US20150236602A1 - Predictive sampling for primary side sensing in isolated flyback converters - Google Patents

Predictive sampling for primary side sensing in isolated flyback converters Download PDF

Info

Publication number
US20150236602A1
US20150236602A1 US14/277,373 US201414277373A US2015236602A1 US 20150236602 A1 US20150236602 A1 US 20150236602A1 US 201414277373 A US201414277373 A US 201414277373A US 2015236602 A1 US2015236602 A1 US 2015236602A1
Authority
US
United States
Prior art keywords
voltage
control signal
cycle
pulse
pulse width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US14/277,373
Other versions
US9093910B1 (en
Inventor
Ramakrishna Ankamreddi
Naresh Venkata Kotikelapudi
Ramesh Giri
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maxim Integrated Products Inc
Original Assignee
Maxim Integrated Products Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maxim Integrated Products Inc filed Critical Maxim Integrated Products Inc
Priority to US14/277,373 priority Critical patent/US9093910B1/en
Assigned to MAXIM INTEGRATED PRODUCTS, INC. reassignment MAXIM INTEGRATED PRODUCTS, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ANKAMREDDI, RAMAKRISHNA, GIRI, RAMESH, KOTIKELAPUDI, NARESH VENKATA
Priority to DE102015101585.4A priority patent/DE102015101585A1/en
Application granted granted Critical
Publication of US9093910B1 publication Critical patent/US9093910B1/en
Publication of US20150236602A1 publication Critical patent/US20150236602A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33507Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters
    • H02M3/33523Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters with galvanic isolation between input and output of both the power stage and the feedback loop

Definitions

  • the present disclosure relates generally to power converters and more particularly to switching regulators for isolated flyback power supplies that use primary side sensing for feedback control.
  • Flyback converters are commonly used in Switched-Mode Power-Supplies (SMPSs), where an output voltage is isolated from an input voltage.
  • An optocoupler is typically used to sense and regulate output voltage on a secondary winding of a transformer.
  • a system comprises a switch, a pulse width modulator, a voltage sensing circuit, a pulse generator, a sampling circuit, and an error amplifier.
  • the switch is connected to an input voltage via a primary winding of a transformer.
  • the pulse width modulator generates a control signal including pulse width modulated pulses having a first frequency and a first duty cycle.
  • the pulse width modulator controls the switch based on the control signal and regulates an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency.
  • the output voltage is supplied to a load connected across the secondary winding through a component connected in series with the secondary winding.
  • the voltage sensing circuit senses a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch.
  • the first voltage represents the output voltage across the secondary winding.
  • the pulse generator generates a single pulse at a sampling time during each cycle of the control signal.
  • the sampling time during a first cycle of the control signal is determined based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal.
  • the sampling circuit includes a single switch and a single capacitance that samples the first voltage based on the single pulse at the sampling time during the first cycle of the control signal.
  • a sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal.
  • the error amplifier compares the sampled value of the first voltage to a reference voltage and outputs an error signal to the pulse width modulator during the first cycle of the control signal.
  • the pulse width modulator controls the first duty cycle of the control signal during the first cycle of the control signal based on the error signal generated by the error amplifier.
  • the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
  • the sampling time is programmable to account for variances in a leakage inductance of the transformer.
  • the sampling circuit includes a single switch and a single capacitance.
  • the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal.
  • the time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay.
  • the programmable delay accounts for variances in a leakage inductance of the transformer.
  • the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • system further comprises a delay circuit that delays the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • the pulse generator comprises a first capacitance that is discharged to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal, that is charged until a second edge of the pulse width modulated pulse in the first cycle of the control signal, and that is discharged for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal.
  • a second capacitance is charged to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero.
  • a comparator compares the second voltage to the third voltage and generates the single pulse when the third voltage becomes greater than the second voltage.
  • the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
  • the second capacitance is K times the first capacitance. K is less than or equal to 1.
  • the sampling time is equal to K times an off-time of a pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
  • the first capacitance is charged using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage.
  • the first capacitance is discharged using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K.
  • the second capacitance is charged using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
  • a method comprises generating a control signal including pulse width modulated pulses having a first frequency and a first duty cycle, controlling a switch connected to an input voltage via a primary winding of a transformer based on the control signal, regulating an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency, and supplying the output voltage to a load connected across the secondary winding through a component connected in series with the secondary winding.
  • the method further comprises sensing a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch, where the first voltage represents the output voltage across the secondary winding, and generating a single pulse at a sampling time during each cycle of the control signal.
  • the method further comprises determining the sampling time during a first cycle of the control signal based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal.
  • the method further comprises sampling, using a single switch and a single capacitance, the first voltage based on the single pulse at the sampling time during the first cycle of the control signal.
  • a sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal.
  • the method further comprises comparing the sampled value of the first voltage to a reference voltage, generating an error signal based on the comparison during the first cycle of the control signal, and controlling the first duty cycle of the control signal during the first cycle of the control signal based on the error signal.
  • the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
  • the sampling time is programmable to account for variances in a leakage inductance of the transformer.
  • the sampling of the first voltage is performed using a single switch and a single capacitance.
  • the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal.
  • the time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay.
  • the programmable delay accounts for variances in a leakage inductance of the transformer.
  • the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • the method further comprises delaying the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • the method further comprises discharging a first capacitance to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal, charging the first capacitance until a second edge of the pulse width modulated pulse in the first cycle of the control signal, and discharging the first capacitance for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal.
  • the method further comprises charging a second capacitance to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero.
  • the method further comprises comparing the second voltage to the third voltage, and generating the single pulse when the third voltage becomes greater than the second voltage.
  • the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
  • the second capacitance is K times the first capacitance. K is less than or equal to 1.
  • the sampling time is equal to K times an off-time of a pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
  • the method further comprises charging the first capacitance using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage.
  • the method further comprises discharging the first capacitance using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K.
  • the method further comprises charging the second capacitance using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
  • FIG. 1 is a functional block diagram of a switched-mode power supply
  • FIG. 2 is a functional block diagram of a switched-mode power supply including a primary side regulator circuit
  • FIG. 3 is a functional block diagram of a switched-mode power supply showing the primary side regulator circuit in detail
  • FIG. 4 shows an example of a voltage sensing circuit used in the primary side regulator circuit shown in FIG. 3 ;
  • FIG. 5 shows an example of a voltage-to-current (V-I) converter circuit used in the primary side regulator circuit shown in FIG. 3 ;
  • FIG. 6 shows an example of a zero current detector used in the primary side regulator circuit in FIG. 3 ;
  • FIG. 7 shows a timing diagram of signals associated with the zero current detector shown in FIG. 6 ;
  • FIG. 8 shows an example of a delay circuit used in the zero current detector shown in FIG. 6 ;
  • FIG. 9 shows an example of a monostable multivibrator used in the zero current detector shown in FIG. 6 ;
  • FIG. 10 is a flowchart of a predictive sampling method for primary-side sensing and regulation in isolated flyback converters.
  • FIG. 11 is a flowchart of a method for generating a sampling pulse to sample a primary side voltage to regulate an output voltage on a secondary side.
  • a demagnetized voltage of a transformer can be utilized to regulate an output voltage of the flyback converter.
  • the effectiveness of this method depends on generating a sampling signal to sample the output voltage just before current in the secondary winding of the transformer ramps down to zero in the presence of parasitic elements associated with the transformer and components (e.g., a diode) in the secondary circuit.
  • Most methods use samples of the output voltage sampled in a prior cycle of a control signal instead of in a current cycle of the control signal to determine the sampling instant. Voltage drops across the parasitic elements, however, can change from one cycle to another due to changes in load. Accordingly, the previously sampled output voltage may not include voltage drops across the parasitic elements in the current cycle, which can result in an incorrect sampling time at which the output voltage is sampled in the current cycle.
  • using the previously sampled output voltage may result in early sampling or delayed sampling.
  • early sampling load regulation may be adversely affected due to higher voltage drops across the parasitic elements.
  • delayed sampling the output voltage is sampled after the secondary current decreases to zero, which can force the converter to go out of regulation due to non-availability of demagnetized voltage on the primary winding.
  • the present disclosure relates to an accurate predictive sampling method for primary-side sensing and regulation in isolated flyback converters.
  • the method can be used to generate a feedback signal by sampling a demagnetized voltage of a transformer onto a single-capacitor-based sample-and-hold (S/H) circuit.
  • a sampling time i.e., an instant at which a sample is taken
  • the feedback signal from the single capacitor is compared to a reference voltage to generate an error signal.
  • the error signal is used to control a duty cycle of a switch connected to the primary winding of the transformer to regulate the output voltage.
  • the sampling time is determined for a given cycle based on an input voltage applied to the primary winding, a voltage drop across the switch, a primary-side conduction-time (set by the duty cycle), and a reflected secondary voltage on the primary winding within the same cycle.
  • the sampling time is independent of parasitic elements posed by the transformer and components (e.g., a diode) connected to the secondary winding because the method uses real-time secondary-side information including voltage drops across a DC resistance (DCR) of the secondary winding and the diode, and the output voltage.
  • the method uses a single sampling signal and a single-capacitor-based sample-and-hold (S/H) circuit.
  • the SMPS 100 includes a transformer 102 , a rectifier circuit 104 , and a regulator circuit 106 .
  • the transformer 102 receives an input voltage V IN .
  • the rectifier circuit 104 rectifies the input voltage V IN and generates an output voltage V OUT .
  • the regulator circuit 106 regulates the output voltage V OUT .
  • the input voltage V IN is applied to a primary winding of the transformer 102 via a capacitance C 1 .
  • the rectifier circuit 104 is connected to a secondary winding of the transformer 102 .
  • the rectifier circuit 104 includes a diode D connected in series with the secondary winding of the transformer 102 and a capacitance C 2 connected across the secondary winding of the transformer 102 .
  • a parasitic DC resistance (DCR) of the secondary winding of the transformer 102 is shown as a resistance connected in series with the secondary winding of the transformer 102 for illustrative purposes.
  • the regulator circuit 106 includes a pulse width modulator (PWM) circuit 108 , a switch SW, a resistance R, and a feedback circuit 110 .
  • the switch SW has a first end connected to the primary winding of the transformer 102 and a second end connected to ground via the resistance R.
  • the PWM circuit 108 generates a control signal (NDRV) including pulse width modulated pulses that turn the switch SW on and off at a predetermined frequency.
  • NDRV control signal
  • Each cycle of the control signal includes a pulse width modulated pulse.
  • Each cycle of the control signal includes an on-time T ON and an off-time T OFF .
  • the on-time T ON is equal to a pulse width of the pulse width modulated pulse.
  • the magnetic energy is delivered to the secondary winding of the transformer 102 during the time T OFF to generate the output voltage V OUT across the secondary winding of the transformer 102 .
  • the output voltage V OUT is delivered to a load (not shown) connected across the secondary winding of the transformer 102 .
  • the feedback circuit 110 generates a feedback signal (an error signal) based on the input voltage V IN , the voltage LX, and the control signal generated by the PWM circuit 108 .
  • the PWM circuit 108 controls the pulse width (or duty cycle) of the pulse width modulated pulses based on the feedback signal to regulate the output voltage V OUT .
  • the feedback circuit 110 includes a voltage sensing circuit 112 ; a plurality of V-I converters 114 - 1 , 114 - 2 , 114 - 3 (collectively V-I converters 114 ); a zero current detector 116 ; a sample-and-hold (S/H) circuit (sampling circuit) 118 ; and an error amplifier 120 .
  • the voltage sensing circuit 112 senses a voltage appearing across the primary winding of the transformer 102 during a secondary conduction-time (T OFF ) of each cycle of the control signal.
  • the voltage sensing circuit 112 generates V OUTSENSE .
  • the voltage sensing circuit 112 may use an attenuation factor ⁇ .
  • the voltage sensing circuit 112 is enabled during the secondary conduction-time (T OFF ) after waiting for a delay T BLANK to discard LC ringing due to a leakage inductance of the transformer 102 and a parasitic capacitance of the switch SW.
  • the voltage across the primary winding of the transformer 102 represents the voltage across the secondary winding of the transformer 102 multiplied by a turns ratio of the transformer 102 .
  • An example of the voltage sensing circuit 112 is shown in FIG. 4 .
  • the V-I converter 114 - 1 generates a first current proportional to the input voltage V IN .
  • the V-I converter 114 - 2 generates a second current proportional to the voltage LX.
  • a summing circuit 115 subtracts the second current from the first current and generates a current I IN .
  • the second current can be neglected if the voltage drop across the switch SW is negligible.
  • the V-I converter 114 - 3 generates a current I OUT proportional to V OUTSENSE .
  • the V-I converter 114 - 3 may scale up the current I OUT by a factor 1/ ⁇ .
  • An example of the V-I converters 114 is shown in FIG. 5 .
  • the zero current detector 116 uses the control signal NDRV generated by the PWM circuit 108 , the current I IN , and the current I OUT to predict the sampling time T SAMPLE at which the secondary current ramps down close to zero, and generates a sampling pulse F_SMP.
  • the zero current detector 116 generates a single sampling pulse F_SMP during each cycle of the control signal. Accordingly, the zero current detector 116 may be called a pulse generator.
  • the sampling pulse F_SMP is a mono-shot signal that closes a sampling switch in the sampling circuit 118 for a period of T PW to sample V OUTSENSE onto a sampling capacitor in the sampling circuit 118 .
  • the sampled voltage (V FB ) is held until the sampling capacitor gets refreshed during a next cycle of the control signal.
  • the error amplifier 120 compares the sampled voltage V FB to a reference voltage V REF and generates an error signal.
  • the PWM circuit 108 controls the duty cycle of switch SW based on the error signal to regulate the output voltage V OUT .
  • the resistance R senses the primary current and limits cycle-by-cycle current based on the error signal.
  • a maximum current limit is a programmed peak current. Current limiting may also be implemented using a lossless method by sensing the voltage LX.
  • the zero current detector 116 accurately predicts the sampling time as follows.
  • the switch SW When the switch SW is turned on, the primary winding of the transformer 102 stores the magnetic energy that depends on the input voltage V IN , the magnetization period (T ON ), and a magnetizing inductance of the transformer 102 .
  • the switch SW Once the switch SW is turned off, the stored energy is delivered to the secondary winding of the transformer 102 during the demagnetization period (T OFF ).
  • T OFF the voltage across the secondary winding of the transformer 102 can be expressed by the following equation:
  • V SEC-TOFF V OUT +V DIODE +V DCR (1)
  • V OUT is the output voltage
  • V DIODE is the voltage drop across the diode D
  • V DCR is the voltage drop across the parasitic resistance DCR of the secondary winding of the transformer 102 .
  • the voltage across the secondary winding of the transformer 102 that gets reflected across the primary winding of the transformer 102 can be expressed by the following equation:
  • V PRI - TOFF N PRI N SEC * ( V OUT + V DIODE + V DCR ) ( 2 )
  • N PRI denotes the number of turns of the primary winding of the transformer 102
  • N SEC denotes the number of turns of the secondary winding of the transformer 102 .
  • V DIODE and V DCR are dependent on the secondary current Ism which ramps down from a peak value of I SEC-PEAK to zero during the demagnetization period T OFF (see FIG. 7 ).
  • the contribution of V DIODE and V DCR has to be minimized. This can be achieved by sampling the voltage across the primary winding of the transformer 102 when the secondary current I SEC reaches nearly zero. A zero crossing event of the secondary current I SEC can be accurately determined by equalizing actual values of magnetizing and demagnetizing fluxes.
  • the magnetization flux ⁇ PRI can be expressed by the following equation:
  • the demagnetization flux ⁇ SEC can be expressed by the following equation:
  • V PRI (V IN ⁇ V LX ).
  • V SEC (V OUT +V DIODE +V DCR ).
  • T OFF V IN - V LX ( V OUT + V DIODE + V DCR ) * N SEC N PRI * T ON ( 6 )
  • T OFF V IN - V LX V PRI - TOFF * T ON ( 7 )
  • the zero current detector 116 determines the sampling time T SAMPLE based on I IN , I OUT , and T ON as follows.
  • I IN is generated using the V-I converters 114 - 1 and 114 - 2 and the summing circuit 115 , and can be expressed by the following equation:
  • I IN G *( V IN ⁇ V LX ) (8)
  • G is the transconductance of the V-I converters 114 - 1 and 114 - 2 .
  • the voltage sensing circuit 112 senses V PRI-TOFF , which is the secondary voltage reflected in the primary winding of the transformer 102 during the demagnetization period T OFF , and which can be expressed by the following equation:
  • V OUT SENSE ⁇ *V PRI-TOFF (9)
  • V-I converter 114 - 3 generates I OUT from V OUTSENSE , which can be expressed by the following equation:
  • Equations (7), (8), and (11) are used to accurately predict the sampling time as follows.
  • the zero current detector 116 includes a first capacitance C 3 , a first switch S 1 , a first monostable multivibrator (mono-shot) 150 , a first delay circuit 152 , a second delay circuit 154 , a second switch S 2 , a second capacitance C 4 , a third switch S 3 , a comparator 156 , and a second monostable multivibrator (mono-shot) 158 .
  • the value of the second capacitance C 4 is K times the value of the value of the first capacitance C 3 , where K is a scaling factor whose value ranges from 0.5 to 1 as explained below.
  • FIG. 8 An example of a rising edge delay circuit that can be used to implement the first and second delay circuits 152 and 154 is shown in FIG. 8 .
  • the first capacitance C 3 is discharged to a ground potential by a pulse F_CLEARI generated by the first monostable multivibrator 150 .
  • F_CLEARI pulse the first capacitance C 3 starts charging from a current source I IN via the first switch S 1 until a falling edge of the control signal NDRV.
  • the first switch S 1 is opened, and a voltage of the first capacitance C 3 is held at a value VC 1 .
  • the first capacitance C 3 After waiting for a delay T BLANK from the falling edge of the control signal NDRV generated by the first delay circuit 152 , the first capacitance C 3 is discharged from the held value of VC 1 via the second switch S 2 and a current source I OUT/K for a duration of a compensation delay T COMPENSATE generated by the second delay circuit 154 .
  • the final voltage VC 1 of the first capacitance C 3 can be expressed by the following equation:
  • the second capacitance C 4 is charged to a voltage VC 2 via the third switch S 3 and a current source I OUT after waiting for the delay T BLANK from the falling edge of the control signal NDRV.
  • the comparator 156 compares the voltage VC 2 to the voltage VC 1 to determine the sampling time T SAMPLE .
  • the second monostable multivibrator 158 generates the sampling pulse F_SMP with a pulse width of T PW .
  • the voltage of the second capacitance C 4 at the sampling time T SAMPLE can be expressed by the following equation:
  • the compensation delay T COMPENSATE is a sum of the blanking time (T BLANK ), the pulse width (T PW ) of the sampling pulse F_SMP, and a programmable delay (T PROG ) that can be used to fine-tune the sampling time T SAMPLE .
  • T SAMPLE K * ( I IN * T ON I OUT ) - ( T PW + T PROG ) ( 18 )
  • T SAMPLE K * [ ( V IN - V LX ) * T ON V PRI - TOFF ] - ( T PW + T PROG ) ( 19 )
  • T SAMPLE K*T OFF ⁇ T PW ⁇ T PROG (20)
  • T SAMPLE should always occur before T OFF .
  • K is the scaling factor that controls the ratio of T SAMPLE to T OFF whose value is always less than or equal to one.
  • T PROG may be used to move T SAMPLE either towards or away from the falling edge of NDRV by a fixed delay using an external programmable element.
  • the sampling time T SAMPLE is shifted by T PW in equation (20) to ensure that the demagnetization voltage is available on the primary winding until the falling edge of the sampling pulse F_SMP when the sampling circuit 118 turns to hold mode.
  • the leakage inductance of the transformer 102 is not considered.
  • the leakage inductance of the transformer 102 forces the SMPS 100 to operate with higher duty cycle, which in turn affects T SAMPLE prediction.
  • K and/or T PROG may be adjusted to accurately predict T SAMPLE .
  • a leakage inductance below 3% may not affect T SAMPLE prediction.
  • values of K and/or T PROG may be adjusted to accurately predict T SAMPLE .
  • K may be selected close to 1
  • T PROG may be selected to be zero for most applications. This would enable the sampling of the output voltage just before the secondary current ramps down to zero.
  • the Zero current detector 116 uses the scaling factor K to adjust a slope of the charging voltage across the second capacitance C 4 , with the value of K ranging from 0.5 to 1. As the value of K decreases, as shown in FIG. 7 , the sampling time shifts from the time where the secondary current I SEC ceases to zero, to the left towards the time where T ON ends.
  • the delay may be programmable.
  • the first delay circuit 152 may include a variable discharging current source (not shown) in addition to a fixed charging current source shown in FIG. 8 .
  • a default offset value of the variable current source is set such that the compensation delay T COMPENSATE is equal to a sum of T BLANK and T PW .
  • the compensation delay T COMPENSATE can be either increased or decreased by an amount T PROG around a default specified fixed delay of T BLANK plus T PW , by modifying the variable discharging current source.
  • a predictive sampling method 200 for primary-side sensing and regulation in isolated flyback converters is shown.
  • a control signal including pulse width modulated pulses having a first frequency and a first duty cycle is generated.
  • the control signal controls a switch connected to an input voltage via a primary winding of a transformer.
  • the control signal regulates an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency.
  • the output voltage is supplied to a load connected across the secondary winding through a component connected in series with the secondary winding.
  • a first voltage across the primary winding is sensed during a demagnetization period represented by the off-time of the switch (T OFF ).
  • the first voltage represents the output voltage across the secondary winding.
  • a single pulse is generated at a sampling time during each cycle of the control signal.
  • the sampling time during a first cycle of the control signal is determined based on the input voltage, a voltage drop across the switch, the first duty cycle (or primary-side conduction-time), and a value of the first voltage sensed during the first cycle of the control signal.
  • the single pulse is delayed by a first period (e.g., T BLANK ) subsequent to an on-time of the PWM pulse to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • the first voltage is sampled once at the sampling time during the first cycle of the control signal based on the single pulse.
  • a sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal.
  • the sampled value of the first voltage is compared to a reference voltage, and an error signal is generated during the first cycle of the control signal.
  • the first duty cycle of the control signal is controlled during the first cycle of the control signal based on the error signal.
  • the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal as the sampling time is determined based on real-time output information.
  • the sampling time is programmable to account for variances in a leakage inductance of the transformer.
  • the sampling time is an instant that follows an on-time of the PWM pulse in the first cycle of the control signal after a time period that is equal to a scaled off-time of the switch (K*T OFF ) minus a sum of a duration of the single pulse (T PW ) and a programmable delay (T PROG ).
  • the programmable delay accounts for variances in the leakage inductance of the transformer.
  • the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • a method 250 for generating the sampling pulse in each cycle of the control signal is shown.
  • a first capacitance is discharged to a ground potential at a first edge (e.g., a rising edge) of a pulse width modulated pulse in a first cycle of the control signal using a mono-shot pulse.
  • the first capacitance is charged using a first current (I IN ) to a first voltage (VC 1 ) until a second edge (e.g., a falling edge) of the pulse width modulated pulse in the first cycle of the control signal.
  • the first capacitance is discharged using a second current (I OUT /K) for a first period (e.g., T COMPENSATE ) to a second voltage (final value of VC 1 ) after waiting for a second period (e.g., T BLANK ) following the second edge of the pulse width modulated pulse in the first cycle of the control signal.
  • a second capacitance is charged using a third current (I OUT ) to a third voltage (VC 2 ) after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero.
  • the second voltage is compared to the third voltage to determine a sampling time (e.g., T SAMPLE ) at which a single sampling pulse is generated when the third voltage becomes greater than the second voltage.
  • the single sampling pulse is used to sample a first voltage across the primary winding of the transformer in the first cycle of the control signal.
  • the first voltage sampled in the first cycle of the control signal reflects the voltage drops across the parasitic elements on the secondary side in the first cycle of the control signal.
  • the first period (e.g., T COMPENSATE ) is a sum of the second period (e.g., T BLANK ), a duration of the single pulse (e.g., T PW ), and a programmable delay (e.g., T PROG ).
  • the second capacitance is K times the first capacitance, where K is less than or equal to 1 (e.g., 0.5 ⁇ K ⁇ 1).

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Dc-Dc Converters (AREA)

Abstract

A system comprises a pulse width modulator, a voltage sensing circuit, a pulse generator, and a sampling circuit. The pulse width modulator generates a control signal to control a switch connected to an input voltage via a primary winding and to regulate an output voltage across a secondary winding that is supplied to a load through a component connected in series with the secondary winding. The voltage sensing circuit senses a first voltage across the primary winding that represents the output voltage. The pulse generator generates a single pulse at a sampling time during a first cycle of the control signal, which is determined based on the input voltage, a voltage drop across the switch, an on-time of the switch, and the first voltage sensed during the first cycle. The sampling circuit samples the first voltage based on the single pulse at the sampling time during the first cycle.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional Application No. 61/939,947, filed on Feb. 14, 2014. The entire disclosure of the application referenced above is incorporated herein by reference.
  • FIELD
  • The present disclosure relates generally to power converters and more particularly to switching regulators for isolated flyback power supplies that use primary side sensing for feedback control.
  • BACKGROUND
  • The background description provided here is for the purpose of generally presenting the context of the disclosure. Work of the presently named inventors, to the extent it is described in this background section, as well as aspects of the description that may not otherwise qualify as prior art at the time of filing, are neither expressly nor impliedly admitted as prior art against the present disclosure.
  • Flyback converters are commonly used in Switched-Mode Power-Supplies (SMPSs), where an output voltage is isolated from an input voltage. An optocoupler is typically used to sense and regulate output voltage on a secondary winding of a transformer.
  • SUMMARY
  • A system comprises a switch, a pulse width modulator, a voltage sensing circuit, a pulse generator, a sampling circuit, and an error amplifier. The switch is connected to an input voltage via a primary winding of a transformer. The pulse width modulator generates a control signal including pulse width modulated pulses having a first frequency and a first duty cycle. The pulse width modulator controls the switch based on the control signal and regulates an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency. The output voltage is supplied to a load connected across the secondary winding through a component connected in series with the secondary winding. The voltage sensing circuit senses a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch. The first voltage represents the output voltage across the secondary winding. The pulse generator generates a single pulse at a sampling time during each cycle of the control signal. The sampling time during a first cycle of the control signal is determined based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal. The sampling circuit includes a single switch and a single capacitance that samples the first voltage based on the single pulse at the sampling time during the first cycle of the control signal. A sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal. The error amplifier compares the sampled value of the first voltage to a reference voltage and outputs an error signal to the pulse width modulator during the first cycle of the control signal. The pulse width modulator controls the first duty cycle of the control signal during the first cycle of the control signal based on the error signal generated by the error amplifier.
  • In another feature, the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
  • In another feature, the sampling time is programmable to account for variances in a leakage inductance of the transformer.
  • In another feature, the sampling circuit includes a single switch and a single capacitance.
  • In another feature, the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal. The time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay. The programmable delay accounts for variances in a leakage inductance of the transformer.
  • In another feature, the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • In another feature, the system further comprises a delay circuit that delays the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • In another feature, the pulse generator comprises a first capacitance that is discharged to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal, that is charged until a second edge of the pulse width modulated pulse in the first cycle of the control signal, and that is discharged for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal. A second capacitance is charged to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero. A comparator compares the second voltage to the third voltage and generates the single pulse when the third voltage becomes greater than the second voltage.
  • In another feature, the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
  • In another feature, the second capacitance is K times the first capacitance. K is less than or equal to 1.
  • In another feature, the sampling time is equal to K times an off-time of a pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
  • In other features, the first capacitance is charged using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage. The first capacitance is discharged using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K. The second capacitance is charged using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
  • In still other features, a method comprises generating a control signal including pulse width modulated pulses having a first frequency and a first duty cycle, controlling a switch connected to an input voltage via a primary winding of a transformer based on the control signal, regulating an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency, and supplying the output voltage to a load connected across the secondary winding through a component connected in series with the secondary winding. The method further comprises sensing a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch, where the first voltage represents the output voltage across the secondary winding, and generating a single pulse at a sampling time during each cycle of the control signal. The method further comprises determining the sampling time during a first cycle of the control signal based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal. The method further comprises sampling, using a single switch and a single capacitance, the first voltage based on the single pulse at the sampling time during the first cycle of the control signal. A sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal. The method further comprises comparing the sampled value of the first voltage to a reference voltage, generating an error signal based on the comparison during the first cycle of the control signal, and controlling the first duty cycle of the control signal during the first cycle of the control signal based on the error signal.
  • In another feature, the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
  • In another feature, the sampling time is programmable to account for variances in a leakage inductance of the transformer.
  • In another feature, the sampling of the first voltage is performed using a single switch and a single capacitance.
  • In another feature, the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal. The time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay. The programmable delay accounts for variances in a leakage inductance of the transformer.
  • In another feature, the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • In another feature, the method further comprises delaying the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • In other features, the method further comprises discharging a first capacitance to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal, charging the first capacitance until a second edge of the pulse width modulated pulse in the first cycle of the control signal, and discharging the first capacitance for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal. The method further comprises charging a second capacitance to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero. The method further comprises comparing the second voltage to the third voltage, and generating the single pulse when the third voltage becomes greater than the second voltage.
  • In another feature, the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
  • In another feature, the second capacitance is K times the first capacitance. K is less than or equal to 1.
  • In another feature, the sampling time is equal to K times an off-time of a pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
  • In other features, the method further comprises charging the first capacitance using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage. The method further comprises discharging the first capacitance using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K. The method further comprises charging the second capacitance using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
  • Further areas of applicability of the present disclosure will become apparent from the detailed description, the claims and the drawings. The detailed description and specific examples are intended for purposes of illustration only and are not intended to limit the scope of the disclosure.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present disclosure will become more fully understood from the detailed description and the accompanying drawings, wherein:
  • FIG. 1 is a functional block diagram of a switched-mode power supply;
  • FIG. 2 is a functional block diagram of a switched-mode power supply including a primary side regulator circuit;
  • FIG. 3 is a functional block diagram of a switched-mode power supply showing the primary side regulator circuit in detail;
  • FIG. 4 shows an example of a voltage sensing circuit used in the primary side regulator circuit shown in FIG. 3;
  • FIG. 5 shows an example of a voltage-to-current (V-I) converter circuit used in the primary side regulator circuit shown in FIG. 3;
  • FIG. 6 shows an example of a zero current detector used in the primary side regulator circuit in FIG. 3;
  • FIG. 7 shows a timing diagram of signals associated with the zero current detector shown in FIG. 6;
  • FIG. 8 shows an example of a delay circuit used in the zero current detector shown in FIG. 6;
  • FIG. 9 shows an example of a monostable multivibrator used in the zero current detector shown in FIG. 6;
  • FIG. 10 is a flowchart of a predictive sampling method for primary-side sensing and regulation in isolated flyback converters; and
  • FIG. 11 is a flowchart of a method for generating a sampling pulse to sample a primary side voltage to regulate an output voltage on a secondary side.
  • In the drawings, reference numbers may be reused to identify similar and/or identical elements.
  • DETAILED DESCRIPTION
  • In a flyback converter, to reduce component count and cost, a demagnetized voltage of a transformer can be utilized to regulate an output voltage of the flyback converter. The effectiveness of this method depends on generating a sampling signal to sample the output voltage just before current in the secondary winding of the transformer ramps down to zero in the presence of parasitic elements associated with the transformer and components (e.g., a diode) in the secondary circuit. Most methods use samples of the output voltage sampled in a prior cycle of a control signal instead of in a current cycle of the control signal to determine the sampling instant. Voltage drops across the parasitic elements, however, can change from one cycle to another due to changes in load. Accordingly, the previously sampled output voltage may not include voltage drops across the parasitic elements in the current cycle, which can result in an incorrect sampling time at which the output voltage is sampled in the current cycle.
  • For example, using the previously sampled output voltage may result in early sampling or delayed sampling. In early sampling, load regulation may be adversely affected due to higher voltage drops across the parasitic elements. In delayed sampling, the output voltage is sampled after the secondary current decreases to zero, which can force the converter to go out of regulation due to non-availability of demagnetized voltage on the primary winding. These methods are therefore unsuitable for applications that use a broad variety of transformers and components in the secondary circuit. Additionally, these methods also use a 2-stage sampling and a plurality of sampling signals, which increase cost, complexity, and probability of error.
  • The present disclosure relates to an accurate predictive sampling method for primary-side sensing and regulation in isolated flyback converters. The method can be used to generate a feedback signal by sampling a demagnetized voltage of a transformer onto a single-capacitor-based sample-and-hold (S/H) circuit. A sampling time (i.e., an instant at which a sample is taken) is determined such that the demagnetized voltage is sampled just before secondary current ramps down to zero. The feedback signal from the single capacitor is compared to a reference voltage to generate an error signal. The error signal is used to control a duty cycle of a switch connected to the primary winding of the transformer to regulate the output voltage. The sampling time is determined for a given cycle based on an input voltage applied to the primary winding, a voltage drop across the switch, a primary-side conduction-time (set by the duty cycle), and a reflected secondary voltage on the primary winding within the same cycle. The sampling time is independent of parasitic elements posed by the transformer and components (e.g., a diode) connected to the secondary winding because the method uses real-time secondary-side information including voltage drops across a DC resistance (DCR) of the secondary winding and the diode, and the output voltage. The method uses a single sampling signal and a single-capacitor-based sample-and-hold (S/H) circuit.
  • Referring now to FIG. 1, a switched mode power supply (SMPS) 100 is shown. The SMPS 100 includes a transformer 102, a rectifier circuit 104, and a regulator circuit 106. The transformer 102 receives an input voltage VIN. The rectifier circuit 104 rectifies the input voltage VIN and generates an output voltage VOUT. The regulator circuit 106 regulates the output voltage VOUT.
  • Referring now to FIG. 2, the SMPS 100 is shown in detail. The input voltage VIN is applied to a primary winding of the transformer 102 via a capacitance C1. The rectifier circuit 104 is connected to a secondary winding of the transformer 102. The rectifier circuit 104 includes a diode D connected in series with the secondary winding of the transformer 102 and a capacitance C2 connected across the secondary winding of the transformer 102. A parasitic DC resistance (DCR) of the secondary winding of the transformer 102 is shown as a resistance connected in series with the secondary winding of the transformer 102 for illustrative purposes.
  • The regulator circuit 106 includes a pulse width modulator (PWM) circuit 108, a switch SW, a resistance R, and a feedback circuit 110. The switch SW has a first end connected to the primary winding of the transformer 102 and a second end connected to ground via the resistance R. The PWM circuit 108 generates a control signal (NDRV) including pulse width modulated pulses that turn the switch SW on and off at a predetermined frequency.
  • Each cycle of the control signal includes a pulse width modulated pulse. Each cycle of the control signal includes an on-time TON and an off-time TOFF. The on-time TON is equal to a pulse width of the pulse width modulated pulse. When a pulse width modulated pulse turns on the switch SW, the input voltage VIN is applied across the primary winding of the transformer 102. Current flows through the primary winding of the transformer 102 for the duration TON. The primary winding of the transformer 102 stores magnetic energy. The switch SW is turned off at the end of the turn-on-time TON. Once the switch SW is turned off, the magnetic energy is delivered to the secondary winding of the transformer 102 during the time TOFF to generate the output voltage VOUT across the secondary winding of the transformer 102. The output voltage VOUT is delivered to a load (not shown) connected across the secondary winding of the transformer 102.
  • The feedback circuit 110 generates a feedback signal (an error signal) based on the input voltage VIN, the voltage LX, and the control signal generated by the PWM circuit 108. The PWM circuit 108 controls the pulse width (or duty cycle) of the pulse width modulated pulses based on the feedback signal to regulate the output voltage VOUT.
  • Referring now to FIG. 3, the feedback circuit 110 is shown in detail. The feedback circuit 110 includes a voltage sensing circuit 112; a plurality of V-I converters 114-1, 114-2, 114-3 (collectively V-I converters 114); a zero current detector 116; a sample-and-hold (S/H) circuit (sampling circuit) 118; and an error amplifier 120.
  • The voltage sensing circuit 112 senses a voltage appearing across the primary winding of the transformer 102 during a secondary conduction-time (TOFF) of each cycle of the control signal. The voltage sensing circuit 112 generates VOUTSENSE. The voltage sensing circuit 112 may use an attenuation factor β. The voltage sensing circuit 112 is enabled during the secondary conduction-time (TOFF) after waiting for a delay TBLANK to discard LC ringing due to a leakage inductance of the transformer 102 and a parasitic capacitance of the switch SW. During the secondary conduction-time (TOFF), the voltage across the primary winding of the transformer 102 represents the voltage across the secondary winding of the transformer 102 multiplied by a turns ratio of the transformer 102. An example of the voltage sensing circuit 112 is shown in FIG. 4.
  • The V-I converter 114-1 generates a first current proportional to the input voltage VIN. The V-I converter 114-2 generates a second current proportional to the voltage LX. A summing circuit 115 subtracts the second current from the first current and generates a current IIN. The second current can be neglected if the voltage drop across the switch SW is negligible. The V-I converter 114-3 generates a current IOUT proportional to VOUTSENSE. The V-I converter 114-3 may scale up the current IOUT by a factor 1/β. An example of the V-I converters 114 is shown in FIG. 5.
  • The zero current detector 116 uses the control signal NDRV generated by the PWM circuit 108, the current IIN, and the current IOUT to predict the sampling time TSAMPLE at which the secondary current ramps down close to zero, and generates a sampling pulse F_SMP. The zero current detector 116 generates a single sampling pulse F_SMP during each cycle of the control signal. Accordingly, the zero current detector 116 may be called a pulse generator.
  • The sampling pulse F_SMP is a mono-shot signal that closes a sampling switch in the sampling circuit 118 for a period of TPW to sample VOUTSENSE onto a sampling capacitor in the sampling circuit 118. The sampled voltage (VFB) is held until the sampling capacitor gets refreshed during a next cycle of the control signal.
  • The error amplifier 120 compares the sampled voltage VFB to a reference voltage VREF and generates an error signal. The PWM circuit 108 controls the duty cycle of switch SW based on the error signal to regulate the output voltage VOUT. The resistance R senses the primary current and limits cycle-by-cycle current based on the error signal. A maximum current limit is a programmed peak current. Current limiting may also be implemented using a lossless method by sensing the voltage LX.
  • The zero current detector 116 accurately predicts the sampling time as follows. When the switch SW is turned on, the primary winding of the transformer 102 stores the magnetic energy that depends on the input voltage VIN, the magnetization period (TON), and a magnetizing inductance of the transformer 102. Once the switch SW is turned off, the stored energy is delivered to the secondary winding of the transformer 102 during the demagnetization period (TOFF). During the demagnetization period TOFF, the voltage across the secondary winding of the transformer 102 can be expressed by the following equation:

  • V SEC-TOFF =V OUT +V DIODE +V DCR  (1)
  • where VOUT is the output voltage, VDIODE is the voltage drop across the diode D, and VDCR is the voltage drop across the parasitic resistance DCR of the secondary winding of the transformer 102.
  • During the demagnetization period TOFF, the voltage across the secondary winding of the transformer 102 that gets reflected across the primary winding of the transformer 102 can be expressed by the following equation:
  • V PRI - TOFF = N PRI N SEC * ( V OUT + V DIODE + V DCR ) ( 2 )
  • where NPRI denotes the number of turns of the primary winding of the transformer 102, and NSEC denotes the number of turns of the secondary winding of the transformer 102.
  • The voltage drops VDIODE and VDCR are dependent on the secondary current Ism which ramps down from a peak value of ISEC-PEAK to zero during the demagnetization period TOFF (see FIG. 7). For accurately sensing the output voltage VOUT reflected across the primary winding of the transformer 102 during the demagnetization period TOFF, the contribution of VDIODE and VDCR has to be minimized. This can be achieved by sampling the voltage across the primary winding of the transformer 102 when the secondary current ISEC reaches nearly zero. A zero crossing event of the secondary current ISEC can be accurately determined by equalizing actual values of magnetizing and demagnetizing fluxes.
  • In the transformer 102, the magnetization flux φPRI can be expressed by the following equation:
  • φ PRI = V PRI * T ON N PRI ( 3 )
  • The demagnetization flux φSEC can be expressed by the following equation:
  • φ SEC = V SEC * T OFF N SEC ( 4 )
  • Neglecting the leakage inductance of the transformer 102, the magnetization flux is equal to the demagnetization flux. From equations (3) & (4), we get
  • T OFF = V PRI V SEC * N SEC N PRI * T ON ( 5 )
  • During TON, VPRI=(VIN−VLX). During TOFF, VSEC=(VOUT+VDIODE+VDCR). Substituting these values in equation (5), we get
  • T OFF = V IN - V LX ( V OUT + V DIODE + V DCR ) * N SEC N PRI * T ON ( 6 )
  • Rewriting equation (6) in terms of equation (2), we get
  • T OFF = V IN - V LX V PRI - TOFF * T ON ( 7 )
  • The zero current detector 116 determines the sampling time TSAMPLE based on IIN, IOUT, and TON as follows. IIN is generated using the V-I converters 114-1 and 114-2 and the summing circuit 115, and can be expressed by the following equation:

  • I IN =G*(V IN −V LX)  (8)
  • where G is the transconductance of the V-I converters 114-1 and 114-2.
  • The voltage sensing circuit 112 senses VPRI-TOFF, which is the secondary voltage reflected in the primary winding of the transformer 102 during the demagnetization period TOFF, and which can be expressed by the following equation:

  • VOUTSENSE =β*V PRI-TOFF  (9)
  • where β=RREF/RREG is the attenuation factor imposed by the voltage sensing circuit 112.
  • The V-I converter 114-3 generates IOUT from VOUTSENSE, which can be expressed by the following equation:
  • I OUT = G β * VOUT SENSE ( 10 )
  • where G/β is the transconductance of the V-I converter 114-3.
    From equations (9) and (10), we get

  • I OUT =G*V PRI-TOFF  (11)
  • Equations (7), (8), and (11) are used to accurately predict the sampling time as follows.
  • Referring now to FIGS. 6 and 7, the zero current detector 116 is shown in detail. The zero current detector 116 includes a first capacitance C3, a first switch S1, a first monostable multivibrator (mono-shot) 150, a first delay circuit 152, a second delay circuit 154, a second switch S2, a second capacitance C4, a third switch S3, a comparator 156, and a second monostable multivibrator (mono-shot) 158. The value of the second capacitance C4 is K times the value of the value of the first capacitance C3, where K is a scaling factor whose value ranges from 0.5 to 1 as explained below.
  • An example of a rising edge delay circuit that can be used to implement the first and second delay circuits 152 and 154 is shown in FIG. 8. An example of a monostable multivibrator (mono-shot) that can be used to implement the first and second monostable multivibrators 150 and 158 is shown in FIG. 9.
  • During a first cycle of the control signal NDRV generated by the PWM circuit 108, at a rising edge of the control signal NDRV, the first capacitance C3 is discharged to a ground potential by a pulse F_CLEARI generated by the first monostable multivibrator 150. After the F_CLEARI pulse, the first capacitance C3 starts charging from a current source IIN via the first switch S1 until a falling edge of the control signal NDRV. At the falling edge of the control signal NDRV, the first switch S1 is opened, and a voltage of the first capacitance C3 is held at a value VC1.
  • After waiting for a delay TBLANK from the falling edge of the control signal NDRV generated by the first delay circuit 152, the first capacitance C3 is discharged from the held value of VC1 via the second switch S2 and a current source IOUT/K for a duration of a compensation delay TCOMPENSATE generated by the second delay circuit 154. The final voltage VC1 of the first capacitance C3 can be expressed by the following equation:
  • VC 1 = I IN * T ON C = I OUT K * T COMPENSATE C ( 12 )
  • For the rest of the secondary conduction-time, the second capacitance C4 is charged to a voltage VC2 via the third switch S3 and a current source IOUT after waiting for the delay TBLANK from the falling edge of the control signal NDRV. The comparator 156 compares the voltage VC2 to the voltage VC1 to determine the sampling time TSAMPLE. At this instant, the second monostable multivibrator 158 generates the sampling pulse F_SMP with a pulse width of TPW. The voltage of the second capacitance C4 at the sampling time TSAMPLE can be expressed by the following equation:
  • VC 2 = I OUT * ( T SAMPLE - T BLANK ) K * C ( 13 )
  • When VC1 and VC2 become equal, the comparator 156 generates the sampling pulse F_SMP. From equations (12) and (13), we get
  • I IN * T ON C - I OUT K * T COMPENSATE C = I OUT * ( T SAMPLE - T BLANK ) K * C ( 14 ) I IN * T ON C = I OUT * ( T SAMPLE - T BLANK + T COMPENSATE ) K * C ( 15 ) T SAMPLE - T BLANK + T COMPENSATE = K * ( I IN * T ON I OUT ) ( 16 )
  • The compensation delay TCOMPENSATE is a sum of the blanking time (TBLANK), the pulse width (TPW) of the sampling pulse F_SMP, and a programmable delay (TPROG) that can be used to fine-tune the sampling time TSAMPLE.

  • T COMPENSATE =T BLANK +T PW +T PROG  (17)
  • Substituting equation (17) in equation (16) and solving for TSAMPLE, we get
  • T SAMPLE = K * ( I IN * T ON I OUT ) - ( T PW + T PROG ) ( 18 )
  • Substituting equations (8) and (11) into equation (18), we get
  • T SAMPLE = K * [ ( V IN - V LX ) * T ON V PRI - TOFF ] - ( T PW + T PROG ) ( 19 )
  • Re-writing equation (19) using equation (7), we get

  • T SAMPLE =K*T OFF −T PW −T PROG  (20)
  • From the above equation, TSAMPLE should always occur before TOFF. K is the scaling factor that controls the ratio of TSAMPLE to TOFF whose value is always less than or equal to one. TPROG may be used to move TSAMPLE either towards or away from the falling edge of NDRV by a fixed delay using an external programmable element. The sampling time TSAMPLE is shifted by TPW in equation (20) to ensure that the demagnetization voltage is available on the primary winding until the falling edge of the sampling pulse F_SMP when the sampling circuit 118 turns to hold mode.
  • In equation (5), the leakage inductance of the transformer 102 is not considered. The leakage inductance of the transformer 102 forces the SMPS 100 to operate with higher duty cycle, which in turn affects TSAMPLE prediction. When the leakage inductance is greater than or equal to a predetermined threshold, K and/or TPROG may be adjusted to accurately predict TSAMPLE. For example, a leakage inductance below 3% may not affect TSAMPLE prediction. If, however, the leakage inductance is above 3%, values of K and/or TPROG may be adjusted to accurately predict TSAMPLE. Typically, K may be selected close to 1, and TPROG may be selected to be zero for most applications. This would enable the sampling of the output voltage just before the secondary current ramps down to zero.
  • The Zero current detector 116 uses the scaling factor K to adjust a slope of the charging voltage across the second capacitance C4, with the value of K ranging from 0.5 to 1. As the value of K decreases, as shown in FIG. 7, the sampling time shifts from the time where the secondary current ISEC ceases to zero, to the left towards the time where TON ends.
  • In the first delay circuit 152 (an example of which is shown in FIG. 8), the delay may be programmable. For example, the first delay circuit 152 may include a variable discharging current source (not shown) in addition to a fixed charging current source shown in FIG. 8. A default offset value of the variable current source is set such that the compensation delay TCOMPENSATE is equal to a sum of TBLANK and TPW. The compensation delay TCOMPENSATE can be either increased or decreased by an amount TPROG around a default specified fixed delay of TBLANK plus TPW, by modifying the variable discharging current source.
  • Referring now to FIG. 10, a predictive sampling method 200 for primary-side sensing and regulation in isolated flyback converters is shown. At 202, a control signal including pulse width modulated pulses having a first frequency and a first duty cycle is generated. At 204, the control signal controls a switch connected to an input voltage via a primary winding of a transformer. At 206, the control signal regulates an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency. At 208, the output voltage is supplied to a load connected across the secondary winding through a component connected in series with the secondary winding.
  • At 210, a first voltage across the primary winding is sensed during a demagnetization period represented by the off-time of the switch (TOFF). The first voltage represents the output voltage across the secondary winding. At 212, a single pulse is generated at a sampling time during each cycle of the control signal. At 214, the sampling time during a first cycle of the control signal is determined based on the input voltage, a voltage drop across the switch, the first duty cycle (or primary-side conduction-time), and a value of the first voltage sensed during the first cycle of the control signal. The single pulse is delayed by a first period (e.g., TBLANK) subsequent to an on-time of the PWM pulse to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
  • At 216, using a single switch and a single capacitance, the first voltage is sampled once at the sampling time during the first cycle of the control signal based on the single pulse. A sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal. At 218, the sampled value of the first voltage is compared to a reference voltage, and an error signal is generated during the first cycle of the control signal. The first duty cycle of the control signal is controlled during the first cycle of the control signal based on the error signal.
  • Accordingly, the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal as the sampling time is determined based on real-time output information. The sampling time is programmable to account for variances in a leakage inductance of the transformer. The sampling time is an instant that follows an on-time of the PWM pulse in the first cycle of the control signal after a time period that is equal to a scaled off-time of the switch (K*TOFF) minus a sum of a duration of the single pulse (TPW) and a programmable delay (TPROG). The programmable delay (TPROG) accounts for variances in the leakage inductance of the transformer. The sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
  • Referring now to FIG. 11, a method 250 for generating the sampling pulse in each cycle of the control signal is shown. At 252, a first capacitance is discharged to a ground potential at a first edge (e.g., a rising edge) of a pulse width modulated pulse in a first cycle of the control signal using a mono-shot pulse. At 254, the first capacitance is charged using a first current (IIN) to a first voltage (VC1) until a second edge (e.g., a falling edge) of the pulse width modulated pulse in the first cycle of the control signal. At 256, the first capacitance is discharged using a second current (IOUT/K) for a first period (e.g., TCOMPENSATE) to a second voltage (final value of VC1) after waiting for a second period (e.g., TBLANK) following the second edge of the pulse width modulated pulse in the first cycle of the control signal. At 258, a second capacitance is charged using a third current (IOUT) to a third voltage (VC2) after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero.
  • At 260, the second voltage is compared to the third voltage to determine a sampling time (e.g., TSAMPLE) at which a single sampling pulse is generated when the third voltage becomes greater than the second voltage. The single sampling pulse is used to sample a first voltage across the primary winding of the transformer in the first cycle of the control signal. The first voltage sampled in the first cycle of the control signal reflects the voltage drops across the parasitic elements on the secondary side in the first cycle of the control signal.
  • In this method, the first period (e.g., TCOMPENSATE) is a sum of the second period (e.g., TBLANK), a duration of the single pulse (e.g., TPW), and a programmable delay (e.g., TPROG). The second capacitance is K times the first capacitance, where K is less than or equal to 1 (e.g., 0.5≦K≦1). The sampling time is equal to K times an off-time of a pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay (i.e., TSAMPLE=K*TOFF−(TPW+TPROG)).
  • The foregoing description is merely illustrative in nature and is in no way intended to limit the disclosure, its application, or uses. The broad teachings of the disclosure can be implemented in a variety of forms. Therefore, while this disclosure includes particular examples, the true scope of the disclosure should not be so limited since other modifications will become apparent upon a study of the drawings, the specification, and the following claims. As used herein, the phrase at least one of A, B, and C should be construed to mean a logical (A or B or C), using a non-exclusive logical OR. It should be understood that one or more steps within a method may be executed in different order (or concurrently) without altering the principles of the present disclosure.

Claims (24)

What is claimed is:
1. A system comprising:
a switch connected to an input voltage via a primary winding of a transformer;
a pulse width modulator that generates a control signal including pulse width modulated pulses having a first frequency and a first duty cycle, that controls the switch based on the control signal, and that regulates an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency, wherein the output voltage is supplied to a load connected across the secondary winding through a component connected in series with the secondary winding;
a voltage sensing circuit that senses a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch, wherein the first voltage represents the output voltage across the secondary winding;
a pulse generator that generates a single pulse at a sampling time during each cycle of the control signal, wherein the sampling time during a first cycle of the control signal is determined based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal;
a sampling circuit that samples the first voltage based on the single pulse at the sampling time during the first cycle of the control signal, wherein a sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal; and
an error amplifier that compares the sampled value of the first voltage to a reference voltage and that outputs an error signal to the pulse width modulator during the first cycle of the control signal,
wherein the pulse width modulator controls the first duty cycle of the control signal during the first cycle of the control signal based on the error signal generated by the error amplifier.
2. The system of claim 1 wherein the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
3. The system of claim 1 wherein the sampling time is programmable to account for variances in a leakage inductance of the transformer.
4. The system of claim 1 wherein the sampling circuit includes a single switch and a single capacitance.
5. The system of claim 1 wherein:
the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal;
the time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay; and
the programmable delay accounts for variances in a leakage inductance of the transformer.
6. The system of claim 1 wherein the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
7. The system of claim 1 further comprising a delay circuit that delays the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
8. The system of claim 1 wherein the pulse generator comprises:
a first capacitance that is discharged to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal, that is charged until a second edge of the pulse width modulated pulse in the first cycle of the control signal, and that is discharged for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal;
a second capacitance that is charged to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero; and
a comparator that compares the second voltage to the third voltage and that generates the single pulse when the third voltage becomes greater than the second voltage.
9. The system of claim 8 wherein the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
10. The system of claim 8 wherein the second capacitance is K times the first capacitance, wherein K is less than or equal to 1.
11. The system of claim 10 wherein the sampling time is equal to K times an off-time of the pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
12. The system of claim 10 wherein:
the first capacitance is charged using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage;
the first capacitance is discharged using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K; and
the second capacitance is charged using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
13. A method comprising:
generating a control signal including pulse width modulated pulses having a first frequency and a first duty cycle;
controlling a switch connected to an input voltage via a primary winding of a transformer based on the control signal;
regulating an output voltage across a secondary winding of the transformer by turning the switch on and off at the first frequency;
supplying the output voltage to a load connected across the secondary winding through a component connected in series with the secondary winding;
sensing a first voltage across the primary winding during a demagnetization period represented by an off-time of the switch, wherein the first voltage represents the output voltage across the secondary winding;
generating a single pulse at a sampling time during each cycle of the control signal;
determining the sampling time during a first cycle of the control signal based on the input voltage, a voltage drop across the switch, an on-time of the switch, and a value of the first voltage sensed during the first cycle of the control signal;
sampling the first voltage based on the single pulse at the sampling time during the first cycle of the control signal, wherein a sampled value of the first voltage reflects the output voltage with minimized voltage drops across the component and parasitic elements of the secondary winding during the first cycle of the control signal;
comparing the sampled value of the first voltage to a reference voltage;
generating an error signal based on the comparison during the first cycle of the control signal; and
controlling the first duty cycle of the control signal during the first cycle of the control signal based on the error signal.
14. The method of claim 13 wherein the sampling time is independent of variations in the voltage drops across the component and the parasitic elements of the secondary winding from the first cycle of the control signal to a second cycle of the control signal.
15. The method of claim 13 wherein the sampling time is programmable to account for variances in a leakage inductance of the transformer.
16. The method of claim 13 wherein the sampling of the first voltage is performed using a single switch and a single capacitance.
17. The method of claim 13 wherein:
the sampling time occurs after a time period following an on-time of a pulse width modulated pulse in the first cycle of the control signal;
the time period is equal to a scaled off-time of the switch minus a sum of a duration of the single pulse and a programmable delay; and
the programmable delay accounts for variances in a leakage inductance of the transformer.
18. The method of claim 13 wherein the sampling time lies between an end of an on-time of a pulse width modulated pulse in the first cycle of the control signal and an instant during an off-time of the pulse in the first cycle of the control signal when current in the secondary winding ramps down to zero.
19. The method of claim 13 further comprising delaying the sensing of the first voltage by a first period subsequent to an on-time of a pulse width modulated pulse in the first cycle of the control signal to account for ringing due to a leakage inductance of the transformer and a parasitic capacitance of the switch.
20. The method of claim 13 further comprising:
discharging a first capacitance to a ground potential at a first edge of a pulse width modulated pulse in the first cycle of the control signal;
charging the first capacitance until a second edge of the pulse width modulated pulse in the first cycle of the control signal;
discharging the first capacitance for a first period to a second voltage after waiting for a second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal;
charging a second capacitance to a third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero;
comparing the second voltage to the third voltage; and
generating the single pulse when the third voltage becomes greater than the second voltage.
21. The method of claim 20 wherein the first period is a sum of the second period, a duration of the single pulse, and a programmable delay.
22. The method of claim 20 wherein the second capacitance is K times the first capacitance, wherein K is less than or equal to 1.
23. The method of claim 22 wherein the sampling time is equal to K times an off-time of the pulse width modulated pulse in the first cycle of the control signal minus a sum of a duration of the single pulse and a programmable delay.
24. The method of claim 22 further comprising:
charging the first capacitance using a first current until the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the first current is proportional to the input voltage;
discharging the first capacitance using a second current for the first period to the second voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal, where the second current is proportional to the first voltage divided by K; and
charging the second capacitance using a third current to the third voltage after waiting for the second period following the second edge of the pulse width modulated pulse in the first cycle of the control signal until current in the secondary winding becomes zero, where the third current is proportional to the first voltage.
US14/277,373 2014-02-14 2014-05-14 Predictive sampling for primary side sensing in isolated flyback converters Active US9093910B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/277,373 US9093910B1 (en) 2014-02-14 2014-05-14 Predictive sampling for primary side sensing in isolated flyback converters
DE102015101585.4A DE102015101585A1 (en) 2014-02-14 2015-02-04 Predictive scanning for primary detection in galvanically isolated flyback converters

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201461939947P 2014-02-14 2014-02-14
US14/277,373 US9093910B1 (en) 2014-02-14 2014-05-14 Predictive sampling for primary side sensing in isolated flyback converters

Publications (2)

Publication Number Publication Date
US9093910B1 US9093910B1 (en) 2015-07-28
US20150236602A1 true US20150236602A1 (en) 2015-08-20

Family

ID=53638546

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/277,373 Active US9093910B1 (en) 2014-02-14 2014-05-14 Predictive sampling for primary side sensing in isolated flyback converters

Country Status (2)

Country Link
US (1) US9093910B1 (en)
DE (1) DE102015101585A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106383258A (en) * 2016-08-31 2017-02-08 苏州迈力电器有限公司 Voltage isolated sampling circuit
US20170133939A1 (en) * 2015-11-05 2017-05-11 Silergy Semiconductor Technology (Hangzhou) Ltd Voltage sampling control method and related control circuit for isolated switching power supply
US10622904B1 (en) * 2019-03-26 2020-04-14 Infineon Technologies Ag Isolated feedback techniques for a flyback voltage converter
JP7498638B2 (en) 2020-10-15 2024-06-12 ローム株式会社 Power supply control device, isolated switching power supply

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102015222674A1 (en) * 2015-11-17 2017-05-18 Tridonic Gmbh & Co Kg Voltage converter and method for operating a voltage converter
CN108923390B (en) 2016-03-29 2020-01-07 昂宝电子(上海)有限公司 System and method for overvoltage protection of LED lighting
JP6611385B1 (en) * 2018-07-30 2019-11-27 浜松ホトニクス株式会社 DC power supply circuit
US10797597B1 (en) * 2019-08-26 2020-10-06 Elite Semiconductor Memory Technology Inc. Transient enhancing circuit and constant-on-time converter using the same
CN112787482B (en) * 2019-11-05 2022-11-01 晶豪科技股份有限公司 Transient enhancement circuit and constant on-time converter using the same
CN113839542B (en) * 2021-09-24 2023-05-26 电子科技大学 Peak current control circuit for on-chip current sampling

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4683528A (en) * 1985-07-22 1987-07-28 Intersil, Inc. Pulse position modulated regulation for power supplies
US20100007394A1 (en) * 2008-07-09 2010-01-14 System General Corp. Method and apparatus of providing a biased current limit for limiting maximum output power of power converters
US20100054000A1 (en) * 2008-08-30 2010-03-04 Active-Semi, Inc. Accurate voltage regulation of a primary-side regulation power supply in continuous conduction mode operation
US20110216559A1 (en) * 2010-03-05 2011-09-08 Hong Kong Applied Science & Technology Research Institute Company Limited Constant-Current Control Module using Inverter Filter Multiplier for Off-line Current-Mode Primary-Side Sense Isolated Flyback Converter
US20110242859A1 (en) * 2010-04-02 2011-10-06 Macroblock, Inc. Isolated primary circuit regulator
US20110261596A1 (en) * 2010-04-27 2011-10-27 Bcd Semiconductor Manufacturing Limited Control circuit for primary side control of switching power supply
US20120008352A1 (en) * 2008-07-09 2012-01-12 System General Corp. Method and apparatus of providing a biased current limit for limiting maximum output power of power converters
US20140246988A1 (en) * 2010-12-30 2014-09-04 Silergy Semiconductor Technology (Hangzhou) Ltd Controlling circuit for an led driver and controlling method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5305192A (en) 1991-11-01 1994-04-19 Linear Technology Corporation Switching regulator circuit using magnetic flux-sensing
US5841643A (en) 1997-10-01 1998-11-24 Linear Technology Corporation Method and apparatus for isolated flyback regulator control and load compensation
US6853563B1 (en) 2003-07-28 2005-02-08 System General Corp. Primary-side controlled flyback power converter
US7471522B2 (en) 2006-08-03 2008-12-30 Linear Technology Corporation Light load regulator for isolated flyback converter
US7463497B2 (en) 2006-08-07 2008-12-09 Linear Technology Corporation Regulator for isolated flyback power supply using primary side sensing
US7486528B2 (en) 2006-08-15 2009-02-03 System General Corp. Linear-predict sampling for measuring demagnetized voltage of transformer
US8213192B2 (en) 2009-12-30 2012-07-03 Silicon Laboratories Inc. Primary side sensing for isolated fly-back converters

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4683528A (en) * 1985-07-22 1987-07-28 Intersil, Inc. Pulse position modulated regulation for power supplies
US20100007394A1 (en) * 2008-07-09 2010-01-14 System General Corp. Method and apparatus of providing a biased current limit for limiting maximum output power of power converters
US20120008352A1 (en) * 2008-07-09 2012-01-12 System General Corp. Method and apparatus of providing a biased current limit for limiting maximum output power of power converters
US20100054000A1 (en) * 2008-08-30 2010-03-04 Active-Semi, Inc. Accurate voltage regulation of a primary-side regulation power supply in continuous conduction mode operation
US20110216559A1 (en) * 2010-03-05 2011-09-08 Hong Kong Applied Science & Technology Research Institute Company Limited Constant-Current Control Module using Inverter Filter Multiplier for Off-line Current-Mode Primary-Side Sense Isolated Flyback Converter
US20110242859A1 (en) * 2010-04-02 2011-10-06 Macroblock, Inc. Isolated primary circuit regulator
US20110261596A1 (en) * 2010-04-27 2011-10-27 Bcd Semiconductor Manufacturing Limited Control circuit for primary side control of switching power supply
US20140246988A1 (en) * 2010-12-30 2014-09-04 Silergy Semiconductor Technology (Hangzhou) Ltd Controlling circuit for an led driver and controlling method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170133939A1 (en) * 2015-11-05 2017-05-11 Silergy Semiconductor Technology (Hangzhou) Ltd Voltage sampling control method and related control circuit for isolated switching power supply
US9825538B2 (en) * 2015-11-05 2017-11-21 Silergy Semiconductor Technology (Hangzhou) Ltd Voltage sampling control method and related control circuit for isolated switching power supply
CN106383258A (en) * 2016-08-31 2017-02-08 苏州迈力电器有限公司 Voltage isolated sampling circuit
US10622904B1 (en) * 2019-03-26 2020-04-14 Infineon Technologies Ag Isolated feedback techniques for a flyback voltage converter
JP7498638B2 (en) 2020-10-15 2024-06-12 ローム株式会社 Power supply control device, isolated switching power supply

Also Published As

Publication number Publication date
US9093910B1 (en) 2015-07-28
DE102015101585A1 (en) 2015-08-20

Similar Documents

Publication Publication Date Title
US9093910B1 (en) Predictive sampling for primary side sensing in isolated flyback converters
US10199944B2 (en) Systems and methods for flyback power converters with switching frequency and peak current adjustments
US10291131B2 (en) Systems and methods for peak current adjustments in power conversion systems
US10541618B2 (en) Method and apparatus for measuring at least one of output current and output power for isolated power converters
US9722497B2 (en) Systems and methods for adjusting frequencies and currents based on load conditions of power conversion systems
US9584027B2 (en) Power converter with winding communication
US20180198371A1 (en) Current converter with control on the primary winding side and compensation of the propagation delay
US7613019B2 (en) Method and apparatus to limit maximum switch current in a switch of a switching power supply
US8238123B2 (en) Frequency limitation method with time hysteresis used in quasi-resonant control
US20150055378A1 (en) Systems and methods for flyback power converters with switching frequency and peak current adjustments based on changes in feedback signals
US20150244275A1 (en) Power Conversion with Delay Compensation
EP2325989A1 (en) Method and apparatus to limit output power in a switching power supply
EP2383874A2 (en) Apparatus and method for sensing of isolated power converter output
US11601044B2 (en) Method for driving an electronic switch in a power converter circuit and control circuit
US10985665B1 (en) Voltage sensing of an active clamp switching power converter circuit using an auxiliary winding having a same polarity as a primary winding
JP6908849B2 (en) Synchronous rectifier circuit and switching power supply
US20090296425A1 (en) Power supply controller and method therefor
US9627988B2 (en) Switch control circuit and resonant converter including the same
US9407141B2 (en) Control circuit of power converter and method therefore
US9667156B2 (en) Power supply with line compensation circuit

Legal Events

Date Code Title Description
AS Assignment

Owner name: MAXIM INTEGRATED PRODUCTS, INC., CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ANKAMREDDI, RAMAKRISHNA;KOTIKELAPUDI, NARESH VENKATA;GIRI, RAMESH;REEL/FRAME:032887/0400

Effective date: 20140513

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction
MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8