SU58882A1 - Scraper loading platform - Google Patents

Scraper loading platform

Info

Publication number
SU58882A1
SU58882A1 SU19497A SU19497A SU58882A1 SU 58882 A1 SU58882 A1 SU 58882A1 SU 19497 A SU19497 A SU 19497A SU 19497 A SU19497 A SU 19497A SU 58882 A1 SU58882 A1 SU 58882A1
Authority
SU
USSR - Soviet Union
Prior art keywords
scraper
beams
loading platform
boom
ore
Prior art date
Application number
SU19497A
Other languages
Russian (ru)
Inventor
А.Г. Выжуенков
Original Assignee
А.Г. Выжуенков
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.Г. Выжуенков filed Critical А.Г. Выжуенков
Priority to SU19497A priority Critical patent/SU58882A1/en
Application granted granted Critical
Publication of SU58882A1 publication Critical patent/SU58882A1/en

Links

Landscapes

  • Ship Loading And Unloading (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

Существуют скреперные погрузочные платформы со стрелой дл  блока и лебедкой, устаковленной на платформе . Отличительной особенностью предлагаемой -платформы  вл етс  то, что ее стрела выполнена в виде двух скрепленных между собою подъемных отогнутых нверху балок дл  направлени  движени  роликов подвесного скрепера.There are scraper loading platforms with a boom for the unit and a winch mounted on the platform. A distinctive feature of the proposed β-platform is that its boom is made in the form of two beams that are fastened together between themselves and bent at the top to guide the movement of the rollers of the hanging scraper.

Это дает возможность скреперу лучше внедр тьс  в кучу погружаемого материала, благодар  чему производительность установки повышаетс .This allows the scraper to be better incorporated into the pile of material to be immersed, thereby increasing plant productivity.

На чертеже фиг. 1 показывает вид сбоку скреперной установки с погрузочной платформой, фиг. 2 - то же в плаае.In FIG. 1 shows a side view of a scraper installation with a loading platform; FIG. 2 - the same in play.

Скре1перна  погрузочна  платформа состоит из собственно платформы 1, к неподвижной раме 9 которой ша рнирно прикреплена на цапфах 8 стрела, состо ща  из двух параллельных балок 2, служащих направл ющими дл  скрепера 3.The skimper loading platform consists of the platform 1 itself, to the fixed frame 9 of which the arrow is fixed on the axles 8, consisting of two parallel beams 2 serving as guides for the scraper 3.

На раме 9 платформы установлена скреперна  лебедка 4. Рама 9 €о всем устройством покоитс  на тележке, снабженной механизмом 5 дл  поворачивани  ее вокруг вертикальной оси. IloBOpoT этот осуществл етс  при помощи электродвигател  6 с редуктором .A scraper winch 4 is mounted on the frame 9 of the platform. The frame 9 € of the entire device rests on a trolley equipped with a mechanism 5 for turning it around a vertical axis. This IloBOpoT is performed by means of an electric motor 6 with a gearbox.

Балки 2 стрелы впереди скрепл ютс  осью, «а которой установлен направл ющий ролик 7, огибаемый канатом, идущим от скрепера 3 к лебедке 4, причем балки 2 впереди имеют дугообразный загиб «верху дл  того, чтобы скрепер, двига сь по ним, лучше забирал руду.Beams 2 of the boom are fastened in front by an axle, which is equipped with a guide roller 7, which bends around a cable running from the scraper 3 to the winch 4, and the beams 2 in front have an arcuate bend to the top so that the scraper can move along them better ore.

Скрепер 3 движетс  по балкам 2 на роликах и имеет откидную внутрь заднюю стенку, с которой грабельный хобот составл ет одно целое.The scraper 3 moves along the beams 2 on the rollers and has a rear wall that can be folded inwards, with which the rake trunk is integral.

Скрепер посредством каната 11 приводитс  в движение скреперной лебедкой 4. При движении скрепера к забою , когда стрела 2 подн та, задн   стенка его вместе с грабельным хобоТОМ откидываетс  внутрь, скрепер проходит по балкам 2 и поднимаетс  по их отогнутому концу. Затем стрела опускаетс , и, при движении скрепера в обратном направлении, он, сход  с загнутого конца балок 2, забирает руду. При этом задн   стенка скрепера закрываетс , упира сь в упоры, а грабельный хобот в месте загиба балок отбрасывает руду. В то же врем  балки 2 своим весом дав т на скрепер, который увлекает руду и.The scraper is driven by the rope 11 by the scraper winch 4. When the scraper moves to the face, when the boom 2 is raised, its back wall together with the rake hobot leans inwards, the scraper goes along the beams 2 and rises along their bent end. Then the boom is lowered and, when the scraper moves in the opposite direction, it, coming down from the curved end of the beams 2, takes the ore. In this case, the rear wall of the scraper is closed, resting against the stops, and the rake trunk at the place of the bend of the beams discards the ore. At the same time, beams 2, with their weight, put pressure on the scraper, which carries the ore and.

переход  с балок 2 на раму 9, поднимает руду на платфо рму 1, где через разгрузочное окно 10 руда поступает в вагонетки.the transition from the beams 2 to the frame 9, lifts the ore to the platform 1, where through the discharge window 10 the ore enters the trolleys.

Опорожненный скрепер откатываетс  обратно и, когда он заходнт в дугообразный загиб балок 2, то при нат жении каната упираетс  в предохранительные упоры и, лри продолжающемс  Наворачиваний катата 11 на барабан лебедки, произ1водит подн тие балок 2 стрелы.The emptied scraper rolls back and, when it enters the bow-shaped bend of the beams 2, then when the rope is tensioned, it rests against the safety stops and, continuing the U-turn of the catat 11 on the winch drum, lifts the beams 2 arrows.

Благодар  введению изогнутых кверху направл ющих балок 2 увеличипаетс  коэфициент заполнени  скрепера , уменьшаетс  длина его хода и увеличиваетс  скорость уборки руды.Due to the introduction of the guide beams 2 curved upward, the scraper filling ratio increases, its stroke length decreases, and the ore harvesting speed increases.

Предмет изобретени .The subject matter of the invention.

Скреперна  погрузочна  платформа со стрелой, отличаюЩа о  тем, что стрела выполнена в В1иде двух скрепленных между собой подъемных и служащих дл  направлени  дви-жени  роликов подвесного скрепера балок , отогнутых кверху, с целью лучшего внедрени  скрепера в кучу погружаемого материала.A scraper loading platform with a boom, distinguished by the fact that the boom is made in two types of two fixed lifting and serving to direct the movement of the rollers of the hanging scraper bends, bent upwards, in order to better incorporate the scraper into the pile of immersed material.

CMCM

oooo

OOOO

oooo

4O4O

Ф H  F h

teCteC

a na n

s s

pp

n cen ce

ss ssyspE ;ss ssyspE;

SU19497A 1938-10-25 1938-10-25 Scraper loading platform SU58882A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU19497A SU58882A1 (en) 1938-10-25 1938-10-25 Scraper loading platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU19497A SU58882A1 (en) 1938-10-25 1938-10-25 Scraper loading platform

Publications (1)

Publication Number Publication Date
SU58882A1 true SU58882A1 (en) 1940-11-30

Family

ID=48241139

Family Applications (1)

Application Number Title Priority Date Filing Date
SU19497A SU58882A1 (en) 1938-10-25 1938-10-25 Scraper loading platform

Country Status (1)

Country Link
SU (1) SU58882A1 (en)

Similar Documents

Publication Publication Date Title
SU58882A1 (en) Scraper loading platform
CN215924101U (en) Double-lifting elevator for port
FR2261387A1 (en) Hand operated overhead working platform - winding gear inside cage, guide rollers steady descent, cage carries hooked arms for safety
RU2522585C1 (en) Mine winding plant
US1993285A (en) Elevator safety gate
FR2242318A1 (en) Lift using rolled steel beam as guide track - lift cabin and counterweights run along opposite sides of beam
SU14701A1 (en) Lifting frames (mooring rings)
CN216551835U (en) Dam trash blocking auxiliary device
CN204713152U (en) Weaving winding up roller transport trolley
US1556401A (en) Fish-trap apron
GB510234A (en) Improvements relating to containers and container-carrying vehicles
SU37568A1 (en) Clarke type mechanical shovel
SU68027A1 (en) Device for moving goods
SU18541A1 (en) Barrier for lifts
CN118145492A (en) Agricultural portable immersible pump lifting machine
SU18272A1 (en) Modification of a mobile bucket elevator conveyor
JPH0642057Y2 (en) Elevator chain pool
SU54387A1 (en) Device for balancing rolling stands tipping skips
SU35344A1 (en) Single chain vertical lift
SU37825A1 (en) A device similar to a crane on a column with a suspended crossbar and with a counterweight
SU2899A1 (en) Loop bucket chain for dredgers
SU25901A1 (en) Rope conveyor
GB312393A (en) Improvements in lifts, hoists and the like
US754775A (en) Hoisting device for live stock.
SU2669A1 (en) A device for the distribution of logs on the stack