A method for constructing a new reinforced concrete structure, comprising: a structural frame having columns of the same dimension of the RC structure, and an enhanced structure connected between the columns; and steel plates screwed to the structural frame to enclose a inner space for being filled up with concrete as to be a wall, which being roughcast with clay or cement on the outside surface and being polished for painting.
TW84104301A1995-05-011995-05-01Method for constructing a new reinforced concrete
TW273583B
(en)
Method for connecting inside-empty vertical and horizontal blocks of block-joining materials for the engineering and construction works and block-joining materials
A method to build vertical wall portions of reinforced concrete, as well as construction shore, mounting element and construction element intended to be used in the method