Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Львовский Национальный Аграрный УниверситетfiledCriticalЛьвовский Национальный Аграрный Университет
Priority to UAU201308837UpriorityCriticalpatent/UA86788U/en
Publication of UA86788UpublicationCriticalpatent/UA86788U/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
A span foamed-concrete element includes reinforcement, perimeter reinforcement as expanded mesh installed in such a way that the vertical sections of the mesh are placed at the sides of the element, and the horizontal sections – in the lower more elongated zone and in the upper most compressed zone of the span foamed-concrete element.
UAU201308837U2013-07-152013-07-15Span foamed concrete element with perimeter reinforcement by expanded mesh
UA86788U
(en)