TWM541487U - Structure improvement of assembled trellis - Google Patents

Structure improvement of assembled trellis Download PDF

Info

Publication number
TWM541487U
TWM541487U TW105212691U TW105212691U TWM541487U TW M541487 U TWM541487 U TW M541487U TW 105212691 U TW105212691 U TW 105212691U TW 105212691 U TW105212691 U TW 105212691U TW M541487 U TWM541487 U TW M541487U
Authority
TW
Taiwan
Prior art keywords
pipe
bolt
diameter
sleeve
pipe joint
Prior art date
Application number
TW105212691U
Other languages
Chinese (zh)
Inventor
Hui-Ling Zeng
Original Assignee
Chang Hua Diamond Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chang Hua Diamond Industrial Co Ltd filed Critical Chang Hua Diamond Industrial Co Ltd
Priority to TW105212691U priority Critical patent/TWM541487U/en
Publication of TWM541487U publication Critical patent/TWM541487U/en

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Description

組合棚架結構改良 Combined scaffolding structure improvement

本創作係關於一種組合棚架結構改良,主要是針對以金屬管接頭與管件插組成型之棚架的穩固性所作的改良設計,透過其管接頭供螺栓穿組之穿孔結構變更,使其得以取得對管件及管接頭套插關係的更佳緊固定位效果,進而確保所搭組之棚架型態的穩固維持者。 This creation is about an improved design of the composite scaffolding structure, mainly for the improvement of the stability of the scaffolding with the metal pipe joint and the pipe fitting type, and through the pipe joint to change the perforation structure of the bolt piercing group, A better fastening positioning effect on the pipe and pipe joint insertion relationship is obtained, thereby ensuring the stable maintenance of the scaffolding type of the set.

按,一般瓜藤類植栽在栽種上,若未搭設適當的棚架供其攀爬依附,則可能使瓜藤在地面任意攀附生長,不但影響美觀,同時也有礙瓜果的生長及日後摘採之便利性。 According to the general melon vine planting, if the appropriate scaffolding is not set up for climbing and climbing, it may cause the vine to grow on the ground, which not only affects the appearance, but also hinders the growth of the fruit and the picking in the future. Convenience.

習知之棚架在搭建上,通常係採竹材或木材搭建成型,先行將其直立桿材下部***或埋設於土壤中,再以水平向之縱、橫桿材交疊連結,並在其交疊部位以鐵絲繞綁緊束,進而完成其棚架的搭設,此種搭建方式,不但施工難度高,且搭建者的技術直接影響其棚架的牢固性與美觀性,另方面其鐵絲繞綁固定的方式,也容易在外力的作用下產生鬆動問題。 The conventional scaffolding is usually built with bamboo or wood. The lower part of the vertical pole is inserted or buried in the soil, and then the horizontal and vertical poles are overlapped and overlapped. The wire is wrapped around the wire and the erection of the scaffold is completed. This construction method not only has high construction difficulty, but also the technology of the constructor directly affects the firmness and aesthetics of the scaffold. On the other hand, the wire is tied and fixed. The way, it is also easy to produce loose problems under the influence of external forces.

為解決類此問題,業界乃開發出組配更為容易且結構更為牢固、美觀之組合式棚架,其主要是預製有多種不同型態之管接頭,使該等管接頭依其不同的套插組態需求而分歧設有不同方向的管套,利用該等管接頭的管套供管件套插連結後,即可構組成適當型態之棚架,而為維持其 棚架型態之穩固性,於該等管接頭的各管套一側通常設有一栓孔,俾供側向鎖入螺栓迫抵於所套插之管件外壁,達成其預期的迫抵定位作用。 In order to solve this problem, the industry has developed a combination scaffold that is easier to assemble and more robust and beautiful. It is mainly prefabricated with a variety of different types of pipe joints, so that the pipe joints are different. Sockets are configured to have different orientations and sleeves are used in different directions. After the pipe joints of the pipe joints are used to insert and connect the pipe fittings, the appropriate type of scaffold can be constructed to maintain the The stability of the scaffolding type is usually provided with a bolt hole on the side of each sleeve of the pipe joint, and the lateral locking bolt is pressed against the outer wall of the inserted pipe member to achieve the desired forced positioning. .

然而,此種單側迫鎖的方式對於棚架而言,因其管件與管接頭為取得套插組設的便利性,通常會使管件與管接頭的管套間存在有些微空間裕度,令管件的套插操作更為容易,雖以螺栓側向鎖設迫抵可達適當之定位作用,但在強風或外力的作用下,久而久之將造成螺栓的鬆動,勢將造成其整體結構穩固性的不足,所以又有業者直接於管件及管接頭的管套相對貫設通孔後,再以螺栓直接穿組兩者並配合螺帽螺合,形成直接穿鎖固定之定位模式。 However, such a single-side forced lock method has a slight space margin between the pipe fitting and the pipe joint of the pipe joint because of the convenience of the pipe fitting and the pipe joint for the scaffolding. It is easier to insert and insert the pipe fittings. Although the lateral locking of the bolts can be used to achieve proper positioning, under the action of strong wind or external force, the bolts will loosen over time, which will result in the overall structural stability. Insufficient, so there is a direct connection between the pipe fittings of the pipe fittings and the pipe joints, and then the bolts are directly threaded through the two sets and screwed together with the nuts to form a direct locking and fixing positioning mode.

惟,正如前所述,因管接頭的管套管件為取得套插之便利性,所以兩者的尺徑保有適當空間裕度,前述螺栓直接穿鎖固定的方式,固然可避免管件脫出管接頭的管套,使其整體組態可獲得維持,但卻完全無法解決前述空間裕度所產生的搖晃問題,甚至使整體的穩固性更差,自有必要設法加以解決改善者。 However, as mentioned above, because the tube sleeve of the pipe joint is convenient for inserting, the size of the two has a proper space margin, and the bolt is directly locked and fixed, although the pipe escape pipe can be avoided. The sleeve of the joint allows the overall configuration to be maintained, but it does not solve the shaking problem caused by the aforementioned space margin, and even makes the overall stability worse, and it is necessary to try to solve the improvement.

有鑑於現有組合棚架在其管件與管接頭插組關係難以獲得穩固維持,創作人特著手進行研發設計,基於其從事相關產業之多年經驗與技術,進而研創出本創作之組合棚架結構改良。 In view of the fact that the existing composite scaffolding is difficult to obtain stable maintenance in the relationship between the pipe fittings and the pipe joints, the creator has specially developed R&D and design, based on his years of experience and technology in related industries, and then researched and created the composite scaffold structure improvement of the creation. .

為取得管接頭與管件套插關係之穩固維持,本創作於結構設計上,乃分別於管接頭的管套與管件端部分別製設有相互對應貫通之穿孔與栓孔,俾供以螺栓一次穿插通過並配合螺帽螺合而取得兩者的直接穿鎖固定,且將管接頭中一側穿孔作加大尺徑設製,使其尺徑大於螺栓栓頭而 可令栓頭通過,藉以在配合螺帽螺合穿鎖管件及管接頭時,得對管件形成拉鎖迫緊效果,從而可大幅提昇其插組關係之穩固性者。 In order to obtain the stable maintenance of the pipe joint and the pipe fitting relationship, the creation of the pipe joint and the pipe end of the pipe joint are respectively provided with perforations and bolt holes respectively corresponding to the pipe joints, and the bolts are provided once. Through the screwing and matching with the nut to obtain the direct locking and fixing of the two, and one side of the pipe joint is perforated to increase the diameter, so that the diameter is larger than the bolt head The bolt can be passed through, so that when the nut is screwed and the pipe fitting and the pipe joint are screwed, the zipper pressing effect is formed on the pipe member, thereby greatly improving the stability of the plugging relationship.

本創作之組合式棚架結構改良,透過對管接頭各管套之穿孔的尺徑規劃設計,使螺栓栓頭可通過其一側穿孔而直接穿插通過管件栓孔及另側栓孔,再配合螺帽與螺栓螺合而達到將管件往另側拉鎖迫緊之穩固定位功效,據以在不增加其結構複雜性的原則下,卻能以簡易之變更而大幅提昇其整體棚架之穩固性,使其不致受外力影響而輕易鬆動者。 The modular scaffolding structure of the present invention is improved, and the diameter of the perforation of the pipe joints of the pipe joints is designed so that the bolt head can be directly inserted through the pipe bolt hole and the other side bolt hole through the one side perforation, and then cooperate The nut and the bolt are screwed together to achieve the stable fixing function of tightening the pipe to the other side, so that the stability of the whole scaffold can be greatly improved by simple modification without increasing the structural complexity. So that it will not be affected by external forces and easily loosened.

(10)‧‧‧管接頭 (10) ‧‧‧ pipe joints

(11)‧‧‧管套 (11) ‧ ‧ sleeves

(12)‧‧‧套插孔 (12) ‧ ‧ sets of jacks

(13)(14)‧‧‧穿孔 (13) (14) ‧ ‧ perforation

(20)‧‧‧管件 (20) ‧‧‧Pipe fittings

(21)‧‧‧套插段 (21) ‧ ‧ set of inserts

(23)(24)‧‧‧栓孔 (23) (24) ‧‧‧Bolt holes

(30)‧‧‧螺栓 (30)‧‧‧ bolts

(31)‧‧‧栓頭 (31) ‧ ‧ ‧ head

(32)‧‧‧螺帽 (32)‧‧‧ Nuts

第1圖:係本創作較佳實施例之整體結構示意圖。 Fig. 1 is a schematic view showing the overall structure of a preferred embodiment of the present invention.

第2圖:係本創作較佳實施例之局部結構組合示意圖。 Fig. 2 is a schematic view showing the partial structure combination of the preferred embodiment of the present invention.

第3圖:係本創作較佳實施例之局部結構分解示意圖。 Figure 3 is a partial exploded view of the preferred embodiment of the present invention.

第4圖:係本創作較佳實施例之管接頭結構示意圖。 Figure 4 is a schematic view showing the structure of a pipe joint of the preferred embodiment of the present invention.

第5圖:係本創作較佳實施例之管接頭結構局部剖切示意圖。 Fig. 5 is a partially cutaway view showing the structure of the pipe joint of the preferred embodiment of the present invention.

第6圖:係本創作較佳實施例之不同型式管接頭示意圖。 Figure 6 is a schematic view of different types of pipe joints in the preferred embodiment of the present invention.

第7圖:係本創作較佳實施例之局部結構關係示意圖。 Figure 7 is a schematic diagram showing the relationship of the partial structure of the preferred embodiment of the present invention.

有關於本創作之結構組成、技術手段及功效達成方面,謹配合圖式再予舉例進一步具體說明於后:請參閱第1~7圖所示,本創作之棚架於結構設計上,主要是由複數不同型式之管接頭(10)(請參考第6圖所示)與複數根等長或不等長之管件(20)插組搭建成型所需型態的棚架,其中: 該複數管接頭(10),宜採不易生鏽、腐蝕之金屬材質製成,以賦予較佳之結構強度,並依其所在位置或接組功能而製設有多向性之分歧管套(11),藉以構組成不同型式樣態,使其各向管套(11)互呈垂直或預定角度關係,而為了其插接之規格化,其每一向之管套(11)乃具有相同深度之套插孔(12),該等套插孔(12)的孔徑概與前述管件(20)的外徑相符,於各管套(11)的預定位置分別製設有一對呈相對貫通之穿孔(13)(14),且其中一穿孔(13)的尺徑大於另一穿孔(14),該穿孔(13)的孔徑更大於螺栓(30)的栓頭(31)尺徑,使螺栓(30)的栓頭(31)可通過該穿孔(13);而前述之複數管件(20),亦採金屬材質製成者為佳,其可依所欲搭組之棚架規格作不同長度之裁製,或可搭配適當的管接頭(10)加以連結增長,而在管件(20)兩端設為可套插於管接頭(10)管套(11)之套插段(21),在各套插段(21)對應前述管接頭(10)的管套(11)穿孔(13)(14)的相對位置則分別製設有一對相對貫通之栓孔(23)(24),據以在將管件(20)套插於管接頭(10)的管套(11)後,乃得使兩者的栓孔(23)(24)及穿孔(13)(14)呈對應狀態,俾供以預定長度之螺栓(30)穿插鎖設;據此,透過前述管接頭(10)各管套(11)之大、小尺徑穿孔(13)(14)設計,使其在以螺栓(30)穿插鎖結管件(20)與管接頭(10)時,因管接頭(10)的管套(11)之該大尺徑穿孔(13)大於螺栓(30)的栓頭(31),所以當螺栓(30)由該大尺徑穿孔(13)側***並穿過管件(20)的栓孔(23)(24)後,再 由另一小尺徑穿孔(14)穿出,配合將螺帽(32)螺合於螺栓(30)的螺紋段時,其栓頭(31)乃得通過該大尺徑穿孔(13)而抵止於管件(20)外緣,並隨著螺帽(32)與螺栓(30)的螺合,進而可將管件(20)往管套(11)的小尺徑穿孔(14)側拉鎖迫緊,如此一來,將可取得更佳之定位效果,使搭建之棚架型態可獲得穩固之維持,不致因外力作用而輕易鬆動,俾能徹底解決習知結構所存在之問題與缺失;即,經由以上說明,可知本創作在棚架的組合搭建上,除了利用不同型式管接頭與等長或不等長管件套插接組成型各種型態之棚架功能外,更進一步透過管接頭之套管的大尺徑栓孔規劃設計,使其在以螺栓穿插螺固管件與管接頭時,令螺栓栓頭可以通過該大尺徑穿孔而直接抵止於管件外緣面以達成側向拉鎖緊掣之定位作用,令其棚架的整體結構更為穩固而牢靠,徹底解決習知結構易受外力影響而鬆動之缺失,使其組製成型的棚架在擺置上更為穩固,且能確保瓜藤植栽之生長與攀爬,不致因棚架傾塌而受影響者;綜上所述,本創作之組合棚架結構改良,在利用多種型式之管接頭配合管件套插組設成型所需型態棚架的功能架構下,更進一步透過管接頭之管套的穿孔尺徑設計,使其在以螺栓插組定位管件與管接頭套插關係時,得以令栓頭通過管接頭的一側穿孔而將管件往另側拉鎖迫緊,據以大幅提昇其整體之結構穩固性,有效解決習知結構定位不牢固之缺失,整體而言,確具極佳之產業利用性與實用價值,誠不失為一優異、突出之創新設計,爰依法提出專利申請。 Regarding the structural composition, technical means and efficacy of this creation, we will further elaborate on the following with the following examples: Please refer to Figures 1~7, the scaffolding of this creation is mainly in structural design. A plurality of different types of pipe joints (10) (refer to Fig. 6) and a plurality of pipe members (20) of equal length or unequal length are inserted into the scaffolds of the desired type, wherein: The plurality of pipe joints (10) are preferably made of a metal material that is not easily rusted or corroded to impart better structural strength, and a multi-directional manifold sleeve is provided according to the position or the function of the group (11) ), by constructing different types of patterns, so that the respective sleeves (11) are perpendicular or predetermined angular relationship with each other, and for the normalization of the plugging, each of the sleeves (11) of the same direction has the same depth. a socket (12), the aperture of the sleeve (12) substantially conforms to the outer diameter of the tube member (20), and a pair of opposite perforations are respectively formed at predetermined positions of the sleeves (11) ( 13) (14), and one of the perforations (13) has a larger diameter than the other perforation (14), and the perforation (13) has a larger hole diameter than the bolt (30) of the bolt (30), so that the bolt (30) The pegs (31) can pass through the perforations (13); and the plurality of pipe members (20) are preferably made of a metal material, and can be cut to different lengths according to the specifications of the scaffolds to be assembled. System, or may be connected with a suitable pipe joint (10) for connection growth, and at both ends of the pipe member (20) is set to be inserted into the pipe joint (10) sleeve (11) sleeve insert (21), in each Set of inserts (21) corresponding to the front The relative positions of the through holes (13) (14) of the sleeve (11) of the pipe joint (10) are respectively formed with a pair of relatively through bolt holes (23) (24) for inserting the pipe member (20) accordingly. After the sleeve (11) of the pipe joint (10), the bolt holes (23) (24) and the perforations (13) (14) of the two joints are correspondingly provided, and the bolts (30) of a predetermined length are provided. Inserting a lock; according to this, the large and small-diameter perforations (13) (14) of the sleeves (11) of the pipe joint (10) are designed to be inserted into the lock pipe (20) by bolts (30). With the pipe joint (10), since the large-diameter perforation (13) of the pipe socket (11) of the pipe joint (10) is larger than the bolt head (31) of the bolt (30), when the bolt (30) is large After the caliper perforation (13) side is inserted and passed through the bolt hole (23) (24) of the pipe member (20), When the nut (32) is screwed into the threaded section of the bolt (30), the bolt head (31) passes through the large-diameter perforation (13). Resisting the outer edge of the pipe member (20), and screwing the nut (32) and the bolt (30), the pipe member (20) can be zippered to the small-diameter perforation (14) side of the pipe sleeve (11). Tight, in this way, better positioning effect will be achieved, so that the scaffolding type can be maintained stably, without being loosened by external forces, and completely solve the problems and defects in the conventional structure; That is to say, through the above description, it can be seen that the creation of the scaffold in the combination of the scaffolding, in addition to the use of different types of pipe joints and the same length or unequal length of pipe fittings plugged into various types of scaffolding functions, further through the pipe joint The large-diameter bolt hole of the casing is designed so that when the bolted pipe fitting and the pipe joint are inserted through the bolt, the bolt head can directly pass through the large-diameter perforation and directly abut the outer edge surface of the pipe to achieve the lateral direction. The positioning function of the zipper is tighter and firmer, and the overall structure of the scaffolding is more stable and reliable. The lack of external force and looseness makes the scaffold made of the group more stable in placement, and can ensure the growth and climbing of the vine planting, and will not be affected by the collapse of the scaffolding; As described above, the composite scaffolding structure of the present invention is improved, and the perforated diameter of the sleeve of the pipe joint is further designed under the functional structure of the type of scaffold required for forming the pipe fittings by using various types of pipe joints. When the bolt is inserted into the pipe fitting and the pipe joint is inserted into the pipe joint, the plug can be punctured to the other side through the perforation of one side of the pipe joint, thereby greatly improving the overall structural stability. Effectively solve the lack of rigid positioning of the conventional structure. On the whole, it has excellent industrial utilization and practical value. It is an excellent and outstanding innovative design.

(10)‧‧‧管接頭 (10) ‧‧‧ pipe joints

(11)‧‧‧管套 (11) ‧ ‧ sleeves

(12)‧‧‧套插孔 (12) ‧ ‧ sets of jacks

(13)(14)‧‧‧穿孔 (13) (14) ‧ ‧ perforation

(20)‧‧‧管件 (20) ‧‧‧Pipe fittings

(21)‧‧‧套插段 (21) ‧ ‧ set of inserts

(23)(24)‧‧‧栓孔 (23) (24) ‧‧‧Bolt holes

(30)‧‧‧螺栓 (30)‧‧‧ bolts

(31)‧‧‧栓頭 (31) ‧ ‧ ‧ head

(32)‧‧‧螺帽 (32)‧‧‧ Nuts

Claims (3)

一種組合棚架結構改良,主要是由複數不同型式之管接頭與複數根等長或不等長之管件插組搭建成型所需型態的棚架,其中該複數管接頭依其所在位置或接組功能而製設有多向性之分歧管套,且每一向之管套乃具有相同深度之套插孔,該等套插孔的孔徑概與前述管件的外徑相符,於各管套的預定位置分別製設有一對呈相對貫通之穿孔,而在前述管件兩端可套插於管接頭之套插段的相對位置則分別製設有一對相對貫通之栓孔,據以在將管件套插於管接頭的管套後,乃得使兩者的栓孔及穿孔呈對應狀態,俾供以預定長度之螺栓配合螺帽加以穿插鎖設以定位其套插關係;其改良係在於:前述管接頭於其各管套預定位置所分別製設的一對呈相對貫通之穿孔,乃使其中一穿孔的尺徑大於另一穿孔,並使該穿孔的孔徑更大於螺栓的栓頭,使螺栓的栓頭可通過該穿孔者。 The utility model relates to a structural improvement of a combined scaffold, which is mainly composed of a plurality of different types of pipe joints and a plurality of pipe joints of the same length or unequal length, which are required to be built into a type of scaffold, wherein the plurality of pipe joints are connected according to their positions or The group function is provided with a multi-directional bi-directional sleeve, and each sleeve is a sleeve having the same depth, and the aperture of the sleeve is substantially consistent with the outer diameter of the tube, and the sleeves are A pair of through holes are formed in the predetermined positions, and a pair of oppositely inserted bolt holes are respectively formed at opposite positions of the sleeves of the pipe joints at the two ends of the pipe fittings, so that the pipe sleeves are After being inserted into the sleeve of the pipe joint, the bolt holes and the perforations of the two joints are correspondingly arranged, and the bolts with the predetermined length are fitted with the nut to be inserted and locked to locate the insertion relationship; the improvement is as follows: The pair of pipe joints respectively formed at predetermined positions of the sleeves are oppositely penetrating, such that the diameter of one of the perforations is larger than the other perforation, and the hole diameter of the perforation is larger than the bolt head of the bolt, so that the bolt The plug head can pass the Those holes. 依據申請專利範圍第1項所述之組合式棚架結構改良,其中所述之螺栓在穿鎖固定管件與管接頭的套插關係時,係使螺栓自管接頭的管套之大尺徑穿孔***並穿過管件栓孔後由另一小尺徑穿孔穿出,配合將螺帽螺合於螺栓的螺紋段而使其栓頭通過該大尺徑穿孔抵止於管件外緣,進而將管件往管套的小尺徑穿孔側拉鎖迫緊者。 According to the improvement of the combined scaffolding structure according to the first aspect of the patent application, wherein the bolt is inserted into the pipe and the pipe joint of the pipe joint, the bolt is perforated by the large diameter of the pipe joint of the pipe joint. Inserted and passed through the tubular bolt hole and pierced by another small-diameter hole, and the nut is screwed to the threaded section of the bolt, so that the bolt head passes through the large-diameter perforation to abut the outer edge of the pipe member, thereby the pipe fitting To the small diameter of the sleeve, the perforated side is zippered. 依據申請專利範圍第1項所述之組合式棚架結構改良,其中所述之管接頭及管件係採金屬材質製成者。 According to the improvement of the combined scaffolding structure according to claim 1, wherein the pipe joint and the pipe fitting are made of a metal material.
TW105212691U 2016-08-19 2016-08-19 Structure improvement of assembled trellis TWM541487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW105212691U TWM541487U (en) 2016-08-19 2016-08-19 Structure improvement of assembled trellis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW105212691U TWM541487U (en) 2016-08-19 2016-08-19 Structure improvement of assembled trellis

Publications (1)

Publication Number Publication Date
TWM541487U true TWM541487U (en) 2017-05-11

Family

ID=59371515

Family Applications (1)

Application Number Title Priority Date Filing Date
TW105212691U TWM541487U (en) 2016-08-19 2016-08-19 Structure improvement of assembled trellis

Country Status (1)

Country Link
TW (1) TWM541487U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI764788B (en) * 2021-07-22 2022-05-11 陳柏蒼 Easy-to-assemble compartment components for storage and handling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI764788B (en) * 2021-07-22 2022-05-11 陳柏蒼 Easy-to-assemble compartment components for storage and handling

Similar Documents

Publication Publication Date Title
US11828056B2 (en) Modular furniture system
JP6310554B2 (en) Tube connector
US10219445B2 (en) Modular plant support poles
US20180360225A1 (en) Structure for connecting a stand pole and a beam of a bunk bed and a bunk bed using the structure
AU2019101163A4 (en) Pool noodle connectors
WO2002055916A3 (en) Fitting and method for joining structural tubular elements
US20170159321A1 (en) Fence and fence connection apparatus and method
TWM541487U (en) Structure improvement of assembled trellis
HK1246577A2 (en) A geocell
CN103790491A (en) Structure of detachable wooden door and connection method thereof
JP2008185173A (en) Pipe joint and structure using the same
ITNA20080024A1 (en) CONSTRUCTION SYSTEM CONSISTING OF THREE-DIMENSIONAL PLASTIC BALL JOINTS AND ALUMINUM RODS FOR DIY CONSTRUCTION OF INTERIOR AND OUTDOOR FURNISHING ELEMENTS.
US20140131647A1 (en) Method and apparatus for providing braced sections of a fence
CN202227943U (en) Rail of balcony guardrail and built-in connection structure of ornaments
KR101277066B1 (en) Connector for assembly structure
CN202299613U (en) Combined protective fence
KR200319281Y1 (en) A Coupling For Pipe Structure
TWM564098U (en) Joint kit structure improvement
JP2009281027A (en) Wooden truss framework member
KR200438611Y1 (en) sunshade frame connector for ginseng field
KR200399003Y1 (en) A Set of Linker for the Aquafarm
KR20080004207U (en) Sunshade frame connector for ginseng field
CN212002206U (en) Assembled building steel structure strutting arrangement
TWI798138B (en) Floating tube structure of floating scaffolding
TWI837906B (en) Hose assembly and drainage system using the same

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees