SU1486470A1 - Arrangement for building up crane tower - Google Patents

Arrangement for building up crane tower Download PDF

Info

Publication number
SU1486470A1
SU1486470A1 SU874261126A SU4261126A SU1486470A1 SU 1486470 A1 SU1486470 A1 SU 1486470A1 SU 874261126 A SU874261126 A SU 874261126A SU 4261126 A SU4261126 A SU 4261126A SU 1486470 A1 SU1486470 A1 SU 1486470A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rack
crane
tower
mounting rack
building
Prior art date
Application number
SU874261126A
Other languages
Russian (ru)
Inventor
Aleksandr E Tolpin
Lev A Nevzorov
Vitalij V Stepanov
Yurij E Levitskij
Nusen Z Tikh
Original Assignee
Sp Kt B Mekh Montazhnykh Rabot
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sp Kt B Mekh Montazhnykh Rabot filed Critical Sp Kt B Mekh Montazhnykh Rabot
Priority to SU874261126A priority Critical patent/SU1486470A1/en
Application granted granted Critical
Publication of SU1486470A1 publication Critical patent/SU1486470A1/en

Links

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Изобретение относится к подъемнотранспортному машиностроению, в частности к устройствам для монтажа башенных кранов ,The invention relates to hoisting machinery, in particular to a device for mounting tower cranes,

Цель изобретения - снижение металлоемкости путем уменьшения изги- 15 бающих усилий в стойке.The purpose of the invention is to reduce the metal consumption by reducing the bending forces in the rack.

На фиг. 1 изображено устройство для наращивания башни крана, вид сбоку; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - схема привода. 20In FIG. 1 shows a device for building a tower crane, side view; in FIG. 2 is a section AA in FIG. 1; in FIG. 3 is a drive diagram. 20

Устройство для наращивания башни крана состоит из монтажной стойки 1 , гидроцилиндра 2, полиспаста 3 перемещения верхней части башни крана и полиспаста 4 перемещения монтажной /5 стойки.A device for building a tower of a crane consists of a mounting rack 1, a hydraulic cylinder 2, a pulley 3 for moving the upper part of a tower of a crane and a pulley 4 for moving a mounting / 5 rack.

Монтажная стойка 1 имеет направляющие пояса 5 и выдвижные упоры 6, с помощью которых она закреплена в замках 7 на рядовой секции 8 башни. 30The mounting rack 1 has guide belts 5 and retractable stops 6, with which it is fixed in locks 7 on the ordinary section 8 of the tower. thirty

Полиспаст 8 перемещения верхней части крана расположен внутри монтажной стойки и имеет неподвижный блок 9 и отклоняющий блок 10, закрепленные в верхней части 1 1 монтаЖной стойки, блоки 12 и 13, расположенные на верхней штанге 14 каретки 15, передвигающейся по направляющим 16, и уравнительный блок 17, установленный на верхней части кра- до на 18. 'The slider 8 for moving the upper part of the crane is located inside the mounting rack and has a fixed block 9 and a deflecting block 10, mounted in the upper part 1 1 of the mounting rack, blocks 12 and 13 located on the upper rod 14 of the carriage 15, which moves along the guides 16, and the leveling block 17 mounted on the top of the hoop to 18. '

Оба конца 19 каната 20 закреплены на верхней части 11 монтажной стойки 1. Канат 20 проходит через блок 13 на каретке 15, неподвижный де(. блок 9, блок 12, отклоняющий блок 10, затем идет на уравнительный ; блок 17, а далее опять запасовывает·? ся на вышеперечисленные блоки, только в обратном порядке. 1 50Both ends 19 of the rope 20 are fixed on the upper part 11 of the mounting rack 1. The rope 20 passes through the block 13 on the carriage 15, motionless ( block 9, block 12, the deflecting block 10, then goes to the leveling block 17, and then again stores ·? On the above blocks, only in reverse order. 1 50

Полиспаст 4 перемещения монтажной стойки расположен также внутри монтажной стойки 1 и имеет неподвижный блок 21, отклоняющие блоки 22, 23, закрепленные в нижней части '24 моитажной стойки, блоки 25, 26, расположенные на нижней штанге 27 каретки 15, и уравнительный блок 28, уста- . новленный на верхней секции башни 18,.The strut 4 of the movement of the mounting rack is also located inside the mounting rack 1 and has a fixed block 21, deflecting blocks 22, 23, mounted in the lower part '24 of the supporting strut, blocks 25, 26 located on the lower rod 27 of the carriage 15, and the leveling block 28, usta-. updated on the upper section of tower 18 ,.

Канат 29 этого полиспаста закрепплен и запасован через блоки таким же образом, как и у полиспаста 3 перемещения верхней части крана.The rope 29 of this tackle is fixed and stored through the blocks in the same way as the tackle 3 moves the upper part of the crane.

Гидроцилиндр 2 расположен внутри монтажной стойки 1, его шток 30 закреплен на.верхней штанге 14 каретки 15 между двумя блоками 13 полиспаста 3 подъема верхней части крана, а корпус 31 - на верхней части 11 монтажной стойки 1.The hydraulic cylinder 2 is located inside the mounting rack 1, its rod 30 is mounted on the upper rod 14 of the carriage 15 between the two blocks 13 of the pulley 3 lifting the upper part of the crane, and the housing 31 is on the upper part 11 of the mounting rack 1.

. Насосная станция 32, подающая рабочую жидкость в гидроцилиндр 2, находится в нижней части монтажной стойки 1 .. Pump station 32, which supplies the working fluid to the hydraulic cylinder 2, is located in the lower part of the mounting rack 1.

1 Монтируемая секция 33 подается грузовой тележкой 34, передвигающейся по стреле 35 крана. 1 Mounting section 33 is served by a cargo truck 34, moving along the boom 35 of the crane.

Наращивание башни крана рядовыми секциями с помощью предлагаемого уст ройства происходит в следующей последовательности.The extension of the crane tower by ordinary sections with the help of the proposed device occurs in the following sequence.

Включением насосной станции 32 подают рабочую жидкость в полость гиД рощилиндра 2, шток 30 выдвигается, вместе с ним опускается вниз по направляющим 16 каретка I5. Расстояние между неподвижным блоком 9 и блоком 13 полиспаста 3 подъема верхней части башни увеличивается, наращиваемая часть крана с закрепленными на ней двумя уравнительными блоками 17 и 28 по направляющим поясам 5 монтажной стойки 1 поднимается вверх, образуется монтажный проем. В последний заводится монтируемая секция 33, которая устанавливается на нижележащую рядовую секцию 8 и-скрепляется с ней. Затем этим же полиспастом опускают верхнюю секцию башни 18 на вновь установленную рядовую секцию 33 и скрепляют их между собой.By turning on the pump station 32, the working fluid is fed into the cavity of the hydraulic cylinder 2, the stem 30 is extended, and with it lowers down along the guides 16 of the carriage I5. The distance between the fixed block 9 and the block 13 of the pulley 3 lifting the upper part of the tower increases, the expandable part of the crane with two leveling blocks fixed on it 17 and 28 along the guide belts 5 of the mounting rack 1 rises, an assembly opening is formed. In the latter, a mounted section 33 is started, which is installed on the underlying row section 8 and is fastened with it. Then, with the same pulley, lower the upper section of the tower 18 onto the newly installed row section 33 and fasten them together.

Дальнейшее наращивание башни происходит после открепления'выдвижных упоров 6 монтажной стойки 1 от предпоследней рядовой секции 8.Further building of the tower occurs after the detachable retractable stops 6 of the mounting rack 1 from the penultimate row section 8.

После этого включают насосную станцию 32, рабочая жидкость подается в штоковую полость гидроцилиндра 2, каретка 15 поднимается, рас5 стояние между блоками 25 и 26 и неподвижным 21 и отклоняющими 22, 23 • , полиспаста 4 подъема монтажной стойки увеличивается, монтажная стойка 1 передвигается вверх относительно башни крана до захода выдвижных упоров 6 в замки 7 вновь смонтированной секции 33.After that, the pump station 32 is turned on, the working fluid is supplied to the rod cavity of the hydraulic cylinder 2, the carriage 15 rises, the distance between the blocks 25 and 26 and the stationary 21 and the deflecting 22, 23 •, the pulley 4 of the mounting rack lifting increases, the mounting rack 1 moves upward relative to crane towers before the retractable stops 6 enter the locks 7 of the newly mounted section 33.

Таким образом, при наращивании башни крана работают попеременно оба полиспаста.Thus, when building the tower of the crane, both pulleys work alternately.

Claims (1)

Ф о р м ула изобретенияClaim Устройство для наращивания башни крана, содержащее монтажную стойку, смонтированную на боковой поверхности башни в направляющих с возможностью перемещения вдоль нее 20A device for building a tower of a crane containing a mounting rack mounted on the side surface of the tower in the rails with the ability to move along it 20 Л-Л и несущую верхнюю часть крана, перемещаемую вдоль стойки, и привод указанных перемещений, о т л и ч ас ю щ е е с я тем, что, с целью сни. о жения металлоемкости путем уменьшения изгибающих усилий в стойке, указанный привод выполнен в виде размещенных внутри монтажной стойки 10 двух полиспастов, канаты которых посредством уравнительных блоков соединены с верхней частью крана, неподвижные обоймы закреплены на противоположных концах стойки, а 15 подвижные - на каретке, смонтированной с возможностью перемещения вдоль стойки силовым цилиндром, причем корпус последнего шарнирно соединен с верхним концом стойки, а шток - с обоймой.L-L and the upper bearing part of the crane movable along the rack, and the drive of said displacement of t h a n and w u c e e c i in that, for the purpose SNI. To reduce the consumption of metal by reducing bending forces in the rack, the specified drive is made in the form of two pulley blocks located inside the mounting rack 10, whose ropes are connected to the upper part of the crane by means of equalizing blocks, fixed clips are fixed at opposite ends of the rack, and 15 movable clips are mounted on the carriage mounted with the possibility of moving along the rack with a power cylinder, the housing of the latter being pivotally connected to the upper end of the rack, and the rod with a clip. фиг.Зfig.Z
SU874261126A 1987-06-12 1987-06-12 Arrangement for building up crane tower SU1486470A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874261126A SU1486470A1 (en) 1987-06-12 1987-06-12 Arrangement for building up crane tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874261126A SU1486470A1 (en) 1987-06-12 1987-06-12 Arrangement for building up crane tower

Publications (1)

Publication Number Publication Date
SU1486470A1 true SU1486470A1 (en) 1989-06-15

Family

ID=21310509

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874261126A SU1486470A1 (en) 1987-06-12 1987-06-12 Arrangement for building up crane tower

Country Status (1)

Country Link
SU (1) SU1486470A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103958388A (en) * 2011-11-30 2014-07-30 比伯拉赫利勃海尔-维克股份有限公司 Apparatus for assembling or disassembling a crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103958388A (en) * 2011-11-30 2014-07-30 比伯拉赫利勃海尔-维克股份有限公司 Apparatus for assembling or disassembling a crane
CN103958388B (en) * 2011-11-30 2016-05-25 比伯拉赫利勃海尔-维克股份有限公司 For the device of installation or removal crane

Similar Documents

Publication Publication Date Title
RU2044687C1 (en) Method of and device for mounting guides in mine
CN109236331B (en) Steel arch trolley suitable for tunnel micro-step excavation method
SU1486470A1 (en) Arrangement for building up crane tower
US5765981A (en) Wire rope tensioning and reeving system for cargo container handling cranes
CN216238175U (en) Basket traveling system is hung in construction of bridge cantilever
CN213679511U (en) Crane convenient to move
CN112627043A (en) Installation device and method for composite cable saddle of narrow cavern of suspension bridge in mountainous area
SU1313950A1 (en) Supporting and hoisting arrangement for jack-up floating offshore rig
SU1569400A1 (en) Device for mounting tower structures
SU1126530A1 (en) Device for section-by-section change of height of tower crane
SU950669A1 (en) Arrangement for erecting supports
SU1567496A1 (en) Hoist
SU1296687A2 (en) Apparatus for driving pile
SU685804A1 (en) Mast erecting arrangement
CN214143337U (en) Installation device of composite cable saddle of narrow cavern of mountain suspension bridge
SU1299950A1 (en) Crane-manipulator
SU1625817A1 (en) Travelling tower crane
SU1472422A1 (en) Tower crane
SU1364589A1 (en) Construction hoist
SU1388382A1 (en) Tower crane
SU1404428A1 (en) Mine hoist
SU1344725A1 (en) Self-mounting tower crane
SU1252291A1 (en) Rope hauling installation
SU991694A1 (en) Equipment for hoisting department of mine shaft
SU1511363A1 (en) Ladder for servicing working platforms