TWM341046U - Pebble stalk manufacturing facility - Google Patents

Pebble stalk manufacturing facility Download PDF

Info

Publication number
TWM341046U
TWM341046U TW97207700U TW97207700U TWM341046U TW M341046 U TWM341046 U TW M341046U TW 97207700 U TW97207700 U TW 97207700U TW 97207700 U TW97207700 U TW 97207700U TW M341046 U TWM341046 U TW M341046U
Authority
TW
Taiwan
Prior art keywords
support frame
seat
ribs
manufacturing equipment
vibration
Prior art date
Application number
TW97207700U
Other languages
Chinese (zh)
Inventor
Kun-Bin Ceng
Kun-Liu Ceng
Mu-Lin Lv
Original Assignee
K & C Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K & C Construction Machinery Co Ltd filed Critical K & C Construction Machinery Co Ltd
Priority to TW97207700U priority Critical patent/TWM341046U/en
Publication of TWM341046U publication Critical patent/TWM341046U/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

M341046 八、新型說明: 【新型所屬之技術領域】 本創作係為一種用於製造礫石樁的製造設備,尤指一種沒有 咼度及深度限制的礫石樁的製造設備。 【先前技術】M341046 VIII. New description: [New technical field] This creation is a manufacturing equipment used to manufacture gravel piles, especially a manufacturing equipment for gravel piles without twist and depth restrictions. [Prior Art]

由於土壤會隨著外在環境的乾濕而有所變化,例如,山坡地 或疋罪近河邊的土壌,會較测,造成土地軟弱,故容易產生山 皮地π動、㈣及軟弱地盤和回填土之沉陷、土壤液化等狀況, 不利=施工,因此,為克服上述問題,遂發展出蝶石樁,有效地 改善前述之各個問題。 目前在製造私樁的過程中,大都细-巨大的設備,將樁 所入地面’以製造填入礫石的空間;然而,目前 者+ 又備’動概數千萬’並非所有營造廠所能負擔,再 施i 喊與歡植人騎度_,倘若在有祕物的地方 的奢境高歧•無法錄统度,衫贿無法進入 蝶,===物細冑咖細費用,故 【新型内容】 基於上述緣由,太畲 作出-種碟石樁 咖其多年來於該行業之經驗,創 …又’其錢服高度上的關,對於樁的長 5 M341046 度亦可靈活組合,並且,不需利用昂貴的設備,即可完成,大幅 降低成本。 由於本創作係_原先1地既有之設備,以及本創作人先前 於96年〇9月04曰所申請之用於挾持樁柱之挾持結構(新型第 M326542號)’利用該夾持機構結合於一震動裝置上,並夾持一般 長度的鋼套官’將其壓人地面,當該鋼套管進人地面深度之 1再取來另-鋼套管,進行焊接,達到延長的效果,再繼續向 下打入’持_重覆前述動作,直到指定深度,由於不需要特殊設 備故不會產生購置的費用,亦省下維修保養費,因此,本創作 更具有_快速、低故障率、高效率、施工品質容易控制、捲徑 大小不魏制、樁長不受關、維修«、施卫機具取得容易、 不受數量限制等優點。 根據上柄多優點,為使審查委員對本創作能進—步的瞭 ㈣=露-較佳之實施方式如下。以下茲舉一最佳實施例,配 將糊作之構成魄及其職成的功效詳細說明 【貫施方式】 置2 第—圖所示’本創作係包含一支撐架1 Q、-震動裝 係設置於預^機構3 ◦及一 _4 ◦,其中,該纖10 裝設於該切ΓΓΓ ’㈣於敎之進行;該震_2 〇係 牙木10上,亚可沿該支擇架工〇上、下移動·該央 M341046 持機構3 ◦裝設於該震動裝置2 Q上,推該震動裂置2 〇 _同 移動;請配合㈣第七圖所示,該鋼套管4 〇為中空管體,並被 該夾持機構3 Q所失持,藉由該震動裝置2 〇帶_失持機構3 ◦震動及下壓’使地面受到鋼套管4 0的擠壓而形成-凹洞,如 第一圖至第五圖所示,當該鋼套管4 0至指定深度後,再將填充 材S倒入該鋼套管4㈣,同時,該震動裝置2 Q帶動該失持機 構3 0震動及向上移動’使該填充物8_落出套管外,並且,該填 充物S在受到震動及賴時,會愈來愈密實’其内之間隙也將逐 漸縮減,故最後所形成之#石樁將會相#_,不易受到任何地 力量而被散開。 又,請參閱第四圖所示,進一步設有一填充材移動裝置5〇, 用以將填充材s倒入該套管内,其中,於本創作所述之填充材s, 可為礫石,石等材料。再者,該支料1⑽可由-支撐架移 動裝置6 〇來攜帶移動,以利於施工之進行。 另外,請參閱第八圖所示,其係為本創作之夾持機構3 〇, 係用於夾持鋼套管4 0,該夾持機構3 〇包含一固定座3 i、一 活動座3 2及-定位機構3 3,其中,該固定座31係為半圓形 本體,其上設有複數條凸肋3 i丄及一連結座3 i 2,該活動座 3 2為一與上述之固定座31對應之半圓形本體,其上設有複數 條凸肋3 21,且其一側與上述之固定座3丄樞接,藉由該固定 座3 1與該活動座32上之凸肋311、321,可増加與鋼套 官4 0之間的磨擦力,以利於施工之進行;又,該定位機構3 3 7 M341046 係.又於賴疋座3 1與該活動座3 2上,用以固定該固定座3 1 及該_座3 2的相對位置,以達到夾持鋼套f 4⑽目的,又, 及口定座31上之連結座3丨2連結於該震動裝置2 〇。然,前 述之夾持機構3 Q為本創作實施例之―,並不以此為限,凡使用 等效之機構裝蹄代,㈣本_之範_。 ”口月荼閱第四圖至第六圖所#,當該鋼套管4 〇被壓入至指定 冰度後將填充材s(礫石或是砂石等)倒入該鋼套管内, ^該鋼套管4 0拉起時,同時進行震動,使填充材s落出該鋼套 吕4 0外亚且’各填充材s會隨著震動而改變彼此之間的接觸 面’直__填充材s相互卡抵無法移動後,才會停止,持續 此種方法到填滿為止,由於各填充材已無空間可以移動或是滑 動’因此,形成-堅固地樁,有效地運用於施工。 、、Τ、上所:4’本創作不需要特殊設備:,故省下了高額的講置費, =及維修保養費,且大幅職原有的設備,使器材充份地被運用 、軍一 乂上圖面所不僅為本創作之—種實施例,其可據以衍生之 、用^圍叙’另因構造簡單,故倍增生產效率亦可兼顧生產成 、々貝/、產翻恥值。但凡與摘作技術思想姻之簡易轉換 或等效轉換者,皆屬本創作之專利範圍之中。 I本们作具有組裝快速、低故神、高效率、施卫品質容易控 Γ捲徑大小不受_、樁長不受關、維修《、施工機具取 t谷易、不受數量限制等優點,完全符合新型專利要件,爰依法 8 M341046 【圖式簡單說明】 第一圖係為本創作之設備架設實施示意平面圖; 第二圖至第四圖係為本創作之設備操作實施示意平面圖; 第五圖至第六圖係為本創作之置入填充材之實施示意平面圖·’ 第七圖係為本創作之鋼套管之立體示意圖; 弟八圖係為本創作之夾持機構之立體示意圖。 【主要元件符號說明】 s......填充材 1 〇......支撐架 2 0……震動裝置 3 0……夾持機構 3 1......固定座 3 1 1......凸肋 3 1 2 ······連結座 3 2......活動座 .3 2 1 ······凸肋 3 3......定位機構 4 Q......鋼套管 5 〇 •…·填充材移動敬置 6 ° ······支撐架移動教置Because the soil will change with the dryness and dampness of the external environment, for example, the soil on the hillside or the sin of the river near the river will be measured, resulting in weak land, so it is easy to produce mountain skin, π, (4) and weak sites. And the backfilling of the backfill, soil liquefaction, etc., unfavorable = construction, therefore, in order to overcome the above problems, the development of pterocene piles, effectively improve the aforementioned problems. At present, in the process of manufacturing private piles, most of the fine-large equipment, the piles are placed on the ground to create a space filled with gravel; however, the current + also prepares 'moving tens of millions' is not all the construction plants can The burden, and then the application of shouting and cultivating people riding _, if the luxury in the place where there is a secret of high-altitude • can not record the degree, the bribe can not enter the butterfly, === fine details, so the cost The new content] Based on the above reasons, Taihao made a variety of experience in the industry, and it has a flexible combination of the length of the pile, and the length of the pile is 5 M341046 degrees. It can be completed without using expensive equipment, which greatly reduces costs. Since this creation department _ the original equipment of the original one, and the holding structure (new type M326542) used by the creator for the holding piles previously applied by the creator in September 2014, the combination of the clamping mechanism On a vibrating device, and holding a general length of the steel sleeve official's pressed to the ground, when the steel casing enters the ground depth of 1 and then take another steel casing for welding, to achieve an extended effect, Continue to move down to 'hold _ repeat the above action until the specified depth, because no special equipment is needed, it will not generate the cost of purchase, and also save maintenance costs, therefore, this creation has more _ fast, low failure rate , high efficiency, easy to control the construction quality, the size of the coil is not Wei, the length of the pile is not closed, the maintenance «, the maintenance of the machine is easy, and the number is not limited. According to the advantages of the upper handle, in order to enable the reviewing committee to advance the creation of the creation (four) = dew - the preferred implementation is as follows. The following is a description of the best embodiment, with the composition of the paste and the function of its function. [Comprehensive method] Set 2 - Figure shows 'This creation contains a support frame 1 Q, - shock mount The system is disposed in the pre-mechanism 3 ◦ and a _4 ◦, wherein the fiber 10 is installed in the cutting ΓΓΓ '(4) in the 敎 ;; the _2 2 〇 is on the ivory 10, and the sub-area along the arranging frame The upper and lower movements of the workpiece are carried out. The central M341046 holding mechanism 3 is mounted on the vibrating device 2 Q, and the vibration splitting is carried out 2 〇 _ with the same movement; please cooperate with (4) the seventh figure, the steel sleeve 4 〇 It is a hollow tube body and is lost by the clamping mechanism 3 Q. The vibration device 2 〇 belt _ loss mechanism 3 ◦ vibration and depression 使 causes the ground to be pressed by the steel sleeve 40 - a recess, as shown in the first to fifth figures, after the steel sleeve 40 reaches a specified depth, the filler S is poured into the steel sleeve 4 (four), and at the same time, the vibration device 2 Q drives the loss The holding mechanism 30 vibrates and moves upwards to make the filling material 8_ fall out of the casing, and the filling material S will become more and more dense when subjected to vibration and sag. Gradually reduced, so # Shizhuang final phase will be formed of #_ not susceptible to any ground forces are spread out. Moreover, as shown in the fourth figure, a filler moving device 5 is further provided for pouring the filler s into the sleeve. The filler s described in the present invention may be gravel, stone, etc. material. Furthermore, the support 1 (10) can be carried by the support frame moving device 6 〇 to facilitate the construction. In addition, as shown in the eighth figure, it is the clamping mechanism 3 为本 of the present invention, which is used for clamping the steel sleeve 40. The clamping mechanism 3 〇 includes a fixing seat 3 i and a movable seat 3 2 and - positioning mechanism 3 3, wherein the fixing base 31 is a semi-circular body, and is provided with a plurality of ribs 3 i 丄 and a connecting seat 3 i 2 , the movable seat 32 is one and the above The semi-circular body corresponding to the fixing base 31 is provided with a plurality of ribs 3 21 thereon, and one side thereof is pivotally connected with the fixing seat 3 ,, and the fixing seat 3 1 and the movable seat 32 are convex. The ribs 311, 321 can be added with the friction force between the steel sleeve 40 to facilitate the construction; further, the positioning mechanism 3 3 7 M341046 is also used on the Laizu 3 1 and the movable seat 3 2 For fixing the relative position of the fixing seat 3 1 and the _ seat 3 2 for the purpose of clamping the steel sleeve f 4 (10), and the connecting seat 3 丨 2 on the mouth fixing seat 31 is coupled to the vibration device 2 〇 . However, the above-mentioned clamping mechanism 3 Q is the embodiment of the present invention, and is not limited thereto, and the equivalent mechanism is used to mount the hoof, and (4) the _ _ _. "After the moon, read the fourth to sixth figure. When the steel casing 4 is pressed into the specified ice, pour the filler s (gravel or gravel, etc.) into the steel casing, ^ When the steel sleeve 40 is pulled up, vibration is simultaneously performed, so that the filler s falls out of the steel sleeve and the filler s changes the contact surface with each other as the vibration __ After the fillers s are mutually incapable of moving, they will stop. After this method is completed, the fillers can be moved or slid because there is no space for each filler. Therefore, the solid piles are formed and effectively used for construction. , Τ,上上: 4' This creation does not require special equipment: therefore, it saves a high amount of lecture fees, = and maintenance costs, and the original equipment is greatly used, so that the equipment is fully used, the military The above picture is not only the embodiment of the creation, but it can be derived from it, and it can be used as a separate structure. Therefore, the production efficiency can also be combined with production, mussels, and shame. Value. Anyone who has a simple conversion or equivalent conversion with the technical idea is a part of the patent scope of this creation. I have the advantages of quick assembly, low gods, high efficiency, easy to control quality, and the size of the coil is not subject to _, the length of the pile is not closed, the maintenance, the construction machine is easy to take, and the quantity is not limited. Full compliance with the new patent requirements, 爰 8 8 M341046 [Simple description of the drawings] The first picture is a schematic plan for the implementation of the equipment erection of the creation; the second to fourth pictures are schematic plan views of the operation of the equipment for the creation; The fifth to sixth figures are schematic plans for the implementation of the filling material for the creation. The seventh picture is a three-dimensional schematic diagram of the steel casing of the creation; the eighth figure is a three-dimensional diagram of the clamping mechanism of the creation. [Main component symbol description] s...... filler material 1 〇... support frame 2 0... vibration device 3 0... clamping mechanism 3 1 ... fixed seat 3 1 1...... rib 3 1 2 ································································· Positioning mechanism 4 Q...Steel sleeve 5 〇•...·Filling material moves 6 ° ······Support frame mobile teaching

Claims (1)

M341046 九、申請專利範圍: 1 ·一種礫石樁製造設備,包含: 支撐架,設置於預定地之側邊; 晨動裝置,裝設於該支撐架上,可沿 -夾持機構,組裝於上述之震動裝置;/ 移動; 空’被上述之夾持機構所夾持; 产定深置帶動該失持機構震動及下壓,當該套乾5 “震:及向上移套冗動裝置帶動該“ 專利範圍第2項所述之蝶石樁製造設備,其中,該失 座;□疋座’為-半圓形本體,其上設有複數條凸肋及一連結 有趨數與上述之固定座對應之半圓形本體,其上設 有稷數條凸肋,且其—懒上叙目定雜接; 应鱼it㉖ΐΐίί上之連結座係與該震動裝置連結,而該固定 座與ϋ動座#合後,形絲體狀,肋紐套管。 ί加2請3項所述之襟石樁製造設備’其中,該支 撐架係進一步結合一支撐架移動設備。 ===第4項所物石樁製造設備,其中,該填M341046 IX. Patent application scope: 1 · A gravel pile manufacturing equipment, comprising: a support frame disposed on a side of a predetermined ground; a morning moving device mounted on the support frame and capable of being assembled along the clamping mechanism The vibration device; / moving; the empty 'clamped by the above-mentioned clamping mechanism; the production of the deep movement of the lost mechanism vibration and depression, when the set of dry 5 "shock: and upward movement of the cover device to drive the The apparatus for manufacturing a shale pile according to the second aspect of the invention, wherein the squat seat is a semi-circular body having a plurality of ribs thereon and a connection having a tendency to be fixed to the above The semi-circular body corresponding to the seat is provided with a plurality of ribs on the ribs, and the slats are arranged to be miscellaneous; the connecting pedestal of the fish is connected to the vibrating device, and the fixing seat and the swaying After the seat #, the shape of the wire, the rib sleeve. ί 加 2 Please refer to the stoning pile manufacturing equipment described in item 3, wherein the support frame is further combined with a support frame moving device. === Item 4 of the stone pile manufacturing equipment, wherein the filling
TW97207700U 2008-05-05 2008-05-05 Pebble stalk manufacturing facility TWM341046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW97207700U TWM341046U (en) 2008-05-05 2008-05-05 Pebble stalk manufacturing facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW97207700U TWM341046U (en) 2008-05-05 2008-05-05 Pebble stalk manufacturing facility

Publications (1)

Publication Number Publication Date
TWM341046U true TWM341046U (en) 2008-09-21

Family

ID=44333797

Family Applications (1)

Application Number Title Priority Date Filing Date
TW97207700U TWM341046U (en) 2008-05-05 2008-05-05 Pebble stalk manufacturing facility

Country Status (1)

Country Link
TW (1) TWM341046U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140133411A (en) 2013-05-09 2014-11-19 퐁 첸 프로즌 푸드 컴퍼니 리미티드 Frozen instant tapioca pearls and method for manufacturing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140133411A (en) 2013-05-09 2014-11-19 퐁 첸 프로즌 푸드 컴퍼니 리미티드 Frozen instant tapioca pearls and method for manufacturing the same

Similar Documents

Publication Publication Date Title
CN207656891U (en) A kind of concrete tamping equipment
TWM341046U (en) Pebble stalk manufacturing facility
CN204882192U (en) Remold native triaxial compression sample making devices
CN108678663A (en) A kind of shale gas exploitation exploration multi-angle drilling device
CN104992602A (en) Motion model of crystal dislocation structure
JP2017159646A5 (en) Method of forming an image on an object using selective laser sintering
CN203583311U (en) Terrace structure of court
CN104333261B (en) Tumbler piezoelectric generating set
CN205574311U (en) Feed vibrating device of weighing -appliance
CN110485307A (en) A kind of anti-device for plugging of bridge construction
CN207215621U (en) A kind of elastic modulus of concrete detection means
CN104612913B (en) It is a kind of to collect pedestrian and mark time the impact type piezoelectric generating device of energy
CN109159695A (en) A kind of charging device of electric automobile with shock-absorbing function
CN203689787U (en) Teaching aid used for electricity demonstration
CN204822111U (en) Powder medicine filling device
CN103884555B (en) A kind of landslide physical assembles with reference to assay device
CN210685434U (en) Concrete vibrating device
CN204117434U (en) A kind of solid is shown and moulding teaching aid
CN207833774U (en) A kind of simulation electric pole shaking fracture apparatus for demonstrating
CN203148643U (en) Continuous model box used in multi-array shaking table test to realize controllable ground motion input
CN206292086U (en) A kind of soil test pressure-like mould
CN204475381U (en) Filling concrete height real-time measurement apparatus in cast-in-place large-diameter thin-wall tubular pile construction
CN204580291U (en) A kind of self power generation musical toothbrush
CN212674564U (en) Adjustable cement mortar jolt ramming table
CN107237263B (en) Mining under railways sealing off and covering anchorage skin hammers method of vibrating into shape

Legal Events

Date Code Title Description
MK4K Expiration of patent term of a granted utility model