Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals Download PDF

Info

Publication number
SU926289A1
SU926289A1 SU802988474A SU2988474A SU926289A1 SU 926289 A1 SU926289 A1 SU 926289A1 SU 802988474 A SU802988474 A SU 802988474A SU 2988474 A SU2988474 A SU 2988474A SU 926289 A1 SU926289 A1 SU 926289A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mining
section
rocks
overburden
sections
Prior art date
Application number
SU802988474A
Other languages
Russian (ru)
Inventor
Марк Еремеевич Певзнер
Виктор Петрович Костовецкий
Илья Моисеевич Левин
Юрий Борисович Панкевич
Владимир Семенович Саликов
Владимир Вильгельмович Андрес
Валентин Иванович Боровиков
Амазасп Ованесович Каракеян
Валентин Алексеевич Овчинников
Original Assignee
Предприятие П/Я Р-6767
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я Р-6767 filed Critical Предприятие П/Я Р-6767
Priority to SU802988474A priority Critical patent/SU926289A1/en
Application granted granted Critical
Publication of SU926289A1 publication Critical patent/SU926289A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

(5) СПОСОБ.ОТКРЫТОЙ РАЗРАБОТКИ СБЛИЖЕННЫХ(5) METHOD OF OPEN DEVELOPMENT OF NEAR

ГОРИЗОНТАЛЬНЫХ И ПОЛОГИХ ПЛАСТОВ ПОЛЕЗНЫХ HORIZONTAL AND LOOSE PLATES USEFUL

II

Изобретение относитс  к горной промышленности и используетс  при открытой разработке месторождений полезных ископаемых.The invention relates to the mining industry and is used in the open pit mining of mineral deposits.

Известен способ открытой разраббтки сближенных горизонтальных и пологих пластов полезных ископаемых , включающий отработку вскрышного уступа заходками с отсыпкой вскрышных пород в отвал и выемку добычного уступа заходками путем выемки вышележащего пласта, обработки междуПластов и выемки нижележащего пласта и транспортирование полезного ископаемого С1..There is a method of open development of contiguous horizontal and flat mineral layers, including testing of the overburden ledges with dumps of overburden rocks in the dump and excavation of the mining ledge by means of excavations of the overlying layer, processing between the plastics and the underlying layer and transportation of mineral deposits.

Известен также способ открытой разработки сближенных горизонтальных и пологих пластрв полезных ископаемых , включающий разделение карьерного пол  на участки, отработку вскрышного уступаЗаходками с отсыпкрй вскрышных пород в ютвал гребн ми вдоль фронта горных работ и отработку добычного уступа заИСКОПАЕМЫХThere is also known a method of opencast development of contiguous horizontal and flat mineral plastrv, which includes dividing the quarry floor into sections, working out the overburden ledge from the overburden rock formations to the ytval ridges and working out the mining escarpment

ходками путем зачистки вышележащего пласта, выемки последнего, отработки междупласть , представленного потенциально плодородными породами, и выемки нижележащего пласта и транспортирование полезного ископаемого . 2. Однако при применении указанных способов в случае наличи  в между пластье потенциально плодородных пород последние укладываютс  в нижнюю часть отвала и безвозвратно тер ютс . Другим недостатком указанных способов  вл етс  то, что рекультивационные работы не включены в единый технологический цикл вскрышных, добычйых и отвальных работ. Это приводит к увеличению трудоемкости рекультивации , снижению продуктивности восстанавливаемых земель и уменьшению эффективности разработки в целом.traversing by stripping the overlying stratum, excavating the latter, working out the inter-area represented by potentially fertile rocks, and excavating the underlying stratum and transporting the mineral. 2. However, when using these methods, if potentially fertile rocks are in between the formations, the latter are placed in the lower part of the heap and are irretrievably lost. Another disadvantage of these methods is that reclamation works are not included in a single technological cycle of stripping, mining and dumping works. This leads to an increase in the complexity of reclamation, a decrease in the productivity of the restored lands and a decrease in the efficiency of development as a whole.

Claims (2)

Цель изобретени  - повышение эффективности разработки и уменьшение трудоемкости рекультива1гии при одновременном повышении продуктивности восстанавливаемых земель. Поставленна  цель достигаетс  тем, что горные работы ведут одновременно спаренными участками, при этом на первом из спаренных участков производ т отработку заходки вскрышного уступа с размещением вскрышных пород в отвал первого участка, а на втором из спаренных участков в направлении, совпадающем с направлением выемки вскрышной заходки на первом участке, осуществл ют отработку добычной заходки с размещением пород от зачистки и пород междупласть  в предотвал второго участка и после окончани  отработки заходок на первом и втором спаренных участках на первом участк отрабатывают заходку добычного усту па с размещением пород от зачистки и пород междупласть  в предотвал пе вого участка, а на втором участке в направлении, совпадающем с направ лением выемКи добычной заходки на первом участке, осуществл ют отрабо ку заходки вскрышного уступа с размещением вскрышных пород в отвал второго участка, и в последующем операции по отработке спаренных уча стков повтор ют, производ т переэкскавацию пород из предотвала на спланированную поверхность отвала. На фиг. 1 представлена схема первого этапа отработки спаренных участков; на фиг. 2 - разрез А-А на фиг.1; на фиг. 3 - схема второго этапа отработки спаренных участков на фиг. k - разрез Б-Б на фиг.З. .Способ заключаетс  в следующем. Кйрьерное поле по фронту горных работ дел т на участки, при этом горные работы ведут одновременно спаренными участками 1 и 2 двум  уступами: вскрышным 3 и добычным Отработку уступов производ т много ковшовыми полноповоротными цепными экскаваторами типа Букау с применением консольных отвалообразова, телей. На первом участке 1 осуществл ю отработку заходки 5 вскрышного уст па с размещением вскрышных пород в отвал 6 первого участка с помощью 70-метрового Консольного от&алообразовател  гребн ми вдоль фронта горных работ, а на втором участке 2 в направлении, совпадающем с направлением выемки вскрышной заходк 4 5 на первом участке, осуществл ют отработку добычной заходки 7 путем зачистки пород 8 над вышележащим пластом 3 выемки последнего,отработки междупласть  10, представленного потенциальноплодородными породами , например глауконитовыми песками , и выемки нижележащего пласта 11. Породы от зачистки и породы междупласть  размещают в предотвал 12 второго участка параллельно фронту горных работ с помощью 3 -метрового консольного отвалообразовател , которым оснащен экскаватор. После отработки заходок 5 и 7 на первом и втором спаренных участках Hfc первом участке отрабатывают заходку 13 добычного уступа путем зачистки пород 8 над вышележащим пластом 9 выемки последнего,отработки междупласть  1СГ и выемки нижележащего пласта 11. Породы от зачистки и породы междупласть  размещают в предотвал 14 первого участка параллельно фронту горных работ с помощью 3 метрового консольного отвалообразовател , а на втором участке в направлении, совпадающем с направлением выемки добычной заходки 14, осуществл ют отработку заходки 15 вскрышного уступа с размещением вскрышных пород в отвал 16 второго участка с помощью 70-метрового консольного отвалообразовател . При этом, вслед за фронтом отсыпки предотвала 12,14 на участках и одновременно с отсыпкой осуществл ют jyia ни ров ку поверхности отвала 6,16 и переэкскавацию пород из предотвалй на сг1ланированную поверхность. Планирование поверхности и переэкскавацию пород из предотвала производ т драглайном, передвигающимс  по отвалу вслед за продвижением экскватора, вынимающего добычной уступ и отсыпающего породы в предотвал. После переэкскавации или одновременно с ней осуществл ют площадное размещение переэкскавируемой породы на спланированной поверхности отвала. В последующем операции по отработке спаренных участков повтор ют. Формула изобретени  Способ открытой разработки сближенных горизонтальных и пологих пластов полезных ископаемых, вклюмающий разделение карьерного пол  на участки, отработку вскрышного уступа на участках заходками с отсыпкой вскрышных пород в отвал гребн ми вдоль фронта горных работ и отработку добычного уступа заходками путем зачистки вышележащего пласта, выемки последнего, отработки междупласть , представленного потенциальн плодородными породами, и выемки нижележащего пласта, Ьланировку отвала и транспортирование полезного ископаемого, отличающийс  тем, чтб, с целью повышени  эффективности разработки и уменьшени  доемкости рекультивации при одновременном повышении продуктивности восстанавливаемых земель, горные работы ведут одновременно спаренными участками , при этом на первом из спаренных участков производ т отработку заходки вскрышного уступа с размещением вскрышных пород в отвал первого участка,а на втором осуществл ют отработку добычной заходки в направле- 25  The purpose of the invention is to increase the efficiency of development and reduce the labor intensity of recultivation while increasing the productivity of the restored lands. The goal is achieved by the fact that the mining operations are carried out simultaneously by paired sections, while in the first of the paired sections the overburden step is tested with the placement of the overburden rocks in the dump of the first section, and in the second of the paired sections in the direction coinciding with the direction of the excavation of the overburden entry in the first area, mining mining passes are carried out with placement of rocks from the stripping and rocks between the area before the second section and after finishing mining of the first and second spa passes At the first site, mining sites are drilled with rock from the stripping and rocks between the front section, and at the second site, in the direction coinciding with the mining route and the mining track in the first site, the overburden ledge from By placing the overburden rocks in the dump of the second section, and in the subsequent operation to work on the paired areas, the rocks are re-excavated from the front to the planned surface of the blade. FIG. 1 shows a diagram of the first stage of testing paired areas; in fig. 2 shows a section A-A in FIG. in fig. 3 is a diagram of the second stage of testing paired sections in FIG. k - section bb in fig.Z. The method is as follows. The open-pit field along the front of mining operations is divided into sections, while mining is carried out simultaneously by paired sections 1 and 2 by two ledges: overburden 3 and mining. The development of the ledges is done by many Bukau-type full-circle chain excavators using cantilever dumping bodies. In the first section 1, the overburdening of the 5 overburden was performed with the overburden in the dump 6 of the first section using a 70-meter cantilever ridge along the mining front, and in the second section 2 in the direction coinciding with the direction of the overburden excavation entry 4 5 in the first section, mining mining intake 7 is carried out by cleaning rocks 8 above the overlying layer 3 excavations of the latter, mining interlayer 10 represented by potential fertile rocks, for example glauconitic dogs s, and the recesses of the underlying layer 11. Species and breeds of stripping mezhduplast predotval 12 disposed in the second section parallel to the front mining using 3-meter cantilevered spreader which is equipped with an excavator. After working out the inlets 5 and 7 on the first and second paired Hfc sections of the first site, the intake 13 of the mining ledge is worked out by stripping the rocks 8 above the overlying stratum 9, excavating the latter, digging the interlayer of the 1SG and dredging the underlying stratum 11. The first section is parallel to the front of mining with the help of a 3-meter cantilever spreader, and at the second section in the direction coinciding with the direction of excavation of the mining stop 14, the approach 15 is carried out overburden ledge with placement of overburden in the dump 16 of the second section using a 70-meter cantilever spreader. At the same time, after the front of the dumping of the predval 12,14 in the areas and simultaneously with the dumping, the dumping surface 6,16 is carried out and the rocks are re-excavated from the pre-dump onto the planed surface. Surface planning and re-excavation of rocks from a pre-shaft is made by a dragline moving along the heap following the advancement of an excavator taking out a mining ledge and pouring rock into a pre-tail. After re-excavation or simultaneously with it, areal placement of the re-excavated rock on the planned surface of the heap. In the subsequent operations, testing of the paired sections is repeated. Formula of the Invention A method of open-cast development of contiguous horizontal and flat mineral layers, including dividing the quarry floor into sections, working out the overburden ledge at the sections with openings with dumping of overburden rocks in the dump with ridges along the mining front and working off the mining ledge by stripping the overlying formation, removing the overburden formations , mining of interplast, represented by potentially fertile rocks, and excavation of the underlying reservoir, dump layout and transportation of useful material digging, characterized in that, in order to increase the efficiency of development and reduce the recovery capacity, while simultaneously improving the productivity of the restored lands, mining operations are carried out simultaneously by paired sections, while the first of the paired sections is tested by overburden of the overburden of the first at the second, mining a landing in the direction of 25 НИИ, совпадающем с направлением выемки вскрышной заходки на первом участке с размещением пород от зачистки и пород междупласть  в пред9 20 Research Institute, coinciding with the direction of excavation of the overburden in the first section with the placement of rocks from the stripping and rocks between the area in pred9 20 2. Уткин А.И. и др. Разработка прочной фосфоритовой руды многоковшовыми цепными экскаваторами. Горный журнал, 1969, 1, с. .. J 2. Utkin A.I. and others. Development of solid phosphate ore by multi-bucket chain excavators. Mining Journal, 1969, 1, p. .. j фуг. 2. 96 отвал второго участка, и после окончани  отработки заходок на первом и втором спаренных участках на первом участке отрабатывают заходку добычного уступа с размещением пород от зачистки и пород междупласть  в предотвал первого участка, а на втором участке осуществл ют отработку заходки вскрышного уступа в направлении , совпадающем с направлением выемки добычной заходки на первом участке , с размещением вскрышных пород в отвал второго участка, и в последующем операции по отработке спаренных учас,тков повтор ют, причем производ т переэкскавацию пород из предотвала на спланированную поверхность отвала. Источники информации, прин тые во внимание при экспертизе 1. Островский Г,К. и др. Совер|шенствование технологии горных ра;бот на разрезе Азейский им. 50-лети  СССР. Добыча угл  открытым способом , 197, 2, с. 6-77fug. 2. 96 dumping of the second section, and after finishing the mining of the first and second paired sections in the first section, mining the mining ledge with placement of the rocks from the stripping and rocks between the front of the first section, and the second mining section in the direction of that coincides with the direction of excavation of the mining stopping in the first section, with the placement of overburden rocks in the dump of the second section, and in the subsequent operation of working on the paired sections, we repeat, and reekskavatsiyu rocks from predotvala planned on blade surface. Sources of information taken into account in the examination 1. Ostrovsky G, K. et al. Improving the technology of mountain works; 50 years of the USSR. Coal mining by the open method, 197, 2, p. 6-77
SU802988474A 1980-10-02 1980-10-02 Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals SU926289A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802988474A SU926289A1 (en) 1980-10-02 1980-10-02 Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802988474A SU926289A1 (en) 1980-10-02 1980-10-02 Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals

Publications (1)

Publication Number Publication Date
SU926289A1 true SU926289A1 (en) 1982-05-07

Family

ID=20920204

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802988474A SU926289A1 (en) 1980-10-02 1980-10-02 Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals

Country Status (1)

Country Link
SU (1) SU926289A1 (en)

Similar Documents

Publication Publication Date Title
Hustrulid et al. Underground mining methods: Engineering fundamentals and international case studies
US5194689A (en) Earth excavation using blast casting and excavating apparatus
SU926289A1 (en) Method for open-pit working of adjacent horizontal and gently-sloping seams of minerals
RU2425220C1 (en) Method for formation of steeply inclined transport access track
RU2285121C1 (en) Method for open underground extraction of series of slightly inclined coal beds
SU1086167A1 (en) Method of strip mining of adjoining horizontal or gently-sloping beds of minerals
Gertsch et al. Surface mine design and planning for lunar regolith production
SU953211A1 (en) Method of open-cast mining of adjoining horizontal and gently-sloping seams of minerals
Ali Elbeblawi et al. Surface Mining Methods and Systems
RU2235205C2 (en) Method for opencast mining blanket deposits
SU1416694A1 (en) Method of open mining of mineral deposits
SU1681000A1 (en) Method of open pit mining of horizontal and gently sloping mineral deposits
Gogolewska Surface and underground mining technology
SU1285151A1 (en) Method of strip mining of minerals
RU2148713C1 (en) Method for opencast mining of sloping and steep deposits of minerals
SU1112122A1 (en) Method for open-pit mining of mineral deposits
SU1097793A1 (en) Method of strip mining of horizontal and gently-sloping beds of minerals
SU1411471A1 (en) Method of mining placer deposits
SU806864A1 (en) Method of open-cast mining of horizontal and gently sloping mineral bed bodies
SU1323715A1 (en) Method of strip mining of inclined mineral deposits
SU883443A1 (en) Method of working adjoining gently sloping potassium beds
SU827789A1 (en) Method of working thick sloping coal seams
SU729349A1 (en) Method of open-cut mining of mineral deposits
SU1585518A1 (en) Method of working a step
SU732531A1 (en) Method for open mining of mineral deposits