SU1523688A1 - Method of operation of power-and-heat generating steam power plant - Google Patents
Method of operation of power-and-heat generating steam power plant Download PDFInfo
- Publication number
- SU1523688A1 SU1523688A1 SU884390693A SU4390693A SU1523688A1 SU 1523688 A1 SU1523688 A1 SU 1523688A1 SU 884390693 A SU884390693 A SU 884390693A SU 4390693 A SU4390693 A SU 4390693A SU 1523688 A1 SU1523688 A1 SU 1523688A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- water
- network
- heat
- power
- increase
- Prior art date
Links
Landscapes
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
Изобретение относитс к теплоэнергетики, может быть использовано на теплоэлектроцентрал х и позвол ет повысить эффективность работы и расширить регулировочный диапазон паротурбинной установки. Способ работы теплофикационной паротурбинной установки включает в себ охлаждение обратной сетевой воды сырой водой, химочистку и деаэрацию сырой воды, аккумулирование деаэрированной воды и смешение ее с основным потоком обратной сетевой воды. В период получени дополнительной мощности искусственно увеличивают против расчетного расход сетевой воды через сетевой подогреватель, аккумулируют избыточную ее часть, которую используют в качестве подпитки теплосети в период провала электрической нагрузки. Это позвол ет повысить эффективность работы установки, расширить ее регулировочный диапазон при работе по тепловому графику, т.е. при сохранении расчетного отпуска тепла потребител м. 1 ил.The invention relates to heat and power engineering, can be used at heat and power plants and allows to increase the efficiency of operation and extend the control range of a steam turbine plant. The method of operation of the steam-turbine cogeneration plant includes cooling the return network water with raw water, dry cleaning and deaerating the raw water, accumulating deaerated water and mixing it with the main flow of the return network water. During the period of obtaining additional power, artificially increase the calculated flow rate of the network water through the grid heater, accumulate its excess part, which is used as feed for the heating network during the period of failure of the electric load. This makes it possible to increase the efficiency of the installation, to expand its adjustment range when operating according to the heat schedule, i.e. while maintaining the estimated heat supply of the consumer m. 1 Il.
Description
Изобретение относитс к теплоэнергетике и может быть использовано на теплоэлектроцентрал х, обеспечивающих систему теплоснабжени с открытым водоразбором, на гор чее водоснабжение , и может оказатьс наиболее эффективным на теплоэлектроцентрал х, привлекаемых к регулированию электрического графика нагрузок в энергосистеме с сохранением отпуска теплоты потребител м без нарушени температурного графика.The invention relates to a power system and can be used at heat and power plants providing a heat supply system with an open water outlet, for hot water supply, and may be most effective at heat and power plants used to regulate the electrical load schedule in the power system while maintaining heat supply to consumers without disturbing the temperature graphics.
Целью изобретени вл етс повьш1е- ние эффективности и расширение регу- :лировочного диапазона паротурбинной установки.The aim of the invention is to increase the efficiency and expansion of the regulation: range of the steam turbine plant.
На чертеже представлена теплофикационна паротурбинна установка. The drawing shows a steam-turbine plant.
Установка включает турбину 1, в конденсаторе 2 которой размещен встроенный пучок 3, соединенный через водо-вод ной теплообменник 4 и химочистку 5 с вакуз ным деаэратором 6, сетевой подогреватель 7 с магистралью 8 пр мой сетевой воды и магистралью 9 обратной сетевой воды , на которой установлен водо-вод ной теплообменник 4,бак 10 запаса деаэрированной воды, подключенный через задвижки 11 к магистрали 9, и бак-аккумул тор 12 гор чей воды, под- ключенньп через задвижки 13 к магистрали 8 npHMOJi сетевой воды и через задвижки 14 к магистрали 9 обратной сетевой воды. Паротурбинна установка содержит насосы 15-18 и задвижки 19-25.The installation includes a turbine 1, in the condenser 2 of which a built-in bundle 3 is placed, connected through a water heat exchanger 4 and a dry cleaning 5 with a vacuum deaerator 6, a network heater 7 with a direct network supply line 8 and a return network supply line 9, on which A water-to-water heat exchanger 4 was installed, a deaerated water supply tank 10 connected through valves 11 to line 9, and a hot water storage tank 12 connected through valves 13 to network 8 nPHMOJi network water and through valves 14 to the line 9 reverse network th water. The steam turbine plant contains pumps 15-18 and valves 19-25.
СЛSL
юYu
Од G5Od g5
0000
Способ осуществл ют следующим образом.The method is carried out as follows.
Пар из турбины 1, работающей с минимальным пропуском пара в конденсатор 2, направл ют в сетевой подогреватель 7, где нагревают сетевую воду, подаваемую насосами непосредственно или через пиковьй водогрейный котел (не показан) в магистраль 8 пр мой сетевой воды. Догрев сетевой воды в пиковом водогрейном котле осуществл ют как обычно, когда температура сетевой воды на выходе из сетевого подогревател 7 ниже значени , требуемого температурным графиком отопительной нагрузки. Сырую воду дл подпитки теплосети и воспламенени внутристанционных потерь, предварительно нагретую во встроенном пучке 3, направл ют в водо-вод ной теплообменник 4, через который, проходит вс обратна сетева вода или ее. часть. Далее сырую воду направл ю на химочистку 5, откуда часть ее, предназначенную дл подпитки теплосети , направл ют в вакуумный деаэратор 6 подпитки теплосети и далее насосами 18 перекачивают в бак 10 запаса деаэрированной воды. Дл получени дополнительной мощности открывают задвилжи 11 и деаэрированную воду насосами 17 из бака 10 запаса деаэрированной воды в количестве, превышающем необходимьй расход дл подпитки теплосети, подают в магист- раль 9 обратной сетевой воды, в сетевой подогреватель 7, затем через открытые задви:ески 13 избыточное количество гор чей воды направл ют в бак-аккумул тор 12 гор чей воды, а расчетное количество сетевой воды после пикового водогрейного котла направл ют по. магистрали 8 пр мой сетевой воды к потребителю.Steam from turbine 1 running with minimal steam flow to condenser 2 is sent to mains heater 7, where mains water supplied by pumps is heated directly or through a peak hot-water boiler (not shown) to line 8 of the mains water. Heating of the network water in the peak hot-water boiler is carried out as usual when the temperature of the network water at the outlet of the network heater 7 is lower than the value required by the temperature schedule of the heating load. Raw water to feed the heat network and ignite internal losses, preheated in the embedded beam 3, is directed to a water-cooled heat exchanger 4, through which all the reverse network water passes or its. part. Next, the raw water is directed to the dry cleaning 5, from where a part of it intended to feed the heating network is sent to a vacuum deaerator 6 to feed the heating network and then pumps 18 to the tank 10 of the deaerated water supply. In order to obtain additional power, the backwaters 11 and deaerated water are opened by pumps 17 from the tank 10 of the deaerated water reserve in an amount exceeding the required flow rate to feed the heating network, are fed to the backflow main line 9, to the network heater 7, then through the open backboards: An excess amount of hot water is directed to the hot water storage tank 12, and the calculated amount of utility water after the peak hot water boiler is directed along. Highway 8 direct network water to the consumer.
В результате повышенного против расчетного расхода сетевой воды че0As a result, heightened vs. estimated consumption of network water
5 five
00
5five
рез основной сетевой подогреватель 7 снижаетс ее температура на выходе из сетевого подогревател 7 и повышаетс мощность установки.cutting the main network heater 7 reduces its temperature at the outlet of the network heater 7 and increases the capacity of the installation.
В период провала электрической нагрузки задвижки 11 и 13 закрывают, открывают задвинки 14, и гор чую воду, накопленную в баке-аккумул торе 12 в период получени дополни-, тельной мощности, насосами 16 в количестве , необходимом дл подпитки теплосети, подают в магистраль 9 обратной сетевой воды. В летний период задвижки 19, 20 и 25 закрыты, а задвижки 21 открыты. Получение дополнительной мощности достигают опи- санньм способом, а в период провала закрывают задвижки 11 и 13, открывают задвижки 14, гор чую воду из бака 12 подают в магистраль 9 обратной сетевой воды, а оттуда по об- водной линии сетевого подогревател 7, дл чего задвижки 23 и 24 закрывают , а задвижки 22 открывают, - в магистраль 8 пр мой сетевой водыDuring the period of failure of the electric load, the valves 11 and 13 close, open the valves 14, and the hot water accumulated in the storage tank 12 during the period of obtaining additional power, with the pumps 16 in the amount necessary to feed the heating network, is fed to the trunk 9 reverse network water. In the summer, valves 19, 20 and 25 are closed, and valves 21 are open. Additional power is obtained by the method described, and during the period of failure the valves 11 and 13 are closed, the valves 14 are opened, hot water from the tank 12 is fed to the return network water line 9, and from there along the bypass line of the network heater 7, gate valves 23 and 24 are closed, and gate valves 22 are opened, - to main 8, straight network water
и к потребителю, iand to the consumer, i
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884390693A SU1523688A1 (en) | 1988-03-10 | 1988-03-10 | Method of operation of power-and-heat generating steam power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884390693A SU1523688A1 (en) | 1988-03-10 | 1988-03-10 | Method of operation of power-and-heat generating steam power plant |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1523688A1 true SU1523688A1 (en) | 1989-11-23 |
Family
ID=21360593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884390693A SU1523688A1 (en) | 1988-03-10 | 1988-03-10 | Method of operation of power-and-heat generating steam power plant |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1523688A1 (en) |
-
1988
- 1988-03-10 SU SU884390693A patent/SU1523688A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР Ь 10908975 кл. F 01 К 3/00, 1982. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2007073008A2 (en) | Heat medium supply facility, composite solar heat electricity generation facility, and method of controlling the facilities | |
US5836162A (en) | Feedwater heater drain recycle system | |
JPS62325B2 (en) | ||
SU1523688A1 (en) | Method of operation of power-and-heat generating steam power plant | |
CN215259733U (en) | Dry-wet state undisturbed switching system suitable for supercritical unit under deep peak regulation state | |
RU2238414C1 (en) | Method for regulating electric power of combined-cycle heating unit incorporating exhaust-heat boiler | |
CN206724131U (en) | A kind of extraction for heat supply electric power station system of the decoupling of thermoelectricity completely | |
SU1183694A1 (en) | Method of load regulation of power-and-heat generating steam turbine plant with reduction-cooling device | |
SU1084472A1 (en) | Method of unloading power-and-heat generating steam turbine plant having staged heating of line water | |
SU1110912A1 (en) | Method for controlling electric power of heat supply steam turbine plant | |
SU1038497A1 (en) | Steam-turbine plant | |
CN220267793U (en) | Wide-load peak regulation system for auxiliary peak regulation of electrode boiler | |
SU1320463A1 (en) | Method of operating a maneuverable counter-pressure central-heating steam turbine plant | |
SU1353893A1 (en) | Method of operation of thermal steam-turbine plant with two-flow low-pressure cylinder | |
SU1212110A1 (en) | Method of operation of heat-supply turbine plant | |
RU175169U1 (en) | Device for automatically generating additional electrical power from turbines of type "T" | |
SU1150384A1 (en) | Method of heat supply to consumers | |
SU1090897A1 (en) | Method of operating steam-turbine plant | |
SU732562A1 (en) | Thermal utility plant | |
SU757754A1 (en) | Steam power plant | |
SU1476160A1 (en) | Method of operation steam turbine heat-and-power plant | |
SU1483051A1 (en) | Method of operation of power-and-heating plant | |
SU601528A1 (en) | Open hot-water supply system | |
SU566000A1 (en) | Method of controlling joint operation of a heating plant and a condensing plant | |
SU1150383A1 (en) | Steam power plant |