TWI812556B - Leftover material winder - Google Patents

Leftover material winder Download PDF

Info

Publication number
TWI812556B
TWI812556B TW111146415A TW111146415A TWI812556B TW I812556 B TWI812556 B TW I812556B TW 111146415 A TW111146415 A TW 111146415A TW 111146415 A TW111146415 A TW 111146415A TW I812556 B TWI812556 B TW I812556B
Authority
TW
Taiwan
Prior art keywords
shaft
adjustment
edge material
path
tension
Prior art date
Application number
TW111146415A
Other languages
Chinese (zh)
Other versions
TW202423823A (en
Inventor
訾國祥
Original Assignee
坤隆行實業股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 坤隆行實業股份有限公司 filed Critical 坤隆行實業股份有限公司
Priority to TW111146415A priority Critical patent/TWI812556B/en
Priority to CN202310780718.6A priority patent/CN118125191A/en
Application granted granted Critical
Publication of TWI812556B publication Critical patent/TWI812556B/en
Publication of TW202423823A publication Critical patent/TW202423823A/en

Links

Images

Landscapes

  • Multiple-Way Valves (AREA)
  • Eye Examination Apparatus (AREA)
  • Air-Conditioning For Vehicles (AREA)
  • Registering, Tensioning, Guiding Webs, And Rollers Therefor (AREA)

Abstract

A leftover material winder is used for winding a plurality of leftover materials which includes a first leftover material and a second leftover material. The leftover material winder includes a first path guiding unit, a second path guiding unit and a winding device. The first path guiding unit is used for guiding the first leftover material to be conveyed along a first path. The second path guiding unit is used for guiding the second leftover material to be conveyed along a second path. The winding device is located at the end of the first path and the second path, to wind the first leftover material and the second leftover material together.

Description

邊料收卷機 Edge material winding machine

本發明係關於一種邊料收卷機,特別是一種可以快速平整收卷複數邊料,且不會影響工作環境,也可以確保邊料的張力勻稱的邊料收卷機。 The invention relates to a side material winding machine, in particular, a side material winding machine that can quickly and flatly rewind a plurality of side materials without affecting the working environment and can also ensure uniform tension of the side materials.

印刷業在製作包裝材料(例如食品的塑膠包材)時,會先印出一卷包裝原料,再將包裝原料用機械裁剪成複數面積較小的包裝材料。在機械裁剪包裝原料的過程中,包裝原料的左右兩側皆會留下長條狀的邊料;長條狀的邊料會被視為廢料而有回收處理的必要。 When the printing industry produces packaging materials (such as plastic packaging materials for food), it first prints out a roll of packaging materials, and then mechanically cuts the packaging materials into multiple packaging materials with smaller areas. During the process of mechanical cutting of packaging raw materials, long strips of edge material will be left on the left and right sides of the packaging raw materials; the long strips of edge material will be regarded as waste and need to be recycled.

一般的處理邊料的方式,是用工業吹風機將邊料吹至垃圾處理區。但是工業吹風機會吹起灰塵而嚴重影響工作環境,並產生吹風的噪音,且吹風也會干擾在同一工作環境的工人作業。或者廠商也會運用一般的邊料收卷機來整理邊料,一般的邊料收卷機具有一捲動軸和一邊料持取件。邊料持取件位於捲動軸上方,邊料持取件可以將邊料移動至接觸捲動軸,以供捲動軸將邊料收卷;然而,一般的邊料收卷機在收卷邊料時,邊料會受到卷動軸拉扯,並且在卷動過程中讓邊料的張力不均,使得收卷成圓筒狀的邊料逐漸出現不平整的外緣;不平整的外緣會更進一步影響後續被收卷的邊料張力和收卷速度,使得邊料的收卷速度忽快忽慢,嚴重時還會扯斷,嚴重影響生產。 The general way to deal with scraps is to use an industrial blower to blow the scraps to the garbage disposal area. However, industrial hair dryers will blow up dust, seriously affecting the working environment, and produce blowing noise, and the blowing will also interfere with the work of workers in the same working environment. Or the manufacturer will use a general side material winding machine to sort the side materials. The general side material winding machine has a rolling shaft and a side material holding piece. The edge material holding part is located above the scrolling shaft, and the edge material holding part can move the edge material to contact the scrolling shaft, so that the scrolling shaft can wind up the edge material; however, the general edge material winding machine does not need to rewind the edge material. When trimming, the edge material will be pulled by the rolling shaft, and the tension of the edge material will be uneven during the rolling process, causing the edge material rolled into a cylindrical shape to gradually have an uneven outer edge; uneven outer edge This will further affect the tension and winding speed of the edge material that is subsequently rolled up, causing the winding speed of the edge material to fluctuate quickly and sometimes slowly. In severe cases, it may even break, seriously affecting production.

因此,如何提供一種新的裝置,其可以收卷複數邊料,且不會影響工作環境,也可以確保收捲邊料平整且張力勻稱,遂成為一值得探討的課題。 Therefore, how to provide a new device that can rewind multiple edge materials without affecting the working environment and ensure that the rolled edge materials are flat and evenly stretched has become a topic worthy of discussion.

本發明之主要目的係在提供一種可以快速收卷複數邊料,且不會影響工作環境,也可以確保邊料的張力勻稱平整的邊料收卷機。 The main purpose of the present invention is to provide an edge material winding machine that can quickly rewind multiple edge materials without affecting the working environment and ensure that the tension of the edge materials is even and even.

為達成上述之目的,本發明之一種邊料收卷機用以收卷複數邊料,複數邊料包括一第一邊料及一第二邊料。邊料收卷機包括一第一路徑引導組件、一第二路徑引導組件和一收卷裝置。第一路徑引導組件用以引導第一邊料沿一第一路徑傳送。第二路徑引導組件用以引導第二邊料沿一第二路徑傳送。收卷裝置位於第一路徑及第二路徑之終點,以一併收卷第一邊料及第二邊料。 In order to achieve the above object, a side material winding machine of the present invention is used to wind up a plurality of side materials. The plurality of side materials include a first side material and a second side material. The edge material winding machine includes a first path guide component, a second path guide component and a winding device. The first path guide component is used to guide the first edge material to be transported along a first path. The second path guide component is used to guide the second edge material to be transported along a second path. The winding device is located at the end of the first path and the second path to wind up the first edge material and the second edge material together.

根據本發明的一實施例,其中第一路徑引導組件更包括一第一引導軸,第二路徑引導組件更包括一第二引導軸,其中第一引導軸的水平高度高於第二引導軸。 According to an embodiment of the present invention, the first path guide assembly further includes a first guide shaft, and the second path guide assembly further includes a second guide shaft, wherein the first guide shaft has a higher level than the second guide shaft.

根據本發明的一實施例,其中第一路徑引導組件更包括一第三引導軸及一第一張力調整組合,其中第一張力調整組合位於第三引導軸與第一引導軸之間,第二路徑引導組件更包括一第四引導軸及一第二張力調整組合,第二張力調整組合位於第四引導軸與第二引導軸之間。 According to an embodiment of the present invention, the first path guide assembly further includes a third guide shaft and a first tension adjustment combination, wherein the first tension adjustment combination is located between the third guide shaft and the first guide shaft, and the second The path guide assembly further includes a fourth guide shaft and a second tension adjustment combination, and the second tension adjustment combination is located between the fourth guide shaft and the second guide shaft.

根據本發明的一實施例,其中第一張力調整組合包括一第一張力調整軸及一第一弧形槽,第一張力調整軸位於第一弧形槽並可相對第一弧形槽移動以調整第一邊料之張力。 According to an embodiment of the present invention, the first tension adjustment assembly includes a first tension adjustment shaft and a first arcuate groove. The first tension adjustment shaft is located in the first arcuate groove and can move relative to the first arcuate groove. Adjust the tension of the first edge material.

根據本發明的一實施例,其中第二張力調整組合包括一第二張力調整軸及一第二弧形槽,其中第二張力調整軸位於第二弧形槽並可相對第二弧形槽移動以調整第二邊料之張力。 According to an embodiment of the present invention, the second tension adjustment assembly includes a second tension adjustment shaft and a second arcuate groove, wherein the second tension adjustment shaft is located in the second arcuate groove and can move relative to the second arcuate groove. To adjust the tension of the second edge material.

根據本發明的一實施例,其中第一路徑引導組件更包括兩第一方向調整軸,第二路徑引導組件更包括兩第二方向調整軸,其中第二方向調整軸位於兩第一方向調整軸之間。 According to an embodiment of the present invention, the first path guide assembly further includes two first direction adjustment shafts, and the second path guide assembly further includes two second direction adjustment shafts, wherein the second direction adjustment shafts are located between the two first direction adjustment shafts. between.

根據本發明的一實施例,邊料收卷機更包括一第一調整軸,第一調整軸包括一第一上軸體和一第一下軸體,其中上軸體位於第二路徑以接收來自兩第二方向調整軸之該第二邊料,下軸體位於第一路徑以接收來自兩第一方向調整軸之第一邊料。 According to an embodiment of the present invention, the edge material winding machine further includes a first adjustment shaft. The first adjustment shaft includes a first upper shaft body and a first lower shaft body, wherein the upper shaft body is located in the second path to receive The second edge material comes from the two second direction adjustment shafts, and the lower shaft body is located in the first path to receive the first edge material from the two first direction adjustment shafts.

根據本發明的一實施例,邊料收卷機更包括一第二調整軸,第二調整軸包括一第二上軸體和一第二下軸體,其中第二上軸體位於第二路徑以接收來自第一上軸體之第二邊料,第二下軸體位於第一路徑以接收來自第一下軸體之第一邊料。 According to an embodiment of the present invention, the edge material winding machine further includes a second adjustment shaft. The second adjustment shaft includes a second upper shaft body and a second lower shaft body, wherein the second upper shaft body is located on the second path. To receive the second edge material from the first upper shaft body, the second lower shaft body is located in the first path to receive the first edge material from the first lower shaft body.

根據本發明的一實施例,其中第一調整軸與第二調整軸可相對移動,藉此調整第一邊料之張力及第二邊料之張力。 According to an embodiment of the present invention, the first adjustment shaft and the second adjustment shaft can move relative to each other, thereby adjusting the tension of the first edge material and the tension of the second edge material.

根據本發明的一實施例,邊料收卷機更包括一第一角度調整件及一第二角度調整件,第一角度調整件及第二角度調整件位於收卷裝置與第二調整軸之間,其中來自第二上軸體之第二邊料穿過第一角度調整件與第二角度調整件間之空隙後與來自第二下軸體之第一邊料重合。 According to an embodiment of the present invention, the edge material winding machine further includes a first angle adjustment member and a second angle adjustment member. The first angle adjustment member and the second angle adjustment member are located between the winding device and the second adjustment shaft. in which the second edge material from the second upper shaft body passes through the gap between the first angle adjustment member and the second angle adjustment member and overlaps with the first edge material from the second lower shaft body.

根據本發明的一實施例,邊料收卷機更包括一橡膠壓輪,橡膠壓輪位於收卷裝置旁邊,橡膠壓輪用以壓住第一邊料及第二邊料。 According to an embodiment of the present invention, the edge material winding machine further includes a rubber pressure wheel. The rubber pressure wheel is located next to the winding device. The rubber pressure wheel is used to press the first edge material and the second edge material.

1:邊料收卷機 1: Edge material winding machine

10:第一路徑引導組件 10: First path guidance component

11:第一引導軸 11: First guide shaft

12:第一方向調整軸 12: First direction adjustment axis

13:第三引導軸 13:Third guide shaft

14:第一張力調整組合 14: First tension adjustment combination

141:第一張力調整軸 141: First tension adjustment shaft

141a、241a:轉向軸 141a, 241a: Steering shaft

142:第一弧形槽 142: First arc groove

20:第二路徑引導組件 20:Second path guidance component

21:第二引導軸 21:Second guide shaft

22:第二方向調整軸 22: Second direction adjustment axis

23:第四引導軸 23:Fourth guide axis

24:第二張力調整組合 24: Second tension adjustment combination

241:第二張力調整軸 241: Second tension adjustment shaft

242:第二弧形槽 242:Second arc groove

31:滑槽 31:Chute

32:第一調整軸 32: First adjustment axis

321:第一上軸體 321:First upper shaft body

322:第一下軸體 322:First lower shaft body

33:第二調整軸 33: Second adjustment axis

331:第二上軸體 331:Second upper shaft body

332:第二下軸體 332:Second lower shaft body

40:收卷裝置 40:Rewinding device

41:收納軸 41: Storage shaft

42:驅動輪 42:Driving wheel

61:第一角度調整件 61: First angle adjustment piece

62:第二角度調整件 62: Second angle adjustment piece

70:積料架 70: Accumulation rack

71:滑軌 71:Slide rail

73:邊料接收單元 73: Edge material receiving unit

80:橡膠壓輪 80: Rubber pressure wheel

90:連接板 90:Connection board

200:第一邊料 200: first side material

300:第二邊料 300: Second side material

L1:第一路徑 L1: first path

L2:第二路徑 L2: Second path

圖1係本發明之一實施例之邊料收卷機的示意圖。 Figure 1 is a schematic diagram of an edge material winding machine according to an embodiment of the present invention.

圖2係本發明之一實施例之邊料收卷機的部分示意圖。 Figure 2 is a partial schematic diagram of a side material winding machine according to an embodiment of the present invention.

圖3係本發明之一實施例之邊料收卷機的另一部分示意圖。 Figure 3 is another partial schematic diagram of the edge material winding machine according to an embodiment of the present invention.

圖4係本發明之一實施例之分隔複數邊料的邊料收卷機的示意圖。 Figure 4 is a schematic diagram of an edge material winding machine for separating multiple edge materials according to an embodiment of the present invention.

圖5係本發明之一實施例之分隔複數邊料的邊料收卷機的部分示意圖。 Figure 5 is a partial schematic diagram of a side material winding machine for separating a plurality of side materials according to an embodiment of the present invention.

圖6係本發明之一實施例之分隔複數邊料的邊料收卷機的另一部分示意圖。 Figure 6 is another partial schematic diagram of the edge material winding machine for separating multiple edge materials according to an embodiment of the present invention.

圖7係本發明之一實施例之收卷裝置的示意圖。 Figure 7 is a schematic diagram of a winding device according to an embodiment of the present invention.

圖8係本發明之一實施例之收卷複數邊料的邊料收卷機的示意圖。 Figure 8 is a schematic diagram of an edge material winding machine for winding multiple edge materials according to an embodiment of the present invention.

圖9係本發明之一實施例之第一調整軸和第二調整軸沿著滑槽移動的邊料收卷機的示意圖。 Figure 9 is a schematic diagram of a side material winding machine in which the first adjustment shaft and the second adjustment shaft move along the chute according to an embodiment of the present invention.

為能更瞭解本發明之技術內容,特舉較佳具體實施例說明如下。 In order to better understand the technical content of the present invention, preferred specific embodiments are described below.

以下請一併參考圖1至圖9關於本發明之一實施例之邊料收卷機。圖1係本發明之一實施例之邊料收卷機的示意圖。圖2係本發明之一實施例之邊料收卷機的部分示意圖。圖3係本發明之一實施例之邊料收卷機的另一部分示意圖。圖4係本發明之一實施例之分隔複數邊料的邊料收卷機的示意圖。圖5 係本發明之一實施例之分隔複數邊料的邊料收卷機的部分示意圖。圖6係本發明之一實施例之分隔複數邊料的邊料收卷機的另一部分示意圖。圖7係本發明之一實施例之收卷裝置的示意圖。圖8係本發明之一實施例之收卷複數邊料的邊料收卷機的示意圖。圖9係本發明之一實施例之第一調整軸和第二調整軸沿著滑槽移動的邊料收卷機的示意圖。 Please refer to FIGS. 1 to 9 below for the edge material winding machine according to one embodiment of the present invention. Figure 1 is a schematic diagram of an edge material winding machine according to an embodiment of the present invention. Figure 2 is a partial schematic diagram of a side material winding machine according to an embodiment of the present invention. Figure 3 is another partial schematic diagram of the edge material winding machine according to an embodiment of the present invention. Figure 4 is a schematic diagram of an edge material winding machine for separating multiple edge materials according to an embodiment of the present invention. Figure 5 This is a partial schematic diagram of an edge material winding machine for separating multiple edge materials according to an embodiment of the present invention. Figure 6 is another partial schematic diagram of the edge material winding machine for separating multiple edge materials according to an embodiment of the present invention. Figure 7 is a schematic diagram of a winding device according to an embodiment of the present invention. Figure 8 is a schematic diagram of an edge material winding machine for winding multiple edge materials according to an embodiment of the present invention. Figure 9 is a schematic diagram of a side material winding machine in which the first adjustment shaft and the second adjustment shaft move along the chute according to an embodiment of the present invention.

如圖1至圖4所示,在本發明的一實施例中,邊料收卷機1可以快速收卷複數邊料,且不會影響工作環境,也可以確保邊料的張力勻稱。複數邊料包括一第一邊料200及一第二邊料300,第一邊料200及第二邊料300皆是外部的包材裁切機切完包材之後所剩餘的塑料長條,為了方便顯示,第一邊料200在各圖中顯示為黑色,第二邊料300顯示為白色。邊料收卷機1包括一第一路徑引導組件10、一第二路徑引導組件20、兩個滑槽31、一第一調整軸32、一第二調整軸33、一收卷裝置40、一第一角度調整件61、一第二角度調整件62、一積料架70和一橡膠壓輪80。在本實施例中,積料架70下方設有一邊料接收單元73,以接收來自裁切機之第一邊料200及第二邊料300。積料架70左上設有一滑軌71,以供設置第一路徑引導組件10。 As shown in Figures 1 to 4, in one embodiment of the present invention, the edge material winding machine 1 can quickly wind up multiple edge materials without affecting the working environment, and can also ensure uniform tension of the edge materials. The plurality of side materials include a first side material 200 and a second side material 300. The first side material 200 and the second side material 300 are both plastic strips remaining after the external packaging material cutting machine cuts the packaging material. For convenience of display, the first side material 200 is shown in black in each figure, and the second side material 300 is shown in white. The edge material winding machine 1 includes a first path guide component 10, a second path guide component 20, two chutes 31, a first adjustment shaft 32, a second adjustment shaft 33, a winding device 40, a A first angle adjustment member 61, a second angle adjustment member 62, a material accumulation rack 70 and a rubber pressure wheel 80. In this embodiment, a side material receiving unit 73 is provided below the material accumulation rack 70 to receive the first side material 200 and the second side material 300 from the cutting machine. A slide rail 71 is provided on the upper left side of the accumulation rack 70 for disposing the first path guide assembly 10 .

如圖2、圖4至圖6所示,在本發明的一實施例中,第一路徑引導組件10接收來自邊料接收單元73之第一邊料200並引導第一邊料200沿一第一路徑L1傳送並協調第一邊料200的張力。第一路徑引導組件10包括一第一引導軸11、兩第一方向調整軸12、一第三引導軸13及一第一張力調整組合14,其中第一引導軸11、第三引導軸13及第一張力調整組合14設於積料架70。第一引導軸11設於積料架70的左上角並接收和引導第一邊料200的方向至第一張力調整組合14。第三引導軸13用以將第一邊料200的方向引導至兩第一方向調整軸12。兩 第一方向調整軸12用以接收第一邊料200,並讓第一邊料200的方向轉折至第一調整軸32。在此須注意的是,本發明所指之第一路徑L1為由第一引導軸11、兩第一方向調整軸12、第三引導軸13、第一調整軸32及第二調整軸33所構成之第一邊料200的引導路徑。 As shown in FIGS. 2 , 4 to 6 , in one embodiment of the present invention, the first path guide assembly 10 receives the first edge material 200 from the edge material receiving unit 73 and guides the first edge material 200 along a first edge material 200 . A path L1 conveys and coordinates the tension of the first edge material 200 . The first path guide assembly 10 includes a first guide shaft 11, two first direction adjustment shafts 12, a third guide shaft 13 and a first tension adjustment assembly 14, wherein the first guide shaft 11, the third guide shaft 13 and The first tension adjustment assembly 14 is provided on the material accumulation rack 70 . The first guide shaft 11 is disposed at the upper left corner of the material accumulation rack 70 and receives and guides the direction of the first edge material 200 to the first tension adjustment assembly 14 . The third guide shaft 13 is used to guide the direction of the first edge material 200 to the two first direction adjustment shafts 12 . two The first direction adjustment shaft 12 is used to receive the first side material 200 and change the direction of the first side material 200 to the first adjustment shaft 32 . It should be noted here that the first path L1 referred to in the present invention is defined by the first guide shaft 11, the two first direction adjustment shafts 12, the third guide shaft 13, the first adjustment shaft 32 and the second adjustment shaft 33. The guiding path of the first edge material 200 is formed.

第二路徑引導組件20接收來自邊料接收單元73之第二邊料300並引導第二邊料300沿一第二路徑L2傳送。第二路徑引導組件20包括一第二引導軸21、兩第二方向調整軸22、一第四引導軸23及一第二張力調整組合24,其中第二引導軸21、第四引導軸23及第二張力調整組合24設於積料架70。第二引導軸21設於積料架70的滑軌71內並用以接收和引導第二邊料300的方向至第二張力調整組合24。第一引導軸11的水平高度高於第二引導軸21,藉由第一引導軸11與第二引導軸21間水平高度的差異,以區分第一邊料200、第二邊料300的傳遞路徑。在本實施例中,第二引導軸21設置設於積料架70的滑軌71內以便調整第二引導軸21的高度,但須注意的是,在本實施例中,第一引導軸11設於積料架70的角落,第二引導軸21設於積料架70的滑軌71,但本發明不以此為限,第一引導軸11與第二引導軸21亦可設於滑軌71。第四引導軸23用以將第二邊料300的方向引導至兩第二方向調整軸22。兩第二方向調整軸22用以接收第二邊料300,並讓第二邊料300的方向轉折至第一調整軸32,第二方向調整軸22位於兩第一方向調整軸12之間。在此須注意的是,本發明所指之第二路徑L2為由一第二引導軸21、兩第二方向調整軸22、一第四引導軸23、第一調整軸32及第二調整軸33所構成之第二邊料300的引導路徑。 The second path guide component 20 receives the second edge material 300 from the edge material receiving unit 73 and guides the second edge material 300 to be transported along a second path L2. The second path guide assembly 20 includes a second guide shaft 21, two second direction adjustment shafts 22, a fourth guide shaft 23 and a second tension adjustment assembly 24, wherein the second guide shaft 21, the fourth guide shaft 23 and The second tension adjustment assembly 24 is provided on the material accumulation rack 70 . The second guide shaft 21 is disposed in the slide rail 71 of the material accumulation rack 70 and is used to receive and guide the direction of the second edge material 300 to the second tension adjustment assembly 24 . The horizontal height of the first guide shaft 11 is higher than that of the second guide shaft 21. The difference in the horizontal height between the first guide shaft 11 and the second guide shaft 21 is used to distinguish the transfer of the first edge material 200 and the second edge material 300. path. In this embodiment, the second guide shaft 21 is disposed in the slide rail 71 of the accumulation rack 70 to adjust the height of the second guide shaft 21 . However, it should be noted that in this embodiment, the first guide shaft 11 The second guide shaft 21 is provided at the corner of the material accumulation rack 70, and the second guide shaft 21 is provided on the slide rail 71 of the material accumulation rack 70. However, the present invention is not limited thereto. The first guide shaft 11 and the second guide shaft 21 can also be provided on the slide rail 71. Rail 71. The fourth guide shaft 23 is used to guide the direction of the second edge material 300 to the two second direction adjustment shafts 22 . The two second direction adjustment shafts 22 are used to receive the second side material 300 and turn the direction of the second side material 300 to the first adjustment shaft 32 . The second direction adjustment shaft 22 is located between the two first direction adjustment shafts 12 . It should be noted here that the second path L2 referred to in the present invention is composed of a second guide shaft 21, two second direction adjustment shafts 22, a fourth guide shaft 23, the first adjustment shaft 32 and the second adjustment shaft. The guide path of the second edge material 300 composed of 33.

如圖2、圖4和圖5所示,第一張力調整組合14設於積料架70且位於第三引導軸13與第一引導軸11之間。第一張力調整組合14用以調整第一邊料 200的張力,第一張力調整組合14包括複數第一張力調整軸141、複數轉向軸141a及複數第一弧形槽142。本實施例之各該第一弧形槽142於積料架70沿垂直方向由上往下排列,且每一個第一弧形槽142中設有一第一張力調整軸141,第一張力調整軸141可於對應之第一弧形槽142內移動,藉由調整第一張力調整軸141於該第一弧形槽142的位置,調整第一邊料200之張力,並藉由設於第一弧形槽142一端之轉向軸141a讓位第一邊料200可轉至另一第一張力調整軸141。然而,第一張力調整軸141、轉向軸141a和第一弧形槽142的數量不以複數為限,藉由多個第一張力調整軸141、轉向軸141a和第一弧形槽142的延長第一邊料200的傳遞路徑,以避免第一邊料200的收卷速度趕不上第一邊料200的提供速度,造成第一邊料200纏繞、第一路徑引導組件10脫離的情況發生,或也可依照設計需求而變更為至少一個。 As shown in FIGS. 2 , 4 and 5 , the first tension adjustment assembly 14 is provided on the material accumulation rack 70 and is located between the third guide shaft 13 and the first guide shaft 11 . The first tension adjustment combination 14 is used to adjust the first edge material With a tension of 200, the first tension adjustment combination 14 includes a plurality of first tension adjustment shafts 141, a plurality of steering shafts 141a and a plurality of first arcuate grooves 142. In this embodiment, the first arc-shaped grooves 142 are arranged from top to bottom in the vertical direction on the material accumulation rack 70, and each first arc-shaped groove 142 is provided with a first tension adjustment shaft 141. The first tension adjustment shaft 141 can move in the corresponding first arc-shaped groove 142. By adjusting the position of the first tension adjustment shaft 141 in the first arc-shaped groove 142, the tension of the first edge material 200 can be adjusted. The turning shaft 141a at one end of the arc-shaped groove 142 allows the first edge material 200 to be turned to another first tension adjustment shaft 141. However, the number of the first tension adjustment shaft 141, the steering shaft 141a and the first arcuate groove 142 is not limited to a plurality. By extending the plurality of first tension adjustment shafts 141, the steering shaft 141a and the first arcuate groove 142 The transfer path of the first side material 200 is to prevent the winding speed of the first side material 200 from not catching up with the supply speed of the first side material 200, causing the first side material 200 to become entangled and the first path guide assembly 10 to detach, or It can also be changed to at least one according to design requirements.

如圖2和圖5所示,第二張力調整組合24位於第四引導軸23與第二引導軸21之間設於積料架70並位於第一張力調整組合14下方。第二張力調整組合24用以調整第二邊料300的張力,第二張力調整組合24包括複數第二張力調整軸241、複數轉向軸241a及複數第二弧形槽242,本實施例之各該第二弧形槽242於積料架70沿垂直方向由下往上排列,且每一第二弧形槽242中設有一第二張力調整軸241,第二張力調整軸241可於對應之第二弧形槽242內移動,藉由調整第二張力調整軸241於該第二弧形槽242的位置,調整第二邊料300之張力,並藉由設於第二弧形槽242一端之轉向軸241a讓位第二邊料300可轉至另一第二張力調整軸241。然而,第二張力調整軸241、轉向軸241a和第二弧形槽242的數量不以複數為限,藉由多個第二張力調整軸241、轉向軸241a和第二弧形槽242的延長第二邊料300的傳遞路徑,以避免第二邊料300的收卷速度趕不上第二邊料300的 提供速度,造成第二邊料300纏繞、第二路徑引導組件20脫離的情況發生,或也可依照設計需求而變更為至少一個。 As shown in FIGS. 2 and 5 , the second tension adjustment assembly 24 is located on the material accumulation rack 70 between the fourth guide shaft 23 and the second guide shaft 21 and is located below the first tension adjustment assembly 14 . The second tension adjustment combination 24 is used to adjust the tension of the second edge material 300. The second tension adjustment combination 24 includes a plurality of second tension adjustment shafts 241, a plurality of steering shafts 241a and a plurality of second arcuate grooves 242. Each of the second tension adjustment shafts 241 in this embodiment The second arc-shaped grooves 242 are arranged from bottom to top in the vertical direction of the material accumulation rack 70 , and each second arc-shaped groove 242 is provided with a second tension adjustment shaft 241 , and the second tension adjustment shaft 241 can be in the corresponding position. By moving within the second arc-shaped groove 242, the tension of the second edge material 300 is adjusted by adjusting the position of the second tension adjustment shaft 241 in the second arc-shaped groove 242. The steering shaft 241a allows the second edge material 300 to be rotated to another second tension adjustment shaft 241. However, the number of the second tension adjustment shaft 241, the steering shaft 241a and the second arcuate groove 242 is not limited to a plurality. By extending the plurality of second tension adjustment shafts 241, the steering shaft 241a and the second arcuate groove 242 The transfer path of the second side material 300 is to prevent the winding speed of the second side material 300 from not catching up with the second side material 300 The speed is provided to cause the second edge material 300 to be entangled and the second path guide component 20 to be detached, or it can be changed to at least one according to design requirements.

如圖3、圖4、圖8和圖9所示,在本發明的一實施例中,第一調整軸32藉由傳動機構(如:馬達,圖未示)的帶動沿著滑槽31橫向移動,並用以接收從第一方向調整軸12和第二方向調整軸22引導而來的第一邊料200、第二邊料300,並調整第一邊料200、第二邊料300的方向至朝向第二調整軸33。第一調整軸32包括一第一上軸體321和一第一下軸體322,第一上軸體321位於第二路徑L2以接收來自兩第二方向調整軸22之第二邊料300,第一下軸體322位於第一路徑L1以接收來自兩第一方向調整軸12之第一邊料200。 As shown in Figures 3, 4, 8 and 9, in one embodiment of the present invention, the first adjustment shaft 32 is driven laterally along the chute 31 by a transmission mechanism (such as a motor, not shown). Move to receive the first side material 200 and the second side material 300 guided from the first direction adjustment shaft 12 and the second direction adjustment shaft 22, and adjust the direction of the first side material 200 and the second side material 300. to the second adjustment axis 33. The first adjustment shaft 32 includes a first upper shaft body 321 and a first lower shaft body 322. The first upper shaft body 321 is located on the second path L2 to receive the second edge material 300 from the two second direction adjustment shafts 22. The first lower shaft body 322 is located on the first path L1 to receive the first edge material 200 from the two first direction adjustment shafts 12 .

第二調整軸33包括一第二上軸體331和一第二下軸體332,第二上軸體331位於第二路徑以接收來自第一上軸體321之第二邊料300,第二下軸體332位於第一路徑以接收來自第一下軸體322之第一邊料200。第二調整軸33位於第一調整軸32和第二方向調整軸22之間。第一調整軸32的移動速度小於第二調整軸33。藉由不同的移動速度,第一調整軸32和第二調整軸33之間的距離會逐漸改變,如此一來在運輸和調整第一邊料200、第二邊料300的方向的過程中,也可以調整第一邊料200、第二邊料300的張力;例如,當第一調整軸32和第二調整軸33移動至第一調整軸32和第二調整軸33之間的距離減少,則會讓環繞著第一調整軸32和第二調整軸33的第一邊料200、第二邊料300之環繞長度也減少而使第一邊料200、第二邊料300的張力變鬆;反之,當第一調整軸32和第二調整軸33移動至第一調整軸32和第二調整軸33之間的距離增加,則會讓環繞著第一調整軸32和第二調整軸33的第一邊料200、第二邊料300之環繞長度也增加而使第一邊料200、第二邊料300的張力變緊。 The second adjustment shaft 33 includes a second upper shaft body 331 and a second lower shaft body 332. The second upper shaft body 331 is located on the second path to receive the second edge material 300 from the first upper shaft body 321. The lower shaft body 332 is located on the first path to receive the first edge material 200 from the first lower shaft body 322 . The second adjustment shaft 33 is located between the first adjustment shaft 32 and the second direction adjustment shaft 22 . The moving speed of the first adjustment shaft 32 is smaller than that of the second adjustment shaft 33 . Through different moving speeds, the distance between the first adjustment shaft 32 and the second adjustment shaft 33 will gradually change. In this way, during the process of transporting and adjusting the directions of the first edge material 200 and the second edge material 300, The tension of the first edge material 200 and the second edge material 300 can also be adjusted; for example, when the first adjustment shaft 32 and the second adjustment shaft 33 move to a point where the distance between the first adjustment shaft 32 and the second adjustment shaft 33 decreases, Then the surrounding length of the first side material 200 and the second side material 300 surrounding the first adjustment shaft 32 and the second adjustment shaft 33 will also be reduced, so that the tension of the first side material 200 and the second side material 300 will become loose. On the contrary, when the first adjustment shaft 32 and the second adjustment shaft 33 move to the distance between the first adjustment shaft 32 and the second adjustment shaft 33, the distance surrounding the first adjustment shaft 32 and the second adjustment shaft 33 will increase. The surrounding length of the first side material 200 and the second side material 300 also increases, so that the tension of the first side material 200 and the second side material 300 becomes tight.

如圖3、圖7和圖8所示,在本發明的一實施例中,收卷裝置40位於第一路徑及第二路徑之終點,以一併收卷第一邊料200及第二邊料300。收卷裝置40包括一收納軸41和一驅動輪42,驅動輪42受到馬達(圖未示)驅動而自行旋轉。收納軸41受到驅動輪42驅動而旋轉,並用以收卷從第一路徑及第二路徑引導而來的第一邊料200及第二邊料300。 As shown in Figures 3, 7 and 8, in one embodiment of the present invention, the winding device 40 is located at the end point of the first path and the second path to wind up the first edge material 200 and the second edge material together. Material 300. The winding device 40 includes a storage shaft 41 and a driving wheel 42. The driving wheel 42 is driven by a motor (not shown) to rotate on its own. The storage shaft 41 is driven by the driving wheel 42 to rotate, and is used to wind up the first edge material 200 and the second edge material 300 guided from the first path and the second path.

如圖3、圖6、圖8和圖9所示,在本發明的一實施例中,第一角度調整件61及第二角度調整件62用以調整第一邊料200及第二邊料300的角度,以使第一邊料200及第二邊料300更順利的被收卷至收卷裝置40上。第一角度調整件61及第二角度調整件62位於收卷裝置40與第二調整軸33之間,其中來自第二上軸體331之第二邊料300穿過第一角度調整件61與第二角度調整件62間之空隙後,與來自第二下軸體332之第一邊料200重合。第一角度調整件61及第二角度調整件62連接第二調整軸33。在本實施例中,第二調整軸33與第一角度調整件61及第二角度調整件62藉由一連接板90連接,藉此當第二調整軸33移動時,第二調整軸33會帶動連接板90移動,連帶著讓連接著連接板90的第一角度調整件61及第二角度調整件62一起移動。 As shown in Figures 3, 6, 8 and 9, in one embodiment of the present invention, the first angle adjustment member 61 and the second angle adjustment member 62 are used to adjust the first edge material 200 and the second edge material. An angle of 300, so that the first edge material 200 and the second edge material 300 can be more smoothly wound onto the winding device 40. The first angle adjustment member 61 and the second angle adjustment member 62 are located between the winding device 40 and the second adjustment shaft 33, in which the second edge material 300 from the second upper shaft body 331 passes through the first angle adjustment member 61 and the second angle adjustment member 62. The gap between the second angle adjustment members 62 overlaps with the first edge material 200 from the second lower shaft body 332 . The first angle adjustment member 61 and the second angle adjustment member 62 are connected to the second adjustment shaft 33 . In this embodiment, the second adjustment shaft 33 is connected to the first angle adjustment member 61 and the second angle adjustment member 62 through a connecting plate 90, whereby when the second adjustment shaft 33 moves, the second adjustment shaft 33 will The connecting plate 90 is driven to move, and the first angle adjusting member 61 and the second angle adjusting member 62 connected to the connecting plate 90 are moved together.

如圖6至圖9所示,在本發明的一實施例中,橡膠壓輪80是在左右兩側安裝了加壓輪的滾軸,橡膠壓輪80位於收卷裝置40之驅動輪42旁邊。橡膠壓輪80用以配合驅動輪42,將第一邊料200及第二邊料300壓在驅動輪42上,以使第一邊料200及第二邊料300變得不易滑動且張力平均,而更容易被收卷到收納軸41。 As shown in Figures 6 to 9, in one embodiment of the present invention, the rubber pressure wheel 80 is a roller with pressure wheels installed on the left and right sides. The rubber pressure wheel 80 is located next to the driving wheel 42 of the winding device 40. . The rubber pressing wheel 80 is used to cooperate with the driving wheel 42 to press the first side material 200 and the second side material 300 on the driving wheel 42 so that the first side material 200 and the second side material 300 become difficult to slide and the tension is even. , and is easier to be rolled up to the storage shaft 41.

當使用者用外部的分條機(圖未示)裁切完包材而殘留下第一邊料200及第二邊料300之後,使用者可以運用邊料收卷機1來收卷第一邊料200及第 二邊料300。首先,如圖2至圖6所示,使用者可以將第一邊料200及第二邊料300拉伸,讓第一邊料200繞過第一引導軸11再右彎至繞過到各個第一張力調整軸141,最後讓第一邊料200繞過第三引導軸13而延伸至第一方向調整軸12。另外,使用者可以讓第二邊料300繞過第二引導軸21再右彎至繞過到各個第二張力調整軸241,最後讓第二邊料300繞過第四引導軸23而延伸至第二方向調整軸22。如此一來,第一引導軸11和第二引導軸21可以將第一邊料200及第二邊料300分隔至不同位置;第一邊料200及第二邊料300在接觸各個第一張力調整軸141和各個第二張力調整軸241時,各個第一張力調整軸141可以沿著第一弧形槽142滑動,各個第二張力調整軸241可以沿著第二弧形槽242滑動;藉由各個第一張力調整軸141和各個第二張力調整軸241的位置變動,可以變更第一邊料200及第二邊料300的移動距離而達到調整張力鬆緊的效果。 After the user uses an external slitting machine (not shown) to cut the packaging material and leaves the first edge material 200 and the second edge material 300, the user can use the edge material winding machine 1 to wind up the first edge material. Side material 200 and 300 for two side materials. First, as shown in FIGS. 2 to 6 , the user can stretch the first edge material 200 and the second edge material 300 to allow the first edge material 200 to go around the first guide shaft 11 and then bend it right to go around each side. The first tension adjustment shaft 141 finally allows the first edge material 200 to bypass the third guide shaft 13 and extend to the first direction adjustment shaft 12 . In addition, the user can let the second edge material 300 go around the second guide shaft 21 and then bend right to go around each second tension adjustment shaft 241, and finally let the second edge material 300 go around the fourth guide shaft 23 and extend to The second direction adjustment shaft 22. In this way, the first guide shaft 11 and the second guide shaft 21 can separate the first edge material 200 and the second edge material 300 to different positions; the first edge material 200 and the second edge material 300 are in contact with each first tension force. When adjusting the shaft 141 and each second tension adjustment shaft 241, each first tension adjustment shaft 141 can slide along the first arc-shaped groove 142, and each second tension adjustment shaft 241 can slide along the second arc-shaped groove 242; By changing the position of each first tension adjustment shaft 141 and each second tension adjustment shaft 241, the moving distance of the first edge material 200 and the second edge material 300 can be changed to achieve the effect of adjusting the tension.

當第一邊料200及第二邊料300從第三引導軸13和第四引導軸23伸出之後,使用者可以將第一邊料200及第二邊料300拉至第一方向調整軸12和第二方向調整軸22,讓第一邊料200繞過上方的第一方向調整軸12往下彎,再向下繞過下方的第一方向調整軸12彎折至碰觸第一調整軸32的第一下軸體322;使用者可以讓第二邊料300繞過上方的第二方向調整軸22往下彎,再向下繞過下方的第二方向調整軸22彎折至碰觸第一調整軸32的第一上軸體321。 After the first side material 200 and the second side material 300 extend from the third guide shaft 13 and the fourth guide shaft 23 , the user can pull the first side material 200 and the second side material 300 to the first direction adjustment shaft. 12 and the second direction adjustment shaft 22, let the first edge material 200 bend downward around the first direction adjustment shaft 12 above, and then bend downward around the first direction adjustment shaft 12 below until it touches the first adjustment. The first lower shaft body 322 of the shaft 32; the user can make the second edge material 300 bend downward around the second direction adjustment shaft 22 above, and then bend downward around the second direction adjustment shaft 22 below until it touches. Touch the first upper shaft body 321 of the first adjustment shaft 32 .

接著,如圖4、圖6至圖9所示,使用者可以將第一邊料200繞過第一下軸體322、延伸至第二調整軸33的第二下軸體332再彎折至穿過第一角度調整件61下方、被橡膠壓輪80壓住後,再纏繞至收卷裝置40的收納軸41;並將第二邊料300繞過第一上軸體321、延伸至第二調整軸33的第二上軸體331再彎折至 穿過第一角度調整件61和第二角度調整件62之間、再纏繞至收卷裝置40的收納軸41。如此一來,即完成第一邊料200、第二邊料300在邊料收卷機1上的設置。 Then, as shown in Figures 4, 6 to 9, the user can wrap the first edge material 200 around the first lower shaft body 322, extend to the second lower shaft body 332 of the second adjustment shaft 33, and then bend it to After passing under the first angle adjustment member 61 and being pressed by the rubber pressure wheel 80, it is then wound to the storage shaft 41 of the winding device 40; and the second edge material 300 is passed around the first upper shaft 321 and extended to the third The second upper shaft body 331 of the second adjustment shaft 33 is then bent to It passes between the first angle adjustment member 61 and the second angle adjustment member 62 and then winds to the storage shaft 41 of the winding device 40 . In this way, the setting of the first edge material 200 and the second edge material 300 on the edge material winding machine 1 is completed.

最後,使用者可以啟動邊料收卷機1,讓驅動輪42驅動收納軸41旋轉,旋轉的收納軸41會開始收卷第一邊料200、第二邊料300,讓第一邊料200、第二邊料300依序沿著接觸到的各個引導軸、各個張力調整軸、方向調整件、移動軸、角度調整件而移動至卷住收卷裝置40。另外,第一調整軸32和第二調整軸33會沿著滑槽31左右移動,故可以讓第一邊料200、第二邊料300也配合第一調整軸32和第二調整軸33的左右移動而在收納軸41左右往返的收卷。本實施例的第一調整軸32和第二調整軸33在左右往返到滑槽31兩端的盡頭時,會立刻掉頭折返且不會暫停,以維持第一邊料200、第二邊料300的張力。由於第一調整軸32的移動速度小於第二調整軸33的移動速度,第一調整軸32的移動速度和第二調整軸33的移動速度的比例為1:2。藉由不同的移動速度,第一調整軸32和第二調整軸33之間的距離會逐漸改變,故也可以調整第一邊料200、第二邊料300的張力。當第一邊料200、第二邊料300配合第一調整軸32和第二調整軸33的左右移動而在收納軸41左右往返的收卷時,第一邊料200、第二邊料300可以被橡膠壓輪80左右兩側的加壓輪壓住,以使第一邊料200及第二邊料300變得平順且張力平均,而更容易被收卷到收納軸41。 Finally, the user can start the edge material winding machine 1 and let the driving wheel 42 drive the storage shaft 41 to rotate. The rotating storage shaft 41 will start to wind up the first edge material 200 and the second edge material 300, so that the first edge material 200 The second edge material 300 moves to the winding and rewinding device 40 sequentially along the contacting guide shafts, tension adjustment shafts, direction adjustment members, moving shafts, and angle adjustment members. In addition, the first adjustment shaft 32 and the second adjustment shaft 33 will move left and right along the chute 31, so the first side material 200 and the second side material 300 can also cooperate with the first adjustment shaft 32 and the second adjustment shaft 33. Winding that moves left and right and reciprocates left and right on the storage shaft 41 . In this embodiment, when the first adjustment shaft 32 and the second adjustment shaft 33 go back and forth to the ends of the chute 31 from left to right, they will immediately turn around without pausing to maintain the stability of the first edge material 200 and the second edge material 300 . Tension. Since the moving speed of the first adjusting shaft 32 is smaller than the moving speed of the second adjusting shaft 33 , the ratio of the moving speed of the first adjusting shaft 32 to the moving speed of the second adjusting shaft 33 is 1:2. Through different moving speeds, the distance between the first adjustment shaft 32 and the second adjustment shaft 33 will gradually change, so the tension of the first edge material 200 and the second edge material 300 can also be adjusted. When the first side material 200 and the second side material 300 cooperate with the left and right movement of the first adjustment shaft 32 and the second adjustment shaft 33 to rewind back and forth on the storage shaft 41, the first side material 200 and the second side material 300 It can be pressed by the pressure wheels on the left and right sides of the rubber pressure wheel 80 so that the first edge material 200 and the second edge material 300 become smooth and have even tension, so that they can be rolled up to the storage shaft 41 more easily.

藉由本發明的邊料收卷機的設計,可以快速收卷複數邊料,且過程中不需運用工業吹風機,故不會影響工作環境。另外,收卷邊料的過程中,可以利用張力調整軸的移動和調整軸的不同移動速度,而調節邊料的張力鬆緊程度,以確保邊料的張力勻稱。 Through the design of the edge material winding machine of the present invention, multiple edge materials can be quickly rolled up, and no industrial hair dryer is needed in the process, so the working environment will not be affected. In addition, during the process of rolling up the edge material, the movement of the tension adjustment shaft and the different moving speeds of the adjustment shaft can be used to adjust the tension of the edge material to ensure that the tension of the edge material is even.

需注意的是,上述僅為實施例,而非限制於實施例。譬如此不脫離本發明基本架構者,皆應為本專利所主張之權利範圍,而應以專利申請範圍為準。 It should be noted that the above are only examples and are not limited to the examples. For example, anything that does not deviate from the basic structure of the present invention shall fall within the scope of rights claimed by this patent, and the patent application scope shall prevail.

1:邊料收卷機 1: Edge material winding machine

10:第一路徑引導組件 10: First path guidance component

20:第二路徑引導組件 20:Second path guidance component

32:第一調整軸 32: First adjustment axis

33:第二調整軸 33: Second adjustment axis

40:收卷裝置 40:Rewinding device

61:第一角度調整件 61: First angle adjustment piece

62:第二角度調整件 62: Second angle adjustment piece

70:積料架 70: Accumulation rack

71:滑軌 71:Slide rail

73:邊料接收單元 73: Edge material receiving unit

80:橡膠壓輪 80: Rubber pressure wheel

Claims (10)

一種邊料收卷機,用以收卷複數邊料,其中該複數邊料包括一第一邊料及一第二邊料,該邊料收卷機包括:一第一路徑引導組件,用以引導該第一邊料沿一第一路徑傳送;一第二路徑引導組件,用以引導該第二邊料沿一第二路徑傳送;一收卷裝置,位於該第一路徑及該第二路徑之終點,以一併收卷該第一邊料及該第二邊料;一滑槽;一第一調整軸,設於該滑槽並於該滑槽內移動,該第一調整軸經該第一路徑接收該第一邊料,該第一調整軸經該第二路徑接收該第二邊料;以及一第二調整軸,設於該滑槽並於該滑槽內移動,該第二調整軸接收來自該第一調整軸之該第一邊料及該第二邊料,其中該第一調整軸的移動速度小於該第二調整軸的移動速度,以改變該第一調整軸與該第二調整軸之距離,以調整該第一邊料之張力及該第二邊料之張力,且該第一調整軸和該第二調整軸在往返到該滑槽兩端的盡頭時,會立刻掉頭折返,以維持該第一邊料、該第二邊料的張力。 A side material winding machine is used to wind up a plurality of side materials, wherein the plurality of side materials includes a first side material and a second side material. The side material winding machine includes: a first path guide component for guiding The first edge material is conveyed along a first path; a second path guide component is used to guide the second edge material to be conveyed along a second path; a winding device is located between the first path and the second path The end point is used to wind up the first edge material and the second edge material together; a chute; a first adjustment shaft, which is provided in the chute and moves in the chute, and the first adjustment shaft passes through the first The path receives the first edge material, and the first adjustment shaft receives the second edge material through the second path; and a second adjustment shaft is provided in the chute and moves in the chute, the second adjustment shaft Receive the first edge material and the second edge material from the first adjustment shaft, wherein the moving speed of the first adjustment shaft is smaller than the moving speed of the second adjustment shaft, so as to change the first adjustment shaft and the second adjustment shaft. The distance between the axes is to adjust the tension of the first edge material and the tension of the second edge material, and the first adjustment axis and the second adjustment axis will immediately turn around when they return to the ends of the two ends of the chute. To maintain the tension of the first edge material and the second edge material. 如請求項1所述之邊料收卷機,其中該第一路徑引導組件更包括一第一引導軸,該第二路徑引導組件更包括一第二引導軸,其中該第一引導軸的水平高度高於該第二引導軸。 The edge material winding machine according to claim 1, wherein the first path guide component further includes a first guide shaft, the second path guide component further includes a second guide shaft, wherein the horizontal direction of the first guide shaft The height is higher than the second guide axis. 如請求項2所述之邊料收卷機,其中該第一路徑引導組件更包括一第三引導軸及一第一張力調整組合,其中該第一張力調整組合位於該第三引 導軸與該第一引導軸之間,該第二路徑引導組件更包括一第四引導軸及一第二張力調整組合,該第二張力調整組合位於該第四引導軸與該第二引導軸之間。 The edge material winding machine according to claim 2, wherein the first path guide assembly further includes a third guide shaft and a first tension adjustment combination, wherein the first tension adjustment combination is located on the third guide shaft. Between the guide shaft and the first guide shaft, the second path guide assembly further includes a fourth guide shaft and a second tension adjustment combination. The second tension adjustment combination is located between the fourth guide shaft and the second guide shaft. between. 如請求項3所述之邊料收卷機,其中該第一張力調整組合包括一第一張力調整軸及一第一弧形槽,該第一張力調整軸位於該第一弧形槽並可相對該第一弧形槽移動以調整該第一邊料之張力。 The edge material winding machine according to claim 3, wherein the first tension adjustment combination includes a first tension adjustment shaft and a first arc-shaped groove, the first tension adjustment shaft is located in the first arc-shaped groove and can Move relative to the first arc-shaped groove to adjust the tension of the first edge material. 如請求項3所述之邊料收卷機,其中該第二張力調整組合包括一第二張力調整軸及一第二弧形槽,其中該第二張力調整軸位於該第二弧形槽並可相對該第二弧形槽移動以調整該第二邊料之張力。 The edge material winding machine according to claim 3, wherein the second tension adjustment combination includes a second tension adjustment shaft and a second arc-shaped groove, wherein the second tension adjustment shaft is located at the second arc-shaped groove and It can move relative to the second arc-shaped groove to adjust the tension of the second edge material. 如請求項2所述之邊料收卷機,其中該第一路徑引導組件更包括兩第一方向調整軸,該第二路徑引導組件更包括兩第二方向調整軸,其中該第二方向調整軸位於該兩第一方向調整軸之間。 The edge material winding machine according to claim 2, wherein the first path guide component further includes two first direction adjustment shafts, and the second path guide component further includes two second direction adjustment shafts, wherein the second direction adjustment shaft The axis is located between the two first direction adjustment axes. 如請求項6所述之邊料收卷機,其中該第一調整軸包括一第一上軸體和一第一下軸體,其中該上軸體位於該第二路徑以接收來自該兩第二方向調整軸之該第二邊料,該下軸體位於該第一路徑以接收來自該兩第一方向調整軸之該第一邊料。 The edge material winding machine as claimed in claim 6, wherein the first adjustment shaft includes a first upper shaft body and a first lower shaft body, wherein the upper shaft body is located in the second path to receive from the two second shaft bodies. For the second edge material of the two direction adjustment shafts, the lower shaft body is located on the first path to receive the first edge material from the two first direction adjustment shafts. 如請求項7所述之邊料收卷機,其中該第二調整軸包括一第二上軸體和一第二下軸體,其中該第二上軸體位於該第二路徑以接收來自該第一上軸體之該第二邊料,該第二下軸體位於該第一路徑以接收來自該第一下軸體之該第一邊料。 The edge material winding machine according to claim 7, wherein the second adjustment shaft includes a second upper shaft body and a second lower shaft body, wherein the second upper shaft body is located on the second path to receive from the The second edge material of the first upper shaft body is located on the first path to receive the first edge material from the first lower shaft body. 如請求項8所述之邊料收卷機,更包括一第一角度調整件及一第二角度調整件,該第一角度調整件及該第二角度調整件位於該收卷裝置與該第 二調整軸之間,其中來自該第二上軸體之該第二邊料穿過該第一角度調整件與該第二角度調整件間之空隙後與來自該第二下軸體之該第一邊料重合。 The edge material winding machine according to claim 8 further includes a first angle adjustment member and a second angle adjustment member, the first angle adjustment member and the second angle adjustment member are located between the winding device and the third angle adjustment member. Between the two adjustment shafts, the second edge material from the second upper shaft body passes through the gap between the first angle adjustment member and the second angle adjustment member and meets the third edge material from the second lower shaft body. The materials on one side overlap. 如請求項1所述之邊料收卷機,更包括一橡膠壓輪,該橡膠壓輪位於該收卷裝置旁邊,該橡膠壓輪用以壓住該第一邊料及該第二邊料。 The edge material winding machine as claimed in claim 1 further includes a rubber pressure wheel located next to the winding device, and the rubber pressure wheel is used to press the first edge material and the second edge material.
TW111146415A 2022-12-02 2022-12-02 Leftover material winder TWI812556B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
TW111146415A TWI812556B (en) 2022-12-02 2022-12-02 Leftover material winder
CN202310780718.6A CN118125191A (en) 2022-12-02 2023-06-29 Rim charge winding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111146415A TWI812556B (en) 2022-12-02 2022-12-02 Leftover material winder

Publications (2)

Publication Number Publication Date
TWI812556B true TWI812556B (en) 2023-08-11
TW202423823A TW202423823A (en) 2024-06-16

Family

ID=88586055

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111146415A TWI812556B (en) 2022-12-02 2022-12-02 Leftover material winder

Country Status (2)

Country Link
CN (1) CN118125191A (en)
TW (1) TWI812556B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM522936U (en) * 2015-11-13 2016-06-01 Jine Wei Ind Co Ltd Wrapping, slitting, winding, retracting shaft clamping and tension control mechanism
CN210286171U (en) * 2019-06-20 2020-04-10 山东泰宝包装制品有限公司 Automatic edge folding device for slitting
CN211870939U (en) * 2020-04-06 2020-11-06 三河市人民印务有限公司 Waste material winding device of plastic packaging machine
CN113526222A (en) * 2021-07-16 2021-10-22 上海复合材料科技有限公司 Continuous gluing method for ultralong composite material strain energy rod

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM522936U (en) * 2015-11-13 2016-06-01 Jine Wei Ind Co Ltd Wrapping, slitting, winding, retracting shaft clamping and tension control mechanism
CN210286171U (en) * 2019-06-20 2020-04-10 山东泰宝包装制品有限公司 Automatic edge folding device for slitting
CN211870939U (en) * 2020-04-06 2020-11-06 三河市人民印务有限公司 Waste material winding device of plastic packaging machine
CN113526222A (en) * 2021-07-16 2021-10-22 上海复合材料科技有限公司 Continuous gluing method for ultralong composite material strain energy rod

Also Published As

Publication number Publication date
CN118125191A (en) 2024-06-04

Similar Documents

Publication Publication Date Title
CN113561503B (en) Film compounding machine
KR100953758B1 (en) Slitter rewinder
KR0169138B1 (en) Film spreading device for use in wrapping apparatus
JPH04345462A (en) Method and apparatus for preparing wound matter
US8950303B2 (en) Web product cutting and screening machine and method
EP3056458B1 (en) Rewinding machine
TWI812556B (en) Leftover material winder
CN105500900A (en) Flat pressing and flat die cutting device connected with intermittent rotation printing machine
US12012237B2 (en) Method and apparatus for wrapping
CN103193103A (en) Drying, slitting and winding integrated machine
US4077306A (en) Bag machine cycle interrupt
US5899403A (en) Method and apparatus for winding bags onto a spindle
TW202423823A (en) Leftover material winder
CN204280811U (en) A kind of online splitting winding device of wide door width coating machine
KR20170062147A (en) Wrapping apparatus using flexible film
CN108996284A (en) A kind of sheet material winding machine
JP7435084B2 (en) Wiping device, head maintenance device and liquid discharge device
CN206703675U (en) Plastic film compounding machine
CN209699974U (en) A kind of Polywoven Bag cutter device
CN202116090U (en) Automatic high-speed rewinding machine for stretch film
US4034905A (en) Flat advancement of running web between guide rollers
CN203199774U (en) Drying, slitting and reeling all-in-one machine
CN219133268U (en) Film water delivery belt production equipment
CN108455359A (en) A kind of oblique trace folding machine
CN109605822B (en) Automatic forming device for PVC packaging box