TWM519019U - Compression molding device for metal sheet - Google Patents

Compression molding device for metal sheet Download PDF

Info

Publication number
TWM519019U
TWM519019U TW104214700U TW104214700U TWM519019U TW M519019 U TWM519019 U TW M519019U TW 104214700 U TW104214700 U TW 104214700U TW 104214700 U TW104214700 U TW 104214700U TW M519019 U TWM519019 U TW M519019U
Authority
TW
Taiwan
Prior art keywords
mold
fluid
metal sheet
sheet
metal
Prior art date
Application number
TW104214700U
Other languages
Chinese (zh)
Inventor
黃子恆
Original Assignee
鼎藝科技股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 鼎藝科技股份有限公司 filed Critical 鼎藝科技股份有限公司
Priority to TW104214700U priority Critical patent/TWM519019U/en
Publication of TWM519019U publication Critical patent/TWM519019U/en

Links

Landscapes

  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

A compression molding device comprises a first mold, a second mold and a fluid delivery unit. The first mold comprises at least one connecting hole, and the second mold comprises a molding cavity. A metal sheet can be clipped between the first mold and the second mold to cover the molding cavity of the second mold. The fluid delivery unit is able to deliver a fluid to a space between the first mold and the metal sheet via a delivery pipe and the connecting hole. Further, the fluid delivery unit is able to deliver the fluid between the first mold and the metal sheet to outside for detaching the metal sheet from the second mold easily.

Description

金屬板材成型裝置 Sheet metal forming device

本創作有關於一種金屬板材成型裝置,有利於將成型的金屬板材由模具上卸下。 The present invention relates to a sheet metal forming apparatus which facilitates the removal of a formed metal sheet from a mold.

加壓成型是一種常見的金屬板材加工方法,並具有製作成本低廉、製作效率高及製作品質一致的優點。因此加壓成型所生產的加壓件普遍被應用在各種不同的領域,例如:消費電子產品、機械裝置、五金材料或運輸載具等。 Press forming is a common metal sheet processing method, and has the advantages of low production cost, high production efficiency and consistent production quality. Therefore, the pressurizing members produced by press molding are generally used in various fields such as consumer electronic products, mechanical devices, hardware materials or transportation vehicles.

一般而言,透過加壓成型加工金屬板材的過程中,首先會加熱金屬板材,以利於進行後續金屬板材的成型步驟。當金屬板材被加熱到一定的溫度後,便可將金屬板材放置在兩個模具之間,而後再將加壓的流體輸入其中一個模具與金屬板材之間。 In general, in the process of processing a metal sheet by press molding, the metal sheet is first heated to facilitate the subsequent step of forming the sheet metal. After the sheet metal is heated to a certain temperature, the metal sheet can be placed between the two molds, and then the pressurized fluid is fed between one of the molds and the metal sheet.

輸送至其中一個模具與金屬板材之間的流體,將會施加壓力給金屬板材,使得金屬板材因為加壓流體的作用,而貼附在另一個模具的內部,以完成金屬板材加壓成型的步驟。 The fluid delivered to one of the molds and the metal sheet will apply pressure to the sheet metal, so that the sheet metal is attached to the inside of the other mold due to the action of the pressurized fluid to complete the step of press forming the sheet metal. .

透過上述的步驟雖然可以完成金屬板材的加工,但金屬板材 在經過加壓之後,往往會緊密的貼合在模具的內部,而不利於操作人員將經過加壓的金屬板材由模具上卸下,進而影響了金屬板材成型的製作效能。 Through the above steps, although the processing of sheet metal can be completed, the sheet metal is After being pressurized, it tends to fit tightly inside the mold, which is unfavorable for the operator to remove the pressed metal sheet from the mold, thereby affecting the production efficiency of the sheet metal forming.

本創作之一目的,在於提供一種金屬板材成型裝置,有利於將成型的金屬板材由模具上取下,並可提高製作金屬板材的效率。 One of the aims of the present invention is to provide a sheet metal forming device which is advantageous for removing the formed metal sheet from the mold and improving the efficiency of the metal sheet.

本創作之一目的,在於提供一種金屬板材成型裝置,可透過流體輸送單元或流體輸入單元將流體輸送至金屬板材與第一模具之間,使得金屬板材朝第二模具的方向成型。此外更可透過流體輸送單元或流體輸出單元,將金屬板材與第一模具之間的流體排出,使得第一模具吸附成型的金屬板材,並有利於將成型的金屬板材由第二模具上取下。 One of the purposes of the present invention is to provide a sheet metal forming apparatus that can transport a fluid between a metal sheet and a first mold through a fluid transfer unit or a fluid input unit such that the metal sheet is formed in a direction toward the second mold. In addition, the fluid between the metal sheet and the first mold is discharged through the fluid conveying unit or the fluid output unit, so that the first mold adsorbs the formed metal sheet and facilitates removing the formed metal sheet from the second mold. .

為達到上述目的,本創作提供一種金屬板材成型裝置,包括:一第一模具,包括至少一連接孔;至少一輸送管,連接第一模具的連接孔;一第二模具,其內部包括至少一成型腔,其中第二模具與第一模具接合時,連接孔會與成型腔相對;及一流體輸送單元,連接輸送管,並用以輸送一流體,其中第一模具與第二模具用以夾持一金屬板材,並以金屬板材覆蓋第二模具的成型腔,而流體輸送單元則經由輸送管及連接孔將流體輸送至第一模具與金屬板材之間,並經由連接孔及輸送管將第一模具及金屬板材之間的流體排出。 In order to achieve the above object, the present invention provides a sheet metal forming apparatus comprising: a first mold including at least one connecting hole; at least one conveying pipe connecting the connecting hole of the first mold; and a second mold having at least one inside thereof a molding cavity, wherein the second mold is engaged with the first mold, the connecting hole is opposite to the molding cavity; and a fluid conveying unit is connected to the conveying pipe and is used for conveying a fluid, wherein the first die and the second die are used for clamping a metal plate, and covering the molding cavity of the second mold with a metal plate, and the fluid conveying unit transports the fluid between the first mold and the metal plate via the conveying pipe and the connecting hole, and firstly passes through the connecting hole and the conveying pipe Fluid discharge between the mold and the metal sheet.

本創作提供另一種金屬板材成型裝置,包括:一第一模具,包括至少一連接孔;至少一輸送管,連接第一模具的連接孔;一第二模具,其內部包括至少一成型腔,其中第二模具與第一模具接合時,連接孔會與 成型腔相對;一流體輸入單元,連接輸送管,其中第一模具與第二模具用以夾持一金屬板材,並以金屬板材覆蓋第二模具的成型腔,而流體輸入單元則經由輸送管及連接孔將一流體輸送至第一模具與金屬板材之間;及一流體輸出單元,連接輸送管,並經由連接孔及輸送管將第一模具及金屬板材之間的流體排出。 The present invention provides another sheet metal forming apparatus, comprising: a first mold comprising at least one connecting hole; at least one conveying pipe connecting the connecting hole of the first mold; and a second mold having at least one forming cavity therein, wherein When the second mold is engaged with the first mold, the connection hole will be a molding chamber is opposite; a fluid input unit is connected to the conveying pipe, wherein the first mold and the second mold are used for holding a metal plate, and the metal plate is used to cover the molding cavity of the second mold, and the fluid input unit is connected via the conveying pipe and The connecting hole conveys a fluid between the first mold and the metal plate; and a fluid output unit that connects the conveying pipe and discharges the fluid between the first mold and the metal plate through the connecting hole and the conveying pipe.

在本創作金屬板材成型裝置一實施例中,其中第一模具的內部包括至少一密封腔,連接連接孔,且第二模具與第一模具接合時,成型腔會與密封腔相對。 In an embodiment of the present metal sheet forming apparatus, wherein the interior of the first mold includes at least one sealing cavity connecting the connecting holes, and the second mold is engaged with the first mold, the molding cavity is opposite to the sealing cavity.

在本創作金屬板材成型裝置一實施例中,其中流體輸送單元經由輸送管及連接孔將流體輸送至密封腔,並經由連接孔及輸送管將密封腔的流體排出。 In an embodiment of the present metal sheet forming apparatus, the fluid conveying unit conveys the fluid to the sealed chamber via the conveying pipe and the connecting hole, and discharges the fluid of the sealed chamber through the connecting hole and the conveying pipe.

在本創作金屬板材成型裝置一實施例中,其中流體輸入單元經由輸送管及連接孔將流體輸送至密封腔,而流體輸出單元則經由連接孔及輸送管將密封腔的流體排出。 In an embodiment of the present metal sheet forming apparatus, wherein the fluid input unit delivers fluid to the sealed chamber via the delivery tube and the connection hole, and the fluid output unit discharges the fluid of the sealed chamber via the connection hole and the delivery tube.

在本創作金屬板材成型裝置一實施例中,其中金屬板材覆蓋密封腔。 In an embodiment of the present metal sheet forming apparatus, the metal sheet covers the sealing chamber.

在本創作金屬板材成型裝置一實施例中,其中流體輸送單元或流體輸出單元將金屬板材與第一模具之間的流體導出,並使得金屬板材與第一模具之間的壓力小於外界的壓力。 In an embodiment of the present metal sheet forming apparatus, wherein the fluid conveying unit or the fluid output unit discharges the fluid between the metal sheet and the first mold, and the pressure between the metal sheet and the first mold is less than the external pressure.

在本創作金屬板材成型裝置一實施例中,其中流體輸入單元將流體輸送至第一模具與金屬板材之間,使得兩者之間的壓力大於外界的壓力;流體輸出單元將第一模具與金屬板材之間的流體排出,使得兩者之 間的壓力略小於外界的壓力;及流體輸入單元再次將流體輸送至第一模具與金屬板材之間,使得兩者之間的壓力略大於或等於外界的壓力。 In an embodiment of the present metal sheet forming apparatus, wherein the fluid input unit transports the fluid between the first mold and the metal sheet such that the pressure between the two is greater than the external pressure; the fluid output unit connects the first mold to the metal Fluid discharge between the plates, making the two The pressure between them is slightly less than the external pressure; and the fluid input unit again transports the fluid between the first mold and the metal sheet such that the pressure between the two is slightly greater than or equal to the external pressure.

10‧‧‧金屬板材成型裝置 10‧‧‧Metal sheet forming device

11‧‧‧第一模具 11‧‧‧First mould

111‧‧‧連接孔 111‧‧‧Connection hole

113‧‧‧密封腔 113‧‧‧ sealed cavity

12‧‧‧金屬板材 12‧‧‧Metal sheet

13‧‧‧第二模具 13‧‧‧Second mold

131‧‧‧成型腔 131‧‧‧Molding cavity

15‧‧‧輸送管 15‧‧‧ delivery tube

17‧‧‧流體輸送單元 17‧‧‧Fluid transport unit

20‧‧‧金屬板材成型裝置 20‧‧‧Metal sheet forming device

27‧‧‧流體輸入單元 27‧‧‧Fluid input unit

281‧‧‧第一開關單元 281‧‧‧First switch unit

283‧‧‧第二開關單元 283‧‧‧Second switch unit

29‧‧‧流體輸出單元 29‧‧‧Fluid output unit

第1圖:為本創作金屬板材成型裝置一實施例的構造示意圖;第2圖:為本創作金屬板材成型裝置又一實施例的構造示意圖;第3圖:為本創作金屬板材成型裝置又一實施例的構造示意圖;第4圖至第8圖:分別為本創作金屬板材成型裝置對金屬板材進行成型一實施例的動作示意圖。雖然已透過舉例方式在圖式中描述了本創作的具體實施方式,並在本文中對其作了詳細的說明,但是本創作還允許有各種修改和替換形式。本創作之圖式內容可為不等比例,圖式及其詳細的描述僅為特定型式的揭露,並不為本創作的限制,相反的,依據專利範圍之精神和範圍內進行修改、均等構件及其置換皆為本創作所涵蓋的範圍。 1 is a schematic structural view of an embodiment of a sheet metal forming apparatus of the present invention; FIG. 2 is a schematic structural view of another embodiment of the sheet metal forming apparatus of the present invention; FIG. 3: Schematic diagram of the construction of the embodiment; Fig. 4 to Fig. 8 are schematic views showing the operation of the embodiment of the metal sheet forming apparatus for forming a metal sheet. While the specific embodiments of the present invention have been described in the drawings and are described in detail herein, the invention herein The schema content of this creation may be unequal proportions. The schema and its detailed description are only the disclosure of specific types, and are not limitations of the creation. On the contrary, modifications and equal components are made according to the spirit and scope of the patent scope. Both their replacements are covered by this creation.

請參閱第1圖,為本創作金屬板材成型裝置一實施例的構造示意圖。如圖所示,本創作所述的金屬板材成型裝置10主要包括一第一模具11、一第二模具13、至少一輸送管15及一流體輸送單元17,其中流體輸 送單元17透過輸送管15連接第一模具11,而第一模具11則可與第二模具13接合。 Please refer to FIG. 1 , which is a schematic structural view of an embodiment of a metal sheet forming apparatus. As shown in the figure, the sheet metal forming apparatus 10 of the present invention mainly includes a first mold 11, a second mold 13, at least one conveying pipe 15, and a fluid conveying unit 17, wherein the fluid is transferred. The feeding unit 17 is connected to the first mold 11 through the conveying pipe 15, and the first mold 11 is engageable with the second mold 13.

具體而言,第一模具11內包括至少一連接孔111,而輸送管15則與連接孔111相連接,使得流體輸送單元17可透過輸送管15及連接孔111將流體輸送至第一模具11內。 Specifically, the first mold 11 includes at least one connecting hole 111, and the conveying pipe 15 is connected with the connecting hole 111, so that the fluid conveying unit 17 can transport the fluid to the first mold 11 through the conveying pipe 15 and the connecting hole 111. Inside.

在使用金屬板材成型裝置10時,通常會在第一模具11及第二模具13之間設置一金屬板材12,並透過第一模具11及第二模具13夾持金屬板材12。流體輸送單元17可將流體輸送至第一模具11與金屬板材12之間,並透過流體對金屬板材12施加壓力,使得金屬板材12朝第二模具13的方向變形。 When the sheet metal forming apparatus 10 is used, a metal plate 12 is usually disposed between the first mold 11 and the second mold 13, and the metal sheet 12 is sandwiched by the first mold 11 and the second mold 13. The fluid delivery unit 17 can transport the fluid between the first mold 11 and the metal sheet 12 and apply pressure to the metal sheet 12 through the fluid to deform the metal sheet 12 in the direction of the second mold 13.

具體來說第二模具13內包括一成型腔131,當第二模具13與第一模具11接合時,第一模具11的連接孔111將會與第二模具13的成型腔131相對。此外當第一模具11及第二模具13夾持金屬板材12時,金屬板材12將會完整的覆蓋第二模具13的成型腔131。流體輸送單元17輸送的流體將會對金屬板材12施壓,使得金屬板材12貼合在第二模具13內的成型腔131的表面,並完成金屬板材12的成型步驟,其中成型後的金屬板材12的形狀會與成型腔131的形狀相同。 Specifically, the second mold 13 includes a molding cavity 131. When the second mold 13 is engaged with the first mold 11, the connection hole 111 of the first mold 11 will be opposed to the molding cavity 131 of the second mold 13. Further, when the first mold 11 and the second mold 13 sandwich the metal sheet 12, the metal sheet 12 will completely cover the molding cavity 131 of the second mold 13. The fluid conveyed by the fluid conveying unit 17 will press the metal sheet 12 so that the metal sheet 12 fits on the surface of the molding cavity 131 in the second mold 13, and the forming step of the metal sheet 12 is completed, wherein the formed metal sheet is formed. The shape of 12 will be the same as that of the molding cavity 131.

在完成金屬板材12的成型步驟後,可將第一模具11與第二模具13分離,而後再將成型的金屬板材12由第二模具13的成型腔131內取出。然而第一模具11與成型的金屬板材12或第二模具13之間的氣體壓力很高,因此若直接分離第一模具11及第二模具13,則可能會產生危險,或者是導致第一模具11與第二模具13錯位。 After the forming step of the metal sheet 12 is completed, the first mold 11 and the second mold 13 can be separated, and then the formed metal sheet 12 can be taken out from the molding cavity 131 of the second mold 13. However, the gas pressure between the first mold 11 and the formed metal sheet 12 or the second mold 13 is high, so if the first mold 11 and the second mold 13 are directly separated, there may be a danger or the first mold may be caused. 11 is misaligned with the second mold 13.

為此在本創作一實施例中,可透過流體輸送單元17將第一模具11與金屬板材12之間的流體導出,並使得第一模具11與金屬板材12之間的壓力大於或等於外界的壓力,而後再將第一模具11及第二模具12分離。以避免第一模具11與第二模具13分離時,所可能導致的危險,或者是發生第一模具11與第二模具13錯位的情形。 To this end, in an embodiment of the present invention, the fluid between the first mold 11 and the metal sheet 12 can be discharged through the fluid transport unit 17, and the pressure between the first mold 11 and the metal sheet 12 is greater than or equal to the outside. The pressure is then separated from the first mold 11 and the second mold 12. The danger that may be caused when the first mold 11 is separated from the second mold 13 is avoided, or the first mold 11 and the second mold 13 are misaligned.

此外在實際製作時,成型的金屬板材12往往會緊貼在第二模具13的成型腔131上,使得成型的金屬板材12不易由第二模具13上取下。一般而言,通常會將第二模具13及成型的金屬板材12放置一段時間,使得第二模具13及成型的金屬板材12冷卻至一定的溫度後,再將成型的金屬板材12由第二模具13上取下。 In addition, in actual production, the formed metal sheet 12 tends to abut against the molding cavity 131 of the second mold 13, so that the formed metal sheet 12 is not easily removed from the second mold 13. Generally, the second mold 13 and the formed metal sheet 12 are usually placed for a period of time, so that the second mold 13 and the formed metal sheet 12 are cooled to a certain temperature, and then the formed metal sheet 12 is replaced by the second mold. Take it off on 13.

然而在第二模具13及金屬板材12在冷卻之後,成型的金屬板材12還是有可能無法由第二模具13的成型腔131內取出。此外在等待第二模具13及金屬板材12冷卻的過程中,往往需要花費許多的時間,進而增加製作成型的金屬板材12所花費的時間及製作成本。 However, after the second mold 13 and the metal sheet 12 are cooled, the formed metal sheet 12 may not be taken out from the molding cavity 131 of the second mold 13. Further, in the process of waiting for the cooling of the second mold 13 and the metal sheet 12, it takes a lot of time to increase the time and production cost of the formed metal sheet 12.

為了方便將成型的金屬板材12由第二模具13的成型腔131取下,並減少將成型的金屬板材12由第二模具13上取下所花費的時間。本創作揭露的流體輸送單元17除了可將流體輸送至第一模具11與金屬板材12之間,更可用以將第一模具11與金屬板材12之間的流體排出,使得第一模具11與金屬板材12之間的壓力略小於外界壓力,例如略小於1大氣壓。 In order to facilitate the removal of the formed metal sheet 12 from the molding cavity 131 of the second mold 13, the time taken to remove the formed metal sheet 12 from the second mold 13 is reduced. The fluid delivery unit 17 disclosed in the present disclosure can be used to discharge fluid between the first mold 11 and the metal sheet 12, and can also discharge the fluid between the first mold 11 and the metal sheet 12, so that the first mold 11 and the metal The pressure between the sheets 12 is slightly less than the external pressure, for example slightly less than 1 atmosphere.

具體來說本創作所述的流體輸送單元17在完成金屬板材12的成型步驟後,才會將第一模具11及金屬板材12之間的流體排出,並可進一步使得第一模具11與成型的金屬板材12之間形成負壓,以鬆動金屬板材 12與第二模具13之間的連接關係。此外當第一模具11與第二模具13分離時,第一模具11將會拉扯成型的金屬板材12,並使得成型的金屬板材12與第二模具13的成型腔131分離或鬆動,藉此將有利於將成型的金屬板材12由第二模具13上取下。 Specifically, the fluid transport unit 17 described in the present invention discharges the fluid between the first mold 11 and the metal sheet 12 after completing the forming step of the metal sheet 12, and further enables the first mold 11 and the formed mold. A negative pressure is formed between the metal sheets 12 to loosen the metal sheets The connection relationship between the 12 and the second mold 13. In addition, when the first mold 11 is separated from the second mold 13, the first mold 11 will pull the formed metal sheet 12, and the formed metal sheet 12 is separated or loosened from the molding cavity 131 of the second mold 13, thereby It is advantageous to remove the formed metal sheet 12 from the second mold 13.

然而在實際應用時,當第一模具11與金屬板材12之間為負壓時,有可能會導致第一模具11不易與第二模具13分離,或者是可能在第一模具11與第二模具13分離的過程中,造成金屬板材12產生變形。為了避免上述的情形發生,在本創作另一實施例中,可透過流體輸送單元17再次將流體輸送至第一模具11與金屬板材12之間,使得第一模具11與金屬板材12之間的壓力略大於或等於外界的壓力,並有利於開啟第一模具11及第二模具13。本創作所述金屬板材成型裝置10的動作方式,會在後續的實施例中詳細說明。 However, in practical applications, when the first mold 11 and the metal sheet 12 are under negative pressure, it may cause the first mold 11 to be difficult to separate from the second mold 13, or may be in the first mold 11 and the second mold. During the separation process, the metal sheet 12 is deformed. In order to avoid the above situation, in another embodiment of the present invention, the fluid can be again transported between the first mold 11 and the metal sheet 12 through the fluid delivery unit 17, such that the first mold 11 and the metal sheet 12 are The pressure is slightly greater than or equal to the external pressure, and is advantageous for opening the first mold 11 and the second mold 13. The mode of operation of the sheet metal forming apparatus 10 of the present invention will be described in detail in the following embodiments.

在本創作上述實施例中,第一模具11的連接孔111、下表面及/或內表面緊貼未成型的金屬板材12,而流體輸送單元17則經由輸送管15及連接孔111將流體輸送至第一模具11與金屬板材12之間,使得金屬板材12朝第二模具13的成型腔131變形,如第1圖所示。 In the above embodiment of the present creation, the connection hole 111, the lower surface and/or the inner surface of the first mold 11 abut against the unformed metal sheet 12, and the fluid delivery unit 17 delivers the fluid via the delivery tube 15 and the connection hole 111. Between the first mold 11 and the metal sheet 12, the metal sheet 12 is deformed toward the molding cavity 131 of the second mold 13, as shown in Fig. 1.

在不同實施例中,如第2圖所示,第一模具11內亦可包括一密封腔113,其中連接孔111連接密封腔113。當第一模具11與第二模具13相接合時,第一模具11的密封腔113將與第二模具13的成型腔131相對,並於密封腔113與成型腔131之間形成一密閉空間。 In different embodiments, as shown in FIG. 2, the first mold 11 may also include a sealing cavity 113 in which the connecting hole 111 is connected to the sealing cavity 113. When the first mold 11 and the second mold 13 are joined, the sealing cavity 113 of the first mold 11 will oppose the molding cavity 131 of the second mold 13, and a sealed space is formed between the sealing chamber 113 and the molding cavity 131.

此外當金屬板材12放置在第一模具11及第二模具13之間時,第一模具11的密封腔113與第二模具13的成型腔131將分別位於金屬板 材12的不同表面,其中金屬板材12將會完整的覆蓋密封腔113及成型腔131。當流體輸送單元17經由輸送管15及連接孔111將流體輸送至第一模具11的密封腔113時,密封腔113內的高壓流體將會對金屬板材12施壓,使得金屬板材12朝第二模具13的成型腔131的方向變形,直到金屬板材12完整的貼合在成型腔131的表面。此外流體輸送單元17更可將密封腔113內的流體排出,使得密封腔113內的壓力小於外界的壓力。 In addition, when the metal sheet 12 is placed between the first mold 11 and the second mold 13, the sealing cavity 113 of the first mold 11 and the molding cavity 131 of the second mold 13 are respectively located on the metal plate. The different surfaces of the material 12, wherein the metal sheet 12 will completely cover the sealing chamber 113 and the molding cavity 131. When the fluid delivery unit 17 delivers fluid to the sealed chamber 113 of the first mold 11 via the delivery tube 15 and the connection hole 111, the high pressure fluid in the sealed chamber 113 will press the metal sheet 12 such that the metal sheet 12 faces the second The direction of the molding cavity 131 of the mold 13 is deformed until the metal sheet 12 is completely attached to the surface of the molding cavity 131. In addition, the fluid delivery unit 17 can discharge the fluid in the sealed chamber 113 such that the pressure in the sealed chamber 113 is less than the external pressure.

請參閱第3圖,為本創作金屬板材成型裝置又一實施例的構造示意圖。如圖所示,本創作所述的金屬板材成型裝置20主要包括一第一模具11、一第二模具13、至少一輸送管15、一流體輸入單元27及一流體輸出單元29,其中流體輸入單元27及流體輸出單元29透過輸送管15連接第一模具11。 Please refer to FIG. 3, which is a schematic structural view of still another embodiment of the original metal sheet forming apparatus. As shown, the sheet metal forming apparatus 20 of the present invention mainly includes a first mold 11, a second mold 13, at least one conveying pipe 15, a fluid input unit 27, and a fluid output unit 29, wherein the fluid input The unit 27 and the fluid output unit 29 are connected to the first mold 11 through the conveying pipe 15.

在第1圖及第2圖所述的實施例中,主要透過單一個流體輸送單元17將流體輸送至第一模具11與金屬板材12之間,或者是將第一模具11與金屬板材12之間流體排出。 In the embodiments described in FIGS. 1 and 2, the fluid is mainly transported between the first mold 11 and the metal sheet 12 through a single fluid transport unit 17, or the first mold 11 and the metal sheet 12 are The fluid is discharged.

在本創作實施例中,則是透過流體輸入單元27將流體輸送至第一模具11與金屬板材12之間,使得金屬板材12朝第二模具13及/或成型腔131的方向變形,並緊貼在成型腔131的表面,以完成金屬板材12成型的步驟。 In the present embodiment, the fluid is delivered to the first mold 11 and the metal sheet 12 through the fluid input unit 27, so that the metal sheet 12 is deformed toward the second mold 13 and/or the molding cavity 131, and is tight. It is attached to the surface of the molding cavity 131 to complete the step of molding the metal sheet 12.

在完成金屬板材12的成型後,則可透過流體輸出單元29將第一模具11與金屬板材12之間流體排出,使得第一模具11與成型的金屬板材12之間的壓力略大於或等於外界的壓力,以利於分離第一模具11及第二模具13。 After the forming of the metal sheet 12 is completed, the fluid between the first mold 11 and the metal sheet 12 can be discharged through the fluid output unit 29, so that the pressure between the first mold 11 and the formed metal sheet 12 is slightly greater than or equal to the outside. The pressure is favorable to separate the first mold 11 and the second mold 13.

在本創作另一實施例中,流體輸出單元29可進一步排出第一模具11與金屬板材12之間的流體,使得兩者之間的壓力略小於外界壓力,例如小於1大氣壓。藉此第一模具11與成型的金屬板材12之間將會形成負壓,以鬆動金屬板材12與第二模具13之間的連接關係。此外當第一模具11與第二模具13分離時,第一模具11將會拉扯成型的金屬板材12,使得成型的金屬板材12與第二模具13的成型腔131的表面分離或鬆動,並有利於將成型的金屬板材12由第二模具13上取下。 In another embodiment of the present creation, the fluid output unit 29 may further discharge the fluid between the first mold 11 and the metal sheet 12 such that the pressure between the two is slightly less than the external pressure, such as less than 1 atmosphere. Thereby, a negative pressure is formed between the first mold 11 and the formed metal sheet 12 to loosen the connection relationship between the metal sheet 12 and the second mold 13. In addition, when the first mold 11 and the second mold 13 are separated, the first mold 11 will pull the formed metal sheet 12, so that the formed metal sheet 12 is separated or loosened from the surface of the molding cavity 131 of the second mold 13, and is advantageous. The formed metal sheet 12 is removed from the second mold 13.

然而在實際應用時,當第一模具11與金屬板材12之間為負壓時,有可能會導致第一模具11不易與第二模具13分離,或者是可能在第一模具11與第二模具13分離的過程中,造成金屬板材12產生變形。為了避免上述的情形發生,在本創作另一實施例中,可透過流體輸入單元27再次將流體輸送至第一模具11與金屬板材12之間,使得第一模具11與金屬板材12之間的壓力略大於或等於外界的壓力,並有利於開啟第一模具11及第二模具13。 However, in practical applications, when the first mold 11 and the metal sheet 12 are under negative pressure, it may cause the first mold 11 to be difficult to separate from the second mold 13, or may be in the first mold 11 and the second mold. During the separation process, the metal sheet 12 is deformed. In order to avoid the above situation, in another embodiment of the present invention, the fluid may be again transported between the first mold 11 and the metal sheet 12 through the fluid input unit 27 such that the first mold 11 and the metal sheet 12 are The pressure is slightly greater than or equal to the external pressure, and is advantageous for opening the first mold 11 and the second mold 13.

在本創作另一實施例中,亦可於流體輸入單元27與第一模具11之間設置一第一開關單元281,並於流體輸出單元29與第一模具11之間設置一第二開關單元283。當流體輸入單元27將流體輸送至第一模具11與金屬板材12之間時,可開啟(on)第一開關單元281,並關閉(off)第二開關單元283,使得流體不至於由流體輸出單元29洩漏。此外當流體輸出單元29將第一模具11與金屬板材12之間流體排出時,則可關閉(off)第一開關單元281,並開啟(on)第二開關單元283,使得外界的流體不至於由流體輸入單元27進入。 In another embodiment of the present invention, a first switch unit 281 may be disposed between the fluid input unit 27 and the first mold 11, and a second switch unit is disposed between the fluid output unit 29 and the first mold 11. 283. When the fluid input unit 27 delivers fluid between the first mold 11 and the metal sheet 12, the first switching unit 281 can be turned on, and the second switching unit 283 can be turned off so that the fluid is not discharged by the fluid. Unit 29 leaks. Further, when the fluid output unit 29 discharges the fluid between the first mold 11 and the metal sheet 12, the first switching unit 281 can be turned off, and the second switching unit 283 can be turned on, so that the external fluid is not prevented. Entered by the fluid input unit 27.

請參閱第4圖至第8圖,分別為本創作金屬板材成型裝置對金屬板材進行成型一實施例的動作示意圖。如第4圖所示,首先將金屬板材12放置在第一模具11與第二模具13之間,其中第一模具11及第二模具13會相互靠近,並夾持兩者之間的金屬板材12。例如第一模具11緊靠金屬板材12的上表面,使得金屬板材12與第一模具11的密封腔113形成密閉空間,此外第二模具13則緊靠金屬板材12的下表面,使得金屬板材12與第二模具13的成型腔131之間形成密閉空間。 Please refer to Fig. 4 to Fig. 8 for the action diagram of an embodiment of forming a sheet metal forming apparatus for forming a metal sheet. As shown in FIG. 4, the metal sheet 12 is first placed between the first mold 11 and the second mold 13, wherein the first mold 11 and the second mold 13 are close to each other and sandwich the metal sheet therebetween. 12. For example, the first mold 11 abuts against the upper surface of the metal sheet 12 such that the metal sheet 12 forms a closed space with the sealing cavity 113 of the first mold 11, and further the second mold 13 abuts against the lower surface of the metal sheet 12, so that the metal sheet 12 A sealed space is formed with the molding cavity 131 of the second mold 13.

一般而言,在將金屬板材12放置在第一模具11及第二模具13前,可預先加熱金屬板材12,並提高金屬板材12的溫度。此外第一模具11及第二模具13亦可保持在一定的溫度,當金屬板材12放置在第一模具11及/或第二模具13上時,第一模具11及第二模具13可持續加熱金屬板材12。 In general, before the metal sheet 12 is placed on the first mold 11 and the second mold 13, the metal sheet 12 can be heated in advance and the temperature of the metal sheet 12 can be increased. In addition, the first mold 11 and the second mold 13 can also be maintained at a certain temperature. When the metal sheet 12 is placed on the first mold 11 and/or the second mold 13, the first mold 11 and the second mold 13 can be continuously heated. Sheet metal 12.

當金屬板材12被放置在第一模具11及第二模具13之間後,流體輸入單元27將會經由輸送管15及連接孔111將流體輸送至第一模具11與金屬板材12之間,例如流體輸入單元27可將流體輸送至第一模具11的密封腔113內,並使得第一模具11與金屬板材12之間的第一壓力P1大於外界的壓力。如第5圖所示,流體輸入單元27輸入的流體將會對金屬板材12加壓,使得金屬板材12朝第二模具13及/或成型腔131的方向變形,直到金屬板材12完整的貼合在第二模具13的成型腔131的表面。 After the metal sheet 12 is placed between the first mold 11 and the second mold 13, the fluid input unit 27 will transport the fluid between the first mold 11 and the metal sheet 12 via the transfer tube 15 and the connection hole 111, for example, The fluid input unit 27 can deliver the fluid into the sealed cavity 113 of the first mold 11 such that the first pressure P1 between the first mold 11 and the metal sheet 12 is greater than the external pressure. As shown in Fig. 5, the fluid input from the fluid input unit 27 will pressurize the metal sheet 12 so that the metal sheet 12 is deformed toward the second mold 13 and/or the molding cavity 131 until the metal sheet 12 is completely fitted. At the surface of the molding cavity 131 of the second mold 13.

待金屬板材12完整的貼合在第二模具13的成型腔131的表面後,基本上便已完成金屬板材12成型的步驟。而後可關閉流體輸入單元27,使得流體輸入單元27不再將流體輸送至金屬板材12與第一模具11之間。待關閉流體輸入單元27後,便可開啟流體輸出單元29,並透過流體輸出單元 29將成型的金屬板材12與第一模具11之間的流體排出,如第6圖所示。 After the metal sheet 12 is completely attached to the surface of the molding cavity 131 of the second mold 13, the step of molding the metal sheet 12 is substantially completed. The fluid input unit 27 can then be closed such that the fluid input unit 27 no longer delivers fluid between the sheet metal 12 and the first mold 11. After the fluid input unit 27 is closed, the fluid output unit 29 can be turned on and the fluid output unit is transmitted. The fluid between the formed metal sheet 12 and the first mold 11 is discharged as shown in Fig. 6.

在本創作一實施例中,流體輸出單元29可將金屬板材12與第一模具11之間的流體排出,使得兩者之間的壓力略大於或等於外界的壓力,並有利於分離第一模具11及第二模具13。 In an embodiment of the present invention, the fluid output unit 29 can discharge the fluid between the metal sheet 12 and the first mold 11 such that the pressure between the two is slightly greater than or equal to the external pressure, and facilitates separation of the first mold. 11 and the second mold 13.

在本創作另一實施例中,流體輸出單元29亦可進一步排出金屬板材12與第一模具11之間的流體,使得成型的金屬板材12與第一模具11之間的第二壓力P2小於外界的壓力,例如1大氣壓。由於第一模具11與金屬板材12之間的壓力略小於外界的壓力,因此會約略將金屬板材12朝第一模具11的方式吸引,藉此以鬆動第一模具11與金屬板材12之間的連接關係。 In another embodiment of the present invention, the fluid output unit 29 can further discharge the fluid between the metal sheet 12 and the first mold 11 such that the second pressure P2 between the formed metal sheet 12 and the first mold 11 is smaller than the outside. The pressure, for example, 1 atmosphere. Since the pressure between the first mold 11 and the metal sheet 12 is slightly smaller than the external pressure, the metal sheet 12 is approximately attracted toward the first mold 11, thereby loosening between the first mold 11 and the metal sheet 12. Connection relationship.

而後可使得第一模具11及第二模具13相互分離,此時由於第一模具11與成型的金屬板材12之間會形成負壓,例如兩者之間的壓力小於外界的壓力。因此當第一模具11與第二模具13分離時,第一模具11將會吸附及拉動成型的金屬板材12,並可能會帶動成型的金屬板材12朝第一模具11的方向移動,或者是鬆動成型的金屬板材12與第二模具13及/或成型腔131之間的連接關係。藉此將有利於將成型的金屬板材12由第二模具13及/或成型腔131取下,並可有效縮短金屬板材12的製作及/或脫模所花費的時間。 Then, the first mold 11 and the second mold 13 can be separated from each other. At this time, a negative pressure is formed between the first mold 11 and the formed metal sheet 12, for example, the pressure between the two is smaller than the external pressure. Therefore, when the first mold 11 and the second mold 13 are separated, the first mold 11 will adsorb and pull the formed metal sheet 12, and may move the formed metal sheet 12 toward the first mold 11 or be loose. The connection relationship between the formed metal sheet 12 and the second mold 13 and/or the molding cavity 131. Thereby, it will be advantageous to remove the formed metal sheet 12 from the second mold 13 and/or the molding cavity 131, and the time taken for the production and/or demolding of the metal sheet 12 can be effectively shortened.

然而在實際應用時,當第一模具11與金屬板材12之間為負壓時,將有可能會導致第一模具11不易與第二模具13分離,或者是可能在第一模具11與第二模具13分離的過程中,造成金屬板材12產生變形。為了避免上述的情形發生,在本創作另一實施例中,可透過流體輸入單元27再次將流體輸送至第一模具11與金屬板材12之間,使得第一模具11與金屬板材12之間的第三壓力P3略大於或等於外界的壓力,如第7圖所示。而後便可 將第一模具11及第二模具13分離,如第8圖所示。 However, in practical applications, when the first mold 11 and the metal sheet 12 are under negative pressure, it may cause the first mold 11 to be difficult to separate from the second mold 13, or may be in the first mold 11 and the second. During the separation of the mold 13, the metal sheet 12 is deformed. In order to avoid the above situation, in another embodiment of the present invention, the fluid may be again transported between the first mold 11 and the metal sheet 12 through the fluid input unit 27 such that the first mold 11 and the metal sheet 12 are The third pressure P3 is slightly greater than or equal to the external pressure, as shown in FIG. Then you can The first mold 11 and the second mold 13 are separated as shown in Fig. 8.

在本創作上述第4至8圖所述的步驟流程中,主要是以第3圖所述的構造進行說明。然而在實際應用時亦可以第1圖或第2圖所示的構造,進行上述第4至8圖所述的步驟流程,同樣可完成金屬板材12成型的步驟,並同樣有利於將成型的金屬板材12由第二模具13及/或成型腔131上取下。 In the flow of the steps described in the above-described fourth to eighth drawings, the structure described in FIG. 3 is mainly explained. However, in the actual application, the steps shown in the above FIGS. 4 to 8 can also be performed in the configuration shown in FIG. 1 or FIG. 2, and the step of forming the metal sheet 12 can be completed, and the formed metal is also favored. The sheet 12 is removed from the second mold 13 and/or the forming cavity 131.

第1圖及第2圖所述的流體輸送單元17可將流體輸送至第一模具11與金屬板材12之間,使得金屬板材12完整的貼附在第二模具13的成型腔131的表面。待完成金屬板材12的成型步驟後,流體輸送單元17更可將第一模具11與成型的金屬板材12之間的流體排出,使得第一模具11與成型的金屬板材12之間的壓力略小於外界的壓力,或者是使得第一模具11與金屬板材12之間的壓力略大於或等於外界的壓力。藉此有利於鬆動金屬板材12與第二模具13之間的連接關係,以利於將成型的金屬板材12由第二模具13及/或成型腔131上取下,及利於分離第一模具11與第二模具13。 The fluid delivery unit 17 described in FIGS. 1 and 2 can transport fluid between the first mold 11 and the metal sheet 12 such that the metal sheet 12 is completely attached to the surface of the molding cavity 131 of the second mold 13. After the forming step of the metal sheet 12 is completed, the fluid conveying unit 17 can discharge the fluid between the first mold 11 and the formed metal sheet 12, so that the pressure between the first mold 11 and the formed metal sheet 12 is slightly smaller. The external pressure is such that the pressure between the first mold 11 and the metal sheet 12 is slightly greater than or equal to the external pressure. Thereby, the connection relationship between the metal sheet 12 and the second mold 13 is loosened, so as to facilitate the removal of the formed metal sheet 12 from the second mold 13 and/or the molding cavity 131, and facilitate separation of the first mold 11 and The second mold 13.

在本創作中所述之連接指的是一個或多個物體或構件之間的直接連接或者是間接連接,例如可在一個或多個物體或構件之間存在有一個或多個中間連接物。 A connection as used in this creation refers to a direct connection or an indirect connection between one or more objects or components, for example one or more intermediate connections may be present between one or more objects or components.

說明書之系統中所描述之也許、必須及變化等字眼並非本創作之限制。說明書所使用的專業術語主要用以進行特定實施例的描述,並不為本創作的限制。說明書所使用的單數量詞(如一個及該個)亦可為複數個,除非在說明書的內容有明確的說明。例如說明書所提及之一個裝置可包括有兩個或兩個以上之裝置的結合,而說明書所提之一物質則可包括有 多種物質的混合。 The words "may," and "changes" described in the system of the specification are not limitations of this creation. The technical terms used in the specification are mainly for the description of specific embodiments, and are not intended to be limiting. The single quantifiers (such as one and the one) used in the specification may also be plural, unless explicitly stated in the contents of the specification. For example, a device referred to in the specification may include a combination of two or more devices, and one of the substances mentioned in the specification may include Mixture of multiple substances.

以上所述者,僅為本創作之較佳實施例而已,並非用來限定本創作實施之範圍,即凡依本創作申請專利範圍所述之形狀、構造、特徵及精神所為之均等變化與修飾,均應包括於本創作之申請專利範圍內。 The above is only the preferred embodiment of the present invention, and is not intended to limit the scope of the present invention, that is, the equivalent changes and modifications of the shapes, structures, features and spirits described in the scope of the patent application. , should be included in the scope of the patent application of this creation.

10‧‧‧金屬板材成型裝置 10‧‧‧Metal sheet forming device

11‧‧‧第一模具 11‧‧‧First mould

111‧‧‧連接孔 111‧‧‧Connection hole

113‧‧‧密封腔 113‧‧‧ sealed cavity

12‧‧‧金屬板材 12‧‧‧Metal sheet

13‧‧‧第二模具 13‧‧‧Second mold

131‧‧‧成型腔 131‧‧‧Molding cavity

15‧‧‧輸送管 15‧‧‧ delivery tube

17‧‧‧流體輸送單元 17‧‧‧Fluid transport unit

Claims (12)

一種金屬板材成型裝置,包括:一第一模具,包括至少一連接孔;至少一輸送管,連接該第一模具的該連接孔;一第二模具,其內部包括至少一成型腔,其中該第二模具與該第一模具接合時,該連接孔會與該成型腔相對;及一流體輸送單元,連接該輸送管,並用以輸送一流體,其中該第一模具與該第二模具用以夾持一金屬板材,並以該金屬板材覆蓋該第二模具的該成型腔,而該流體輸送單元則經由該輸送管及該連接孔將該流體輸送至該第一模具與該金屬板材之間,並經由該連接孔及該輸送管將該第一模具及該金屬板材之間的該流體排出。 A sheet metal forming apparatus comprising: a first mold comprising at least one connecting hole; at least one conveying pipe connecting the connecting hole of the first mold; and a second mold having at least one forming cavity therein, wherein the first mold When the second mold is engaged with the first mold, the connecting hole is opposite to the molding cavity; and a fluid conveying unit is connected to the conveying tube for conveying a fluid, wherein the first mold and the second mold are used for clamping Holding a metal plate and covering the molding cavity of the second mold with the metal plate, and the fluid conveying unit conveys the fluid between the first mold and the metal plate via the conveying pipe and the connecting hole, And discharging the fluid between the first mold and the metal plate through the connecting hole and the conveying pipe. 如申請專利範圍第1項所述之金屬板材成型裝置,其中該第一模具的內部包括至少一密封腔,連接該連接孔,且該第二模具與該第一模具接合時,該成型腔會與該密封腔相對。 The sheet metal forming apparatus according to claim 1, wherein the inside of the first mold includes at least one sealing cavity connected to the connecting hole, and the second mold is engaged with the first mold, the molding cavity is Opposite the sealed cavity. 如申請專利範圍第2項所述之金屬板材成型裝置,其中該流體輸送單元經由該輸送管及該連接孔將該流體輸送至該密封腔,並經由該連接孔及該輸送管將該密封腔的該流體排出。 The sheet metal forming apparatus according to claim 2, wherein the fluid conveying unit conveys the fluid to the sealing chamber via the conveying pipe and the connecting hole, and the sealing cavity is through the connecting hole and the conveying pipe The fluid is discharged. 如申請專利範圍第2項所述之金屬板材成型裝置,其中該金屬板材覆蓋該密封腔。 The sheet metal forming apparatus of claim 2, wherein the metal sheet covers the sealed chamber. 如申請專利範圍第1項所述之金屬板材成型裝置,其中該流體輸送單元將該金屬板材與該第一模具之間的該流體導出,並使得該金屬板材與該第一模具之間的壓力略大於、略小於或等於外界的壓力。 The sheet metal forming apparatus according to claim 1, wherein the fluid conveying unit guides the fluid between the metal sheet and the first mold, and causes a pressure between the metal sheet and the first mold. Slightly greater than, slightly less than or equal to the external pressure. 如申請專利範圍第1項所述之金屬板材成型裝置,其中該流體輸送單元將該流體輸送至該第一模具與該金屬板材之間,使得兩者之間的壓力大於外界的壓力;該流體輸送單元將該第一模具與該金屬板材之間的該流體排出,使得兩者之間的壓力略小於外界的壓力;及該流體輸送單元再次將該流體輸送至該第一模具與該金屬板材之間,使得兩者之間的壓力略大於或等於外界的壓力。 The sheet metal forming apparatus according to claim 1, wherein the fluid conveying unit transports the fluid between the first mold and the metal sheet such that a pressure between the two is greater than an external pressure; the fluid The conveying unit discharges the fluid between the first mold and the metal sheet such that the pressure between the two is slightly smaller than the external pressure; and the fluid conveying unit again transports the fluid to the first mold and the metal sheet Between, so that the pressure between the two is slightly greater than or equal to the external pressure. 一種金屬板材成型裝置,包括:一第一模具,包括至少一連接孔;至少一輸送管,連接該第一模具的該連接孔;一第二模具,其內部包括至少一成型腔,其中該第二模具與該第一模具接合時,該連接孔會與該成型腔相對;一流體輸入單元,連接該輸送管,其中該第一模具與該第二模具用以夾持一金屬板材,並以該金屬板材覆蓋該第二模具的該成型腔,而該流體輸入單元則經由該輸送管及該連接孔將一流體輸送至該第一模具與該金屬板材之間;及一流體輸出單元,連接該輸送管,並經由該連接孔及該輸送管將該第一模具及該金屬板材之間的該流體排出。 A sheet metal forming apparatus comprising: a first mold comprising at least one connecting hole; at least one conveying pipe connecting the connecting hole of the first mold; and a second mold having at least one forming cavity therein, wherein the first mold When the second mold is engaged with the first mold, the connecting hole is opposite to the molding cavity; a fluid input unit is connected to the conveying tube, wherein the first mold and the second mold are used for clamping a metal plate, and The metal plate covers the molding cavity of the second mold, and the fluid input unit conveys a fluid between the first mold and the metal plate via the conveying pipe and the connecting hole; and a fluid output unit is connected The conveying pipe discharges the fluid between the first mold and the metal plate through the connecting hole and the conveying pipe. 如申請專利範圍第7項所述之金屬板材成型裝置,其中該第一模具的內部包括至少一密封腔,連接該連接孔,且該第二模具與該第一模具接合時,該成型腔會與該密封腔相對。 The sheet metal forming apparatus according to claim 7, wherein the inside of the first mold includes at least one sealing cavity connected to the connecting hole, and the second mold is engaged with the first mold, the molding cavity is Opposite the sealed cavity. 如申請專利範圍第8項所述之金屬板材成型裝置,其中該流體輸入單元經由該輸送管及該連接孔將該流體輸送至該密封腔,而該流體輸出單元則經由該連接孔及該輸送管將該密封腔的該流體排出。 The sheet metal forming apparatus according to claim 8, wherein the fluid input unit conveys the fluid to the sealed chamber via the conveying pipe and the connecting hole, and the fluid output unit passes through the connecting hole and the conveying The tube discharges the fluid from the sealed chamber. 如申請專利範圍第8項所述之金屬板材成型裝置,其中該金屬板材覆蓋該密封腔。 The sheet metal forming apparatus of claim 8, wherein the metal sheet covers the sealed chamber. 如申請專利範圍第7項所述之金屬板材成型裝置,其中該流體輸出單元將該金屬板材與該第一模具之間的該流體導出,並使得該金屬板材與該第一模具之間的壓力略大於、小於或等於外界的壓力。 The sheet metal forming apparatus according to claim 7, wherein the fluid output unit guides the fluid between the metal sheet and the first mold, and causes a pressure between the metal sheet and the first mold. Slightly greater than, less than or equal to the external pressure. 如申請專利範圍第7項所述之金屬板材成型裝置,其中該流體輸入單元將該流體輸送至該第一模具與該金屬板材之間,使得兩者之間的壓力大於外界的壓力;該流體輸出單元將該第一模具與該金屬板材之間的該流體排出,使得兩者之間的壓力略小於外界的壓力;及該流體輸入單元再次將該流體輸送至該第一模具與該金屬板材之間,使得兩者之間的壓力略大於或等於外界的壓力。 The sheet metal forming apparatus according to claim 7, wherein the fluid input unit conveys the fluid between the first mold and the metal sheet such that a pressure between the two is greater than an external pressure; the fluid The output unit discharges the fluid between the first mold and the metal sheet such that the pressure between the two is slightly smaller than the external pressure; and the fluid input unit again transports the fluid to the first mold and the metal sheet Between, so that the pressure between the two is slightly greater than or equal to the external pressure.
TW104214700U 2015-09-10 2015-09-10 Compression molding device for metal sheet TWM519019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW104214700U TWM519019U (en) 2015-09-10 2015-09-10 Compression molding device for metal sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW104214700U TWM519019U (en) 2015-09-10 2015-09-10 Compression molding device for metal sheet

Publications (1)

Publication Number Publication Date
TWM519019U true TWM519019U (en) 2016-03-21

Family

ID=56086507

Family Applications (1)

Application Number Title Priority Date Filing Date
TW104214700U TWM519019U (en) 2015-09-10 2015-09-10 Compression molding device for metal sheet

Country Status (1)

Country Link
TW (1) TWM519019U (en)

Similar Documents

Publication Publication Date Title
US20120133087A1 (en) Method and apparatus for manufacturing articles with the help of a mould
TW201012654A (en) Press and method for laminating essentially plate-shaped workpieces
US10500798B2 (en) Method of forming carbon-fiber product and implementation device thereof
JP6114248B2 (en) Pallet and transport system
TWI554342B (en) Compression molding device for metal sheet and compression molding method for metal sheet
TWM519019U (en) Compression molding device for metal sheet
JP2001246665A (en) Molding device for thermoplastic material
CN105149409A (en) Metal sheet forming device and metal sheet forming method
JP2007131466A (en) Method and apparatus for manufacturing optical lens
CN205008458U (en) Sheet metal forming device
WO2018139631A1 (en) Resin sealing device and resin sealing method
TWM510848U (en) Rapid resin injection molding transfer device
JP2011222633A5 (en) Substrate bonding apparatus, method of manufacturing laminated semiconductor, laminated semiconductor and substrate bonding method
TWM519018U (en) Compression molding system for metal sheet material
TWI615069B (en) Circuit board pressing device
TW201412423A (en) Metal sheet material forming device
WO2019185086A3 (en) Device and method for producing formed ice pieces
KR101487605B1 (en) Safety glass manufacturing apparatus
CN207498268U (en) The mold and master mold of used in glass products
JP5307521B2 (en) Resin sheet thermoforming equipment
TWM447803U (en) Metal plate forming system
JP6800007B2 (en) Resin molding equipment and resin molding method
CN212099586U (en) Candy packing carton plastic envelope blank pressing mechanism
JP2012179839A (en) Thermal transfer forming unit
CN105599213B (en) EPS sheet material machine cavity pressure detection means