TW202200483A - Combined aerial work elevator - Google Patents

Combined aerial work elevator Download PDF

Info

Publication number
TW202200483A
TW202200483A TW109120672A TW109120672A TW202200483A TW 202200483 A TW202200483 A TW 202200483A TW 109120672 A TW109120672 A TW 109120672A TW 109120672 A TW109120672 A TW 109120672A TW 202200483 A TW202200483 A TW 202200483A
Authority
TW
Taiwan
Prior art keywords
frame
upper frame
lower frame
base
aerial work
Prior art date
Application number
TW109120672A
Other languages
Chinese (zh)
Other versions
TWI810467B (en
Inventor
黃建德
Original Assignee
惠亞工程股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 惠亞工程股份有限公司 filed Critical 惠亞工程股份有限公司
Priority to TW109120672A priority Critical patent/TWI810467B/en
Publication of TW202200483A publication Critical patent/TW202200483A/en
Application granted granted Critical
Publication of TWI810467B publication Critical patent/TWI810467B/en

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)
  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention is a combined aerial work elevator, comprising: a base, a lower frame, and an upper frame are superposed on the other end of the lower frame, an extension frame, one end of the extension frame extends the other end of the upper frame of the highest layer; The hoist is connected to the lower frame; a plurality of pulleys, wherein at least the two pulleys are located at both ends of the extension frame; and one end of the steel cable is connected to the hoist, the other end of the steel cable is connected to a hook, supported by the pulley, so that the hoist can slide the steel cable; The three-dimensional structure formed by the upper frame and the lower frame has at least one support beam to form a longitudinal column of the three-dimensional structure; and at least one horizontal beam, two ends of the horizontal beam are respectively connected to the support beams to form a three-dimensional horizontal cylinder of the structure.

Description

組合式高空作業升降機台Combined aerial work lift table

一種升降裝置,特別是一種組合式升降裝置。A lifting device, especially a combined lifting device.

先前技術,利用升降裝置結合貨車,動態進行貨物或人員的拖吊運送,但科技廠房內的特殊環境,無法讓貨車順利進出廠房進行拖吊運送。In the prior art, the lifting device combined with the truck is used to dynamically carry out the towing and transportation of goods or personnel. However, the special environment in the technology workshop cannot allow the truck to smoothly enter and exit the workshop for towing and transportation.

先前技術,對於過重的貨物,或要拉伸貨物至較高的位置,升降裝置的結構體,經重複架高疊合後,穩固性不強,不容易拉伸支撐過重的貨物。In the prior art, for over-heavy goods or to stretch the goods to a higher position, the structure of the lifting device is not very stable after repeated stacking, and it is not easy to stretch and support the over-heavy goods.

先前技術,對於疊高的升降裝置,缺乏操作人員的攀爬設備,對於升降裝置的維修保養,不易組裝拆卸。In the prior art, there is a lack of climbing equipment for operators for a stack-up lifting device, and it is not easy to assemble and disassemble the lifting device for maintenance.

本發明的目的即在提供一組合式高空作業升降機台,經由 上框架以及下框架的疊合,或是上框架以及上框架的疊合的技術手段,調整拖吊貨物的高度,並以接合板以及螺栓穿設固持上框架以及下框架的技術手段,此外該支撐部係固定於該底座的下側,達到組合式高空作業升降機台的組合快速以及穩定的具體功效。The purpose of the present invention is to provide a combined aerial work lift platform, through the superposition of the upper frame and the lower frame, or the technical means of the superposition of the upper frame and the upper frame, to adjust the height of the towed goods, and to join the plate And the technical means of fixing the upper frame and the lower frame through bolts, in addition, the supporting part is fixed on the lower side of the base, so as to achieve the specific effect of fast and stable combination of the combined aerial work lift platform.

本發明為解決習知技術之問題所採用之技術手段,係提供一種組合式高空作業升降機台,包含:一底座,該底座具有至少一固定座,該固定座固合該底座;一下框架,該下框架的一端經由該固定座接合該底座;一上框架,該上框架的一端,經由疊合該下框架的另一端;一延伸架,該延伸架的一端係延伸該上框架的另一端;一捲揚機,該捲揚機連結該於該下框架;複數個滑輪,其中至少該兩個滑輪分別位於該延伸架的兩端;以及一鋼索,該鋼索一端連結該捲揚機,該鋼索另一端連結一吊鉤,經由該滑輪支撐,該捲揚機藉以滑動該鋼索;其中,該上框架以及該下框架,所形成的立體結構,具有至少一支撐樑,藉以形成立體結構的縱向柱體;以及至少一橫樑,該橫樑的兩端係分別連結該支撐樑,藉以形成立體結構的橫向柱體。The technical means adopted by the present invention to solve the problems of the prior art is to provide a combined aerial work lift platform, comprising: a base, the base has at least one fixing seat, the fixing seat is fixed to the base; a frame, the One end of the lower frame is connected to the base via the fixing seat; an upper frame, one end of the upper frame is overlapped with the other end of the lower frame; an extension frame, one end of the extension frame extends the other end of the upper frame; a hoist, the hoist is connected to the lower frame; a plurality of pulleys, wherein at least the two pulleys are located at two ends of the extension frame respectively; and a wire rope, one end of the wire rope is connected to the hoist, and the other end of the wire rope is connected to a hook , supported by the pulley, through which the hoist slides the wire rope; wherein, the three-dimensional structure formed by the upper frame and the lower frame has at least one support beam, thereby forming a longitudinal column of the three-dimensional structure; and at least one cross beam, the The two ends of the beam are respectively connected to the support beam, so as to form a horizontal column of a three-dimensional structure.

本發明為解決習知技術之問題所採用之技術手段,係提供一種組合式高空作業升降機台,包含:一底座,該底座具有至少一固定座,該固定座固合該底座;一下框架,該下框架的一端經由該固定座接合該底座;複數個上框架,其係由最底層的該上框架至最高層的該上框架相互疊合,其中最底層的該上框架的一端,經由疊合該下框架的另一端;一延伸架,該延伸架的一端係延伸最高層的該上框架的另一端;一捲揚機,該捲揚機連結該於該下框架; 複數個滑輪,其中至少該兩個滑輪分別位於該延伸架的兩端;以及一鋼索,該鋼索一端連結該捲揚機,該鋼索另一端連結一吊鉤,經由該滑輪支撐,該捲揚機藉以滑動該鋼索;其中,該上框架以及該下框架,所形成的立體結構,具有至少一支撐樑,藉以形成立體結構的縱向柱體;以及至少一橫樑,該橫樑的兩端係分別連結該支撐樑,藉以形成立體結構的橫向柱體。The technical means adopted by the present invention to solve the problems of the prior art is to provide a combined aerial work lift platform, comprising: a base, the base has at least one fixing seat, the fixing seat is fixed to the base; a frame, the One end of the lower frame is joined to the base via the fixed seat; a plurality of upper frames are superimposed from the upper frame of the lowest layer to the upper frame of the highest layer, and one end of the upper frame of the lowest layer is superimposed on each other. The other end of the lower frame; an extension frame, one end of the extension frame is connected to the other end of the upper frame extending the highest floor; a hoist, the hoist is connected to the lower frame; a plurality of pulleys, of which at least two pulleys are respectively located at both ends of the extension frame; and a wire rope, one end of the wire rope is connected to the hoist, the other end of the wire rope is connected to a hook, supported by the pulley, the hoist is used to slide the wire rope; wherein, the upper frame and the lower frame , the formed three-dimensional structure has at least one support beam to form a vertical column of the three-dimensional structure; and at least one cross beam, the two ends of the cross beam are respectively connected to the support beam to form a horizontal column of the three-dimensional structure.

在本發明的一實施例中係提供一種組合式高空作業升降機台,該上框架、以及該下框架的樑型中至少其中之一係H字型的柱狀體。In an embodiment of the present invention, a combined aerial work lift platform is provided. At least one of the beam shapes of the upper frame and the lower frame is an H-shaped columnar body.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,更包含:至少一接合板,該接合板係分別連結於該下框架的支撐樑的一端,以及連結於該上框架的支撐樑的一端:以及至少一螺栓,經由該螺栓穿設該下框架的支撐樑的接合板,以及該上框架的支撐樑的接合板,藉以固持該下框架以及該上框架。In an embodiment of the present invention, a combined aerial work lift platform is provided, further comprising: at least one joint plate, the joint plate is respectively connected to one end of the support beam of the lower frame, and is connected to the upper frame One end of the supporting beam: and at least one bolt, through which the bolt passes through the joint plate of the supporting beam of the lower frame and the joint plate of the supporting beam of the upper frame, so as to fix the lower frame and the upper frame.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,更包括:至少一手扶梯,該手扶梯系連結於該下框架以及該上框架中之至少其中之一。In an embodiment of the present invention, a combined aerial work lift platform is provided, which further includes: at least one escalator, which is connected to at least one of the lower frame and the upper frame.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,該延伸架係H字型的柱狀體。In an embodiment of the present invention, a combined aerial work lift platform is provided, wherein the extension frame is an H-shaped columnar body.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,該滑輪連結於該該下框架以及該上框架中之至少其中之一。In an embodiment of the present invention, a combined aerial work lift platform is provided, wherein the pulley is connected to at least one of the lower frame and the upper frame.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,更包含:至少一支撐部,該支撐部係固定於該底座的下側。In an embodiment of the present invention, a combined aerial work lift platform is provided, which further comprises: at least one support portion, and the support portion is fixed on the lower side of the base.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,該支撐部係具有一伸縮架結構,該底座的平衡經由該支撐部拉伸後支撐。In an embodiment of the present invention, a combined aerial work lift platform is provided, wherein the support portion has a telescopic frame structure, and the balance of the base is supported after being stretched by the support portion.

在本發明的一實施例中係提供一種組合式高空作業升降機台,其中,該支撐部係具有一滾輪結構,該底座經由該支撐部作動後滑行。In an embodiment of the present invention, a combined aerial work lift platform is provided, wherein the support portion has a roller structure, and the base slides after being actuated by the support portion.

以下根據第1圖~第3圖,而說明本發明的實施方式。該說明並非為限制本發明的實施方式,而為本發明之實施例的一種。Embodiments of the present invention will be described below with reference to FIGS. 1 to 3 . This description is not intended to limit the embodiments of the present invention, but is an example of the present invention.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,包含:一底座40、至少一上框架20、一延伸架23、一捲揚機33、複數個滑輪(11、12、13)、一鋼索14、以及一吊鉤。其中,該底座40具有至少一固定座31,該固定座31固合該底座40。該下框架30的一端經由該固定座31接合該底座40。至少一上框架20,最底層的該上框架20的一端,經由疊合該下框架30的另一端。該延伸架23的一端係延伸最高層的該上框架20的另一端。該捲揚機33連結該於該下框架30。 複數個滑輪(11、12、13),其中至少該兩個滑輪(11、12)分別固定於該延伸架23的兩端,另一個滑輪13固定於下框架30上。該鋼索14一端連結該捲揚機33,該鋼索14另一端連結一吊鉤141,經由該滑輪(11、12、13)支撐,該捲揚機33藉以滑動該鋼索14。本發明的吊鉤141,可經由拖吊藍, 或是夾具,或是磁鐵體吸盤地等效替代,進行貨物的拖吊。As shown in FIGS. 1 to 3, a combined aerial work lift platform according to an embodiment of the present invention includes: a base 40, at least one upper frame 20, an extension frame 23, a hoist 33, a plurality of Pulleys (11, 12, 13), a wire rope 14, and a hook. The base 40 has at least one fixing base 31 , and the fixing base 31 is fixed to the base 40 . One end of the lower frame 30 is connected to the base 40 via the fixing seat 31 . At least one upper frame 20 , one end of the lowermost frame 20 is overlapped with the other end of the lower frame 30 . One end of the extension frame 23 is the other end of the upper frame 20 extending the highest level. The hoist 33 is connected to the lower frame 30 . A plurality of pulleys ( 11 , 12 , 13 ), wherein at least two pulleys ( 11 , 12 ) are respectively fixed on both ends of the extension frame 23 , and the other pulley 13 is fixed on the lower frame 30 . One end of the wire rope 14 is connected to the hoist 33 , and the other end of the wire rope 14 is connected to a hook 141 , which is supported by the pulleys ( 11 , 12 , 13 ), and the hoist 33 slides the wire rope 14 . The hook 141 of the present invention can be used as an equivalent substitute for a towing crane, a clamp, or a magnet suction cup to carry out the towing of the goods.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,該上框架20以及該下框架30,所形成的立體結構,具有複數個支撐樑50,藉以形成立體結構的縱向柱體;以及複數個橫樑21,該橫樑21的兩端係分別連結該支撐樑50,藉以形成立體結構的橫向柱體,本發明提供由橫樑21結合支撐樑50的立體結構,增強組合後組合式高空作業升降機台的張力以及應力,藉以拖吊較重貨物時,能獲的較佳的穩定度。As shown in FIG. 1 to FIG. 3, according to an embodiment of the present invention, a combined aerial work lift platform, wherein the upper frame 20 and the lower frame 30 form a three-dimensional structure with a plurality of support beams 50, in order to form a longitudinal column of a three-dimensional structure; and a plurality of beams 21, the two ends of the beam 21 are respectively connected to the support beam 50, so as to form a transverse column of a three-dimensional structure, the present invention provides the beam 21 combined with the support beam 50 The three-dimensional structure enhances the tension and stress of the combined aerial work lift platform, so that better stability can be obtained when towing heavier goods.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,經由 上框架20以及下框架30的疊合,或是上框架20以及上框架20的疊合的技術手段,疊合的方式是由相對應縱向柱體的支撐樑50相接。調整拖吊貨物的高度,複數個上框架20係具有相互疊合的結構。該上框架20係由支撐樑50與橫樑21組合而呈日字型的立體結構、以及該下框架30係由支撐樑50與複數個橫樑21組合而呈井字型的立體結構,該井字型的立體結構下部較上部為寬。本發明日字型的立體結構與井字型的立體結構之組合,藉以增強組合後組合式高空作業升降機台的張力以及應力,拖吊較重貨物時能獲的較佳的穩定度。此外,本發明的一實施例的一種組合式高空作業升降機台,其中該延伸架23經由支柱22的一端連接支撐,支柱22的另一端固定於該上框架20的橫樑21上,可以增加延伸架23的負載強度,該橫樑21的兩端分別固定於該上框架20的支撐樑50上,藉以提升該延伸架23支撐貨物的重量。As shown in FIG. 1 to FIG. 3, according to an embodiment of the present invention, a combined aerial work lift platform, wherein through the superposition of the upper frame 20 and the lower frame 30, or the upper frame 20 and the upper frame 20 The technical means of superposition is to connect the supporting beams 50 corresponding to the longitudinal columns. To adjust the height of the towed cargo, a plurality of upper frames 20 have a structure that overlaps with each other. The upper frame 20 is a three-dimensional structure formed by the combination of support beams 50 and cross beams 21 to form a Japanese-shaped three-dimensional structure; The lower part of the three-dimensional structure is wider than the upper part. The combination of the Japanese-shaped three-dimensional structure and the well-shaped three-dimensional structure of the present invention can enhance the tension and stress of the combined aerial work lift platform after the combination, and can obtain better stability when towing heavier goods. In addition, according to an embodiment of the present invention, a combined aerial work lift platform, wherein the extension frame 23 is connected and supported through one end of a column 22, and the other end of the column 22 is fixed on the beam 21 of the upper frame 20, and an extension frame can be added. 23, both ends of the beam 21 are respectively fixed on the support beam 50 of the upper frame 20, so as to lift the extension frame 23 to support the weight of the cargo.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,上框架20與下框架30的疊合,係經由螺栓55穿設接合板(52,53)的技術手段,讓使用者可以快速組合上框架20與下框架30,並將其疊合固定成一體。本發明的一實施例係提供至少一接合板(52,53),該接合板(52,53)係分別連結固定於該上框架20的支撐樑50的一端,以及連結固定於該下框架30的支撐樑50的一端;以及至少一螺栓55,經由該螺栓55穿設該上框架20的支撐樑50的接合板(52, 53),以及該下框架30的支撐樑50的接合板(52,53),藉以固持該下框架30以及該上框架20。As shown in FIG. 1 to FIG. 3, according to an embodiment of the present invention, a combined aerial work lift platform, wherein the superimposition of the upper frame 20 and the lower frame 30 is through the bolts 55 through the joint plate (52). , 53) technical means, allowing the user to quickly combine the upper frame 20 and the lower frame 30, and superimpose and fix them into one. An embodiment of the present invention provides at least one joint plate (52, 53), the joint plates (52, 53) are respectively connected and fixed to one end of the support beam 50 of the upper frame 20 and to the lower frame 30. One end of the support beam 50; and at least one bolt 55, through which the joint plate (52, 53) of the support beam 50 of the upper frame 20 passes through the joint plate (52, 53) of the support beam 50 of the lower frame 30 , 53), so as to hold the lower frame 30 and the upper frame 20.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,關於先前技術中,疊高的升降裝置,缺乏操作人員的攀爬設備,對於升降裝置的維修保養,不易組裝拆卸的問題,發明提供至少一手扶梯(24,32),該手扶梯(24,32)係分別連結於該下框架30以及該上框架20,如第1圖~第3圖所示,藉以克服上述先前技術的缺點。As shown in FIG. 1 to FIG. 3, according to an embodiment of the present invention, a combined type aerial work lift platform, wherein, as for the stacking lifting device in the prior art, there is a lack of climbing equipment for operators. The maintenance of the device is difficult to assemble and disassemble. The invention provides at least one escalator (24, 32), and the escalator (24, 32) is respectively connected to the lower frame 30 and the upper frame 20, as shown in Figs. 3, in order to overcome the above-mentioned shortcomings of the prior art.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,該滑輪(11、12、13)連結於該該下框架30以及該上框架20中之至少其中之一。該滑輪(11、12、13)可以是定滑輪,亦可採用動滑輪,或是由定滑輪以及動滑輪所組成的滑輪組。As shown in FIG. 1 to FIG. 3, according to an embodiment of the present invention, a combined aerial work lift platform, wherein the pulleys (11, 12, 13) are connected to the lower frame 30 and the upper frame 20 at least one of them. The pulleys (11, 12, 13) can be fixed pulleys, movable pulleys, or a pulley set composed of fixed pulleys and movable pulleys.

如第1圖~第3圖所示,依據本發明的一實施例的一種組合式高空作業升降機台,其中,該底座40的下側具有至少一支撐部35,該支撐部35係分別固定於該底座40的下側,該支撐部35一般設置三個。該支撐部35係具有一伸縮架結構,該底座40的平衡經由該支撐部35拉伸後支撐於地面,形成支點底座40的底盤更大的槓桿平衡,以增加支撐樑組合式高空作業升降機台之穩定度,及支撐拖吊較重貨物時的平衡。該支撐部35具有伸縮之手段,縮入該底座40的下側,以便組合式高空作業升降機台容置在適合的工作場所。該底座40係具有一滾輪結構41,該底座40經由該滾輪結構41作動後滑行,可容易移動以更換場地施工。本發明組合式高空作業升降機台的支撐部35及滾輪結構41具有的功效和目的,可以提供本發明組合式高空作業升降機台的滑行,固定、以及平衡於科技廠房內的特殊環境。As shown in FIG. 1 to FIG. 3, according to an embodiment of a combined aerial work lift platform of the present invention, the lower side of the base 40 has at least one support portion 35, and the support portion 35 is respectively fixed to the On the lower side of the base 40 , there are generally three supporting parts 35 . The support portion 35 has a telescopic frame structure, and the balance of the base 40 is stretched and supported on the ground through the support portion 35 to form a larger lever balance of the chassis of the fulcrum base 40 to increase the support beam combined aerial work lift platform stability and balance when towing heavier loads. The support portion 35 has a telescopic means, and is retracted into the lower side of the base 40, so that the combined aerial work lift platform can be accommodated in a suitable workplace. The base 40 has a roller structure 41 , and the base 40 slides after being actuated by the roller structure 41 , and can be easily moved to change the site for construction. The function and purpose of the support part 35 and the roller structure 41 of the combined aerial work lift table of the present invention can provide the sliding, fixation, and balance of the combined aerial work lift table of the present invention in a special environment in a technological workshop.

如第1圖~第3圖所示,依據本發明的一實施例的以上之敘述以及說明僅為本發明之較佳實施例之說明,對於此項技術具有通常知識者當可依據以下所界定申請專利範圍以及上述之說明而作其他之修改,惟此些修改仍應是為本發明之發明精神而在本發明之權利範圍中。As shown in FIG. 1 to FIG. 3, the above description and description according to an embodiment of the present invention are only the description of the preferred embodiment of the present invention, and those with ordinary knowledge in this technology can refer to the following definitions. Other modifications are made within the scope of the patent application and the above description, but these modifications should still be within the scope of the right of the present invention for the inventive spirit of the present invention.

11:滑輪 12:滑輪 13:滑輪 14:鋼索 141:吊鉤 20:上框架 21:橫樑 22:支柱 23:延伸架 24:手扶梯 30:下框架 31:固定座 32:手扶梯 33:捲揚機 35:支撐部 40:底座 41:滾輪結構 50:支撐樑 52:接合板 53:接合板 55:螺栓11: Pulley 12: Pulley 13: Pulley 14: Wire rope 141: Hook 20: Upper frame 21: Beam 22: Pillars 23: Extension rack 24: Escalator 30: Lower frame 31: Fixed seat 32: Escalator 33: Windlass 35: Support part 40: base 41: Roller structure 50: Support beam 52: Splice plate 53: Splice plate 55: Bolts

第1圖為本發明一實施例升降機的立體示意圖。 第2圖為本發明一實施例升降機的側視示意圖。 第3圖為本發明一實施例升降機的前視示意圖。FIG. 1 is a three-dimensional schematic diagram of an elevator according to an embodiment of the present invention. FIG. 2 is a schematic side view of an elevator according to an embodiment of the present invention. FIG. 3 is a schematic front view of an elevator according to an embodiment of the present invention.

11:滑輪11: Pulley

12:滑輪12: Pulley

13:滑輪13: Pulley

14:鋼索14: Wire rope

141:吊鉤141: Hook

20:上框架20: Upper frame

21:橫樑21: Beam

22:支柱22: Pillars

23:延伸架23: Extension rack

24:手扶梯24: Escalator

30:下框架30: Lower frame

31:固定座31: Fixed seat

32:手扶梯32: Escalator

33:捲揚機33: Windlass

35:支撐部35: Support part

40:底座40: base

41:滾輪結構41: Roller structure

50:支撐樑50: Support beam

52:接合板52: Splice plate

53:接合板53: Splice plate

55:螺栓55: Bolts

Claims (10)

一種組合式高空作業升降機台,包含: 一底座,該底座具有至少一固定座,該固定座固合該底座; 一下框架,該下框架的一端經由該固定座固定於該底座; 一上框架,該上框架的一端,經由疊合固定於該下框架的另一端; 一延伸架,該延伸架的一端係延伸該上框架的另一端; 一捲揚機,該捲揚機連結該於該下框架; 複數個滑輪,其中至少該兩個滑輪分別位於該延伸架的兩端;以及 一鋼索,該鋼索一端連結該捲揚機,該鋼索另一端連結一吊鉤,經由該滑輪支撐,該捲揚機藉以滑動該鋼索; 其中,該上框架以及該下框架,所形成的立體結構,具有至少一支撐樑,藉以形成立體結構的縱向柱體;以及至少一橫樑,該橫樑的兩端係分別連結該支撐樑,藉以形成立體結構的橫向柱體。A combined aerial work lift table, comprising: a base, the base has at least one fixing seat, and the fixing seat is fixed to the base; a lower frame, one end of the lower frame is fixed to the base via the fixing seat; an upper frame, one end of the upper frame is fixed to the other end of the lower frame by overlapping; an extension frame, one end of the extension frame extends the other end of the upper frame; a hoist connected to the lower frame; a plurality of pulleys, wherein at least the two pulleys are located at both ends of the extension frame; and a wire rope, one end of the wire rope is connected to the hoist, the other end of the wire rope is connected to a hook, supported by the pulley, through which the hoist slides the wire rope; Wherein, the three-dimensional structure formed by the upper frame and the lower frame has at least one supporting beam to form a longitudinal column of the three-dimensional structure; and at least one transverse beam, two ends of the transverse beam are respectively connected to the supporting beam to form The horizontal column of the three-dimensional structure. 一種組合式高空作業升降機台,包含: 一底座,該底座具有至少一固定座,該固定座固合該底座; 一下框架,該下框架的一端經由該固定座接合該底座; 複數個上框架,其係由最底層的該上框架至最高層的該上框架相互疊合,其中最底層的該上框架的一端,經由疊合該下框架的另一端; 一延伸架,該延伸架的一端係延伸最高層的該上框架的另一端; 一捲揚機,該捲揚機連結該於該下框架; 複數個滑輪,其中至少該兩個滑輪分別位於該延伸架的兩端;以及 一鋼索,該鋼索一端連結該捲揚機,該鋼索另一端連結一吊鉤,經由該滑輪支撐,該捲揚機藉以滑動該鋼索; 其中,該上框架以及該下框架,所形成的立體結構,具有至少一支撐樑,藉以形成立體結構的縱向柱體;以及至少一橫樑,該橫樑的兩端係分別連結該支撐樑,藉以形成立體結構的橫向柱體。A combined aerial work lift table, comprising: a base, the base has at least one fixing seat, and the fixing seat is fixed to the base; a lower frame, one end of the lower frame is connected to the base via the fixing seat; A plurality of upper frames, which are stacked from the upper frame of the lowest layer to the upper frame of the highest layer, wherein one end of the upper frame of the lowest layer is overlapped with the other end of the lower frame; an extension frame, one end of the extension frame is extended to the other end of the upper frame of the highest floor; a hoist connected to the lower frame; a plurality of pulleys, wherein at least the two pulleys are located at both ends of the extension frame; and a wire rope, one end of the wire rope is connected to the hoist, the other end of the wire rope is connected to a hook, supported by the pulley, through which the hoist slides the wire rope; Wherein, the three-dimensional structure formed by the upper frame and the lower frame has at least one supporting beam to form a longitudinal column of the three-dimensional structure; and at least one transverse beam, two ends of the transverse beam are respectively connected to the supporting beam to form The horizontal column of the three-dimensional structure. 如請求項1或2所述之組合式高空作業升降機台,其中,該上框架係由支撐樑與橫樑組合而呈日字型的立體結構、以及該下框架係由支撐樑與複數個橫樑組合而呈井字型的立體結構,該井字型的立體結構下部較上部為寬。The combined lift platform for aerial work as claimed in claim 1 or 2, wherein the upper frame is a three-dimensional structure formed by the combination of support beams and beams, and the lower frame is composed of support beams and a plurality of beams As for the well-shaped three-dimensional structure, the lower part of the well-shaped three-dimensional structure is wider than the upper part. 如請求項1或2所述之組合式高空作業升降機台,其中,更包含: 至少一接合板,該接合板係分別連結於該下框架的支撐樑的一端,以及連結於該上框架的支撐樑的一端:以及 至少一螺栓,經由該螺栓穿設該下框架的支撐樑的接合板,以及該上框架的支撐樑的接合板,藉以固持該下框架以及該上框架。The combined aerial work lift platform as described in claim 1 or 2, further comprising: at least one joint plate connected to one end of the support beam of the lower frame and one end of the support beam of the upper frame respectively: and At least one bolt passes through the joint plate of the support beam of the lower frame and the joint plate of the support beam of the upper frame, so as to fix the lower frame and the upper frame. 如請求項1或2所述之組合式高空作業升降機台,其中,更包括: 至少一手扶梯,該手扶梯系連結於該下框架以及該上框架中之至少其中之一。The combined aerial work lift platform as claimed in claim 1 or 2, further comprising: At least one escalator is connected to at least one of the lower frame and the upper frame. 如請求項1或2所述之組合式高空作業升降機台,其中,該延伸架係經由支柱的一端連接支撐,該支柱的另一端固定於該上框架的該橫樑上,該橫樑的兩端分別固定於該上框架的該支撐樑上,藉以提升該延伸架支撐貨物的重量。The combined aerial work lift platform as claimed in claim 1 or 2, wherein the extension frame is connected and supported through one end of a column, the other end of the column is fixed on the beam of the upper frame, and the two ends of the beam are respectively It is fixed on the support beam of the upper frame, so as to lift the extension frame to support the weight of the cargo. 如請求項1或2所述之組合式高空作業升降機台,其中,該滑輪連結於該該下框架以及該上框架中之至少其中之一。The combined aerial work lift platform as claimed in claim 1 or 2, wherein the pulley is connected to at least one of the lower frame and the upper frame. 如請求項1或2所述之組合式高空作業升降機台,其中,更包含: 至少一支撐部,該支撐部係固定於該底座的下側。The combined aerial work lift platform as described in claim 1 or 2, further comprising: At least one supporting portion is fixed on the lower side of the base. 如請求項8所述之組合式高空作業升降機台,其中,該支撐部係具有一伸縮架結構,該底座的平衡經由該支撐部拉伸後支撐。The combined aerial work lift platform as claimed in claim 8, wherein the support portion has a telescopic frame structure, and the balance of the base is supported after being stretched by the support portion. 如請求項8所述之組合式高空作業升降機台,其中,該底座係具有一滾輪結構,該底座經由該滾輪結構作動後滑行。The combined aerial work lift platform as claimed in claim 8, wherein the base has a roller structure, and the base slides after being actuated by the roller structure.
TW109120672A 2020-06-18 2020-06-18 Combined aerial work elevator TWI810467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109120672A TWI810467B (en) 2020-06-18 2020-06-18 Combined aerial work elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109120672A TWI810467B (en) 2020-06-18 2020-06-18 Combined aerial work elevator

Publications (2)

Publication Number Publication Date
TW202200483A true TW202200483A (en) 2022-01-01
TWI810467B TWI810467B (en) 2023-08-01

Family

ID=80787833

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109120672A TWI810467B (en) 2020-06-18 2020-06-18 Combined aerial work elevator

Country Status (1)

Country Link
TW (1) TWI810467B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0747452B2 (en) * 1988-04-06 1995-05-24 株式会社日立ビルシステムサービス Elevator installation method
CN101018731B (en) * 2004-07-12 2010-06-16 因温特奥股份公司 Lift and pulley assembly for use in a lift
CN203359889U (en) * 2013-05-31 2013-12-25 上海宝冶集团有限公司 Wall plate lifting and installation integrated operation platform
JP6404694B2 (en) * 2014-12-05 2018-10-10 株式会社神戸製鋼所 Electric winch device and mobile crane
JP2018000036A (en) * 2016-06-28 2018-01-11 井関農機株式会社 Combine
TWM574621U (en) * 2018-07-13 2019-02-21 邱雲海 Assembling and lifting device for telescopic sleeve and scaffolding
CN110759265A (en) * 2018-07-27 2020-02-07 昌邑市宝路达机械制造有限公司 Lifting device of material lifting mechanism
CN109205482A (en) * 2018-11-07 2019-01-15 江苏广源幕墙装饰工程有限公司 The hanging apparatus of curtain wall lighting roof

Also Published As

Publication number Publication date
TWI810467B (en) 2023-08-01

Similar Documents

Publication Publication Date Title
US10106995B2 (en) Deck for use in construction
US10738488B2 (en) Lift truck operated stacking formwork table system and a method of operation thereof
US20160258171A1 (en) Deck with a slidable platform
US20200173185A1 (en) Deck and hoist for use in construction
CN205527400U (en) Lifting mechanism
US20170226756A1 (en) Scaffold for supporting a working platform for bridges
JP5769961B2 (en) Construction method and removal method of structure
CN110562856B (en) Hoisting device for heavy object and hoisting and carrying method
US20100230559A1 (en) Gantry device for use in the assembly or maintenance of heavy parts of a travelling device
JP6270692B2 (en) Lifting device and lifting method
TW202200483A (en) Combined aerial work elevator
US10526179B2 (en) Portable lifting apparatus
JP2019082071A (en) Scaffold lifting device
CN210825133U (en) Cable trench cover lifting device
TWM603464U (en) Combined aerial work elevator
CN213011676U (en) Combined type high-altitude operation lifting machine platform
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
CN201052950Y (en) Crane
CN113816284A (en) Combined elevator
JP2002129747A (en) Lift-up method and lift-up system
KR200476632Y1 (en) Crane with parts being adapted to assemble or disassemble
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
CN202530777U (en) Rapidly-mounted high-altitude overhauling device of aluminum alloy block
CN218930606U (en) Steel construction attic platform
CN103121625B (en) Method for high altitude disassembly of large-scale part