TW494327B - Computer-implemented product development planning method - Google Patents

Computer-implemented product development planning method Download PDF

Info

Publication number
TW494327B
TW494327B TW088115914A TW88115914A TW494327B TW 494327 B TW494327 B TW 494327B TW 088115914 A TW088115914 A TW 088115914A TW 88115914 A TW88115914 A TW 88115914A TW 494327 B TW494327 B TW 494327B
Authority
TW
Taiwan
Prior art keywords
product
group
work
schedule
scope
Prior art date
Application number
TW088115914A
Other languages
English (en)
Inventor
Jonathan M Cherneff
Krishna Kumar
Original Assignee
I2 Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by I2 Technologies Inc filed Critical I2 Technologies Inc
Application granted granted Critical
Publication of TW494327B publication Critical patent/TW494327B/zh

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Description

494327 經濟部智慧財產局員工消費合作社印製 Α7 Β7 五、發明說明(/ ) 本發明主要關於藉電腦施行之商業企業管理,尤其是 用以規劃發展產品之明細表的系統以及方法。 本發明之背景 藉電腦施行之規劃以及預定系統被逐漸增加地使用於 工廠和其他的企業。此等系統將企業環境模式化且在環境 限制內提供用以產生滿足消費者需求項目之時間表。 一般而言,規劃以及預定問題可表示爲受限制最佳化 問題。例如,考慮於一製造環境中在單一資源安排一序列 工作之問題。假設各工作皆具有期限並且其目的爲排定各 工作使其在期限前完成。觀看這問題之一方式爲於開始時 間之空間中搜尋β在該觀點之下,問題爲受限制最佳化問 題,其中之可變化處爲開始時間,限制處爲無工作可重疊, 並且目的爲不錯過期限》 一企業活動,其預定以及規劃問題並未足夠地藉電腦 施行之方法提出,爲新的產品開發。公司依靠新的產品開 發以達成策略定位或增加收益成長。這強調對企業之產品 明細表最佳化,亦即,製造產品以及相關的資源預定表之 選擇。 許多已經發展於其他型式的企業管理的既有技術以及 工具可被應用於明細表規劃。例如,可用來自德州Irving的 .丨2技術公司之供應連鎖管理系統。許多使用以供應連鎖管 理之模式結構以及程序可被應用於產品開發管理。但是, 產生於明細表規劃的唯一問題導致需要一組特殊地公式化 以供產品開發的模式β 4 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) --:--^---·-------------訂---------^ AWI (請先閱讀背面之注意事項再填寫本頁) 494327 A7 B7 經濟部智慧財產局員工消費合作社印製
五、發明說明(Z ) 發明摘要 本發明之一論點是關於提供代表"最佳”產品明細表之 資料,而使用於企業產品開發管理之一種系統。該系統具 有使用一組基因演算法和一組限制機器之一組最佳化機 器。該最佳化機器操作於具有下面構件的一組企業模式上 面: 代表被提議將被該企業製造之一組產品的產品模式, 代表產品將被形成之一組構件的構件模式,代表在一組構 件開發中將被進行之一組工作的工作模式,以及代表可用 於進行工作之一組資源的資源模式。該基因演算法被使用 以提供產品順序作爲明細表之候選者。該限制機器接受該 模式之限制建立各順序之一組時間表。該基因演算法和限 制機器利用相關於該模式之限制的違反性以叠代程序一起 評估各順序,並且提供較佳順序。這程序結果是一組,,最佳 ”明細表,亦即,最佳地滿足限制以及代表用以發展該明細 表之管線的資料。限制違反性可被轉移至一組目的準則, 例如利潤,而使最佳化是利用利潤最大化。 本發明之一優點是接受產品管線限制使產品明細表最 佳化。該系統快速地收斂至一組良好的解同時也能快速地 傳輸增量改變至時間表。 圖形之簡略說明 第1圖展示依據本發明之產品開發管理系統》 第2圖展示第1圖之產品開發模式。 第3圖展示由第1圖的基因演算法以及限制機器達成之 5 本纸張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) Μ-----------------線 (請先閱讀背面之注意事項再填寫本頁) 4^4327 經濟部智慧財產局員工消費合作社印製 Α7 Β7 五、發明說明(4 ) 程序。 第4-10圖展示由第1圖之展示層提供的各種圖形β 發明之詳細說明 第1圖爲依據本發明藉電腦施行之產品明細表管理系統 10之軟體結構的方塊圖。系統10可被製作於具有典型電腦 構件的電腦上,例如處理器、記憶體、儲存元件、以及輸 入和輸出元件。在操作時,系統10被使用以展示產品流程 並且提供將某種目標最佳化,例如利潤最大化之產品明細 表。 系統10之典型使用者爲具有某種程度的產品營業額之 製造企業。某些該等企業可以在任何時間具有考慮開發的 數十種或數百種產品。時常,因‘爲有限的銷售窗口,所以 產品投產時間是嚴格的。如此工業之範例爲高科技、消耗 性電子、自動化、以及製藥工業》該等企業使用系統10以 管理產品開發活動。亦即,系統1 〇協助開發產品之決定以 及開發之時間和地點。 系統1 0之一組構件爲產品開發程序之模式1 2。如下面 說明,模式1 2利用被提議以及作用產品將商業企業模式化。 產品具有需要工作並且使用資源之構件。模式1 2代表產品 明細表,以及其管線,亦即,供用於明細表之所有工作以 及資源。 基因演算法13使用模式12以產生各種產品優先順序’ 其接著排定時間表並且鲆估。限制機器14使用模式12以建 立這些時間表,亦即,開發產品所需的工作以及指定資源 6 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) —:—.-------------訂---------線 (請先閱讀背面之注意事項再填寫本頁) ^4327 A7 B7 經濟部智慧財產局員工消費合作社印製
五、發明說明U 至工作。在這說明之範例中’基因演算法1 3以及限制機器1 4 爲分離程序。但是,系統10也可同時與整合兩者功能之機 器13使用。 爲了長期儲存’模式12、基因演算法13、以及限制機 器14被儲存於長期儲存記憶體16中。但是,在本發明之操 作以解決明細表管理問題時,系統10之這些構件被保持於 作用電腦記億體中以求速率和效率^ 一組表示界面18提供使用者互動視覺。各種觀點皆適 合於規劃程序之不同的論點以及不同的人員。 系統1 〇可以使用物件導向技術被製作。如下面說明, 物件導向觀點提供一組高度互動使用者界面以及一組相當 代表複雜企業之內部表示。 一般而言,系統10被製作於電腦之網路上,例如客戶-伺服器系統。事實上,系統10之典型的應用將是一分散系 統’其中在不同工作站之各種人員可以被提供相關於包含 他們的職業功能之決定的資訊。例如,如下面說明,系統1 〇 提供不同的圖形給人員,例如明細表管理器、主規畫器、 線路管理器、以及計劃管理器。 產品開發模式 如展示於第2圖,模式12包含一些模式型式,各具相關 的屬性。各模式型式被使用以定義模式範例。對各模式型 式而言’各種導出之模式皆包含整體產品開發模式1 2。 例如,產品模式型式2 1被使用以定義各種產品模式, 各代表一種產品提議,亦即,企業可能產生之一種產品。 7 本纸張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) ^-------I ^------I--^ (請先閱讀背面之注意事項再填寫本頁) φ4327 經濟部智慧財產局員工消費合作社印製 Α7 Β7 五、發明說明(s ) 產品利用他們的構件分析被說明。產品可以爲"作用,,或,,不 作用"。在一般情形下,包含於產品明細表25之產品成爲一 種作用產品,否則’爲產品提議。產品模式型式21之其他 屬性的範例爲:步驟、策略値、以及各種財務限度β後者 包含計劃之整體生命週期銷售作爲產品之完成日期的函 數,以及隨時間變化的計劃生產成本。 構件模式型式22定義構件模式,其代表各產品之構件。 構件模式型式22之其他屬性的範例爲:工作網路、銷售擴 展者、與其他構件的優先關係、產品(非開發)成本、以及產 品容量。一組構件之工作網路爲一組或更多組工作,其代 表以建立構件,和工作持續以及附屬性所需要之工作。構 件可以具有利潤提升,因此整合選擇性的構件將提升該產 品計劃之利潤。一利潤提升之範例爲包含CD-ROM於電腦中 將提升1 〇%之利潤。構件可爲重複性的,一組構件可以爲另 一構件之部份。 產品21以及構件22均具有優先順序。優先順序被使用 以決定排定工作時間表之順序。因此,高優先順序之產品 以及構件的工作將具有較佳機會以得到資源。 工作模式型式23定義工作模式,各代表用以開發所給 予構件所需的工作。工作模式型式23具有下面的饜性:持 續量、變異量、以及資源不同性。資源不同性導致工作之 變化產量(因爲不同的持續以及持續變動)以及不同的成本。 資源模式型式24具有下面的屬性:容量、日期、一組 親長-這資源之聚合族群、以及成本結構。容量是有限的但 8 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) .—^—-------------訂---------線 (請先閱讀背面之注意事項再填寫本頁) 經濟部智慧財產局員工消費合作社印製 494327 . A7 ____ B7 五、發明說明(么) 隨時間變化。例如,一組設計族群,其至三月前具有六人, 接著將會成爲七人。資源被階層式地模式化,引動一規劃 漏斗’其指定未來聚合計畫以及目前特定計畫。 模式12同時也提供”圖形",其導出自模式資料。這些 圖形、明細表25和管線26,由基因演算法13以及限制機器14 構成並且包含模式資料之子集。 產品明細表圖形25定義一組作用產品。明細表25爲由 > 基因演算法13以及限制機器14達成之產品開發規劃程序的 結果。因此’於各產品之構件中它指定所有選擇以及不同 性之決定。明細表25同時也指定被選擇構件之預定表,亦 即,該等構件之資源以及開始工作日期之指定。 明細表25具有各種財務限度屬性。計劃銷售以及計劃 成本依據明細表之時間表從提出產品至市場而導出。生命 週期成本具有兩組構件:開發成本以及產品成本。開發成 本爲所有工作之成本總數。產品成本被獨立地輸入並且可 依據於使用者所需求之因素。計劃之利潤爲計劃之生命週 | 期銷售減去計劃之成本。 關於一得到成本之範例而言,假設選擇之產品具有構 件Υ。這構件具有某種相關的工作。一特定的工作可進行於 不同的資源,例如,市場硏究工作可進行於屋內資源或外 方資源。同樣地,工作可以具有時序選擇。因爲各資源具 有相關的成本結構,所以選擇何種工作以及何時去做會導 致所給予的成本。 產品管線圖形26爲一組資源集合以及排定於(指定於)作 9 本纸張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) ^--------t---------線 (請先閱讀背面之注意事項再填寫本頁) 494327 經濟部智慧財產局員工消費合作社印製 A7 B7 五、發明說明(7 ) 用產品之資源之所有工作。一般而言,·所有的資源模式將 被使用於該管線。其與作用產品之被選擇構件相關之工作 將同時爲管線之一部份。與明細表25·相似,管線26爲產品 開發規劃程序之結果。 明細表25之最佳化意指搜尋具有儘可能高利潤(或其他 目的準則)之明細表。問題被呈現至基因演算法13以及限制 機器14而成爲一聯合搜尋問題,並且簡化以搜尋構件選擇、 資源選擇、以及時序選擇而產生最佳明細表。 所需的目標,例如計劃之利潤,在接受各種限制之下 被最佳化。限制之範例爲:If發容量、產品/特點策略(優先 序)、時間仰賴之銷售〃工作優先序、凍結至資源的開發任 務、資源選擇、以及成本。優先限制之範例爲工作B必須接 著工作A。資源選擇限制之範例爲工作A可完成於資源1、2、 或3,但非資源4或5。 時間之表示最小至天數。預期使用爲規劃之範圍是一 年至五年,及模式範例資料之各種部份的天數、星期數以 及月數版本。 在典型的應用中,產品模式型式2 1、構件模式型式22、 工作模式型式23、以及資源模式型式24,提供啓始企業模 式。模式範例之値以及他們的屬性由特定的使用者提供。 明細表圖形25以及管線圖形26之値在系統10操作時被基因 演算法13和限制機器14動態地建構。 一組動態計算之模式屬性的範例爲產品開發成本。開 發成本爲特定的時間表(何種資源被使用以及他們的時序)之 10 ^纸張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) . 1 --------訂---------^ ^_w! (請先閱讀背面之注意事項再填寫本頁) 494327 Α7 Β7 經濟部智慧財產局員工消費合作社印製
五、發明說明(牙) 函數並且在限制機器14之時間表建立程序時被指定數値。 開發成本可以與計劃之產品成本相對照,其被輸入至模式 12。但是,如下面說明,兩者皆爲搜尋最佳產品明細表之 因素,例如,使利潤最大化者。 限制機器以及基因演算法 本發明之特點爲同時使用基因演算法13以及限制機器 1 4。提供最佳化明細表之問題可分成爲兩部分:將一組產 品排序以及排定建立一組產品所需之工作時間表。 一般而言,下面將更詳細說明,基因演算法13被使用 以提供產品之排序列表(順序)。限制機器1 4被使用以建立設 計所給予的產品順序所需之工作時間表,其包含決定構件、 資源、以及時序選擇。換言之,由限制機器14建構之時間 表解決由構件之各種工作網路屬性所呈現之資源選擇以及 時序選擇。雖然系統10之這兩組構件在功能上有區別,整 體而言,它們仍可以被稱爲”最佳化機器"。 如同於習見的基因演算法,基因演算法13自演進程序 之比喻衍生其運作。該程序一般似乎歸納爲與環境中之資 源競爭之物種。某些物種較佳地被裝備以生存並且更可能 生存以及傳輸他們的基因材料。一般而言,基因演算法之 作用是施加運算子(交叉以及轉變)至可能解之群體,稱爲" 染色體”。當基因材料自一組染色體交叉至另一組時交叉類 比於(簡化)基因現象。接著基因演算法14之一般程序爲評估 一組(群體)之可能解(染色體)的合適性。接著藉進行操作, 例如交叉、複製、以及轉變而產生一組新的群體。捨棄舊 11 本紙張尺度適用中國國家標準(CNS)A4規格(21〇 X 297公爱) ^--------^---------^ (請先閱讀背面之注意事項再填寫本頁) 494327 經濟部智慧財產局員工消費合作社印製 A7 B7__ 五、發明說明(?) 的群體而提出使用新的群體。 使用基因演算法以供藉電腦施行排定時間表之範例說 明於(3.5乂3%61*(^之美國專利>1〇.5,319,781,標題爲”使用基 因步驟產生時間表"。該演算法可適用於本發明之模式12的 使用。同時也可使用其他變化之基因演算法。 同時提供基因演算法13以及限制機器14之商業化可用 的產品爲RHYTHM最佳時間規畫工具,其爲i2技術公司 RHYTHM序列產品之部份。這些工具可適用於模式12之使 用以解決本發明所欲解之問題。 爲了達到本發明之目的,最佳化可被置於下面的搜尋 問題中:當以有限資源建構時間表時,搜尋最佳化計劃利 潤之產品排序。搜尋空間爲產品優先序、產品組態、執行 策略(例如製作或購買)、以及執行時間之選擇組合。舉例而 言,最佳化問題可以涵蓋200種產品提議,各具不同的構件 組態之10種選擇,各組態在各操作下具1-5不同的資源而產 生高位準工廠順序(路由)以及可能一年之時間範圍。 基因演算法13之各染色體代表具有特定排序,亦即, 產品順序之一組產品。此處之"排序”意指在其較佳時間下 得到其較佳資源之產品能力。由一組染色體表示之產品之 特定順序對應這些產品之排序。 優先順序可以爲使用者·輸入値以及由基因演算法13指 定値之組合。例如,一組200種之產品提議可以具5種不同 的優先順序分類’亦即,優先順序分類1-5被輸入至模式 1 2 (藉指定數値至產品模式2 1)。在此情況中,基因演算法1 3 12 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) --.---r--.-------------訂--------- (請先閱讀背面之注意事項再填寫本頁) ^4327 A7 B7 五、 經濟部智慧財產局員工消費合作社印製
發明說明(/。) 可以被使用以解決在各分類之內的優先順序。 對所給予一組產品而言,優先順序分類X之50種產品 中,將會有50!種可能排序(順序)。對一組所給予的順序, 限制機器14被使用以建立最佳時間表,以評估該時間表, 並且指定計分予該時間表。這計分導出自對於各限制之懲 罰性違反之和,如果對各限制有違反。該計分接著附帶至 相關的順序之染色體。基因演算法13接著使用染色體以及 其計分以再產生新的染色體。 第3圖展示最佳化機器(基因演算法13以及限制機器14) 之程序。在步驟31中,基因演算法12產生產品之嘗試順序。 這嘗試順序可被認爲是”被提議明細表"。在步驟32中,限 制機器14產生這順序之時間表,並且在步驟33中,其以一 組計分而評估時間表。步驟34決定是否順序以及時間表爲 目前之最佳,而其”最佳”是由目的準則所決定,例如利潤 最大化。若非,則順序以及記分會返回至基因演算法1 3, 其產生新的(可能較佳的)順序。 系統10之特點爲其提供增量或廣域最佳化之能力,以 及對如果假設之反應。例如,如果某種構件失效,則增量 最佳化可以被要求。系統10可以被使用以提供另外的解決 法。廣域最佳化提供將指定目標,例如利潤,最佳化之提 議明細表。用以輸入"如果"型式詢問之模式編輯圖形配合 第9圖說明於下。 表示界面 表示界面18支援數種圖形,定義爲提供模式12之圖形 13 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) ^--------^---------^ (請先閲讀背面之注意事項再填寫本頁) 494327 A7 B7 五、發明說明(// ) 表示的顯示。模式12可以被不同地觀看以因應不同的目的, 例如當不同的人員使用模式12以決定製造以及監視在產品 開發中他們的相關特定人員時。如下面指示,圖形可分成 爲三組主要分類:財務、規劃管理、以及資源配置。所有 型式之圖形可以被使用以同時供報告以及詢問。 如所展示,屏幕顯示爲視窗-型式格式,其具有共同地 與這型式格式相關的圖形界面特點。使用者藉使用標準界 面工具,例如鍵盤輸入以及指示元件(滑鼠)作游標移動而與 表示層18互動。在顯示之上以及之下的各種工具列、選單 列、以及檔案認證,若不爲視窗·型式顯示之範疇,則不被 展示。 第4圖爲系統10之產品定義圖形40的範例。圖形40定義 可能的產品以及構件,並且具有許多視窗40a-40c。在圖形 40之範例中,產品爲車輛,其一組構件,印模,與其各種 工作被展示出。在視窗40a中,產品以"樹狀"結構被圖形化。 與特定的構件相關之工作可被觀看到,例如被列在印模 CX3 22之下者。工作視窗40b列出這些工作與他們的開始日 期、結束日期、以及持續期。工作視窗40b同時也展示工作 網路,而在工作之間具相關鏈路。完成工作網路即完成構 件之設計。資源視窗40c展示設計指定構件所需之工作》 第5圖展示工作視窗40b由資源時間表視窗40d所取代之 圖形40。如上所述,對於一與構件相關之所給予的工作網 路,一旦構件、資源、以及時序選擇被形成,或手動或由 限制機器1 4,則時間表可被顯示於視窗40c。完全明細表之 14 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) •丨]---- (請先閱讀背面之注意事項再填寫本頁) 經濟部智慧財產局員工消費合作社印製 一n n n ϋ ϋ I ϋ n ft.— n n ϋ n ϋ Ik ·1 1· ·ϋ ϋ ϋ -I ϋ 11 an n n ϋ 1* ϋ 494327 Α7 Β7 經濟部智慧財產局員工消費合作社印制衣
五、發明說明) 時間表的組合包含管線圖形25 ^ 第6圖展示模式12之明細表圖形60。圖形60列出針對明 細表以及時序和財務資料被選擇之產品模式2 1。與明細表 相關之財務屬性,如上所述,被使用以提供明細表摘要財 務細節。 第7圖展示模式12之工作進度圖形70。這圖形70展示一 選擇之產品的工作進度以及自預期時序之變化。 第8圖爲產品模式12之銷售計劃圖形80。如上所述,各 產品具有計劃之銷售屬性,其被使用以提供圖形80。 第9圖爲"增加計劃"圖形90,其展示限制機器14之"如 果”能力。圖形90允許使用者增加產品模式21至明細表25。 機器14修改管線模式25,並且計算和顯示財務結果。 第10圖展示情節編輯圖形1〇〇。圖形1〇〇允許管理者或 其他的人員產生包含於各種資源模式24之投資(或解除)的投 資情節。限制機器14接著依據目前明細表25以及管線26計 算財務結果並且顯示這些結果(未展示出)。 其他的實施例 雖然本發明已詳細說明,應該了解,各種改變、替代、 和更動可被形成而不脫離所附加申請專利範圍定義之本發 明的精神和範禱。 本紙張尺度適用中國國家標準(CNS)A4規格(210 X 297公釐) ^--------^---------^ (請先閱讀背面之注意事項再填寫本頁) 494327 A7 _B7 五、發明說明(/3 ) 元件標號對照表 經濟部智慧財產局員工消費合作社印製 10··· …管 理 系 統 12… …模 式 13··· …基 因 演 算法 14··· …限 制 機 器 16··· …長 期 儲 存記 憶體 2 1… …產 品 模 式型 式 22… …構 件 模 式型 式 23 ··· …工 作 模 式型 式 24·" …資 源 模 式型 式 25.·· …產 品 明 細表 26··. …管 線 40··. …產 品 定 義圖 形 4 0 a- 40c · •視窗 60··. …明 細 表 圖形 70.·. …工 作 進 度圖 形 80··· …銷 售 計 劃圖 形 90·._ …增 加 計劃圖 形 100- ……情節編輯圖形 (請先閱讀背面之注意事項再填寫本頁) 本紙張尺度適用中國國家標準(CNS)A4、規格(210 x 297公釐)

Claims (1)

  1. 494327 A8 B8 C8 D8 六、申請專利範圍 經濟部智慧財產局員工消費合作社印製 1 · 一種用以將產品開發模式化之電腦系統,其供使 用於該電腦系統上面之企業產品管理並且被一組最佳化機 器所保持和操作,包含有: 利用一組產品模式型式所定義並且被該電腦系統儲存 之多數個產品模式,各產品模式代表被提議將被該企業製 造之一組產品; 利用一組構件模式型式所定義並且被該電腦系統儲存 之多數個構件模式,各構件模式代表一組產品將被形成之 一組構件; - 利用一組工作模式型式所定義並且被該電腦系統儲存 之多數個工作模式,各工作模式代表在一組構件開發中將 被進行之一組工作; 利用一組資源模式型式所定義並且被該電腦系統儲存 之多數個資源模式,各資源模式代表可用於進行一組工作 之一組資源; 至少一組管線圖形,其代表用以產生如利用該最佳化 機器所決定之一組產品的工作和指定資源之一;以及 至少一組產品明細表圖形,其代表該等產品之一組, 如利用該最佳化機器所決定。 2. 如申請專利範圍第1項之系統,其中該最佳化機器 具有用以提供該明細表圖形之候選者明細表之一種基因演 算法。 3. 如申請專利範圍第1項之系統,其中該基因演算法 之染色體代表可能的產品順序。 17 本纸張尺度適用中國國家標準(CNS ) A4規格(210X297公釐) (請先閱讀背面之注意事項再填寫本頁) 訂 線_· 494327 A8 B8 C8 D8 經齊郎訾慧时產苟員工消費合作社印製 申請專利範圍 4.如申請專利範圍第1項之系統,其中該最佳化機器 具有用以建立該管線圖形之候選者時間表之一組限制機 器’其中該限制機器接受相關於該模式之限制而建立該時 間表。 5 ·如申請專利範圍第4項之系統’其中該限制機器依 據該限制是否被違反而以一組計分評估各預定表。 6· 如申請專利範圍第1項之系統,其中該明細表_形 提供相關於該明細表之財務限度。 7· 如申請專利範圍第1項之系統,其中該工作模式型 式具有代表用以進行一組工作之不同資源的不同屬性之一 組資源。 8·如申請專利範圍第1項之系統,其中該構件模式型 式具有代表用以提供一組構件之工作的一組工作網路屬 性。 9. 如申請專利範圍第1項之系統,其中該資源模式型 式具有代表用以配置資源至工作之法則的一組容量屬性。 10. —種用以提供代表產品明細表之資料的系統,其 供使用於電腦系統上面之企業產品開發管理,包含有: 具有一組基因演算法和一組限制機器之一組最佳化機 器; 具有下面構件之一組企業模式: 利用一組產品模式型式所定義並且被該電腦系統儲存 之多數個產品模式,各產品模式代表被提議將被該企業製 造之一組產品;利用一組構件模式型式所定義並且被該電 本紙張尺度逋用中國國家揉準(CNS ) A4規格(210X297公釐) ---------I------訂------0 (請先閲讀背面之注意事項再填寫本頁) 494327 A8 B8 C8 D8 六、申請專利範圍 腦系統儲存之多數個構件模式,各構件模式代表一組產品 將被形成之一組構件;利用一組工作模式型式所定義並且 被該電腦系統儲存之多數個工作模式,各工作模式代表在 一組構件開發中將被進行之一組工作:利用一組資源模式 型式所定義並且被該電腦系統儲存之多數個資源模式,各 資源模式代表可用於進行一組工作之一組資源;至少一組 管線圖形,其代表用以產生如利用該最佳化機器所決定之 一組產品的工作和指定資源之一;以及代表該等產品之一 組的至少一組產品明細表圖形; 其中該基因演算法可操作以提供作爲該明細表圖形候 選者之產品的順序; 其中該限制機器可操作而接受該模式之限制以提供該 順序預定表;並且 其中該基因演算法和該限制機器利用違反限制情形一 起評估該等順序並且改進該等順序,因而提供該明細表圖 形和該管線圚形。 11. 如申請專利範圍第10項之系統,其中該最佳化機 器可操作以利用變化之增量影響修改該明細表圖形以反應 於該模式中被使用者輸入之變化。 12. 如申請專利範圍第10項之系統,其中該基因演算 法之染色體代表可能的產品優先序。 13·如申請專利範圍第10項之系統,其中該限制機器 依據該限制是否被違反而以一組計分評估各時間表。 14·如申請專利範圍第10項之系統,其中該明細表圖 19 本紙張尺度適用中國國家標準(CNS ) A4規格(210X297公釐) (請先閲讀背面之注意事項再填寫本頁) 訂 經濟部智慧財產局員工消費合作社印製 494327 A8 B8 C8 D8 遂齊曰¾^¾.¾員X.消費合ftfi印製 六、申請專利範圍 形提供相關於該明細表之財務限度。 15. 如申請專利範圍第1〇項之系統,其中該工作模式 進一步地代表用以進行工作的不同資源。 16. 如申請專利範圍第1〇項之系統,其中該構件模式 型式具有代表用以提供一組構件之工作的一組工作網路屬 性。 17. 如申請專利範圍第1〇項之系統,其中該等順序被 評估而使得來自該等順序之利潤被最大化。 18. 如申請專利範圍第1〇項之系統,進一步地包含用 以提供該等圖形和該模式之顯示的一組表示層。 19. 如申請專利範圍第1〇項之系統,其中該資源模式 型式具有代表用以配置資源至工作之法則的一組容量屬 性。 20. —種提供代表產品明細表之資料供使用於電腦系 統上企業產品開發管理之方法,其包含的步驟有: 以具有至少下面構件的企業模式將該企業模式化:利 用一組產品模式型式所定義並且被該電腦系統儲存之多數 個產品模式’各產品模式代表被提議將被該企業製造之一 組產品;利用一組構件模式型式所定義並且被該電腦系統 儲存之多數個構件模式,各構件模式代表一組產品將被形 成之一組構件;利用一組工作模式型式所定義並且被該電 腦系統儲存之多數個工作模式,各工作模式代表在一組構 件開發中將被進行之一組工作;利用一組資源模式型式所 定義並且被該電腦系統儲存之多數個資源模式,各資源模 20 本紙張尺度適用中國國家標準(CNS ) A4規格(210X297公釐) 装------訂------線、 (請先閱讀背面之注意事項再填寫本頁) A8 B8 C8 D8 六、申請專利範圍 式代表可用於進行一組工作之一組資源以及用以配置資源 至工作之法則; 選擇該產品之一組順序作爲一組候選者明細表; 建立該順序之一組時間表,該建立步驟以接受該模式 之限制而建立該時間表之限制機器而達成; 利用該限制之違反性而評估該順序; 依據該評估步驟結果產生一組新的順序,該產生步驟 利用一組基因演算法而達成:以及 數次疊代地重複該建立、評估、和產生步驟。 (請先閲讀背面之注意事項再填寫本頁) 訂 經濟部中央標準局員工消費合作社印製 痒_----- 11 2 本紙張尺度適用中國國家標準(CNS ) A4規格(210X297公釐)
TW088115914A 1998-09-16 1999-11-01 Computer-implemented product development planning method TW494327B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US09/154,373 US6233493B1 (en) 1998-09-16 1998-09-16 Computer-implemented product development planning method

Publications (1)

Publication Number Publication Date
TW494327B true TW494327B (en) 2002-07-11

Family

ID=22551107

Family Applications (1)

Application Number Title Priority Date Filing Date
TW088115914A TW494327B (en) 1998-09-16 1999-11-01 Computer-implemented product development planning method

Country Status (9)

Country Link
US (1) US6233493B1 (zh)
EP (2) EP1359529A1 (zh)
JP (1) JP2002525715A (zh)
KR (1) KR20010079838A (zh)
AU (1) AU6036899A (zh)
CA (1) CA2342942A1 (zh)
MX (1) MXPA01002771A (zh)
TW (1) TW494327B (zh)
WO (1) WO2000016228A1 (zh)

Families Citing this family (100)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6487469B1 (en) * 1998-11-13 2002-11-26 Texas Instruments Incorporated System and method for integrating schedule and design environments
AU2613600A (en) * 1999-01-15 2000-08-01 Bicknell Consulting, Inc. Adaptable integrated-content product development sytem
US20030018511A1 (en) * 1999-01-15 2003-01-23 Bicknell Barbara A. Adaptable integrated-content product development system
US6631413B1 (en) * 1999-01-28 2003-10-07 International Business Machines Corporation Method for optimizing profits in electronic delivery of digital objects
US7139719B1 (en) 1999-10-08 2006-11-21 I2 Technologies Us, Inc. System for scheduling product planning
US7130809B1 (en) * 1999-10-08 2006-10-31 I2 Technology Us, Inc. System for planning a new product portfolio
US7668743B2 (en) * 1999-12-06 2010-02-23 Toyota Jidosha Kabushiki Kaisha Demand-production scheme planning apparatus, and storage medium
US6714827B1 (en) * 1999-12-21 2004-03-30 Daimlerchrysler Corporation Method for scheduling a project to design and manufacture a multi-component assembly
JP4529213B2 (ja) * 2000-01-19 2010-08-25 富士ゼロックス株式会社 要素編成支援装置及び要素編成支援プログラムが記録された記憶媒体
US7280973B1 (en) * 2000-03-23 2007-10-09 Sap Ag Value chain optimization system and method
US7206751B2 (en) * 2000-03-23 2007-04-17 Sap Ag Value chain optimization system and method
US6578004B1 (en) * 2000-04-27 2003-06-10 Prosight, Ltd. Method and apparatus for facilitating management of information technology investment
JP2001312610A (ja) * 2000-04-28 2001-11-09 Nec Corp M&a案作成システム及びm&a案作成方法
US7542948B2 (en) * 2000-06-16 2009-06-02 Honda Giken Kogyo Kabushiki Kaisha Genetic design method and apparatus
EP1312995B1 (en) * 2000-06-30 2006-08-16 Teijin Limited Production planning method and system for production planning
US7627493B1 (en) * 2000-08-25 2009-12-01 SCA Holdings Production and distribution supply chain optimization software
US7283971B1 (en) * 2000-09-06 2007-10-16 Masterlink Corporation System and method for managing mobile workers
US8190463B2 (en) * 2000-09-06 2012-05-29 Masterlink Corporation System and method for managing mobile workers
US20020082950A1 (en) * 2000-09-06 2002-06-27 Johnson Controls Technology Company Product planning, development and program management information system and method
US6510547B1 (en) * 2000-10-20 2003-01-21 Xilinx, Inc. Method and apparatus for evolving an object using simulated annealing and genetic processing techniques
US7668761B2 (en) * 2000-10-27 2010-02-23 Jda Software Group System and method for ensuring order fulfillment
AU2002224459A1 (en) * 2000-10-27 2002-05-06 Manugistics, Inc. System and methods for sharing and viewing supply chain information
US6862585B2 (en) 2000-12-19 2005-03-01 The Procter & Gamble Company System and method for managing product development
US20020099583A1 (en) * 2001-01-24 2002-07-25 Matusek Lawrence W. Architecture and techniques for providing product configurations to an enterprise resource planner
US20020111850A1 (en) * 2001-02-12 2002-08-15 Chevron Oronite Company Llc System and method for new product clearance and development
US8214501B1 (en) 2001-03-02 2012-07-03 At&T Intellectual Property I, L.P. Methods and systems for electronic data exchange utilizing centralized management technology
US6801818B2 (en) * 2001-03-14 2004-10-05 The Procter & Gamble Company Distributed product development
DE10120151A1 (de) * 2001-04-25 2002-11-07 Mitan Wirtschaftssoftware Ag Verfahren zur Darstellung bzw. Verarbeitung von technischen Varianten eines Produktes in PPS-/ERP-Systemen
US7716332B1 (en) 2001-06-20 2010-05-11 At&T Intellectual Property I, L.P. System and method for server-based predictive caching of back-end system data
US20090210081A1 (en) * 2001-08-10 2009-08-20 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US9729639B2 (en) * 2001-08-10 2017-08-08 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US20090204237A1 (en) * 2001-08-10 2009-08-13 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US8914300B2 (en) * 2001-08-10 2014-12-16 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US7797062B2 (en) * 2001-08-10 2010-09-14 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US8417360B2 (en) * 2001-08-10 2013-04-09 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US6984198B2 (en) * 2001-08-14 2006-01-10 Applied Materials, Inc. Experiment management system, method and medium
US20030069869A1 (en) * 2001-10-05 2003-04-10 Jane Gronau Computer aided strategic planning systems and methods
US6961732B2 (en) 2001-12-18 2005-11-01 General Electric Company Web based process capability data collection and reporting system
US20030135429A1 (en) * 2002-01-11 2003-07-17 Jean-Luc Pous Custom engineered product system and process
EP1345167A1 (en) * 2002-03-12 2003-09-17 BRITISH TELECOMMUNICATIONS public limited company Method of combinatorial multimodal optimisation
JP3735079B2 (ja) * 2002-03-15 2006-01-11 株式会社日立製作所 自動車製造ラインの投入順計画立案装置および方法
US7801976B2 (en) * 2002-05-28 2010-09-21 At&T Intellectual Property I, L.P. Service-oriented architecture systems and methods
US20030233268A1 (en) * 2002-06-17 2003-12-18 Ehsan Taqbeem Multi-dimensional interdependency based project management
US20040044555A1 (en) * 2002-09-04 2004-03-04 Bangs Richard Alan Systems, apparatus, and methods for facilitating product development
US7159206B1 (en) * 2002-11-26 2007-01-02 Unisys Corporation Automated process execution for project management
US7469217B2 (en) * 2002-12-10 2008-12-23 Savvis Communications Corporation Product toolkit system and method
US7213007B2 (en) 2002-12-24 2007-05-01 Caterpillar Inc Method for forecasting using a genetic algorithm
US20040243459A1 (en) * 2003-01-24 2004-12-02 Geritz William F. System and method for automating business development
US7664664B2 (en) * 2003-04-23 2010-02-16 Oracle International Corporation Methods and systems for portfolio planning
US7139629B2 (en) * 2003-04-28 2006-11-21 Palo Alto Research Center Incorporated Planning and scheduling for failure recovery system and method
WO2004104728A2 (en) * 2003-05-19 2004-12-02 Sap Aktiengesellschaft Methods and systems for facilitating data processing workflow
US20050027577A1 (en) * 2003-07-30 2005-02-03 Saeed Baruch I. Architecture for general purpose business planning optimization system and methods therefor
US7426701B2 (en) * 2003-09-08 2008-09-16 Chrysler Llc Interactive drill down tool
US7043320B1 (en) * 2003-10-16 2006-05-09 Jrg Software, Inc. Method and apparatus for planning a manufacturing schedule using an adaptive learning process
WO2005079312A2 (en) * 2004-02-13 2005-09-01 Bdmetrics Inc. Automated system and method for determination and reporting of business development opportunities
NZ533494A (en) * 2004-06-09 2006-12-22 Total Comm Ltd Dynamic business enhancement system
US20060085205A1 (en) * 2004-10-08 2006-04-20 Sampath Kumar Method, program and system for the implementation of cognitive business processes
US20060080159A1 (en) * 2004-10-08 2006-04-13 Sampath Kumar Method, program and system for the implementation of cognitive business processes in a sales enterprise
US7793294B2 (en) * 2005-02-22 2010-09-07 Northrop Grumman Corporation System for scheduling tasks within an available schedule time period based on an earliest possible end time of the task
US7958037B2 (en) * 2005-03-23 2011-06-07 Hewlett-Packard Development Company, L.P. Method and apparatus for product selection
US7668788B2 (en) * 2005-06-06 2010-02-23 Wren William E Resource assignment optimization using direct encoding and genetic algorithms
US8996151B2 (en) * 2005-11-09 2015-03-31 The Boeing Company Visualization of product build using precedence transversal method
US20070106410A1 (en) * 2005-11-09 2007-05-10 The Boeing Company Systems and methods for production planning by visualizing products and resources in a manufacturing process
US20070156425A1 (en) * 2006-01-03 2007-07-05 General Electric Company Using optimization algorithm for quantifying product technical merit to facilitate product selection
US20070156424A1 (en) * 2006-01-03 2007-07-05 General Electric Company Tool and method for quantifying product technical merit to facilitate product selection
US20070288300A1 (en) * 2006-06-13 2007-12-13 Vandenbogart Thomas William Use of physical and virtual composite prototypes to reduce product development cycle time
US20080071590A1 (en) * 2006-09-15 2008-03-20 Bin Zhang Solving a model to select members of a portfolio
US20080154809A1 (en) * 2006-10-20 2008-06-26 Genalytics, Inc. Use and construction of categorical interactions using a rule gene in a predictive model
US20080154808A1 (en) * 2006-10-20 2008-06-26 Genalytics, Inc. Use and construction of time series interactions in a predictive model
US20080228544A1 (en) * 2007-03-15 2008-09-18 Bd Metrics Method and system for developing an audience of buyers and obtaining their behavioral preferences using event keywords
US20080270151A1 (en) * 2007-04-26 2008-10-30 Bd Metrics Method and system for developing an audience of buyers and obtaining their behavioral preferences to promote commerce on a communication network
US8069127B2 (en) * 2007-04-26 2011-11-29 21 Ct, Inc. Method and system for solving an optimization problem with dynamic constraints
US20080294723A1 (en) * 2007-05-22 2008-11-27 Bank Of America Corporation Business Process Automation
US20090216576A1 (en) * 2008-02-21 2009-08-27 Maxager Technology, Inc. Method for constrained business plan optimization based on attributes
US20100063831A1 (en) * 2008-09-11 2010-03-11 Gm Global Technology Operations, Inc. Visualizing revenue management trade-offs via a two-dimensional pareto curve showing measures of overall volume or share versus measures of overall profitability or adjusted revenue
TWI391839B (zh) * 2009-01-17 2013-04-01 Univ Nat Taiwan Science Tech 半導體產業之資源分派系統及方法
US20110167018A1 (en) * 2010-01-04 2011-07-07 Vicki Hamilton Prioritizing and Tracking Investments
US8306943B2 (en) * 2010-03-04 2012-11-06 NTelx, Inc. Seasonality-based rules for data anomaly detection
US20130226660A1 (en) * 2010-03-04 2013-08-29 Lusine Yepremyan Cyclicality-Based Rules for Data Anomaly Detection
US8713525B2 (en) * 2010-03-25 2014-04-29 International Business Machines Corporation Software management system for network data processing systems
US20120185286A1 (en) * 2011-01-17 2012-07-19 Palo Alto Research Center Incorporated Online continual automated planning framework based on timelines
US11676090B2 (en) 2011-11-29 2023-06-13 Model N, Inc. Enhanced multi-component object-based design, computation, and evaluation
IN2014DN07781A (zh) * 2012-03-23 2015-05-15 Hitachi Ltd
US9141581B2 (en) * 2012-07-25 2015-09-22 Sap Se Production scheduling management
US9466026B2 (en) 2012-12-21 2016-10-11 Model N, Inc. Rule assignments and templating
US10373066B2 (en) 2012-12-21 2019-08-06 Model N. Inc. Simplified product configuration using table-based rules, rule conflict resolution through voting, and efficient model compilation
US11074643B1 (en) 2012-12-21 2021-07-27 Model N, Inc. Method and systems for efficient product navigation and product configuration
US20140344007A1 (en) * 2013-05-20 2014-11-20 Honeywell International Inc. Plant operating point determination by integrating profit profile and risk profile
TWI502523B (zh) * 2013-09-11 2015-10-01 Nat Univ Tsing Hua 半導體產品多目標產能規劃系統及其方法
US20150112636A1 (en) * 2013-10-23 2015-04-23 Caterpillar Inc. Systems and methods for forecasting using cartesian genetic programming
US10503499B2 (en) 2015-12-04 2019-12-10 David Anthony Bishop Methods and systems for managing agile development
CN105629927A (zh) * 2015-12-18 2016-06-01 武汉开目信息技术有限责任公司 一种基于混合遗传算法的mes生产计划排产方法
CN106250985A (zh) * 2016-08-01 2016-12-21 西华大学 一种求解配电网网架多阶段规划的改进遗传膜方法
US10692065B2 (en) * 2017-06-19 2020-06-23 Accenture Global Solutions Limited Using a mixture model to generate simulated transaction information
WO2019035097A1 (en) * 2017-08-18 2019-02-21 The Regents Of The University Of Michigan CENTRALIZED STRUCTURE FOR THE MANUFACTURE OF SMALL LOTS
US10757169B2 (en) 2018-05-25 2020-08-25 Model N, Inc. Selective master data transport
US11315053B1 (en) * 2020-02-13 2022-04-26 Tensorx, Inc. Systems and methods for optimizing complex systems
DE102020203718A1 (de) * 2020-03-23 2021-09-23 Zf Friedrichshafen Ag Computerimplementiertes Verfahren für eine Produktionsplanung und/oder -steuerung eines Produktionssystems und Produktionsplanung und/oder-steuerungssystem zur Produktionsoptimierung
KR102264571B1 (ko) * 2020-10-30 2021-06-15 주식회사 애자일소다 계층 구조를 갖는 의사결정 에이전트
CN113987619B (zh) * 2021-12-29 2022-04-12 广州赛意信息科技股份有限公司 提高交互体验的工业设计***及方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4752890A (en) * 1986-07-14 1988-06-21 International Business Machines Corp. Adaptive mechanisms for execution of sequential decisions
US5343554A (en) * 1988-05-20 1994-08-30 John R. Koza Non-linear genetic process for data encoding and for solving problems using automatically defined functions
US5148513A (en) * 1988-05-20 1992-09-15 John R. Koza Non-linear genetic process for use with plural co-evolving populations
US5291394A (en) 1990-06-01 1994-03-01 Motorola, Inc. Manufacturing control and capacity planning system
US5063507A (en) * 1990-09-14 1991-11-05 Plains Cotton Cooperative Association Goods database employing electronic title or documentary-type title
US5319781A (en) * 1991-05-03 1994-06-07 Bolt Beranek And Newman Inc. Generation of schedules using a genetic procedure
US5453601A (en) * 1991-11-15 1995-09-26 Citibank, N.A. Electronic-monetary system
US5311438A (en) 1992-01-31 1994-05-10 Andersen Consulting Integrated manufacturing system
US5390282A (en) * 1992-06-16 1995-02-14 John R. Koza Process for problem solving using spontaneously emergent self-replicating and self-improving entities
US5541848A (en) * 1994-12-15 1996-07-30 Atlantic Richfield Company Genetic method of scheduling the delivery of non-uniform inventory
US5819244A (en) * 1995-10-02 1998-10-06 Apple Computer, Inc. Adaptive computing systems, computer readable memories and processes employing hyperlinear chromosomes
US5867397A (en) * 1996-02-20 1999-02-02 John R. Koza Method and apparatus for automated design of complex structures using genetic programming

Also Published As

Publication number Publication date
AU6036899A (en) 2000-04-03
US6233493B1 (en) 2001-05-15
MXPA01002771A (es) 2002-08-12
WO2000016228A1 (en) 2000-03-23
JP2002525715A (ja) 2002-08-13
KR20010079838A (ko) 2001-08-22
EP1114385A1 (en) 2001-07-11
EP1359529A1 (en) 2003-11-05
CA2342942A1 (en) 2000-03-23

Similar Documents

Publication Publication Date Title
TW494327B (en) Computer-implemented product development planning method
Attaran Information technology and business‐process redesign
US7574379B2 (en) Method and system of using artifacts to identify elements of a component business model
TW378307B (en) Strategy driven planning system and method of operation
US7904320B1 (en) Business process for developing enterprise strategy
WO2006041865A2 (en) Method for reengineering of business processes
Clausen et al. The role of spaces and occasions in the transformation of information technologies-Lessons from the social shaping of IT systems for manufacturing in a Danish context
Scheer Principles of efficient information management
Kassem et al. A structured methodology for enterprise modeling: a case study for modeling the operation of a british organization
Lusa et al. Planning working time accounts under demand uncertainty
Pradhan et al. A Novel IIoT Based ERP-PLM System for MSME of Indian Market
Britton et al. An explication of the viable system model for project management
JP2001273313A (ja) プロセス記述装置および方法ならびにプロセス分類方法
Pena-Mora et al. Information technology planning framework for Japanese general contractors
Scheer Computer: a challenge for business administration
Jui-Chin et al. Development of a collaborative manufacturing, planning, and scheduling system: integrating lean and agile manufacturing for the supply chain
US20140149186A1 (en) Method and system of using artifacts to identify elements of a component business model
SCN Education BV Data warehousing: the ultimate guide to building corporate business intelligence
Dong et al. iRDM: A solution for workforce supply chain management in an outsourcing environment
TW502183B (en) System for planning new product release
Halsail et al. A production planning and scheduling framework for smaller manufacturing enterprises
Ott Organization Design as a Groupware–supported Team process
Hsu et al. Information-Integrated Enterprises
Bhargava Real-time production scheduling in ERP systems using a simulation based approach
Gopalakrishnan Design and development of a decision support system for scheduling steel fabrication projects

Legal Events

Date Code Title Description
GD4A Issue of patent certificate for granted invention patent
MM4A Annulment or lapse of patent due to non-payment of fees