Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Віталій Павлович Лялюк, Аркадій Костянтинович Тараканов, Дар'я Олександрівна КассімfiledCriticalВіталій Павлович Лялюк
Priority to UAU201505595UpriorityCriticalpatent/UA103280U/en
Publication of UA103280UpublicationCriticalpatent/UA103280U/en
Way of blast-furnace includes a separate download portions of coke and iron materials in silos boot without cone device section weight each portion on the same number of parts, unloading each portion of the bunker on the surface pour with distribution parts portions distributor in circular zones top of the furnace and the periodic downloading of coke in the axial zone to form an axial outlet, with the results of the previous operation of the blast furnace determined for these conditions melting optimal values of the total energy flow Gornova gas and radius axial outlet, and with increasing total energy Gornova gas above the optimal range of axial vents reduce, while reducing full energy Gornova gas below the optimal range of axial outlet increases.
UAU201505595U2015-06-082015-06-08Way of blast-furnace
UA103280U
(en)