US20170208519A9 - Method and apparatus for supporting handoff from gprs/geran to lte eutran - Google Patents

Method and apparatus for supporting handoff from gprs/geran to lte eutran Download PDF

Info

Publication number
US20170208519A9
US20170208519A9 US14/014,818 US201314014818A US2017208519A9 US 20170208519 A9 US20170208519 A9 US 20170208519A9 US 201314014818 A US201314014818 A US 201314014818A US 2017208519 A9 US2017208519 A9 US 2017208519A9
Authority
US
United States
Prior art keywords
lte
wtru
enb
geran
sgsn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US14/014,818
Other versions
US20140003393A1 (en
US9913185B2 (en
Inventor
Kamel M. Shaheen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
InterDigital Technology Corp
Original Assignee
InterDigital Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by InterDigital Technology Corp filed Critical InterDigital Technology Corp
Priority to US14/014,818 priority Critical patent/US9913185B2/en
Publication of US20140003393A1 publication Critical patent/US20140003393A1/en
Publication of US20170208519A9 publication Critical patent/US20170208519A9/en
Application granted granted Critical
Publication of US9913185B2 publication Critical patent/US9913185B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0066Transmission or use of information for re-establishing the radio link of control information between different types of networks in order to establish a new radio link in the target network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/14Reselecting a network or an air interface
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0061Transmission or use of information for re-establishing the radio link of neighbour cell information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/14Reselecting a network or an air interface
    • H04W36/144Reselecting a network or an air interface over a different radio air interface technology
    • H04W36/1446Reselecting a network or an air interface over a different radio air interface technology wherein at least one of the networks is unlicensed
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters
    • H04W36/30Reselection being triggered by specific parameters by measured or perceived connection quality data
    • H04W36/302Reselection being triggered by specific parameters by measured or perceived connection quality data due to low signal strength
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L25/00Baseband systems
    • H04L25/38Synchronous or start-stop systems, e.g. for Baudot code
    • H04L25/40Transmitting circuits; Receiving circuits
    • H04L25/49Transmitting circuits; Receiving circuits using code conversion at the transmitter; using predistortion; using insertion of idle bits for obtaining a desired frequency spectrum; using three or more amplitude levels ; Baseband coding techniques specific to data transmission systems
    • H04L25/497Transmitting circuits; Receiving circuits using code conversion at the transmitter; using predistortion; using insertion of idle bits for obtaining a desired frequency spectrum; using three or more amplitude levels ; Baseband coding techniques specific to data transmission systems by correlative coding, e.g. partial response coding or echo modulation coding transmitters and receivers for partial response systems
    • H04L25/4975Correlative coding using Tomlinson precoding, Harashima precoding, Trellis precoding or GPRS

Definitions

  • This application is related to wireless communications.
  • wireless communication systems There are different types of wireless communication systems.
  • GPRS general packet radio service
  • GERAN global system for mobile communication radio access network
  • LTE long term evolution evolved universal terrestrial radio access network
  • a method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN are disclosed.
  • the method includes receiving an LTE measurement report.
  • An HO is initiated to the LTE network and a relocation request signal is transmitted.
  • a relocation command signal that includes an evolved Node-B (eNB) identifier (ID) is received.
  • eNB evolved Node-B
  • FIG. 1 shows an example general network architecture of an LTE system architecture
  • FIG. 2 shows an example first stage handoff procedure from a GERAN system to an LTE system
  • FIG. 3 shows an example second stage handoff procedure from a GERAN system to an LTE system
  • FIG. 4 shows an example third stage handoff procedure from a GPRS/GERAN system to an LTE system
  • FIG. 5 is a functional block diagram of a wireless transmit/receive unit and a base station
  • FIGS. 6A-6C show an example signal diagram of a handoff procedure
  • FIGS. 7A-7C show an example signal diagram of an alternative handoff procedure.
  • wireless transmit/receive unit includes but is not limited to a user equipment (UE), a mobile station, a fixed or mobile subscriber unit, a pager, a cellular telephone, a personal digital assistant (PDA), a computer, or any other type of user device capable of operating in a wireless environment.
  • base station includes but is not limited to a Node-B, a site controller, base station controller, an access point (AP), or any other type of interfacing device capable of operating in a wireless environment.
  • FIG. 1 shows an example general network architecture of an LTE system architecture 100 .
  • the LTE system 100 shows the interworking between LTE system architecture with the existing GERAN, UTRAN, based GPRS Core.
  • the LTE system includes an evolved radio access network (RAN) (E-Node B) connected to an evolved packet core containing a mobility management entity/user plane entity (MME/UPE), and inter AS anchor.
  • RAN evolved radio access network
  • MME/UPE mobility management entity/user plane entity
  • the evolved packet core connects to an HSS, PCRF, HSS, operator IP servers, (e.g., IMS, PSS, and the like), a Non-3GPP IP Access network, and a wireless local area network (WLAN) 3GPP IP Access block.
  • HSS evolved radio access network
  • PCRF Packet Control Protocol
  • HSS operator IP servers
  • Non-3GPP IP Access network e.g., IMS, PSS, and the like
  • WLAN wireless local area network
  • An operations IP server (e.g., IMS, PSS, and the like) is also included in the LTE system 100 .
  • the GPRS Core contains the Serving GPRS Support Node (SGSN) which is responsible for mobility management, access procedures, and user plane control. It also contains the Gateway GPRS Support Node (GGSN) where the network is connected to external networks and other operator servers.
  • the Operator IP Service includes the IP Multimedia Service Subsystem (IMS), where voice over IP (VoIP) and other multimedia services are controlled.
  • IMS IP Multimedia Service Subsystem
  • VoIP voice over IP
  • the Non-3GPP IP access includes connections to other technologies such as 3GPP2 (CDMA2000) and WiMAX (e.g., IEEE 802.16 systems).
  • the Evolved Core also connects to WLAN networks that are incorporated into 3GPP systems via interworking architecture defined in 3GPP.
  • FIG. 2 shows an example first stage handoff procedure 200 where a WTRU is transitioning from coverage within a GERAN system to coverage within an LTE system.
  • a WTRU (depicted by the ovals shown at the bottom of the Figure), is being handed over from one system to the other.
  • the WTRU is currently connected to a gateway GPRS support node (GGSN) via a serving GPRS support node (SGSN), and a target base station controller (BSC).
  • GGSN gateway GPRS support node
  • SGSN serving GPRS support node
  • BSC target base station controller
  • the cells belonging to GERAN systems may include different Location Areas/Routing Areas (LA 1 /RA 1 ) from those belonging to LTE based cells (LA 2 /RA 2 ).
  • LA 1 /RA 1 Location Areas/Routing Areas
  • LA 2 /RA 2 LTE based cells
  • GERAN cells may be co-located with LTE cells, these cells may remain under different LA/RA configurations due to the differences between the two system architectures.
  • FIG. 3 shows an example second stage handoff procedure 300 from a GERAN system to an LTE system, that may be utilized optionally.
  • a tunnel may be created between the target BSC and an evolved Node B as the WTRU is handed off from one system to another.
  • the tunnel temporarily forwards the current pending data transfer between the GERAN system and the WTRU via the eNode-B while the new connection through the Evolved Core Network is being established. This should ensure that no data is lost during transition.
  • the operator may chose not to implement this step and go to a complete transition case where no connection is established between a GERAN BSC and eNode-B. Forwarding of data can occur at higher layers between the two core networks.
  • FIG. 4 shows an example third stage handoff procedure 400 from a GPRS/GERAN system to an LTE system.
  • the WTRU is now connected to an access gateway (AGW) via a new MME and target E-Node B.
  • AGW access gateway
  • FIG. 5 is a functional block diagram of a WTRU 510 and a base station 520 .
  • the WTRU 510 is in communication with the base station 520 and both are configured to support handoff from GPRS/GERAN to LTE EUTRAN.
  • the WTRU 510 includes a processor 515 , a receiver 516 , a transmitter 517 , and an antenna 518 .
  • the processor 515 is configured to support handoff from GPRS/GERAN to LTE EUTRAN.
  • the receiver 516 and the transmitter 517 are in communication with the processor 515 .
  • the antenna 518 is in communication with both the receiver 516 and the transmitter 517 to facilitate the transmission and reception of wireless data.
  • the processor 515 , receiver 516 , transmitter 517 , and antenna 518 may be configured as a GPRS/GERAN radio transceiver, or configured as an LTE EUTRAN radio transceiver.
  • processors, receivers, transmitters, and antennas may be included in the WTRU 510 , whereby different groupings of processors, receivers, transmitters, and antennas operate in different modes, (e.g., GPRS/GERAN transceiver or LTE EUTRAN transceiver).
  • the base station 520 includes a processor 525 , a receiver 526 , a transmitter 527 , and an antenna 528 .
  • the processor 525 is configured to support handoff from GPRS/GERAN to LTE EUTRAN.
  • the receiver 526 and the transmitter 527 are in communication with the processor 525 .
  • the antenna 528 is in communication with both the receiver 526 and the transmitter 527 to facilitate the transmission and reception of wireless data.
  • the WTRU 510 and base station 520 may be in communication with other network devices.
  • FIGS. 6A-6C show an example signal diagram of a handoff procedure 600 .
  • a dual mode WTRU (LTE/GERAN) 510 is shown, a target e-Node B (T-ENB) 520 , a serving BSC (S-BSC) 530 , an LTE-MME 540 , a serving second generation (2G) SGSN 550 , and an LTE UPE/Gateway/GGSN 560 .
  • the WTRU 510 includes an LTE and GERAN transceiver.
  • step 601 measurements are performed at the WTRU 510 .
  • the measurements are performed by the GERAN transceiver in the WTRU 510 on an LTE network.
  • the WTRU 510 then transmits a measurement report (LTE) signal ( 602 ) to the S-BSC 530 .
  • LTE measurement report
  • Intersystem HO is initiated, with LTE being the target (step 603 ).
  • a relocation request signal 604 containing the source cell ID and the target cell ID is transmitted from the S-BSC 530 to the serving 2G SGSN 550 .
  • the serving 2G SGSN determines the target system ID and the MME ID (step 605 ), and forwards the relocation request to the LTE-MME 540 .
  • the LTE-MME 540 determines the target e-Node B ID, and requests the user profile and context if it was not included in signaling message 606 (step 607 ).
  • the LTE-MME 540 sends a handoff request signal ( 608 ) to the T-ENB 520 , containing the cell ID, MME ID, GGSN TEID, and the international mobile subscriber identity/temporary mobile subscriber identity (IMSI/TMSI).
  • IMSI/TMSI international mobile subscriber identity/temporary mobile subscriber identity
  • the T-ENB 520 determines channel availability and initiates radio access bearer (RAB) establishment (step 609 ).
  • RAB radio access bearer
  • the T-ENB 520 transmits a handoff request ACK, (including the IMSI/TMSI), signal ( 610 ) to the LTE-MME 540 , which transmits a relocation response signal 611 , that includes the IMSI and T-E Node B ID to the serving 2G SGSN 550 .
  • the LTE-MME 540 then creates an MM state and SM state to prepare for activating packet data protocol (PDP) context information (step 612 ).
  • PDP packet data protocol
  • the serving 2G SGSN 550 transmits a relocation command signal ( 613 ), that includes the TMSI and E-Node B ID to the S-BSC 530 , which establishes a temporary tunnel to the E-Node B to forward data (step 614 ).
  • User data is then forwarded between the T-ENB 520 and the S-BSC 530 , and the HO command 615 is transmitted from the T-ENB 520 to the GERAN transceiver of the WTRU 510 , which transmits an initiate/synch radio signal ( 616 ), which includes the target channel ID, to the LTE transceiver.
  • the T-ENB 520 sends a relocation detect signal ( 617 ) to the LTE-MME 540 , and the LTE transceiver ACKs ( 618 ) the initiate/synch radio signal.
  • An HO complete signal ( 619 ) is sent from the GERAN transceiver to the S-BSC.
  • RAN information and RAB establishment is performed between the LTE transceiver and the T-ENB 520 ( 620 ) and user DL/UL traffic flows.
  • a PS attach signal ( 621 ) is transmitted from the LTE transceiver to the T-ENB 520 , which forwards the signal to the LTE-MME 540 ( 622 ).
  • the LTE-MME 540 transmits a PS attach accepted signal ( 623 ) to the LTE transceiver through the T-ENB 520 , which responds with a PS attach accept ACK ( 624 ), which is forwarded to the LTE-MME 540 through the T-ENB 520 .
  • the MME-LTE updates the PDP context with the new E-Node B TEID (step 625 ), and transmits an update PDP context signal ( 626 ) to the LTE UPE/Gateway/GGSN 560 . Additionally, user data may be transmitted along a GPRS tunneling protocol user plane (GTP-U).
  • GTP-U GPRS tunneling protocol user plane
  • An HO complete signal ( 627 ) is sent from the LTE-MME 540 to the serving 2G SGSN 550 , which sends a release signal ( 628 ) to the S-BSC 530 and an HO complete ACK ( 629 ) to the LTE-MME 540 .
  • Traffic is switched from the SGSN to the E-Node B (step 630 ) by the LTE UPE/Gateway/GGSN 560 , and the S-BSC 530 releases the E-Node B BSS tunnel and stops forwarding data (step 631 ).
  • a release ACK ( 632 ) is transmitted from the S-BSC 530 to the serving 2G SGSN 550 , and user DL/UL data and control data proceeds between the LTE transceiver the T-ENB 520 , and the LTE UPE/Gateway/GGSN 560 .
  • FIGS. 7A-7C show an example signal diagram of an alternative handoff procedure 700 .
  • user downlink (DL) and uplink (UL) traffic is occurring between the entities and in the GERAN mode of the dual mode WTRU 510 .
  • measurements are performed at the WTRU 510 .
  • the WTRU 510 then transmits a measurement report (LTE) signal ( 702 ) to the S-BSC 530 .
  • Intersystem HO is initiated, with LTE being the target (step 703 ).
  • a relocation request signal 704 containing the source cell ID and the target cell ID is transmitted from the S-BSC 530 to the serving 2G SGSN 550 .
  • the serving 2G SGSN determines the target system ID and the MME ID (step 705 ), and forwards the relocation request to the LTE-MME 540 .
  • the LTE-MME 540 determines the target e-Node B ID, and requests the user profile and context if it was not included in signaling message 706 (step 707 ).
  • the LTE-MME 540 sends a handoff request signal ( 708 ) to the T-ENB 520 , containing the cell ID, MME ID, GGSN TEID, and the international mobile subscriber identity /temporary mobile subscriber identity (IMSI/TMSI).
  • IMSI/TMSI international mobile subscriber identity /temporary mobile subscriber identity
  • the T-ENB 520 determines channel availability and initiates radio access bearer (RAB) establishment (step 709 ).
  • RAB radio access bearer
  • the T-ENB 520 transmits a handoff request ACK, (including the IMSI/TMSI), signal ( 710 ) to the LTE-MME 540 , which transmits a relocation response signal 711 , that includes the IMSI and T-E Node B ID to the serving 2G SGSN 550 .
  • the LTE-MME 540 then creates an MM state and SM state to prepare for activating packet data protocol (PDP) context information (step 712 ).
  • PDP packet data protocol
  • the serving 2G SGSN 550 transmits a relocation command signal ( 713 ), that includes the TMSI and E-Node B ID to the S-BSC 530 , which establishes a temporary tunnel to the E-Node B to forward data (step 714 ).
  • User data is then forwarded between the T-ENB 520 and the S-BSC 530 , and the HO command 715 is transmitted from the T-ENB 520 to the GERAN transceiver of the WTRU 510 , which transmits an initiate/synch radio signal ( 716 ), which includes the target channel ID, to the LTE transceiver.
  • An ACK ( 717 ) is sent from the LTE transceiver, and an HO complete message ( 718 ) is sent from the GERAN transceiver to the S-BSC 530 , which forwards an HO complete signal ( 719 ) to the T-ENB 520 .
  • RAN and RAB establishment occurs between the LTE transceiver and the T-ENB 520 , and the T-ENB 520 transmits a relocation detect message ( 720 ) to the LTE-MME 540 .
  • the MME-LTE updates the PDP context with the new E-Node B TEID (step 721 ).
  • An HO complete signal ( 722 ) is sent from the LTE-MME 540 to the serving 2G SGSN 550 , which sends a release signal ( 723 ) to the S-BSC 530 and an HO complete ACK ( 724 ) to the LTE-MME 540 .
  • Traffic is switched from the SGSN to the E-Node B (step 725 ) by the LTE UPE/Gateway/GGSN 560 , and the S-BSC 530 releases the E-Node B BSS tunnel and stops forwarding data (step 726 ).
  • a release ACK ( 727 ) is transmitted from the S-BSC 530 to the serving 2G SGSN 550 , and user DL/UL data and control data proceeds between the LTE transceiver the T-ENB 520 , and the LTE UPE/Gateway/GGSN 560 .
  • radio resources are prepared in the target 3GPP access system before the WTRU 510 is commanded by the source 3GPP access system to change to the target 3GPP access system.
  • a tunnel is established between the two radio access networks (RANs) (basic service set (BSS) and E-Node B) in order to forward the data while the core network resources are assigned.
  • RANs radio access networks
  • BSS basic service set
  • E-Node B E-Node B
  • a control interface may exist in the core level between the 2G/3G SGSN and corresponding MME to exchange the mobility context and the session context of the Mobile. Additionally, the target system may provide directions to the WTRU 510 as to the radio access requirements, such as the radio resource configuration, target cell system information, and the like.
  • ROM read only memory
  • RAM random access memory
  • register cache memory
  • semiconductor memory devices magnetic media such as internal hard disks and removable disks, magneto-optical media, and optical media such as CD-ROM disks, and digital versatile disks (DVDs).
  • Suitable processors include, by way of example, a general purpose processor, a special purpose processor, a conventional processor, a digital signal processor (DSP), a plurality of microprocessors, one or more microprocessors in association with a DSP core, a controller, a microcontroller, Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) circuits, any other type of integrated circuit (IC), and/or a state machine.
  • DSP digital signal processor
  • ASICs Application Specific Integrated Circuits
  • FPGAs Field Programmable Gate Arrays
  • a processor in association with software may be used to implement a radio frequency transceiver for use in a wireless transmit receive unit (WTRU), user equipment (UE), terminal, base station, radio network controller (RNC), or any host computer.
  • the WTRU may be used in conjunction with modules, implemented in hardware and/or software, such as a camera, a video camera module, a videophone, a speakerphone, a vibration device, a speaker, a microphone, a television transceiver, a hands free headset, a keyboard, a Bluetooth® module, a frequency modulated (FM) radio unit, a liquid crystal display (LCD) display unit, an organic light-emitting diode (OLED) display unit, a digital music player, a media player, a video game player module, an Internet browser, and/or any wireless local area network (WLAN) or Ultra Wide Band (UWB) module.
  • WLAN wireless local area network
  • UWB Ultra Wide Band

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A method and apparatus for supporting a handoff (HO) from a general packet radio service (GPRS), global system for mobile communication radio access network (GERAN), and long term evolution (LTE) evolved universal terrestrial radio access network (EUTRAN) includes receiving an LTE measurement report. A HO is initiated to the LTE network and a relocation request signal is transmitted. A relocation command signal that includes an evolved Node-B (eNB) identifier (ID) is received.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is a continuation of U.S. patent application Ser. No. 12/029,505 filed Feb. 12, 2008 which issues as U.S. Pat. No. 8,526,952 on Sep. 3, 2013, which claims the benefit of U.S. Provisional Application No. 60/889,353, filed Feb. 12, 2007, which is incorporated by reference as if fully set forth.
  • FIELD OF INVENTION
  • This application is related to wireless communications.
  • BACKGROUND
  • There are different types of wireless communication systems. For example, some wireless communication systems include general packet radio service (GPRS), global system for mobile communication radio access network (GERAN), and long term evolution (LTE) evolved universal terrestrial radio access network (EUTRAN).
  • When a mobile unit is traveling, it may need to be handed off from one network to another. Since not all networks are identical, a method for supporting the handoff between systems would be beneficial.
  • SUMMARY
  • A method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN are disclosed. The method includes receiving an LTE measurement report. An HO is initiated to the LTE network and a relocation request signal is transmitted. A relocation command signal that includes an evolved Node-B (eNB) identifier (ID) is received.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • A more detailed understanding may be had from the following description, given by way of example in conjunction with the accompanying drawings wherein:
  • FIG. 1 shows an example general network architecture of an LTE system architecture;
  • FIG. 2 shows an example first stage handoff procedure from a GERAN system to an LTE system;
  • FIG. 3 shows an example second stage handoff procedure from a GERAN system to an LTE system;
  • FIG. 4 shows an example third stage handoff procedure from a GPRS/GERAN system to an LTE system;
  • FIG. 5 is a functional block diagram of a wireless transmit/receive unit and a base station;
  • FIGS. 6A-6C show an example signal diagram of a handoff procedure; and
  • FIGS. 7A-7C show an example signal diagram of an alternative handoff procedure.
  • DETAILED DESCRIPTION
  • When referred to hereafter, the terminology “wireless transmit/receive unit (WTRU)” includes but is not limited to a user equipment (UE), a mobile station, a fixed or mobile subscriber unit, a pager, a cellular telephone, a personal digital assistant (PDA), a computer, or any other type of user device capable of operating in a wireless environment. When referred to hereafter, the terminology “base station” includes but is not limited to a Node-B, a site controller, base station controller, an access point (AP), or any other type of interfacing device capable of operating in a wireless environment.
  • FIG. 1 shows an example general network architecture of an LTE system architecture 100. The LTE system 100 shows the interworking between LTE system architecture with the existing GERAN, UTRAN, based GPRS Core. The LTE system includes an evolved radio access network (RAN) (E-Node B) connected to an evolved packet core containing a mobility management entity/user plane entity (MME/UPE), and inter AS anchor. The evolved packet core connects to an HSS, PCRF, HSS, operator IP servers, (e.g., IMS, PSS, and the like), a Non-3GPP IP Access network, and a wireless local area network (WLAN) 3GPP IP Access block. An operations IP server, (e.g., IMS, PSS, and the like) is also included in the LTE system 100. The GPRS Core contains the Serving GPRS Support Node (SGSN) which is responsible for mobility management, access procedures, and user plane control. It also contains the Gateway GPRS Support Node (GGSN) where the network is connected to external networks and other operator servers. The Operator IP Service includes the IP Multimedia Service Subsystem (IMS), where voice over IP (VoIP) and other multimedia services are controlled. The Non-3GPP IP access includes connections to other technologies such as 3GPP2 (CDMA2000) and WiMAX (e.g., IEEE 802.16 systems). The Evolved Core also connects to WLAN networks that are incorporated into 3GPP systems via interworking architecture defined in 3GPP.
  • FIG. 2 shows an example first stage handoff procedure 200 where a WTRU is transitioning from coverage within a GERAN system to coverage within an LTE system. As shown in FIG. 2, a WTRU, (depicted by the ovals shown at the bottom of the Figure), is being handed over from one system to the other. The WTRU is currently connected to a gateway GPRS support node (GGSN) via a serving GPRS support node (SGSN), and a target base station controller (BSC).
  • The cells belonging to GERAN systems may include different Location Areas/Routing Areas (LA1/RA1) from those belonging to LTE based cells (LA2/RA2). In certain deployments, although GERAN cells may be co-located with LTE cells, these cells may remain under different LA/RA configurations due to the differences between the two system architectures.
  • FIG. 3 shows an example second stage handoff procedure 300 from a GERAN system to an LTE system, that may be utilized optionally. A tunnel may be created between the target BSC and an evolved Node B as the WTRU is handed off from one system to another. The tunnel temporarily forwards the current pending data transfer between the GERAN system and the WTRU via the eNode-B while the new connection through the Evolved Core Network is being established. This should ensure that no data is lost during transition. The operator may chose not to implement this step and go to a complete transition case where no connection is established between a GERAN BSC and eNode-B. Forwarding of data can occur at higher layers between the two core networks.
  • FIG. 4 shows an example third stage handoff procedure 400 from a GPRS/GERAN system to an LTE system. As shown in FIG. 4, the WTRU is now connected to an access gateway (AGW) via a new MME and target E-Node B.
  • FIG. 5 is a functional block diagram of a WTRU 510 and a base station 520. As shown in FIG. 5, the WTRU 510 is in communication with the base station 520 and both are configured to support handoff from GPRS/GERAN to LTE EUTRAN.
  • In addition to the components that may be found in a typical WTRU, the WTRU 510 includes a processor 515, a receiver 516, a transmitter 517, and an antenna 518. The processor 515 is configured to support handoff from GPRS/GERAN to LTE EUTRAN. The receiver 516 and the transmitter 517 are in communication with the processor 515. The antenna 518 is in communication with both the receiver 516 and the transmitter 517 to facilitate the transmission and reception of wireless data. The processor 515, receiver 516, transmitter 517, and antenna 518 may be configured as a GPRS/GERAN radio transceiver, or configured as an LTE EUTRAN radio transceiver. Also, although only one processor, receiver, transmitter, and antenna is shown, it should be noted that multiple processors, receivers, transmitters, and antennas may be included in the WTRU 510, whereby different groupings of processors, receivers, transmitters, and antennas operate in different modes, (e.g., GPRS/GERAN transceiver or LTE EUTRAN transceiver).
  • In addition to the components that may be found in a typical base station, the base station 520 includes a processor 525, a receiver 526, a transmitter 527, and an antenna 528. The processor 525 is configured to support handoff from GPRS/GERAN to LTE EUTRAN. The receiver 526 and the transmitter 527 are in communication with the processor 525. The antenna 528 is in communication with both the receiver 526 and the transmitter 527 to facilitate the transmission and reception of wireless data.
  • It should be noted that the WTRU 510 and base station 520 may be in communication with other network devices.
  • FIGS. 6A-6C show an example signal diagram of a handoff procedure 600. In the signal diagram of FIGS. 6A-6C, a dual mode WTRU (LTE/GERAN) 510 is shown, a target e-Node B (T-ENB) 520, a serving BSC (S-BSC) 530, an LTE-MME 540, a serving second generation (2G) SGSN 550, and an LTE UPE/Gateway/GGSN 560. The WTRU 510 includes an LTE and GERAN transceiver.
  • As shown in FIGS. 6A-6C, user downlink (DL) and uplink (UL) traffic is occurring between the entities and in the GERAN mode of the dual mode WTRU 510. In step 601, measurements are performed at the WTRU 510. In one example, the measurements are performed by the GERAN transceiver in the WTRU 510 on an LTE network. The WTRU 510 then transmits a measurement report (LTE) signal (602) to the S-BSC 530. Intersystem HO is initiated, with LTE being the target (step 603). A relocation request signal 604, containing the source cell ID and the target cell ID is transmitted from the S-BSC 530 to the serving 2G SGSN 550. The serving 2G SGSN determines the target system ID and the MME ID (step 605), and forwards the relocation request to the LTE-MME 540.
  • The LTE-MME 540 determines the target e-Node B ID, and requests the user profile and context if it was not included in signaling message 606 (step 607). The LTE-MME 540 sends a handoff request signal (608) to the T-ENB 520, containing the cell ID, MME ID, GGSN TEID, and the international mobile subscriber identity/temporary mobile subscriber identity (IMSI/TMSI). The T-ENB 520 determines channel availability and initiates radio access bearer (RAB) establishment (step 609). The T-ENB 520 transmits a handoff request ACK, (including the IMSI/TMSI), signal (610) to the LTE-MME 540, which transmits a relocation response signal 611, that includes the IMSI and T-E Node B ID to the serving 2G SGSN 550. The LTE-MME 540 then creates an MM state and SM state to prepare for activating packet data protocol (PDP) context information (step 612).
  • The serving 2G SGSN 550 transmits a relocation command signal (613), that includes the TMSI and E-Node B ID to the S-BSC 530, which establishes a temporary tunnel to the E-Node B to forward data (step 614). User data is then forwarded between the T-ENB 520 and the S-BSC 530, and the HO command 615 is transmitted from the T-ENB 520 to the GERAN transceiver of the WTRU 510, which transmits an initiate/synch radio signal (616), which includes the target channel ID, to the LTE transceiver. The T-ENB 520 sends a relocation detect signal (617) to the LTE-MME 540, and the LTE transceiver ACKs (618) the initiate/synch radio signal.
  • An HO complete signal (619) is sent from the GERAN transceiver to the S-BSC. RAN information and RAB establishment is performed between the LTE transceiver and the T-ENB 520 (620) and user DL/UL traffic flows. A PS attach signal (621) is transmitted from the LTE transceiver to the T-ENB 520, which forwards the signal to the LTE-MME 540 (622). The LTE-MME 540 transmits a PS attach accepted signal (623) to the LTE transceiver through the T-ENB 520, which responds with a PS attach accept ACK (624), which is forwarded to the LTE-MME 540 through the T-ENB 520.
  • The MME-LTE updates the PDP context with the new E-Node B TEID (step 625), and transmits an update PDP context signal (626) to the LTE UPE/Gateway/GGSN 560. Additionally, user data may be transmitted along a GPRS tunneling protocol user plane (GTP-U).
  • An HO complete signal (627) is sent from the LTE-MME 540 to the serving 2G SGSN 550, which sends a release signal (628) to the S-BSC 530 and an HO complete ACK (629) to the LTE-MME 540. Traffic is switched from the SGSN to the E-Node B (step 630) by the LTE UPE/Gateway/GGSN 560, and the S-BSC 530 releases the E-Node B BSS tunnel and stops forwarding data (step 631). A release ACK (632) is transmitted from the S-BSC 530 to the serving 2G SGSN 550, and user DL/UL data and control data proceeds between the LTE transceiver the T-ENB 520, and the LTE UPE/Gateway/GGSN 560.
  • FIGS. 7A-7C show an example signal diagram of an alternative handoff procedure 700. As shown in FIG. 7A-7C, user downlink (DL) and uplink (UL) traffic is occurring between the entities and in the GERAN mode of the dual mode WTRU 510. In step 701, measurements are performed at the WTRU 510. The WTRU 510 then transmits a measurement report (LTE) signal (702) to the S-BSC 530. Intersystem HO is initiated, with LTE being the target (step 703). A relocation request signal 704, containing the source cell ID and the target cell ID is transmitted from the S-BSC 530 to the serving 2G SGSN 550. The serving 2G SGSN determines the target system ID and the MME ID (step 705), and forwards the relocation request to the LTE-MME 540.
  • The LTE-MME 540 determines the target e-Node B ID, and requests the user profile and context if it was not included in signaling message 706 (step 707). The LTE-MME 540 sends a handoff request signal (708) to the T-ENB 520, containing the cell ID, MME ID, GGSN TEID, and the international mobile subscriber identity /temporary mobile subscriber identity (IMSI/TMSI). The T-ENB 520 determines channel availability and initiates radio access bearer (RAB) establishment (step 709). The T-ENB 520 transmits a handoff request ACK, (including the IMSI/TMSI), signal (710) to the LTE-MME 540, which transmits a relocation response signal 711, that includes the IMSI and T-E Node B ID to the serving 2G SGSN 550. The LTE-MME 540 then creates an MM state and SM state to prepare for activating packet data protocol (PDP) context information (step 712).
  • The serving 2G SGSN 550 transmits a relocation command signal (713), that includes the TMSI and E-Node B ID to the S-BSC 530, which establishes a temporary tunnel to the E-Node B to forward data (step 714). User data is then forwarded between the T-ENB 520 and the S-BSC 530, and the HO command 715 is transmitted from the T-ENB 520 to the GERAN transceiver of the WTRU 510, which transmits an initiate/synch radio signal (716), which includes the target channel ID, to the LTE transceiver. An ACK (717) is sent from the LTE transceiver, and an HO complete message (718) is sent from the GERAN transceiver to the S-BSC 530, which forwards an HO complete signal (719) to the T-ENB 520. RAN and RAB establishment occurs between the LTE transceiver and the T-ENB 520, and the T-ENB 520 transmits a relocation detect message (720) to the LTE-MME 540.
  • User DL/UL traffic occurs between the LTE transceiver and the T-ENB 520. The MME-LTE updates the PDP context with the new E-Node B TEID (step 721).
  • An HO complete signal (722) is sent from the LTE-MME 540 to the serving 2G SGSN 550, which sends a release signal (723) to the S-BSC 530 and an HO complete ACK (724) to the LTE-MME 540. Traffic is switched from the SGSN to the E-Node B (step 725) by the LTE UPE/Gateway/GGSN 560, and the S-BSC 530 releases the E-Node B BSS tunnel and stops forwarding data (step 726). A release ACK (727) is transmitted from the S-BSC 530 to the serving 2G SGSN 550, and user DL/UL data and control data proceeds between the LTE transceiver the T-ENB 520, and the LTE UPE/Gateway/GGSN 560.
  • As described in FIGS. 1-7C above, radio resources are prepared in the target 3GPP access system before the WTRU 510 is commanded by the source 3GPP access system to change to the target 3GPP access system. A tunnel is established between the two radio access networks (RANs) (basic service set (BSS) and E-Node B) in order to forward the data while the core network resources are assigned.
  • A control interface may exist in the core level between the 2G/3G SGSN and corresponding MME to exchange the mobility context and the session context of the Mobile. Additionally, the target system may provide directions to the WTRU 510 as to the radio access requirements, such as the radio resource configuration, target cell system information, and the like.
  • There is an intermediate state during handoff where the DL U-plane data is sent from source system to the target system before the U-plane is switched directly to the target system in order to avoid the loss of user data, (e.g., by forwarding). Bi-casting may also be used until the 3GPP Anchor determines that it can send DL U-plane data directly to the target system.
  • Although features and elements are described above in particular combinations, each feature or element can be used alone without the other features and elements or in various combinations with or without other features and elements. The methods or flow charts provided herein may be implemented in a computer program, software, or firmware incorporated in a computer-readable storage medium for execution by a general purpose computer or a processor. Examples of computer-readable storage mediums include a read only memory (ROM), a random access memory (RAM), a register, cache memory, semiconductor memory devices, magnetic media such as internal hard disks and removable disks, magneto-optical media, and optical media such as CD-ROM disks, and digital versatile disks (DVDs).
  • Suitable processors include, by way of example, a general purpose processor, a special purpose processor, a conventional processor, a digital signal processor (DSP), a plurality of microprocessors, one or more microprocessors in association with a DSP core, a controller, a microcontroller, Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) circuits, any other type of integrated circuit (IC), and/or a state machine.
  • A processor in association with software may be used to implement a radio frequency transceiver for use in a wireless transmit receive unit (WTRU), user equipment (UE), terminal, base station, radio network controller (RNC), or any host computer. The WTRU may be used in conjunction with modules, implemented in hardware and/or software, such as a camera, a video camera module, a videophone, a speakerphone, a vibration device, a speaker, a microphone, a television transceiver, a hands free headset, a keyboard, a Bluetooth® module, a frequency modulated (FM) radio unit, a liquid crystal display (LCD) display unit, an organic light-emitting diode (OLED) display unit, a digital music player, a media player, a video game player module, an Internet browser, and/or any wireless local area network (WLAN) or Ultra Wide Band (UWB) module.

Claims (8)

What is claimed is:
1. A method for use in a Long Term Evolution (LTE) Mobility Management Entity (MME), comprising:
receiving a relocation request message from a Serving GPRS Support Node (SGSN) serving a wireless transmit/receive unit (WTRU) using GSM EDGE Radio Access Network (GERAN) technology, the relocation request message including an International Mobile Subscriber Identity (IMSI) of the WTRU and a handover target identifier;
communicating a handover request message to an evolved Node-B (eNB), the handover request message including an identifier of the WTRU; and
receiving a handover request acknowledgement message from the eNB.
2. The method of claim 1, further comprising:
receiving an attachment notify message from the eNB, the attachment notify message indicating that the WTRU has successfully accessed the eNB; and
communicating a relocation complete message to the SGSN, the relocation complete message indicating that the WTRU has successfully accessed the eNB;
3. The method of claim 2, further comprising:
receiving a relocation complete acknowledgement message from the SGSN; and
providing LTE services to the WTRU.
4. A Long Term Evolution (LTE) Mobility Management Entity (MME), comprising:
a receiver, configured to receive a relocation request message from a Serving GPRS Support Node (SGSN) serving a wireless transmit/receive unit (WTRU) using GSM EDGE Radio Access Network (GERAN) technology, the relocation request message including an International Mobile Subscriber Identity (IMSI) of the WTRU and a handover target identifier; and
a transmitter, configured to communicate a handover request message to an evolved Node-B (eNB), the handover request message including an identifier of the WTRU;
wherein the receiver further is configured to receive a handover request acknowledgement message from the eNB.
5. The MME of claim 4, wherein:
the receiver is further configured to receive an attachment notify message from the eNB, the attachment notify message indicating that the WTRU has successfully accessed the eNB; and
the transmitter is further configured to communicate a relocation complete message to the SGSN, the relocation complete message indicating that the WTRU has successfully accessed the eNB.
6. The MME of claim 5, wherein:
the receiver is further configured to receive a relocation complete acknowledgement message from the SGSN; and
the receiver and transmitter are further configured to provide LTE services to the WTRU.
7. A wireless transmit/receive unit, comprising:
a processor configured to perform measurements on long term evolution (LTE) cells and transmit a measurement report to a general packet radio service global system for mobile communication radio access network (GERAN) base station,
the processor further configured to receive a handover command transmitted by the GERAN base station, wherein the handover command includes radio resource configuration and target cell information for an LTE cell; and
the processor further configured to establish a connection with the LTE cell in response to the handover command.
8. A method, comprising:
performing measurements on long term evolution (LTE) cells by a wireless transmit/receive unit (WTRU);
transmitting a measurement report to a general packet radio service global system for mobile communication radio access network (GERAN) base station by the WTRU;
receiving a handover command transmitted by the GERAN base station, wherein the handover command includes radio resource configuration and target cell information for an LTE cell; and
establishing a connection with the LTE cell in response to the handover command.
US14/014,818 2007-02-12 2013-08-30 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN Active 2028-05-27 US9913185B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/014,818 US9913185B2 (en) 2007-02-12 2013-08-30 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US88935307P 2007-02-12 2007-02-12
US12/029,505 US8526952B2 (en) 2007-02-12 2008-02-12 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN
US14/014,818 US9913185B2 (en) 2007-02-12 2013-08-30 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US12/029,505 Continuation US8526952B2 (en) 2007-02-12 2008-02-12 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN

Publications (3)

Publication Number Publication Date
US20140003393A1 US20140003393A1 (en) 2014-01-02
US20170208519A9 true US20170208519A9 (en) 2017-07-20
US9913185B2 US9913185B2 (en) 2018-03-06

Family

ID=39529359

Family Applications (2)

Application Number Title Priority Date Filing Date
US12/029,505 Active 2031-04-01 US8526952B2 (en) 2007-02-12 2008-02-12 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN
US14/014,818 Active 2028-05-27 US9913185B2 (en) 2007-02-12 2013-08-30 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US12/029,505 Active 2031-04-01 US8526952B2 (en) 2007-02-12 2008-02-12 Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN

Country Status (15)

Country Link
US (2) US8526952B2 (en)
EP (1) EP2127445B1 (en)
JP (4) JP5081927B2 (en)
KR (6) KR20150022025A (en)
CN (4) CN103957568B (en)
AR (1) AR065303A1 (en)
AU (1) AU2008216739B2 (en)
BR (1) BRPI0807310B8 (en)
CA (1) CA2678102C (en)
IL (1) IL200357A (en)
MX (1) MX2009008592A (en)
MY (1) MY151917A (en)
RU (1) RU2421941C2 (en)
TW (4) TWI451724B (en)
WO (1) WO2008100488A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10348475B2 (en) * 2015-09-23 2019-07-09 Idac Holdings, Inc. Wireless transmit/receive unit (WTRU)-centric transmission

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1972163B1 (en) * 2006-01-09 2016-12-14 Telefonaktiebolaget LM Ericsson (publ) A node and a method relating to handover within mobile communication
CN101128043B (en) 2006-08-15 2011-02-02 华为技术有限公司 Data processing method for switching between systems or change
US8576795B2 (en) 2007-03-16 2013-11-05 Qualcomm Incorporated Method and apparatus for handoff between source and target access systems
US9049629B2 (en) * 2007-06-18 2015-06-02 Qualcomm Incorporated Method and apparatus for fast inter-system handover
US8064403B2 (en) 2007-08-17 2011-11-22 Research In Motion Limited Mobility mechanism for service continuity
CN102017719B (en) 2008-03-25 2013-09-25 苹果公司 Method and system for maintaining multiple PDN network connection during inter-technology handover in idle mode
CN101552978B (en) * 2008-03-31 2011-04-13 华为技术有限公司 Method, system and device for realizing route optimization
US20090316660A1 (en) * 2008-06-24 2009-12-24 Charles Perkins Method, system, and apparatus for handover amongst plurality of communication networks
CN101656990B (en) * 2008-08-20 2014-10-22 三星电子株式会社 Method for supporting switching in mobile communication system
US8867565B2 (en) 2008-08-21 2014-10-21 Qualcomm Incorporated MIMO and SDMA signaling for wireless very high throughput systems
US8902805B2 (en) * 2008-10-24 2014-12-02 Qualcomm Incorporated Cell relay packet routing
US8989085B2 (en) * 2008-10-31 2015-03-24 Mediatek Inc. Downlink network synchronization mechanism for femtocell in cellular OFDM systems
US9357450B2 (en) 2009-02-05 2016-05-31 Nokia Solutions And Networks Oy Method and device for data processing in a mobile communication network
WO2010112037A1 (en) * 2009-03-31 2010-10-07 Telefonaktiebolaget Lm Ericsson (Publ). Redistribution of terminals
US9215643B2 (en) * 2009-09-04 2015-12-15 Hitachi, Ltd. Route selecting device and mobile radio communication system
CN102036213A (en) * 2009-09-30 2011-04-27 中兴通讯股份有限公司 Method, device and system for maintaining information in adjacent region
CN102413493A (en) 2010-09-21 2012-04-11 北京三星通信技术研究有限公司 Method for determining relocation process and method for determining switching process
GB2484922B (en) * 2010-10-25 2014-10-08 Sca Ipla Holdings Inc Infrastructure equipment and method
EP2538721A1 (en) * 2011-06-22 2012-12-26 Alcatel Lucent Support of IP connections over trusted non-3GPP access
JP5223952B2 (en) 2011-08-12 2013-06-26 日本電気株式会社 Mobile communication system, mobile station, switching station, and mobile station location registration method
KR101294705B1 (en) * 2011-08-31 2013-08-23 에스케이텔레콤 주식회사 Method and apparatus for processing message to enable packet subsystem handover between wcdma and epc networks
US9456341B2 (en) 2011-10-19 2016-09-27 Telefonaktiebolaget L M Ericsson Methods and devices for deriving a permanent UE identifier
US9161281B2 (en) 2012-06-08 2015-10-13 Blackberry Limited Method and apparatus for multi-rat transmission
US10560882B2 (en) * 2012-06-08 2020-02-11 Blackberry Limited Method and apparatus for multi-rat transmission
US9877256B2 (en) 2014-03-24 2018-01-23 Intel IP Corporation Systems, devices, and methods for interworking between a universal mobile telecommunications system (UMTS) network and a wireless local area network (WLAN)
US9467921B2 (en) * 2014-05-08 2016-10-11 Intel IP Corporation Systems, devices, and methods for long term evolution and wireless local area interworking
US9912985B2 (en) * 2014-09-26 2018-03-06 Intel Corporation Content distribution
US9743331B1 (en) * 2016-01-29 2017-08-22 Google Inc. Techniques for remotely managing device connectivity in response to cellular network outages

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7876729B1 (en) 1998-07-20 2011-01-25 Qualcomm Incorporated Intersystem base station handover
US6968190B1 (en) * 1999-11-29 2005-11-22 Nokia Mobile Phones, Ltd. Transfer of optimization algorithm parameters during handover of a mobile station between radio network subsystems
JP3399428B2 (en) * 2000-01-12 2003-04-21 日本電気株式会社 Mobile communication system
FI108491B (en) * 2000-02-11 2002-01-31 Nokia Corp Repositioning the serving network element
US6615044B2 (en) 2001-06-06 2003-09-02 Nokia Mobile Phones, Ltd. Method of WCDMA coverage based handover triggering
KR20050036521A (en) * 2003-10-16 2005-04-20 삼성전자주식회사 Seamless handover method in fh-ofdm based mobile communication system
EP1592275B1 (en) * 2004-04-29 2006-06-21 Matsushita Electric Industrial Co., Ltd. Relocation, also of parts, of radio resource management control functionality from one BTS to a second in a distributed radio access network
GB0418436D0 (en) * 2004-08-18 2004-09-22 Nokia Corp Communication system
JP4634851B2 (en) 2005-04-22 2011-02-16 三菱電機株式会社 Handover method, C-planeWireless Controller device, base station and terminal station
JP4639257B2 (en) 2005-05-18 2011-02-23 テルコーディア ライセンシング カンパニー, リミテッド ライアビリティ カンパニー Seamless handoff between heterogeneous access networks using a service control point handoff controller
US20060276190A1 (en) * 2005-05-19 2006-12-07 Interdigital Technology Corporation Method and apparatus for implementing a handoff between radio access networks deployed under different radio access technologies
WO2007000722A2 (en) 2005-06-29 2007-01-04 Koninklijke Philips Electronics N.V. Method and apparatus for pilot capture for wireless intersystem handover
KR101042763B1 (en) * 2005-07-07 2011-06-20 삼성전자주식회사 Hand-over method and apparatus between differential systems
CA2611962C (en) * 2005-07-07 2013-08-27 Samsung Electronics Co., Ltd. Handover method and apparatus between different systems
US8553643B2 (en) * 2005-07-19 2013-10-08 Qualcomm Incorporated Inter-system handover using legacy interface
US8064400B2 (en) * 2005-07-20 2011-11-22 Interdigital Technology Corporation Method and system for supporting an evolved UTRAN
EP1911311B1 (en) 2005-08-01 2017-06-28 Ubiquisys Limited Automatic base station configuration
DE202005021930U1 (en) * 2005-08-01 2011-08-08 Corning Cable Systems Llc Fiber optic decoupling cables and pre-connected assemblies with toning parts
US20080146242A1 (en) * 2006-12-18 2008-06-19 Nokia Corporation Method for requesting an uplink resource allocation during a downlink data transmission
US20080153454A1 (en) * 2006-12-21 2008-06-26 Nokia Corporation Emergency service in a communication system
CN104244344B (en) * 2006-12-28 2018-01-26 诺基亚技术有限公司 Circuit-switched call is to packet switched call and packet switched call to the switching of circuit-switched call
US20080188223A1 (en) * 2007-02-07 2008-08-07 Nokia Corporation Method, a system and a network element for performing a handover of a mobile equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10348475B2 (en) * 2015-09-23 2019-07-09 Idac Holdings, Inc. Wireless transmit/receive unit (WTRU)-centric transmission

Also Published As

Publication number Publication date
AU2008216739B2 (en) 2011-09-15
KR20090115882A (en) 2009-11-09
KR101609431B1 (en) 2016-04-05
CA2678102A1 (en) 2008-08-21
JP5081927B2 (en) 2012-11-28
AU2008216739A1 (en) 2008-08-21
CN103957568B (en) 2018-07-06
RU2009134151A (en) 2011-03-20
CN103957569A (en) 2014-07-30
IL200357A0 (en) 2010-04-29
JP2014161108A (en) 2014-09-04
RU2421941C2 (en) 2011-06-20
AR065303A1 (en) 2009-05-27
EP2127445A1 (en) 2009-12-02
CN101606415A (en) 2009-12-16
CN103957568A (en) 2014-07-30
CN201219296Y (en) 2009-04-08
KR20150022025A (en) 2015-03-03
CN101606415B (en) 2014-05-07
TW201218698A (en) 2012-05-01
BRPI0807310B1 (en) 2020-06-02
TW201540023A (en) 2015-10-16
US20140003393A1 (en) 2014-01-02
MY151917A (en) 2014-07-31
JP5902750B2 (en) 2016-04-13
TWI497949B (en) 2015-08-21
MX2009008592A (en) 2009-10-07
KR20130133859A (en) 2013-12-09
WO2008100488A1 (en) 2008-08-21
KR101443957B1 (en) 2014-10-07
CA2678102C (en) 2014-09-23
US9913185B2 (en) 2018-03-06
JP2010518793A (en) 2010-05-27
IL200357A (en) 2013-06-27
TWM335897U (en) 2008-07-01
KR20090118968A (en) 2009-11-18
BRPI0807310B8 (en) 2020-06-23
CN103957569B (en) 2018-07-17
KR20110118185A (en) 2011-10-28
TW200835244A (en) 2008-08-16
KR20140052086A (en) 2014-05-02
US20080268846A1 (en) 2008-10-30
TWI451724B (en) 2014-09-01
US8526952B2 (en) 2013-09-03
EP2127445B1 (en) 2020-04-08
BRPI0807310A2 (en) 2014-05-20
JP2013017216A (en) 2013-01-24
JP2016131385A (en) 2016-07-21

Similar Documents

Publication Publication Date Title
US9913185B2 (en) Method and apparatus for supporting handoff from GPRS/GERAN to LTE EUTRAN
US8072936B2 (en) Method and apparatus for supporting handover from LTE/EUTRAN to GPRS/GERAN

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4