US20180016751A1 - Forwork segment - Google Patents

Forwork segment Download PDF

Info

Publication number
US20180016751A1
US20180016751A1 US15/546,732 US201515546732A US2018016751A1 US 20180016751 A1 US20180016751 A1 US 20180016751A1 US 201515546732 A US201515546732 A US 201515546732A US 2018016751 A1 US2018016751 A1 US 2018016751A1
Authority
US
United States
Prior art keywords
segment
formwork
formwork segment
outer face
carriageway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/546,732
Inventor
Faiver BOTELLO ROJAS
Bladimir OSORIO MUÑOZ
Javier INAREJOS MESA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acciona Construccion SA
Original Assignee
Acciona Infraestructuras SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acciona Infraestructuras SA filed Critical Acciona Infraestructuras SA
Publication of US20180016751A1 publication Critical patent/US20180016751A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/40Slabs; Blocks; Pot sleepers; Fastening tie-rods to them
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems

Definitions

  • the present invention relates to a formwork segment for the construction of a continuous carriageway for railway tracks.
  • the carriageway segments are constructed on site using the previous assembly of a formwork system, which has to bear the pressure of fresh concrete, guarantee termination of the clean segment, and provide straight surfaces between adjacent carriageway segments.
  • the formwork systems are formed by boards of stable materials, which cover the entire width of individual carriageway segments, where both the assembly and removal of the formwork after the concreting to leave the carriageway free for railway tracks. Moreover, installing and removing the formwork is frequently associated with difficulties and partial destruction of the formwork material, in particular when the roots are already assembled over the carriageway segments.
  • the present invention tries to resolve one or more disadvantages shown above using a formwork carriageway segment for railway tracks as defined in the claims.
  • the formwork segment is a formwork element that is integrally connected to a carriageway segment of railway that remains permanently on the outside of the carriageway segment.
  • the formwork segment includes a carriageway segment, in which a material has been poured to form an integral and monolithic joint, i.e., a single element where the formwork segment is non-demouldable from the carriageway segment.
  • the formwork segment is configured to form a hollow space to be filled with a poured bearing material bound hydraulically, concrete, asphalt, composite or similar material that railway tracks bear.
  • the formwork segment presents an essentially rectangular transversal section.
  • the formwork segment comprises at least one projection as ribbing or generatrix at the cuter face of the hollow space of the formwork segment to facilitate transmission of tensions between the poured material and the formwork segment, preventing relative slipping between both of them.
  • the projection is of rectilinear polygon type in the longitudinal and/or transversal direction of the formwork segment and has a negative dovetail type outgoing core that is a non-demouldable formwork segment.
  • the formwork segment is configured to receive an anti-slip material of type sand coated with resin, on which the fresh poured material is emptied, within the hollow space of the formwork segment.
  • the formwork segment is configured to provide multiple concave or convex crimps distributed at this outer face to prevent relative slipping between the poured material and the formwork segment, increasing the friction between the poured material and the formwork segment.
  • the formwork segment enters into the slab of the poured material or vice versa to increase the adherence between both.
  • the formwork segment is adapted to bear the pressure of the poured material within the hollow space of the formwork segment and subsequently, of the poured material hardened by curing or setting.
  • the formwork segment is configured to be transported empty or filled with poured material up to its working position above a foundation or continuous base plate of a track system.
  • the formwork segment is configured to provide multiple bumps at its lower outer face as figures jutting out or projected beyond the surface of the lower outer face distributed at this lower outer face to prevent relative slipping between the formwork segment and the foundation, increasing the friction between the formwork segment and the foundation.
  • the formwork segment enters into the foundation to obtain an anchoring effect by increasing the adherence between the formwork segment and the foundation.
  • the foundation includes at least one insertion beyond the surface and the foundation at a predetermined height to enter into a hollow deformation including the projection so as to receive the insert of the foundation, providing a similar anchoring effect between the formwork segment and the foundation.
  • the formwork segment is configured to receive an elastic material within the hollow space of the formwork segment in the shape of a blanket of elastomeric type of material to control vibrations and noise generated by the movement of railway vehicles on track systems.
  • the formwork segment is configured to he installed in its working position, directly supported above the foundation or directly supported above an elastic material of an elastomeric type of material, which is directly supported above the foundation with the objective of increasing the elasticity between the foundation and the formwork segment and decreasing the dynamic loads when railway vehicles pass.
  • the formwork segment is configured like a pre-fabricated part, which achieves a bench of continuous integral vehicular action by juxtaposing a big number of formwork segments, making some formwork segments bump into other formwork segments; and joining the segments among themselves.
  • pre-fabricated parts facilitates repairs and replacement of a formwork segment damaged by wear and tear or any other condition.
  • the formwork segment minimizes costs arising from railway maintenance and conservation operations.
  • the formwork segment includes a number of hollows or spaces, which can receive multiple points of track support for assembly and fastening of two tracks running parallel to each other.
  • the points of support are projected beyond the surface of the slab of the poured material at a predetermined height.
  • the formwork segment is also configured for embedding of multiple points of track support for assembly and fastening of two tracks running parallel to each other within the poured material. As such, the points of support of the tracks must be routed individually or like sleepers within the formwork segment before emptying the poured material within the hollow space of the formwork segment.
  • the formwork segment is configured to provide two rows of continuous parallel hollows to the longitudinal axis of the formwork segment for embedding and fastening of two tracks running parallel to each other within the slab of the poured material.
  • the tracks previously to be embedded in the formwork segment are cased with elastic material that envelops the tracks and gives elastic properties to buffer the vibrations and control the noise generated by the movement of railway vehicles.
  • the elastic material is installed within the continuous hollow of the slab of the poured material.
  • the formwork segment is made from a material composed of material of reinforced polymer fibre type, thermoplastic, or similar materials.
  • FIG. 1 shows a perspective view of a formwork segment without filling poured material; the formwork segment has an essentially rectangular transversal section,
  • FIG. 2 shows a perspective view of the formwork segment with two rows of empty hollows to receive points of track support for assembly and fastening of two tracks running parallel to each other; the lower outer face of the formwork segment is assembled in physical contact with a blanket of elastic material,
  • FIG. 3 shows a perspective view of a formwork segment with two rows of empty hollows receiving points of track support, to which two railway tracks are assembled and fastened, with the formwork segment assembled in physical contact with a blanket of elastic material,
  • FIG. 4 shows a perspective view of the formwork segment with two rows of empty hollows receiving points of track support, to which two railway tracks are assembled and fastened, with the formwork segment assembled in physical contact with the blanket of elastic material, and where the points of support are projected beyond the surface of the slab of the poured material at a predetermined height, and
  • FIG. 5 shows a perspective view of a continuous carriageway of railway tracks including multiple formwork segments juxtaposed, making some formwork segments bump into other formwork segments.
  • carriageway segment 41 comprises a formwork segment 11 , in which a material has been poured to form an integral and monolithic joint, where the formwork segment 11 is non-demouldable from the carriageway segment 41 .
  • Formwork segment 11 has an essentially rectangular transversal section
  • Formwork segment 11 forms a hollow space 12 to be filled with a poured bearing material of binding material type, capable of entering into the composition of a poured slab of the poured material bound hydraulically, concrete, asphalt, composite or similar material that railway tracks 31 bear.
  • Formwork segment 11 comprises at least one projection 13 as ribbing or generatrix at the outer face of the hollow space 12 of formwork segment 11 to facilitate transmission of tensions between the poured material and formwork segment 11 , preventing relative slipping between both of them.
  • projection 13 is a hollow conduit that can receive technical equipment, fluid distribution pipes, cables and other type of material related to maintenance, help, control and management of the movement of railway vehicles over railways of track systems, or other type of civil infrastructure, inside.
  • Projection 13 is of rectilinear polygon type in the longitudinal direction of formwork segment 11 and has a negative dovetail type such that formwork segment 11 is non-demouldable.
  • Formwork segment 11 is configured to receive an anti-slip material of type sand coated with resin, on which the fresh poured material is emptied, within the hollow space 12 of the formwork segment.
  • Formwork segment 11 provides a plurality of dents or bumps at its outer face 14 of the hollow space 12 of the formwork segment 11 as figures jutting cut projected beyond lower outer face 12 of the hollow space 11 , being distributed at outer face 14 to prevent relative slipping between the slab of the poured material and formwork segment 11 , increasing the friction between the poured material and formwork segment 11 .
  • formwork segment 11 enters into the slab of the poured material or vice versa to increase the adherence between both.
  • Formwork segment 11 bears the pressure of the poured material within hollow space 12 of formwork segment 11 and subsequently, of the poured material hardened by curing or setting.
  • formwork segment 11 is transportable empty or filled with the slab of the poured material up to its working position above a foundation or continuous base plate of a track system.
  • Formwork segment 11 provides a plurality of projections at the lower cuter face 15 as figures jutting out projected beyond the surface of the lower outer face 15 , which are distributed at the lower cuter face 15 , preventing relative slipping between the slab of the poured material and formwork segment 11 by increasing the friction between formwork segment 11 and the foundation.
  • formwork segment 11 enters into the foundation to obtain an anchoring effect by increasing the adherence between formwork segment 11 and the foundation,
  • the foundation comprises at least one insertion projected beyond the surface of the foundation at a predetermined height to enter into a hollow deformation 16 of projection 13 , which receives the insert of the foundation, providing a similar anchoring effect between formwork segment 11 and the foundation.
  • Formwork segment 11 receives an elastic material within the hollow space 12 of formwork segment 11 in the shape of a blanket of elastomeric type of material to control vibrations and noise generated by the movement of railway vehicles over railways of a track system.
  • Formwork segment 11 is installed in its working position, directly supported above the foundation or directly supported above an elastic material of an elastomeric type of material, which is in turn directly supported above the foundation with the objective of increasing the elasticity between the foundation and the formwork segment and decreasing the dynamic loads when railway vehicles pass.
  • Formwork segment 11 is produced like a pre-fabricated part, which juxtaposing a big number of aligned formwork segments 11 , making some formwork segments 11 bump into other formwork segments 11 ; joining the segments 11 among themselves achieves a bench of continuous integral rolling.
  • FIGS. 2 to 5 show formwork segment 11 including a plurality of empty hollows 21 , which can receive a plurality of points of track support 31 for assembly and fastening of two tracks 32 running parallel to each other. Points of support 31 are projected beyond the surface of the slab of the poured material at a predetermined height. Point of support 31 , once inserted within the hollow 21 is supported by a cover part 22 of elastic material to reduce noise and vibrations generated by the movement of vehicles on railways of the track system.
  • Points of track support 31 are inserted within the slab of the poured material. As such, the points of support 31 of the tracks must be routed individually or like sleepers within formwork segment 11 before emptying the freshly poured material within the hollow space 12 of formwork segment 11 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relate to a formwork segment for the construction of a continuous carriageway for railway tracks, where the formwork segment is rigidly connected to a carriageway segment, such that the formwork segment remains permanently on the lower outer face of the carriageway segment and is non-demouldable, a hollow space that can be filled with a poured material being provided, and the formwork segment being made from a composite material such as a reinforced polymer fibre material, thermoplastic materials, or the like.

Description

    OBJECT
  • The present invention relates to a formwork segment for the construction of a continuous carriageway for railway tracks.
  • STATE OF THE ART
  • Railway networks shaped like a compact concrete carriageway are known to be made with multiple carriageway segments arranged one after the other.
  • The carriageway segments are constructed on site using the previous assembly of a formwork system, which has to bear the pressure of fresh concrete, guarantee termination of the clean segment, and provide straight surfaces between adjacent carriageway segments.
  • The formwork systems are formed by boards of stable materials, which cover the entire width of individual carriageway segments, where both the assembly and removal of the formwork after the concreting to leave the carriageway free for railway tracks. Moreover, installing and removing the formwork is frequently associated with difficulties and partial destruction of the formwork material, in particular when the roots are already assembled over the carriageway segments.
  • SUMMARY
  • The present invention tries to resolve one or more disadvantages shown above using a formwork carriageway segment for railway tracks as defined in the claims.
  • The formwork segment is a formwork element that is integrally connected to a carriageway segment of railway that remains permanently on the outside of the carriageway segment. As such, the formwork segment includes a carriageway segment, in which a material has been poured to form an integral and monolithic joint, i.e., a single element where the formwork segment is non-demouldable from the carriageway segment.
  • The formwork segment is configured to form a hollow space to be filled with a poured bearing material bound hydraulically, concrete, asphalt, composite or similar material that railway tracks bear. As such, the formwork segment presents an essentially rectangular transversal section.
  • The formwork segment comprises at least one projection as ribbing or generatrix at the cuter face of the hollow space of the formwork segment to facilitate transmission of tensions between the poured material and the formwork segment, preventing relative slipping between both of them.
  • The projection is of rectilinear polygon type in the longitudinal and/or transversal direction of the formwork segment and has a negative dovetail type outgoing core that is a non-demouldable formwork segment.
  • The formwork segment is configured to receive an anti-slip material of type sand coated with resin, on which the fresh poured material is emptied, within the hollow space of the formwork segment.
  • The formwork segment is configured to provide multiple concave or convex crimps distributed at this outer face to prevent relative slipping between the poured material and the formwork segment, increasing the friction between the poured material and the formwork segment. In summary, the formwork segment enters into the slab of the poured material or vice versa to increase the adherence between both.
  • The formwork segment is adapted to bear the pressure of the poured material within the hollow space of the formwork segment and subsequently, of the poured material hardened by curing or setting.
  • In addition, the formwork segment is configured to be transported empty or filled with poured material up to its working position above a foundation or continuous base plate of a track system.
  • The formwork segment is configured to provide multiple bumps at its lower outer face as figures jutting out or projected beyond the surface of the lower outer face distributed at this lower outer face to prevent relative slipping between the formwork segment and the foundation, increasing the friction between the formwork segment and the foundation. In summary, the formwork segment enters into the foundation to obtain an anchoring effect by increasing the adherence between the formwork segment and the foundation.
  • According to one variant, the foundation includes at least one insertion beyond the surface and the foundation at a predetermined height to enter into a hollow deformation including the projection so as to receive the insert of the foundation, providing a similar anchoring effect between the formwork segment and the foundation.
  • The formwork segment is configured to receive an elastic material within the hollow space of the formwork segment in the shape of a blanket of elastomeric type of material to control vibrations and noise generated by the movement of railway vehicles on track systems.
  • The formwork segment is configured to he installed in its working position, directly supported above the foundation or directly supported above an elastic material of an elastomeric type of material, which is directly supported above the foundation with the objective of increasing the elasticity between the foundation and the formwork segment and decreasing the dynamic loads when railway vehicles pass.
  • The formwork segment is configured like a pre-fabricated part, which achieves a bench of continuous integral vehicular action by juxtaposing a big number of formwork segments, making some formwork segments bump into other formwork segments; and joining the segments among themselves.
  • The use of pre-fabricated parts facilitates repairs and replacement of a formwork segment damaged by wear and tear or any other condition. As such, the formwork segment minimizes costs arising from railway maintenance and conservation operations.
  • The formwork segment includes a number of hollows or spaces, which can receive multiple points of track support for assembly and fastening of two tracks running parallel to each other. The points of support are projected beyond the surface of the slab of the poured material at a predetermined height.
  • The formwork segment is also configured for embedding of multiple points of track support for assembly and fastening of two tracks running parallel to each other within the poured material. As such, the points of support of the tracks must be routed individually or like sleepers within the formwork segment before emptying the poured material within the hollow space of the formwork segment.
  • The formwork segment is configured to provide two rows of continuous parallel hollows to the longitudinal axis of the formwork segment for embedding and fastening of two tracks running parallel to each other within the slab of the poured material. The tracks previously to be embedded in the formwork segment are cased with elastic material that envelops the tracks and gives elastic properties to buffer the vibrations and control the noise generated by the movement of railway vehicles. The elastic material is installed within the continuous hollow of the slab of the poured material.
  • The formwork segment is made from a material composed of material of reinforced polymer fibre type, thermoplastic, or similar materials.
  • BRIEF DESCRIPTION OF THE FIGURES
  • A more detailed explanation of the system in accordance with embodiments of the invention is given in the below description based on the enclosed figures, in which:
  • FIG. 1 shows a perspective view of a formwork segment without filling poured material; the formwork segment has an essentially rectangular transversal section,
  • FIG. 2 shows a perspective view of the formwork segment with two rows of empty hollows to receive points of track support for assembly and fastening of two tracks running parallel to each other; the lower outer face of the formwork segment is assembled in physical contact with a blanket of elastic material,
  • FIG. 3 shows a perspective view of a formwork segment with two rows of empty hollows receiving points of track support, to which two railway tracks are assembled and fastened, with the formwork segment assembled in physical contact with a blanket of elastic material,
  • FIG. 4 shows a perspective view of the formwork segment with two rows of empty hollows receiving points of track support, to which two railway tracks are assembled and fastened, with the formwork segment assembled in physical contact with the blanket of elastic material, and where the points of support are projected beyond the surface of the slab of the poured material at a predetermined height, and
  • FIG. 5 shows a perspective view of a continuous carriageway of railway tracks including multiple formwork segments juxtaposed, making some formwork segments bump into other formwork segments.
  • DESCRIPTION
  • Now, with respect to FIGS. 1, 4 and 5, where a formwork segment 11 is shown, which is a formwork element that will remain integrally connected to a carriageway segment 41 of railway, i.e., the formwork segment 11 that remains permanently on the outside of the carriageway segment 41. As such, carriageway segment 41 comprises a formwork segment 11, in which a material has been poured to form an integral and monolithic joint, where the formwork segment 11 is non-demouldable from the carriageway segment 41. Formwork segment 11 has an essentially rectangular transversal section,
  • Formwork segment 11 forms a hollow space 12 to be filled with a poured bearing material of binding material type, capable of entering into the composition of a poured slab of the poured material bound hydraulically, concrete, asphalt, composite or similar material that railway tracks 31 bear.
  • Formwork segment 11 comprises at least one projection 13 as ribbing or generatrix at the outer face of the hollow space 12 of formwork segment 11 to facilitate transmission of tensions between the poured material and formwork segment 11, preventing relative slipping between both of them. In addition, projection 13 is a hollow conduit that can receive technical equipment, fluid distribution pipes, cables and other type of material related to maintenance, help, control and management of the movement of railway vehicles over railways of track systems, or other type of civil infrastructure, inside.
  • Projection 13 is of rectilinear polygon type in the longitudinal direction of formwork segment 11 and has a negative dovetail type such that formwork segment 11 is non-demouldable.
  • Formwork segment 11 is configured to receive an anti-slip material of type sand coated with resin, on which the fresh poured material is emptied, within the hollow space 12 of the formwork segment.
  • Formwork segment 11 provides a plurality of dents or bumps at its outer face 14 of the hollow space 12 of the formwork segment 11 as figures jutting cut projected beyond lower outer face 12 of the hollow space 11, being distributed at outer face 14 to prevent relative slipping between the slab of the poured material and formwork segment 11, increasing the friction between the poured material and formwork segment 11. In summary, formwork segment 11 enters into the slab of the poured material or vice versa to increase the adherence between both.
  • Formwork segment 11 bears the pressure of the poured material within hollow space 12 of formwork segment 11 and subsequently, of the poured material hardened by curing or setting.
  • In addition, formwork segment 11 is transportable empty or filled with the slab of the poured material up to its working position above a foundation or continuous base plate of a track system.
  • Formwork segment 11 provides a plurality of projections at the lower cuter face 15 as figures jutting out projected beyond the surface of the lower outer face 15, which are distributed at the lower cuter face 15, preventing relative slipping between the slab of the poured material and formwork segment 11 by increasing the friction between formwork segment 11 and the foundation.
  • In summary, formwork segment 11 enters into the foundation to obtain an anchoring effect by increasing the adherence between formwork segment 11 and the foundation,
  • As per one variant, the foundation comprises at least one insertion projected beyond the surface of the foundation at a predetermined height to enter into a hollow deformation 16 of projection 13, which receives the insert of the foundation, providing a similar anchoring effect between formwork segment 11 and the foundation.
  • Formwork segment 11 receives an elastic material within the hollow space 12 of formwork segment 11 in the shape of a blanket of elastomeric type of material to control vibrations and noise generated by the movement of railway vehicles over railways of a track system.
  • Formwork segment 11 is installed in its working position, directly supported above the foundation or directly supported above an elastic material of an elastomeric type of material, which is in turn directly supported above the foundation with the objective of increasing the elasticity between the foundation and the formwork segment and decreasing the dynamic loads when railway vehicles pass.
  • Formwork segment 11 is produced like a pre-fabricated part, which juxtaposing a big number of aligned formwork segments 11, making some formwork segments 11 bump into other formwork segments 11; joining the segments 11 among themselves achieves a bench of continuous integral rolling.
  • With respect now to the FIGS. 2 to 5 that show formwork segment 11 including a plurality of empty hollows 21, which can receive a plurality of points of track support 31 for assembly and fastening of two tracks 32 running parallel to each other. Points of support 31 are projected beyond the surface of the slab of the poured material at a predetermined height. Point of support 31, once inserted within the hollow 21 is supported by a cover part 22 of elastic material to reduce noise and vibrations generated by the movement of vehicles on railways of the track system.
  • Points of track support 31 are inserted within the slab of the poured material. As such, the points of support 31 of the tracks must be routed individually or like sleepers within formwork segment 11 before emptying the freshly poured material within the hollow space 12 of formwork segment 11.

Claims (13)

1. Formwork segment of construction of a continuous carriageway for railway tracks, where the formwork segment (11) is integrally connected to a carriageway segment (41), remaining permanently on the lower outer face of the carriageway segment (41), the formwork segment (11) being non-demouldable, and providing a hollow space (12) that can be filled with a poured material.
2. Segment according to claim 1, characterized in that the formwork segment (11) is made from a material composed of material of reinforced polymer fibre type, thermoplastic, or similar materials.
3. Segment according to claim 1, characterized in that the poured material is of bearing material type bound hydraulically, concrete, asphalt, composite or similar material.
4. Segment according to claim 3, characterized in that the poured material emptied over an anti-slip material deposited previously on the outer face (14) of the hollow space (12) of the formwork segment (1).
5. Segment according claim 3, characterized in that the poured material emptied over an elastic material deposited previously on this outer face (14) of the hollow space (12) of the formwork segment (11).
6. Segment according to claim 1, characterized in that the formwork segment (11) comprises at least one projection (12) jutting out beyond the outer face (14) of the hollow space (12) of formwork segment (11) facilitate transmission of tensions between the poured material and formwork segment (11).
7. Segment according to claim 6, characterized in that the projection (13) is of rectilinear polygon type in the longitudinal and/or transversal direction of the formwork segment (11) and presents a negative outgoing core.
8. Segment according to claim 1, characterized in that the formwork segment (11) is configured to provide, on the outer face (14) of the hollow space (12) of formwork segment (11), a plurality of dents distributed at the outer face (14) entering into the slab of the poured material or vice versa to increase the adherence between both.
9. Segment according to claim 1, diameterized in that the formwork segment (11) is configured to provide a plurality of projections at its lower outer face (15) as figures jutting out, projected beyond the surface of the lower outer face (15), distributed at the lower outer face (15), to enter into a foundation providing a similar anchoring effect between the formwork segment (11) and the foundation.
10. Segment according to claim 9, characterized in that the formwork segment (13) comprises a hollow deformation (16) configured to receive an insert is projected beyond the surface of the foundation at a predetermined height to enter into the hollow deformation (16).
11. Segment according to claim 1, characterized in that the formwork segment (11) comprises a number of empty hollows (21), which can receive a plurality of points of track support (31) for assembly and fastening of two railway tracks (32) running parallel to each other, where the points of support (31) are projected beyond the surface of the slab of the poured material at a predetermined height.
12. Segment according to claim 1, characterized in that the formwork segment (11) is configured to include a plurality of points of track support (31) for assembly and fastening of two railway tracks (32) running parallel to each other within the slab of the poured material.
13. Continuous carriageway of railway tracks, characterized in that the carriageway comprises a plurality of formwork segments juxtaposed, according to claim 1, making some formwork segments bump into other formwork segments.
US15/546,732 2015-01-30 2015-01-30 Forwork segment Abandoned US20180016751A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/ES2015/070069 WO2016120504A1 (en) 2015-01-30 2015-01-30 Formwork segment

Publications (1)

Publication Number Publication Date
US20180016751A1 true US20180016751A1 (en) 2018-01-18

Family

ID=56542493

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/546,732 Abandoned US20180016751A1 (en) 2015-01-30 2015-01-30 Forwork segment

Country Status (5)

Country Link
US (1) US20180016751A1 (en)
EP (1) EP3252230A1 (en)
AU (1) AU2015379580A1 (en)
CA (1) CA2975205A1 (en)
WO (1) WO2016120504A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11247327B2 (en) * 2017-03-23 2022-02-15 IPR—Intelligente Peripherien fuer Roboter GmbH Support rail for a robot platform that can be moved in translation, and motion system and robot system having a support rail of this kind

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090121035A1 (en) * 2005-11-15 2009-05-14 Martin Kowalski Fixed carriageway for rail vehicles

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3552030B2 (en) * 1999-07-06 2004-08-11 東京地下鉄株式会社 Sleeper elastic track device
EP2155964B1 (en) * 2007-05-11 2014-06-18 Feronia S.A. Prefabricated module for a railway and method for manufacturing this module
ES2371568B1 (en) * 2008-07-02 2012-09-14 Universidade Da Coruña CONSTRUCTION SYSTEM IN PLATE ROAD FOR RAILWAY THROUGH THE EMPLOYMENT OF PREFABRICATED UNITS WORKED WITH AUTOCOMPACTABLE CONCRETE.
BR112013020094A2 (en) * 2011-02-14 2016-10-25 Wegh Group S P A railway structure and mounting method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090121035A1 (en) * 2005-11-15 2009-05-14 Martin Kowalski Fixed carriageway for rail vehicles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11247327B2 (en) * 2017-03-23 2022-02-15 IPR—Intelligente Peripherien fuer Roboter GmbH Support rail for a robot platform that can be moved in translation, and motion system and robot system having a support rail of this kind

Also Published As

Publication number Publication date
EP3252230A1 (en) 2017-12-06
AU2015379580A1 (en) 2017-09-14
CA2975205A1 (en) 2016-08-04
WO2016120504A1 (en) 2016-08-04

Similar Documents

Publication Publication Date Title
EP2529050B1 (en) Railway or metro track support
KR102200955B1 (en) Road way construction method for mountain railway
JP2004538401A (en) Method of continuously supporting rails on fixed tracks, as well as adjusting devices and fixed tracks
CN105908639B (en) A kind of prefabricated box culvert and fast positioning construction method
CN108914715B (en) Assembly type ballastless track structure for vibration reduction zone and assembly method
US20160319541A1 (en) Constructive system and method of construction thereof
EP0663470B1 (en) Process for obtaining a superstructure for railway tracks
UA67777C2 (en) A railway of tramvay rail, fastening system for it (versions) and method for laying it
KR102105230B1 (en) Railroad bridge construction method for keeping preexistence railroad track and rail service
DE19503220A1 (en) System for ballastless permanent way of rail track
KR20120039429A (en) Precast rail slab for rail track and embedded railway track structure using the rail slab
US20180016751A1 (en) Forwork segment
EP3263766A1 (en) Concrete slab for a railway vehicle and/or guided tyre vehicle
DE102016114855A1 (en) Trough-shaped superstructure for a bridge, bridge, precast concrete part for a trough of a bridge and method for the construction of a bridge
US20180298566A1 (en) Post-tension running track
JP4093428B2 (en) High-strength reinforced concrete precast plate
DE4401260C1 (en) Permanent waxy construction for railway tracks, esp. for high speed
CN210194342U (en) Longitudinal-connection track plate structure
US20050252985A1 (en) Rail sleeper and ballast-free track structure
JPH09273102A (en) Sleeper
US2296756A (en) Load transfer device
KR101650856B1 (en) Partial slab integrated I-shaped girder and bridge construction method using the same
EP3885491B1 (en) Method for renovating a railway line
US9499945B2 (en) Methods for the construction and repair of concrete pavements
KR102457140B1 (en) Segmented sleepers assembly for railroads and turnout construction method using the same

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION