TW201344384A - Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide - Google Patents

Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide Download PDF

Info

Publication number
TW201344384A
TW201344384A TW101114065A TW101114065A TW201344384A TW 201344384 A TW201344384 A TW 201344384A TW 101114065 A TW101114065 A TW 101114065A TW 101114065 A TW101114065 A TW 101114065A TW 201344384 A TW201344384 A TW 201344384A
Authority
TW
Taiwan
Prior art keywords
engineering
application
materials
automatic guiding
automatic
Prior art date
Application number
TW101114065A
Other languages
Chinese (zh)
Other versions
TWI465870B (en
Inventor
xie-sen Wu
Original Assignee
xie-sen Wu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by xie-sen Wu filed Critical xie-sen Wu
Priority to TW101114065A priority Critical patent/TW201344384A/en
Publication of TW201344384A publication Critical patent/TW201344384A/en
Application granted granted Critical
Publication of TWI465870B publication Critical patent/TWI465870B/zh

Links

Landscapes

  • General Factory Administration (AREA)

Abstract

This invention provides a manufacturing method of material with automatic construction guide. According to the actual material combinations for the construction, it is to customize, combine and use the material based on actual requirements, in which commercially available standard products can be directly used and nonstandard items are customized, through cuting and processed before usage. A construction function guide is marked on each component according to construction requirement content so that the component contains message of automatic construction function guide mark, where the mark can guide the construction tasks and all the components are customized and combined and packaged according to the entire construction task requirements; thus, completing the manufacturing of material with automatic construction guide and building a material preparation model of "dedicated material for dedicated use". Further, the surface of the package is added with the mark of management function guide of construction operation control requirement so that the package of the component has the information mark of automatic construction operation management function guide; thus completing the preparation of material with automatic construction operation guide.

Description

自動導引工程施作用料及自動導引工程作業用料之製作方法Automatic guiding engineering application material and automatic guiding engineering operation material manufacturing method

本發明是一種自動導引工程施作用料製作方法與工程用料準備技術工程用料管控技術,工程施作用料導引技術及工程施作用料生產技術相關,特別應用於各種工程作業及個人DIY組合商品之組合技術及商品材料生產技術相關。The invention relates to an automatic guiding engineering application material manufacturing method, a engineering material preparation technology engineering material control technology, an engineering application material guiding technology and a engineering application material production technology, and is particularly applied to various engineering operations and personal DIY. Combination technology of combined products and production technology of commodity materials.

按習知工程用料均依商場交易訂定規格呎吋及包裝,是通用性供貨模式,而工程用料內容往往是透過專業工程人員,依作業環境與空間及個人專業技能決定用料內容,為施作順暢領取供應量會遠大於實際施作用量,往往忽略用料裁切損耗問題、餘料及物料管控問題及作業空間衝突問題,甚至影響施作品質,造成重大損耗,常有缺失分析如下:According to the conventional engineering materials, the specifications and packaging are set according to the transaction of the mall. It is a universal supply mode, and the engineering materials are often determined by professional engineers, depending on the working environment and space and personal professional skills. For the smooth delivery of the supply will be much larger than the actual application, often overlooking the problem of cutting loss, residual materials and material control problems and work space conflicts, and even affecting the quality of the work, causing significant losses, often missing analysis as follows:

(1) 工程用料供應量大於實際使用量,施作時材料使用必須依實際環境空間運用進行作業,市售材料是通用性的規格呎吋與作業現場不相符,必須進行裁切作業,裁切時只能考慮實際需求,會有大量餘料發生,餘料管理及使用是個大問題,餘料是沒有記錄且容易受到施作環境汙染,如水、水氣、油汙、灰塵等等,更有久而氧化情形,一般工程人員均不會主動應用,往往在工程結束形成大量廢料。(1) The supply of engineering materials is larger than the actual usage. The materials used in the application must be operated according to the actual environmental space. The commercially available materials are versatile specifications, which are not consistent with the job site, and must be cut. When cutting, we can only consider the actual demand, there will be a lot of surplus materials, and the management and use of surplus materials is a big problem. The remaining materials are not recorded and are easily affected by environmental pollution, such as water, moisture, oil, dust, etc. For a long time, the general engineering personnel will not actively apply, and often a large amount of waste is formed at the end of the project.

(2) 工程用料運用選擇往往是由工程人員決定,工程人員必須現場實況進行作業,依設計圖作業前必須花大量時間測量、會意組合用料內容,進行必要裁切、測量、比對組合、施作程序,作業裁切時往往不會查看餘料使用,裁切後更不會記錄餘料內容,餘料送回倉庫,管理餘料與餘料使用是工程作業難題,費時費力,不見得能有效消除損耗。(2) The selection of engineering materials is often determined by the engineering personnel. The engineering personnel must carry out the work on the spot. According to the design drawings, it takes a lot of time to measure and agree to combine the materials, and carry out the necessary cutting, measuring and comparison. When the work is cut, the residual material is often not used. After cutting, the residual material content will not be recorded. The remaining material is sent back to the warehouse. The management of the residual material and the residual material is a difficult problem in engineering operation, which is time-consuming and laborious. Can effectively eliminate losses.

(3) 工程用料之使用內容不會有標示,工程施作人員需要就使用,容易造成誤用或分配不均的情形發生,因倉管人員不會知道材料用途及分配運用作業內容,容易有管控盲點。(3) The use content of the engineering materials will not be marked, and the project personnel need to use them, which may cause misuse or uneven distribution. Because the warehouse management personnel will not know the purpose of the materials and the distribution and operation contents, it is easy to have Control blind spots.

(4) 現有工程作業均以採設計圖導引工程作業,而設計圖只能看到自己作業部份,無法查看其他施作內容,難免會有作業衝突情形發生,造成工程作業修改損耗,往往在施作後才發現問題,而設計圖無法完整陳述作業順序、組合用料內容,施作人員必須自行摸索,花費大量時間,容易發生作業上疏失,對工程作業進度管控困難。(4) The existing engineering operations are guided by the design drawings, and the design drawings can only see the part of the operation, and cannot view other application contents. It is inevitable that there will be conflicts in the operation, which will cause the engineering operation to be modified and lost. The problem was discovered after the application, and the design drawing could not fully state the operation sequence and the content of the combined materials. The application personnel had to explore for themselves, spent a lot of time, was prone to job losses, and was difficult to control the progress of the project.

(5) 現有工程查核用料困難,因施作用料沒有標示,無法即時顯現是否符合作業規範,唯有查看設計圖及用料規範才清楚,查核工作費時費力,而工程人員往往不會面面俱到檢查,只要有用料就施工,容易產生錯誤。(5) It is difficult to check the materials used in the existing projects. Because the application materials are not marked, it is impossible to immediately show whether the operation specifications are met. Only when the design drawings and materials specifications are checked, it is clear that the inspection work is time-consuming and laborious, and the engineers often do not check all the work. As long as the materials are applied, it is easy to make mistakes.

(6) 工程施作在任務銜接部份,往往必須加以註記施作銜接記號標示,提供日後作業使用,而現有標示作業是由工程人員自行進行,沒有統一作業訂定標準,該標示內容只有部份人員清楚,時間久後往往由不同人員執行時,或受到環境因素汙染無法看到標示內容或脫落現象時,必須重新檢查確認,會增加大量時間。(6) The construction of the project in the task connection part often has to be marked as a connection mark to provide future operation, and the existing marking operation is carried out by the engineering staff. There is no standard for the unified operation. The personnel are clear that when the time is long, they are often executed by different personnel, or when they are not contaminated by environmental factors, they cannot be checked or confirmed. It is necessary to re-examine and confirm, which will increase the time.

(7) 現有組合性商品,雖然用料已經都準備好,材料上沒有導引資訊作業方式,必須查看組合說明書,每個人不一定清楚說明書內容及作業順序與用料方向性作業調整問題,往往複雜些就會出現問題。組裝技術基本要領,說明書無法清楚交待時,組裝後才發現錯誤,費時費力因難重重,往往需要多次組合後才能清楚要領。(7) Existing composite products, although the materials have been prepared, there is no information to guide the operation of the materials, you must look at the combination of instructions, each person does not necessarily understand the contents of the instructions and the sequence of operations and the direction of the material to adjust the problem, often Complexity will cause problems. The basics of assembly technology, the instructions can not be clearly explained, the error is found after assembly, time and effort is difficult, and often requires multiple combinations to clear the essentials.

綜合上述工程施作用料沒有自動導引功能及專料專用模式,在工程作業中不但有管理及施作上困難,有浪費損耗問題,更有餘料管控盲點,進出貨倉管問題,更有因用料分配不均產生缺料阻礙施作風險,在傳統使用人力作業行業中是常見問題,如配電生產、機械設備製造、設備安裝工器、電氣配電工程、配管工程、消防工程、空調工程、給排水工程、通信工程、營建工程、器具組裝工程、室內裝修工程、家具廚具之組裝及個人DIY組裝商品等人力作業市場經常可見。如何應用施作用料建立有效物料管控技術、施作導引技術,來達到預防工程作業損耗,提昇施作效率。In addition to the above-mentioned engineering application materials, there is no automatic guiding function and special material-specific mode. In engineering operation, not only management and application difficulties, but also wasteful loss problems, more control of blind spots, and problems of entering and leaving warehouses are more common. Uneven distribution of materials leads to the risk of material shortage, which is a common problem in traditional manpower industry, such as power distribution production, mechanical equipment manufacturing, equipment installation, electrical distribution engineering, piping engineering, fire engineering, air conditioning engineering, Manpower operations such as water supply and drainage engineering, communication engineering, construction engineering, appliance assembly engineering, interior decoration engineering, assembly of furniture and kitchenware, and personal DIY assembly products are often seen. How to apply effective material management and control technology and implement guiding technology to prevent the loss of engineering operation and improve the efficiency of application.

本發明目的為應用標示技術將工程施作自動導引資訊直接標示在工程用料表面上,直接指引工程作業組合目的,免除先前用料準備程序,降低用料盲點,提昇施作效率,改善物料管控缺失及風險。The purpose of the invention is to apply the marking technology to directly mark the engineering as automatic guiding information on the surface of the engineering material, directly guide the purpose of the engineering operation combination, exempt the previous material preparation procedure, reduce the material blind spot, improve the application efficiency, and improve the material. Loss of control and risk.

本發明另一目的為應用專料專用備料模式,工程用料依工程需求事先進行必要測量、裁剪、加工及導引性標示,進而組合包裝,免除施作中裁切作業,降低裁切損耗,更能避免餘料發生及管控。因專料專用能結合工程管控作業需求與施作任務,可依工程進度配送用料,並大幅降低用料管控成本。Another object of the present invention is to apply a special material preparation mode, and the engineering materials are subjected to necessary measurement, cutting, processing and guiding indication according to engineering requirements, and then combined packaging, thereby eliminating the cutting operation during the application, reducing the cutting loss, and more Avoid residual material generation and control. Because special materials can be combined with engineering control operations and application tasks, materials can be distributed according to the progress of the project, and the cost of material control is greatly reduced.

本發明另一目的為應用統一且耐候性標示作業,讓施作用料標示清楚明確,不但能強化工程銜接指引,更能作為工程查核依據,提昇工程管控效率與能力。Another object of the present invention is to apply uniform and weather-resistant marking operations, so that the application materials are clearly marked, not only can strengthen the engineering connection guidelines, but also serve as a basis for engineering inspection, and improve engineering control efficiency and capability.

本發明另一目的為應用施作用料組合包裝表面導引管理功能標示,可讓工程用料與工程任務相結合,利用標示指引用料目的、任務分配、用料配送時間、施作時間,可降低工程用料管控成本,更可降低工程協商、摸索及查核成本,可發揮零庫存作業模式。Another object of the present invention is to apply the application of the active material packaging surface guide management function label, which can combine the engineering materials with the engineering tasks, and utilize the labeling guide material purpose, task assignment, material delivery time, and application time. Reduce the cost of engineering materials control, and reduce the cost of project negotiation, exploration and verification, and play a zero inventory operation mode.

本發明另一目的為應用導引施作功能標示來導引工程施作組合任務,透過專料專用明確指引標示內容,可讓組合作業更順暢確實,能降低專業技術落差,能提供即時有效組合技術指引,強化組合商品優越性,讓組合商品更受市場歡迎。Another object of the present invention is to apply the guidance function function indication to guide the engineering application task, and to clearly mark the content through the special material, so that the combination operation can be smoother and more accurate, the professional technology gap can be reduced, and the instant effective combination can be provided. The technical guidelines strengthen the superiority of the combined products and make the combined products more popular in the market.

為達上述發明目的一種自動導引工程施作用料之製作方法,係依工程施作實際用料組合,按實際需求進行客製化製作組合運用,針對每一個組件依施作需求內容進行導引施作功能標示,使該組件具有自動導引施作功能標示訊息標示。標示能指引施作任務,依整體工程任務需求加以組合包裝,即完成自動導引工程施作用料製作,建立專料專用備料模式。進一步將包裝表面上增加結合工程作業管控作業需求之導引管理功能標示,使該組件包裝上具有自動導引工程作業管理功能標示之資訊標示,即完成自動導引工程作業用料之製作,可依工程進度任務需求進行用料配送與管控,讓用料與施作任務相結合,能免除施作中餘料發生及管理,可讓工程作業管控更方便更有效率,導引施作功能標示可讓施作組合更順暢,沒有施作盲點,不需事前準備程序,提高施作品質,建立清潔有效率施作模式。透過施作導引功能標示,組合DIY商品,能正確快速組合,提供商品組合最佳化模式,讓商品得到最完善使用,不會有技術落差盲點。能提高組合商品組合成功率,強化商品利用性。In order to achieve the above object, a method for manufacturing an automatic guiding engineering application material is to perform a customized combination according to actual needs according to the actual application of the project, and to guide each component according to the requirements of the application. The function is marked so that the component has an automatic guidance function indicator message indication. The marking can guide the application task and combine packaging according to the overall engineering task requirements, that is, complete the automatic guiding engineering application of the active material, and establish a special material preparation mode. Further, the guiding management function label combined with the engineering operation control operation requirement is added on the surface of the packaging, so that the component packaging has the information indication of the automatic guiding engineering operation management function marking, that is, the automatic guiding engineering operation material is completed, According to the progress and task requirements of the project, the distribution and control of materials are used, so that the combination of materials and tasks can eliminate the occurrence and management of residual materials, which makes the management of engineering operations more convenient and efficient. The combination is even smoother, there is no blind spot, no need to prepare the procedure beforehand, improve the quality of the work, and establish a clean and efficient mode of operation. Through the application of the guiding function label, the combination of DIY products can be correctly and quickly combined, and the product combination optimization mode can be provided, so that the products can be used most perfectly, and there will be no technical blind spots. It can improve the success rate of combined product combinations and enhance product utilization.

透過集中專業的備料模式,可降低現場作業因即時需要裁切,忽略合理化裁切所造成損耗,更可讓現場作業不需測量裁切,大幅減化施作程序更可降低人為疏忽衝突模式發生。更利用專業抗候統一標示模式,可讓施工更明確,透過事前設計模擬、測量計算、精準用料,能讓施作更精確,能預防作業衝突及用料組合精確性,專料專用模式可讓施作清楚精確,能大幅提昇施作品質,工程查核及管控能即時有效掌握,能減少協商討論,可防止修正等工務事宜及前後施作盲點發生,能統一管控的最佳模式。Through the centralized professional stocking mode, the on-site work can be reduced due to the need for cutting, ignoring the loss caused by rational cutting, and the on-site operation can be performed without measuring the cutting. The drastic reduction of the application procedure can reduce the occurrence of human inadvertent conflict mode. . The use of professional weather resistance uniform marking mode can make the construction more clear. Through pre-design simulation, measurement calculation and precise material use, it can make the application more precise, prevent job conflict and material combination accuracy, and special-purpose mode can be used. Let the application be clear and precise, the quality of the work can be greatly improved, the project check and control can be effectively and immediately grasped, the negotiation and discussion can be reduced, and the best mode of unified control can be prevented by preventing work items such as corrections and blind spots occurring before and after.

一種具有自動導引工程施作用料及自動導引工程作業用料之製作方法實施程序,如圖一所示為自動導引工程作業用料生產流程圖,可透過人工加工或專業設備達到備料目的,程序內容說明如下:The utility model relates to an implementation method for the production method of the automatic guiding engineering application material and the automatic guiding engineering working material, and the flow chart of the production process of the automatic guiding engineering operation material is shown in Fig. 1, which can achieve the purpose of preparation by manual processing or professional equipment. The contents of the program are as follows:

1.取得工程作業之自動導引準備用料資訊1001. Obtain the information of the automatic guidance preparation materials for engineering operations 100

該自動導引用料資訊由1.工程用料規格明細2.工程施作用料導引功能標示內容3.管理功能標示內容等三種資料組合而成。該工程用料規格明細可用文字或圖形表示,符合工程施作內容真正用料資訊。該工程施作用料導引功能標示內容,係為工程用料之每一組件進行標示內容,內容表示方式可為文字敘述或圖形顯示,係針對每一元件進行標示規格位置與內容為獨一無二識別資料,該內容可為:材料組合順序、方向指引、用料指引、施作用途作業代碼、測量基準點、基準線、測量數據、組件相連記號、相互連接位置、施作路徑、功能用途、組件連接代號及腳位,其內容作為自動導引工程施作之工具。而管理功能標示內容主要針對組合用料之配送管理及工程作業管控應用,指引工程管控作業資訊,其內容可為客戶名稱、工程名稱、施作項目、施作組別、施作地點、施作日期、配送日期、出貨序號、用料內容、包裝組合資訊及用料用途,其內容作為自動導引工程作業之工具,標示內容可為單一或多重標示。The information of the automatic guiding material is composed of three kinds of materials, such as 1. engineering material specification detail 2. engineering application material guiding function labeling content 3. management function labeling content. The specification of the materials used in the project can be expressed in words or figures, which is in line with the actual materials used in the project. The marking function of the guiding material function of the project is to mark the content of each component of the engineering material, and the content representation manner can be a text description or a graphic display, and the position and content of the labeling specification are uniquely identified for each component. The content can be: material combination order, direction guidance, material guidance, application operation code, measurement reference point, reference line, measurement data, component connection mark, interconnection position, application path, function use, component connection Code and foot, its content is used as a tool for automatic guidance engineering. The management function labeling content is mainly for the distribution management and engineering operation control application of the combined materials, and guides the project management operation information. The content can be the customer name, project name, construction project, implementation group, implementation location, and implementation. The date, delivery date, shipping serial number, material content, packaging combination information and material usage, the content of which is used as a tool for automatic guiding engineering work, the marking content can be single or multiple labels.

2.用料分配2002. Material allocation 200

針對工程需求用料不同加以分類,除了依材料性質與內容不同區分外,更可依市場規格品及客製化需求品區分,進行不同用料準備。According to the different materials used in engineering requirements, in addition to the different nature of the material and content, it can be divided according to market specifications and customized requirements, and prepare different materials.

3.取料3003. Retrieving 300

將工程施作內容用料取出進行導引用料準備作業。The project is used as a content material to take out the guiding material preparation work.

4.對位標示4004. Registration mark 400

依照工程需求模式加以在用料給予進行導引施作功能標示,該標示位置及標示內容,依工程規劃需求作業為單一或多重標示,並直接對位噴印於工程用料表面上或利用標籤標於標示位置上。According to the engineering demand mode, the function indication is given in the guidance of the materials. The marking position and the marking content are single or multiple markings according to the engineering planning requirements, and are directly printed on the surface of the engineering materials or used labels. Marked on the marked position.

5.對位裁切5005. Alignment cutting 500

依工程作業用料需求對用料進行裁切,以符合工程用料需求,可透過裁切裝置對位裁切,除可應用雷射、電漿、離子、火焰等設備進行裁切外,更可應用傳統裁切裝置進行油壓切斷裝置、鋸斷模式、沖壓模式等方式進行。According to the demand of engineering work materials, the materials are cut to meet the requirements of engineering materials. They can be cut through the cutting device, except for laser, plasma, ion, flame and other equipment. The conventional cutting device can be applied to the hydraulic cutting device, the sawing mode, the punching mode, and the like.

6.組合用料6006. Combination material 600

依工程作業需求用料加以組合、比對用料,查核數量種類。According to the engineering operation requirements, the materials are combined and compared with the materials used to check the quantity types.

7.包裝7007. Packing 700

將工程用料給予統合包裝,即完成自動導引工程用料準備。The engineering materials are given to the integrated packaging, that is, the automatic guiding engineering materials preparation is completed.

8.標示管理功能標示作業8008. Mark management function marking job 800

將用料管控作業與工程任務相結合,該用料之管理功能標示,標示於包裝表面上或以標籤貼於包裝表面,標示方式可為單一或多重標示。The material management operation is combined with the engineering task, and the management function of the material is marked on the surface of the package or attached to the surface of the package by a label, and the labeling manner may be single or multiple labels.

9.備料完成9009. Preparation is completed 900

上述導引施作用料製作涉及多種材料及生產技術專業,往往必須透過多重單位進行用料準備,或由單一單位用料準備,達到整體施作目的及任務,製作的量可由單一或多數組合來準備,其組合包裝用料可依工程作業需求及備料方便性,進行必要準備作業。The above-mentioned guiding application materials involve a variety of materials and production technology, and often have to be prepared through multiple units of materials, or prepared from a single unit of materials, to achieve the overall purpose of the application and tasks, the amount of production can be a single or majority combination In preparation, the combined packaging materials can be prepared according to the engineering operation requirements and the convenience of preparation.

上述自動導引工程施作用料及自動導引工程作業用料之製作程序中之對位標示與對位裁切程序之先後可依生產流程方便性調整其先後,能執行符合工程用料需求為準則;而市售標準品用料準備時不需進行裁切,直接標示即能運用。The alignment mark and the alignment cutting program in the production process of the above-mentioned automatic guiding engineering application materials and automatic guiding engineering operation materials can be adjusted according to the convenience of the production process, and can be implemented according to the requirements of the engineering materials. And the commercially available standard materials are not required to be cut when prepared, and can be used directly by marking.

電氣工程之自動導引施作用料及自動導引工程作業用料之製作範例:電氣工程實施例,如表一所示為電氣工程之管理功能標示,表二為電氣工程之材料需求表及導引施作功能標示資訊,圖二為電氣工程連接示意圖,圖三為自動導引工程施作用料製作完成示意圖。從圖三的用料可以清楚每個用料都有特殊連接導引標示,該項工程作業人員能輕易拿起連接項施作,每條線上都連接記號,可輕易完成如圖二所示工作內容,透過圖三用料組合包裝即可完成自動導引工程施作用料製作,再貼上表一的管理功能標示標籤即可清楚指引本用料作業項目,形成自動導引工程作業用料之功能,完成備料程序。Examples of the production of automatic guiding materials and automatic guiding engineering materials for electrical engineering: Electrical engineering examples, as shown in Table 1, are the management function labels for electrical engineering, and Table 2 is the material requirements table and guidance for electrical engineering. The function is marked as information. Figure 2 is a schematic diagram of the electrical engineering connection. Figure 3 is a schematic diagram of the automatic guiding engineering application. It can be clear from the materials in Figure 3 that each material has a special connection guide mark. The project operator can easily pick up the connection items, and each line is connected with a mark, which can easily complete the work shown in Figure 2. Content, through the combination of materials and materials in Figure 3, the automatic guiding project can be completed, and then the management function label of Table 1 can be attached to clearly guide the material operation project, and the automatic guiding engineering operation materials are formed. Function, complete the preparation process.

配管工程之自動導引工程施作用料及自動導引工程作業用料之製作範例:由表三可以清楚看到工程施作項目的導引管理功能標示內容資訊,從表四中可以看到導引施作功能標示所需工程用料規格及標示作業內容,從圖四中可看到本項工程連接示意圖,在圖五所準備各項零組件示意圖,每個組件都有組合需求功能代碼標示,透過功能代碼可輕易區分用料銜接位置,能輕易自動導引工程施作內容,將圖四所示用料組合包裝即形成自動導引工程施作用料。再將表三導引管理功能標示,標示在包裝表面上即形成自動導引工程作業用料製作完成。Example of production of automatic guiding engineering application materials and automatic guiding engineering work materials for piping engineering: Table 3 can clearly see the information of the guiding management function marking contents of the project implementation project. From Table 4, you can see the guidance. The function specification indicates the required engineering material specification and the marking operation content. The connection diagram of this project can be seen from Figure 4. The various components are prepared in Figure 5. Each component has a combination requirement function code label. The function code can easily distinguish the position of the material connection, and can easily and automatically guide the project application content, and the package material shown in Fig. 4 is packaged to form an automatic guiding engineering application material. Then, the guidance management function of Table 3 is marked and marked on the surface of the package to form an automatic guiding engineering work material.

機械機座組裝工程之自動導引工程施作用料及自動導引工程作業用料之製作範例:表五為機台組裝工程之基座項目的導引管理功能標示,表六為機座用料明細及標示內容,圖六為安裝示意圖,透過表六資料可輕易製作出圖七的零件及導引施作功能標示,從組件內容可輕易組合圖六形狀的基座,將圖七的零組件組合包裝即完成基座組裝自動導引施作用料準備,加上標示如表五資訊,完成機械工程之基座組裝之自動導引工程作業之用料製作。Example of the production of automatic guiding engineering application materials and automatic guiding engineering work materials for mechanical machine assembly engineering: Table 5 is the guiding management function indication of the base project of the machine assembly engineering, and Table 6 is the material details of the machine base. And the labeling content, Figure 6 is the installation diagram. The parts of Figure 7 and the guidance function indication can be easily created through the data of Table 6. The components of Figure 6 can be easily combined from the contents of the component, and the components of Figure 7 can be combined. The packaging completes the preparation of the susceptor assembly automatic guiding application material, and the labeling is as shown in Table 5, and the material for the automatic guiding engineering operation of the pedestal assembly of the mechanical engineering is completed.

板金箱體組裝工程之自動導引工程施作用料及自動導引工程作業用料之製作範例:表七為板金箱體組裝之導引管理功能標示資訊,表八為施作用料準備資訊,是以圖形作為模式作業,如圖九為板金切割平面資訊,圖十為板金標示平面資訊及標示內容,圖八為組裝示意圖。我們從表八資料及圖九與圖十之標示及裁切圖形資訊,能輕易完成如圖十一內各個組件標示與裁切後的組合組件,該組件加以包裝即完成本項板金箱體工程之自動導引施作用料製作,進一步在包裝表面標示如表七的管理功能標示即完成本項板金箱體工程之自動導引工程作業用料之製作。Example of the production of automatic guiding engineering and automatic guiding engineering materials for sheet metal assembly engineering: Table 7 is the guiding management function marking information for sheet metal box assembly, and Table 8 is for the preparation information of the application materials. The figure is used as a mode operation, as shown in Figure 9 for sheet metal cutting plane information, Figure 10 is sheet metal marking plane information and labeling content, and Figure 8 is an assembly diagram. From the information in Table 8 and the marking and cutting graphic information in Figure 9 and Figure 10, we can easily complete the combination and labeling of the components in Figure 11. The package is packaged to complete the sheet metal box project. The automatic guiding application material is produced, and further, the packaging function surface is marked with the management function label of Table 7 to complete the production of the automatic guiding engineering operation material of the sheet metal box engineering.

個人DIY組合商品之自動導引施作用料製作範例:由圖十二所示為市售三層櫃的組合示意圖,單獨查看沒有識別標示組合用料,組合會比較困難,而查看組合示意圖會比較清楚,有組合代號說明,上隔板1,背板2、4、6,中3、5隔板,下隔板7,右側板8,左側板9,但對組合作業的順序佈局比較不清楚,因為有許多可能會相同用料,如2、4、6相同,3、5相關互換性大,對作業容易有模糊空間。如果轉換圖十三為相同的材料內容,其中將組合順序及位置標線標示於施作用料上,可以清楚每個材料相連位置,從1開始順序到8則完成組合,將每一個零件按標籤(虛線)對齊,則可快速組合完成三層置物櫃,不但可以指引組合順序,更可提示正確位置,防止偏差,虛線能確保線合位置正確性,可強化組合作業品質,減少技術偏斜落差。Example of automatic guiding application of personal DIY combination products: As shown in Figure 12, it is a combination diagram of commercially available three-tier cabinets. It is difficult to compare the combination of materials without identification labels. The combination diagram will be more difficult to compare. Clearly, there are combination code descriptions, upper partition 1, back plate 2, 4, 6, middle 3, 5 partition, lower partition 7, right side panel 8, left side panel 9, but the order layout of the combined operation is relatively unclear Because there are many materials that may be the same, such as 2, 4, and 6, the 3, 5 related interchangeability is large, and it is easy to have a fuzzy space for the work. If the conversion figure 13 is the same material content, in which the combination order and position markings are marked on the application material, it is clear that the connection position of each material, from 1 to 8 to complete the combination, each part is labeled (Dash line) alignment, you can quickly complete the three-tier locker, not only can guide the combination sequence, but also can prompt the correct position, prevent deviation, the dotted line can ensure the correct position of the wire, can strengthen the quality of the combined work, reduce the technical deviation .

上列詳細說明乃針對本發明可行實施例進行具體說明,惟該實施例並非用以限制本發明之專利範圍,凡未脫離本發明技藝精神所為之等效實施或變更,均應包含於本案之專利範圍中。The detailed description of the present invention is intended to be illustrative of the preferred embodiments of the present invention, and is not intended to limit the scope of the invention. In the scope of patents.

綜上所述,本案不僅於技術思想上確屬創新,並具備習用之傳統方法所不及之上述多項功效,已充分符合新穎性及進步性之法定發明專利要件,爰依法提出申請,懇請 貴局核准本件發明專利申請案,以勵發明,至感德便。To sum up, this case is not only innovative in terms of technical thinking, but also has many of the above-mentioned functions that are not in the traditional methods of the past. It has fully complied with the statutory invention patent requirements of novelty and progressiveness, and applied for it according to law. Approved this invention patent application, in order to invent invention, to the sense of virtue.

100...取得工程作業之自動導引準備用料資訊100. . . Obtain information on automatic guidance preparation materials for engineering operations

200...用料分配200. . . Material allocation

300...取料300. . . Reclaimer

400...對位標示(施作功能標示)400. . . Alignment mark (apply function mark)

500...對位裁切(標準品不需裁切)500. . . Counter cutting (standards do not need to be cut)

600...組合用料600. . . Combined material

700...包裝700. . . package

800...標示管理功能標示作業800. . . Mark management function marking operation

900...備料完成900. . . Preparation of materials

請參閱有關本發明之詳細說明及其附圖,將可進一步瞭解本發明之技術內容及其目的功效;有關附圖為:Please refer to the detailed description of the present invention and the accompanying drawings, and the technical contents of the present invention and its effects can be further understood; the related drawings are:

圖一係為自動導引工程作業用料生產流程圖;Figure 1 is a flow chart for the production of automatic guiding engineering work materials;

圖二係為電氣工程連接流程圖;Figure 2 is a flow chart of electrical engineering connection;

圖三係為電氣工程自動導引工程施作用料製作示意圖;Figure 3 is a schematic diagram of the production of the active material for the electrical engineering automatic guiding project;

圖四係為配管工程連接示意圖;Figure 4 is a schematic diagram of piping connection;

圖五係為配管工程自動導引工程施作用料製作示意圖;Figure 5 is a schematic diagram of the production of the active material for the piping engineering;

圖六係為機械機座組裝連接示意圖;Figure 6 is a schematic diagram of the assembly and connection of the mechanical base;

圖七係為機械機座自動導引工程施作用料製作示意圖;Figure 7 is a schematic diagram of the production of the mechanical material for the automatic guiding project of the mechanical base;

圖八係為板金箱體組裝示意圖;Figure 8 is a schematic view of the assembly of the sheet metal case;

圖九係為板金箱體材料裁切圖;Figure IX is a cut-out view of the sheet metal box material;

圖十係為板金箱體材料標示資料圖;Figure 10 is a map of the material of the sheet metal box;

圖十一係為板金箱體自動導引工程施作用料製作示意圖;Figure 11 is a schematic diagram of the production of the material for the automatic guiding project of the sheet metal box;

圖十二係為個人DIY商品組裝示意圖;以及Figure 12 is a schematic diagram of the assembly of personal DIY products;

圖十三係為個人DIY商品自動導引工程施作用料製作示意圖Figure 13 is a schematic diagram of the production of the material for the personal DIY product automatic guiding project.

100...取得工程作業之自動導引準備用料資訊100. . . Obtain information on automatic guidance preparation materials for engineering operations

200...用料分配200. . . Material allocation

300...取料300. . . Reclaimer

400...對位標示(施作功能標示)400. . . Alignment mark (apply function mark)

500...對位裁切(標準品不需裁切)500. . . Counter cutting (standards do not need to be cut)

600...組合用料600. . . Combined material

700...包裝700. . . package

800...標示管理功能標示作業800. . . Mark management function marking operation

900...備料完成900. . . Preparation of materials

Claims (8)

一種自動導引工程施作用料之製作方法,係依工程施作用料組合,按需求進行客制化製作組合運用,針對每一個組件依施作需求進行導引施作功能標示,使該組件具有自動導引施作功能標示之訊息標示,係指引施作任務,依據整體工程任務需要加以客製化組合包裝即完成自動導引工程施作用料之製作。The invention relates to a method for manufacturing an automatic guiding engineering application material, which is according to a combination of engineering materials and materials, and is customized and combined according to requirements, and is guided by each component according to the requirements of the application, so that the component has The automatic guidance function is used to mark the message, which is the guide task, and the customized engineering package is completed according to the needs of the overall engineering task. 如申請專利範圍第1項所述之自動導引工程作業用料之製作方法,其中將自動導引工程施作用料組合包裝後之用料,進一步在施作用料包裝表面上增加結合工程作業管控需求之導引管理功能標示,使該組件具有自動導引工程作業管理功能標示之資訊標示,即完成自動導引工程作業用料之製作。For example, in the method for manufacturing the automatic guiding engineering work material described in the first aspect of the patent application, the material for the automatic guiding engineering application material package is further combined with the engineering operation control on the surface of the application material packaging. The guiding management function of the demand is marked so that the component has the information indication of the automatic guiding engineering operation management function labeling, that is, the production of the automatic guiding engineering operation material is completed. 如申請專利範圍第1項所述之自動導引工程施作用料之製作方法,其中該導引施作功能標示,係為文字、圖形表示或兩者並用之,其內容係為材料組合順序、方向指引、用料指引、施作用途、作業代碼、測驗基準點、基準線、測量數據、組件相連記號、相互連接位置、施作路徑、功能用途、組件連接代號及腳位,其內容係作為指引工程施作之工具,其標示內容係為單一項目或多重項目標示,標示方式係為單一位置或多重位置,依作業需求配合作業。The method for manufacturing an automatic guiding engineering application material according to claim 1, wherein the guidance function is a text, a graphic representation or a combination of the two, the content of which is a material combination order, Direction guidance, material guidance, application purpose, operation code, test reference point, reference line, measurement data, component connection mark, interconnection position, application path, function use, component connection code and pin position, the content is The tool for guiding the project is marked with a single item or multiple items. The labeling method is a single location or multiple locations, and the operation is coordinated according to the operation requirements. 如申請專利範圍第2項所述之自動導引工程作用料之製作方法,其中該導引工程作業管理功能標示,其內容係為工程名稱、施作項目、施作組別、施作地點、施作日期、配送日期、出貨序號、用料內容、包裝組合資訊、或用料用途,其內容係作為導引工程作業之工具,其標示內容係為單一項目或多重項目標示,依作業需求配合作業。For example, the method for manufacturing an automatic guiding engineering action material according to item 2 of the patent application scope, wherein the guiding engineering operation management function is marked, the content of which is the project name, the application project, the application group, the implementation site, The date of application, the date of delivery, the serial number of the shipment, the content of the material used, the information of the package combination, or the purpose of the material used, the content of which is used as a tool for guiding engineering operations, and the label content is a single item or multiple item label, depending on the operation requirements. Cooperate with the work. 一種具有自動導引工程施作及自動導引工程作業用料製作方法,其中該方法之施作步驟為:取得工程之工程作業之自動導引備料資訊;進行用料分配;取料;對位標示;對位裁切;組合用料;包裝;標示管理功能標示;以及備料完成。The utility model relates to a method for manufacturing an automatic guiding engineering application and an automatic guiding engineering working material, wherein the method of the method is: obtaining automatic guiding and preparing material information of the engineering operation of the engineering; performing material distribution; reclaiming; Marking; alignment cutting; combination of materials; packaging; marking management function marking; and preparation of materials. 如申請專利範圍第5項所述之具有自動導引工程施作及自動導引工程作業用料製作方法,其中該對位標示及對位裁切之程序,亦能互換先後順序,依備料施作方便取決,而市售標準品備料不需進行裁切,則免除該備料程序。For example, in the method of the fifth aspect of the patent application, there is an automatic guiding engineering application and an automatic guiding engineering working material manufacturing method, wherein the alignment labeling and the alignment cutting procedure can also be exchanged in sequence, according to the preparation method. For convenience, and the preparation of commercially available standard materials does not need to be cut, the preparation procedure is exempted. 如申請專利範圍第1項所述之自動導引工程施作用料之製作方法,其中該工程用料,係涉及範圍廣且多,該工程施作用料係以依材料性質不同、或加工工藝內容不同進行分類分項執行用料之準備,在其準備完成後再加以整合包裝,該準備單位係由單一執行組合,亦由多重單位分項組合,形成完整自動導引工程施作用料之準備。The method for manufacturing an automatic guiding engineering application material according to the first aspect of the patent application, wherein the engineering material relates to a wide range and a plurality of materials, and the engineering application materials are different according to material properties or processing materials. Different preparations for the classification and execution of the materials are prepared and integrated after the preparation is completed. The preparation units are composed of a single execution combination and are also combined by multiple units to form a complete automatic guidance project. 如申請專利範圍第7項所述之自動導引工程施作用料之製作方法,該工程用料準備數係由單一或多數準備,用料準備量係由單量或多量準備,以符合工程施作需求為目標。For the production method of the automatic guiding engineering application material described in the seventh paragraph of the patent application, the preparation amount of the engineering materials is prepared by a single or a large number, and the material preparation amount is prepared by a single amount or a large amount to conform to the engineering application. Demand is the goal.
TW101114065A 2012-04-20 2012-04-20 Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide TW201344384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW101114065A TW201344384A (en) 2012-04-20 2012-04-20 Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW101114065A TW201344384A (en) 2012-04-20 2012-04-20 Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide

Publications (2)

Publication Number Publication Date
TW201344384A true TW201344384A (en) 2013-11-01
TWI465870B TWI465870B (en) 2014-12-21

Family

ID=49990200

Family Applications (1)

Application Number Title Priority Date Filing Date
TW101114065A TW201344384A (en) 2012-04-20 2012-04-20 Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide

Country Status (1)

Country Link
TW (1) TW201344384A (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030083890A1 (en) * 2001-11-01 2003-05-01 Duncan Gregory Scott Automated pack out
WO2004097728A1 (en) * 2003-04-25 2004-11-11 Sharp Kabushiki Kaisha Tag, and method and system using the same
US7440932B2 (en) * 2003-10-02 2008-10-21 International Business Machines Corporation Method and system for automating issue resolution in manufacturing execution and material control systems
EP2465483B8 (en) * 2005-05-16 2016-09-14 ARxIUM Inc. Automated pharmacy admixture system (APAS)
TW201207764A (en) * 2010-08-10 2012-02-16 Dingey Information Comp Co Ltd Material truncation and selection and calculation system

Also Published As

Publication number Publication date
TWI465870B (en) 2014-12-21

Similar Documents

Publication Publication Date Title
CN206169769U (en) Digit control machine tool with automated inspection function
CN105518725A (en) Production system simulation device, production system simulation method, and production system simulation program
Ajmera et al. Lean six sigma implementation in textile industry
CN107067138A (en) Power Material recruits the electronic accessory system of the assessment of bids
CN102486854A (en) Supplier management model system
TW201344384A (en) Manufacturing methods of material with automatic construction guide, and material with automatic construction operation guide
Megawati et al. Reducing defect in furniture industry using a lean six sigma approach
Banduka et al. Designing a layout using Schmigalla method combined with software tool vistable
CN103455866B (en) The manufacture method that homing guidance engineering applies materials and homing guidance engineer operation materials
Fässberg et al. An empirical study towards a definition of production complexity
CN104318369A (en) Small and special stepping motor production information management system
CN102968679A (en) Automatic guiding method and system of engineer operation
CN102999871B (en) Utilize the clean method applying of guiding information and the Model Establishment engineering of getting the raw materials ready
CN206519509U (en) A kind of wiring board secure ram error-proof structure
Chen The Application of 6S Management in A Company-Taking A Company as an Example
Yang et al. Production line balance optimization design of S company
Gao et al. Research on Improving Assembly Line Banlancing of Household Refrigerator
CN103679338A (en) Ship outfitting intermediate product standardization timeliness assessment method
TW201232431A (en) Method for establishing construction cleaning execution with guidance information and material preparation mode
CN203534744U (en) Light sensation type code spraying device
CN204974910U (en) Punching and shearing machine
CN205731749U (en) A kind of spray test platform
JP3220411U (en) Plant piping production system
Pastukhova et al. Regulation of process «Сontrol of monitoring and measuring devices»
TW201308233A (en) Automatically-guided engineering operation cloud service and electronic business system for part supply thereof