US11833467B2 - Boiler plant and carbon dioxide removal method - Google Patents

Boiler plant and carbon dioxide removal method Download PDF

Info

Publication number
US11833467B2
US11833467B2 US17/779,430 US202017779430A US11833467B2 US 11833467 B2 US11833467 B2 US 11833467B2 US 202017779430 A US202017779430 A US 202017779430A US 11833467 B2 US11833467 B2 US 11833467B2
Authority
US
United States
Prior art keywords
carbon dioxide
absorbing
absorbing liquid
liquid
circulation line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US17/779,430
Other versions
US20220410062A1 (en
Inventor
Atsushi Tsutsumi
Hiromi Ishii
Tetsuya Tanaka
Naoyuki Nagafuchi
Takashi Kamijo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Mitsubishi Heavy Industries Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd, Mitsubishi Heavy Industries Engineering Ltd filed Critical Mitsubishi Heavy Industries Ltd
Assigned to Mitsubishi Heavy Industries Engineering, Ltd., MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment Mitsubishi Heavy Industries Engineering, Ltd. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: ISHII, HIROMI, KAMIJO, TAKASHI, NAGAFUCHI, NAOYUKI, TANAKA, TETSUYA, TSUTSUMI, ATSUSHI
Publication of US20220410062A1 publication Critical patent/US20220410062A1/en
Assigned to MHI ENGINEERING, LTD. reassignment MHI ENGINEERING, LTD. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: Mitsubishi Heavy Industries Engineering, Ltd.
Assigned to MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment MITSUBISHI HEAVY INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MHI ENGINEERING, LTD.
Application granted granted Critical
Publication of US11833467B2 publication Critical patent/US11833467B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/14Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
    • B01D53/1425Regeneration of liquid absorbents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/14Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
    • B01D53/1412Controlling the absorption process
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/14Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
    • B01D53/1456Removing acid components
    • B01D53/1475Removing carbon dioxide
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/14Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by absorption
    • B01D53/18Absorbing units; Liquid distributors therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/343Heat recovery
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/62Carbon oxides
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • F23J15/04Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material using washing fluids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2252/00Absorbents, i.e. solvents and liquid materials for gas absorption
    • B01D2252/20Organic absorbents
    • B01D2252/204Amines
    • B01D2252/20478Alkanolamines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/50Carbon oxides
    • B01D2257/504Carbon dioxide
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/0283Flue gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2215/00Preventing emissions
    • F23J2215/50Carbon dioxide
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2219/00Treatment devices
    • F23J2219/40Sorption with wet devices, e.g. scrubbers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/0018Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters using electric energy supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02CCAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
    • Y02C20/00Capture or disposal of greenhouse gases
    • Y02C20/40Capture or disposal of greenhouse gases of CO2
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/32Direct CO2 mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/12Improving ICE efficiencies

Definitions

  • the present invention relates to a boiler plant including a boiler and a carbon dioxide capture system for removing carbon dioxide contained in an exhaust gas from the boiler, and a carbon dioxide removal method for removing the carbon dioxide contained in the exhaust gas.
  • An exhaust gas containing carbon dioxide is discharged from a boiler that generates steam with the heat of a combustion gas generated through the combustion of fossil fuel. From the viewpoint of environmental protection, a technique for removing the carbon dioxide from the exhaust gas as much as possible is required. As such a technique, for example, the plant described in Japanese Unexamined Patent Application Publication No. 2015-104693 (hereinafter JP '693) is known.
  • the plant described in JP '693 has an absorber that absorbs carbon dioxide in an exhaust gas into an absorbing liquid and discharges the exhaust gas from which the carbon dioxide has been removed, and an absorbing-liquid regeneration device that separates the carbon dioxide from the absorbing liquid that has absorbed the carbon dioxide.
  • the absorbing-liquid regeneration device includes a regenerator, a circulation line, and a heat exchanger (or reboiler). The regenerator allows the absorbing liquid, which has absorbed the carbon dioxide from the absorber, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to exhaust the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber.
  • the circulation line is a line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator.
  • the heat exchanger (or reboiler) is provided in the circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the circulation line and the steam.
  • the plant further has a heat amount regulating unit that regulates the amount of heat input to the heat exchanger (or reboiler).
  • the heat amount regulating unit specifically regulates the flow rate of the steam that is a target for heat exchange with the absorbing liquid.
  • the steam generated in the boiler may be used as the target for heat exchange with the absorbing liquid in the heat exchanger (or reboiler).
  • the absorbing liquid cannot be heated by the heat exchanger, and the temperature of the absorbing liquid in the regenerator and the heat exchanger cannot be raised.
  • the carbon dioxide is not separated from the absorbing liquid in the regenerator, and the absorbing liquid is not regenerated. As a result, the carbon dioxide contained in the exhaust gas from the boiler cannot be removed unless the steam is supplied from the boiler.
  • an object of the present invention is to provide a boiler plant capable of reducing carbon dioxide in an exhaust gas exhausted from the plant even in the process of starting the boiler, and a carbon dioxide removal method.
  • a boiler plant as one aspect according to the invention for achieving the above object includes a boiler that generates steam with heat of a combustion gas generated through combustion of a fossil fuel, and a carbon dioxide capture system that removes carbon dioxide contained in an exhaust gas exhausted from the boiler.
  • the carbon dioxide capture system includes an absorbing-liquid regeneration device that separates the carbon dioxide from an absorbing liquid that has absorbed the carbon dioxide, and an absorber that allows the exhaust gas from the boiler to flow thereinto, absorbs the carbon dioxide in the exhaust gas in the absorbing liquid from the absorbing-liquid regeneration device, and discharges the exhaust gas from which the carbon dioxide has been removed.
  • the absorbing-liquid regeneration device includes a regenerator that allows the absorbing liquid, which has absorbed the carbon dioxide in the absorber, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber, a first circulation line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a second circulation line that takes out the absorbing liquid from the inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a heat exchanger that is provided in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and the steam from the boiler, a heater that is provided in the second circulation line to heat the absorbing liquid flowing through the second circulation line, and a switcher that switches between a first heating state in which the absorbing liquid flows through the first circulation line and a second heating state in which the
  • the absorbing-liquid regeneration device when the steam condition that the temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied, the absorbing-liquid regeneration device is brought into the first heating state.
  • the absorbing liquid In the first heating state, the absorbing liquid is heated with the steam from the boiler in the heat exchanger. As the absorbing liquid is heated, the inside of the regenerator becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid.
  • the absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber.
  • the carbon dioxide in the exhaust gas from the boiler is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged.
  • the steam from the boiler satisfies the steam condition, the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
  • the absorbing-liquid regeneration device is brought into the second heating state when the steam sent from the boiler to the heat exchanger does not satisfy the steam condition (the temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure), for example, in the process of stopping or starting the boiler.
  • the absorbing liquid is heated by the heater.
  • the inside of the regenerator becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid.
  • the absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber.
  • the carbon dioxide in the exhaust gas from the boiler is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. Additionally, in the present aspect, even when the second heating state is switched to the first heating state, the temperature of the absorbing liquid in the regenerator is equal to or higher than the predetermined temperature, so that the second heating state is switched to the first heating state. Even immediately after that, the temperature of the absorbing liquid in the regenerator can be raised to the target temperature in a short time, and the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
  • a carbon dioxide removal method as one aspect according to the invention for achieving the above object includes an absorbing-liquid regeneration step in which carbon dioxide is separable from an absorbing liquid that has absorbed the carbon dioxide, and an absorption step in which the exhaust gas from the boiler flows in, the carbon dioxide in the exhaust gas is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged.
  • the absorbing-liquid regeneration step is executed by the absorbing-liquid regeneration device.
  • the absorbing-liquid regeneration device includes a regenerator that allows the absorbing liquid, which has absorbed the carbon dioxide through the execution of the absorption step, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and causes the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step, a first circulation line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a second circulation line that takes out the absorbing liquid from the inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a heat exchanger that is provided in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and the steam from the boiler, and a heater that is provided in the second circulation line to heat the absorbing liquid flowing through the second circulation line.
  • the absorbing-liquid regeneration step includes a first heating step in which the absorbing liquid flows through the first circulation line such that the absorbing liquid is heatable by the heat exchanger, and a second heating step in which the absorbing liquid flows through the second circulation line such that the absorbing liquid is heatable by the heater.
  • the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.
  • FIG. 1 is a system diagram of a boiler plant according to an embodiment of the present invention.
  • FIG. 2 is a system diagram of a carbon dioxide capture system according to the embodiment of the present invention.
  • FIG. 3 is a timing chart showing the execution timings of a plurality of steps executed by the boiler plant according to the embodiment of the present invention.
  • a boiler plant of the present embodiment will be described with reference to FIGS. 1 to 3 .
  • the boiler plant of the present embodiment includes gas turbine equipment 10 , a heat recovery system generator 20 , steam turbine equipment 30 , a power system facility 40 , a carbon dioxide capture system 50 , and a plant control device 100 .
  • the gas turbine equipment 10 includes a gas turbine 11 , a fuel line 16 that guides fuel (fossil fuel) F to the gas turbine 11 , a fuel regulating valve 17 that regulates the flow rate of the fuel F flowing through the fuel line 16 , and a GT generator 19 that generates power by driving the gas turbine 11 . Since the gas turbine equipment 10 includes the GT generator 19 as described above, the gas turbine equipment is also a gas turbine power generation facility.
  • the gas turbine 11 includes an air compressor 12 that compresses air A to generate compressed air, a combustor 13 that combusts the fuel F in the compressed air to generate combustion gas, and a turbine 14 driven with the combustion gas.
  • the air compressor 12 has a compressor rotor, and a compressor casing that covers the compressor rotor.
  • the turbine 14 has a turbine rotor, and a turbine casing that covers the turbine rotor.
  • the compressor rotor and the turbine rotor are coupled to each other to form a gas turbine rotor 15 .
  • the fuel line 16 is connected to the combustor 13 .
  • the fuel line 16 is provided with the fuel regulating valve 17 .
  • the heat recovery system generator 20 heats water with the heat of exhaust gas from the gas turbine 11 and turns the water into steam.
  • the steam turbine equipment 30 includes a steam turbine 31 driven with the steam generated by the heat recovery system generator 20 , a main steam line 32 that guides the steam generated by the heat recovery system generator 20 to the steam turbine 31 , a steam regulating valve 33 that regulates the flow rate of the steam flowing into the steam turbine 31 from the main steam line 32 , a temperature sensor 34 that detects the temperature of the steam flowing through the main steam line 32 , a pressure sensor 35 that detects the pressure of the steam flowing through the main steam line 32 , a condenser 36 that returns the steam exhausted from the steam turbine 31 to water, a supply water line 37 that guides the water in the condenser 36 to the heat recovery system generator 20 , and an ST generator 39 that generates power by driving the steam turbine 31 .
  • the steam turbine equipment 30 includes the ST generator 39 , the steam turbine equipment 30 is also a steam turbine power generation facility.
  • the power system facility 40 includes a GT power system 41 a that electrically connects the GT generator 19 to an external power system 48 , a GT circuit breaker 42 a provided in the GT power system 41 a , a GT transformer 43 a provided in the GT power system 41 a , an ST power system 41 b that electrically connects the ST generator 39 to the external power system 48 , an ST circuit breaker 42 b provided in the ST power system 41 b , an ST transformer 43 b provided in the ST power system 41 b , an AC/DC converter 44 that converts alternating-current power flowing through the GT power system 41 a and the ST power system 41 b into direct-current power, a direct-current power system 45 connected to the AC/DC converter 44 , and a solar power generation facility 46 connected to the direct-current power system 45 .
  • the solar power generation facility 46 includes a plurality of solar cells.
  • a plurality of power generation facilities are electrically connected to the external power system 48 .
  • One power generation facility of the plurality of power generation facilities is a wind power generation facility 49 .
  • the wind power generation facility 49 includes a windmill.
  • Both the solar power generation facility 46 and the wind power generation facility 49 are carbon-free power generation facilities.
  • the carbon-free power generation facility is a facility that generates power by using the combustion gas generated through the combustion of the fossil fuel, for example, a facility that discharges carbon dioxide having a concentration lower than the carbon dioxide concentration in the exhaust gas from the gas turbine power generation facility 10 of the present embodiment or a facility that does not discharge the carbon dioxide during power generation.
  • the solar power generation facility 46 and the wind power generation facility 49 are both facilities that generate power by using renewable energy.
  • the plant control device 100 controls the opening and closing of the fuel regulating valve 17 and the steam regulating valve 33 .
  • the carbon dioxide capture system 50 includes a gas booster 51 , an exhaust gas cooling device 60 , an absorber 70 , an absorbing-liquid regeneration device 80 , and an exhaust gas recirculation line 52 .
  • the gas booster 51 boosts the pressure of the exhaust gas from the heat recovery system generator 20 to send the boosted exhaust gas to the exhaust gas cooling device 60 .
  • the exhaust gas cooling device 60 cools the exhaust gas from the gas booster 51 .
  • the exhaust gas cooling device 60 includes a cooling tower 61 , a water circulation line 62 , a water circulation pump 63 , a water cooler 64 , and a low-temperature exhaust gas line 65 .
  • the cooling tower 61 has a cooling tower container 61 v and a filling material 61 p disposed in an intermediate portion in the vertical direction in the cooling tower container 61 v .
  • the exhaust gas from the gas booster 51 is supplied to a position below a filling material 61 p in the cooling tower container 61 v .
  • One end of the water circulation line 62 is connected to a lower end of the cooling tower container 61 v , and the other end of the water circulation line 62 is connected to a position above the filling material 61 p in the cooling tower container 61 v .
  • the water circulation pump 63 and the water cooler 64 are provided in the water circulation line 62 .
  • the water reserved at a bottom portion of the cooling tower container 61 v flows into the water circulation pump 63 via the water circulation line 62 .
  • the water circulation pump 63 boosts the pressure of the water to send the boosted water to an upper portion in the cooling tower container 61 v via the water circulation line 62 .
  • the water cooler 64 is a heat exchanger that cools the water by exchanging heat between the water flowing through the water circulation line 62 and a cooling medium.
  • As the cooling medium for example, cooling water is used.
  • One end of the low-temperature exhaust gas line 65 is connected to an upper end of the cooling tower container 61 v.
  • One end of the exhaust gas recirculation line 52 is connected to the low-temperature exhaust gas line 65 . Additionally, the other end of the exhaust gas recirculation line 52 is connected to a suction port of the air compressor 12 in the gas turbine equipment 10 . In addition, the aforementioned gas booster 51 may be provided in the low-temperature exhaust gas line 65 .
  • the absorber 70 absorbs the carbon dioxide contained in the exhaust gas from the exhaust gas cooling device 60 into an absorbing liquid, and discharges the exhaust gas from which the carbon dioxide has been removed.
  • the absorber 70 includes an absorption tower 71 , an exhaust line 72 , a lean absorbing-liquid line 73 , a lean-rich heat exchanger 74 , a lean absorbing-liquid pump 75 , a lean absorbing-liquid cooler 76 , a lean absorbing-liquid regulating valve 77 , a rinse water circulation line 78 , a rinse water circulation pump 79 p , and a rinse water cooler 79 r.
  • the absorption tower 71 has an absorption tower container 71 v , a lower filling material 71 pa , an upper filling material 71 pb , a lower demister 71 da , an upper demister 71 db , and a tray 71 t .
  • the lower filling material 71 pa , the upper filling material 71 pb , the lower demister 71 da , the upper demister 71 db , and the tray 71 t are all disposed in the absorption tower container 71 v .
  • the lower filling material 71 pa is disposed at a distance downward with respect to the upper filling material 71 pb .
  • the lower demister 71 da is disposed in the vertical direction between the lower filling material 71 pa and the upper filling material 71 pb .
  • the upper demister 71 db is disposed above the upper filling material 71 pb .
  • Both the lower demister 71 da and the upper demister 71 db capture the moisture contained in the gas rising from the bottom to the top and suppress the rise of the moisture above themselves.
  • the tray 71 t is disposed in the vertical direction between the lower demister 71 da and the upper filling material 71 pb .
  • the tray 71 t is formed with a plurality of through-holes penetrating in the vertical direction and a water reservoir portion 71 s in which the rinse water is reserved.
  • the other end of the aforementioned low-temperature exhaust gas line 65 is connected to a position below the lower filling material 71 pa in the absorption tower container 71 v .
  • the exhaust line 72 is connected to an upper end of the absorption tower container 71 v .
  • the exhaust gas that has passed through the absorption tower container 71 v flows through the exhaust line 72 .
  • the exhaust gas is exhausted to the outside of the plant via a chimney or the like.
  • One end of the rinse water circulation line 78 is connected to the water reservoir portion 71 s in the absorption tower container 71 v , and the other end of the rinse water circulation line 78 is connected to a position above the upper filling material 71 pb and below the upper demister 71 db , in the absorption tower container 71 v .
  • Both the rinse water circulation pump 79 p and the rinse water cooler 79 r are provided in the rinse water circulation line 78 .
  • the rinse water circulation pump 79 p boosts the pressure of the rinse water flowing into the rinse water circulation line 78 .
  • the rinse water cooler 79 r cools the rinse water that has flowed into the rinse water circulation line 78 .
  • a lean absorbing liquid flows through the lean absorbing-liquid line 73 .
  • the lean absorbing liquid is an absorbing liquid that absorbs a small amount of carbon dioxide.
  • the rich absorbing liquid is an absorbing liquid that absorbs a large amount of carbon dioxide.
  • the absorbing liquid is an amine-based absorbing liquid.
  • alkanolamines such as monoethanolamine, diethanolamine, triethanolamine, methyldiethanolamine, diisopropanolamine, and diglycolamine can be adopted. Additionally, hindered amines can also be adopted. Additionally, each of these single aqueous solutions or mixed aqueous solutions of two or more of these can also be adopted.
  • One end of the lean absorbing-liquid line 73 is connected to a position above the lower filling material 71 pa and below the lower demister 71 da , in the absorption tower container 71 v . For this reason, the lean absorbing liquid that has flowed through the lean absorbing-liquid line 73 is sprayed in an intermediate space between the lower filling material 71 pa and the lower demister 71 da in the absorption tower container 71 v.
  • the lean-rich heat exchanger 74 , the lean absorbing-liquid pump 75 , the lean absorbing-liquid cooler 76 , and the lean absorbing-liquid regulating valve 77 are all provided in the lean absorbing-liquid line 73 .
  • the lean-rich heat exchanger 74 heats the rich absorbing liquid while cooling the lean absorbing liquid by exchanging heat between the lean absorbing liquid and the rich absorbing liquid.
  • the lean absorbing-liquid pump 75 boosts the pressure of the lean absorbing liquid flowing through the lean absorbing-liquid line 73 .
  • the lean absorbing-liquid cooler 76 is a heat exchanger that cools the lean absorbing liquid by exchanging heat between the lean absorbing liquid boosted by the lean absorbing-liquid pump 75 and the cooling medium.
  • the cooling medium for example, cooling water is used.
  • the lean absorbing-liquid regulating valve 77 regulates the flow rate of the lean absorbing liquid.
  • the absorbing-liquid regeneration device 80 separates the carbon dioxide from the absorbing liquid that has absorbed the carbon dioxide from the absorber 70 , that is, the rich absorbing liquid.
  • the absorbing-liquid regeneration device 80 has a regenerator 81 , a carbon dioxide recovery line 82 , a cooler 82 r , a moisture separation tank 82 t , a carbon dioxide compressor 82 c , a water pump 82 p , a moisture recovery line 82 w , a rich absorbing-liquid line 83 , a rich absorbing-liquid pump 84 , a rich absorbing-liquid regulating valve 85 , a first circulation line 86 , a second circulation line 87 , a reboiler (heat exchanger) 89 , a heater 90 , a switcher 92 , a switching controller 93 , a temperature sensor 94 , a second heating controller 95 , a secondary battery 96 , a charging and discharging controller 97 , and
  • the regenerator 81 has a regenerator container 81 v , a filling material 81 p disposed at an intermediate portion in the vertical direction in the regenerator container 81 v , and a tray 81 t disposed under the filling material 81 p in the regenerator container 81 v .
  • the tray 81 t is formed with a plurality of through-holes penetrating in the vertical direction and a liquid reservoir portion 81 s in which the absorbing liquid is reserved.
  • the other end of the aforementioned lean absorbing-liquid line 73 is connected to a lower end of the regenerator container 81 v.
  • the carbon dioxide recovery line 82 is connected to an upper end of the regenerator container 81 v .
  • the cooler 82 r , the moisture separation tank 82 t , and the carbon dioxide compressor 82 c are provided in the carbon dioxide recovery line 82 .
  • the cooler 82 r cools the gas containing carbon dioxide flowing out from the regenerator container 81 v .
  • the moisture separation tank 82 t separates the moisture contained in this gas.
  • the carbon dioxide compressor 82 c compresses the gas from which most of the moisture has been removed.
  • One end of the moisture recovery line 82 w is connected to a lower end of the moisture separation tank 82 t .
  • the other end of the moisture recovery line 82 w is connected to a position above the filling material 81 p in the regenerator container 81 v . For this reason, the water reserved in the moisture separation tank 82 t is sprayed into an upper space in the regenerator container 81 v .
  • the water pump 82 p is provided on the moisture recovery line 82 w .
  • the gas compressed by the carbon dioxide compressor 82 c is sent to, for example, a carbon dioxide liquefaction facility where the gas is liquefied.
  • One end of the rich absorbing-liquid line 83 is connected to a lower end of the aforementioned absorption tower container 71 v , and the other end of the rich absorbing-liquid line 83 is connected to a position above the filling material 81 p in the regenerator container 81 v and below a connection position of the moisture recovery line 82 w with respect to the regenerator container 81 v .
  • the rich absorbing liquid from the rich absorbing-liquid line 83 is sprayed into the upper space in the regenerator container 81 v .
  • the rich absorbing-liquid pump 84 and the rich absorbing-liquid regulating valve 85 are provided in the rich absorbing-liquid line 83 .
  • the rich absorbing-liquid pump 84 boosts the pressure of the rich absorbing liquid flowing through the rich absorbing-liquid line 83 .
  • the rich absorbing-liquid regulating valve 85 regulates the flow rate of the rich absorbing liquid.
  • the aforementioned lean-rich heat exchanger 74 is provided in the rich absorbing-liquid line 83 .
  • the lean-rich heat exchanger 74 exchanges heat between the lean absorbing liquid flowing through the lean absorbing-liquid line 73 and the rich absorbing liquid flowing through the rich absorbing-liquid line 83 .
  • the first circulation line 86 has an inflow-side sharing portion 86 a including the aforementioned one end, an outflow-side sharing portion 86 b including the aforementioned other end, and an intermediate portion 86 c between the inflow-side sharing portion 86 a and the outflow-side sharing portion 86 b .
  • a reboiler (heat exchanger) 89 is provided in the intermediate portion 86 c in the first circulation line 86 .
  • a heating steam line 38 (refer to FIG.
  • the reboiler 89 heats the absorbing liquid by exchanging heat between the absorbing liquid flowing through the intermediate portion 86 c and the steam from the heating steam line 38 .
  • the second circulation line 87 has an inflow-side sharing portion 86 a of the first circulation line 86 , an outflow-side sharing portion 86 b of the first circulation line 86 , and an intermediate portion 87 c between the inflow-side sharing portion 86 a and the outflow-side sharing portion 86 b . That is, the first circulation line 86 and the second circulation line 87 share an inflow-side portion and an outflow-side portion with each other.
  • the intermediate portion 87 c of the second circulation line 87 is independent of the intermediate portion 86 c of the first circulation line 86 .
  • the heater 90 is provided in the intermediate portion 87 c of the second circulation line 87 .
  • the heater 90 has a heating container 90 v into which the absorbing liquid flowing through the intermediate portion 87 c of the second circulation line 87 flows, and an electric heater 91 that heats the absorbing liquid in the heating container 90 v .
  • the electric heater 91 has an electric heater main body 91 a that is a heat generating body, and a heater drive circuit 91 b that supplies power to the electric heater main body 91 a.
  • the switcher 92 has a first shut-off valve 92 a provided in the intermediate portion 86 c of the first circulation line 86 and a second shut-off valve 92 b provided in the intermediate portion 87 c of the second circulation line 87 .
  • the switching controller 93 controls the opening and closing of the first shut-off valve 92 a and the second shut-off valve 92 b depending on the steam temperature detected by the temperature sensor 34 of the steam turbine equipment 30 and the steam pressure detected by the pressure sensor 35 of the steam turbine equipment 30 .
  • the switching controller 93 controls the opening and closing of the first shut-off valve 92 a and the second shut-off valve 92 b , it is possible to realize a first heating state in which the absorbing liquid is allowed to flow through the first circulation line 86 and the absorbing liquid can be heated by the reboiler 89 and a second heating state in which the absorbing liquid is allowed to flow through the second circulation line 87 and the absorbing liquid can be heated by the heater 90 .
  • the switching controller 93 instructs the switcher 92 to bring about the first heating state when the steam condition that the temperature of the steam sent from the heat recovery system generator 20 to the reboiler 89 is equal to or higher than a predetermined temperature Ts and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied. Additionally, the switching controller 93 instructs the switcher 92 to bring about the second heating state when the steam sent from the heat recovery system generator 20 to the reboiler 89 does not satisfy the steam condition. In a case where the first heating state is realized, the switching controller 93 gives an opening instruction to the first shut-off valve 92 a and gives a closing instruction to the second shut-off valve 92 b .
  • the switching controller 93 gives a closing instruction to the first shut-off valve 92 a and gives an opening instruction to the second shut-off valve 92 b .
  • the switcher 92 is constituted by the first shut-off valve 92 a and the second shut-off valve 92 b , but the switcher 92 can also be constituted by one three-way valve. In this case, the three-way valve is provided at a connection portion between the intermediate portion 86 c of the first circulation line 86 and the intermediate portion 87 c of the second circulation line 87 .
  • the temperature sensor 94 is provided at a bottom portion of the regenerator container 81 v .
  • the temperature sensor 94 detects the temperature of the absorbing liquid reserved at a bottom portion in the regenerator container 81 v.
  • the second heating controller 95 controls the heating in the heater 90 depending on the absorbing liquid temperature detected by the temperature sensor 94 . Specifically, an ON instruction or an OFF instruction is given to the heater drive circuit 91 b depending on the absorbing liquid temperature.
  • the discharge system 98 electrically connects the heater drive circuit 91 b to the charging and discharging controller 97 .
  • the direct-current power system 45 and the secondary battery 96 are further electrically connected to the charging and discharging controller 97 .
  • the charging and discharging controller 97 charges the secondary battery 96 with the direct-current power from the direct-current power system 45 or discharges power from the secondary battery 96 depending on a state signal from the plant control device 100 .
  • the gas turbine rotor 15 When the gas turbine 11 is in steady operation, the gas turbine rotor 15 is rotating at a rated rotation speed. In this case, the air compressor 12 compresses the air to generate compressed air. The compressed air flows into the combustor 13 . The fuel F is supplied to the combustor 13 . The combustor 13 combusts the fuel F in the compressed air to generate a combustion gas. The turbine 14 is driven by the combustion gas. By driving the turbine 14 , the GT generator 19 generates power. The power generated by the GT generator 19 is supplied to the external power system 48 via the GT circuit breaker 42 a and the GT transformer 43 a in the closed state.
  • the heat recovery system generator 20 generates steam by using the heat of the exhaust gas.
  • steam at a predetermined temperature or higher and a predetermined pressure or higher is generated in a predetermined amount or higher.
  • the steam turbine rotor When the steam turbine 31 is in steady operation, the steam turbine rotor is rotating at a rated rotation speed.
  • the ST generator 39 generates power by rotating the steam turbine rotor.
  • the power generated by the ST generator 39 is supplied to the external power system 48 via the ST circuit breaker 42 b and the ST transformer 43 b in the closed state.
  • the exhaust gas exhausted from the heat recovery system generator 20 flows into the carbon dioxide capture system 50 .
  • the exhaust gas boosted by the gas booster 51 flows into the cooling tower 61 of the exhaust gas cooling device 60 in the carbon dioxide capture system 50 .
  • the cooling tower 61 the exhaust gas is cooled to, for example, about 40° C.
  • a part of the exhaust gas cooled in the cooling tower 61 flows into a lower space in the absorption tower container 71 v via the low-temperature exhaust gas line 65 . In this way, the reason why the exhaust gas is cooled is that the carbon dioxide is easily absorbed by the absorbing liquid.
  • the other part of the exhaust gas cooled in the cooling tower 61 flows into the air compressor 12 of the gas turbine 11 via the low-temperature exhaust gas line 65 and the exhaust gas recirculation line 52 .
  • the air compressor 12 compresses not only the outside air but also the exhaust gas cooled in the cooling tower 61 .
  • the exhaust gas flows into the heat recovery system generator 20 again via the combustor 13 and the turbine 14 .
  • the carbon dioxide concentration in the exhaust gas exhausted from the heat recovery system generator 20 in other words, the exhaust gas flowing into the carbon dioxide capture system 50 becomes high.
  • the carbon dioxide capture system 50 removes carbon dioxide from the exhaust gas having a high carbon dioxide concentration. For this reason, in the present embodiment, the carbon dioxide removal efficiency in the carbon dioxide capture system 50 can be enhanced.
  • a lean absorbing liquid at 40° C. is sprayed from the lean absorbing-liquid line 73 .
  • the lean absorbing liquid descends in the absorption tower container 71 v . In the descending process, the lean absorbing liquid comes into contact with the exhaust gas and absorbs the carbon dioxide in the exhaust gas.
  • the lean absorbing liquid becomes a rich absorbing liquid by absorbing the carbon dioxide and is temporarily reserved at a bottom portion in the absorption tower container 71 v . Meanwhile, the exhaust gas from which the carbon dioxide has been removed by the contact with the lean absorbing liquid rises and passes through the lower demister 71 da . The moisture contained in the exhaust gas is removed in the process of passing through the lower demister 71 da . The exhaust gas passes through the through-holes of the tray 71 t and further rises.
  • the water reserved in the water reservoir portion 71 s of the tray 71 t is boosted and cooled via the rinse water circulation pump 79 p and the rinse water cooler 79 r , and then enters a space above the upper filling material 71 pb in the absorption tower container 71 v and is sprayed as rinse water.
  • the exhaust gas that has passed through the tray 71 t comes into contact with the rinse water and is cooled in the process of passing through the upper filling material 71 pb .
  • a part of the rinse water is reserved in the water reservoir portion 71 s of the tray 71 t .
  • the rest of the rinse water passes through the tray 71 t and is temporarily reserved as a part of the lean absorbing liquid at the bottom portion in the absorption tower container 71 v .
  • the exhaust gas cooled with the rinse water passes through the upper demister 71 db .
  • the moisture contained in the exhaust gas is removed in the process of passing through the upper demister 71 db .
  • the exhaust gas from which the carbon dioxide and the moisture have been removed is exhausted to the outside of the plant via the exhaust line 72 .
  • the rich absorbing liquid reserved at the bottom portion in the absorption tower container 71 v flows into the rich absorbing-liquid line 83 .
  • the rich absorbing liquid is boosted by the rich absorbing-liquid pump 84 in the process of flowing through the rich absorbing-liquid line 83 , and then heated by heat exchange with the lean absorbing liquid in the lean-rich heat exchanger 74 .
  • the heated rich absorbing liquid is sprayed into the upper space in the regenerator container 81 v via the rich absorbing-liquid regulating valve 85 .
  • the rich absorbing liquid sprayed into the upper space in the regenerator container 81 v is heated in contact with the steam in the regenerator container 81 v , and the carbon dioxide in the rich absorbing liquid is separated.
  • the carbon dioxide is sent to, for example, the carbon dioxide liquefaction facility via the carbon dioxide recovery line 82 .
  • the rich absorbing liquid becomes a lean absorbing liquid as the carbon dioxide is separated.
  • a part of the lean absorbing liquid is reserved in the liquid reservoir portion 81 s of the tray 81 t . Additionally, the rest of the lean absorbing liquid is temporarily reserved at the bottom portion in the regenerator container 81 v through the through-hole of the tray 81 t.
  • the lean absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86 .
  • a part of the steam generated in the heat recovery system generator 20 flows into the reboiler 89 via the heating steam line 38 .
  • the lean absorbing liquid is heated to, for example, 120° C. by heat exchange between the lean absorbing liquid and the steam.
  • the lean absorbing liquid heated by the reboiler 89 flows into the regenerator container 81 v via the first shut-off valve 92 a in the open state.
  • a part of the lean absorbing liquid becomes the steam in the regenerator container 81 v and rises in the regenerator container 81 v . Additionally, the rest of the lean absorbing liquid descends in the regenerator container 81 v and is temporarily reserved at the bottom portion of the regenerator container 81 v.
  • the lean absorbing liquid reserved at the bottom portion in the regenerator container 81 v flows into the lean absorbing-liquid line 73 .
  • the lean absorbing liquid is cooled by heat exchange with the rich absorbing liquid in the lean-rich heat exchanger 74 in the process of flowing through the lean absorbing-liquid line 73 , and then boosted by the lean absorbing-liquid pump 75 .
  • the lean absorbing liquid is cooled to, for example, the aforementioned 40° C. by the lean absorbing-liquid cooler 76 , and then sprayed into an upper space in the absorption tower container 71 v via the lean absorbing-liquid regulating valve 77 .
  • a fuel supply step Sfs a GT circuit breaker closing step Stbc, an ST circuit breaker closing step Ssbc, a chargeable step Sch, the absorption step Sab, an absorbing-liquid regeneration step Sre, and a first heating step Sh 1 are executed.
  • the fuel supply step Sfs fuel is supplied to the combustor 13 of the gas turbine 11 . For this reason, during the fuel supply step Sfs, combustion gas is generated, and the combustion gas flows into the carbon dioxide capture system 50 as the exhaust gas via the heat recovery system generator 20 .
  • the GT circuit breaker closing step Stbc the GT circuit breaker 42 a is closed, the GT generator 19 generates power, and the power in this case is supplied to the external power system 48 .
  • the ST circuit breaker closing step Ssbc the ST circuit breaker 42 b is closed, the ST generator 39 generates power, and the power in this case is supplied to the external power system 48 .
  • the direct-current power system 45 and the secondary battery 96 are brought into an electrically connected state via the charging and discharging controller 97 .
  • a chargeable state is brought about in which a part of the power from the GT generator 19 , the ST generator 39 , the solar power generation facility 46 , and the wind power generation facility 49 electrically connected to the direct-current power system 45 is chargeable into the secondary battery 96 via the charging and discharging controller 97 .
  • the secondary battery 96 In the chargeable state, if the secondary battery 96 is not in a fully charged state, a part of the alternating-current power from the GT generator 19 , the ST generator 39 , and the wind power generation facility 49 may be converted into direct-current power by the AC/DC converter 44 and then charged into the secondary battery 96 via the direct-current power system 45 and the charging and discharging controller 97 . Additionally, in the chargeable state, if the secondary battery 96 is not in the fully charged state, a part of the direct-current power from the solar power generation facility 46 may be charged into the secondary battery 96 via the direct-current power system 45 and the charging and discharging controller 97 .
  • the carbon dioxide capture system 50 absorbs the carbon dioxide contained in the exhaust gas exhausted from the heat recovery system generator 20 into the lean absorbing liquid, and brings about a state in which the exhaust gas from which the carbon dioxide has been removed can be discharged.
  • the carbon dioxide capture system 50 brings about a state in which the carbon dioxide can be separated from the rich absorbing liquid that is an absorbing liquid that has absorbed the carbon dioxide. In this state, when the rich absorbing liquid flows into the regenerator 81 , the carbon dioxide is separated from the rich aqueous solution, and the rich absorbing liquid becomes a lean absorbing liquid.
  • the first heating step Sh 1 is included in the absorbing-liquid regeneration step Sre.
  • the absorbing-liquid regeneration device 80 brings about the first heating state in which the absorbing liquid flows through the first circulation line 86 and the absorbing liquid can be heated by the reboiler 89 .
  • the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92 the first shut-off valve 92 a is open and the second shut-off valve 92 b is closed.
  • the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86 .
  • the absorbing liquid is heated by the steam from the heat recovery system generator 20 in the reboiler 89 .
  • the heated absorbing liquid returns to the inside of the regenerator 81 via the first circulation line 86 and the first shut-off valve 92 a in the open state.
  • the fuel supply to the combustor 13 of the gas turbine 11 is stopped (fuel supply stop step Sfc), and the GT circuit breaker 42 a is opened (GT circuit breaker opening step Stbo).
  • the fuel supply stop step Sfc is executed when the plant control device 100 gives a closing instruction to the fuel regulating valve 17 .
  • the combustion gas is no longer generated in the combustor 13 .
  • the GT circuit breaker opening step Stbo is executed by the plant control device 100 giving an opening instruction to the GT circuit breaker 42 a .
  • the GT circuit breaker closing step Stbc is executed, power is no longer supplied from the GT generator 19 to the external power system 48 .
  • the flow rate of the steam generated by the heat recovery system generator 20 is maintained at the value during the steady operation of the gas turbine 11 for a predetermined time, but decreases gradually. Additionally, when the fuel supply to the combustor 13 is stopped, the temperature and pressure of the steam generated by the heat recovery system generator 20 are also maintained at the values during the steady operation of the gas turbine 11 for a predetermined time, but decrease gradually. For this reason, the steady operation of the steam turbine 31 cannot be performed.
  • the ST circuit breaker 42 b opens at the same time as the fuel supply to the combustor 13 of the gas turbine 11 is stopped or after a predetermined time after the fuel supply is stopped (ST circuit breaker opening step Ssbo).
  • the ST circuit breaker opening step Ssbo is executed by the plant control device 100 giving an opening instruction to the ST circuit breaker 42 b .
  • the ST circuit breaker closing step Ssbc is executed, power is no longer supplied from the ST generator 39 to the external power system 48 .
  • the boiler plant When the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition, the boiler plant is brought into a dischargeable state in which discharge is possible from the secondary battery 96 to the electric heater 91 (dischargeable step Sdch).
  • the charging and discharging controller 97 brings the boiler plant into a dischargeable state when a state signal is received from the plant control device 100 to the effect that the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition. In the dischargeable state, the charging and discharging controller 97 brings the secondary battery 96 and the heater drive circuit 91 b of the electric heater 91 into an electrically connected state.
  • the absorbing-liquid regeneration device 80 is brought into the second heating state in which the absorbing liquid flows through the second circulation line 87 and the absorbing liquid is heated by the heater 90 (second heating step Sh 2 ).
  • the switching controller 93 determines that the steam condition is no longer satisfied and instructs the switcher 92 to bring about the second heating state.
  • the second heating state is brought about in which, in the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92 , the first shut-off valve 92 a is closed and the second shut-off valve 92 b is opened.
  • the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the heater 90 via the second circulation line 87 .
  • the absorbing liquid may be heated by the electric heater 91 in the heater 90 .
  • the heated absorbing liquid returns to the inside of the regenerator container 81 v via the second circulation line 87 and the second shut-off valve 92 b in the open state.
  • the second heating control step Sh 2 c is executed.
  • the second heating controller 95 controls the heating in the heater 90 depending on the absorbing liquid temperature detected by the temperature sensor 94 .
  • a predetermined first temperature for example, 100° C.
  • the second heating controller 95 gives an ON instruction to the heater drive circuit 91 b .
  • a predetermined second temperature for example, 120° C.
  • the heater drive circuit 91 b When an ON instruction is input to the heater drive circuit 91 b , the power discharged from the secondary battery 96 is supplied to the electric heater main body 91 a , the electric heater main body 91 a generates heat, and the absorbing liquid flowing through the second circulation line 87 is heated. Additionally, when an OFF instruction is input to the heater drive circuit 91 b , power is no longer supplied from the secondary battery 96 to the electric heater main body 91 a , and the electric heater main body 91 a no longer generates heat. Thus, in the second heating step Sh 2 , the temperature of the absorbing liquid in the regenerator 81 fluctuates between the first temperature Tab 1 and the second temperature Tab 2 .
  • the temperature of the absorbing liquid in the regenerator 81 is maintained at substantially the first temperature Tab 1 (for example, 100° C.) or higher.
  • the exhaust gas which is the combustion gas exhausted from the gas turbine 11 , flows into the heat recovery system generator 20 .
  • the heat recovery system generator 20 turns water into steam by using the heat of the exhaust gas.
  • the temperature and pressure of the steam increase gradually.
  • the absorbing-liquid regeneration device 80 is brought into the first heating state in which the absorbing liquid flows through the first circulation line 86 and the reboiler 89 heats the absorbing liquid (first heating step Sh 1 ).
  • the switching controller 93 determines that the steam condition is satisfied and instructs the switcher 92 to bring about the first heating state.
  • the first heating state is brought about in which, in the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92 , the first shut-off valve 92 a is opened and the second shut-off valve 92 b is closed.
  • the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86 .
  • the absorbing liquid is heated by the steam from the heat recovery system generator 20 in the reboiler 89 .
  • the heated absorbing liquid returns to the inside of the regenerator container 81 v via the first circulation line 86 and the first shut-off valve 92 a in the open state.
  • the dischargeable step Sdch is switched to the chargeable step Sch from this point of time. Additionally, when the steam generated by the heat recovery system generator 20 satisfies the steam condition and the rotation speed of the steam turbine 31 reaches the rated rotation speed, the ST circuit breaker 42 b is closed (ST circuit breaker closing step Ssbc), and power can be supplied from the ST generator 39 to the external power system 48 .
  • the heat recovery system generator 20 When the heat recovery system generator 20 is started, exhaust gas flows into the carbon dioxide capture system 50 from the heat recovery system generator 20 .
  • the expression “when the heat recovery system generator 20 is started” is from the time when fuel supply to the gas turbine 11 is started, combustion gas is generated, exhaust gas passes through the heat recovery system generator 20 , and the heat recovery system generator 20 starts to generate steam until the steam satisfies the steam condition.
  • the absorption step Sab and the absorbing-liquid regeneration step Sre are executed even at the time of the start-up.
  • the second heating step Sh 2 is executed in the absorbing-liquid regeneration step Sre, and the temperature of the absorbing liquid in the regenerator 81 is maintained at substantially the first temperature Tab 1 (for example, 100° C.) or higher.
  • the temperature of the absorbing liquid in the regenerator 81 is lower than an appropriate temperature (for example, 120° C.) for separating the carbon dioxide from the absorbing liquid. For this reason, in the regenerator 81 , the ability to separate the carbon dioxide from the absorbing liquid decreases.
  • the amount of the carbon dioxide contained in the lean absorbing liquid sent from the regenerator 81 to the absorption tower 71 is larger than that when the steam turbine 31 and the heat recovery system generator 20 are in steady operation. Therefore, at the time of the start-up, the absorption rate of the carbon dioxide in the exhaust gas in the absorber 70 is lower than that when the steam turbine 31 and the heat recovery system generator 20 are in steady operation.
  • the absorber 70 since the absorber 70 absorbs the carbon dioxide in the exhaust gas into the absorbing liquid and executes the regeneration of the absorbing liquid that has absorbed the carbon dioxide even at the time of the start-up, the amount of discharge of the carbon dioxide can be suppressed when the heat recovery system generator 20 is started.
  • the temperature of the absorbing liquid in the regenerator 81 is lower than the appropriate temperature (for example, 120° C.) for separating the carbon dioxide.
  • the temperature of the absorbing liquid in the absorption tower 71 in this case is substantially equal to or higher than the first temperature Tab 1 (for example, 100° C.)
  • the temperature of the absorbing liquid in the absorption tower 71 can be set to the appropriate temperature (for example, 120° C.) for separating the carbon dioxide, within a short time after being switched to the first heating state.
  • the amount of discharge of the carbon dioxide immediately after the absorbing-liquid regeneration device 80 is switched from the second heating state to the first heating state can be suppressed.
  • the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.
  • the absorbing-liquid regeneration device 80 when the absorbing-liquid regeneration device 80 is in the second heating state, the absorbing liquid is not always heated by the heater 90 . Therefore, the consumption of electric energy in the heater 90 can be suppressed.
  • the boiler plant of the present embodiment includes the gas turbine power generation facility 10 including the GT generator 19 and the steam turbine power generation facility 30 including the ST generator 39 , but further includes the carbon dioxide capture system 50 .
  • the carbon dioxide in the exhaust gas exhausted from the boiler plant is little.
  • the discharge of the carbon dioxide when generating the power for charging the secondary battery 96 can be suppressed.
  • the boiler of the present embodiment is the heat recovery system generator 20 that generates steam with the heat of the exhaust gas from the gas turbine 11 .
  • the boiler may be a general boiler having a combustion chamber for combusting fossil fuel.
  • the steam turbine 31 may include a plurality of steam turbines 31 in which the pressures of inflowing steam are different from each other.
  • the GT generator 19 and the ST generator 39 are independent generators.
  • one generator may be connected to the rotors, and the generator may serve as both a generator for the gas turbine 11 and a generator for the steam turbine 31 .
  • the heater 90 of the present embodiment has the electric heater 91 , and the energy for heating the absorbing liquid with the heater 90 is electric energy.
  • the energy for heating the absorbing liquid with the heater 90 may not be the electric energy, and may be, for example, the thermal energy of steam.
  • a boiler or the like that generates steam independently of the heat recovery system generator 20 is required.
  • the temperature of the absorbing liquid in the regenerator 81 is controlled to fluctuate between the first temperature Tab 1 and the second temperature Tab 2 .
  • the temperature of the absorbing liquid in the regenerator 81 may be controlled to be, for example, a third temperature between the first temperature Tab 1 and the second temperature Tab 2 .
  • the first circulation line 86 and the second circulation line 87 in the present embodiment share a part with each other.
  • the first circulation line 86 and the second circulation line 87 may be completely independent of each other.
  • the switching controller 93 and the second heating controller 95 in the present embodiment are present separately from the plant control device 100 .
  • the switching controller 93 and the second heating controller 95 may be incorporated in the plant control device 100 .
  • the chargeable step Sch when the GT generator 19 or the ST generator 39 no longer generates power, the chargeable step Sch ends. However, if another power generation facility in the plant or a power generation facility connected to the external power system 48 is in operation and there is surplus power, the chargeable step Sch may not be ended. That is, in a case where there is surplus power, the chargeable step Sch may be continued.
  • the boiler plant when the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition, the boiler plant is brought into the dischargeable state (dischargeable step Sdch). For this reason, in the present embodiment, the chargeable step Sch and the dischargeable step Sdch are not executed in the same time zone. However, if the secondary battery 96 has a function capable of simultaneously performing charging and discharging, the execution time zone of the chargeable step Sch and the execution time zone of the dischargeable step Sdch may partially overlap each other. In this case, the start timing of the dischargeable step Sdch may coincide with the end timing of the chargeable step Sch in the present embodiment, or may be earlier than the end timing of the chargeable step Sch in the present embodiment.
  • the boiler plant in the above embodiment is grasped as follows, for example.
  • the carbon dioxide capture system 50 has an absorbing-liquid regeneration device 80 that separates the carbon dioxide from an absorbing liquid that has absorbed the carbon dioxide, and an absorber 70 that allows the exhaust gas from the boiler 20 to flow thereinto, absorbs the carbon dioxide in the exhaust gas in the absorbing liquid from the absorbing-liquid regeneration device, and discharges the exhaust gas from which the carbon dioxide has been removed.
  • the absorbing-liquid regeneration device 80 has a regenerator 81 that allows the absorbing liquid, which has absorbed the carbon dioxide in the absorber 70 , to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber 70 , a first circulation line 86 that takes out the absorbing liquid from an inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81 , a second circulation line 87 that takes out the absorbing liquid from the inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81 , a heat exchanger 89 that is provided in the first circulation line 86 to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line 86 and the steam from the boiler 20 , a heater 90 that is provided in the second circulation line 87 to heat the absorbing liquid flowing through the second circulation line 87 ,
  • the absorbing-liquid regeneration device 80 when the steam condition that the temperature of the steam sent from the boiler 20 to the heat exchanger 89 is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied, the absorbing-liquid regeneration device 80 is brought into the first heating state. In the first heating state, the absorbing liquid is heated with the steam from the boiler 20 in the heat exchanger 89 . As the absorbing liquid is heated, the inside of the regenerator 81 becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber 70 .
  • the carbon dioxide in the exhaust gas from the heat recovery system generator 20 is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged.
  • the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
  • the absorbing-liquid regeneration device 80 when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the absorbing-liquid regeneration device 80 is brought into the second heating state. In the second heating state, the absorbing liquid is heated by the heater 90 . As the absorbing liquid is heated, the inside of the regenerator 81 becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber 70 . In the absorber 70 , the carbon dioxide in the exhaust gas from the boiler 20 is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged.
  • the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
  • the temperature of the absorbing liquid in the regenerator 81 is equal to or higher than the predetermined temperature. Therefore, even immediately after the second heating state is switched to the first heating state, the temperature of the absorbing liquid in the regenerator 81 can be raised to a target temperature within a short time. For this reason, in the present aspect, it is possible to reduce the amount of the carbon dioxide contained in the exhaust gas exhausted from the plant even immediately after the second heating state is switched to the first heating state.
  • the first heating state when the steam sent from the boiler 20 to the heat exchanger 89 satisfies the steam condition, the first heating state can be automatically brought about. Additionally, in the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the second heating state can be automatically brought about.
  • the absorbing liquid is not always heated by the heater 90 . Therefore, the consumption of thermal energy in the heater 90 can be suppressed.
  • the heater 90 has an electric heater 91 that generates heat by supplying power from the secondary battery 96 .
  • the electric heater 91 can be heated with the power charged in the secondary battery 96 .
  • the power generation facility when the power generation facility is generating power, if the secondary battery 96 is not in a fully charged state, the power from the power generation facility can be charged in the secondary battery 96 . Additionally, in the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the electric heater 91 can be heated with the power charged in the secondary battery 96 .
  • the power generation facility includes the generator 39 .
  • the power from the generator 39 can be charged in the secondary battery 96 .
  • the discharge of the carbon dioxide when generating the power for charging the secondary battery 96 can be suppressed.
  • the boiler 20 is a heat recovery system generator that generates steam with heat of the combustion gas exhausted from the gas turbine 11 .
  • a carbon dioxide removal method in a ninth aspect executes an absorbing-liquid regeneration step Sre in which carbon dioxide is separable from an absorbing liquid that has absorbed the carbon dioxide, and an absorption step Sab in which an exhaust gas from a boiler 20 flows in, the carbon dioxide in the exhaust gas is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step Sre, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged.
  • the absorbing-liquid regeneration step Sre is executed by an absorbing-liquid regeneration device 80 .
  • the absorbing-liquid regeneration device 80 has a regenerator 81 that allows the absorbing liquid, which has absorbed the carbon dioxide through an execution of the absorption step Sab, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and causes the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step Sab, a first circulation line 86 that takes out the absorbing liquid from an inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81 , a second circulation line 87 that takes out the absorbing liquid from the inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81 , a heat exchanger 89 that is provided in the first circulation line 86 to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line 86 and steam from the boiler 20 , and
  • the absorbing-liquid regeneration step Sre includes a first heating step Sh 1 in which the absorbing liquid flows through the first circulation line 86 such that the absorbing liquid is heatable by the heat exchanger 89 , and a second heating step Sh 2 in which the absorbing liquid flows through the second circulation line 87 such that the absorbing liquid is heatable by the heater 90 .
  • the absorbing-liquid regeneration step Sre includes a chargeable step Sch in which the secondary battery 96 is chargeable and a dischargeable step Sdch in which the secondary battery 96 is dischargeable to the electric heater 91 .
  • the secondary battery 96 and the electric heater 91 are electrically connected to each other such that power is dischargeable from the secondary battery 96 to the electric heater 91 when the steam condition is not satisfied.
  • the carbon-free power generation facility is a facility that discharges carbon dioxide having a concentration lower than the carbon dioxide concentration in the exhaust gas from a facility that generates power by using the combustion gas generated through the combustion of the fossil fuel, or a facility that does not discharge the carbon dioxide during power generation.
  • the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Treating Waste Gases (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Chimneys And Flues (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

A boiler plant includes a carbon dioxide capture system. The carbon dioxide capture system has an absorbing-liquid regeneration device and an absorber. The absorbing-liquid regeneration device includes a regenerator, a first circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, and a second circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, a heat exchanger, a heater, and a switcher. The heat exchanger heats the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and steam from the boiler. The heater heats the absorbing liquid flowing in the second circulation line. The switcher switches between a first heating state, in which the absorbing liquid flows in the first circulation line, and a second heating state, in which the absorbing liquid flows in the second circulation line.

Description

TECHNICAL FIELD
The present invention relates to a boiler plant including a boiler and a carbon dioxide capture system for removing carbon dioxide contained in an exhaust gas from the boiler, and a carbon dioxide removal method for removing the carbon dioxide contained in the exhaust gas.
Priority is claimed on Japanese Patent Application No. 2019-238846 filed on Dec. 27, 2019, the content of which is incorporated herein by reference.
BACKGROUND ART
An exhaust gas containing carbon dioxide is discharged from a boiler that generates steam with the heat of a combustion gas generated through the combustion of fossil fuel. From the viewpoint of environmental protection, a technique for removing the carbon dioxide from the exhaust gas as much as possible is required. As such a technique, for example, the plant described in Japanese Unexamined Patent Application Publication No. 2015-104693 (hereinafter JP '693) is known.
The plant described in JP '693 has an absorber that absorbs carbon dioxide in an exhaust gas into an absorbing liquid and discharges the exhaust gas from which the carbon dioxide has been removed, and an absorbing-liquid regeneration device that separates the carbon dioxide from the absorbing liquid that has absorbed the carbon dioxide. The absorbing-liquid regeneration device includes a regenerator, a circulation line, and a heat exchanger (or reboiler). The regenerator allows the absorbing liquid, which has absorbed the carbon dioxide from the absorber, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to exhaust the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber. The circulation line is a line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator. The heat exchanger (or reboiler) is provided in the circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the circulation line and the steam. The plant further has a heat amount regulating unit that regulates the amount of heat input to the heat exchanger (or reboiler). The heat amount regulating unit specifically regulates the flow rate of the steam that is a target for heat exchange with the absorbing liquid.
The steam generated in the boiler may be used as the target for heat exchange with the absorbing liquid in the heat exchanger (or reboiler). In this case, if there is no the steam supply from the boiler, the absorbing liquid cannot be heated by the heat exchanger, and the temperature of the absorbing liquid in the regenerator and the heat exchanger cannot be raised. In a case where the temperature of the absorbing liquid in the regenerator and the heat exchanger is low, the carbon dioxide is not separated from the absorbing liquid in the regenerator, and the absorbing liquid is not regenerated. As a result, the carbon dioxide contained in the exhaust gas from the boiler cannot be removed unless the steam is supplied from the boiler.
In a general boiler, when fuel starts to be charged into the boiler, an exhaust gas containing carbon dioxide starts to be exhausted immediately from the boiler, while steam equal to or higher than a predetermined temperature and equal to or higher than a predetermined pressure is not generated immediately. Additionally, in a heat recovery system generator that generates steam by using the heat of the exhaust gas from a gas turbine, when the fuel starts to be charged into the gas turbine, the exhaust gas containing carbon dioxide starts to be exhausted immediately from the heat recovery system generator, while the steam equal to or higher than a predetermined temperature and equal to or higher than a predetermined pressure is not generated immediately. That is, in both a general boiler and a heat recovery system generator, there is a time lag between the start of exhaust of the exhaust gas and the start of generation of the steam equal to or higher than a predetermined temperature and equal to or higher than a predetermined pressure. For this reason, the absorbing liquid cannot be sufficiently heated by the heat exchanger for a predetermined time after the combustion gas starts to be exhausted from the boiler, and the carbon dioxide contained in the exhaust gas from the boiler cannot be removed.
Thus, an object of the present invention is to provide a boiler plant capable of reducing carbon dioxide in an exhaust gas exhausted from the plant even in the process of starting the boiler, and a carbon dioxide removal method.
Solution to Problem
A boiler plant as one aspect according to the invention for achieving the above object includes a boiler that generates steam with heat of a combustion gas generated through combustion of a fossil fuel, and a carbon dioxide capture system that removes carbon dioxide contained in an exhaust gas exhausted from the boiler.
The carbon dioxide capture system includes an absorbing-liquid regeneration device that separates the carbon dioxide from an absorbing liquid that has absorbed the carbon dioxide, and an absorber that allows the exhaust gas from the boiler to flow thereinto, absorbs the carbon dioxide in the exhaust gas in the absorbing liquid from the absorbing-liquid regeneration device, and discharges the exhaust gas from which the carbon dioxide has been removed. The absorbing-liquid regeneration device includes a regenerator that allows the absorbing liquid, which has absorbed the carbon dioxide in the absorber, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber, a first circulation line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a second circulation line that takes out the absorbing liquid from the inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a heat exchanger that is provided in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and the steam from the boiler, a heater that is provided in the second circulation line to heat the absorbing liquid flowing through the second circulation line, and a switcher that switches between a first heating state in which the absorbing liquid flows through the first circulation line and a second heating state in which the absorbing liquid flows through the second circulation line.
In the present aspect, when the steam condition that the temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied, the absorbing-liquid regeneration device is brought into the first heating state. In the first heating state, the absorbing liquid is heated with the steam from the boiler in the heat exchanger. As the absorbing liquid is heated, the inside of the regenerator becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber. In the absorber, the carbon dioxide in the exhaust gas from the boiler is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. Thus, in the present aspect, when the steam from the boiler satisfies the steam condition, the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
In the present aspect, the absorbing-liquid regeneration device is brought into the second heating state when the steam sent from the boiler to the heat exchanger does not satisfy the steam condition (the temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure), for example, in the process of stopping or starting the boiler. In the second heating state, the absorbing liquid is heated by the heater. As the absorbing liquid is heated, the inside of the regenerator becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber. In the absorber, the carbon dioxide in the exhaust gas from the boiler is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. Additionally, in the present aspect, even when the second heating state is switched to the first heating state, the temperature of the absorbing liquid in the regenerator is equal to or higher than the predetermined temperature, so that the second heating state is switched to the first heating state. Even immediately after that, the temperature of the absorbing liquid in the regenerator can be raised to the target temperature in a short time, and the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
A carbon dioxide removal method as one aspect according to the invention for achieving the above object includes an absorbing-liquid regeneration step in which carbon dioxide is separable from an absorbing liquid that has absorbed the carbon dioxide, and an absorption step in which the exhaust gas from the boiler flows in, the carbon dioxide in the exhaust gas is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged.
The absorbing-liquid regeneration step is executed by the absorbing-liquid regeneration device. The absorbing-liquid regeneration device includes a regenerator that allows the absorbing liquid, which has absorbed the carbon dioxide through the execution of the absorption step, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and causes the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step, a first circulation line that takes out the absorbing liquid from an inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a second circulation line that takes out the absorbing liquid from the inside of the regenerator and then returns the taken-out absorbing liquid to the inside of the regenerator, a heat exchanger that is provided in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and the steam from the boiler, and a heater that is provided in the second circulation line to heat the absorbing liquid flowing through the second circulation line. The absorbing-liquid regeneration step includes a first heating step in which the absorbing liquid flows through the first circulation line such that the absorbing liquid is heatable by the heat exchanger, and a second heating step in which the absorbing liquid flows through the second circulation line such that the absorbing liquid is heatable by the heater.
Advantageous Effects of Invention
According to one aspect of the present invention, the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.
BRIEF DESCRIPTION OF DRAWINGS
FIG. 1 is a system diagram of a boiler plant according to an embodiment of the present invention.
FIG. 2 is a system diagram of a carbon dioxide capture system according to the embodiment of the present invention.
FIG. 3 is a timing chart showing the execution timings of a plurality of steps executed by the boiler plant according to the embodiment of the present invention.
DESCRIPTION OF EMBODIMENTS
Hereinafter, an embodiment and a modification example of the boiler plant according to the present invention will be described below with reference to the drawings.
Embodiment
A boiler plant of the present embodiment will be described with reference to FIGS. 1 to 3 .
As shown in FIG. 1 , the boiler plant of the present embodiment includes gas turbine equipment 10, a heat recovery system generator 20, steam turbine equipment 30, a power system facility 40, a carbon dioxide capture system 50, and a plant control device 100.
The gas turbine equipment 10 includes a gas turbine 11, a fuel line 16 that guides fuel (fossil fuel) F to the gas turbine 11, a fuel regulating valve 17 that regulates the flow rate of the fuel F flowing through the fuel line 16, and a GT generator 19 that generates power by driving the gas turbine 11. Since the gas turbine equipment 10 includes the GT generator 19 as described above, the gas turbine equipment is also a gas turbine power generation facility.
The gas turbine 11 includes an air compressor 12 that compresses air A to generate compressed air, a combustor 13 that combusts the fuel F in the compressed air to generate combustion gas, and a turbine 14 driven with the combustion gas. The air compressor 12 has a compressor rotor, and a compressor casing that covers the compressor rotor. The turbine 14 has a turbine rotor, and a turbine casing that covers the turbine rotor. The compressor rotor and the turbine rotor are coupled to each other to form a gas turbine rotor 15. The fuel line 16 is connected to the combustor 13. The fuel line 16 is provided with the fuel regulating valve 17.
The heat recovery system generator 20 heats water with the heat of exhaust gas from the gas turbine 11 and turns the water into steam.
The steam turbine equipment 30 includes a steam turbine 31 driven with the steam generated by the heat recovery system generator 20, a main steam line 32 that guides the steam generated by the heat recovery system generator 20 to the steam turbine 31, a steam regulating valve 33 that regulates the flow rate of the steam flowing into the steam turbine 31 from the main steam line 32, a temperature sensor 34 that detects the temperature of the steam flowing through the main steam line 32, a pressure sensor 35 that detects the pressure of the steam flowing through the main steam line 32, a condenser 36 that returns the steam exhausted from the steam turbine 31 to water, a supply water line 37 that guides the water in the condenser 36 to the heat recovery system generator 20, and an ST generator 39 that generates power by driving the steam turbine 31. As described above, since the steam turbine equipment 30 includes the ST generator 39, the steam turbine equipment 30 is also a steam turbine power generation facility.
The power system facility 40 includes a GT power system 41 a that electrically connects the GT generator 19 to an external power system 48, a GT circuit breaker 42 a provided in the GT power system 41 a, a GT transformer 43 a provided in the GT power system 41 a, an ST power system 41 b that electrically connects the ST generator 39 to the external power system 48, an ST circuit breaker 42 b provided in the ST power system 41 b, an ST transformer 43 b provided in the ST power system 41 b, an AC/DC converter 44 that converts alternating-current power flowing through the GT power system 41 a and the ST power system 41 b into direct-current power, a direct-current power system 45 connected to the AC/DC converter 44, and a solar power generation facility 46 connected to the direct-current power system 45. The solar power generation facility 46 includes a plurality of solar cells.
Additionally, a plurality of power generation facilities are electrically connected to the external power system 48. One power generation facility of the plurality of power generation facilities is a wind power generation facility 49. The wind power generation facility 49 includes a windmill. Both the solar power generation facility 46 and the wind power generation facility 49 are carbon-free power generation facilities. The carbon-free power generation facility is a facility that generates power by using the combustion gas generated through the combustion of the fossil fuel, for example, a facility that discharges carbon dioxide having a concentration lower than the carbon dioxide concentration in the exhaust gas from the gas turbine power generation facility 10 of the present embodiment or a facility that does not discharge the carbon dioxide during power generation. Additionally, the solar power generation facility 46 and the wind power generation facility 49 are both facilities that generate power by using renewable energy.
The plant control device 100 controls the opening and closing of the fuel regulating valve 17 and the steam regulating valve 33.
The carbon dioxide capture system 50 includes a gas booster 51, an exhaust gas cooling device 60, an absorber 70, an absorbing-liquid regeneration device 80, and an exhaust gas recirculation line 52.
As shown in FIG. 2 , the gas booster 51 boosts the pressure of the exhaust gas from the heat recovery system generator 20 to send the boosted exhaust gas to the exhaust gas cooling device 60. The exhaust gas cooling device 60 cools the exhaust gas from the gas booster 51. The exhaust gas cooling device 60 includes a cooling tower 61, a water circulation line 62, a water circulation pump 63, a water cooler 64, and a low-temperature exhaust gas line 65.
The cooling tower 61 has a cooling tower container 61 v and a filling material 61 p disposed in an intermediate portion in the vertical direction in the cooling tower container 61 v. The exhaust gas from the gas booster 51 is supplied to a position below a filling material 61 p in the cooling tower container 61 v. One end of the water circulation line 62 is connected to a lower end of the cooling tower container 61 v, and the other end of the water circulation line 62 is connected to a position above the filling material 61 p in the cooling tower container 61 v. The water circulation pump 63 and the water cooler 64 are provided in the water circulation line 62. The water reserved at a bottom portion of the cooling tower container 61 v flows into the water circulation pump 63 via the water circulation line 62. The water circulation pump 63 boosts the pressure of the water to send the boosted water to an upper portion in the cooling tower container 61 v via the water circulation line 62. As a result, the water is sprayed into an upper space in the cooling tower container 61 v. The water cooler 64 is a heat exchanger that cools the water by exchanging heat between the water flowing through the water circulation line 62 and a cooling medium. As the cooling medium, for example, cooling water is used. One end of the low-temperature exhaust gas line 65 is connected to an upper end of the cooling tower container 61 v.
One end of the exhaust gas recirculation line 52 is connected to the low-temperature exhaust gas line 65. Additionally, the other end of the exhaust gas recirculation line 52 is connected to a suction port of the air compressor 12 in the gas turbine equipment 10. In addition, the aforementioned gas booster 51 may be provided in the low-temperature exhaust gas line 65.
The absorber 70 absorbs the carbon dioxide contained in the exhaust gas from the exhaust gas cooling device 60 into an absorbing liquid, and discharges the exhaust gas from which the carbon dioxide has been removed. The absorber 70 includes an absorption tower 71, an exhaust line 72, a lean absorbing-liquid line 73, a lean-rich heat exchanger 74, a lean absorbing-liquid pump 75, a lean absorbing-liquid cooler 76, a lean absorbing-liquid regulating valve 77, a rinse water circulation line 78, a rinse water circulation pump 79 p, and a rinse water cooler 79 r.
The absorption tower 71 has an absorption tower container 71 v, a lower filling material 71 pa, an upper filling material 71 pb, a lower demister 71 da, an upper demister 71 db, and a tray 71 t. The lower filling material 71 pa, the upper filling material 71 pb, the lower demister 71 da, the upper demister 71 db, and the tray 71 t are all disposed in the absorption tower container 71 v. The lower filling material 71 pa is disposed at a distance downward with respect to the upper filling material 71 pb. The lower demister 71 da is disposed in the vertical direction between the lower filling material 71 pa and the upper filling material 71 pb. The upper demister 71 db is disposed above the upper filling material 71 pb. Both the lower demister 71 da and the upper demister 71 db capture the moisture contained in the gas rising from the bottom to the top and suppress the rise of the moisture above themselves. The tray 71 t is disposed in the vertical direction between the lower demister 71 da and the upper filling material 71 pb. The tray 71 t is formed with a plurality of through-holes penetrating in the vertical direction and a water reservoir portion 71 s in which the rinse water is reserved.
The other end of the aforementioned low-temperature exhaust gas line 65 is connected to a position below the lower filling material 71 pa in the absorption tower container 71 v. The exhaust line 72 is connected to an upper end of the absorption tower container 71 v. The exhaust gas that has passed through the absorption tower container 71 v flows through the exhaust line 72. The exhaust gas is exhausted to the outside of the plant via a chimney or the like.
One end of the rinse water circulation line 78 is connected to the water reservoir portion 71 s in the absorption tower container 71 v, and the other end of the rinse water circulation line 78 is connected to a position above the upper filling material 71 pb and below the upper demister 71 db, in the absorption tower container 71 v. Both the rinse water circulation pump 79 p and the rinse water cooler 79 r are provided in the rinse water circulation line 78. The rinse water circulation pump 79 p boosts the pressure of the rinse water flowing into the rinse water circulation line 78. The rinse water cooler 79 r cools the rinse water that has flowed into the rinse water circulation line 78.
A lean absorbing liquid flows through the lean absorbing-liquid line 73. The lean absorbing liquid is an absorbing liquid that absorbs a small amount of carbon dioxide. Additionally, the rich absorbing liquid is an absorbing liquid that absorbs a large amount of carbon dioxide. The absorbing liquid is an amine-based absorbing liquid. Specifically, as the absorbing liquid, for example, alkanolamines such as monoethanolamine, diethanolamine, triethanolamine, methyldiethanolamine, diisopropanolamine, and diglycolamine can be adopted. Additionally, hindered amines can also be adopted. Additionally, each of these single aqueous solutions or mixed aqueous solutions of two or more of these can also be adopted. One end of the lean absorbing-liquid line 73 is connected to a position above the lower filling material 71 pa and below the lower demister 71 da, in the absorption tower container 71 v. For this reason, the lean absorbing liquid that has flowed through the lean absorbing-liquid line 73 is sprayed in an intermediate space between the lower filling material 71 pa and the lower demister 71 da in the absorption tower container 71 v.
The lean-rich heat exchanger 74, the lean absorbing-liquid pump 75, the lean absorbing-liquid cooler 76, and the lean absorbing-liquid regulating valve 77 are all provided in the lean absorbing-liquid line 73. The lean-rich heat exchanger 74 heats the rich absorbing liquid while cooling the lean absorbing liquid by exchanging heat between the lean absorbing liquid and the rich absorbing liquid. The lean absorbing-liquid pump 75 boosts the pressure of the lean absorbing liquid flowing through the lean absorbing-liquid line 73. The lean absorbing-liquid cooler 76 is a heat exchanger that cools the lean absorbing liquid by exchanging heat between the lean absorbing liquid boosted by the lean absorbing-liquid pump 75 and the cooling medium. As the cooling medium, for example, cooling water is used. The lean absorbing-liquid regulating valve 77 regulates the flow rate of the lean absorbing liquid.
The absorbing-liquid regeneration device 80 separates the carbon dioxide from the absorbing liquid that has absorbed the carbon dioxide from the absorber 70, that is, the rich absorbing liquid. The absorbing-liquid regeneration device 80 has a regenerator 81, a carbon dioxide recovery line 82, a cooler 82 r, a moisture separation tank 82 t, a carbon dioxide compressor 82 c, a water pump 82 p, a moisture recovery line 82 w, a rich absorbing-liquid line 83, a rich absorbing-liquid pump 84, a rich absorbing-liquid regulating valve 85, a first circulation line 86, a second circulation line 87, a reboiler (heat exchanger) 89, a heater 90, a switcher 92, a switching controller 93, a temperature sensor 94, a second heating controller 95, a secondary battery 96, a charging and discharging controller 97, and a discharge system 98.
The regenerator 81 has a regenerator container 81 v, a filling material 81 p disposed at an intermediate portion in the vertical direction in the regenerator container 81 v, and a tray 81 t disposed under the filling material 81 p in the regenerator container 81 v. The tray 81 t is formed with a plurality of through-holes penetrating in the vertical direction and a liquid reservoir portion 81 s in which the absorbing liquid is reserved. The other end of the aforementioned lean absorbing-liquid line 73 is connected to a lower end of the regenerator container 81 v.
The carbon dioxide recovery line 82 is connected to an upper end of the regenerator container 81 v. A gas containing carbon dioxide flowing out of the regenerator container 81 v flows through the carbon dioxide recovery line 82. The cooler 82 r, the moisture separation tank 82 t, and the carbon dioxide compressor 82 c are provided in the carbon dioxide recovery line 82. The cooler 82 r cools the gas containing carbon dioxide flowing out from the regenerator container 81 v. The moisture separation tank 82 t separates the moisture contained in this gas. The carbon dioxide compressor 82 c compresses the gas from which most of the moisture has been removed. One end of the moisture recovery line 82 w is connected to a lower end of the moisture separation tank 82 t. The other end of the moisture recovery line 82 w is connected to a position above the filling material 81 p in the regenerator container 81 v. For this reason, the water reserved in the moisture separation tank 82 t is sprayed into an upper space in the regenerator container 81 v. The water pump 82 p is provided on the moisture recovery line 82 w. The gas compressed by the carbon dioxide compressor 82 c is sent to, for example, a carbon dioxide liquefaction facility where the gas is liquefied.
One end of the rich absorbing-liquid line 83 is connected to a lower end of the aforementioned absorption tower container 71 v, and the other end of the rich absorbing-liquid line 83 is connected to a position above the filling material 81 p in the regenerator container 81 v and below a connection position of the moisture recovery line 82 w with respect to the regenerator container 81 v. For this reason, the rich absorbing liquid from the rich absorbing-liquid line 83 is sprayed into the upper space in the regenerator container 81 v. The rich absorbing-liquid pump 84 and the rich absorbing-liquid regulating valve 85 are provided in the rich absorbing-liquid line 83. The rich absorbing-liquid pump 84 boosts the pressure of the rich absorbing liquid flowing through the rich absorbing-liquid line 83. The rich absorbing-liquid regulating valve 85 regulates the flow rate of the rich absorbing liquid. Additionally, the aforementioned lean-rich heat exchanger 74 is provided in the rich absorbing-liquid line 83. Thus, the lean-rich heat exchanger 74 exchanges heat between the lean absorbing liquid flowing through the lean absorbing-liquid line 73 and the rich absorbing liquid flowing through the rich absorbing-liquid line 83.
One end of the first circulation line 86 is connected to the liquid reservoir portion 81 s in the regenerator container 81 v, and the other end of the first circulation line 86 is connected to a position below the liquid reservoir portion 81 s in the regenerator container 81 v. The first circulation line 86 has an inflow-side sharing portion 86 a including the aforementioned one end, an outflow-side sharing portion 86 b including the aforementioned other end, and an intermediate portion 86 c between the inflow-side sharing portion 86 a and the outflow-side sharing portion 86 b. A reboiler (heat exchanger) 89 is provided in the intermediate portion 86 c in the first circulation line 86. A heating steam line 38 (refer to FIG. 1 ) branching from the main steam line 32 of the steam turbine equipment 30 is connected to the reboiler 89. The reboiler 89 heats the absorbing liquid by exchanging heat between the absorbing liquid flowing through the intermediate portion 86 c and the steam from the heating steam line 38.
The second circulation line 87 has an inflow-side sharing portion 86 a of the first circulation line 86, an outflow-side sharing portion 86 b of the first circulation line 86, and an intermediate portion 87 c between the inflow-side sharing portion 86 a and the outflow-side sharing portion 86 b. That is, the first circulation line 86 and the second circulation line 87 share an inflow-side portion and an outflow-side portion with each other. The intermediate portion 87 c of the second circulation line 87 is independent of the intermediate portion 86 c of the first circulation line 86. The heater 90 is provided in the intermediate portion 87 c of the second circulation line 87. The heater 90 has a heating container 90 v into which the absorbing liquid flowing through the intermediate portion 87 c of the second circulation line 87 flows, and an electric heater 91 that heats the absorbing liquid in the heating container 90 v. The electric heater 91 has an electric heater main body 91 a that is a heat generating body, and a heater drive circuit 91 b that supplies power to the electric heater main body 91 a.
The switcher 92 has a first shut-off valve 92 a provided in the intermediate portion 86 c of the first circulation line 86 and a second shut-off valve 92 b provided in the intermediate portion 87 c of the second circulation line 87.
The switching controller 93 controls the opening and closing of the first shut-off valve 92 a and the second shut-off valve 92 b depending on the steam temperature detected by the temperature sensor 34 of the steam turbine equipment 30 and the steam pressure detected by the pressure sensor 35 of the steam turbine equipment 30. As the switching controller 93 controls the opening and closing of the first shut-off valve 92 a and the second shut-off valve 92 b, it is possible to realize a first heating state in which the absorbing liquid is allowed to flow through the first circulation line 86 and the absorbing liquid can be heated by the reboiler 89 and a second heating state in which the absorbing liquid is allowed to flow through the second circulation line 87 and the absorbing liquid can be heated by the heater 90. The switching controller 93 instructs the switcher 92 to bring about the first heating state when the steam condition that the temperature of the steam sent from the heat recovery system generator 20 to the reboiler 89 is equal to or higher than a predetermined temperature Ts and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied. Additionally, the switching controller 93 instructs the switcher 92 to bring about the second heating state when the steam sent from the heat recovery system generator 20 to the reboiler 89 does not satisfy the steam condition. In a case where the first heating state is realized, the switching controller 93 gives an opening instruction to the first shut-off valve 92 a and gives a closing instruction to the second shut-off valve 92 b. Additionally, in a case where the second heating state is realized, the switching controller 93 gives a closing instruction to the first shut-off valve 92 a and gives an opening instruction to the second shut-off valve 92 b. In addition, here, the switcher 92 is constituted by the first shut-off valve 92 a and the second shut-off valve 92 b, but the switcher 92 can also be constituted by one three-way valve. In this case, the three-way valve is provided at a connection portion between the intermediate portion 86 c of the first circulation line 86 and the intermediate portion 87 c of the second circulation line 87.
The temperature sensor 94 is provided at a bottom portion of the regenerator container 81 v. The temperature sensor 94 detects the temperature of the absorbing liquid reserved at a bottom portion in the regenerator container 81 v.
The second heating controller 95 controls the heating in the heater 90 depending on the absorbing liquid temperature detected by the temperature sensor 94. Specifically, an ON instruction or an OFF instruction is given to the heater drive circuit 91 b depending on the absorbing liquid temperature.
The discharge system 98 electrically connects the heater drive circuit 91 b to the charging and discharging controller 97. The direct-current power system 45 and the secondary battery 96 are further electrically connected to the charging and discharging controller 97. The charging and discharging controller 97 charges the secondary battery 96 with the direct-current power from the direct-current power system 45 or discharges power from the secondary battery 96 depending on a state signal from the plant control device 100.
Next, the operation of the boiler plant described above will be described.
First, the operation of the boiler plant when the gas turbine 11, the steam turbine 31, and the heat recovery system generator 20 are in steady operation will be described.
When the gas turbine 11 is in steady operation, the gas turbine rotor 15 is rotating at a rated rotation speed. In this case, the air compressor 12 compresses the air to generate compressed air. The compressed air flows into the combustor 13. The fuel F is supplied to the combustor 13. The combustor 13 combusts the fuel F in the compressed air to generate a combustion gas. The turbine 14 is driven by the combustion gas. By driving the turbine 14, the GT generator 19 generates power. The power generated by the GT generator 19 is supplied to the external power system 48 via the GT circuit breaker 42 a and the GT transformer 43 a in the closed state.
The exhaust gas exhausted from the gas turbine 11 flows into the heat recovery system generator 20. The heat recovery system generator 20 generates steam by using the heat of the exhaust gas. When the heat recovery system generator 20 is in steady operation, steam at a predetermined temperature or higher and a predetermined pressure or higher is generated in a predetermined amount or higher.
When the steam turbine 31 is in steady operation, the steam turbine rotor is rotating at a rated rotation speed. The ST generator 39 generates power by rotating the steam turbine rotor. The power generated by the ST generator 39 is supplied to the external power system 48 via the ST circuit breaker 42 b and the ST transformer 43 b in the closed state.
The exhaust gas exhausted from the heat recovery system generator 20 flows into the carbon dioxide capture system 50. The exhaust gas boosted by the gas booster 51 flows into the cooling tower 61 of the exhaust gas cooling device 60 in the carbon dioxide capture system 50. In the cooling tower 61, the exhaust gas is cooled to, for example, about 40° C. A part of the exhaust gas cooled in the cooling tower 61 flows into a lower space in the absorption tower container 71 v via the low-temperature exhaust gas line 65. In this way, the reason why the exhaust gas is cooled is that the carbon dioxide is easily absorbed by the absorbing liquid. Additionally, the other part of the exhaust gas cooled in the cooling tower 61 flows into the air compressor 12 of the gas turbine 11 via the low-temperature exhaust gas line 65 and the exhaust gas recirculation line 52. Thus, the air compressor 12 compresses not only the outside air but also the exhaust gas cooled in the cooling tower 61. The exhaust gas flows into the heat recovery system generator 20 again via the combustor 13 and the turbine 14. For this reason, the carbon dioxide concentration in the exhaust gas exhausted from the heat recovery system generator 20, in other words, the exhaust gas flowing into the carbon dioxide capture system 50 becomes high.
As described above, the carbon dioxide capture system 50 removes carbon dioxide from the exhaust gas having a high carbon dioxide concentration. For this reason, in the present embodiment, the carbon dioxide removal efficiency in the carbon dioxide capture system 50 can be enhanced.
The exhaust gas that has flowed into the lower space in the absorption tower container 71 v rises in the absorption tower container 71 v. Additionally, in the intermediate space between the lower filling material 71 pa and the lower demister 71 da in the absorption tower container 71 v, for example, a lean absorbing liquid at 40° C. is sprayed from the lean absorbing-liquid line 73. The lean absorbing liquid descends in the absorption tower container 71 v. In the descending process, the lean absorbing liquid comes into contact with the exhaust gas and absorbs the carbon dioxide in the exhaust gas. The lean absorbing liquid becomes a rich absorbing liquid by absorbing the carbon dioxide and is temporarily reserved at a bottom portion in the absorption tower container 71 v. Meanwhile, the exhaust gas from which the carbon dioxide has been removed by the contact with the lean absorbing liquid rises and passes through the lower demister 71 da. The moisture contained in the exhaust gas is removed in the process of passing through the lower demister 71 da. The exhaust gas passes through the through-holes of the tray 71 t and further rises. The water reserved in the water reservoir portion 71 s of the tray 71 t is boosted and cooled via the rinse water circulation pump 79 p and the rinse water cooler 79 r, and then enters a space above the upper filling material 71 pb in the absorption tower container 71 v and is sprayed as rinse water. The exhaust gas that has passed through the tray 71 t comes into contact with the rinse water and is cooled in the process of passing through the upper filling material 71 pb. A part of the rinse water is reserved in the water reservoir portion 71 s of the tray 71 t. Additionally, the rest of the rinse water passes through the tray 71 t and is temporarily reserved as a part of the lean absorbing liquid at the bottom portion in the absorption tower container 71 v. The exhaust gas cooled with the rinse water passes through the upper demister 71 db. The moisture contained in the exhaust gas is removed in the process of passing through the upper demister 71 db. The exhaust gas from which the carbon dioxide and the moisture have been removed is exhausted to the outside of the plant via the exhaust line 72.
The rich absorbing liquid reserved at the bottom portion in the absorption tower container 71 v flows into the rich absorbing-liquid line 83. The rich absorbing liquid is boosted by the rich absorbing-liquid pump 84 in the process of flowing through the rich absorbing-liquid line 83, and then heated by heat exchange with the lean absorbing liquid in the lean-rich heat exchanger 74. The heated rich absorbing liquid is sprayed into the upper space in the regenerator container 81 v via the rich absorbing-liquid regulating valve 85.
The rich absorbing liquid sprayed into the upper space in the regenerator container 81 v is heated in contact with the steam in the regenerator container 81 v, and the carbon dioxide in the rich absorbing liquid is separated. The carbon dioxide is sent to, for example, the carbon dioxide liquefaction facility via the carbon dioxide recovery line 82. The rich absorbing liquid becomes a lean absorbing liquid as the carbon dioxide is separated. A part of the lean absorbing liquid is reserved in the liquid reservoir portion 81 s of the tray 81 t. Additionally, the rest of the lean absorbing liquid is temporarily reserved at the bottom portion in the regenerator container 81 v through the through-hole of the tray 81 t.
The lean absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86. A part of the steam generated in the heat recovery system generator 20 flows into the reboiler 89 via the heating steam line 38. In the reboiler 89, the lean absorbing liquid is heated to, for example, 120° C. by heat exchange between the lean absorbing liquid and the steam. The lean absorbing liquid heated by the reboiler 89 flows into the regenerator container 81 v via the first shut-off valve 92 a in the open state. A part of the lean absorbing liquid becomes the steam in the regenerator container 81 v and rises in the regenerator container 81 v. Additionally, the rest of the lean absorbing liquid descends in the regenerator container 81 v and is temporarily reserved at the bottom portion of the regenerator container 81 v.
The lean absorbing liquid reserved at the bottom portion in the regenerator container 81 v flows into the lean absorbing-liquid line 73. The lean absorbing liquid is cooled by heat exchange with the rich absorbing liquid in the lean-rich heat exchanger 74 in the process of flowing through the lean absorbing-liquid line 73, and then boosted by the lean absorbing-liquid pump 75. After that, the lean absorbing liquid is cooled to, for example, the aforementioned 40° C. by the lean absorbing-liquid cooler 76, and then sprayed into an upper space in the absorption tower container 71 v via the lean absorbing-liquid regulating valve 77.
As shown in FIG. 3 , when the gas turbine 11, the steam turbine 31, and the heat recovery system generator 20 described above are in steady operation, a fuel supply step Sfs, a GT circuit breaker closing step Stbc, an ST circuit breaker closing step Ssbc, a chargeable step Sch, the absorption step Sab, an absorbing-liquid regeneration step Sre, and a first heating step Sh1 are executed.
In the fuel supply step Sfs, fuel is supplied to the combustor 13 of the gas turbine 11. For this reason, during the fuel supply step Sfs, combustion gas is generated, and the combustion gas flows into the carbon dioxide capture system 50 as the exhaust gas via the heat recovery system generator 20. In the GT circuit breaker closing step Stbc, the GT circuit breaker 42 a is closed, the GT generator 19 generates power, and the power in this case is supplied to the external power system 48. In the ST circuit breaker closing step Ssbc, the ST circuit breaker 42 b is closed, the ST generator 39 generates power, and the power in this case is supplied to the external power system 48. In the chargeable step Sch, the direct-current power system 45 and the secondary battery 96 are brought into an electrically connected state via the charging and discharging controller 97. For this reason, a chargeable state is brought about in which a part of the power from the GT generator 19, the ST generator 39, the solar power generation facility 46, and the wind power generation facility 49 electrically connected to the direct-current power system 45 is chargeable into the secondary battery 96 via the charging and discharging controller 97. In the chargeable state, if the secondary battery 96 is not in a fully charged state, a part of the alternating-current power from the GT generator 19, the ST generator 39, and the wind power generation facility 49 may be converted into direct-current power by the AC/DC converter 44 and then charged into the secondary battery 96 via the direct-current power system 45 and the charging and discharging controller 97. Additionally, in the chargeable state, if the secondary battery 96 is not in the fully charged state, a part of the direct-current power from the solar power generation facility 46 may be charged into the secondary battery 96 via the direct-current power system 45 and the charging and discharging controller 97.
In the absorption step Sab, the carbon dioxide capture system 50 absorbs the carbon dioxide contained in the exhaust gas exhausted from the heat recovery system generator 20 into the lean absorbing liquid, and brings about a state in which the exhaust gas from which the carbon dioxide has been removed can be discharged. In this state, when the exhaust gas exhausted from the heat recovery system generator 20 flows into the absorption tower 71, the carbon dioxide contained in the exhaust gas is absorbed by the lean absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. In the absorbing-liquid regeneration step Sre, the carbon dioxide capture system 50 brings about a state in which the carbon dioxide can be separated from the rich absorbing liquid that is an absorbing liquid that has absorbed the carbon dioxide. In this state, when the rich absorbing liquid flows into the regenerator 81, the carbon dioxide is separated from the rich aqueous solution, and the rich absorbing liquid becomes a lean absorbing liquid.
The first heating step Sh1 is included in the absorbing-liquid regeneration step Sre. In the first heating step Sh1, the absorbing-liquid regeneration device 80 brings about the first heating state in which the absorbing liquid flows through the first circulation line 86 and the absorbing liquid can be heated by the reboiler 89. In the first heating state, in the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92, the first shut-off valve 92 a is open and the second shut-off valve 92 b is closed. In the first heating state, the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86. The absorbing liquid is heated by the steam from the heat recovery system generator 20 in the reboiler 89. The heated absorbing liquid returns to the inside of the regenerator 81 via the first circulation line 86 and the first shut-off valve 92 a in the open state.
Next, the operation of the boiler plant until the gas turbine 11, the steam turbine 31, and the heat recovery system generator 20 are stopped from a state in which the gas turbine 11, the steam turbine 31, and the heat recovery system generator 20 are in steady operation will be described.
First, the fuel supply to the combustor 13 of the gas turbine 11 is stopped (fuel supply stop step Sfc), and the GT circuit breaker 42 a is opened (GT circuit breaker opening step Stbo). The fuel supply stop step Sfc is executed when the plant control device 100 gives a closing instruction to the fuel regulating valve 17. When the fuel supply to the combustor 13 of the gas turbine 11 is stopped, the combustion gas is no longer generated in the combustor 13. For this reason, the flow rate of the exhaust gas flowing into the carbon dioxide capture system 50 from the gas turbine 11 via the heat recovery system generator 20 decreases gradually. The GT circuit breaker opening step Stbo is executed by the plant control device 100 giving an opening instruction to the GT circuit breaker 42 a. When the GT circuit breaker closing step Stbc is executed, power is no longer supplied from the GT generator 19 to the external power system 48.
When the fuel supply to the combustor 13 is stopped, the flow rate of the steam generated by the heat recovery system generator 20 is maintained at the value during the steady operation of the gas turbine 11 for a predetermined time, but decreases gradually. Additionally, when the fuel supply to the combustor 13 is stopped, the temperature and pressure of the steam generated by the heat recovery system generator 20 are also maintained at the values during the steady operation of the gas turbine 11 for a predetermined time, but decrease gradually. For this reason, the steady operation of the steam turbine 31 cannot be performed. Thus, the ST circuit breaker 42 b opens at the same time as the fuel supply to the combustor 13 of the gas turbine 11 is stopped or after a predetermined time after the fuel supply is stopped (ST circuit breaker opening step Ssbo). The ST circuit breaker opening step Ssbo is executed by the plant control device 100 giving an opening instruction to the ST circuit breaker 42 b. When the ST circuit breaker closing step Ssbc is executed, power is no longer supplied from the ST generator 39 to the external power system 48.
When power is no longer supplied from the GT generator 19 or the ST generator 39 to the external power system 48, that is, when the GT generator 19 or the ST generator 39 no longer generates power, the chargeable step Sch ends.
When the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition, the boiler plant is brought into a dischargeable state in which discharge is possible from the secondary battery 96 to the electric heater 91 (dischargeable step Sdch). The charging and discharging controller 97 brings the boiler plant into a dischargeable state when a state signal is received from the plant control device 100 to the effect that the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition. In the dischargeable state, the charging and discharging controller 97 brings the secondary battery 96 and the heater drive circuit 91 b of the electric heater 91 into an electrically connected state.
Additionally, when the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition, the absorbing-liquid regeneration device 80 is brought into the second heating state in which the absorbing liquid flows through the second circulation line 87 and the absorbing liquid is heated by the heater 90 (second heating step Sh2). When the temperature detected by the temperature sensor 34 provided in the main steam line 32 becomes lower than a predetermined temperature Ts or when the pressure detected by the pressure sensor 35 provided in the main steam line 32 becomes lower than a predetermined pressure, the switching controller 93 determines that the steam condition is no longer satisfied and instructs the switcher 92 to bring about the second heating state. As a result, the second heating state is brought about in which, in the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92, the first shut-off valve 92 a is closed and the second shut-off valve 92 b is opened. In the second heating state, the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the heater 90 via the second circulation line 87. The absorbing liquid may be heated by the electric heater 91 in the heater 90. The heated absorbing liquid returns to the inside of the regenerator container 81 v via the second circulation line 87 and the second shut-off valve 92 b in the open state.
In the second heating step Sh2, the second heating control step Sh2 c is executed. In the second heating control step Sh2 c, the second heating controller 95 controls the heating in the heater 90 depending on the absorbing liquid temperature detected by the temperature sensor 94. When the absorbing liquid temperature becomes lower than a predetermined first temperature (for example, 100° C.) Tab1, the second heating controller 95 gives an ON instruction to the heater drive circuit 91 b. Additionally, when the absorbing liquid temperature becomes higher than a predetermined second temperature (for example, 120° C.) Tab2 that is higher than the first temperature Tab1, the second heating controller 95 gives an OFF instruction to the heater drive circuit 91 b. When an ON instruction is input to the heater drive circuit 91 b, the power discharged from the secondary battery 96 is supplied to the electric heater main body 91 a, the electric heater main body 91 a generates heat, and the absorbing liquid flowing through the second circulation line 87 is heated. Additionally, when an OFF instruction is input to the heater drive circuit 91 b, power is no longer supplied from the secondary battery 96 to the electric heater main body 91 a, and the electric heater main body 91 a no longer generates heat. Thus, in the second heating step Sh2, the temperature of the absorbing liquid in the regenerator 81 fluctuates between the first temperature Tab1 and the second temperature Tab2.
For this reason, even if the heat recovery system generator 20 no longer generates steam, the temperature of the absorbing liquid in the regenerator 81 is maintained at substantially the first temperature Tab1 (for example, 100° C.) or higher.
When fuel is no longer supplied to the gas turbine 11, the gas turbine 11 is stopped, the heat recovery system generator 20 no longer generates steam, the steam turbine 31 is stopped, and then the fuel supply to the gas turbine 11 is started (fuel supply step Sfs), combustion gas is generated, and the rotation speed of the gas turbine rotor 15 increases gradually. When the rotation speed of the gas turbine rotor 15 reaches the rated rotation speed (for example, 3600 rpm), the GT circuit breaker 42 a is closed (GT circuit breaker closing step Stbc), the GT generator 19 generates power, and the power in this case is supplied to the external power system 48.
As described above, the exhaust gas, which is the combustion gas exhausted from the gas turbine 11, flows into the heat recovery system generator 20. The heat recovery system generator 20 turns water into steam by using the heat of the exhaust gas. The temperature and pressure of the steam increase gradually. In this process, when the steam generated by the heat recovery system generator 20 satisfies the steam condition, the absorbing-liquid regeneration device 80 is brought into the first heating state in which the absorbing liquid flows through the first circulation line 86 and the reboiler 89 heats the absorbing liquid (first heating step Sh1). When the temperature detected by the temperature sensor 34 provided in the main steam line 32 becomes equal to or higher than a predetermined temperature Ts and when the pressure detected by the pressure sensor 35 provided in the main steam line 32 becomes equal to or higher than a predetermined pressure, the switching controller 93 determines that the steam condition is satisfied and instructs the switcher 92 to bring about the first heating state. As a result, the first heating state is brought about in which, in the first shut-off valve 92 a and the second shut-off valve 92 b constituting the switcher 92, the first shut-off valve 92 a is opened and the second shut-off valve 92 b is closed. In the first heating state, the absorbing liquid reserved in the liquid reservoir portion 81 s in the regenerator container 81 v flows into the reboiler 89 via the first circulation line 86. The absorbing liquid is heated by the steam from the heat recovery system generator 20 in the reboiler 89. The heated absorbing liquid returns to the inside of the regenerator container 81 v via the first circulation line 86 and the first shut-off valve 92 a in the open state.
Additionally, since the GT generator 19 generates power when the steam generated by the heat recovery system generator 20 satisfies the steam condition, the dischargeable step Sdch is switched to the chargeable step Sch from this point of time. Additionally, when the steam generated by the heat recovery system generator 20 satisfies the steam condition and the rotation speed of the steam turbine 31 reaches the rated rotation speed, the ST circuit breaker 42 b is closed (ST circuit breaker closing step Ssbc), and power can be supplied from the ST generator 39 to the external power system 48.
When the heat recovery system generator 20 is started, exhaust gas flows into the carbon dioxide capture system 50 from the heat recovery system generator 20. In addition, the expression “when the heat recovery system generator 20 is started” is from the time when fuel supply to the gas turbine 11 is started, combustion gas is generated, exhaust gas passes through the heat recovery system generator 20, and the heat recovery system generator 20 starts to generate steam until the steam satisfies the steam condition. In the present embodiment, the absorption step Sab and the absorbing-liquid regeneration step Sre are executed even at the time of the start-up.
At the time of the start-up, the second heating step Sh2 is executed in the absorbing-liquid regeneration step Sre, and the temperature of the absorbing liquid in the regenerator 81 is maintained at substantially the first temperature Tab1 (for example, 100° C.) or higher. However, in most of a time zone during the start-up, the temperature of the absorbing liquid in the regenerator 81 is lower than an appropriate temperature (for example, 120° C.) for separating the carbon dioxide from the absorbing liquid. For this reason, in the regenerator 81, the ability to separate the carbon dioxide from the absorbing liquid decreases. That is, the amount of the carbon dioxide contained in the lean absorbing liquid sent from the regenerator 81 to the absorption tower 71 is larger than that when the steam turbine 31 and the heat recovery system generator 20 are in steady operation. Therefore, at the time of the start-up, the absorption rate of the carbon dioxide in the exhaust gas in the absorber 70 is lower than that when the steam turbine 31 and the heat recovery system generator 20 are in steady operation. However, in the present embodiment, since the absorber 70 absorbs the carbon dioxide in the exhaust gas into the absorbing liquid and executes the regeneration of the absorbing liquid that has absorbed the carbon dioxide even at the time of the start-up, the amount of discharge of the carbon dioxide can be suppressed when the heat recovery system generator 20 is started.
When the steam generated by the heat recovery system generator 20 satisfies the steam condition and the absorbing-liquid regeneration device 80 is brought into the first heating state, there is a high possibility that the temperature of the absorbing liquid in the regenerator 81 is lower than the appropriate temperature (for example, 120° C.) for separating the carbon dioxide. However, since the temperature of the absorbing liquid in the absorption tower 71 in this case is substantially equal to or higher than the first temperature Tab1 (for example, 100° C.), the temperature of the absorbing liquid in the absorption tower 71 can be set to the appropriate temperature (for example, 120° C.) for separating the carbon dioxide, within a short time after being switched to the first heating state. Thus, in the present embodiment, the amount of discharge of the carbon dioxide immediately after the absorbing-liquid regeneration device 80 is switched from the second heating state to the first heating state can be suppressed.
As described above, in the present embodiment, the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.
In the present embodiment, when the absorbing-liquid regeneration device 80 is in the second heating state, the absorbing liquid is not always heated by the heater 90. Therefore, the consumption of electric energy in the heater 90 can be suppressed.
In the chargeable state of the present embodiment, a part of the power from the GT generator 19, the ST generator 39, the solar power generation facility 46, and the wind power generation facility 49 may be charged in the secondary battery 96. The solar power generation facility 46 and the wind power generation facility 49 are carbon-free power generation facilities that generate power by using renewable energy. Additionally, the boiler plant of the present embodiment includes the gas turbine power generation facility 10 including the GT generator 19 and the steam turbine power generation facility 30 including the ST generator 39, but further includes the carbon dioxide capture system 50. Thus, the carbon dioxide in the exhaust gas exhausted from the boiler plant is little. Thus, in the present embodiment, the discharge of the carbon dioxide when generating the power for charging the secondary battery 96 can be suppressed.
MODIFICATION EXAMPLE
The boiler of the present embodiment is the heat recovery system generator 20 that generates steam with the heat of the exhaust gas from the gas turbine 11. However, the boiler may be a general boiler having a combustion chamber for combusting fossil fuel.
The steam turbine 31 may include a plurality of steam turbines 31 in which the pressures of inflowing steam are different from each other.
In the present embodiment, the GT generator 19 and the ST generator 39 are independent generators. However, in a case where the gas turbine rotor 15 and the steam turbine rotor are coupled to each other, one generator may be connected to the rotors, and the generator may serve as both a generator for the gas turbine 11 and a generator for the steam turbine 31.
The heater 90 of the present embodiment has the electric heater 91, and the energy for heating the absorbing liquid with the heater 90 is electric energy. However, the energy for heating the absorbing liquid with the heater 90 may not be the electric energy, and may be, for example, the thermal energy of steam. However, in this case, a boiler or the like that generates steam independently of the heat recovery system generator 20 is required.
In the second heating control step Sh2 c of the present embodiment, the temperature of the absorbing liquid in the regenerator 81 is controlled to fluctuate between the first temperature Tab1 and the second temperature Tab2. However, in the second heating control step Sh2 c, the temperature of the absorbing liquid in the regenerator 81 may be controlled to be, for example, a third temperature between the first temperature Tab1 and the second temperature Tab2.
The first circulation line 86 and the second circulation line 87 in the present embodiment share a part with each other. However, the first circulation line 86 and the second circulation line 87 may be completely independent of each other.
The switching controller 93 and the second heating controller 95 in the present embodiment are present separately from the plant control device 100. However, the switching controller 93 and the second heating controller 95 may be incorporated in the plant control device 100.
In the present embodiment, when the GT generator 19 or the ST generator 39 no longer generates power, the chargeable step Sch ends. However, if another power generation facility in the plant or a power generation facility connected to the external power system 48 is in operation and there is surplus power, the chargeable step Sch may not be ended. That is, in a case where there is surplus power, the chargeable step Sch may be continued.
In the present embodiment, when the GT generator 19 and the ST generator 39 no longer generate power and the steam generated by the heat recovery system generator 20 no longer satisfies the steam condition, the boiler plant is brought into the dischargeable state (dischargeable step Sdch). For this reason, in the present embodiment, the chargeable step Sch and the dischargeable step Sdch are not executed in the same time zone. However, if the secondary battery 96 has a function capable of simultaneously performing charging and discharging, the execution time zone of the chargeable step Sch and the execution time zone of the dischargeable step Sdch may partially overlap each other. In this case, the start timing of the dischargeable step Sdch may coincide with the end timing of the chargeable step Sch in the present embodiment, or may be earlier than the end timing of the chargeable step Sch in the present embodiment.
Additional Notes
The boiler plant in the above embodiment is grasped as follows, for example.
    • (1) A boiler plant in a first aspect includes a boiler 20 that generates steam with heat of a combustion gas generated through combustion of a fossil fuel F, and a carbon dioxide capture system 50 that removes carbon dioxide contained in an exhaust gas exhausted from the boiler 20.
The carbon dioxide capture system 50 has an absorbing-liquid regeneration device 80 that separates the carbon dioxide from an absorbing liquid that has absorbed the carbon dioxide, and an absorber 70 that allows the exhaust gas from the boiler 20 to flow thereinto, absorbs the carbon dioxide in the exhaust gas in the absorbing liquid from the absorbing-liquid regeneration device, and discharges the exhaust gas from which the carbon dioxide has been removed. The absorbing-liquid regeneration device 80 has a regenerator 81 that allows the absorbing liquid, which has absorbed the carbon dioxide in the absorber 70, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and returns the absorbing liquid from which the carbon dioxide has been separated to the absorber 70, a first circulation line 86 that takes out the absorbing liquid from an inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81, a second circulation line 87 that takes out the absorbing liquid from the inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81, a heat exchanger 89 that is provided in the first circulation line 86 to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line 86 and the steam from the boiler 20, a heater 90 that is provided in the second circulation line 87 to heat the absorbing liquid flowing through the second circulation line 87, and a switcher 92 that switches between a first heating state in which the absorbing liquid flows through the first circulation line 86 and a second heating state in which the absorbing liquid flows through the second circulation line 87.
In the present aspect, when the steam condition that the temperature of the steam sent from the boiler 20 to the heat exchanger 89 is equal to or higher than a predetermined temperature and the pressure of the steam is equal to or higher than a predetermined pressure is satisfied, the absorbing-liquid regeneration device 80 is brought into the first heating state. In the first heating state, the absorbing liquid is heated with the steam from the boiler 20 in the heat exchanger 89. As the absorbing liquid is heated, the inside of the regenerator 81 becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber 70. In the absorber 70, the carbon dioxide in the exhaust gas from the heat recovery system generator 20 is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. Thus, in the present aspect, when the steam from the boiler 20 satisfies the steam condition, the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced.
In the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the absorbing-liquid regeneration device 80 is brought into the second heating state. In the second heating state, the absorbing liquid is heated by the heater 90. As the absorbing liquid is heated, the inside of the regenerator 81 becomes a high-temperature environment, and the carbon dioxide is separated from the absorbing liquid. The absorbing liquid from which the carbon dioxide has been separated is supplied to the absorber 70. In the absorber 70, the carbon dioxide in the exhaust gas from the boiler 20 is absorbed by the absorbing liquid, and the exhaust gas from which the carbon dioxide has been removed is discharged. Thus, in the present aspect, even when the steam from the boiler 20 does not satisfy the steam condition, the carbon dioxide contained in the exhaust gas exhausted from the plant can be reduced. Additionally, in the present aspect, even when the second heating state is switched to the first heating state, the temperature of the absorbing liquid in the regenerator 81 is equal to or higher than the predetermined temperature. Therefore, even immediately after the second heating state is switched to the first heating state, the temperature of the absorbing liquid in the regenerator 81 can be raised to a target temperature within a short time. For this reason, in the present aspect, it is possible to reduce the amount of the carbon dioxide contained in the exhaust gas exhausted from the plant even immediately after the second heating state is switched to the first heating state.
    • (2) In the boiler plant in a second aspect according to the boiler plant of the first aspect, the absorbing-liquid regeneration device 80 has a switching controller 93 that instructs the switcher 92 to bring about the first heating state when a steam condition that a temperature of the steam sent from the boiler 20 to the heat exchanger 89 is equal to or higher than a predetermined temperature and a pressure of the steam is equal to or higher than a predetermined pressure is satisfied, and instructs the switcher 92 to bring about the second heating state when the steam condition is not satisfied.
In the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 satisfies the steam condition, the first heating state can be automatically brought about. Additionally, in the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the second heating state can be automatically brought about.
    • (3) In the boiler plant in a third aspect according to the boiler plant of the second aspect, the absorbing-liquid regeneration device 80 has a temperature sensor 94 that detects a temperature of the absorbing liquid reserved in the regenerator 81, and a second heating controller 95 that heats the absorbing liquid by the heater 90 when the temperature detected by the temperature sensor 94 becomes lower than a predetermined temperature in the second heating state.
In the present aspect, even in the second heating state, the absorbing liquid is not always heated by the heater 90. Therefore, the consumption of thermal energy in the heater 90 can be suppressed.
    • (4) In the boiler plant in a fourth aspect according to in the boiler plant of the second aspect or the third aspect, the absorbing-liquid regeneration device 80 has a secondary battery 96, and a charging and discharging controller 97 that controls charging and discharging of the secondary battery 96.
The heater 90 has an electric heater 91 that generates heat by supplying power from the secondary battery 96.
In the present aspect, the electric heater 91 can be heated with the power charged in the secondary battery 96.
    • (5) In the boiler plant in a fifth aspect according to the boiler plant of the fourth aspect, the charging and discharging controller 97 brings about a chargeable state in which a power generation facility and the secondary battery 96 are electrically connected to each other such that power is chargeable from the power generation facility to the secondary battery 96 when the power generation facility is generating power, and brings about a dischargeable state in which the secondary battery 96 and the electric heater 91 are electrically connected to each other such that power is dischargeable from the secondary battery 96 to the electric heater 91 when the steam condition is not satisfied.
In the present aspect, when the power generation facility is generating power, if the secondary battery 96 is not in a fully charged state, the power from the power generation facility can be charged in the secondary battery 96. Additionally, in the present aspect, when the steam sent from the boiler 20 to the heat exchanger 89 does not satisfy the steam condition, the electric heater 91 can be heated with the power charged in the secondary battery 96.
    • (6) The boiler plant in a sixth aspect according to the boiler plant of the fifth aspect further includes a steam turbine 31 that is driven with the steam from the boiler 20, and a generator 39 that generates power by driving the steam turbine 31.
The power generation facility includes the generator 39.
In the present aspect, when the generator 39 driven by the steam turbine 31 is generating power, the power from the generator 39 can be charged in the secondary battery 96.
    • (7) In the boiler plant in a seventh aspect according to the boiler plant of the fifth aspect or the sixth aspect, the power generation facility includes a carbon-free power generation facility, and the carbon-free power generation facility is a facility that discharges carbon dioxide having a concentration lower than the carbon dioxide concentration in the exhaust gas from a facility that generates power by using the combustion gas generated through the combustion of the fossil fuel, or a facility that does not discharge the carbon dioxide during power generation.
In the present aspect, the discharge of the carbon dioxide when generating the power for charging the secondary battery 96 can be suppressed.
    • (8) The boiler plant in an eighth aspect according to the boiler plant of any one of the first aspect to the seventh aspect further includes a gas turbine 11 that is driven with the combustion gas generated through the combustion of the fossil fuel F.
The boiler 20 is a heat recovery system generator that generates steam with heat of the combustion gas exhausted from the gas turbine 11.
The carbon dioxide removal method in the above embodiment is grasped as follows, for example. (9) A carbon dioxide removal method in a ninth aspect executes an absorbing-liquid regeneration step Sre in which carbon dioxide is separable from an absorbing liquid that has absorbed the carbon dioxide, and an absorption step Sab in which an exhaust gas from a boiler 20 flows in, the carbon dioxide in the exhaust gas is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step Sre, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged.
The absorbing-liquid regeneration step Sre is executed by an absorbing-liquid regeneration device 80. The absorbing-liquid regeneration device 80 has a regenerator 81 that allows the absorbing liquid, which has absorbed the carbon dioxide through an execution of the absorption step Sab, to flow thereinto, separates the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and causes the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step Sab, a first circulation line 86 that takes out the absorbing liquid from an inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81, a second circulation line 87 that takes out the absorbing liquid from the inside of the regenerator 81 and then returns the taken-out absorbing liquid to the inside of the regenerator 81, a heat exchanger 89 that is provided in the first circulation line 86 to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line 86 and steam from the boiler 20, and a heater 90 that is provided in the second circulation line 87 to heat the absorbing liquid flowing through the second circulation line 87. The absorbing-liquid regeneration step Sre includes a first heating step Sh1 in which the absorbing liquid flows through the first circulation line 86 such that the absorbing liquid is heatable by the heat exchanger 89, and a second heating step Sh2 in which the absorbing liquid flows through the second circulation line 87 such that the absorbing liquid is heatable by the heater 90.
    • (10) In the carbon dioxide removal method in a tenth aspect according to the carbon dioxide removal method of the ninth aspect, in the absorbing-liquid regeneration step Sre, the first heating step Sh1 is executed when a steam condition that a temperature of the steam sent from the boiler 20 to the heat exchanger 89 is equal to or higher than a predetermined temperature and a pressure of the steam is equal to or higher than a predetermined pressure is satisfied, and the second heating step Sh2 is executed when the steam condition is not satisfied.
    • (11) In the carbon dioxide removal method in an eleventh aspect according to the carbon dioxide removal method of the tenth aspect, the second heating step Sh2 includes a second heating control step Sh2 c in which the absorbing liquid is heated by the heater 90 when a temperature of the absorbing liquid reserved in the regenerator 81 becomes lower than a predetermined temperature.
    • (12) In the carbon dioxide removal method in a twelfth aspect according to the carbon dioxide removal method of the tenth aspect or the eleventh aspect, the absorbing-liquid regeneration device 80 has a secondary battery 96, and the heater 90 has an electric heater 91 that generates heat by supplying power from the secondary battery 96.
The absorbing-liquid regeneration step Sre includes a chargeable step Sch in which the secondary battery 96 is chargeable and a dischargeable step Sdch in which the secondary battery 96 is dischargeable to the electric heater 91.
    • (13) In the carbon dioxide removal method in a thirteenth aspect according to the carbon dioxide removal method of the twelfth aspect, in the chargeable step Sch, a power generation facility and the secondary battery 96 are electrically connected to each other such that power is chargeable from the power generation facility to the secondary battery 96 when the power generation facility is generating power.
Additionally, in the dischargeable step Sdch, the secondary battery 96 and the electric heater 91 are electrically connected to each other such that power is dischargeable from the secondary battery 96 to the electric heater 91 when the steam condition is not satisfied.
    • (14) In the carbon dioxide removal method in a fourteenth aspect according to the carbon dioxide removal method of the thirteenth aspect, the power generation facility includes a carbon-free power generation facility.
The carbon-free power generation facility is a facility that discharges carbon dioxide having a concentration lower than the carbon dioxide concentration in the exhaust gas from a facility that generates power by using the combustion gas generated through the combustion of the fossil fuel, or a facility that does not discharge the carbon dioxide during power generation.
    • (15) In the carbon dioxide removal method in a fifteenth aspect according to the carbon dioxide removal method of the fourteenth aspect, the carbon-free power generation facility includes a facility that generates power by using renewable energy.
INDUSTRIAL APPLICABILITY
According to one aspect of the present invention, the carbon dioxide in the exhaust gas exhausted from the plant can be reduced even in the process of starting the boiler.
REFERENCE SIGNS LIST
    • 10 gas turbine equipment (or gas turbine power generation facility)
    • 11 gas turbine
    • 12 air compressor
    • 13 combustor
    • 14 turbine
    • 15 gas turbine rotor
    • 16 fuel line
    • 17 fuel regulating valve
    • 19 GT generator
    • 20 heat recovery system generator (or boiler)
    • 30 steam turbine equipment (or steam turbine power generation facility)
    • 31 steam turbine
    • 32 main steam line
    • 33 steam regulating valve
    • 34 temperature sensor
    • 35 pressure sensor
    • 36 condenser
    • 37 supply water line
    • 38 heating steam line
    • 39 ST generator
    • 40 power system facility
    • 41 a GT power system
    • 41 b ST power system
    • 42 a GT circuit breaker
    • 42 b ST circuit breaker
    • 43 a GT transformer
    • 43 b ST transformer
    • 44 AC/DC converter
    • 45 direct-current power system
    • 46 solar power generation facility
    • 48 external power system
    • 49 wind power generation facility
    • 50 carbon dioxide capture system
    • 51 gas booster
    • 52 exhaust gas recirculation line
    • 60 exhaust gas cooling device
    • 61 cooling tower
    • 61 v cooling tower container
    • 61 p filling material
    • 62 water circulation line
    • 63 water circulation pump
    • 64 water cooler
    • 65 low-temperature exhaust gas line
    • 70 absorber
    • 71 absorption tower
    • 71 v absorption tower container
    • 71 pa lower filling material
    • 71 pb upper filling material
    • 71 da lower demister
    • 71 db upper demister
    • 71 t tray
    • 71 s water reservoir portion
    • 72 exhaust line
    • 73 lean absorbing-liquid line
    • 74 lean-rich heat exchanger
    • 75 lean absorbing-liquid pump
    • 76 lean absorbing-liquid cooler
    • 77 lean absorbing-liquid regulating valve
    • 78 rinse water circulation line
    • 79 p rinse water circulation pump
    • 79 r rinse water cooler
    • 80 absorbing-liquid regeneration device
    • 81 regenerator
    • 81 v regenerator container
    • 81 p filling material
    • 81 t tray
    • 81 s liquid reservoir portion
    • 82 carbon dioxide recovery line
    • 82 r cooler
    • 82 t moisture separation tank
    • 82 c carbon dioxide compressor
    • 82 p water pump
    • 82 w moisture recovery line
    • 83 rich absorbing-liquid line
    • 84 rich absorbing-liquid pump
    • 85 rich absorbing-liquid regulating valve
    • 86 First circulation line
    • 86 a inflow-side sharing portion
    • 86 b outflow-side sharing portion
    • 86 c intermediate portion
    • 87 second circulation line
    • 87 c intermediate portion
    • 89 reboiler (heat exchanger)
    • 90 heater
    • 90 v heating container
    • 91 electric heater
    • 91 a electric heater main body
    • 91 b heater drive circuit
    • 92 switcher
    • 92 a first shut-off valve
    • 92 b second shut-off valve
    • 93 switching controller
    • 94 temperature sensor
    • 95 second heating controller
    • 96 secondary battery
    • 97 charging and discharging controller
    • 98 discharge system
    • 100 plant control device

Claims (15)

The invention claimed is:
1. A boiler plant comprising:
a boiler configured to generate steam with heat of a combustion gas generated through combustion of a fossil fuel; and
a carbon dioxide capture system configured to remove carbon dioxide contained in an exhaust gas exhausted from the boiler,
wherein the carbon dioxide capture system includes:
an absorbing-liquid regeneration device configured to separate the carbon dioxide from an absorbing liquid that has absorbed the carbon dioxide, and
an absorber configured to allow the exhaust gas from the boiler to flow thereinto, absorb the carbon dioxide in the exhaust gas in the absorbing liquid from the absorbing-liquid regeneration device, and discharge the exhaust gas from which the carbon dioxide has been removed, and
wherein the absorbing-liquid regeneration device includes:
a regenerator configured to allow the absorbing liquid, which has absorbed the carbon dioxide in the absorber, to flow thereinto, separate the carbon dioxide from the absorbing liquid in a high-temperature environment to discharge the carbon dioxide, and return the absorbing liquid from which the carbon dioxide has been separated to the absorber,
a first circulation line configured to take out the absorbing liquid from an inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a second circulation line configured to take out the absorbing liquid from the inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a heat exchanger in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and the steam from the boiler,
a heater in the second circulation line to heat the absorbing liquid flowing through the second circulation line, and
a switcher configured to switch between a first heating state in which the absorbing liquid flows through the first circulation line and a second heating state in which the absorbing liquid flows through the second circulation line.
2. The boiler plant according to claim 1, wherein the absorbing-liquid regeneration device includes a switching controller configured to instruct the switcher to bring about the first heating state when a steam condition that a temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and a pressure of the steam is equal to or higher than a predetermined pressure is satisfied, and to instruct the switcher to bring about the second heating state when the steam condition is not satisfied.
3. The boiler plant according to claim 2, wherein the absorbing-liquid regeneration device includes:
a temperature sensor configured to detect a temperature of the absorbing liquid reserved in the regenerator, and
a second heating controller configured to heat the absorbing liquid by the heater when the temperature detected by the temperature sensor becomes lower than a predetermined temperature in the second heating state.
4. The boiler plant according to claim 2,
wherein the absorbing-liquid regeneration device includes a secondary battery, and a charging and discharging controller configured to control charging and discharging of the secondary battery, and
wherein the heater has an electric heater configured to generate heat by supplying power from the secondary battery.
5. The boiler plant according to claim 4, wherein the charging and discharging controller is configured to bring about a chargeable state in which a power generation facility and the secondary battery are electrically connected to each other such that power is chargeable from the power generation facility to the secondary battery when the power generation facility is generating power, and to bring about a dischargeable state in which the secondary battery and the electric heater are electrically connected to each other such that power is dischargeable from the secondary battery to the electric heater when the steam condition is not satisfied.
6. The boiler plant according to claim 5, further comprising:
a steam turbine to be driven with the steam from the boiler; and
a generator configured to generate power by driving the steam turbine, wherein the power generation facility includes the generator.
7. The boiler plant according to claim 5,
wherein the power generation facility includes a carbon-free power generation facility, and
wherein the carbon-free power generation facility is configured to discharge carbon dioxide having a concentration lower than a carbon dioxide concentration in exhaust gas from a facility configured to generate power by using the combustion gas generated through the combustion of the fossil fuel, or the carbon-free power generation facility is is configured to not exhaust carbon dioxide during power generation.
8. The boiler plant according to claim 1, further comprising:
a gas turbine to be driven with the combustion gas generated through the combustion of the fossil fuel,
wherein the boiler is a heat recovery system generator configured to generate steam with heat of the combustion gas exhausted from the gas turbine.
9. A carbon dioxide removal method comprising:
an absorbing-liquid regeneration step in which carbon dioxide is separated from an absorbing liquid that has absorbed the carbon dioxide, and
an absorption step in which the carbon dioxide in exhaust gas from a boiler is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged,
wherein the absorbing-liquid regeneration step is executed by an absorbing-liquid regeneration device, the absorbing-liquid regeneration device including:
a regenerator configured to allow the absorbing liquid, which has absorbed the carbon dioxide via the absorption step, to flow thereinto, to separate the carbon dioxide from the absorbing liquid in a high-temperature environment to exhaust the carbon dioxide, and to cause the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step,
a first circulation line configured to take out the absorbing liquid from an inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a second circulation line configured to take out the absorbing liquid from the inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a heat exchanger in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and steam from the boiler, and
a heater in the second circulation line to heat the absorbing liquid flowing through the second circulation line,
wherein the absorbing-liquid regeneration step includes:
a first heating step in which the absorbing liquid flows through the first circulation line such that the absorbing liquid is heated by the heat exchanger, and
a second heating step in which the absorbing liquid flows through the second circulation line such that the absorbing liquid is heated by the heater, and
wherein, in the absorbing-liquid regeneration step, the first heating step and the second heating step are performed by switching heating states between a first heating state, in which the absorbing liquid flows through the first circulation line, and a second heating state, in which the absorbing liquid flows through the second circulation line.
10. A carbon dioxide removal method comprising:
an absorbing-liquid regeneration step in which carbon dioxide is separated from an absorbing liquid that has absorbed the carbon dioxide, and
an absorption step in which the carbon dioxide in exhaust gas from a boiler is absorbed in the absorbing liquid processed in the absorbing-liquid regeneration step, and the exhaust gas from which the carbon dioxide has been removed is capable of being discharged,
wherein the absorbing-liquid regeneration step is executed by an absorbing-liquid regeneration device, the absorbing-liquid regeneration device including:
a regenerator configured to allow the absorbing liquid, which has absorbed the carbon dioxide via the absorption step, to flow thereinto, to separate the carbon dioxide from the absorbing liquid in a high-temperature environment to exhaust the carbon dioxide, and to cause the absorbing liquid from which the carbon dioxide has been separated to be used in the absorption step,
a first circulation line configured to take out the absorbing liquid from an inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a second circulation line configured to take out the absorbing liquid from the inside of the regenerator and then return the taken-out absorbing liquid to the inside of the regenerator,
a heat exchanger in the first circulation line to heat the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and steam from the boiler, and
a heater in the second circulation line to heat the absorbing liquid flowing through the second circulation line, and
wherein the absorbing-liquid regeneration step includes:
a first heating step in which the absorbing liquid flows through the first circulation line such that the absorbing liquid is heated by the heat exchanger, and
a second heating step in which the absorbing liquid flows through the second circulation line such that the absorbing liquid is heated by the heater, and
wherein, in the absorbing-liquid regeneration step, the first heating step is executed when a steam condition is satisfied, the steam condition being satisfied when a temperature of the steam sent from the boiler to the heat exchanger is equal to or higher than a predetermined temperature and a pressure of the steam is equal to or higher than a predetermined pressure, and the second heating step is executed when the steam condition is not satisfied.
11. The carbon dioxide removal method according to claim 10, wherein the second heating step includes a second heating control step in which the absorbing liquid is heated by the heater when a temperature of the absorbing liquid reserved in the regenerator becomes lower than a predetermined temperature.
12. The carbon dioxide removal method according to claim 10, wherein:
the absorbing-liquid regeneration device includes a secondary battery,
the heater has an electric heater configured to generate heat by supplying power from the secondary battery, and
the absorbing-liquid regeneration step includes:
a chargeable step in which the secondary battery is chargeable, and
a dischargeable step in which the secondary battery is dischargeable to the electric heater.
13. The carbon dioxide removal method according to claim 12, wherein:
in the chargeable step, a power generation facility and the secondary battery are electrically connected to each other such that power is chargeable from the power generation facility to the secondary battery when the power generation facility is generating power, and
in the dischargeable step, the secondary battery and the electric heater are electrically connected to each other such that power is dischargeable from the secondary battery to the electric heater when the steam condition is not satisfied.
14. The carbon dioxide removal method according to claim 13, wherein:
the power generation facility includes a carbon-free power generation facility, and
the carbon-free power generation facility is configured to discharge carbon dioxide having a concentration lower than a carbon dioxide concentration in the exhaust gas from a facility configured to generate power by using a combustion gas generated through a combustion of a fossil fuel, or the carbon-free power generation facility is configured to not discharge the carbon dioxide during power generation.
15. The carbon dioxide removal method according to claim 14, wherein the carbon-free power generation facility is configured to generate power by using renewable energy.
US17/779,430 2019-12-27 2020-12-07 Boiler plant and carbon dioxide removal method Active US11833467B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2019-238846 2019-12-27
JP2019238846A JP7356344B2 (en) 2019-12-27 2019-12-27 Boiler plant and carbon dioxide removal method
PCT/JP2020/045388 WO2021131629A1 (en) 2019-12-27 2020-12-07 Boiler plant and carbon dioxide removal method

Publications (2)

Publication Number Publication Date
US20220410062A1 US20220410062A1 (en) 2022-12-29
US11833467B2 true US11833467B2 (en) 2023-12-05

Family

ID=76573958

Family Applications (1)

Application Number Title Priority Date Filing Date
US17/779,430 Active US11833467B2 (en) 2019-12-27 2020-12-07 Boiler plant and carbon dioxide removal method

Country Status (6)

Country Link
US (1) US11833467B2 (en)
EP (1) EP4083505A4 (en)
JP (1) JP7356344B2 (en)
AU (1) AU2020415622B2 (en)
CA (1) CA3163472A1 (en)
WO (1) WO2021131629A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023072266A (en) * 2021-11-12 2023-05-24 三菱重工エンジニアリング株式会社 Carbon dioxide recovery system
CN116099333B (en) * 2023-04-13 2023-06-23 清华四川能源互联网研究院 Produced gas chemical method carbon capture system
CN116247827B (en) * 2023-05-10 2023-08-22 长江三峡集团实业发展(北京)有限公司 Industrial park comprehensive energy system and operation method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110232286A1 (en) 2010-03-29 2011-09-29 Hitachi, Ltd. Boiler Apparatus
US20110277479A1 (en) 2009-01-28 2011-11-17 Peter Richter Method and device for separating of carbon dioxide from an exhaust gas of a fossil-fired power plant
US20120219482A1 (en) * 2011-02-25 2012-08-30 Alstom Technology Ltd Systems and processes for removing volatile degradation products produced in gas purification
US20120328501A1 (en) * 2011-06-22 2012-12-27 Mitsubishi Heavy Industries, Ltd. Air pollution control system and air pollution control method
US8613794B2 (en) * 2007-01-25 2013-12-24 Shell Oil Company Process for producing a pressurised CO2 stream in a power plant integrated with a CO2 capture unit
US20140301927A1 (en) 2013-04-09 2014-10-09 Kabushiki Kaisha Toshiba Carbon dioxide capturing system and method of operating same
JP2015104693A (en) 2013-11-29 2015-06-08 株式会社東芝 Carbon dioxide recovery system and carbon dioxide recovery system operation method
US20160151742A1 (en) * 2014-12-01 2016-06-02 Kabushiki Kaisha Toshiba Carbon dioxide capture system
US20160166977A1 (en) 2014-12-10 2016-06-16 Exxonmobil Research And Engineering Company Gas-assisted stripping of liquid solvents for carbon capture
US20160263517A1 (en) * 2013-11-21 2016-09-15 Korea Institute Of Energy Research Energy-saving acidic gas capture system and method using condensed water
US20180339265A1 (en) 2017-05-25 2018-11-29 Bechtel Infrastructure and Power Corporation System for time-shifting post-combustion co2 capture
JP2019076810A (en) 2017-10-20 2019-05-23 三菱重工エンジニアリング株式会社 Acidic gas removal device and acidic gas removal method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5704937B2 (en) 2011-01-31 2015-04-22 三菱日立パワーシステムズ株式会社 Thermal power generation system with carbon dioxide separation and recovery device
WO2012169634A1 (en) * 2011-06-09 2012-12-13 旭化成株式会社 Carbon-dioxide absorber and carbon-dioxide separation/recovery method using said absorber
JP6064771B2 (en) 2013-04-26 2017-01-25 株式会社Ihi Carbon dioxide recovery method and recovery apparatus
JP2015097986A (en) 2013-11-19 2015-05-28 株式会社Ihi Distillation column, liquid heating method, and carbon dioxide recovery apparatus and carbon dioxide recovery method using the same

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8613794B2 (en) * 2007-01-25 2013-12-24 Shell Oil Company Process for producing a pressurised CO2 stream in a power plant integrated with a CO2 capture unit
US20110277479A1 (en) 2009-01-28 2011-11-17 Peter Richter Method and device for separating of carbon dioxide from an exhaust gas of a fossil-fired power plant
JP2012516226A (en) 2009-01-28 2012-07-19 シーメンス アクチエンゲゼルシヤフト Method and apparatus for separating carbon dioxide from exhaust gas from fossil fuel power plant equipment
JP2011208846A (en) 2010-03-29 2011-10-20 Hitachi Ltd Boiler apparatus
US20110232286A1 (en) 2010-03-29 2011-09-29 Hitachi, Ltd. Boiler Apparatus
US20120219482A1 (en) * 2011-02-25 2012-08-30 Alstom Technology Ltd Systems and processes for removing volatile degradation products produced in gas purification
US20120328501A1 (en) * 2011-06-22 2012-12-27 Mitsubishi Heavy Industries, Ltd. Air pollution control system and air pollution control method
US20140301927A1 (en) 2013-04-09 2014-10-09 Kabushiki Kaisha Toshiba Carbon dioxide capturing system and method of operating same
US20160263517A1 (en) * 2013-11-21 2016-09-15 Korea Institute Of Energy Research Energy-saving acidic gas capture system and method using condensed water
JP2015104693A (en) 2013-11-29 2015-06-08 株式会社東芝 Carbon dioxide recovery system and carbon dioxide recovery system operation method
JP6158054B2 (en) 2013-11-29 2017-07-05 株式会社東芝 Carbon dioxide recovery system and operation method thereof
US20160151742A1 (en) * 2014-12-01 2016-06-02 Kabushiki Kaisha Toshiba Carbon dioxide capture system
US20160166977A1 (en) 2014-12-10 2016-06-16 Exxonmobil Research And Engineering Company Gas-assisted stripping of liquid solvents for carbon capture
US20180339265A1 (en) 2017-05-25 2018-11-29 Bechtel Infrastructure and Power Corporation System for time-shifting post-combustion co2 capture
JP2019076810A (en) 2017-10-20 2019-05-23 三菱重工エンジニアリング株式会社 Acidic gas removal device and acidic gas removal method
US20200368674A1 (en) 2017-10-20 2020-11-26 Mitsubishi Heavy Industries Engineering, Ltd. Acid gas removal apparatus and acid gas removal method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
International Search Report dated Jan. 26, 2021 in International (PCT) Application No. PCT/JP2020/045388.
Written Opinion of the International Searching Authority dated Jan. 26, 2021 in International (PCT) Application No. PCT/JP2020/045388.

Also Published As

Publication number Publication date
WO2021131629A1 (en) 2021-07-01
JP7356344B2 (en) 2023-10-04
AU2020415622A1 (en) 2022-06-09
JP2021107751A (en) 2021-07-29
EP4083505A4 (en) 2024-01-10
CA3163472A1 (en) 2021-07-01
US20220410062A1 (en) 2022-12-29
AU2020415622B2 (en) 2023-10-05
EP4083505A1 (en) 2022-11-02

Similar Documents

Publication Publication Date Title
US11833467B2 (en) Boiler plant and carbon dioxide removal method
US8424282B2 (en) Combined-cycle power plant with exhaust gas recycling and CO2 separation, and method for operating a combined cycle power plant
US20120227372A1 (en) Power plant for co2 capture
KR101577611B1 (en) Flushing the exhaust gas recirculation lines of a gas turbine
CN102822451B (en) Power plant equipment and method of operation thereof
EP2232018B1 (en) Power plant with CO2 capture and compression
US20100326074A1 (en) Steam turbine power plant and operation method thereof
NO322002B1 (en) Method and apparatus for starting emission-free gas turbine power stations
EP2540381B1 (en) Plant comprising a co2 recovery devide and method of operating the plant
CA2576613A1 (en) Method for generating energy in an energy generating installation comprising a gas turbine, and energy generating installation for carrying out said method
EP2497561A1 (en) Thermal power plant, steam turbine and control method for a thermal power plant
JP5635510B2 (en) Power plant and energy supply system using the same
JP2013523429A (en) Method and apparatus for separating carbon dioxide from exhaust gas from fossil fuel power plant equipment
KR20130100175A (en) Marine power generation system
CA2543379C (en) Turbo set with starting device
WO2020175012A1 (en) Gas turbine plant and exhaust carbon dioxide recovery method therefor
TW201337087A (en) Methods for using a carbon dioxide capture system as an operating reserve
EP4083402A1 (en) Exhaust gas processing equipment and gas turbine plant
AU2013313605A1 (en) Heat recovery system and heat recovery method
JP2020002895A (en) Combined-cycle power generation facility and operation method therefor
EP3786421B1 (en) Plant and combustion exhaust gas processing method
EP4166764A1 (en) Gas turbine plant
JP2005140023A (en) Micro gas turbine power generating installation
EP2907793A1 (en) Carbon dioxide recovery system
JPS63215839A (en) Furnace gas pressure turbine of blast furnace

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TSUTSUMI, ATSUSHI;ISHII, HIROMI;TANAKA, TETSUYA;AND OTHERS;REEL/FRAME:060002/0854

Effective date: 20220518

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:TSUTSUMI, ATSUSHI;ISHII, HIROMI;TANAKA, TETSUYA;AND OTHERS;REEL/FRAME:060002/0854

Effective date: 20220518

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT RECEIVED

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED

AS Assignment

Owner name: MHI ENGINEERING, LTD., JAPAN

Free format text: CHANGE OF NAME;ASSIGNOR:MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.;REEL/FRAME:065388/0633

Effective date: 20230401

AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:MHI ENGINEERING, LTD.;REEL/FRAME:065403/0164

Effective date: 20230928

STCF Information on status: patent grant

Free format text: PATENTED CASE