcooled reactor 'for reaction at anelevated temperature a predeterminedf-'reactant mixture; charge comprising solid magnesium particles, solidl particles; ofV a titanium subchloridehaving achlorine to titanium atom ratio of less thanV 4,' andi sodium chloride, controlling 4the rate of said feeding to'- establishvandmaintain a reaction zone within the lower portion of said reactor wherein a temperature above the melting point of said-chlorides and below the vaporizationtemperature of said'titanium and magnesium prevails, Ymaintaining a superincumbent melting zone withinA said reactor and abovel said reaction zone to form a molten.
  • a process for producing titanium metal which clomprises feeding a premix of reactants comprising regulated amounts of a titanium chloride, a reducing metal selected from an alkali metal, an alkaline earth ⁇ metal and magnesium, together with, a chloride of a metal selected from the group ofV alkali and alkaline earth metals, into the bottomv of.
  • reaction chamber and a reaction zone maintained at an elevated temperature above the melting point of the chlorides ⁇ present in said reactants and below the vaporiz'ation temperature of titanium and said reducing metal, the wall surfaces of which are continuously cooled, moving the formed metal product upwardly through said chamber from, a reaction zone to a melting zone by the force of the oncoming feed of reactants, withdrawing reaction by-products from a discharge zone maintained at a point intermediate said reaction zone and melting zone, maintaining a head of inert gas above the melting zone sufficient to force said gas downwardly around the edges of the molten metal formed,y in the melting zone .and against the rising metal network to replace voids therein and to assist in discharging said byproducts from said discharge zone, subjecting the metal product formed to arc melting treatment during said reaction to provide a molten pool thereof in said melting zone and withdrawing the molten metal from said pool into an associated metal solidication and recovery zone.

Description

March 4, 1958 Q0 e ooooooooooooooooo R. B. EATON ETAL 2,825,642
METHOD OE PRODUCING GROUP IV-A METALS Fijled March 9, 1954' ARGON RUSSELL B.- EATON und CHARLES H. W|NTER,JR`
ATTORNEY METHOD OF PRODUCNG GROUP IV A METALS Russell B. Eaton and Charles Winter, Jr., Wilmington, q Del., assignors to E. I. du Pont de Nemours & Company, Wilmington, Del., a corporation of Delaware Application March 9, 1954, Serial N o. 414,946
V6 Claims. (Cl. 75-84.S)
This invention relates to a process for the preparation of the group IV-A metals. More especially, this invention relates to an integrated continuous process for the preparation of titanium metal.
Titanium metal is presently commercially produced by utilizing magnesium reduction of titanium tetrachloride.v
This process is a batch operation in which the various steps necessary for the production of the metal are carried out in various places and at various times. Batch processes of this type require extensive handling of the metal and the by-product materials are therefore wasteful in time, effort, and equipment, and encourage contamination of the product metal.
Integrated continuous processes for titanium metal have been proposed of whichU. S. P. 2,564,337 is an example. According to that process, as described, the following steps are required: (a) the halide and reducing metal reactants are fed into a reactor; (b) reaction occurs andthe titanium product metal settles downwardly; (c) then it is recovered and movedupwardly; (d) it is drained and moved horizontally-and downwardly; (e) it is stored in a bin; (f) it is moved horizontally, and (g) then dropped vertically into the purification and melting furnace, These integrated movements in different pieces of apparatus require that the equipment be complex and expensive. Also, in the arcV melting, of a mixture of the liquid by-product and titanium metal, splashing of the titanium, because of sudden vaporization of the byproduct, causes the liquid titanium to contact the electrode, the liquid titanium attacks the electrode structure and carries impurities such as carbon or tungsten into the product metal. Large ingots of pure titanium may be considered ill adapted for purposes wherein it is necessary to have an alloy of titanium. The large ingot form is not easily handled and requires comminuting for the production of homogeneous alloy ingots by remelting alloy mixtures.
AIn the above mentioned processes the ratio of the reactants are not under control; that is, the reducing metal either exists, (l) in the rst instance, in large excess to which is added the titanium tetrahalide; or, (2) in the ysecond case, the titanium halide atmosphere exists within the reactor and the reducing metal magnesium is added to that atmosphere. In both of these no control over the actual amount of reactant taking place in the reaction is maintained. Also, the amount of reactive heat is not under control. The reaction between the reducing metal such as magnesium and titanium tetrachloride releases a large amount of heat. Therefore, the reaction must be controlled within limits of size and shape for the heat release capacity of the apparatus because extreme temperatures will cause reaction between the produced titanium and the reactor walls which are commonly made of iron.
It is among the objects of the present invention to provide a process in which the required movements of the reactants and products are simplified. Another object is to provide a process which requires simple and ates Patent Patented Mar. 4, 1958 inexpensive apparatus. Other objects are to provide a lprocess in which the product metal is produced in a form suitable for maximum utilization in the metal industry without subsequent handling step. It provides a process wherein the reactive heat and the heat provided for melting of the metal assist in separating the by-products and unreacted materials from the product metal. Also, an integrated continuous process is provided in which there is an upward movement of all materials during feeding, reaction, separation, and melting. Other objects will become apparent as the description proceeds. Y
The above and other objects are accomplished by this invention which includes a continuous process for producing solid forms of refractory metal which comprises continuously and forcibly feeding premix charge of solid reducing metal and solid halide salt composition containing a halide of the refractory metal upwardly into a cooled-Wall reactor, controlling the rate of said feed to establish and maintain a reaction zone at a temperature above the melting point of the halide salt portion of the reaction mass and within the lower portion of said reactor, removing fluid halide salt by-product and any ancillary vapors from the reactor through at least one port situated above the said reaction zone and below a superincumbent melting zone, maintaining an effective pressure of inert gas above said melting zone and a flowof said gas downwardly to the said by-product removal port, melting the solid product metal into a pool within said superincumbent melting zone by means of an electric arc, and draining the molten metal into an associated zone for solidification into the desired form. In one partcular embodiment this invention comprises aV continuous process for producing titanium metal shot which comprises continuously and forcibly feeding premixed charge of solid particles of magnesium and solid particles of a titanium subchloride, with a chlorine to titanium atom ratio less than 4, associated with sodium chloride upwardly into a cooled wall reactor, controlling the rate of said feed to establish and maintain a reaction zone within the lower portion of said reactor, removing uid magnesium chloride and sodium chloride, and argon va pors, from the reactor through at least one port situated above the said reaction zone and below a superincumbent melting zone, maintaining an effective pressure of argon above said melting zone and a ow of said argon downwardly to the said removal port, melting the solid titanium into a pool within said superincumbent melting zone by means of an electric arc, and draining the molten titanium into an associated zone for solidication into titanium shot.
One particular embodiment of our invention will now be described in connection with the vertical cross-sectional view illustrated in the accompanying figure of the drawing showing equipment suitable for carrying out this process.
The reacting components of the premixed charge are stored in bin 1. This premixed charge consists of the reducing metal and the titanium halide. v The titanium halide composition, preferably in small particles for ease of mixing', comprises a titanium subchloride, with a chlorine to titanium atom ratio less than 4 associated with at least one chloride selected from a class consisting of the chlorides of the alkali or alkaline earth metals. The reducing metal, preferably in the form of small solid particles, is selected from the class consisting of alkali or alkaline earth metals and preferably magnesium partibles. These two reacting constituents are mixed in predetermined proportions to produce the titanium metal;
Athat is, with sutlicient reducing metal to accept the chloduit the material falls freely and section 3 serves as av barrier to prevent the inadvertent flareback of the reaction up into the storage bin'. Section 3 has an argon 4purge which prevents contamination of the produced kmetal by absorbed or occluded air. The conduit 3 is :connected to the feeding section 4, which is a waterycooled conduit leading to the lower portionof the reaction chamber 7, The feed conduit 4 contains a screw .force feeding mechanism having a regulatable speed to Icontrol the rate of feed of the premix charge. The walls :are water cooled with water entering inlet 5 and exiting lat port o. The reactor vessel 7 is cylindrical in form with .an outer jacket as cooling means. The coolant enters that section at port S and leaves at port 9. The entire section s cooled with a heat transfer salt to about 50 C. above the melting point of the lay-product salt. 'The lower portion of the reactor is provided with a conical bottom as shown. Y
' Near the lower end the reactor has a number of byproduct halide salt removal ports 10a leading through the cooled section to an exterior bustle pipe 10 which drains by line 11 and valve 12 to an exterior catch basin not shown. This is the by-product salt and argon removal section. The premix feed enters through the conduit 4, into the conical bottom of the reaction vessel and within this section the rate of feeding is controlled so that a reaction front is stabilized as shown at point 13. The products of the reaction and the reaction mixture are then pushed by the screw action upwardly in the reactor and when the molten salt has reached the level of the removal ports, asalt level 14 is stabilized. Above the level of 14 the mass of titanium metal contains molten salt draining from the metal and from the outer zone above the drainage section 15.
As the metal moves upwardly in the conduit it then passes from the drainage section into a hotter zone in which the temperature exceeds the boiling point of the by-product salt. The by-products are vaporized and this vapor partially coudenses to the liquid form as it progresses downwardly to the drainage section. As the metal product is pushed upwardly by the incoming feed it then approaches the melting zone 17. The melting is accomplished by the arc electrode 18 tted into a Water cooled head 19 to which cooling water is fed through port 20 and leaves through port 21. Power from a D. C. source is supplied to the electrode, from a source not shown with the electrode at a negativepotential and the vessel walls at the positive potential. The conduit 7 has a molten metal discharge port 22 which establishes the level of the molten pool. then falls into a cooling and shotting section 23 which is a water-cooled conduit leading to a storage bin. Water is furnished to the jacket through port 24 and leaves through port 25. The molten metal is continuously formed by the arc melting operation and the metal for the melting operation is continuously fed into the Zone by the action of the force feed of the reactants at the lower portion of the reactor. The solidified titanium shot 26 from the solidiiication conduit fall into an argon purged ein 27 that may be emptied through valve 28 into an intermediate bin 29 which allows discharge of the product metal through valve 30 without substantial loss of argon. The bin 27 is purged of any amount of by-product by an argon flow makeup coming in through line 31 into the recirculation sy'stem consisting of a pump 33 and a cooler 32. The argon pressure within bin 27 causes it to ow back through conduit 23 into the head of the melting section. This argon pressure within the melting head section supplies a owof argon around the edges of the molten pool where a leaking type of seal is obtained. This ow of argon down through the metal mass prevents the by-product salt from entering into the melting section and assists in thevaporization and drainage of the byfproductsalt from the metalV as it follows its upward- Va rate of approximately 6900 pounds per hour.
4 course. `Loss of this small leakage of argon'may be avoided by providing that the salt and argon removed through line 11 enter a sump wherein the gas may be taken from a overhead level.
Summarizing the foregoing process, the titanium halide composition and magnesium metal are reacted at a controlled rate to produce an integrated network of sponge titanium metal. As this product is pushed upward by incoming feed the bulk of the by-product salt is removed through abustle ring to establish a maximum liquid salt level. within the reactor. Further drainage of the sponge titanium above the salt level is obtained by substituting argon gas for the salt Within the voids. Vaporization of the residual salts from the sponge metal occurs as the mass approaches the shallow pool of molten titanium metal maintained by an arc at the upper portion of the equipment. Internally, condensation of the vaporized salt occurs in that portion of the equipment beneath the vaporization zone but above the salt liquid level. Argon is introduced at -a pressure slightly above the removal pressure to the vapor space above the liquid titanium metal. This argon serves to prevent volatile material rising through the imperfect seal between the liquid titanium metal pool and the cool equipment shell. This Vargon leaves the equipment along with the liquid by-provduct saltand may be recycled. The liquid titanium metal is continuously removed from the shallow pool by overlowing toV a water-cooled conduit. This liquid titanium metal on freezing forms small globules resembling shot material.
It will be understood therefore that in this continuous process and its sequence of operations, there is provided a gradual temperature rise of the material and, in addition to withdrawing salt from the product outlet zone near the base of the reaction chamber, undrained contaminants are also yvapor-ized as they are carried into the melting zone; these vapors are condensed internally below the distillation zone and directed downward to the byproduct outlet with the aid of inert gas escaping down- Ward within the chamber from the head maintained in the melting z one,
' lThe following example will show one mode of operation of this invention, but this is intended as illustrative only not as a limitation thereof.
Example A reactor similar to; that shown in the figure of the drawing, which included a vertical steel cylinder, 24 `inches in diameter by 48 inches tall. It was equipped The molten metal leaving port 22 L with an arc melting head and arranged for screw feeding of'particles of titanium subchloride associated with sodium chloride of the composition represented by the formula TiCl2.5.l.5NaC1 and magnesium particles through a conical bottom having a 6-inch diameter inlet. The particle sizes of the magnesium and titanium subchlo- Iwas calculated to be approximately inches per minute.' The reaction was started by lowering the arc melting electrode and striking an arc against the rising premixed charge. The arc electrode was retracted to the melting position as soon as the reaction was started. As
Athe titanium metal sponge product rose above the salt tapping bustle pipe, by-product salt issued from it at During the above operations a stream of argon gas was introduced4 to the top of the unit at a rate of 150 cubic feet per hour. This argon gas left the u nit via the salt tapping pipe, along with a small amount of excess magnesi'um.
aszaeaa As the mass of titanium sponge approached the overflow port, the arc was restarted, and a pool of liquid titanium metal established. As the liquid titanium metal rose above the exit port, it was conducted by means of a water-cooled copper chute into the gas tight receiver from which solidified and cooled pellets were periodically discharged through a lock arrangement to the atmosphere. It was found that the production rate was approximately 1500 pounds per hour, and that the power requirement was approximately 1500 kilowatts at 40 volts D. C. The electrode was maintained negative as in established "arc melting practice.
The solid titanium halide composition comprises a titanium sub-chloride with a chlorine to titanium ratio less than 4 associated with at least one chloride salt selected from the class consisting of the chlorides of the alkali or alkaline earth metals. The titanium halide composition reactant may be obtained from several sources of which the following are illustrative: 1) the addition of pure sub-chloride to the associated salt; (2) the formation of a salt mixture by the reduction of titanium tetrachloride with the proper amount of a reducing metal; and (3) the reduction of titanium tetrachloride by hydrogen in the presence of a molten salt as an absorbing medium. In the solid state, then the composition is nesiurn or the titanium metal product. It is contemplated that for the production of titanium alloys that the halide salt composition may contain either the metal or metal halide of the material desired in the titanium alloy, for instance iron chloride may be included ifa titanium-iron alloy is desired, or, nickel chloride, tungsten chloride,
' aluminum chloride, or other various alloying materials as may be desired in the final alloy product.
The solid reducing metal is selected from the class consisting of alkali or alkaline earth metals and preferably is magnesium. The preferred reductant, magnesium particles or droplets to be applied in the reduction system may be produced by agitation, shotting, atomization, from reduction reactions which produce particulate magnesium, and from the usual commercial sources. The particle size desired may be obtained from these sources by control of the variants available in the various production methods.- The reactants are mixed in the proportions required to produce titanium metal and by-product salt. The particlesize of the reducing metal and the titanium subchloride composition are adjusted to obtain a desired reaction propagation rate. This together with the method of adjusting the feeding rate allows complete control over the rate of production of a reactor unit. With the example shown the following conditions obtain during the period of stable operation: (l) the rising rate of the titanium metal sponge was .65" per minute; (2) rising rate of the liquid titanium was .32" per minute; (3) estimated downward superficial vapor velocity from the distillation zone was about 1.5 ft. per second.
Although this process has been discussed as applied to titanium as the metal to be produced, it is also applicable for the production of the group IV-A metals in general; that is, titanium, zirconium, and hafnium; and may be extended to other metals wherein a solid halide or metal salt may be reacted with a reducing agent to produce a solid metal structure and a by-product material which is molten and vaporizable below this The Y melting temperature. The preferred titanium salt utilized in the operation is a sub-chloride as previously discussed, and it is preferred because of the economic advantage obtained when utilizing this common halogen component. In certain cases the other solid halides of the halogens (bromine and iodine) may be utilized, but because of their economic position the titaniumv salts of these elements are not preferred. With zirconium metal as a further example of group IV-A, the tetrachloride salt may be utilized because it is a solid which may be mixed with the magnesium particles to produce a premixed charge suitable for the operation of the method of this invention. Certain factors are to be considered in the choice of the metal salt reactant and the reductant utilized inour process. The metal salt should be solid at temperatures prevailing in the reactor feeding process. The reductant should be solid at this same temperature. The by-product salt obtained from the reaction should melt and be vaporized below the melting temperature of the product metal. Also, Vthe reductant metal should be vaporized below this temperature if a pure product metal is desired. In the operation of this process to produce alloys of the product metal, it is permissible to add the alloying element either as particles of metal; or if the product metal may be obtained by reduction of a salt by the reducing agent employed, then a salt of the alloying ingredient may be added to the charge whereupon both the product metal and the alloying metal will be obtained by the reduction and -an lalloy produced in the melting step. Y
The reactor 7 .shown in the drawing and applied in the example was a cylindrical vessel, but this shape is not critical, and rectangular, square, or other shape vessels may be equally satisfactory. The reactor was operated in a vertical position with the reactants being fed into the lower portion. In the broader aspect the reactor may be in inclined positions up to nearly the horizontal position with the limitation that the flow of the reactants to the nal product is in an upwardly direction.
This invention allows complete control over the rate of production of titanium metal because the reaction rate may be controlled as previously discussed by4 the .sizing of the reactants. The feed rate is controllable over wide limits and therefore may be stabilized at that value set by the reactivity of the premix charge in order that a stable reaction front, as shown in the drawing at 13, may be established. With a given type of reaction feed the rate of production per reactor unit will depend upon the size of the equipment. In this process the material enters an in-line processing unit at the base as reactants and the desired metal is discharged from the upper portion as a finished product eminently suitable for the metallurgical uses. The shot form of titanium is particularly useful for producing a feed for a melting furnace to produce pure or alloyed metal. Their solid shape gives a low area to volume relationship and vbecause of the solid structure produces a very stable material for storage. The complete processing of theV material of the reactants to the nished product is done withinone equipment unit and no intermediate discharging, handling, coinminuting or vacuum equipment is necessary.
We claim as our invention:
l. A continuous process for producing a solid form of group IV-A refractory metal selected from the group consisting of titanium, zirconium, and hafnium, comprising forcibly and continuously charging a mixture comprising predetermined amounts of a solid reducing metal selected from the group consisting of alkali, alkaline earth metals and magnesium, and a solid metal halide salt of said refractory metal upwardly into a cooled wall reactor for reaction therein at an elevated temperature,
charging said mixture at such a rate that a reaction zone is established and maintained within the lower portion of said reactor at a temperature above the melting point of the halide salt portion of the mass undergoing reaction andbelow the vaporization temperature of the refractory metal; uijidenprodiictionl and said i reducing metal, Y maintaining aVA superincumbent melting 'zone above said reactionV zone-to -formfamolten l pool of said refractory `product during said reaction, removing fluid halide salt reaction by-product andf ancillary vapors from the reactor through a withdrawal outlet arranged above saidreaction zone andbelow said=melting zone, flowing an inert gas at apositive pressure downwardly in said reactor and through said melting zone, around the edges of said moltenpool, and out said by-productwithdrawal:outlet, subjecting the solid refractory metal product obtained in the reactor to-Iarc melting to form a. molten pool thereof within said superincumbent melting zone, and draining saidmolten metal product from said pool into an associated collecting zonesfor; soliditicati-on and recovery.V
2. A continuous process. for producing a solid form of titanium metal, comprising forcibly. and continuously charging-a mixture of predetermined lamounts of a solid reducing metal. selected from the group consistingy of alkali, alkaline earth metals and-magnesium, and a solid metall halide saltl composition containingl a halide of titanium anda halide of'ametaliselected from the group consisting of alkali and alkalineearth metals, upwardly into a cooledwall reactor forreaction thereinat an elevated temperature, charging said mixture at such a rate that a reaction zone isestablished and maintained within the lower portion of said reactor at a temperature above the melting point4 of the,` halide salt portion of the mass undergoing reaction and below the vaporization temperature of titanium and'said reducing metal, maintaining a superincumbent melting zone above said reaction zone to form a molten pool of said refractory product during said reaction, removing fluid halide salt reaction by-productand ancillary vapors from the reactor'through a withdrawal outlet arranged above said reaction zone and below said-melting zone, tlowing an inert gas at a positive pressure downwardly in said reactor andthrough said melting zone, around the edges of said molten pool, and out said by-product withdrawal outlet, subjecting the titanium product obtained in the reactor to arc melting to form a molten pool thereof within said superincumbent melting zone, and draining said molten titanium product from said pool into an associated collecting zone for solidiication and recovery.
3. A continuous process for producing titanium metal shot which comprises continuously and forcibly feeding a premiXed charge of predetermined amounts of solid particles of magnesium, and solid particles ofv a titanium sub-chloride having a chlorine to titanium atom ratio of less than 4 and sodium chloride, upwardly for reaction into a cooled wall reactor for reaction therein at an elevatedV temperature, controlling the rate of said forcible feeding to establish and maintain a reaction zone within `the lower portion of said reactor at a temperature above the melting point of the chloride salt by-products and below the vaporization temperature of titanium and magnesium, maintaining a superincumbent melting zone above 4said reaction zone to form a molten pool of said refractory product during said reaction, draining uid magnesium chloride and sodium chloride from the reactor through at least one port situated above said reaction zone and below said vsuperincumbent melting zone, maintaining an effective pressure of argon above said melting zone and llowing said argon downwardly around the edges of said'moiten pool to and out said removal port, arc melting solid titanium formed as a pool within said superincumbent melting zone, and draining the molten titanium from said pool into an associated zone for solidication into solid titanium shot.
4. A continuous process for producing a solid form of a group lV-A refractory metal selected from the group consisting of titanium, zirconium, and hafnium which comprises continuously and forcibly feeding upwardly into an externally cooled reactor a premixed reactant charge: comprising predetermined quantities of. al solid reducing. metal selected from. the group consistingy ofV alkali, alkaline earth metals, and magnesium, and solid metal chloride salt composition containing a chloride of saidfrefractory.metaliand'a chloride of a metal selected frorrrthe groupconsisting of alkali and alkaline earth metals, controlling therate of said feeding to establish and maintainareaction zone within the lower party of said reactorA at a temperature above the melting point of the chloride salttreaction product formed but below the vaporization temperature of said refractory and reducing metals, maintaining a superincumbentmelting zone above saidlreaction zone to form a molten pool ofsaid refractory product.y during said4 reaction, removing from the reactory chloride salt by-product formed inv fluid state together,withranysancillary` vapors from at least one withdrawal point. maintained above said reaction Zone and belowl said superincumbent` melting zone, maintaining a pressure of'inert gas above saidfmelting zone and owing said gas `downwardly aroundthe edges of said molten pool to and:outof said by-product withdrawal point, arc melting solid product. refractory metal obtained and forming -a pool thereof withinsaid superincumbent melting zone, anddraining the molten metal fromsaid pool-into anassociated zone for solidiiication and recovery in predetermined form.
5; A; continuous process for producing'titanium metal in individualisolidparticles,which comprises continuously and forcibly feeding upwardly into an externally wallcooled reactor 'for reaction at anelevated temperature a predeterminedf-'reactant mixture; charge comprising solid magnesium particles, solidl particles; ofV a titanium subchloridehaving achlorine to titanium atom ratio of less thanV 4,' andi sodium chloride, controlling 4the rate of said feeding to'- establishvandmaintain a reaction zone within the lower portion of said reactor wherein a temperature above the melting point of said-chlorides and below the vaporizationtemperature of said'titanium and magnesium prevails, Ymaintaining a superincumbent melting zone withinA said reactor and abovel said reaction zone to form a molten. pool of said refractory product during said reaction, removing fluid magnesiumv chloride and sodium chloride andrancillary vapors fromthe reactorthrough at least one withdrawal, pointj situated; above said reaction zone and below saidsuperincumbentmelting zone, maintaining an effective pressure' of argon above said melting zone and owing said argon downwardly around the edges ofl said molten pool and to and through said removal point, arc melting solid titanium product obtained andforming a pool thereof within saidisuperincumbent melting zone, and draining molten titanium from said pool, into an; associated zone for solidication into individual titanium particles.
6. A process for producing titanium metal which clomprises feeding a premix of reactants comprising regulated amounts of a titanium chloride, a reducing metal selected from an alkali metal, an alkaline earth` metal and magnesium, together with, a chloride of a metal selected from the group ofV alkali and alkaline earth metals, into the bottomv of. a reaction chamber and a reaction zone maintained at an elevated temperature above the melting point of the chlorides` present in said reactants and below the vaporiz'ation temperature of titanium and said reducing metal, the wall surfaces of which are continuously cooled, moving the formed metal product upwardly through said chamber from, a reaction zone to a melting zone by the force of the oncoming feed of reactants, withdrawing reaction by-products from a discharge zone maintained at a point intermediate said reaction zone and melting zone, maintaining a head of inert gas above the melting zone suficient to force said gas downwardly around the edges of the molten metal formed,y in the melting zone .and against the rising metal network to replace voids therein and to assist in discharging said byproducts from said discharge zone, subjecting the metal product formed to arc melting treatment during said reaction to provide a molten pool thereof in said melting zone and withdrawing the molten metal from said pool into an associated metal solidication and recovery zone.
References Cited in the file of this patent UNTTED STATES PATENTS 2,205,854 Kroll June 25, 1940 10 Kroll et a1. June 15, 1948 Maddex Aug. 14, 1951 Jordan Aug. 4, 1953 Jordan Jan. 26, 1954 FOREIGN PATENTS Great Britain Feb. 4, 1953 OTHER REFERENCES 26th edition, 1943. Pages 426-429, inclusinve.

Claims (1)

1. A CONTINUOUS PROCESS FOR PRODUCIG A SOLID FROM OF GROUP IV-A REFRACTORY METAL SELECTED FROM THE GROUP CONSISTING OF TITANIUM, ZIRCONIUM, AND HAFNIUM, COMPRISING FORCIBLY AND CONTINUOUSLY CHARGIG A MIXTURE COMPRISING PEDETERMINED AMOUNTS OF A SOLID REDUCING METAL SELECTED FROM THE GROUP CONSISTING OF ALKALI, ALKALINE EARTH METALS AND MAGNESIUM, AND A SOLID METAL HALIDE SALT OF SAID REFRACTORY METAL UPWARDLY INTO A COOLED WALL REACTOR FOR REACTION THEREIN AT AN ELEVATED TEMPERATURE, CHARGING SAID MIXTURE AT SUCH THAT A REACTION ZONE IS ESTABLISHED AND MAINTAINED WITHIN THE LOWER PORTION OF SAID REACTOR AT A TEMPERATURE ABOVE THE MELTING POINT OF THE HALIDE SALT PORTION OF THE MASS UNDERGOING REACTION AND BELOW THE VAPORIZATION TEMPERATURE OF THE REFRACTORY METAL UNDER PRODUCTION AND SAID REDUCING METAL, MAINTAINING A SUPERINCUMBENT MELTING ZONE ABOVE SAID REACTION ZONE TO FORM A MOLTEN POOL OF SAID RREFRACTORY PRODUCT DURING SAID REACTION, REMOVING FLUID HALIDE SALT REACTION BY-PRODUCT AND ANCILLARY VAPORS FROM THE REACTOR THROUGH A WITHDRAWAL OUTLET ARRANGED ABOVE SAID REACTION ZONE AND BELOW SAID MELTING ZONE, FLOWING AN INERT GAS AT A POSITIVE PRESSURE DOWNWARDLY IN SAID REACTOR AND THROUGH SAID MELTING ZONE, AROUND THE EDGES OF SAID MOLTEN POOL, AND OUT SAID BY-PRODUCT WITHDRAWAL OUTLET, SUBJECTING THE SOLID REFRACTORY METAL PRODUCT OBTAINED IN THE REACTOR TO ARC MELTING TO FORM A MOLTED POOL THEREOF WITHIN SAID SUPERINCUMBENT MELTING ZONE, AND DRAINING SAID MOLTEN METAL PRODUCT FROM SAID POOL INTO AN ASSOCIATED COLLECTING ZONE FOR SOLIDIFICATION AND RECOVERY.
US414946A 1954-03-09 1954-03-09 Method of producing group iv-a metals Expired - Lifetime US2825642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US414946A US2825642A (en) 1954-03-09 1954-03-09 Method of producing group iv-a metals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US414946A US2825642A (en) 1954-03-09 1954-03-09 Method of producing group iv-a metals

Publications (1)

Publication Number Publication Date
US2825642A true US2825642A (en) 1958-03-04

Family

ID=23643694

Family Applications (1)

Application Number Title Priority Date Filing Date
US414946A Expired - Lifetime US2825642A (en) 1954-03-09 1954-03-09 Method of producing group iv-a metals

Country Status (1)

Country Link
US (1) US2825642A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390647A (en) * 1964-06-25 1968-07-02 Smith Kline French Lab Production of pharmaceutical dosage units
DE1583903B1 (en) * 1966-07-26 1971-11-18 Oregon Metallurg Corp DEVICE FOR SEPARATING POLLUTIONS FROM A METAL PRODUCT LIKE TITANIUM
US4093194A (en) * 1976-01-13 1978-06-06 E. I. Du Pont De Nemours And Company Process and reactor for making magnesium metal
US4105192A (en) * 1975-02-13 1978-08-08 Nippon Mining Company Process and apparatus for producing zirconium sponge
US4162291A (en) * 1977-10-12 1979-07-24 Westinghouse Electric Corp. Liquid silicon casting control mechanism
EP0261042A1 (en) * 1986-09-19 1988-03-23 CEZUS Compagnie Européenne du Zirconium Process and apparatus for producing zirconium metal by reducing zirconium tetrachloride

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2205854A (en) * 1937-07-10 1940-06-25 Kroll Wilhelm Method for manufacturing titanium and alloys thereof
US2443253A (en) * 1944-04-12 1948-06-15 Electro Metallurg Co Process for producing zirconium chloride
US2564337A (en) * 1948-11-02 1951-08-14 Battelle Development Corp Production of refractory metals
GB686845A (en) * 1949-02-15 1953-02-04 Titan Gmbh Improvements in or relating to the manufacture of, and coating by titanium or alloys of titanium
US2647826A (en) * 1950-02-08 1953-08-04 Jordan James Fernando Titanium smelting process
US2667413A (en) * 1951-01-15 1954-01-26 Jordan James Fernando Vapor-phase smelting process

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2205854A (en) * 1937-07-10 1940-06-25 Kroll Wilhelm Method for manufacturing titanium and alloys thereof
US2443253A (en) * 1944-04-12 1948-06-15 Electro Metallurg Co Process for producing zirconium chloride
US2564337A (en) * 1948-11-02 1951-08-14 Battelle Development Corp Production of refractory metals
GB686845A (en) * 1949-02-15 1953-02-04 Titan Gmbh Improvements in or relating to the manufacture of, and coating by titanium or alloys of titanium
US2647826A (en) * 1950-02-08 1953-08-04 Jordan James Fernando Titanium smelting process
US2667413A (en) * 1951-01-15 1954-01-26 Jordan James Fernando Vapor-phase smelting process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3390647A (en) * 1964-06-25 1968-07-02 Smith Kline French Lab Production of pharmaceutical dosage units
DE1583903B1 (en) * 1966-07-26 1971-11-18 Oregon Metallurg Corp DEVICE FOR SEPARATING POLLUTIONS FROM A METAL PRODUCT LIKE TITANIUM
US4105192A (en) * 1975-02-13 1978-08-08 Nippon Mining Company Process and apparatus for producing zirconium sponge
US4093194A (en) * 1976-01-13 1978-06-06 E. I. Du Pont De Nemours And Company Process and reactor for making magnesium metal
US4162291A (en) * 1977-10-12 1979-07-24 Westinghouse Electric Corp. Liquid silicon casting control mechanism
EP0261042A1 (en) * 1986-09-19 1988-03-23 CEZUS Compagnie Européenne du Zirconium Process and apparatus for producing zirconium metal by reducing zirconium tetrachloride
FR2604184A1 (en) * 1986-09-19 1988-03-25 Cezus Co Europ Zirconium PROCESS AND DEVICE FOR MAKING METAL ZIRCONIUM BY REDUCING ZIRCONIUM TETRACHLORIDE

Similar Documents

Publication Publication Date Title
US5032176A (en) Method for manufacturing titanium powder or titanium composite powder
US6409797B2 (en) Method of making metals and other elements from the halide vapor of the metal
US5958106A (en) Method of making metals and other elements from the halide vapor of the metal
CA2196534C (en) Method of making metals and other elements
US4356029A (en) Titanium product collection in a plasma reactor
US2941867A (en) Reduction of metal halides
US2827371A (en) Method of producing titanium in an agitated solids bed
US2890112A (en) Method of producing titanium metal
JPS6121290B2 (en)
US2825642A (en) Method of producing group iv-a metals
US20030061907A1 (en) Gel of elemental material or alloy and liquid metal and salt
US20060107790A1 (en) System and method of producing metals and alloys
US4105440A (en) Process for reducing metal halides by reaction with calcium carbide
US7435282B2 (en) Elemental material and alloy
US20030145682A1 (en) Gel of elemental material or alloy and liquid metal and salt
US2847295A (en) Process and apparatus for the electrothermal production of magnesium
US2847297A (en) Method of producing titanium crystals
US20020148327A1 (en) Elemental material and alloy
US2744006A (en) Method of producing refractory metals
JPH0288727A (en) Production of metal titanium
US3243281A (en) Extraction of aluminum using mercury containing mercuric halide
US2758831A (en) Lined metal reduction apparatus
US2772875A (en) Production of pure titanium and zirconium
EP1989336B1 (en) Reactor intended for titanium production
US3085873A (en) Method for collecting and separating the refractory metal component from the reaction products in the production of the refractory metals titanium, zirconium, vanadium, hafnium, silicon, thorium, chromium, or columbium