- US20110214839A1 US20110214839A1 US13/128,603 US200813128603A US2011214839A1 US 20110214839 A1 US20110214839 A1 US 20110214839A1 US 200813128603 A US200813128603 A US 200813128603A US 2011214839 A1 US2011214839 A1 US 2011214839A1
- Authority
- US
- United States
- Prior art keywords
- gas
- lng
- natural gas
- compressor
- flow line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C5/00—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
- F17C5/06—Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with compressed gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2201/00—Vessel construction, in particular geometry, arrangement or size
- F17C2201/05—Size
- F17C2201/052—Size large (>1000 m3)
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/032—Hydrocarbons
- F17C2221/033—Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0107—Single phase
- F17C2223/0123—Single phase gaseous, e.g. CNG, GNC
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0146—Two-phase
- F17C2223/0153—Liquefied gas, e.g. LPG, GPL
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0135—Pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0157—Compressors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/03—Heat exchange with the fluid
- F17C2227/0337—Heat exchange with the fluid by cooling
- F17C2227/0339—Heat exchange with the fluid by cooling using the same fluid
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/03—Heat exchange with the fluid
- F17C2227/0367—Localisation of heat exchange
- F17C2227/0388—Localisation of heat exchange separate
- F17C2227/0395—Localisation of heat exchange separate using a submerged heat exchanger
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/04—Indicating or measuring of parameters as input values
- F17C2250/0404—Parameters indicated or measured
- F17C2250/043—Pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/04—Indicating or measuring of parameters as input values
- F17C2250/0404—Parameters indicated or measured
- F17C2250/0439—Temperature
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/04—Indicating or measuring of parameters as input values
- F17C2250/0486—Indicating or measuring characterised by the location
- F17C2250/0491—Parameters measured at or inside the vessel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2250/00—Accessories; Control means; Indicating, measuring or monitoring of parameters
- F17C2250/06—Controlling or regulating of parameters as output values
- F17C2250/0605—Parameters
- F17C2250/0636—Flow or movement of content
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2260/00—Purposes of gas storage and gas handling
- F17C2260/02—Improving properties related to fluid or fluid transfer
- F17C2260/023—Avoiding overheating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2260/00—Purposes of gas storage and gas handling
- F17C2260/02—Improving properties related to fluid or fluid transfer
- F17C2260/025—Reducing transfer time
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0142—Applications for fluid transport or storage placed underground
- F17C2270/0144—Type of cavity
- F17C2270/0149—Type of cavity by digging cavities
- F17C2270/0152—Salt caverns
Definitions
- the present invention relates to a method of increasing gas mass flow injection rates to gas storage caverns using LNG.
- Natural gas is traditionally stored in a gaseous form in large volume salt caverns and aquifers to meet peak demand and ensure a secure supply.
- the gas is added to storage by compression, resulting in an increment in cavern temperature and an increment in cavern pressure. These increments in pressure and temperature in the cavern decrease the rate at which gas can be added to the cavern.
- a method to increase gas mass flow injection rates to a gas storage cavern includes using liquid natural gas (LNG) to cool natural gas in a natural gas flow line upstream of a compressor used to compress gas for storage in to a gas storage cavern.
- LNG liquid natural gas
- FIG. 1 is a schematic diagram that depicts an embodiment of the teachings contained herein.
- FIG. 2 is a variation on the embodiment shown in FIG. 1 .
- Gas is supplied from main pipeline stream 1 .
- the gas to storage is routed through line 2 to exchanger 30 where it is cooled by LNG.
- the cooler gas exits exchanger 30 via stream 3 to knock out drum 31 , to remove any condensate and debris present in the stream.
- the condensate is removed through stream 4 .
- the cold gas is routed through stream 5 to compressor 32 for injection into cavern 33 via stream 6 .
- LNG is supplied from tank 35 and is routed through line 8 to pump 36 where it is pressurized and routed through line 9 .
- the LNG is routed through line 10 to exchanger 30 , to cool the gas to storage and exits the exchanger through line 11 .
- the gas in stream 11 is colder than compressed gas in stream 6 .
- the gas can then be routed through valve 39 and line 12 to mix directly with stream 6 in mixer 41 , increasing the gas density of gas stream 7 to storage 33 .
- the option of routing stream 11 through valve 38 and line 13 directly to storage cavern 33 is available.
- the operating conditions for the cavern are monitored by pressure and temperature sensors 34 .
- the objective is to increase the gas injection rate of compressor 32 by lowering the temperature of the gas suction line to the compressor, making the gas denser, thus increasing the mass flow rate and also decreasing the compressor outlet temperature.
- the compressor outlet temperature can be further decreased by direct mixing of stream 12 with stream 6 . For every incremental decrease in the temperature of gas entering cavern 33 , the amount of gas cavern 33 is capable of storing increases. If it is desirable to further decrease the temperature of cavern 33 , the option of routing stream 11 through valve 38 and line 13 directly to storage cavern 33 is followed.
- Gas is supplied from main pipeline stream 1 .
- the gas to storage is routed through line 2 to exchanger 30 where it is cooled by LNG.
- the cooler gas exits exchanger 30 via stream 3 to knock out drum 31 to remove any condensate and debris present in the stream.
- the condensate is removed through stream 4 .
- the cold gas is routed through stream 5 to compressor 32 , where it is compressed and delivered through line 6 to exchanger 41 where it is cooled.
- the compressed and cooled stream 7 mixes with stream 11 and is stored through line 12 into gas cavern storage 33 .
- LNG is supplied from tank 35 and is routed through line 8 to pump 36 where it is pressurized and routed through line 9 .
- the LNG is routed to exchanger 30 , to cool the gas to storage and exits the exchanger through line 10 .
- the gas in stream 10 is colder than compressed gas in stream 6 .
- the gas stream 10 enters exchanger 41 to cool the compressor discharge gas.
- the gas can then be routed through valve 39 to mix directly with stream 7 to storage 33 through line 12 .
- the option of routing stream 11 through valve 38 and line 13 directly to storage cavern 33 is available.
- the operating conditions for the cavern are monitored by pressure and temperature sensors 34 .
- the objective is to increase the gas mass flow injection rate of compressor 32 by lowering the temperature of the gas suction line to the compressor, making the gas denser, thus increasing the mass flow rate whilst also decreasing the compressor outlet temperature.
- the compressor outlet temperature is further decreased by indirect mixing of stream 10 with stream 6 thus further improving the power requirements for compression.
- the described embodiment of FIG. 3 provides the ability for gas cavern operators to increase the mass flow gas injection rates to cavern storage.
- the stored gas exits the cavern via stream 50 to meet demand.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
- The present invention relates to a method of increasing gas mass flow injection rates to gas storage caverns using LNG.
- Natural gas is traditionally stored in a gaseous form in large volume salt caverns and aquifers to meet peak demand and ensure a secure supply. The gas is added to storage by compression, resulting in an increment in cavern temperature and an increment in cavern pressure. These increments in pressure and temperature in the cavern decrease the rate at which gas can be added to the cavern.
- A method to increase gas mass flow injection rates to a gas storage cavern, includes using liquid natural gas (LNG) to cool natural gas in a natural gas flow line upstream of a compressor used to compress gas for storage in to a gas storage cavern.
- These and other features of the invention will become more apparent from the following description in which reference is made to the appended drawings, the drawings are for the purpose of illustration only and are not intended to in any way limit the scope of the invention to the particular embodiment or embodiments shown, wherein:
-
FIG. 1 is a schematic diagram that depicts an embodiment of the teachings contained herein. -
FIG. 2 is a variation on the embodiment shown inFIG. 1 . - The preferred method to increase mass flow gas injection rates will now be described with reference to
FIG. 1 . - Gas is supplied from
main pipeline stream 1. The gas to storage is routed throughline 2 to exchanger 30 where it is cooled by LNG. The cooler gas exits exchanger 30 viastream 3 to knock outdrum 31, to remove any condensate and debris present in the stream. The condensate is removed throughstream 4. The cold gas is routed throughstream 5 tocompressor 32 for injection intocavern 33 viastream 6. LNG is supplied fromtank 35 and is routed throughline 8 to pump 36 where it is pressurized and routed throughline 9. The LNG is routed throughline 10 to exchanger 30, to cool the gas to storage and exits the exchanger throughline 11. The gas instream 11 is colder than compressed gas instream 6. The gas can then be routed throughvalve 39 andline 12 to mix directly withstream 6 inmixer 41, increasing the gas density ofgas stream 7 tostorage 33. The option ofrouting stream 11 throughvalve 38 andline 13 directly tostorage cavern 33 is available. The operating conditions for the cavern are monitored by pressure andtemperature sensors 34. The objective is to increase the gas injection rate ofcompressor 32 by lowering the temperature of the gas suction line to the compressor, making the gas denser, thus increasing the mass flow rate and also decreasing the compressor outlet temperature. The compressor outlet temperature can be further decreased by direct mixing ofstream 12 withstream 6. For every incremental decrease in the temperature ofgas entering cavern 33, the amount ofgas cavern 33 is capable of storing increases. If it is desirable to further decrease the temperature ofcavern 33, the option ofrouting stream 11 throughvalve 38 andline 13 directly tostorage cavern 33 is followed. - A variation will now be described with reference to
FIG. 2 . - Gas is supplied from
main pipeline stream 1. The gas to storage is routed throughline 2 to exchanger 30 where it is cooled by LNG. The cooler gas exits exchanger 30 viastream 3 to knock outdrum 31 to remove any condensate and debris present in the stream. The condensate is removed throughstream 4. The cold gas is routed throughstream 5 tocompressor 32, where it is compressed and delivered throughline 6 to exchanger 41 where it is cooled. The compressed and cooledstream 7 mixes withstream 11 and is stored throughline 12 intogas cavern storage 33. LNG is supplied fromtank 35 and is routed throughline 8 to pump 36 where it is pressurized and routed throughline 9. The LNG is routed to exchanger 30, to cool the gas to storage and exits the exchanger throughline 10. The gas instream 10 is colder than compressed gas instream 6. Thegas stream 10 entersexchanger 41 to cool the compressor discharge gas. The gas can then be routed throughvalve 39 to mix directly withstream 7 tostorage 33 throughline 12. The option ofrouting stream 11 throughvalve 38 andline 13 directly tostorage cavern 33 is available. The operating conditions for the cavern are monitored by pressure andtemperature sensors 34. The objective is to increase the gas mass flow injection rate ofcompressor 32 by lowering the temperature of the gas suction line to the compressor, making the gas denser, thus increasing the mass flow rate whilst also decreasing the compressor outlet temperature. The compressor outlet temperature is further decreased by indirect mixing ofstream 10 withstream 6 thus further improving the power requirements for compression. The described embodiment ofFIG. 3 provides the ability for gas cavern operators to increase the mass flow gas injection rates to cavern storage. - The stored gas exits the cavern via
stream 50 to meet demand. - In this patent document, the word “comprising” is used in its non-limiting sense to mean that items following the word are included, but items not specifically mentioned are not excluded. A reference to an element by the indefinite article “a” does not exclude the possibility that more than one of the element is present, unless the context clearly requires that there be one and only one of the elements.
- It will be apparent to one skilled in the art that modifications may be made to the illustrated embodiments without departing from scope of the Claims.
Claims (10)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CA2008/001975 WO2010051617A1 (en) | 2008-11-10 | 2008-11-10 | Method to increase gas mass flow injection rates to gas storage caverns using lng |
Publications (1)
Publication Number | Publication Date |
---|---|
US20110214839A1 true US20110214839A1 (en) | 2011-09-08 |
Family
ID=42152417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/128,603 Abandoned US20110214839A1 (en) | 2008-11-10 | 2008-11-10 | Method to increase gas mass flow injection rates to gas storage caverns using lng |
Country Status (3)
Country | Link |
---|---|
US (1) | US20110214839A1 (en) |
EP (1) | EP2364413B1 (en) |
WO (1) | WO2010051617A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392935A (en) * | 2011-10-27 | 2012-03-28 | 中国寰球工程公司 | Liquefied natural gas loading system and method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102506298B (en) * | 2011-09-30 | 2013-11-06 | 中国寰球工程公司 | Cold-circulating system and method for liquefied natural gas loading system |
Citations (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3002362A (en) * | 1959-09-24 | 1961-10-03 | Liquifreeze Company Inc | Natural gas expansion refrigeration system |
US3280575A (en) * | 1965-05-20 | 1966-10-25 | Mobil Oil Corp | Liquefied gas storage system |
US3477509A (en) * | 1968-03-15 | 1969-11-11 | Exxon Research Engineering Co | Underground storage for lng |
US3747359A (en) * | 1969-08-01 | 1973-07-24 | Linde Ag | Gas liquefaction by a fractionally condensed refrigerant |
US3754405A (en) * | 1969-02-10 | 1973-08-28 | Black Sivalls & Bryson Inc | Method of controlling the hydrocarbon dew point of a gas stream |
US3792590A (en) * | 1970-12-21 | 1974-02-19 | Airco Inc | Liquefaction of natural gas |
US3846993A (en) * | 1971-02-01 | 1974-11-12 | Phillips Petroleum Co | Cryogenic extraction process for natural gas liquids |
US3848427A (en) * | 1971-03-01 | 1974-11-19 | R Loofbourow | Storage of gas in underground excavation |
US3919853A (en) * | 1973-02-12 | 1975-11-18 | Inst Francais Du Petrole | Process and apparatus for cooling and/or liquefying a gas or a gas mixture |
US3950958A (en) * | 1971-03-01 | 1976-04-20 | Loofbourow Robert L | Refrigerated underground storage and tempering system for compressed gas received as a cryogenic liquid |
US3962881A (en) * | 1974-02-19 | 1976-06-15 | Airco, Inc. | Liquefaction of a vapor utilizing refrigeration of LNG |
US4276749A (en) * | 1980-04-16 | 1981-07-07 | Phillips Petroleum Company | Storage system for liquefied gases |
US4279130A (en) * | 1979-05-22 | 1981-07-21 | El Paso Products Company | Recovery of 1,3-butadiene by fractional crystallization from four-carbon mixtures |
US4418530A (en) * | 1977-12-15 | 1983-12-06 | Moskovsky Institut Khimicheskogo Mashinostroenia | Sewer plant for compressor station of gas pipeline system |
US4424680A (en) * | 1981-11-09 | 1984-01-10 | Rothchild Ronald D | Inexpensive method of recovering condensable vapors with a liquified inert gas |
US4430103A (en) * | 1982-02-24 | 1984-02-07 | Phillips Petroleum Company | Cryogenic recovery of LPG from natural gas |
US4751151A (en) * | 1986-12-08 | 1988-06-14 | International Fuel Cells Corporation | Recovery of carbon dioxide from fuel cell exhaust |
US5137558A (en) * | 1991-04-26 | 1992-08-11 | Air Products And Chemicals, Inc. | Liquefied natural gas refrigeration transfer to a cryogenics air separation unit using high presure nitrogen stream |
US5383746A (en) * | 1990-11-15 | 1995-01-24 | Dufourneaud; Jean-Marie | Process and device providing tightened operational safety for underground liquefied gas storage |
US5425230A (en) * | 1992-05-25 | 1995-06-20 | Aktsionernoe Obschestvo "Kriokor" | Gas distribution station with power plant |
US5467722A (en) * | 1994-08-22 | 1995-11-21 | Meratla; Zoher M. | Method and apparatus for removing pollutants from flue gas |
US5511905A (en) * | 1993-10-26 | 1996-04-30 | Pb-Kbb, Inc. | Direct injection of cold fluids into a subterranean cavern |
US5634340A (en) * | 1994-10-14 | 1997-06-03 | Dresser Rand Company | Compressed gas energy storage system with cooling capability |
US5685170A (en) * | 1995-11-03 | 1997-11-11 | Mcdermott Engineers & Constructors (Canada) Ltd. | Propane recovery process |
US5799505A (en) * | 1997-07-28 | 1998-09-01 | Praxair Technology, Inc. | System for producing cryogenic liquefied industrial gas |
US6089022A (en) * | 1998-03-18 | 2000-07-18 | Mobil Oil Corporation | Regasification of liquefied natural gas (LNG) aboard a transport vessel |
US6138473A (en) * | 1998-03-02 | 2000-10-31 | L'air Liquide, Societe Anonyme Pour I'etude Et I'exploitation Des Procedes Georges Claude | Station and process for dispensing a reduced-pressure gas |
US6182469B1 (en) * | 1998-12-01 | 2001-02-06 | Elcor Corporation | Hydrocarbon gas processing |
US6282917B1 (en) * | 1998-07-16 | 2001-09-04 | Stephen Mongan | Heat exchange method and apparatus |
US6378330B1 (en) * | 1999-12-17 | 2002-04-30 | Exxonmobil Upstream Research Company | Process for making pressurized liquefied natural gas from pressured natural gas using expansion cooling |
US6432565B1 (en) * | 1997-08-26 | 2002-08-13 | Shell Oil Company | Producing electrical energy from natural gas using a solid oxide fuel cell |
US6516616B2 (en) * | 2001-03-12 | 2003-02-11 | Pomfret Storage Comapny, Llc | Storage of energy producing fluids and process thereof |
US6517286B1 (en) * | 2001-02-06 | 2003-02-11 | Spectrum Energy Services, Llc | Method for handling liquified natural gas (LNG) |
US6526777B1 (en) * | 2001-04-20 | 2003-03-04 | Elcor Corporation | LNG production in cryogenic natural gas processing plants |
US20030051875A1 (en) * | 2001-09-17 | 2003-03-20 | Wilson Scott James | Use of underground reservoirs for re-gassification of LNG, storage of resulting gas and / or delivery to conventional gas distribution systems |
US6581409B2 (en) * | 2001-05-04 | 2003-06-24 | Bechtel Bwxt Idaho, Llc | Apparatus for the liquefaction of natural gas and methods related to same |
US6658888B2 (en) * | 2002-04-10 | 2003-12-09 | Carrier Corporation | Method for increasing efficiency of a vapor compression system by compressor cooling |
US6739140B2 (en) * | 2001-12-19 | 2004-05-25 | Conversion Gas Imports, L.P. | Method and apparatus for warming and storage of cold fluids |
US6751985B2 (en) * | 2002-03-20 | 2004-06-22 | Exxonmobil Upstream Research Company | Process for producing a pressurized liquefied gas product by cooling and expansion of a gas stream in the supercritical state |
US6813893B2 (en) * | 2001-12-19 | 2004-11-09 | Conversion Gas Imports, L.L.C. | Flexible natural gas storage facility |
US6826911B2 (en) * | 2001-03-12 | 2004-12-07 | Pomfret Storage Company, Llc | Storage of energy producing fluids and process thereof |
US20050061396A1 (en) * | 2003-09-04 | 2005-03-24 | Landry David Charles | Reception, processing, handling and distribution of hydrocarbons and other fluids |
WO2005068847A1 (en) * | 2004-01-16 | 2005-07-28 | Cryostar Sas | Compressor |
US6932121B1 (en) * | 2003-10-06 | 2005-08-23 | Atp Oil & Gas Corporation | Method for offloading and storage of liquefied compressed natural gas |
US6945049B2 (en) * | 2002-10-04 | 2005-09-20 | Hamworthy Kse A.S. | Regasification system and method |
US20060076076A1 (en) * | 2004-10-01 | 2006-04-13 | Darling Charles M Iv | Method of unloading and vaporizing natural gas |
US7065974B2 (en) * | 2003-04-01 | 2006-06-27 | Grenfell Conrad Q | Method and apparatus for pressurizing a gas |
US7107788B2 (en) * | 2003-03-07 | 2006-09-19 | Abb Lummus Global, Randall Gas Technologies | Residue recycle-high ethane recovery process |
US20070101732A1 (en) * | 2003-06-05 | 2007-05-10 | John Mak | Power cycle with liquefied natural gas regasification |
US20070186563A1 (en) * | 2006-02-15 | 2007-08-16 | David Vandor | System and method for cold recovery |
US7257966B2 (en) * | 2005-01-10 | 2007-08-21 | Ipsi, L.L.C. | Internal refrigeration for enhanced NGL recovery |
WO2007140581A1 (en) * | 2006-06-06 | 2007-12-13 | Jose Lourenco | Method of increasing storage capacity of natural gas storage caverns |
US7377127B2 (en) * | 2002-05-08 | 2008-05-27 | Fluor Technologies Corporation | Configuration and process for NGL recovery using a subcooled absorption reflux process |
US20090001727A1 (en) * | 2005-04-19 | 2009-01-01 | Statoil Asa | Process for Production of Electric Energy and Co2 From a Hydrocarbon Feedstock |
US20090010717A1 (en) * | 2006-08-19 | 2009-01-08 | Agr Deepwater Development Systems, Inc. | Methods for Storing Gas |
US20090019887A1 (en) * | 2006-01-31 | 2009-01-22 | Jose Lourenco | Method of conditioning natural gas in preparation for storage |
US20090028644A1 (en) * | 2007-07-23 | 2009-01-29 | Jose Lourenco | Method to increase storage capacity of natural gas storage caverns with a refrigeration system |
US20090208388A1 (en) * | 2007-06-06 | 2009-08-20 | Mckeigue Kevin | Integrated processes for generating carbon monoxide for carbon nanomaterial production |
US20100175884A1 (en) * | 2009-01-15 | 2010-07-15 | Leendert Poldervaart | Offshore gas recovery |
US20110277498A1 (en) * | 2007-10-17 | 2011-11-17 | Sander Kaart | Method and apparatus for controlling a regrigerant compressor, and use thereof in a method of cooling a hydrocarbon stream |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2891347B1 (en) * | 2005-09-28 | 2007-11-02 | Air Liquide | METHOD AND DEVICE FOR FILLING A PRESSURIZED GAS IN A RESERVOIR |
CA2552327C (en) * | 2006-07-13 | 2014-04-15 | Mackenzie Millar | Method for selective extraction of natural gas liquids from "rich" natural gas |
DE102007011530A1 (en) * | 2007-03-09 | 2008-09-11 | Bayerische Motoren Werke Aktiengesellschaft | Method for filling a pressure accumulator provided for a cryogenic storage medium, in particular hydrogen |
-
2008
- 2008-11-10 EP EP08877918.6A patent/EP2364413B1/en active Active
- 2008-11-10 WO PCT/CA2008/001975 patent/WO2010051617A1/en active Application Filing
- 2008-11-10 US US13/128,603 patent/US20110214839A1/en not_active Abandoned
Patent Citations (63)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3002362A (en) * | 1959-09-24 | 1961-10-03 | Liquifreeze Company Inc | Natural gas expansion refrigeration system |
US3280575A (en) * | 1965-05-20 | 1966-10-25 | Mobil Oil Corp | Liquefied gas storage system |
US3477509A (en) * | 1968-03-15 | 1969-11-11 | Exxon Research Engineering Co | Underground storage for lng |
US3754405A (en) * | 1969-02-10 | 1973-08-28 | Black Sivalls & Bryson Inc | Method of controlling the hydrocarbon dew point of a gas stream |
US3747359A (en) * | 1969-08-01 | 1973-07-24 | Linde Ag | Gas liquefaction by a fractionally condensed refrigerant |
US3792590A (en) * | 1970-12-21 | 1974-02-19 | Airco Inc | Liquefaction of natural gas |
US3846993A (en) * | 1971-02-01 | 1974-11-12 | Phillips Petroleum Co | Cryogenic extraction process for natural gas liquids |
US3848427A (en) * | 1971-03-01 | 1974-11-19 | R Loofbourow | Storage of gas in underground excavation |
US3950958A (en) * | 1971-03-01 | 1976-04-20 | Loofbourow Robert L | Refrigerated underground storage and tempering system for compressed gas received as a cryogenic liquid |
US3919853A (en) * | 1973-02-12 | 1975-11-18 | Inst Francais Du Petrole | Process and apparatus for cooling and/or liquefying a gas or a gas mixture |
US3962881A (en) * | 1974-02-19 | 1976-06-15 | Airco, Inc. | Liquefaction of a vapor utilizing refrigeration of LNG |
US4418530A (en) * | 1977-12-15 | 1983-12-06 | Moskovsky Institut Khimicheskogo Mashinostroenia | Sewer plant for compressor station of gas pipeline system |
US4279130A (en) * | 1979-05-22 | 1981-07-21 | El Paso Products Company | Recovery of 1,3-butadiene by fractional crystallization from four-carbon mixtures |
US4276749A (en) * | 1980-04-16 | 1981-07-07 | Phillips Petroleum Company | Storage system for liquefied gases |
US4424680A (en) * | 1981-11-09 | 1984-01-10 | Rothchild Ronald D | Inexpensive method of recovering condensable vapors with a liquified inert gas |
US4430103A (en) * | 1982-02-24 | 1984-02-07 | Phillips Petroleum Company | Cryogenic recovery of LPG from natural gas |
US4751151A (en) * | 1986-12-08 | 1988-06-14 | International Fuel Cells Corporation | Recovery of carbon dioxide from fuel cell exhaust |
US5383746A (en) * | 1990-11-15 | 1995-01-24 | Dufourneaud; Jean-Marie | Process and device providing tightened operational safety for underground liquefied gas storage |
US5137558A (en) * | 1991-04-26 | 1992-08-11 | Air Products And Chemicals, Inc. | Liquefied natural gas refrigeration transfer to a cryogenics air separation unit using high presure nitrogen stream |
US5425230A (en) * | 1992-05-25 | 1995-06-20 | Aktsionernoe Obschestvo "Kriokor" | Gas distribution station with power plant |
US5511905A (en) * | 1993-10-26 | 1996-04-30 | Pb-Kbb, Inc. | Direct injection of cold fluids into a subterranean cavern |
US5467722A (en) * | 1994-08-22 | 1995-11-21 | Meratla; Zoher M. | Method and apparatus for removing pollutants from flue gas |
US5634340A (en) * | 1994-10-14 | 1997-06-03 | Dresser Rand Company | Compressed gas energy storage system with cooling capability |
US5685170A (en) * | 1995-11-03 | 1997-11-11 | Mcdermott Engineers & Constructors (Canada) Ltd. | Propane recovery process |
US5799505A (en) * | 1997-07-28 | 1998-09-01 | Praxair Technology, Inc. | System for producing cryogenic liquefied industrial gas |
US6432565B1 (en) * | 1997-08-26 | 2002-08-13 | Shell Oil Company | Producing electrical energy from natural gas using a solid oxide fuel cell |
US6138473A (en) * | 1998-03-02 | 2000-10-31 | L'air Liquide, Societe Anonyme Pour I'etude Et I'exploitation Des Procedes Georges Claude | Station and process for dispensing a reduced-pressure gas |
US6089022A (en) * | 1998-03-18 | 2000-07-18 | Mobil Oil Corporation | Regasification of liquefied natural gas (LNG) aboard a transport vessel |
US6282917B1 (en) * | 1998-07-16 | 2001-09-04 | Stephen Mongan | Heat exchange method and apparatus |
US6182469B1 (en) * | 1998-12-01 | 2001-02-06 | Elcor Corporation | Hydrocarbon gas processing |
US6378330B1 (en) * | 1999-12-17 | 2002-04-30 | Exxonmobil Upstream Research Company | Process for making pressurized liquefied natural gas from pressured natural gas using expansion cooling |
US6517286B1 (en) * | 2001-02-06 | 2003-02-11 | Spectrum Energy Services, Llc | Method for handling liquified natural gas (LNG) |
US6516616B2 (en) * | 2001-03-12 | 2003-02-11 | Pomfret Storage Comapny, Llc | Storage of energy producing fluids and process thereof |
US6826911B2 (en) * | 2001-03-12 | 2004-12-07 | Pomfret Storage Company, Llc | Storage of energy producing fluids and process thereof |
US6526777B1 (en) * | 2001-04-20 | 2003-03-04 | Elcor Corporation | LNG production in cryogenic natural gas processing plants |
US6581409B2 (en) * | 2001-05-04 | 2003-06-24 | Bechtel Bwxt Idaho, Llc | Apparatus for the liquefaction of natural gas and methods related to same |
US20030051875A1 (en) * | 2001-09-17 | 2003-03-20 | Wilson Scott James | Use of underground reservoirs for re-gassification of LNG, storage of resulting gas and / or delivery to conventional gas distribution systems |
US20050155357A1 (en) * | 2001-12-19 | 2005-07-21 | Conversion Gas Imports, L.P. | Dual gas facility |
US6739140B2 (en) * | 2001-12-19 | 2004-05-25 | Conversion Gas Imports, L.P. | Method and apparatus for warming and storage of cold fluids |
US6813893B2 (en) * | 2001-12-19 | 2004-11-09 | Conversion Gas Imports, L.L.C. | Flexible natural gas storage facility |
US6848502B2 (en) * | 2001-12-19 | 2005-02-01 | Conversion Gas Imports, L.P. | Method and apparatus for warming and storage of cold fluids |
US6751985B2 (en) * | 2002-03-20 | 2004-06-22 | Exxonmobil Upstream Research Company | Process for producing a pressurized liquefied gas product by cooling and expansion of a gas stream in the supercritical state |
US6658888B2 (en) * | 2002-04-10 | 2003-12-09 | Carrier Corporation | Method for increasing efficiency of a vapor compression system by compressor cooling |
US7377127B2 (en) * | 2002-05-08 | 2008-05-27 | Fluor Technologies Corporation | Configuration and process for NGL recovery using a subcooled absorption reflux process |
US6945049B2 (en) * | 2002-10-04 | 2005-09-20 | Hamworthy Kse A.S. | Regasification system and method |
US7107788B2 (en) * | 2003-03-07 | 2006-09-19 | Abb Lummus Global, Randall Gas Technologies | Residue recycle-high ethane recovery process |
US7065974B2 (en) * | 2003-04-01 | 2006-06-27 | Grenfell Conrad Q | Method and apparatus for pressurizing a gas |
US20070101732A1 (en) * | 2003-06-05 | 2007-05-10 | John Mak | Power cycle with liquefied natural gas regasification |
US20050061396A1 (en) * | 2003-09-04 | 2005-03-24 | Landry David Charles | Reception, processing, handling and distribution of hydrocarbons and other fluids |
US6932121B1 (en) * | 2003-10-06 | 2005-08-23 | Atp Oil & Gas Corporation | Method for offloading and storage of liquefied compressed natural gas |
WO2005068847A1 (en) * | 2004-01-16 | 2005-07-28 | Cryostar Sas | Compressor |
US20060076076A1 (en) * | 2004-10-01 | 2006-04-13 | Darling Charles M Iv | Method of unloading and vaporizing natural gas |
US7257966B2 (en) * | 2005-01-10 | 2007-08-21 | Ipsi, L.L.C. | Internal refrigeration for enhanced NGL recovery |
US20090001727A1 (en) * | 2005-04-19 | 2009-01-01 | Statoil Asa | Process for Production of Electric Energy and Co2 From a Hydrocarbon Feedstock |
US20090019887A1 (en) * | 2006-01-31 | 2009-01-22 | Jose Lourenco | Method of conditioning natural gas in preparation for storage |
US20070186563A1 (en) * | 2006-02-15 | 2007-08-16 | David Vandor | System and method for cold recovery |
WO2007140581A1 (en) * | 2006-06-06 | 2007-12-13 | Jose Lourenco | Method of increasing storage capacity of natural gas storage caverns |
US20090010717A1 (en) * | 2006-08-19 | 2009-01-08 | Agr Deepwater Development Systems, Inc. | Methods for Storing Gas |
US20090208388A1 (en) * | 2007-06-06 | 2009-08-20 | Mckeigue Kevin | Integrated processes for generating carbon monoxide for carbon nanomaterial production |
US20090028644A1 (en) * | 2007-07-23 | 2009-01-29 | Jose Lourenco | Method to increase storage capacity of natural gas storage caverns with a refrigeration system |
US7854567B2 (en) * | 2007-07-23 | 2010-12-21 | Jose Lourenco | Method to increase storage capacity of natural gas storage caverns with a refrigeration system |
US20110277498A1 (en) * | 2007-10-17 | 2011-11-17 | Sander Kaart | Method and apparatus for controlling a regrigerant compressor, and use thereof in a method of cooling a hydrocarbon stream |
US20100175884A1 (en) * | 2009-01-15 | 2010-07-15 | Leendert Poldervaart | Offshore gas recovery |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392935A (en) * | 2011-10-27 | 2012-03-28 | 中国寰球工程公司 | Liquefied natural gas loading system and method |
Also Published As
Publication number | Publication date |
---|---|
EP2364413A4 (en) | 2014-12-31 |
WO2010051617A1 (en) | 2010-05-14 |
EP2364413A1 (en) | 2011-09-14 |
EP2364413B1 (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7854567B2 (en) | Method to increase storage capacity of natural gas storage caverns with a refrigeration system | |
CA2657697C (en) | Liquid hydrocarbon slug containing vapor recovery system | |
CN103075868B (en) | A kind of liquefaction system of natural gas and liquifying method | |
CN105275778A (en) | Device and method for supplying fluid | |
CN102636001B (en) | For cooling down one pack system or the method for multi-component stream | |
CN209801147U (en) | control system for preventing cavitation of supercharging device and gas supply system | |
US20130195690A1 (en) | Liquid nitrogen pump equipment load testing and experimenting apparatus and testing and experimenting method thereof | |
US20130186132A1 (en) | System and Method of Capturing, Processing and Utilizing Stranded Natural Gas | |
CN103062035A (en) | Test run system and method of low temperature air compressor | |
EP2364413B1 (en) | Method to increase gas mass flow injection rates to gas storage caverns using lng | |
CN104913592A (en) | Small natural gas liquefying technology | |
CA2638663C (en) | Method to increase gas mass flow injection rates to gas storage caverns using lng | |
JP7026490B2 (en) | A BOG recondensing device and an LNG storage system equipped with the BOG recondensing device. | |
US20160208984A1 (en) | Liquefied gas filling station combined with a liquefied gas production device | |
US8128317B2 (en) | Method of increasing storage capacity of natural gas storage caverns | |
CN112129040B (en) | Liquid xenon cooling and reliquefaction skid-mounted device and method thereof | |
CN204345957U (en) | BOG cold energy utilization device | |
CN104329561B (en) | A kind of system of liquid nitrogen LNG Liquefied natural gas and method thereof | |
CN208735967U (en) | Air-conditioning system | |
TW201315923A (en) | A gas liquefaction apparatus | |
EP3045849A3 (en) | A plant for liquefying methane gas | |
KR101486549B1 (en) | System for automatically charging and controlling the gas for industry | |
CN112013267A (en) | Pump relay mode output system and method for LNG peak shaving | |
CN203114603U (en) | Trial run system for low-temperature gas compressor | |
KR20130044019A (en) | System for controlling flow rate of boil-off gas and method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: 1304342 ALBERTA LTD, CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MILLAR, MACKENZIE;REEL/FRAME:031648/0104 Effective date: 20131106 Owner name: 1304338 ALBERTA LTD, CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LOURENCO, JOSE;REEL/FRAME:031648/0284 Effective date: 20131106 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
STCV | Information on status: appeal procedure |
Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER |
|
STCV | Information on status: appeal procedure |
Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS |
|
STCV | Information on status: appeal procedure |
Free format text: BOARD OF APPEALS DECISION RENDERED |
|
STCB | Information on status: application discontinuation |