SU1543081A1 - Method of guiding mineral deposits - Google Patents

Method of guiding mineral deposits Download PDF

Info

Publication number
SU1543081A1
SU1543081A1 SU884362122A SU4362122A SU1543081A1 SU 1543081 A1 SU1543081 A1 SU 1543081A1 SU 884362122 A SU884362122 A SU 884362122A SU 4362122 A SU4362122 A SU 4362122A SU 1543081 A1 SU1543081 A1 SU 1543081A1
Authority
SU
USSR - Soviet Union
Prior art keywords
column
slot
jet
flexible
well
Prior art date
Application number
SU884362122A
Other languages
Russian (ru)
Inventor
Mikhail M Smirnov
Viktor S Kozlov
Aleksej V Yurojts
Vladimir R Buyanov
Original Assignee
Mo Geologorazvedoch Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mo Geologorazvedoch Inst filed Critical Mo Geologorazvedoch Inst
Priority to SU884362122A priority Critical patent/SU1543081A1/en
Application granted granted Critical
Publication of SU1543081A1 publication Critical patent/SU1543081A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

<p>Изобретение относится к горному делу и геологии и м.б. использовано преимущественно для создания радиаль-</p></li></ul> <p>Изобретение относится к горному . делу и геологии и может быть использовано преимущественно для создания радиальных горизонтальных и наклонных каналов от основного ствола вертикальной скважины, например,^ при выщелачивании полезных ископаемых.</p> <p>Цель изобретения - снижение трудоемкости .</p> <p>На фиг,1-3 представлены схемы вывода гибкой колонны из основного ствола при различных углах отклонения .</p> <p>Способ заключается в следующем. Продуктивный пласт 1 вскрывают вертикальной скважиной 2, в которой размещают скважинный гидромонитор</p> <p>2</p> <p>ных горизонтальных и наклонных каналов от основного ствола вертикальной скважины, например, при выщелачивании полезных ископаемых. Цель снижение трудоемкости. В прискважинной зоне формируют полость в виде щелевидной прорези (П) размывом напорной струей жидкости. После образования П в скважину подают гибкую колонну (ГК). Изменяют направление перемещения последней на радиальное с помощью отклонителя. Перемещают ГК в радиальном направлении в пространстве между сводом сформированной П и истекающей напорной струей. Последнюю подают под давлением, §</p> <p>достаточным для удержания ГК в указанном пространстве, 3 ил.</p> <ul style="list-style:none;"><li> <p>3, размещенный на торце става насосно-компрессорных труб 4, вдоль которого расположена гибкая эксплуа· тационная колонна 5. Торец гибкой эксплуатационной колонны 5 может быть снабжен гидромониторной головкой 6 или специальным пробойником для забивного внедрения колонны с помощью ударника, закрепленного на <sub>; </sub>канате в указанной колонне 5. Скважинный гидромонитор 3 снабжен направляющим отклонителем 7, расположенным непосредственно над гидромониторной насадкой. Поворотом гидромонитора 3 располагают гидромониторную насадку в заданном азимутальном направлении и подают по ставу труб 4 под давлением жидкость, например</p></li></ul> <p>5и ,„&gt;1543081</p> <p>3</p> <p>1543081</p> <p>4</p> <p>воду или водовоздушную смесь, при этом из насадки гидромонитора 3 истекает высоконапорная струя 8, размывающая породы прискважинной зоны, выносимые из скважины по методу прямой промывки. Путем медленного подъема скважинного гидромонитора в прискважинной зоне формируют щелевидную прорезь 9, располагающуюся в плоскости, в которой лежит ось скважины 2.</p> <p>После того, как сформирован . свод щелевидной прорези 9, начинают перемещать вниз гибкую эксплуатационную колонну 5, которая при взаимодействии с наклонной поверхностью отклонителя 7 изгибается. Гибкую колонну 5, например рукав из плотной резины, из полиуретана, полиэтилена и т.д.,, выводят в пространство между сводом 10 щелевидной прорези 9 и истекающей из насадки гидромонитора 3 напорной струей жидкости. В силу значительного давления жидкости в струе 8, а также ограниченности пространства между сводом 10 и стенками прорези 9 гибкая колонна 5 продвигается в прорезь 9 в замкнутом пространстве между сводом 10, стенками и струей 8 с опорой на последнюю, при этом вслед-, ствие большой скорости истечения •струи облегчается перемещение .колонны 5 в прорези, так как поток жидкости, как бы тащит колонну в сторону забоя, т, е. струя 8 является направляющим элементом для направленного перемещения гибкой колонны в пределах прорези 9 и внедрения этой колонны в породы продуктивного пласта 1 в заданном направлении. Как только гидромониторная головка 6 колонны 5 достигает забоя прорези 9, начинается размыв канала в породах продуктивного пласта 1 с перемещением в канал колонны 5, При использовании пробойника после того, как последний упирается в забой, приступают к забивному внедрению колонны 5 в породу продуктивного пласта.</p> <p>После продвижения колонны 5 в породы продуктивного пласта на некоторую длину, достаточную для последующего поддержания выбранного направления, например на длину 1,5 м, прекращают подачу через гидромонитор 3 жидкости и продолжают внедрение '' колонны 5 в продуктивный пласт уже</p> <p>вне зависимости от работы гидромо-’</p> <p>нитора.</p> <p>Выбор направления вывода колонны 5 в вертикальной плоскости осуществляется путем изменения угла истечения в этой плоскости напорной струи 8, т.е. углом установки насадки в гидромониторе 3. Для этого на поверхности устанавливают насадку под заранее заданным углом, при этом и струя в забое прорези 9 истекает под заранее заданным углом, и под этим же углом формируется свод 10 прорези 9, в силу чего колонна 5 выводится под заранее заданным углом. При увеличенном радиусе изгиба гибкой колонны 5 над формируе- . мой прорезью 9 можно формировать дополнительную прорезь 11 с меньшим радиусом размыва.</p> <p>Приме р. Продуктивный пласт, представленный песками мощностью 2 м, вскрывают вертикальной скважиной 220 мм, которую обсаживают до кровли пласта с цементацией затрубного пространства. После этого вво/ дят в скважину колонну насосно-компрессорных труб 60 мм с гидромонитором на торце с насадкой, установленной горизонтально, а вдоль наоосно-компрессорных труб с возможностью перемещения относительно них размещают полиэтиленовый гибкий рукав диаметром 53 мм с пробойником на торце в виде конуса и с ударником, размещенным в рукаве и подвешенном на тросе. Вслед за этим при давлении воды 30 МПа производят размыв вертикальной щелевидной прорези шириной в среднем 60 мм с радиусом размыва 0,7 м. После образования начальной прорези высотой 0,4 м с помощью ударных нагрузок начинают перемещать рукав вниз и выводят его между сводом образованной прорези и работающей струей. Силу ударов снижают, приближая нагрузки к вибрационным, при этом рукав начинает перемещаться и &quot;протаскиваться&quot; работающей струей вдоль свода до забоя с внедрением пробойника в породы прискважинной зоны. После внедрение пробойника с рукавом на глубину 0,5 м в прискважинную зону прекращают размыв пород и усиливают ударные нагрузки, заглубляя рукав в породы на заданную длину.</p> <p>5</p> <p>1543081</p> <p>6</p><p> The invention relates to mining and geology and m. used primarily to create a radial - </ p> </ li> </ ul> <p> The invention relates to mining. business and geology and can be used mainly to create radial horizontal and inclined channels from the main trunk of a vertical well, for example, ^ when leaching minerals. </ p> <p> The purpose of the invention is to reduce the complexity. </ p> <p> FIGS. 1-3 show diagrams for outputting a flexible column from the main barrel at different deflection angles. </ p> <p> The method is as follows. The reservoir 1 is opened by a vertical well 2, in which a well monitor is placed </ p> <p> 2 </ p> <p> horizontal and inclined channels from the main trunk of a vertical well, for example, during leaching of minerals. The purpose of reducing the complexity. In the near-wellbore zone, a cavity is formed in the form of a slit-like slot (P) by washing out with a pressure jet of fluid. After the formation of P in the well serves a flexible column (GC). Change the direction of movement of the latter to radial using a diverter. Move the Ledger in the radial direction in the space between the arch formed by the P and the outflowing pressure jet. The latter is fed under pressure, § </ p> <p> sufficient to keep the Ledger in the specified space, 3 Il. </ p> <ul style = "list-style: none;"> <li> <p> 3, placed at the end of the tubing 4, along which the flexible production string 5 is located. The end of the flexible production string 5 can be equipped with a jetting head 6 or a special piercer for hammering in the string using a hammer. sub>; </ sub> the rope in the specified column 5. The downhole jet monitor 3 is provided with a guide diverter 7 located directly above the jetting nozzle. By rotating the hydromonitor 3, the jetting nozzle is positioned in a given azimuthal direction and a liquid is supplied to the pipes 4 under pressure, for example </ p> </ li> </ ul> <p> 5i, „&gt; 1543081 </ p> <p> 3 </ p> <p> 1543081 </ p> <p> 4 </ p> <p> water or water-air mixture, while the high-pressure jet 8, which erodes the rocks of the near-wellbore zone, is removed from the well by the method of direct flushing. By slowly lifting the well jet in the near-wellbore zone, a slit-shaped slot 9 is formed, which is located in the plane in which the axis of the well 2 lies. </ P> <p> Once formed. the vault of the slot 9, begins to move down the flexible production string 5, which, when interacting with the inclined surface of the diverter 7, is bent. Flexible column 5, for example a sleeve made of thick rubber, made of polyurethane, polyethylene, etc., is brought into the space between the roof 10 of the slit-shaped slot 9 and the pressure stream of fluid flowing from the nozzle of the jetting machine 3. Due to the significant pressure of the fluid in the jet 8, as well as the limited space between the roof 10 and the walls of the slot 9, the flexible column 5 moves into the slot 9 in the confined space between the roof 10, the walls and the stream 8 on the basis of the latter. flow speeds • the jet facilitates movement of the column 5 into the slot, as the fluid flow, as it were, drags the column towards the bottom, ie, jet 8 is a guiding element for the directional movement of the flexible column within slot 9 and the introduction of this column into rocks of the reservoir 1 in a given direction. As soon as the jetting head 6 of the column 5 reaches the bottom of the slot 9, the channel begins to erode in the rocks of the reservoir 1, moving into the channel of the column 5. </ p> <p> After advancing the column 5 into the reservoir rocks for a certain length sufficient to subsequently maintain the chosen direction, for example, 1.5 m long, the flow through fluid monitor 3 of the fluid is stopped and the introduction of the column 5 into the reservoir continues </ p > <p> regardless of how hydromo-’works </ p> <p> nitor. </ p> <p> The choice of the direction of the output of the column 5 in the vertical plane is carried out by changing the angle of discharge in this plane of the pressure jet 8, i.e. the installation angle of the nozzle in the monitor 3. To do this, install the nozzle at a predetermined angle on the surface, while the jet in the bottom of the slot 9 ends at a predetermined angle, and the arch 10 of the slot 9 is formed at the same angle, so that column 5 is output under predetermined angle. With an increased bend radius of the flexible column 5 over the formation-. my slot 9 can form an additional slot 11 with a smaller erosion radius. </ p> <p> Example p. The reservoir, represented by 2 m sands, is opened with a 220 mm vertical well, which is planted to the top of the reservoir with cementation of the annulus. After that, a 60-mm tubing string with a hydraulic monitor at the end with a horizontal nozzle installed into the well was inserted into the well, and a polyethylene flexible hose 53 mm in diameter with a punch at the end in the form of a cone and with a drummer placed in the sleeve and suspended on a cable. Following this, at a water pressure of 30 MPa, a vertical sipe of 60 mm in width with an erosion radius of 0.7 m is eroded. After the initial slot of 0.4 m in height has been formed, using the shock loads, the sleeve is moved downwards and out between the arch of the formed slot and running jet. The force of the blows is reduced, bringing the loads closer to the vibratory ones, while the sleeve begins to move and &quot; pull through &quot; working stream along the arch before slaughter with the introduction of the punch in the rocks near the wellbore zone. After the introduction of the punch with a sleeve to a depth of 0.5 m in the near-wellbore zone, the erosion of the rocks is stopped and the impact loads are intensified, the sleeve is buried to the rocks for a given length. </ P> <p> 5 </ p> <p> 1543081 </ p> <p> 6 </ p>

Claims (1)

Формула изобретенияClaim Способ вывода гибкой колонны из ствола скважины, включающий формирование в прискважинной зоне полости, подачу в скважину гибкой колонны с изменением направления перемещения ~ последней на радиальное в интервале указанной полости, от л и'ч а ю щ и й с я тем, что, с целью снижения трудоемкости, полость формируют в виде щелевидной прорези размывом напорной струей жидкости, а гибкую 5 колонну перемещают в радиальном направлении в пространстве между сводом сформированной прорези и истекающей напорной струей, при этом струю подают под давлением, достаточ· 10 ным для удержания гибкой колонны в указанном пространстве.The method of withdrawal of the flexible column from the wellbore, including the formation in the near-wellbore zone of the cavity, the flow into the well of the flexible column with a change in the direction of movement of the latter to the radial one in the interval of the cavity indicated, from the purpose of reducing the complexity, the cavity is formed in the form of a slit-shaped slot by washing out with a pressure jet of liquid, and the flexible 5 column is moved radially in the space between the arch of the formed slot and the flowing pressure jet, while the jet is supplied under pressure, 10 nym enough to hold the flexible column in the specified space. фиг.22 15430811543081
SU884362122A 1988-01-08 1988-01-08 Method of guiding mineral deposits SU1543081A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884362122A SU1543081A1 (en) 1988-01-08 1988-01-08 Method of guiding mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884362122A SU1543081A1 (en) 1988-01-08 1988-01-08 Method of guiding mineral deposits

Publications (1)

Publication Number Publication Date
SU1543081A1 true SU1543081A1 (en) 1990-02-15

Family

ID=21349098

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884362122A SU1543081A1 (en) 1988-01-08 1988-01-08 Method of guiding mineral deposits

Country Status (1)

Country Link
SU (1) SU1543081A1 (en)

Similar Documents

Publication Publication Date Title
US6915853B2 (en) Method and device for perforating a portion of casing in a reservoir
US4497381A (en) Earth drilling apparatus and method
US8925651B2 (en) Hydraulic drilling method with penetration control
US4319784A (en) Apparatus for water jet and impact drilling and mining
CN201367892Y (en) Pipe string structure of downhole hydraulic-jetting fracturing and acidizing tool of oil-gas well
US3439953A (en) Apparatus for and method of mining a subterranean ore deposit
RU166522U1 (en) DRILLING DRILL FOR DRILLING WITH SIMULTANEOUS CASE
SU1543081A1 (en) Method of guiding mineral deposits
EP2400112A1 (en) Producing hydrocarbon material from a layer of oil sand
US4508389A (en) Apparatus and method for hydraulically mining unconsolidated subterranean mineral formations
RU2754232C1 (en) Method for constructing an underground tunnel reservoir in a rock salt reservoir of limited capacity
CA1129446A (en) Method and apparatus for drilling and mining
RU2256796C1 (en) Method for extraction of mineral resources and device for realization of said method
RU2645059C1 (en) Method of rimose hydrosand-blast perforation
RU1793056C (en) Method of hole hydraulic mining of mineral resources from inclined seams
RU2268982C1 (en) Multilateral well building method
SU1099082A1 (en) Downhole suction dredger
SU1543080A1 (en) Method of guiding a flexible hose radially from well
SU617584A1 (en) Device for winning minerals through boreholes
RU2139465C1 (en) Method of trenchless laying of pipe lines on soil
CA1221085A (en) Earth drilling apparatus and method
SU1093813A1 (en) Deep-well hydraulic monitor unit
SU1506115A1 (en) Well hydraulic monitor device
SU1151674A1 (en) Method and apparatus for hydraulic mining of minerals through wells
SU1537815A1 (en) Device for winning materials from underground formation