TWI260362B - Male wall - Google Patents

Male wall Download PDF

Info

Publication number
TWI260362B
TWI260362B TW93135327A TW93135327A TWI260362B TW I260362 B TWI260362 B TW I260362B TW 93135327 A TW93135327 A TW 93135327A TW 93135327 A TW93135327 A TW 93135327A TW I260362 B TWI260362 B TW I260362B
Authority
TW
Taiwan
Prior art keywords
fixed
unit
wall
bracket
shaped
Prior art date
Application number
TW93135327A
Other languages
Chinese (zh)
Other versions
TW200617251A (en
Inventor
Jian-Yuan Tzeng
Original Assignee
Jian-Yuan Tzeng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jian-Yuan Tzeng filed Critical Jian-Yuan Tzeng
Priority to TW93135327A priority Critical patent/TWI260362B/en
Publication of TW200617251A publication Critical patent/TW200617251A/en
Application granted granted Critical
Publication of TWI260362B publication Critical patent/TWI260362B/en

Links

Landscapes

  • Building Environments (AREA)

Abstract

A kind of can fast build wall device, and use of material Is molding metalling board and concrete collocation of wall cell components, can built complete wall have high strength and fire control function, collocation steel ribs structural design will very active, and economical build wall device.

Description

1260362 九、發明說明: 【發明所屬之技術領域】 ,發,係麟-韻贼造方法;驗預鑄騎土版或水泥版配 5金屬支架快速固著的方法,特別是不需要其他大型塔吊裝置或 龐大運輸系統,就能將牆壁建造完成。 【先前技術】 建築界所熟知的預鑄工法(牆壁類)··是因應大量且相同造型之建 築物外牆而產生之建築技術;但因為臺灣地小人稠,道路小,大籲 型預鑄牆板交通運輸吊裝施工不便,每每須要大型塔带裝置,成 本兩叩且巨大}儿重的預鑄牆板,在施工中或施工後其安全維護的 措施均馬虎不得,徒增工程成本或使用信心,又因臺灣土地單元 切割極小,建築物大小不—,外牆造型多變,所以傳統的預鱗工 法不適因應此種變化多端的造型設計。在臺灣營造工程中因成本 高所以使用不多;但預鑄工法有其優點原因是:在施工速度上相 當快,所有牆板均在工廠製作,施工品質均能充分控制,生產速⑩ 度快,尤其搭配高層鋼骨結構之建築物,其建造速度及抗震性均 是相當好。 本發明之牆板單元取預鱗牆板工法之優點,如在工廠製造品質統 一、生產速度快、產量能控制等,工地現場組裝快速、成本低、 抗震性、防火性、重量輕等之優點。而去其缺點如:巨大沉重、 交通運輸成本高、施工吊裝不易、後續安全維護成本高等而發明 1260362 【發明内容】 富圖得知,本發明建造牆壁的方法是由如 透過組件金屬邊框⑴預留的螺栓圓 由第_ s及第 成的,也就是一種組合式的牆壁建造方式, 件可知每個組件都是由金屬鈑成型如第 (IX如第二mm-等零件組合焊接而成,單元組件的邊框 屬固定I^個金屬鈑成型零件都有預留螺栓圓孔⑵金 屬口疋Li支架(6)(如第六圖、第八圖^ ,電管或其他管路或線路配通 預留孔其作用疋牆壁組合當中螺检結合各組件上 暑 3單具有強度應力,並於組件各邊其中 預‘早兀組件上下垂直對齊銜接,左右預鑄組 型支架⑹與支架之間為垂直連接、上下延伸, t ϊίίί與固定L型支架⑹之間與預鑄單元組件之間均事 ι^ίΐϊ^f栓κ孔⑵’使螺栓接合’使之相互連結成一 二抑1 f石夕利康或止水橡膠封條⑼使之密合不滲水 有向内側90度彎曲之折邊,其功用 組件在金屬鈑零件如第三圖、第四 ⑴後,再於其内置點焊鋼絲網⑶並· ΐ^ϊΐ ,二圖所示),再將焊固完成之邊框組件 =疑气⑸硬化後再作表面處理如舖設磁碑U /由/黍等即元成預鑄單元組件之製作。 明得知本發明所完成的_真有防火功能,因為全使用 :組單元組件皆在工廠完成,在== n' 乍八有縮短工時的作用。每個組件皆由金屬邊框 )加點焊鋼_⑶減凝土⑸域錄作完柄配合螺絲強 1260362 力結合’所以組件本身或組合成的牆壁皆有抵抗應力的功能。 綜合上述所言,本發明具有·· 1、 防火功能:適合使用於防火區隔之構造物σ 2、 縮知工時:因為只在工地現場使用螺栓組裝,所以施工速度 會报快。 3、 抗應力強··因為使用有強度的金屬鈑零件所焊接成的邊框(1) 及點焊鋼絲網(3)及抗壓的混凝土 (5)所以預鑄單 元組件本身就有抵抗應力的功能再加上螺絲強力 結合搭配鋼骨結構設計抗應力功能會更好。 【實施方式】 · 依據本發明之方法,預鑄混凝土版單元組件及金屬固定L型支架 (6)都必須在工廠事先製作完成包括預鱗混凝土版上之裝飾材料 及圖案’備齊材料配件才運至工地進行組合(依設計尺寸安裝), 當中須注意螺栓結合要確實及防水橡膠施工要實在及組合牆面平 整度、整體水平、垂直的要求。 【圖式簡單說明】 第一圖是預鑄混凝土版組合牆完成立體圖。 馨 第一圖是單元組件金屬邊框及點焊鋼絲網立體圖。 第三圖是預鑄單元組件之Ζ型零件立體圖。 第四圖是預鑄單元組件之[J型零件立體圖。 苐五S是預矯單元紐件之L型拿件立體圖。 第六圖是金屬固定L型支架之L型零件立體圖。 第七圖是預鑄單元組件平妓製作立體圖。 第八圖是預鑄單元組件及固定L型支架組合立體圖。 【主要元件符號說明】 1260362 (1) .預鑄單元組件金屬邊框。 (2) .預鑄單元組件金屬邊框上之螺栓圓孔。 (3乂點焊鋼絲網。 (4) .平板或模板。 (5) .混凝土。 (6) .固定L型支架。 (7) .木板或模板。 (8) .固定L型支架上之橢圓孔。 (9) .石夕利康或止水橡膠封條。1260362 IX. Description of the invention: [Technical field to which the invention belongs], hair, lining-rhyme thief manufacturing method; 預鑄 預鑄 預鑄 或 or cement version with 5 metal bracket fast fixing method, especially no other large tower crane The wall can be built with a device or a huge transport system. [Prior Art] The construction method (wall type) that is well known in the construction industry is a construction technique that is generated in response to a large number of buildings of the same shape; but because the small people in Taiwan are thick, the road is small, The construction of cast-in-wall slabs is inconvenient for transportation. Every time a large tower belt device is required, the cost of the wall slabs with two cumbers and huge weights is not sloppy during construction or after construction. The use of confidence, because Taiwan's land unit is extremely small, the size of the building is not - the exterior wall shape is changeable, so the traditional pre-scale method is not suitable for this kind of changeable design. In Taiwan's construction projects, the cost is high, so there is not much use; but the construction method has its advantages: the construction speed is quite fast, all the wall panels are made in the factory, the construction quality can be fully controlled, and the production speed is 10 degrees. Especially for buildings with high-rise steel structures, the construction speed and shock resistance are quite good. The wall panel unit of the invention takes the advantages of the pre-scale wall panel method, such as uniform manufacturing quality, fast production speed, and output control, etc., and the advantages of quick assembly, low cost, shock resistance, fire resistance and light weight on site. . And the disadvantages such as: huge heavy, high transportation cost, difficult construction and hoisting, and high cost of subsequent safety maintenance, etc., invented 1260362. [Inventive content] Futu learned that the method of constructing a wall of the present invention is pre-processed by a metal frame (1) The bolt circle left is made of the first _ s and the first, that is, a combined wall construction method. It can be seen that each component is formed by welding a metal raft, such as the first IX, such as the second mm-part combination. The frame of the unit assembly is fixed. I^ metal 钣 molding parts have reserved bolt holes (2) metal port 疋 Li bracket (6) (such as the sixth figure, the eighth figure ^, the electric pipe or other pipeline or line matching The reserved hole is used in the wall combination. The screw inspection combined with each component has the strength stress, and the front side of the component is pre-aligned with the vertical alignment of the assembly, and the left and right 預鑄 group bracket (6) and the bracket are Vertical connection, up and down extension, between t ϊ ίίί and fixed L-shaped bracket (6) and 預鑄 unit assembly ι^ίΐϊ^f κ 孔 hole (2) 'make bolts' to connect them into one or two 1 f stone Xi Likang The water-stop rubber seal (9) makes it close to the non-permeable water with a 90 degree bend to the inside. The functional components are after the metal 钣 parts, such as the third and fourth (1), and then the built-in spot welded steel mesh (3) and ΐ ^ ϊΐ , shown in the second figure), and then the frame component of the welded joint = the suspected gas (5) is hardened and then surface treated, such as the laying of the magnetic monument U / by / 黍, etc. The _ really fireproof function completed by the invention, because the whole use: the group unit components are all completed in the factory, and the function of shortening the working hours in == n' 乍8. Each component is made of metal frame) plus spot welding steel _(3) minus The concrete (5) field is recorded as a handle with a screw strong 1260362 force combined 'so the components themselves or the combined walls are resistant to stress. In summary, the present invention has a fire prevention function: a structure suitable for use in a fire compartment. σ 2. Reduction of working hours: Since the bolts are assembled only at the site, the construction speed will be reported quickly. 3, strong stress resistance · Because of the use of the strength of the metal 钣 parts welded frame (1) and spot welded steel mesh (3) and pressure-resistant concrete (5), so the unit assembly itself has resistance to stress The function combined with the strong combination of the screw and the steel structure is better. [Embodiment] According to the method of the present invention, the concrete unit unit assembly and the metal fixed L-shaped bracket (6) must be prepared in advance at the factory, including the decorative material and the pattern of the pre-scale concrete plate. Shipped to the construction site for assembly (installed according to design size), it is necessary to pay attention to the bolt combination and the waterproof rubber construction and the combination of wall flatness, overall horizontal and vertical requirements. [Simple description of the drawing] The first picture is a perspective view of the concrete wall of the concrete. Xin The first picture is a three-dimensional view of the metal frame of the unit assembly and the spot welded steel wire mesh. The third figure is a perspective view of the 零件-type part of the 預鑄 unit assembly. The fourth figure is a [J-part part perspective view of the unit assembly.苐5 S is a perspective view of the L-shaped piece of the pre-correction unit. The sixth figure is a perspective view of the L-shaped part of the metal fixed L-shaped bracket. The seventh picture is a perspective view of the unit assembly of the unit. The eighth figure is a perspective view of the combination of the unit assembly and the fixed L-shaped bracket. [Main component symbol description] 1260362 (1) .預鑄Unit component metal frame. (2) .預鑄 Bolt hole on the metal frame of the unit assembly. (3) spot welded steel wire mesh. (4) . Flat plate or formwork. (5) . Concrete. (6) . Fixed L-shaped bracket. (7) .Wood board or formwork. (8). Fixed ellipse on L-shaped bracket Hole (9) . Shi Xi Likang or water seal rubber seal.

Claims (1)

1260362 十、申請專利範圍: 1、 一種預鑄式組合牆壁,係包括各種不同或相同之預鑄單元組 件所組合而成,其中預鑄單元組件上下垂直對齊銜接,左右預鑄 組件之間夾有固定L型支架,固定L型支架與支架之間為垂直連 接、上下延伸,預鑄單元組件與固定匕型支架之間與預鑄單元組 件之間均事先預留有對齊之螺栓圓孔,使螺栓接合,使之相互連 結成一體為其特徵,各預铸單元組件上下邊框與邊框之接著處及 相互與支架之間接著處用矽利康或止水橡膠封條於其中,使之密 合不滲水,並且各預缚單元組件及支架組合完成後,固定L型支 架事先預留之橢圓孔均會對齊貫通,以便日後鋪置管路、線路之 用,固定L型支架短向邊亦會平整對齊,以便攻牙螺釘栓鎖模板, 灌漿填注混凝土或栓鎖其他板類為其特徵,搭配已完成之建築物 樑柱結構,即可在建物内部快速組合完成牆壁的建造。 2、 如申請專利範圍第丄項之預鑄式組合牆壁,其中之預鑄單元 組件係在工廠製造之零組件為本組合式牆壁之主要構成物之一, 預鑄單元組件係由金屬鈑成型之邊框,預鑄單元組件上下邊框為 Z型及门型留有螺栓圓孔之零件,左右兩邊框為L型留有螺栓圓 孔之零件’四個不同形狀的零件焊接而成預鑄單元組之邊框,在 邊框内置放點焊鋼絲網,並焊固於邊框内侧四周,將邊框水平放 置於平板或模板上灌注混凝土,以完全覆蓋點焊鋼絲網及四周, 俟混凝土完全硬化後即可移出進行養護工作,完成之單元組件可 於其表面作其他裝飾處理為其特徵。 1260362 3、如f請專利範g)第1項之輯式組合牆壁,其中之固定u 支条係在工廠製造之零組件為本組合式牆壁之主要構成物之— 固定L型支架係由金屬鈑成型之L型斷面,固定l型支架為有預 留螺栓圓孔及管線貫通用之橢圓孔,其斷面型狀有長向邊及短向 邊之區別,L型長向邊為使用螺栓固定預鑄單元組件用,短向邊 為攻牙螺絲鎖模板及其他板類用為其特徵。1260362 X. Patent application scope: 1. A cymbal combination wall consisting of a combination of different or identical 預鑄 unit components, wherein the 預鑄 unit assembly is vertically aligned with the upper and lower 預鑄 components. The L-shaped bracket is fixed, and the fixed L-shaped bracket and the bracket are vertically connected and extended vertically, and an aligned bolt hole is reserved in advance between the unit assembly and the fixed jaw bracket and the unit assembly. The bolts are joined to each other to be integrated with each other. The upper and lower frames of the pre-cast unit assembly and the frame are connected to each other and the brackets are respectively sealed with a kelicon or a water-stop rubber seal to make them tightly adhered. After the pre-binding unit assembly and the bracket combination are completed, the elliptical holes reserved in advance for the fixed L-shaped brackets will be aligned, so that the pipelines and lines can be laid in the future, and the short sides of the fixed L-shaped brackets will also be aligned smoothly. In order to make the tapping screw bolt template, grouting concrete or bolting other board characteristics, with the completed beam and column structure of the building, it can be built in the building. The department quickly completed the construction of the wall. 2. For example, in the case of the 组合-type composite wall of the scope of the patent application, the component of the unit is a factory-made component which is one of the main components of the modular wall, and the unit component is formed by a metal crucible. The frame of the unit, the upper and lower frames of the unit assembly are Z-shaped and the door type has the parts with bolt holes. The left and right frames are L-shaped parts with bolt holes. Four different shapes of parts are welded into the unit group. The frame has a built-in spot welded steel wire mesh and is welded around the inside of the frame. The frame is placed horizontally on the flat plate or template to fill the concrete to completely cover the spot welded wire mesh and the surrounding area. The concrete can be removed after it is completely hardened. For the maintenance work, the completed unit components can be characterized by other decorative treatments on their surfaces. 1260362 3. For example, please refer to the patented series g) the combination wall of the first item, in which the fixed u-branch is factory-made components are the main components of the combined wall - the fixed L-shaped bracket is made of metal The L-shaped section of the 钣 shape, the fixed l-type bracket is an elliptical hole with a reserved bolt round hole and a pipeline through, and the section shape has a difference of a long side and a short side, and the L type long side is used. The bolts are fixed for the unit assembly, and the short side is characterized by the tapping screw lock template and other plates.
TW93135327A 2004-11-17 2004-11-17 Male wall TWI260362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW93135327A TWI260362B (en) 2004-11-17 2004-11-17 Male wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW93135327A TWI260362B (en) 2004-11-17 2004-11-17 Male wall

Publications (2)

Publication Number Publication Date
TW200617251A TW200617251A (en) 2006-06-01
TWI260362B true TWI260362B (en) 2006-08-21

Family

ID=37874724

Family Applications (1)

Application Number Title Priority Date Filing Date
TW93135327A TWI260362B (en) 2004-11-17 2004-11-17 Male wall

Country Status (1)

Country Link
TW (1) TWI260362B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114412059A (en) * 2022-02-25 2022-04-29 浙江亚厦装饰股份有限公司 Assembled partition wall batten and preparation method thereof
TWI807971B (en) * 2022-08-24 2023-07-01 曾建源 Horsepower combination wall ii

Also Published As

Publication number Publication date
TW200617251A (en) 2006-06-01

Similar Documents

Publication Publication Date Title
CN106013454A (en) Building based on large-space structure body and freestanding type external envelope structure as well as construction method
CN105317110A (en) Integrated assembly type steel structure building
WO2015050502A1 (en) Prefabricated wall panel and assembly
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
WO2018137491A1 (en) Modular steel structure prefabricated building
CN105421818A (en) Embedded steel structure assembling residence
US20220074204A1 (en) A building element
TWI260362B (en) Male wall
CN204252325U (en) A kind of in-line Prefabricated steel construction integration assembling green building component
JP6050549B2 (en) Multi-family house
CN207812689U (en) A kind of dry method connecting plate type structural system
CN218714288U (en) Decoration-free building structure
US11697938B2 (en) Pre-fabricated structures and methods
CN109518844A (en) Semi-unit type stone curtain wall structure and its construction method
CN206570986U (en) A kind of special-shaped prefabricated sandwich concrete panel of integration decoration
CN215054296U (en) High strength fire prevention heat preservation partition wall structure
WO2019007229A1 (en) Floor slab system
TWI807971B (en) Horsepower combination wall ii
CN110499852B (en) Construction method of efficient and rapid integrated forming energy-saving wall
TW201209252A (en) Stone wall of ceramsite concrete brick
KR20030040687A (en) panel for external underground wall of building, structure and construction method using the same
JPH0589604U (en) Joint structure of composite beams
CN212358583U (en) Integrated assembly type frame structure building system
CN207277898U (en) A kind of antitheft sound-insulation and heat-insulation heat insulation anti-shock building of assembling type steel structure
CN206815590U (en) A kind of wallboard installation node based on frame system

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees