SU1654342A1 - Method for replacement of annular air duct for hot blowing of blast furnace - Google Patents

Method for replacement of annular air duct for hot blowing of blast furnace Download PDF

Info

Publication number
SU1654342A1
SU1654342A1 SU894701477A SU4701477A SU1654342A1 SU 1654342 A1 SU1654342 A1 SU 1654342A1 SU 894701477 A SU894701477 A SU 894701477A SU 4701477 A SU4701477 A SU 4701477A SU 1654342 A1 SU1654342 A1 SU 1654342A1
Authority
SU
USSR - Soviet Union
Prior art keywords
air duct
sections
furnace
reduce
annular
Prior art date
Application number
SU894701477A
Other languages
Russian (ru)
Inventor
Юрий Петрович Галов
Николай Иванович Гуречкин
Владимир Яковлевич Блинчевский
Михаил Васильевич Саввин
Original Assignee
Череповецкое Су N 1 Треста "Центрдомнаремонт"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Череповецкое Су N 1 Треста "Центрдомнаремонт" filed Critical Череповецкое Су N 1 Треста "Центрдомнаремонт"
Priority to SU894701477A priority Critical patent/SU1654342A1/en
Application granted granted Critical
Publication of SU1654342A1 publication Critical patent/SU1654342A1/en

Links

Landscapes

  • Furnace Details (AREA)
  • Tunnel Furnaces (AREA)

Abstract

Изобретение огноситс  к черной металлургии, в частности к доменному производству, и может быть нспользо- n-iiio при замене кольцевого воздухопровода гор чего дуть . Цель изобретени  - сокращение времени простом печи при ремонте и снижение трудоемкости монтажных работ. Демонтированные уз пи старого воздухопровода транспортируют п зону действи  монтажной Олл- кн в свободно подвешенном к новому воздухопроводу состо нии путем выкатывани  узлов его секций, перемеща  кольцевые направл ющие старого воз-- духопровода по оперным элементам ко лого воздухопровода. 8 ил.The invention is fire-resistant to ferrous metallurgy, in particular, to the domain production, and can be used n-iiio when replacing the ring air duct with a hot blow. The purpose of the invention is to reduce the time of a simple furnace during repairs and reduce the labor intensity of installation work. The dismantled nodes of the old air duct transport the operating zone of the assembly All-Kan in a state freely suspended from the new air duct by rolling out the assemblies of its sections, moving the annular guides of the old air duct along the operative elements of the air duct. 8 il.

Description

Изобретение относитс  к черной металлургии , в частности к доменному производству, и может быть использовано при замене кольцевого воздухопровода гор чего дуть  на капитальном ремонте доменной печи.The invention relates to ferrous metallurgy, in particular, to blast furnace production, and can be used when replacing a ring air duct with a hot blast during major repairs of a blast furnace.

Цель изобретени  - сокращение времени просто  печи при ремонте, сокращение трудоемкости монтажных работ.The purpose of the invention is to reduce the time just to repair the furnace, reducing the labor intensity of the installation work.

Па фиг.1 изображен демонтируемый кольцевой воздухопровод, разрез; на фиг.2 - расположение старого воздухопровода при его транспортировке в зону монтажной балки, разрез; на фиг.З - расположение нового воздухопровода при его монтаже, разрез; на фиг.А - монтаж нового воздухопровода , план; на фиг.З - транспорт тировка старого воздухопровода в зо- ну монтажной балки, план; на фиг.6 - узел I на фиг.2; на фиг.7 - узел II на фиг.З; на фиг.8 - демонтируемыйPA figure 1 shows a dismountable annular air duct, cut; figure 2 - the location of the old air duct during its transportation to the area of the mounting beam, the section; on fig.Z - the location of the new air duct during its installation, section; on figa - installation of the new air duct, the plan; FIG. 3 shows the transportation of the old air duct to the zone of the mounting beam, the plan; figure 6 - node I in figure 2; 7 - node II in FIG. 3; on Fig - dismountable

кольцевой, воздухопровод (вариант верхнего расположени  воздухопровода),annular air duct (option of the upper location of the duct),

Способ осуществл ют следующим образом.The method is carried out as follows.

После остановки печи производ т отсоединение старого воздухопровода 1 (фи.1) от колонн доменной печи и опускание его на опоры 2. Монтируют на нем кольцевые направл ющие 3 (фиг.2) и производ т накатывание по ним зафутерованных секций 4 (фиг.З и 4) нового воздухопровода 5 в проектное положение вокруг печи, сварку секций 4 между собой. Собранный новый воздухопровод 5 подвешивают , удалив опоры 2, на подвесках 6 (фиг.2) к колоннам 7 опорной системы доменной печи. Демонтированный воздухопровод 1 удал ют из ремонтной зоны путем выкатывани  в свободно подвешенном к новому воздухопроводу 5 состо нии узлов его секций 8, перемеОЭ СПAfter stopping the furnace, the old air pipe 1 (Fig.1) is disconnected from the columns of the blast furnace and lowered onto the supports 2. The annular guides 3 are mounted on it (Fig.2) and the lined sections 4 are rolled over it (Fig. 3 and 4) a new air duct 5 to the design position around the furnace, welding sections 4 among themselves. The assembled new air duct 5 is suspended by removing the supports 2 on the suspensions 6 (FIG. 2) to the columns 7 of the blast furnace support system. The disassembled air pipe 1 is removed from the repair zone by rolling out in the state of the nodes of its sections 8, rehiming SP, freely suspended from the new air pipe 5.

4 00 -U 4 00 -U

ii

1Я i urn nt tit.it и щмЕзл ющие З по onopii Hi Пол ковым элементам 9 нового возi ли.фсвода 5, 1I i urn nt tit.it and smzlyuschie Z onopii Hi To the longitudinal elements 9 of the new case, 5,

Ролнкоьые опорные элементы 9 расi ю/енч в гкшосачх Ю КольцевыхRnolnye supporting elements 9 ras u / ench in russia Yu Koltsevykh

и маг  ющих 3 чмеющих в попереч- чм « HUH f jopny двутавра с.ого i u vV- Onpono i: 1 Прч этом пси монтаже новог воздухопровода 5 опорнойand 3 swindle in the cross section of the “HUH f jopny I-beams of the village i u vV- Onpono i: 1 of this psi installation of the air duct 5 of the supporting

онтс ктной поверхностью 11 (фиг. 6) гчукит внутренн   поверхность 12 ниж- 1 и ITU IKV 1 it ЛЬЦСРОЙ направл ющей }, i i 1 t дем нтаже острого воздухо- i говод.т (iH r.bl - внутренн   по , . т нг(тт I - к |15-чеЙ ПОЛКИ 15,Onts ktnoy surface 11 (Fig. 6) gchukit inner surface 12 of the lower-1 and ITU IKV 1 it LETSRO guide}, ii 1 t demountable sharp air - i t (iH r.bl - internal by, t ng (tt I - to | 15-SHELF 15,

vtT-, г IT;-PT X НТрЛВЛЯЮI Т1,i-I L, ч J ь ц П ЗО -vtT-, g IT; -PT X NTRVLIUII T1, i-I L, h J nd C P ZO -

165165

JC Jc

гм Ч if JTOBum h if jtob

г„ KIВЫ f -( ШЧ Г1Я g „KIVYA f - (SHCH G1Ya

орт ixort ix

- . ЛГО ПОЗДУ-. LGO LOST

. Кочьцег ые направл ю- joff -екдтт Ь, установлен- F рейстси  монтажной У1с чении гтарого возд хоTi3 ремонтной зоны имеют вы0 5зк 17 фиг. 7) дт  вывода из полос- ей 10 oTiopn tx роликовых эте. гнтов 9 о  . Kochtseg yuyu-joff-ekdtt b, installed-F reystsy mounting installation of an air conditioner Ti3 repair area have high 5 17 in FIG. 7) dt output from the 10 oTiopn tx strip of roller ete. gt 9 o

.,1 тре-ч 1 ют1 i г р -бо: по э I P., 1 thre-h 1 ut1 i g p -bo: by e i p

, I.UI.U

вето t-лзлухсчровода гори- ir-, , i ч лш е1-1гоч печи пр м jwL,4li п.гчн 1 с ic воздухопровода 1 - , IH,I г- м чной печи, ъ veto t-bluff horizontally- ir-,, i h lsh e1-1goch furnace straight jwL, 4li pgcn 1 with ic duct 1 -, IH, I g-michnoy furnace, ъ

)тп с Т С г 3 гоб 1НЯОМ ВИДГ fia 9Д01ЧЫ - , h Г vi jt i КОЛЫ1СЗОГО) TP with T C g 3 Gob 1 NOYA WIDG fia 9D01CHY -, h G vi jt i KOLY1SOSOGO

зс духппиоп тл Сфи.,3) монтиру- г чправл ющие 3 Чооче- гтог -уог т зону L действи  монтажной баотки секции 4 (фиг,4) нового вочдухепговод  s, Через вырезы 16 (Лиг. Л) та:,оп т п располагают опорны ооликовп гт мечтч Ч (фттг.З), смон- ТЧФОРПНПЫГ iii нижней части нового воздухе ipop vv1 5,внутри полостей 10 кочьцевьт начравл юшчх старогэ воз- духопророда К При этом опорные чои„ щемен чл 9 (фиг.6) располагаютс  п вн тоенчей поверхности 12 iiiiKHCw полки 1 J Производ т монтаж нового воздух опроРоца 5 (фиг. 3,4) г-гч-тем перемещени  его секций 4 по кэ.| ыт наарлвлчющим 3 старого i 1г1вод 1 К net ледующий стыковки н us не оду собой. Далее ПРОНЗИЛ., г тч зку опор 2 (фиг«2) и подветл ъ PI ri новый воздухо 3) mount the guides 3 Touchet-ug t zone L of the action baht of section 4 (fig, 4) of the new branch door s, through the notches 16 (Ligth L): Oolikov gd dreaming H (ftg.W), mount-TCHFORPNPYG iii lower part of the new air ipop vv1 5 are located, 10 kochtsevt nasravl yushchi starogeporodorod K 10 are located inside the cavities. internal surface 12 iiiiKHCw shelves 1 J The installation of the new air of the OPERATOR 5 (Fig. 3.4) of the r-hc displacement of its 4 kOe sections. | I’m looking for 3 old i 1g1vod 1 K net, next docking us not alone. Then PRONZIL., G tzku supports 2 (Fig. "2) and a new air is supplied in PI ri

2525

543424543424

провод 5 на подвесках 6 к колоннам 7 доменной печи. При этом старый воздухопровод 1 оказываетс  свободно подве- ,. шейным на новом воздухопроводе 5, а его кольцевые направл ющие 3 (фиг.5) располагаютс  с опорой внутренней поверхности 14 верхней полки 15 на опорных роликовых элементах 9 новогоwire 5 on hangers 6 to the columns 7 of the blast furnace. In this case, the old air duct 1 is freely suspended,. neck on the new air duct 5, and its annular guides 3 (figure 5) are located with the support of the inner surface 14 of the upper flange 15 on the supporting roller elements 9 new

Ю воздухопровода 5.S duct 5.

Разрезают демонтированный воздухопровод 1 на секции 8 (фиг.7) и поочередно выкатывают последние в зону L действи  монтажной балки, переме15 ча  кольцевые направл ющие 3 по опорным роликовым элементам 9 нового воздухопровода 5. На кольцевых направ- л юпц1х 3 (фиг. 7) каждой секции 8, установленной в зоне L действи  мон2о тзкной балки, вырезают прорези 17The disassembled air line 1 is cut into sections 8 (Fig. 7) and the latter are alternately rolled out into the L zone of the mounting beam, moving annular guides 3 along the roller bearing elements 9 of the new air line 5. On the ringed directions 1x3 (Fig. 7) each section 8 installed in the zone L of the action of the monotone beam, cut out the slots 17

дл  впвода опорных роликовых элементов 9 нового воздухопровода 5 из полостей 10 и, загтропив на крюк монта ной балки, удал ют секцию 8 из зоны ремонта.To inject the supporting roller elements 9 of the new air duct 5 from the cavities 10 and, posting onto the hook of the mounting beam, remove section 8 from the repair zone.

Применение изобретени  значительно сокращает трудозатраты на ремонтные работы, исключает работы с применением электролебедок дл  удалени  демонтированных узлов из ремонтной зоны, упрощает выполнение работ, позвол ет механизировать эти работы, примен   дл  этих целей простое в изготовлении устройство. Сроки просто  печи на ремонте сокращаютс  на 20 ч.The application of the invention significantly reduces the labor costs for repair work, eliminates the work with the use of electric winch to remove the dismantled components from the repair area, simplifies the execution of work, allows to mechanize these works, using an easy-to-make device for these purposes. Dates just furnace repair reduced by 20 hours.

Claims (1)

Формула изобретени Invention Formula Способ замены кольцевого воздухопровода гор чего дуть  доменной печи, включающий отсоединение старого воздухопровода от печи, опускание в собранном виде на опоры и монтаж на нем кольцевых направл ющих, установку на кольцевых направл ющих с помощью монтажной балки секций нового воздухопровода с опорными элементами и их перемещение в проектное положение путем передвижки каждой секции на ее опорных элементах по кольцевым направл ющим с последующим соединением секций между собой и с печью, транспортировку секций старого воздухопровода в зону действи  монтажной балки, отличающийс  тем, что, с целью сокращени  времени просто  печи при ремонте, сокращени  трудоемкости)монтажных работ, транспортировку демонтированных секций ста30A method for replacing an annular air duct with a hot blast of a blast furnace, including disconnecting the old air duct from the furnace, lowering the assembled form onto the supports and mounting the annular guides on it, installing the new duct sections with supporting elements on the annular guides design position by moving each section on its supporting elements along the annular guides followed by connecting the sections between themselves and with the furnace, transporting sections of the old air guide gadfly into the zone of action of the mounting beam, characterized in that, in order to reduce the time just for the furnace during repair, reduce the labor intensity of the installation, transport of the dismantled sections of the steel 3535 4040 4545 5050 5555 фиг.22 Г-JMr J r r-i -aU1 vDr r-i -aU1 vD мm 1,81.8 VV фиг.55 WflWfl фиг. 8FIG. eight Составитель И.Логачева Гедаклир пЛУнько Техред А.Кравчук Корректор Н.Ревска Compiled by I.Logacheva Gedaklir PLUnko Tehred A. Kravchuk Proofreader N.Revska 1,14,151,14,15 фиг. 7FIG. 7
SU894701477A 1989-06-09 1989-06-09 Method for replacement of annular air duct for hot blowing of blast furnace SU1654342A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894701477A SU1654342A1 (en) 1989-06-09 1989-06-09 Method for replacement of annular air duct for hot blowing of blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894701477A SU1654342A1 (en) 1989-06-09 1989-06-09 Method for replacement of annular air duct for hot blowing of blast furnace

Publications (1)

Publication Number Publication Date
SU1654342A1 true SU1654342A1 (en) 1991-06-07

Family

ID=21452403

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894701477A SU1654342A1 (en) 1989-06-09 1989-06-09 Method for replacement of annular air duct for hot blowing of blast furnace

Country Status (1)

Country Link
SU (1) SU1654342A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112481437A (en) * 2020-11-27 2021-03-12 上海宝冶冶金工程有限公司 Blast furnace Y-shaped downcomer dismounting and replacing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельстве СССР К Я -1943, кч. F 04 С 23/СО, 1379. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112481437A (en) * 2020-11-27 2021-03-12 上海宝冶冶金工程有限公司 Blast furnace Y-shaped downcomer dismounting and replacing method
CN112481437B (en) * 2020-11-27 2022-07-08 上海宝冶冶金工程有限公司 Blast furnace Y-shaped downcomer dismounting and replacing method

Similar Documents

Publication Publication Date Title
SU1654342A1 (en) Method for replacement of annular air duct for hot blowing of blast furnace
DK0857495T3 (en) Apparatus for treating a body organ with magnetic field therapy
CN111594694A (en) Circular pipeline feeding type integral repairing equipment and repairing method thereof
EP2949885B1 (en) Method and device for mounting and removing of a turbine component
US4330262A (en) Walking beam furnace
CA2069757A1 (en) Method and means for repairing existing manhole
ATE196284T1 (en) ELEVATOR ARRANGEMENT AND METHOD FOR INSTALLING A RAIL SYSTEM
KR100894944B1 (en) Transfer jig of substrate assembling apparatus, and transfer method thereof
CN108637620A (en) For production line of bar roller-way bearing and the dismounting holder of speed reducer
KR100478992B1 (en) Method of constructing a blast furnace body and lifting transfer apparatus
HUP0301492A2 (en) Method for production a connector point on a travel way
US4951298A (en) Closed remelting furnace having several horizontally movable furnace lower portions
FI880736A0 (en) APPARATUS AND EQUIPMENT FOR THE MAINTENANCE OF STORES AND HOSES.
CN210289161U (en) Steel construction engineering component mounting structure
JP4804676B2 (en) Piping installation method and apparatus in tunnel
CA2164388A1 (en) Melt Shop Layout
FI913063A (en) FOERFARANDE FOER FOERNYANDE AV BLOCK AV JAERNVAEG OCH APPARATUR FOER TILLAEMNING AV FOERFARANDET
US4288219A (en) Refractory insulated member and method of installation thereof in a reheat furnace
FR2833066B1 (en) DEVICE FOR PLACING TEMPORARY SUPPORTS IN FLUID CIRCULATION PIPES
SU1423490A1 (en) Method of dismantling support beams
CN213682201U (en) A installation device for piecemeal formula corrugated steel pipe gallery
CN218400776U (en) Mining excavator track rises and tightly installs
JPH0754024A (en) Structure of furnace bottom in blast furnace
SU1337414A1 (en) Method of repairing blast furnace and device for effecting same
US4241902A (en) System for vessel exchange