TW201214309A - Parts reservation supply system and the method of pre-reserving parts - Google Patents

Parts reservation supply system and the method of pre-reserving parts Download PDF

Info

Publication number
TW201214309A
TW201214309A TW99131631A TW99131631A TW201214309A TW 201214309 A TW201214309 A TW 201214309A TW 99131631 A TW99131631 A TW 99131631A TW 99131631 A TW99131631 A TW 99131631A TW 201214309 A TW201214309 A TW 201214309A
Authority
TW
Taiwan
Prior art keywords
parts
product
products
control center
failure rate
Prior art date
Application number
TW99131631A
Other languages
Chinese (zh)
Inventor
Xi-Ping You
da-yu Chen
Original Assignee
Runservice Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Runservice Pte Ltd filed Critical Runservice Pte Ltd
Priority to TW99131631A priority Critical patent/TW201214309A/en
Publication of TW201214309A publication Critical patent/TW201214309A/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a parts reservation supply system and the method of pre-reserving parts. The system includes a plurality of product manufacturers, a plurality of product suppliers, a plurality of regional parts administrators, a plurality of maintenance service providers and a control center, in which the product suppliers submit the demands to the product manufacturers; the product manufacturers manufacture products and provide parts according to the demands; and the maintenance service providers provide product maintenance services. In this method, an estimation is obtained by the control center and an order is placed with the product manufacturers based on the predetermined failure rate of respective parts versus the overall demands according to the parts table and predetermined product shipment amount provided by the product suppliers; parts shipped by the product manufacturers are then transmitted to the respective regional parts administrators who will reserve and manage the parts, so as to supply parts as required to corresponding maintenance service providers.

Description

201214309 六、發明說明: 【發明所屬之技術領域】 /本發明係關於—種供應系統,尤指—種零件储備供應 系統以及預先儲備零件之方法。 【先前技術】 現今例如個人電腦等之加工製造產。口。中,肖大量使用 生產的零件,且其中大半係由原廠商委託加工 ^商…目此,當產品因為故障或損壞而送修時,目 H維修方法多半為找出產品中的損壞零件,並以新零件 、之’而若產品非由原廠所製造,其維修流程更可 2ί;:的原廠商加工製造商、以及零件製造商而更加 —當進行產品的維修時,若缺乏維修所需的零件 ;;=Γ修時間增長或是維修成本增加等問題,因此 對,廠商來說’健備足夠數量的各式零件以供 :: 必要的’但若儲備了過多或是沒有需求的零件,則為 種成本浪費,因此零件儲備量的預測相當重要 由於目前的加工製造產品,在製造、銷 -疋 並不-定由同-廠商執行,例如產品出二“呈序上 之相關資訊流通…因此更無法對維::二:件貢料等 備量進行預測。 > 氣令件之應儲 發明人爰因於此’本於積極創作之精 以解決上述問題且有效整合相〜-種可 R以預估零件應儲 201214309 備量之「零件儲備供應系統及預先儲備零件之方法」’幾 經研九貫驗終至完成此項嘉惠世人之發明。 【發明内容】 雲於上述習知的零件供應方法尚有改進空間,本發明 之目的係針對現行的產品維修服務鏈,提供_種零件儲備 供應系統以及預先储備零件之方法,俾能有效整^售後服 務資料以預估各零件之應儲備數量,進而訂構並儲備零件 以供維修使用。 v 依據本發明之一特色’本發明係提出一種零件儲備供 應系統,其係用以整合售後資訊以預先儲備複數種零件以 供維修使用,該系統包括:複數個產品製造者係依需求 製造產。口口,並分別提供其所製造之產品之各以牛;複數個 產品供應者,係各別向該等產品製造者提出需求以由其製 造所需之產品;複數個分區零件管理者,係用以儲備/、'管 理、以及發送複數種零件;複數個維修服務提供者,係^ 供有產品之維修服務,其分別具有相對應之一分區零件管 理者,並自其所對應之分區零件管理者取得維修所需之各 零件·’以及一管控令心,係對複數種零件分別設定相對應 之一預設故障率,以複數種零件所分別對應之預設故障率 對該等維修服務提供者維修所需之複數種零件所分別對應 之一需求總數進行預估,然後向該等產品製造者訂購,^ 將所訂購之複數種零件分別發送至該等分區零件管理者以 由其储備及官理;其中,該等產品供應者係將一出貨查。 201214309 零件資料表以及一預定出貨量發送至管控 之 τ % 其預估複數種零件所分別對應之需求總數 依據本發明之另一特色,本發明係提出—種於零件儲 備供應系統進行售後服務資訊之整合以預先儲備複數種零 牛之方法3亥糸統包括複數個產品製造者、複數個產品供 應者、複數個分區零件管理者、複數個維修服務提供者 管控中心,纟中該等產品供應者係各別向該等產品 1k者提出而求’該等產品製造者係依需求製造產品, 分別提供其所製造之產品之各零件,該等分區零件管理者 ^以則f、_及發送複數種轉,料料服務提供者 產^之維修服務,其分別具有相對應之—分區零件 數二Γ中心係龍數種零件所分別對應之-需求總 丁-,並向该等產品製造者訂購,該方法包括 對複數種零件分別設定相對應之-預設 ,()5亥寻產品供應者係將-出貨產品之一灾件資 表以及一預定出貨量發送至管控 7 '枓 產品之零件資料表及料出p 巾心依出貨 應之預以複數種零件所分別對 予“故㈣預估複數種零件 數’然後向該等產品製造者進行訂 二:二求總 係將所㈣之複數料件 I產。4造者 送至該等分區零件管理者;以及由其分別發 理其所儲備之複數種零件。)4刀區零件管理者管 【實施方式】 201214309 為能讓讀者更瞭解本發明之技術内容,特舉較佳實施 例說明如下’請先參照圖丨’圖丨係本發明一較佳實施例: 零件儲備供應系統之示意圖。如圖丨所示,本發明之零件儲 備供應系·統包括一管控中心1、複數個分區零件管理者2、 钹數個維修服務提供者3、複數個產品製造者4、以及複數 個產品供應者5 ’其中各維修服務提供者3係具有相對應的 一分區零件管理者2。 前述管控令心丨係對各種零件分別設定其所對應的一 ,設故障率’並依據出貨產品的零件資料表與預定出貨 量、以及各零件之庫存數目,以各零件的預設故障率對其 之需求總數進行預估然後向產品製造者4訂購,以及將零;牛 分別發送至分區零件管理者2以由其進行儲備;管控中心1 更提供-網站系統’以供各產品製造者4、各產品供應者5、 以及各分區零件管理者2經由網際網路連接,以發^、接 收、以及查詢各種零件的儲備的相關資訊。分區零件管理 者2係儲備 '管理及發送各種零件,其中各種零㈣分別呈 有相對應的-庫存數目’分區零件管理者2並定期將各種零 件的庫存數目提供至管控中心1。 前述維修服務提供者3提供有產品的維修服務,並係 自相對應的分區零件管理者2取得維修所需的各零件。前述 產品製造者4係為-原始設備製造商(㈤ginal Equipm⑽201214309 VI. Description of the invention: [Technical field to which the invention pertains] / The present invention relates to a supply system, in particular, a spare parts supply system and a method of pre-stocking parts. [Prior Art] Nowadays, for example, processing and manufacturing of personal computers and the like. mouth. In the middle, Xiao uses a large number of parts produced, and most of them are commissioned by the original manufacturer... In this case, when the product is repaired due to malfunction or damage, most of the repair methods are to find the damaged parts in the product, and With the new parts, and if the products are not manufactured by the original manufacturer, the maintenance process can be more effective: the original manufacturer and the manufacturer of the parts, and more, when the product is repaired, if there is a lack of maintenance Parts;;=the time of repair time or the increase of maintenance costs, so the manufacturer, 'healthy enough number of various parts for:: necessary' but if the reserves are too much or there is no demand for parts , is a waste of cost, so the forecast of parts reserves is very important. Because the current processing and manufacturing products, manufacturing, sales, and sales are not determined by the same manufacturer, for example, the product is in the second order. ...so it is even more difficult to predict the dimensions of the dimension::2: tribute and materials. > The inventor of the gas-sending component should be able to solve the above problems and effectively integrate R ~- species can be estimated to be part of the amount of backup storage 201214309 "reserve supply system components and pre-positioned parts of the method" 'by a few experimental research nine penetration end to complete this invention Jia Huishi person. SUMMARY OF THE INVENTION There is still room for improvement in the above-described conventional parts supply method. The object of the present invention is to provide a method for stock supply and supply of parts, and a method for preserving parts in advance for the current product repair service chain. ^ After-sales service data to estimate the amount of reserves for each part, and then to build and reserve parts for maintenance. v In accordance with one feature of the present invention, the present invention provides a parts stock supply system for integrating after-sales information to pre-stock a plurality of parts for maintenance, the system comprising: a plurality of product manufacturers are manufactured according to requirements Production. Ports, and each of the products manufactured by the company; each of the product suppliers, each of which presents the demand to the manufacturer of the product to manufacture the required products; a plurality of partitioned parts managers, Used to reserve/, 'manage, and send a plurality of parts; a plurality of service providers, which are provided with product repair services, each of which has a corresponding one-part part manager, and the corresponding partition parts The manager obtains the parts required for maintenance, and the control of the control unit. The preset failure rate is set for each of the plurality of parts, and the repair service is provided for the preset failure rate corresponding to the plurality of parts. The total number of parts required for the repair of the supplier is estimated, and then ordered from the manufacturer of the product. ^ The plurality of parts ordered are sent to the partitioned parts manager for storage. Preparation and administration; among them, the suppliers of these products will be checked for shipment. 201214309 Parts data sheet and a scheduled shipment sent to the control τ % The estimated total number of parts corresponding to the respective parts according to another feature of the present invention, the present invention is proposed to be sold in the parts reserve supply system The integration of service information to pre-reserve multiple types of zero cattle 3 糸 system includes a number of product manufacturers, a number of product suppliers, a number of partition parts managers, a number of maintenance service provider control centers, such as The product suppliers individually propose to these 1k products that 'the manufacturers of these products manufacture products according to their needs, and provide the parts of the products they manufacture, respectively, and the divisional parts managers ^f, _ And sending a plurality of kinds of transfer, the material service provider's maintenance service, which has correspondingly - the number of partition parts, the number of parts of the center, the number of parts corresponding to each - the total demand - and to these products The manufacturer orders, the method includes setting corresponding to each of the plurality of parts--preset, (5) the product supplier of the product is the one of the products to be shipped A predetermined shipment is sent to the parts and components of the control 7 '枓 product and the output of the material is based on the pre-existing number of parts, and the number of parts is estimated to be “four (4) The manufacturer of the product shall make a second order: the second is to produce the plurality of parts I of the (4). The 4 producers are sent to the divisional parts managers; and the plurality of parts they reserve are separately processed.) 4 knives [Detailed Description of the Invention] [0012] In order to provide the reader with a better understanding of the technical contents of the present invention, the preferred embodiment will be described as follows: Please refer to the drawings first. FIG. 1 is a preferred embodiment of the present invention: Schematic diagram of the supply system. As shown in FIG. ,, the parts reserve supply system of the present invention includes a control center 1, a plurality of partition parts managers 2, a plurality of service providers 3, and a plurality of product manufacturers. And a plurality of product suppliers 5' each of the service provider 3 series has a corresponding one-part parts manager 2. The above-mentioned control order system sets the corresponding one for each part, and sets the failure rate' According to the parts data sheet of the shipped product and the scheduled shipment quantity, and the inventory quantity of each part, the total demand of each part is estimated according to the preset failure rate and then ordered to the product manufacturer 4, and will be zero; They are sent to the partition part manager 2 for storage; the control center 1 provides a - website system for each product manufacturer 4, each product supplier 5, and each partition part manager 2 to connect via the Internet. To send, receive, and query information about the reserves of various parts. Partitioned parts manager 2 is the reserve 'management and transmission of various parts, of which various zero (four) respectively have corresponding - inventory number 'partition parts manager 2 and The stock quantity of various parts is periodically supplied to the control center 1. The aforementioned service provider 3 provides repair service for the product, and obtains the parts required for maintenance from the corresponding partition part manager 2. The aforementioned product manufacturer 4 is - original equipment manufacturer ((5) ginal Equipm (10)

Manufacturer’ OEM)’其係依據需求製造產品並提供有 其所製造的產品的各種零件,且產品製造者4更提供各種零 件的歷史故障率至管控中心丨’以供管控中心丨設定為各種 201214309 零件的預設故障率。前述產品供應者5係為一原始設計製造 商(〇丨·丨gmal Design Manufacturer ’ 0DM),其係分別向產品 製造者4提出需求以由其製造所需的產品。 管控中心1可依據產品製造者4所提供的各種零件的 歷史故障率或實際故障率來設定其之預設故障率,其中各 種料的實⑨故障率係由維修服務提供者3透㉟各分區零 件管理者2將各零件之實際故障資訊定期傳送至管控中心1 以由其進行計异而得,各種零件的實際故障率可為其之年 度故障率,gp,各零件的年度更換總數除以其之年度銷售 總數,然後管控中心1依據產品供應者5所提供的出貨產: 的零件資料表與預^出貨量、以及分區零件管理者2所料 的各零件之庫存數目,以各種零件的預設故障率對其之需 求總數進行預估。舉例來說,管控t心1所預估的某一零: 的需求總數可為: N X rij X fj X t — Ij — p., 其中’ N為^貨產品的預定出貨量;nj為出貨產品中該零件 的使用數里例如若出貨產品為一筆記型電腦其中使用2 個相同型號的硬碟,則該硬碟的使用數量為2; fi為該零件 的=設故料;1為—時間參數;0各分區零件管理者2 目前已儲備的該零件的數量總和;Pj係管控t心1已訂購但 尚未取得的該零件的數量總和。 。月同%參照圖2及圖3 ’圖2係本發明一較佳實施例之預 先儲備令件之方法之流程圖,圖3係對應於圖2之方法流程 的運作況心之成裎。如圖2及圖3所示,以本發明於零件储 201214309 備供應系統進行售後資訊整合以預先儲備複數種零件之方 法’ i先’各產品製造者4分別提供各種零件的歷史故障率 至管控中心卜管控中心丨並將各種零件的職故障率設定 為其之歷史故障率(步驟S|);產品供應者5將出貨產品的零 件資料表以及預定出貨量傳送至管控令心}(步驟s2);各分 區零件管理者2將各種零件的庫存數目提 】(步驟S3)。 ^曰著’管控中心!依據出貨產品的零件資料表以及預 疋 以及各種零件於各分區零件管理者2處之庫存數 各種零件所設定的預設故障率對其之需求總數 進=古’然後向各產品製造者4提出零件訂購需求(步驟 :產品製造者4將所訂購的零件運送至管控中心1(步 :二管控:心丨將零件分別發送至各分區零件管理者2, :::件官理者2進行零件之儲備以及管理維修服務提 驟二唯Γ應,分區零件管理者2處取得所需之零件(步 '一、i服務提供者3透過各分區零件管理者2將各零件 敁障資訊定期傳送至管控中心丨,以供其 際故障率(步驟S7);管控中…係將各種零: 供庫^早”'為其之實際故障率(步驟S8);而當產品 出貨商品的零件資料表以及預定出貨量 時(返回步驟S2),管控中心1即以各種零件的 :::::作為預設故障率對各種零件的應儲備數量進行 201214309Manufacturer's OEM's manufactures products according to demand and provides various parts of the products they manufacture, and the product manufacturer 4 provides the historical failure rate of various parts to the control center 丨' for the control center 丨 set to various 201214309 The preset failure rate of the part. The aforementioned product supplier 5 is an original design manufacturer (〇丨 丨gmal Design Manufacturer ’ 0DM) which separately requests the product manufacturer 4 to manufacture the desired product therefrom. The control center 1 can set its preset failure rate according to the historical failure rate or the actual failure rate of various parts provided by the product manufacturer 4, wherein the real 9 failure rate of various materials is provided by the service provider 3 through 35 divisions. The part manager 2 periodically transmits the actual fault information of each part to the control center 1 to calculate it. The actual failure rate of each part can be its annual failure rate, gp, the total number of annual replacements of each part divided by The total number of annual sales, and then the control center 1 based on the product information provided by the product supplier 5: the parts data sheet and the pre-shipment amount, and the number of parts of the parts that the divisional parts manager 2 is expected to The preset failure rate of the part is estimated for its total demand. For example, the total number of demand for a certain zero: estimated by t-heart 1 can be: NX rij X fj X t — Ij — p., where 'N is the scheduled shipment of the product; nj is the In the number of uses of the part in the product, for example, if the product to be shipped is a notebook computer in which two hard disks of the same type are used, the number of the hard disk used is 2; fi is the defective material of the part; The time-parameter parameter; 0 the total number of parts that have been reserved by each part manager 2; Pj is the sum of the number of parts that have been ordered but not yet acquired. . Referring to Figures 2 and 3, Figure 2 is a flow diagram of a method of pre-storing a command in accordance with a preferred embodiment of the present invention, and Figure 3 is a representation of the operational conditions of the method flow of Figure 2. As shown in FIG. 2 and FIG. 3, the method for integrating the after-sales information in the parts storage 201214309 supply system to pre-store a plurality of parts is provided by the manufacturer of each product 4 to provide the historical failure rate of various parts to The control center and the control center set the failure rate of each part to its historical failure rate (step S|); the product supplier 5 transmits the parts data sheet of the shipped product and the scheduled shipment to the control order} (Step s2); each partition part manager 2 mentions the stock quantity of each part (step S3). ^曰's control center! According to the parts data sheet of the shipped product and the pre-existing and the number of stocks of each part in each partition part manager 2, the preset failure rate set by various parts is the total number of demand, and then to each product manufacturer 4 Propose part ordering requirements (step: Product manufacturer 4 will ship the ordered parts to the control center 1 (step: two control: the heart will send the parts to each partition part manager 2, ::: the official 2 Part of the reserve and management and repair service step 2, only the partition parts manager 2 to obtain the required parts (step '1, i service provider 3 through the partition parts manager 2 to send each part of the obstacle information regularly To the control center 丨, for the failure rate (step S7); in the control ... will be a variety of zero: supply library ^ early "' for its actual failure rate (step S8); and when the product shipped parts of the product information For the table and the scheduled shipment (return to step S2), the control center 1 uses the various parts of ::::: as the preset failure rate for the number of spare parts of various parts 201214309

由上述之說明可知’本發明之零件儲備供應系統係以 管控中心1統整各產品供應者5所提供之出貨產品及其使用 零件之相關資訊、以及各產品製造者4所提供之各種零件之 故障率之相關資訊,由於定期對各種零件的實際故障率進 行匯整’因此本發明更可預估各種零件在維修更換上可能 的使用數量,而能精確估計其之應庫存量,因此本發明能 有效達成儲備適當數量零件之功效,而可有效減少維修所 需時間’同時避免赌備多餘零件及增加成本。 上述實施例僅係為了方便說明而舉例而已,本發明所 主張之權利範圍自應以中請專利範_述為準,而非僅限 於上述實施例。 圖式簡單說明] 圖I係本發明一較佳奮姑彳5|丨々+ 又住Μ虼例之零件儲備供應系 圖。 車乂佳贯絲.你丨夕φ从Μ . 統之示意 圖 =2係本發明-較佳實施例之預域備零件之方法之流程 佳實施例之料㈣供⑽統之運作訊 【主要元件符號說明 1管控中心 3維修服務提供者 5產品供應者 2分區零件管理者 4產品製造者 S1-S8步驟 9As can be seen from the above description, the parts reserve supply system of the present invention integrates the products of the products and the parts used by the product suppliers 5 with the control center 1 and the various parts provided by the product manufacturers 4 The information about the failure rate is due to the regular collection of the actual failure rate of various parts. Therefore, the present invention can estimate the number of possible use of various parts in repair and replacement, and can accurately estimate the amount of inventory, so this The invention can effectively achieve the effect of stocking the appropriate number of parts, and can effectively reduce the time required for maintenance, while avoiding gambling spare parts and increasing costs. The above-described embodiments are merely examples for the convenience of the description, and the scope of the claims of the present invention is based on the scope of the patent application, and is not limited to the above embodiments. BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a diagram showing a part supply and supply system of a preferred example of the present invention.乂 乂 贯 . . 丨 φ φ φ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 示意图 示意图 示意图 示意图 示意图 示意图DESCRIPTION OF SYMBOLS 1 Control Center 3 Maintenance Service Provider 5 Product Provider 2 Partition Part Manager 4 Product Maker S1-S8 Step 9

Claims (1)

201214309 七、申請專利範圍: 丨-種零件儲備供應系統’其係用以整合售後服務資 訊以預先儲備複數種零件以供維修使用,該系統包括、 複數個產品製造者,係依需 1 其所製造之產品之各零件’·求錢產品,並分別提供 複數個產品供應者’係各別向該等產品製造者提出需 求以由其製造所需之產品; 南 …複數個分區零件管理者,係用以儲備、管理、以及發 送这複數種零件; 、複數個維修服務提供者,係、提供有產品之維修服務, 其分別具有相對應之—分區零件管理者並自其所對應之 該分區零件管理者取得維修所需之各零件;以及 一管控中心’係、對該複數種零件分別設定相對應之— 預設故障率’以該複數種零件所分別對應之該預設故障率 對該等維修服務提供者維修所需之該複數種零件所分別對 應之—需求總數進行預估,然後向該等產品製造者訂購, 並將所訂構之該複數種零件分別發送至該等分區零件管理 者以由其儲備及管理; 其中,該等產品供應者係將一出貨產品之一零件資料 =及-預定出貨量發送至該管控中心,以供其預估該複 數種令件所分別對應之該需求總數。 2.如申請專利範圍第〗項所述之系統’其中該等產品 製造者更提供該複數個零件所分別對應之—歷史故”2 201214309 :管控中…供其設定為該複 預設故障率。 丨刀引對應之該 3·如申請專利範㈣丨項㈣之純, 服務提供者透過其所 ,、中4寻維修 之實際故障資訊定至==零件管理者將各零件 计异出额數種零件之—實際故障率。 工中 4. 如巾請專利範㈣3項所述之系統 零件所分別對庳之#容败&amp; a ,、甲。哀複數種 产故障ι . μ貝不故降率係為其所分別對應之一年 度故μ ’料度故㈣料 : 銷售總數。 干又文供〜數除以一年度 5. 如中請專利範圍第1所述之系統, =者,備之該複數種零件係分別具有相對 對:之該庫::分ΐ零件管理者係定期將該複數種零件所 愛:所::別f::目提供至該管控中心,以供其對該複數種 “牛所刀別對應之該需求總數進行預估。 6·如申請專利範圍第5項所述之系統其中該 心所預估之該複數種突土 控令 々中所/刀別對應之該需求總數係為: 卜1厂ρ】 N 一一 -中N為,亥出貨產品之該預定出貨量,。為 化 =:;!種零件各別的使用數量,⑽數 管理者故F早率,t為-時間參數’ I』為該等分區零件 ::者目則已储備之該複數種 控中心已訂購但岛去你,a 双里〜才IV系。亥官 一尚未取诗之該複數種零件的數量總和。 201214309 7. 如申請專利範圍第,項所述之系統,其中該管巧中 心係提供-網站Μ,以供該等產品製造者 '該等產品供 應者以及該等分區零件管理者經由網際網路連接以發送、 接收'以及查詢該複數種零件之儲備之相關資訊。 8. -種於零件賤供㈣統進行售後服務資訊之整 ^預先儲備複數種零件之方法,該系統包括複數個產品 “者、稷數個產品供應者、複數個分區零件管理 數個維修服務提供者、以及—管控中心,纟中該等產Μ 〜者係各別向該等產品製造者提出需|,該等產品製造者 :依需求製造產品’並分別提供其所製造之產品之各零 =該等分區零㈣理者用以儲備、管理及發送該複數種 ㈣修服務提供者提供有產品之維㈣務其分 數猶&lt; t對應之一分區零件管理者,該管控中心係對該複 ==別對應之—需求總數進行預估並向該等產 口口衣&amp;者叮購,該方法包括下列步驟: ⑷該⑼H料數種零件分別較相對應之 —預設故障率; (B)該等產品供I者㈣—㈣產品之—零件資料 表以及一預定出貨量發送至該管控中心; 預定(出Lί 依$出貨產品之該零件資料表及該 箱社以,㈣複數種零件所分別對應之該預設故障率 種零件所分別對應之-需求總數,然後向該等 產U〇製造者進行訂購; 201214309 )。亥等產品製造者係將所 送至該管# φ』啤之6亥歿數種零件運 s k中心’以由其分別發 者;以及 ^主δ亥寺分區零件管理 (Ε)該等分區零件管理者管理1 。 ’、所儲備之該複數種 』9.如申請專利範圍第8項所述之方法, 零件 其中步驟(Α) 更包括下列步驟: 之-歷史故障供::數個零件所分別對應 (Α2) δ亥官控中心將該複數種零件所八 設故=率設定為其所分別對應之該歷史故;:對應之該預 驟:·如申請專利範_8項所述之方法,更包括下列步 件管服務提供者透過其所對應之該等分^ 心者將各零件之實際故障資訊定期傳送二= ⑹該管控中心計算出該 率;以及 ,之—霄際故障 ⑻該管控十心將該複數種零 設故障率設定為其所分別對應 對應之該預 步驟(Β)。 際故障率,然後返回 丨1 ·如申請專利範圍第丨0項所述 種零件所分別對應之該實際故障率係為其所分=數 13 201214309 又ί5早率β年度故障率係為一年度更 度銷售總數。 双丨承μ〜年 12·如㈣專利範目第8項所述之方法, 零件=輕記錄有其㈣備之該複數《件所;:=區 之庫存數目,且步驟(c)更包括下列步驟: 、應 ⑹)該等分區零件管理者將該複數種零件所 應之5玄庫存數目提供至該管控中心;以及 71對 (C2)該管控中心依該出貨產品之該 預定出貨量:以及該等分區零件管理者所儲備2 = =件所分㈣應之該庫存數目,㈣複數種零 應之該預設故障率預估該複數種零件所分別對應之二= 總數,然後向該等產品製造者進行訂購。 布; 中、、請專利範圍第12項所述之方法,其中該管控 ^所預估之該複數種零件所分別對應之該需求總數係 t—Ij-Pj Ν X η: 其中,N為該出貨產品之該預定 叫貝里 η』马s玄出貨洚?中 該複數種零件各別的使用數量、。 里1丨為。玄报數種零件各別的 故P早率,t為一時間參數,丨為該 ^ ^ ^ 寺刀E零件官理者目前已 儲備之遠複數種零件的數量總和,Pj係該管控中心已訂賭 但尚未取得之該複數種零件的數量總和。 八、圖式(請見下頁): 14201214309 VII. Patent application scope: The 丨-type parts reserve supply system 'is used to integrate after-sales service information to pre-store a plurality of parts for maintenance. The system includes, and a plurality of product manufacturers, Each part of the manufactured product '· ask for money, and provide a plurality of product suppliers separately' to each of the product manufacturers to demand the products to be manufactured by them; south ... multiple partition parts manager Used to reserve, manage, and deliver the plurality of parts; a plurality of service providers, and provide product repair services, respectively, having corresponding ones - the partition part manager and corresponding thereto The partition part manager obtains each part required for maintenance; and a control center 'sets the corresponding parts of the plurality of parts respectively - a preset failure rate' corresponding to the preset failure rate pair of the plurality of parts respectively The total number of parts required for the repair of the plurality of parts required by the repair service provider is estimated, and then the products are The product manufacturer orders and copies the plurality of parts to be distributed to the divisional parts manager for storage and management; wherein the product suppliers are one of the parts of the product to be shipped = And - the scheduled shipment is sent to the control center for estimating the total number of the demand corresponding to the plurality of orders. 2. The system as described in the application scope of the patent scope, wherein the manufacturer of the products further provides the plurality of parts corresponding to each other - the history is 2 201214309: in the control ... for setting the reset failure rate丨 引 对应 对应 对应 对应 如 如 如 如 如 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请 申请The actual failure rate of several kinds of parts. In the middle of the work 4. If the system part of the patent part (4) 3, the system parts are opposite to the faulty &amp; a, A. The number of production faults ι . Therefore, the rate of decline is one of the corresponding annuals, so the 'quantity' (four) material: the total number of sales. The dry and the text supply ~ number divided by the year 5. As in the patent scope, the system described in the first, = The plurality of parts are respectively provided with a relative pair: the library: the branching part manager regularly loves the plurality of parts: the:::f:: the item is provided to the control center for its Estimate the total number of such demand for the multiple species6. The system of claim 5, wherein the total number of demand for the plurality of types of soil control orders is determined by the heart: 卜1厂ρ】N 一一- Medium N is the scheduled shipment volume of the products shipped by Hai. For the number of parts used for the ==;!!, (10) the number of managers, F, the early rate, t is the - time parameter 'I' for the partitioned parts:: the multiple control centers that have been reserved Has been ordered but the island goes to you, a double-lily ~ only IV. Haiguan The sum of the number of parts of the plural that have not yet been taken. 201214309 7. The system of claim 1, wherein the system provides a website for the product manufacturer to provide the product suppliers and the partition component managers via the Internet. Connect to send, receive 'and query the information about the reserve of the multiple parts. 8. - Method of planting parts (4) to carry out after-sales service information ^ Pre-reserving a plurality of parts, the system includes a plurality of products "man, several product suppliers, multiple partition parts management several repairs The service providers, as well as the control centres, and the producers of the products, are individually required to make the products to the manufacturers of such products, and the manufacturers of such products: manufacture the products on demand and provide the products they manufacture separately. Each zero = the partition zero (four) is used to reserve, manage and send the plural (4) repair service provider provides the product dimension (four) the score is still < t corresponding to a partition part manager, the control center The total number of demand corresponding to the complex == is estimated and purchased from the mouthpieces &amp; the method includes the following steps: (4) The parts of the (9) H material are correspondingly corresponding to each other - a preset fault (B) These products are for I (4) - (4) product - parts data sheet and a scheduled shipment to the control center; scheduled (out Lί 依 出货 出货 出货 出货 出货 出货 出货 该 该 该(4) a plurality of parts Corresponding to the total number of demand corresponding to the preset failure rate type parts, and then ordering to the manufacturer of the U〇 manufacturer; 201214309). The manufacturer of the product such as Hai will send it to the tube #φ』啤酒6 殁 殁 殁 零件 零件 运 中心 运 ' 运 ' ' ' ' ' ' 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 以及 寺 以及 寺 寺 寺 寺The method described in claim 8 of the patent scope, the step (Α) of the part further includes the following steps: - historical fault supply:: several parts correspond to each other (Α2) δHai official control center of the plurality of parts The setting of the rate = the corresponding history of the corresponding reason;: corresponding to the pre-expiration: · The method described in the patent application _8, further including the following step-by-step service provider through the corresponding The quintile of the heart will periodically transmit the actual fault information of each part. (6) The control center calculates the rate; and, the 霄 故障 ( (8) The control ten hearts set the multiple zero failure rates to their respective Corresponding to the corresponding pre-step (Β). The failure rate, then return 丨1 · The actual failure rate corresponding to the parts described in item 丨0 of the patent application scope is the number of points = 13 201214309 and ί5 early rate β annual failure rate It is the total number of sales in a year. Double 丨μμ~年12· (4) The method described in item 8 of the patent model, parts = light record has its (4) prepared for the plural "parts;: = area inventory The number, and the step (c) further comprises the following steps: (6)) the partitioning part manager provides the number of 5 inventories of the plurality of parts to the control center; and 71 pairs (C2) of the control center The scheduled shipment of the shipped product: and the reserves of the partitioned parts manager 2 = = the number of the inventory (4), and (4) the predetermined failure rate of the plurality of zeros to estimate the plurality of parts The corresponding two = total number, and then ordered to the manufacturer of the products. The method of claim 12, wherein the total number of the demand corresponding to the plurality of parts estimated by the control unit is t_Ij-Pj Ν X η: wherein N is the What is the order for the shipment of the product called Berry η』马s玄 shipment? The number of uses of the various parts. 1 丨. Xuan reported several parts of the different P rate, t is a time parameter, 丨 is the sum of the number of parts of the ^ ^ ^ Temple knife E part official has been reserved, Pj is the control center has The sum of the number of parts of the gambling but not yet obtained. Eight, schema (see next page): 14
TW99131631A 2010-09-17 2010-09-17 Parts reservation supply system and the method of pre-reserving parts TW201214309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW99131631A TW201214309A (en) 2010-09-17 2010-09-17 Parts reservation supply system and the method of pre-reserving parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW99131631A TW201214309A (en) 2010-09-17 2010-09-17 Parts reservation supply system and the method of pre-reserving parts

Publications (1)

Publication Number Publication Date
TW201214309A true TW201214309A (en) 2012-04-01

Family

ID=46786463

Family Applications (1)

Application Number Title Priority Date Filing Date
TW99131631A TW201214309A (en) 2010-09-17 2010-09-17 Parts reservation supply system and the method of pre-reserving parts

Country Status (1)

Country Link
TW (1) TW201214309A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110383325A (en) * 2017-09-29 2019-10-25 日立建机株式会社 Parts ordering system and parts ordering method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110383325A (en) * 2017-09-29 2019-10-25 日立建机株式会社 Parts ordering system and parts ordering method
CN110383325B (en) * 2017-09-29 2023-12-29 日立建机株式会社 Parts ordering system and parts ordering method

Similar Documents

Publication Publication Date Title
Yu et al. Modelling the benefits of information sharing-based partnerships in a two-level supply chain
US8712823B2 (en) System, method and program recording medium for supply capacity estimation
Kritchanchai et al. Developing inventory management in hospital
CN102542414A (en) Business process and loose coupling method and system of business data processing based on rule engine
Dey A fuzzy random integrated inventory model with imperfect production under optimal vendor investment
Tibben-Lembke et al. An inventory model for delayed customization: A hybrid approach
JP6424311B2 (en) Supply chain management apparatus and method, system and program therefor
CN113469591A (en) Inventory replenishment control method and device, electronic equipment and storage medium
Cheng et al. Intermittent demand forecasting in a tertiary pediatric intensive care unit
Bakal et al. Value of supplier’s capacity information in a two-echelon supply chain
TW201214309A (en) Parts reservation supply system and the method of pre-reserving parts
JP2017065909A (en) Commodity operation method, commodity operation apparatus, commodity operation system, and commodity operation program
US11824730B2 (en) Methods and systems relating to impact management of information technology systems
CN111539552A (en) Method for predicting life cycle of electronic component based on semiconductor market data
Williams The influenza vaccine supply chain: structure, risk, and coordination
JP4643993B2 (en) Limit order execution probability calculation system and execution probability calculation program
Wilson et al. Dynamic interrelationships in hard wheat basis markets
US20120245972A1 (en) Providing access to future exception information in a supply plan collaboration system
Ramzy et al. Mare: Semantic supply chain disruption management and resilience evaluation framework
JP2006259858A (en) Exhibit management system and computer program for managing exhibit
TW200411482A (en) A system and method for withdrawing and dispatching goods in stock management according to production commands
CN114091770A (en) Prediction analysis method, device, equipment and storage medium for material demand plan
CN110675112A (en) E-commerce system based on supply chain management
US20160148135A1 (en) Systems and methods for balancing an assembly line
JP2006227664A (en) Part management system